Pending Punch Point OF ROHTAK BSC Sl No Test Case No. Test Case Port for CBC-Not Shown 1 Part B.9
2 PARTC 5.4
Remarks Letter provided As at time of AT not to much traffic present so it can show by make 7 call at a Traffic per TRX with AMR (Erlang) time Lb interface for SMLC Letter provided Intra BSC Handover no comercial site to show Already shown by text message,but person want video mms MMS not shown From BSNL we have get now Redundancy Test -Link only 1 Redundancy STM out of 2 Redundancy not shown Letter provided LBS Letter provided CBC Currently BSC in TDM,so SS7 shown SIGTRAN Not Shown Allocation of TC Resource Pools BSC using INNER TC
3 PARTC 5.5
4 PART C 8 5 PART C11 6 PART C12 7 PART C19 8 PART C17
<>
13 , 1
ZTE
Proprietary Confidential
How can be cleare letter provided
need to gather 7 subscriber in test BTS letter provided Now can show as site swap already started
can show only on one STM,second STM redundancy not provided letter provided letter provided letter required letter required
<>
13 , 2
ZTE
Proprietary Confidential
GURGAON BSC Sl No Test Case No. Test Case Port for CBC-Not Shown 1 2 3 4 5 6 7 Part B.9
Remarks Letter provided
How can be cleare letter provided
Lb interface for SMLC Letter provided Intra BSC Handover no comercial site to show mms not success PARTC 5.4 MMS not shown Letter provided PARTC 5.5 LBS Letter provided PART C11 CBC Currently BSC in TDM,so SS7 shown only PART C12 SIGTRAN Not Shown PART C19 Allocation of TC Resource PoolsBSC using INNER TC NOT SHOWN PART C9 ii) iii) Infrastructure Alarm
letter provided now can show can be show Letter provided Letter provided letter required letter required Need one Power engineer to integrate ala
<>
7/26/2013
13 , 3
ZTE
Proprietary Confidential
ngineer to integrate alarm with RNC
<>
7/26/2013
13 , 4
ZTE
Proprietary Confidential
Sl No
Test Case No.
Test Case
Remarks Letter Provided Done by simulation,pending from BSNL end
2 Dynamic adding of Sigtran Sigtran 37 PART C9 ii)
iii) Infrastructure Alarm
<>
7/26/2013
13 , 5
ZTE
Proprietary Confidential
NO PUNCH POINT LEFT
<>
13 , 6
ZTE
Proprietary Confidential
Sl No
Test Case No.
Test Case
Remarks
1 PART_B -9
2 PART_C -1
Annexure -I all Transmission media between Point given as Punchpoint Network Elements One Extra Shelf Hardware conformity for all of RNC equipments including tools, present,with spares, testers and valid extra Card licensed software for Infra alarm not reflecting from ZTE PP NTR Clock not synchronized
3 PART-C -5-iii)
Infrastructure Alarm
4 PART-C -9
Clock Synchronization
5 PART-C -10.4
NOT Shown Intra RNC Handover Check of LBS/SMLC Service NOT Shown
Check of Cell Broad Casting Service
6 PART-C -10.8
7 PART-C -10.9
NOT Shown
Check that it is possible to display number of calls and occupancy for a given group NOT Shown of circuit/devices/Links Report on status and congestion condition on common control devices and NOT Shown processors.
8 PART-C -11
9 PART-D -2
10 PART-D -3
Report on presence status of the system or designating equipment such as trunk free, NOT Shown
11 PART-D -10
NOT Shown Performance report of Data
Performance report of Handover
12 PART-D -11
NOT Shown
<>
13 , 7
ZTE
Performance report of voice traffic
Proprietary Confidential
13 PART-D -12
NOT Shown
<>
13 , 8
ZTE
Proprietary Confidential
How can be cleare
Need one Power engineer to integrate alarm with RNC
No Commercial NodeB
Letter provided
Letter provided
<>
13 , 9
ZTE
Proprietary Confidential
<>
13 , 10
ZTE Sl No Test Case No. Test Case Remarks
Proprietary Confidential
1 PART_B -9
Annexure -I all Transmission media between Point given as Punchpoint Network Elements
Hardware conformity for all equipments including tools, spares, testers and valid licensed software for operating systems
2 PART_C -1
One Extra Shelf of RNC present,with extra Card NTR Clock not synchronized NOT Shown NOT Shown NOT Shown
3 4 5 6
PART-C PART-C PART-C PART-C
-9 Clock Synchronization -10.4 Intra RNC Handover -10.8 Check of LBS/SMLC Service -15 Check of support of IPv6
Report on status and congestion condition on junctions and trunks. Report on status and congestion condition on common control devices and processors.
7 PART -D 1
NOT Shown
8 PART -D 2
NOT Shown
9 PART -D 3
Report on presence status of the system or designating equipment such as trunk free, blocked, input/output device in use or blocked. NOT Shown
10 PART-D-10 11 PART-D-11 12 PART-D-12
Performance report of Data Performance report of Handover Performance report of voice traffic
Data Resource Timeslot Utility Rate report-Not NOT Shown NOT Shown
<>
13 , 11
ZTE How can be cleare
Proprietary Confidential
No Commercial NodeB Letter provided
<>
13 , 12
ZTE
Proprietary Confidential
Sl No
PartA 1 Check for 1 dimension of 2.Lb interface 2 for SMLC. 3.Intra BSC 3 Handover .
Test Case No. Remarks
As per PO & vetted BOM Certificate for latest/ 2.Letter provided by CMTS Planning, need to show to T&D 3.no comercial site to show.
How can be cleare
In PO there is no option for Dimension Can Close in Re-AT, Need to Re-offer Now can show
6.LBS & CBC. 6.Letter Required Power engineer required
Infrastructure Need to extend alarm from ZTE PP 5 alarm
<>
13 , 13