M.V.
DAKSHINESHWAR
May-09 PAGE - 01 S.No 1 2 3 4 5 6 7 8 9 10 11 12 13 S.No 1 2 3 4 5 6 7 8 9 S.No 1 2 3 4 5 6 Alarms& Trips Lub.oil low pressure alarm Lub.oil low pressure shut down Camshaft lub.oil low pressure alarm Camshaft lub.oil low pressure shutdown JCW low pressure alarm JCW low pressure shutdown JCW high temperature alarm Piston cooling low pressure alarm Control air low pressure alarm Thrust bearing high temp. alarm Cyl. Exh. High temp. alarm C/case oil mist high alarm M/E emergency shutdown Alarms& Trips L.O.low pressure alarm L.O.low pressure shutdown JCW low pressure alarm JCW high temp. alarm JCW high temp. shutdown F.O low pressure alarm Rocker arm low pr. alarm L.O. high temp alarm Starting air low pr. Alarm Alarms& Trips Low water level alarm Low low water level alarm/ shutdown Flame failure alarm & trip F.O. low pr. alarm Steam high pressure alarm Burner auto cut in/ cut off MONTHLY ALARMS TEST Date Tried MAIN ENGINE 5/27/2009 5/27/2009 5/27/2009 5/27/2009 5/27/2009 5/27/2009 5/27/2009 5/27/2009 5/27/2009 5/27/2009 5/27/2009 5/27/2009 5/27/2009 AUXILIARY ENGINES A/E # 1 A/E # 2 5/9/2009 5/9/2009 5/9/2009 5/9/2009 5/9/2009 5/9/2009 5/9/2009 5/9/2009 5/9/2009 5/9/2009 5/9/2009 5/9/2009 5/9/2009 5/9/2009 Status OK OK OK OK OK OK OK OK OK OK OK OK OK A/E # 3 5/9/2009 5/9/2009 5/9/2009 5/9/2009 5/9/2009 5/9/2009 5/9/2009 STATUS OK OK OK OK OK OK OK OK OK REMARKS REMARKS
S.No Alarms& Trips 1 Phase failure alarm 2 Tank low level alarm 3 Emergency steering tryout
S.No Alarms& Trips 1 Cooliong water high temp. alarm/trip 2 L.O. low pressure alarm S.No Alarms& Trips 1 Chlorination tank low level cut off 2 Chlorination tank high level cut in 3 Chlorination tank high level alarm
AUXILIARY BOILER Date Tried Status 5/28/2009 OK 5/28/2009 OK 5/28/2009 OK 5/28/2009 OK 5/28/2009 OK 5/28/2009 OK STEERING GEAR Date Tried Status 5/26/2009 OK 5/26/2009 OK 5/26/2009 OK AIR COMPRESSORS Date last tested Main air Main air Topp. up Compr.#1 Compr.#2 Compr. 5/13/2009 5/13/2009 5/13/2009 5/13/2009 5/13/2009 5/13/2009 SEWAGE TREATMENT PLANT Date Tried Status 5/16/2009 OK 5/16/2009 OK 5/16/2009 OK
REMARKS
REMARKS
Control air Compr. 5/13/2009 5/13/2009
REMARKS OK OK REMARKS
PAGE - 02
S.No 1 2 3 4 5 S.No 1 2 S.No 1 2 3 4 S.No 1 2 3 S.No
1 2 3
EMERGENCY GENERATOR Date Tried 5/27/2009 5/27/2009 5/27/2009 5/27/2009 5/27/2009 OILY BILGE SEPARATOR Alarms& Trips Date Tried Oil content high alarm 5/23/2009 3-way valve change over to holding tank 5/23/2009 INCINERATOR Alarms& Trips Date Tried Flame failure alarm/ trip 5/22/2009 Exh temp high alarm/ trip 5/22/2009 Combustion chamber temp high alarm/ trip 5/22/2009 Low atomization air pr. Alarm 5/22/2009 FIRE & GENERAL ALARM SYSTEM Alarms& Trips Date Tried Fire alarms 5/30/2009 General alarms 5/30/2009 CO2 alarms 5/27/2009 MISCELLANEOUS ALARMS Alarms& Trips Date Tried E/R bilge high level alarms(port,st/bd,aft&M/E drain) 5/30/2009 Lifeboat davit limit switches(port&st/bd) 5/24/2009 Hospital alarm 5/30/2009 Alarms& Trips L.O. low pr. alarm / shutdown JCW high temp alarm/ shutdown Auto start Local start ( battery) Local start ( pneumatic)
Status OK OK OK OK OK Status OK OK Status OK OK OK OK Status OK OK OK Status OK OK OK
REMARKS PRE-AMSA
REMARKS
REMARKS
REMARKS
REMARKS
ELECTRICAL OFFICER
SECOND ENGINEER
CHIEF ENGINEER