Aggregate Planning Example
Aggregate Planning Example
Learning Objective: To take the first steps in translating forecasts for demand into a production plan.
Aggregate Planning: Attempts to match the supply of and demand for a product or service by determining the appropriate quantities and timing of inputs, transformation, and outputs. Decisions made on production, staffing, inventory and backorder levels. Characteristics of aggregate planning:
Considers a "planning horizon" from about 3 to 18 months, with periodic updating Looks at aggregate product demand, stated in common terms Looks at aggregate resource quantities, stated in common terms Possible to influence both supply and demand by adjusting production rates, workforce levels, inventory levels, etc., but facilities cannot be expanded.
Production Plan (manufacturing aggregate plan): A managerial statement of the period-by-period (time-phased) production rates, work-force levels, and inventory investment, given customer requirements and capacity limitations. Staffing Plan (service aggregate plan): A managerial statement of the period-by-period staff sizes and labour-related capacities, given customer requirements and capacity limitations.
Objectives of Aggregate Planning Objective of aggregate planning frequently is to minimize total cost over the planning horizon.
maximize customer service minimize inventory investment minimize changes in workforce levels minimize changes in production rates maximize utilization of plant and equipment
Attempts to handle fluctuations in demand by focusing on demand management Use pricing strategies and/or advertising and promotion Develop counter-cyclical products Request customers to backorder or advance-order Do not meet demand
Attempts to handle fluctuations in demand by focusing on supply and capacity management Vary size work force size by hiring or layoffs Vary utilization of labour and equipment through overtime or idle time Build or draw from inventory Subcontract production Negotiate cooperative arrangements with other firms Allow backlogs, back orders, and/or stockouts
Mixed strategy:
Combines elements of both an active strategy and a passive (reactive) strategy Firms will usually use some combination of the two
capacities (workforce levels, production schedules, output rates, etc.) are adjusted to match demand requirements over the planning horizon. Advantages:
anticipation inventory is not required, and investment in inventory is low labour utilization is kept high
Disadvantages:
expense of adjusting output rates and/or workforce levels alienation of workforce Level Approach Capacities (workforce levels, production schedules, output rates, etc.) are kept constant over the planning horizon.
Advantages:
Disadvantages:
greater inventory investment is required increased overtime and idle time resource utilizations vary over time
Aggregate Planning Methods: Intuitive Methods Intuitive methods use management intuition, experience, and rulesof-thumb, frequently accompanied by graphical and/or spreadsheet analysis. Advantage:
Disadvantage:
Aggregate Planning Example: Suppose you have the following forecasts for demand to meet: Month 1 2 3 4 5 6 Demand 1000 1200 1500 1900 1800 1600 Relevant Costs: Regular production cost Lost sales Inventory carrying costs Subcontracting costs Hiring costs Firing costs Beginning workforce level Capacity per worker Initial inventory level Closing inventory level $35/unit $100/unit $10/unit/month $60/unit $1500/worker $3000/worker 20 workers 50 units/month 700 units 100 units
LEVEL PRODUCTION STRATEGY Find the requirements for the period of the plan and produce the average amount needed per month to meet the plan. First determine the average requirements per month: Avg. requirements = total requirements - opening inv. + closing inv. number of periods Avg. requirements = (9000 - 700 + 100)/6 = 1400 units/period Steps:
1. 2. 3. 4.
Enter the production data Determine hire/fire to get to production level desired Update inventory levels Does the inventory run out - If it does recalculate average production needed and go to step 1 5. Calculate totals for each category 6. Calculate costs LEVEL STRATEGY Period Req. Prod. Inv.(700) Hire Fire Sub. 1 1000 2 1200 3 1500 4 1900 5 1800 6 1600 Total 9000
Costs: 1. Regular production costs: 2. Inventory carrying costs: 3. Hiring Costs: TOTAL COSTS: _________ CHASE STRATEGY
Produce exactly what is required every period. Hire and fire to adjust monthly production to monthly requirements. The first and last period production levels are adjusted to account for opening inventory and closing inventory requirements.
Period Req.
1 1000
2 1200
3 1500
4 1900
5 1800
6 1600
Total 9000
Prod. Inv.(700) Hire Fire Sub. Costs: 1. 2. 3. 4. Regular production costs: Inventory carrying costs: Hiring Costs: Firing Costs:
Intuitive (Mixed) Strategy - Trial and Error to find a good solution - Use Excel to model the problem and test the impact of different solutions - Build the model using proper structure with key variables at the top and a summary of key results immediately below. Finding Optimal Solutions Using Linear Programming - Aggregate planning problems can be solved optimally using linear programming (LP). - Given the constraints on requirements, production capabilities, allowed workforce changes, overtime and subcontracting limits plus all relevant costs LP will find an optimal solution to the problem which minimizes total costs. -Excel's Solver add-in will perform LP
Back to Index