L & T Infrastructure
Sample Case Study
Primavera
Project ID
VPRP
Name of Project
Vashi Panvel Road Project
Start date
01 March 2012
Contractual Duration
290 days
Page | 2
WBS
Lev el
1 2 3 3 4 4 2 3 4 4 5 3 4
Code
VPRP VPRP.1 VPRP.1.1 VPRP.1.2 VPRP.1.2.1 VPRP.1.2.2 VPRP.2 VPRP.2.1 VPRP.2.1.1 VPRP.2.1.2 VPRP.2.1.2. VPRP.2.2 VPRP.2.2.1
WBS Name
VASHI-PANVEL ROAD PROJECT PRE-CONSTRUCTION LAND HANDOVER DESIGN & DRAWINGS SUBMISSION APPROVAL CONSTRUCTION 0-10 Kms ROAD WORKS STRUCTURES FLYOVER 10-20 Kms ROAD WORKS
Page | 3
Activity List
VASHI-PANVEL ROAD PROJECT
A1300 A1310
NTP Project Finish
PRE-CONSTRUCTION
LAND HANDOVER
A1220 A1230 0-10 Kms 10-20 Kms
DESIGN & DRAWINGS SUBMISSION
A1240 A1250 A1260 Typical C/S drawings Plan & Profile drawing Flyover Typical C/S drawings Plan & Profile drawing Flyover
APPROVAL
A1270 A1280 A1290
CONSTRUCTION
0-10 ROAD WORKS
A1000 A1010 A1020 A1030 A1040 A1050 A1060 A1070 C&G Excavation Embankment Subgrade GSB WMM DBM BC
STRUCTURES FLYOVER
A1080 A1090 A1100 A1110 A1120 A1130 Piling Pile Cap Pier Pier Cap Girder Deck Slab Page | 4
ROAD WORKS
A1140 A1150 A1160 A1170 A1180 A1190 A1200 A1210 C&G Excavation Embankment Subgrade GSB WMM DBM BC
Page | 5
Predecessors
Activity ID A1300 A1310 Activity Name NTP Project Finish
Activity ID A1070 A1210 Activity Name BC BC Activity Name NTP Activity Name NTP Activity Name NTP Activity Name NTP Activity Name NTP Activity Name Typical C/S drawings Activity Name Plan & Profile drawing Activity Name Flyover Activity Name 0-10 Kms Typical C/S drawings Activity Name C&G Plan & Profile drawing Relationship Type FF FF Relationship Type SS Relationship Type SS Relationship Type SS Relationship Type SS Relationship Type SS Relationship Type SS Relationship Type SS Relationship Type SS Relationship Type SS SS Relationship Type SS SS Lag 0 0 Lag 0 Lag 0 Lag 0 Lag 0 Lag 0 Lag 15 Lag 15 Lag 15 Lag 15 10 Lag 10 25
A1220
0-10 Kms
Activity ID A1300
A1230
10-20 Kms
Activity ID A1300
A1240
Typical C/S drawings
Activity ID A1300
A1250
Plan & Profile drawing
Activity ID A1300
A1260
Flyover
Activity ID A1300
A1270
Typical C/S drawings
Activity ID A1240
A1280
Plan & Profile drawing
Activity ID A1250
A1290
Flyover
Activity ID A1260
A1000
C&G
Activity ID A1220 A1270
A1010
Excavation
Activity ID A1000 A1280
Page | 6
A1020
Embankment
Page | 7
Activity ID A1010
Activity Name Excavation Activity Name Embankment Activity Name Subgrade Activity Name GSB Activity Name WMM Activity Name DBM BC Deck Slab Activity Name Flyover Activity Name Piling Activity Name Pile Cap Activity Name Pier Activity Name Pier Cap Activity Name Girder
Relationship Type SS Relationship Type FF Relationship Type FF Relationship Type FF Relationship Type FF Relationship Type FF FF FF Relationship Type FS Relationship Type FF Relationship Type FF Relationship Type FF Relationship Type FF Relationship Type SS
Lag 5 Lag 10 Lag 10 Lag 15 Lag 10 Lag 5 -5 10 Lag -20 Lag 15 Lag 15 Lag 10 Lag 10 Lag 10
A1030
Subgrade
Activity ID A1020
A1040
GSB
Activity ID A1030
A1050
WMM
Activity ID A1040
A1060
DBM
Activity ID A1050
A1070
BC
Activity ID A1060 A1210 A1130
A1080
Piling
Activity ID A1290
A1090
Pile Cap
Activity ID A1080
A1100
Pier
Activity ID A1090
A1110
Pier Cap
Activity ID A1100
A1120
Girder
Activity ID A1110
A1130
Deck Slab
Activity ID A1120
A1140
C&G
Activity ID A1230 A1270 Activity Name 10-20 Kms Typical C/S drawings Relationship Type SS SS Lag 30 20
A1150
Excavation
Page | 8
Activity ID A1140 A1280
Activity Name C&G Plan & Profile drawing Activity Name Excavation Activity Name Embankment Activity Name Subgrade Activity Name GSB Activity Name WMM Activity Name DBM
Relationship Type SS SS Relationship Type SS Relationship Type FF Relationship Type FF Relationship Type FF Relationship Type FF Relationship Type FF
Lag 10 35 Lag 5 Lag 10 Lag 10 Lag 15 Lag 10 Lag 5
A1160
Embankment
Activity ID A1150
A1170
Subgrade
Activity ID A1160
A1180
GSB
Activity ID A1170
A1190
WMM
Activity ID A1180
A1200
DBM
Activity ID A1190
A1210
BC
Activity ID A1200
Resource List
Resource ID Resource Name Lev el UOM Price/uni t
Page | 9
Sc C&G EXV EMB SG GSB WMM DBM BC CN CNm3 CNm4 CNm4 RINF
Scope Cleaning & Grubbing Excavation Embankment Subgrade Granular Sub-Base Wet Mix Macadam Dense Bituminous Macadam Bituminous Concrete Concrete Concrete M30 Concrete M40 Concrete M45 Reinforcement
1 2 2 2 2 2 2 2 2 2 2 2 2 2 m3 m3 m3 MT 7500 8000 8500 65000 hec m3 m3 m3 m3 m3 m3 m3 25000 50 110 115 400 1000 6500 8500
0 0 5
BOQ
0-10 Kms C&G 28Hec Piling
Page | 10
FLYOVER
Excavation Embankment Subgrade GSB WMM DBM BC
74000m3 275000m3 90000m3 52000m3 31500m3 18000m3 11200m3
Concrete M-35 Reinforcement Pile Cap Concrete M-35 Reinforcement Pier Concrete M-40 Reinforcement Pier Cap
600m3 54MT 375m3 39MT 225m3 36MT 420m3 105MT 1600m3 220MT 2150m3 275MT
10-20 Kms C&G Excavation Embankment Subgrade GSB WMM DBM BC 32Hec 77000m3 235000m3 84500cum 55000m3 32000m3 18400m3 11800m3
Concrete M-40 Reinforcement Girder Concrete M-45 Reinforcement Deck Slab Concrete M-45 Reinforcement