Capacity Verification
Capacity Verification
1 2 3 7 8
Part Number Part Description KTTM Annual Capacity Planning Volume pcs/year Process Step Process Description Units hours shifts days weeks hours % pcs/hour % % pcs/hour pcs/year % X hour pcs pcs % pcs pcs/ hour pcs/ hour hour text % X STEP 1 120 STEP 2
4 5 6
Run@Rate Date Supplier Name Supplier Location STEP 3 STEP 4 STEP 5 STEP 6
9 10 11 12 13 14
Working hours/shift Shifts/ day Days/ week Weeks/ year Total hours/year (9*10*11*12) % of line for KTTM parts (Allocation %) Quoted Production Rate (part # item 1) Quoted % scrap Quoted % line efficiency Adjusted production rate (15*(1-16)*17) Available capacity (15*14*(1-16)*17)*13 Utilization % (3/19) Bottleneck operation Trial run duration Total parts produced Number of bad parts First time capability % ((23-24)/24)*100 Number of good parts (23-24) Net output (26/22) Takt Time Rate (Target) (3/13*14) Downtime Reason
15 16 17 18 19 20 21 22 23 24 25 26 27 28 29
30 31 32
34
SUMMARY
35
The RUN@RATE results are acceptable and meet KTTM capacity planning volume requirements:
33
The attached capability study results meet KTTM requirements: Corrective actions are required: New production readiness trial run is required: Date: Date:
Status Acceptable
36
Auditor signature:
D20.503.B0
February 11 2004
30301458B Inflator retainer bracket pcs/year Process Step Process Description Units hours shifts days weeks hours % pcs/hour % % pcs/hour pcs/year % X hour pcs pcs % pcs pcs/ hour pcs/ hour hour text % X 28.1% 700,000 STEP 1 Stamp Part 7.5 3 5 48 5400 100% 720.0 2% 97% 684 3,695,933 19% 2.00 929 5 99.46% 924 462 130 STEP 2 CNC #1
4 5 6
Run@Rate Date Supplier Name Supplier Location STEP 3 CNC #2 STEP 4 Weld Fasteners 7.0 3 5 48 5040 100% 164.0 5% 95% 148 745,970 94% 2.00 290 4 98.62% 286 143 139 7.0 3 5 48 5040 100% 240.0 9% 92% 201 1,012,677 69% 1.25 252 12 95.24% 240 192 139
February 14, 2004 Acme Machining Cleveland, OH STEP 5 Paint 10.5 1 5 48 2520 50% 1200.0 5% 95% 1,083 1,364,580 51% 1.00 794 4 99.50% 790 790 556 STEP 6
9 10 11 12 13 14
Working hours/shift Shifts/ day Days/ week Weeks/ year Total hours/year (9*10*11*12) % of line for KTTM parts (Allocation %) Quoted Production Rate (part # item 1) Quoted % scrap Quoted % line efficiency Adjusted production rate (15*(1-16)*17) Available capacity (15*14*(1-16)*17)*13 Utilization % (3/19) Bottleneck operation Trial run duration Total parts produced Number of bad parts First time capability % ((23-24)/24)*100 Number of good parts (23-24) Net output (26/22) Takt Time Rate (Target) (3/13*14) Downtime Reason
8.5 2 5 48 4080 87% 210.0 2% 94% 193 686,677 102% X 1.00 249 2 99.20% 247 247 197 0.5 Reprogramming 79.8%
15 16 17 18 19 20 21 22 23 24 25 26 27 28 29
30 31 32
97.1% X 34 SUMMARY
72.3%
70.3%
35
The RUN@RATE results are acceptable and meet KTTM capacity planning volume requirements:
33
The attached capability study results meet KTTM requirements: Corrective actions are required: New production readiness trial run is required: Date: Date: April 1, 2404 May 16, 2004
Status Acceptable
36
Tom Alison
Auditor signature:
Gerald Biggs
D20.503.B0
February 11 2004
RESPONSE
REQUIRED ACTION
COMMENTS
conditional Fax #
Tool Backup Builder Tool 70% FIRST Tool Backup Builder Tool Tool Backup Builder Tool ARE ALL OPERATIONS ABOVE TIME CAPABILITY?
IS SPC IN PLACE AND VISUAL NEAR PRODUCTION? HAS THE RAMP PLAN BEEN DISCUSSED AND VERIFIED? HAVE ALL OPEN 8-D'S AND DEVIATIONS BEEN REVIEWED? ARE MANUFACTURING INSTRUCTIONS IN PLACE AND VISUAL? HAS A CONTINGENCY PLAN BEEN DEVELOPED? ARE ALL CAPABILITY STUDIES ACCEPTABLE?
ITEM
14 15 16 17 18 19 20 21 22 23 24 25
RESPONSE
REQUIRED ACTION
RESPONSIBLE PARTY
COMMENTS
D20.503.B0
February 11 2004
Part Number
Characteristic or Specification
Average
Standard Deviation
PpK
1 2 3 4 5 6 7
Part Number
Note: If no USL/LSL, then leave cell blank Upper Specification Limit Lower Specification Limit
Characteristic or Specification
Average
Standard Deviation
PpK
1 2 3 4 5 6 7
Part Number
Note: If no USL/LSL, then leave cell blank Upper Specification Limit Lower Specification Limit
Characteristic or Specification
Average
Standard Deviation
PpK
1 2 3 4 5 6 7
Part Number
Note: If no USL/LSL, then leave cell blank Upper Specification Limit Lower Specification Limit
Characteristic or Specification
Average
Standard Deviation
PpK
1 2 3 4 5 6 7
Part Number
Note: If no USL/LSL, then leave cell blank Upper Specification Limit Lower Specification Limit
Characteristic or Specification
Average
Standard Deviation
PpK
1 2 3 4 5 6
D20.503.B0
February 11 2004
Part Number
Sample Size
30
Characteristic or Specification
Average
Standard Deviation
PpK
1 2 3 4 5 6 7
Sample Size
Note: If no USL/LSL, then leave cell blank Upper Specification Limit Lower Specification Limit
Characteristic or Specification
Average
Standard Deviation
PpK
1 2 3 4 5 6 7
Sample Size
Note: If no USL/LSL, then leave cell blank Upper Specification Limit Lower Specification Limit
Characteristic or Specification
Average
Standard Deviation
PpK
1 2 3 4 5 6 7
Sample Size
Note: If no USL/LSL, then leave cell blank Upper Specification Limit Lower Specification Limit
Characteristic or Specification
Average
Standard Deviation
PpK
1 2 3 4 5 6 7
Sample Size
Note: If no USL/LSL, then leave cell blank Upper Specification Limit Lower Specification Limit
Characteristic or Specification
Average
Standard Deviation
PpK
1 2 3 4 5 6
D20.503.B0
February 11 2004