PPAP Checklist
PPAP Checklist
The following guideline / checklist shall be used for PPAP level 1-5 submissions. PPAP packages should be submitted for
approval to the appropriate ASDE / SDE 10 days prior to PPAP required date if not level 1 approved by ACH. All references to
SCs and CCs also mean VSs and VCs for all programs launching for MY 07 and later.
The following guideline/checklist shall be used for PPAP level 1-5 submissions. PPAP packages should be submitted for approval to the
Supplier Supplier 10 days Customer
appropriate ASDE/SDE prior to PPAP required date if not level 1 approved by ACH. All references to SCs and CCs also mean VSs
Check (√) Approval Approvaland VCs PartforNumber:
all programs launching for MY 07 and later.
if Included Required Required Reason for Submission:
in PPAP Prior to PSW Prior to PSW
Binder Submission Submission PPAP Level:
PPAP Phase:
ACH PPAP Checklist (this document) as the table of contents
7. Dimensional Results
100% layout for 6 parts for a single line process minimum
100% layout for 6 parts for each cavity if the process has 2 cavities per tool minimum
100% layout for 3 parts for each cavity if the process has 3, 4 or 5 cavities per tool minimum
100% layout for 1 part for each cavity if the process has 6 or more cavities per tool minimum
YES N/A a. Tabular Summary Format (according to AIAG manual) - with 100 % in tolerance results
Note: Data cannot be older than one year
YES YES b. Any surrogate data must be approved by ACH's Supplier Performance office
Note: Number of layouts may be modified with approval from ACH. Attach approval
if applicable
SQF-013a ACH PPAP Checklist Hard Copies of this Document are Uncontrolled
Printed on 02/27/2009
Revision Date: October 1, 2008 Page 1 of 3
Supplier Supplier Customer
Check (√) Approval Approval Part Number:
if Included Required Required Reason for Submission:
in PPAP Prior to Prior to
Binder PSW PSW PPAP Level:
Submission Submission PPAP Phase:
NA YES 14. Appearance & Lighting Approval Report, (AAR) if applicable (per AIAG requirement)
16. Sample Product (Qty:_____) (specify how many samples to be sent to customer's plant
according to customer's plant direction)
17. Master Samples (Qty:_____) (specify how many master samples are retained at the
manufacturing site)
YES N/A 21. Run at Rate data from production trial run (as required by ASDE/SDE) (N/A for semi conductors)
CV (Capacity Verification) preliminary calculation - CV calculation sheet can be found in ASAMS.
SQF-013a ACH PPAP Checklist Hard Copies of this Document are Uncontrolled
Printed on 02/27/2009
Revision Date: October 1, 2008 Page 2 of 3
Revision History
3/16/2006 Release
7/31/2006 Updated Characteristics Analysis Form calculations.
2/14/2007 Separated PPAP checklist from ACH SPCA
3/29/2007 Maintenance change - corrected spelling & numbering.
10/15/2007 Added "PPAP Phase" to heading under "PAPP Level".
Added "PPAP Phase" at item 13c
10/1/2008 Item 5 Process Flow Diagrams - added "from start of
process" to ACH's manufacturing facility.
SQF-013a ACH PPAP Checklist Hard Copies of this Document are Uncontrolled
Printed on 02/27/2009
Revision Date: October 1, 2008 Page 3 of 3