0% found this document useful (0 votes)
67 views11 pages

Sample Case Study: L & T Infrastructure

This document provides a summary of the Vashi-Panvel Road Project including key details like the start date, contractual duration, work breakdown structure (WBS), activity list with predecessors, resource list, and bill of quantities (BOQ) for elements like excavation, embankment, concrete, and reinforcement across two segments from 0-10kms and 10-20kms. The project involves construction of a new road and flyover with a planned start date of March 1, 2012 and contractual duration of 290 days.

Uploaded by

Shaibajit Mitra
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
67 views11 pages

Sample Case Study: L & T Infrastructure

This document provides a summary of the Vashi-Panvel Road Project including key details like the start date, contractual duration, work breakdown structure (WBS), activity list with predecessors, resource list, and bill of quantities (BOQ) for elements like excavation, embankment, concrete, and reinforcement across two segments from 0-10kms and 10-20kms. The project involves construction of a new road and flyover with a planned start date of March 1, 2012 and contractual duration of 290 days.

Uploaded by

Shaibajit Mitra
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 11

L & T Infrastructure

Sample Case Study


Primavera

Project ID

VPRP

Name of Project

Vashi Panvel Road Project

Start date

01 March 2012

Contractual Duration

290 days

Page | 2

WBS
Lev el
1 2 3 3 4 4 2 3 4 4 5 3 4

Code
VPRP VPRP.1 VPRP.1.1 VPRP.1.2 VPRP.1.2.1 VPRP.1.2.2 VPRP.2 VPRP.2.1 VPRP.2.1.1 VPRP.2.1.2 VPRP.2.1.2. VPRP.2.2 VPRP.2.2.1

WBS Name
VASHI-PANVEL ROAD PROJECT PRE-CONSTRUCTION LAND HANDOVER DESIGN & DRAWINGS SUBMISSION APPROVAL CONSTRUCTION 0-10 Kms ROAD WORKS STRUCTURES FLYOVER 10-20 Kms ROAD WORKS

Page | 3

Activity List
VASHI-PANVEL ROAD PROJECT
A1300 A1310
NTP Project Finish

PRE-CONSTRUCTION
LAND HANDOVER
A1220 A1230 0-10 Kms 10-20 Kms

DESIGN & DRAWINGS SUBMISSION


A1240 A1250 A1260 Typical C/S drawings Plan & Profile drawing Flyover Typical C/S drawings Plan & Profile drawing Flyover

APPROVAL
A1270 A1280 A1290

CONSTRUCTION
0-10 ROAD WORKS
A1000 A1010 A1020 A1030 A1040 A1050 A1060 A1070 C&G Excavation Embankment Subgrade GSB WMM DBM BC

STRUCTURES FLYOVER
A1080 A1090 A1100 A1110 A1120 A1130 Piling Pile Cap Pier Pier Cap Girder Deck Slab Page | 4

ROAD WORKS
A1140 A1150 A1160 A1170 A1180 A1190 A1200 A1210 C&G Excavation Embankment Subgrade GSB WMM DBM BC

Page | 5

Predecessors
Activity ID A1300 A1310 Activity Name NTP Project Finish
Activity ID A1070 A1210 Activity Name BC BC Activity Name NTP Activity Name NTP Activity Name NTP Activity Name NTP Activity Name NTP Activity Name Typical C/S drawings Activity Name Plan & Profile drawing Activity Name Flyover Activity Name 0-10 Kms Typical C/S drawings Activity Name C&G Plan & Profile drawing Relationship Type FF FF Relationship Type SS Relationship Type SS Relationship Type SS Relationship Type SS Relationship Type SS Relationship Type SS Relationship Type SS Relationship Type SS Relationship Type SS SS Relationship Type SS SS Lag 0 0 Lag 0 Lag 0 Lag 0 Lag 0 Lag 0 Lag 15 Lag 15 Lag 15 Lag 15 10 Lag 10 25

A1220

0-10 Kms
Activity ID A1300

A1230

10-20 Kms
Activity ID A1300

A1240

Typical C/S drawings


Activity ID A1300

A1250

Plan & Profile drawing


Activity ID A1300

A1260

Flyover
Activity ID A1300

A1270

Typical C/S drawings


Activity ID A1240

A1280

Plan & Profile drawing


Activity ID A1250

A1290

Flyover
Activity ID A1260

A1000

C&G
Activity ID A1220 A1270

A1010

Excavation
Activity ID A1000 A1280

Page | 6

A1020

Embankment

Page | 7

Activity ID A1010

Activity Name Excavation Activity Name Embankment Activity Name Subgrade Activity Name GSB Activity Name WMM Activity Name DBM BC Deck Slab Activity Name Flyover Activity Name Piling Activity Name Pile Cap Activity Name Pier Activity Name Pier Cap Activity Name Girder

Relationship Type SS Relationship Type FF Relationship Type FF Relationship Type FF Relationship Type FF Relationship Type FF FF FF Relationship Type FS Relationship Type FF Relationship Type FF Relationship Type FF Relationship Type FF Relationship Type SS

Lag 5 Lag 10 Lag 10 Lag 15 Lag 10 Lag 5 -5 10 Lag -20 Lag 15 Lag 15 Lag 10 Lag 10 Lag 10

A1030

Subgrade
Activity ID A1020

A1040

GSB
Activity ID A1030

A1050

WMM
Activity ID A1040

A1060

DBM
Activity ID A1050

A1070

BC
Activity ID A1060 A1210 A1130

A1080

Piling
Activity ID A1290

A1090

Pile Cap
Activity ID A1080

A1100

Pier
Activity ID A1090

A1110

Pier Cap
Activity ID A1100

A1120

Girder
Activity ID A1110

A1130

Deck Slab
Activity ID A1120

A1140

C&G
Activity ID A1230 A1270 Activity Name 10-20 Kms Typical C/S drawings Relationship Type SS SS Lag 30 20

A1150

Excavation
Page | 8

Activity ID A1140 A1280

Activity Name C&G Plan & Profile drawing Activity Name Excavation Activity Name Embankment Activity Name Subgrade Activity Name GSB Activity Name WMM Activity Name DBM

Relationship Type SS SS Relationship Type SS Relationship Type FF Relationship Type FF Relationship Type FF Relationship Type FF Relationship Type FF

Lag 10 35 Lag 5 Lag 10 Lag 10 Lag 15 Lag 10 Lag 5

A1160

Embankment
Activity ID A1150

A1170

Subgrade
Activity ID A1160

A1180

GSB
Activity ID A1170

A1190

WMM
Activity ID A1180

A1200

DBM
Activity ID A1190

A1210

BC
Activity ID A1200

Resource List
Resource ID Resource Name Lev el UOM Price/uni t

Page | 9

Sc C&G EXV EMB SG GSB WMM DBM BC CN CNm3 CNm4 CNm4 RINF

Scope Cleaning & Grubbing Excavation Embankment Subgrade Granular Sub-Base Wet Mix Macadam Dense Bituminous Macadam Bituminous Concrete Concrete Concrete M30 Concrete M40 Concrete M45 Reinforcement

1 2 2 2 2 2 2 2 2 2 2 2 2 2 m3 m3 m3 MT 7500 8000 8500 65000 hec m3 m3 m3 m3 m3 m3 m3 25000 50 110 115 400 1000 6500 8500

0 0 5

BOQ
0-10 Kms C&G 28Hec Piling
Page | 10

FLYOVER

Excavation Embankment Subgrade GSB WMM DBM BC

74000m3 275000m3 90000m3 52000m3 31500m3 18000m3 11200m3

Concrete M-35 Reinforcement Pile Cap Concrete M-35 Reinforcement Pier Concrete M-40 Reinforcement Pier Cap

600m3 54MT 375m3 39MT 225m3 36MT 420m3 105MT 1600m3 220MT 2150m3 275MT

10-20 Kms C&G Excavation Embankment Subgrade GSB WMM DBM BC 32Hec 77000m3 235000m3 84500cum 55000m3 32000m3 18400m3 11800m3

Concrete M-40 Reinforcement Girder Concrete M-45 Reinforcement Deck Slab Concrete M-45 Reinforcement