Bearing 1 High Shaft Vibration, Ramagundam, 500 MW, 00-01 PDF

Shaft vibration at bearing No. 1 in a 500 MW turbine was ranging from 100 to 200 microns. To reduce vibration, control valve No. 4 was fully closed. The unit underwent major overhaul where it was found that the bearing side packers and yoke clearances were larger than designed. The bearing was replaced and clearances were adjusted as designed. Additional rectifications included adjusting roll check values, centering readings, and alignments. After completion, shaft vibration reduced to 40-50 microns and subharmonic vibration was absent, with all control valves open.

Uploaded by

sanjeevchhabra
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
433 views5 pages

Bearing 1 High Shaft Vibration, Ramagundam, 500 MW, 00-01 PDF

Shaft vibration at bearing No. 1 in a 500 MW turbine was ranging from 100 to 200 microns. To reduce vibration, control valve No. 4 was fully closed. The unit underwent major overhaul where it was found that the bearing side packers and yoke clearances were larger than designed. The bearing was replaced and clearances were adjusted as designed. Additional rectifications included adjusting roll check values, centering readings, and alignments. After completion, shaft vibration reduced to 40-50 microns and subharmonic vibration was absent, with all control valves open.

Uploaded by

sanjeevchhabra
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 5

FEED BACK NO.

11
PROTECT UNIT NO. SUBJECT RAMAGUNDAM STPP - 500 MW 4 HIGH SHAFT VTBRATIQN IN BEARING NO.l

PROBLEM REPORTED:

Shaft vibration of bearing No.l was in the range of 100 to 200 microns with sub-harmonic vibration ranging from 25 to 60 microns. To limit the shaft vibration, control valve no.4 was fully closed. Subharmonic vibration at bearing No.l was around 22 microns with control valve No.4 fully closed condition. Unit-4 was stopped on 20.03.2000 for major overhaul of HP, IP, IP, Generator and Turbine Stop / Control Valves. DEVIATIONS NOTICED AND RECTIFICATIONS CARRIED OUT:
DEVIATIONS Bearing No.1 side packers, Yoke key clearances found more than design values. Bearing No.1 babbit found loose in Ultrasonic test. Swing check value at journal No.1 was found 0.37 mm. RECTIFICATIONS Bearing No.1 was replaced with new one. All bearing side packer, Yoke clearances were maintained as per design values. Swing check value brought down to 0.12 mm by resorting to correction of HP-IP coupling face run outs. HP, IP Roll check values and centering readings were adjusted as per design values. Catenary of the shaft system brought to design limits by resorting to alignment adjustment of all the rotors. LP-GEN, alignment was readjusted.

HP-IP roll check values, centering readings found disturbed.

Catenery of total shaft system was not in order.

LP-GEN misalignment noticed.

During 1998 and 1999 vibration rectification attempts 1.50 mm to 1.80 mm shims were added underneath the pedestal no.l after coupling all rotors as recommended by KWU German Expert.

These shims were removed even the German KWU Expert opined to keep the shims again, if required.

The unit was attended for bearing no.1 shaft vibration problem earlier on two occasions (Overhaul) and HP cylinder checked for horn drop test also.

RESULT:

After completion of above rectification works. Unit was synchronized and fully loaded on 17.05.2000. Shaft vibration at bearing No.1 has come down to 40 to 50 microns and sub harmonic vibration is also absent. All the control valves are in open condition and there was no need felt to dose control valve No.4. NTPC-RSTPP has appreciated the efforts of BHELSAS/Secunderabad for resolving the vibration problem.

28

FEED BACK NO. 11


PROTECT UNIT NO. SUBJECT RAMAGUNDAM STPP - 500 MW 4 HIGH SHAFT VTBRATIQN IN BEARING NO.l

PROBLEM REPORTED:

Shaft vibration of bearing No.l was in the range of 100 to 200 microns with sub-harmonic vibration ranging from 25 to 60 microns. To limit the shaft vibration, control valve no.4 was fully closed. Subharmonic vibration at bearing No.l was around 22 microns with control valve No.4 fully closed condition. Unit-4 was stopped on 20.03.2000 for major overhaul of HP, IP, IP, Generator and Turbine Stop / Control Valves. DEVIATIONS NOTICED AND RECTIFICATIONS CARRIED OUT:
DEVIATIONS Bearing No.1 side packers, Yoke key clearances found more than design values. Bearing No.1 babbit found loose in Ultrasonic test. Swing check value at journal No.1 was found 0.37 mm. RECTIFICATIONS Bearing No.1 was replaced with new one. All bearing side packer, Yoke clearances were maintained as per design values. Swing check value brought down to 0.12 mm by resorting to correction of HP-IP coupling face run outs. HP, IP Roll check values and centering readings were adjusted as per design values. Catenary of the shaft system brought to design limits by resorting to alignment adjustment of all the rotors. LP-GEN, alignment was readjusted.

HP-IP roll check values, centering readings found disturbed.

Catenery of total shaft system was not in order.

LP-GEN misalignment noticed.

During 1998 and 1999 vibration rectification attempts 1.50 mm to 1.80 mm shims were added underneath the pedestal no.l after coupling all rotors as recommended by KWU German Expert.

These shims were removed even the German KWU Expert opined to keep the shims again, if required.

The unit was attended for bearing no.1 shaft vibration problem earlier on two occasions (Overhaul) and HP cylinder checked for horn drop test also.

RESULT:

After completion of above rectification works. Unit was synchronized and fully loaded on 17.05.2000. Shaft vibration at bearing No.1 has come down to 40 to 50 microns and sub harmonic vibration is also absent. All the control valves are in open condition and there was no need felt to dose control valve No.4. NTPC-RSTPP has appreciated the efforts of BHELSAS/Secunderabad for resolving the vibration problem.

28