Primavera P6 EPPM Administrator
Primavera P6 EPPM Administrator Training (R8.1+)
Duration: 1-day (on-site or on-line) Prerequisite: Previous experience with any version of Primavera P6 EPPM or Professional (as an administrator) an advantage but not essential. Course Description With the release of Oracle Primavera P6 EPPM 8.1, the administrative functionality for the system moved out of the P6 Professional client and into the web based EPPM system. If youre new to P6 EPPM or are migrating from a Professional client P6 system to EPPM 8.1+, this course is ideal for getting up and running fast using the new web based administration tools. This class is an instructor lead course offered on-site or online. Whatever delivery method you choose, you are provided with access to a Primavera P6 EPPM R8.2 training environment to use as a sandbox for safely practicing the techniques of P6 administration. You are also provided with a comprehensive training manual that will also function as a reference guide and aide memoir as you begin to work with your P6 EPPM production system.
Course
Outline
Chapter 1 - Introduction
About this training
Chapter 2 - Working with Data Structures
Working with the OBS Understanding the Enterprise Project Structure (EPS) Modifying the EPS Creating a New EPS Node Responsible Manager Assignment Managing and using Project Templates
Chapter 3 - Working with Enterprise Data
The Enterprise Data Page Categories of Enterprise Data Global Settings Timesheet Periods Project, Activity and Resource Codes Working with Project User Defined Fields (UDFs)
Chapter 4 Adding Users
P6 EPPM User Overview Adding a New User to P6 User Interface Views
Chapter 5 - Resource Administration
Working with Roles Role Teams Adding Resources Resource Teams (Global or User) Setting Resources for Progress Reporter Timesheets
Chapter 6 - Global Dashboards and Views
Creating and Managing Dashboards Modifying Existing Dashboards
Chapter 7 - Understanding the Data Date
The P6 Data Date
Chapter 8 - Managing Services
Global Scheduled Services Application Settings Page Services Project Preferences Project Scheduled Services Apply Actuals Schedule Service Summarize Service Leveling Service
Chapter 9 - Application Settings
Data Limits Earned value General ID Lengths Services Timesheets Time Periods
Chapter 10 Project Portfolios
Creating a Portfolio Filtered Portfolios Assigning a Portfolio to the Dashboard
Chapter 11 Common Maintenance Items
Environmental Issues Web Browser Settings Java Issues Virus Protection Software Users Locked out of P6 Progress Reporter and Timesheet Issues Other common items that generate helpdesk requests
Chapter 12 Appendix A Portlets Index
A guide to configuring the Dashboard portlets (bonus chapter reference material)
To learn more about this class, please contact Ten Six Consulting (703) 910-2600 or email us at [email protected]