Silt Removal for SHP Projects

The document discusses the design of desilting tanks for small hydropower projects. It provides information on components of small hydropower schemes and types of desilting arrangements. The key parameters considered in designing desilting tanks are discussed, such as settling velocity, horizontal flow velocity, particle size to be removed. An example calculation for sizing a desilting tank is presented based on these parameters.

Uploaded by

tarang001
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
1K views4 pages

Silt Removal for SHP Projects

The document discusses the design of desilting tanks for small hydropower projects. It provides information on components of small hydropower schemes and types of desilting arrangements. The key parameters considered in designing desilting tanks are discussed, such as settling velocity, horizontal flow velocity, particle size to be removed. An example calculation for sizing a desilting tank is presented based on these parameters.

Uploaded by

tarang001
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 4

4/27/2011

SHORTTERMTRAININGPROGRAMME SiltRemovalandResistiveMaterialforSHP Projects


High head scheme

TYPEOFSCHEME

Medium head scheme

Design of Desilting Tank

Low head scheme

Dr.SKSingal
ALTERNATEHYDROENERGYCENTRE INDIANINSTITUTEOFTECHNOLOGY,ROORKEE Email:[email protected]
April 26, 2011

4/27/2011

COMPONENTSOFSMALLHYDROPOWERSCHEME
DiversionandIntakestructure Desilting chamber WaterconductorsystemForebay/balancingreservoir Penstock Surgetank Powerhouse T bi generator Turbine, t and dcontrols t l TailRace Switchyard

DESIGNOFCIVILWORKSCOMPONENTS

DESILTINGARRANGEMENTS
Preventive : The entry of sediment checked before its entry into the head regulation. These are constructed in the streams. streams Curative:Thesedimentisexcludedfromthechannelafter itsentrywiththechannel.Theseareconstructedinthe channel.

Thesizesofcivilworksaregovernedbydischarge(Q) dischargeisworkedoutbasedoncapacityandhead
P = gQH

Where, P g H installedcapacity(kW) accelerationduetogravity(m/s2) head(m) combinedefficiencyofmachines

4/27/2011

DESILTINGTANK

SETTLINGVELOCITYFORQUARTZGRAIN(RUBEY)

Thedesilting tankisdesignedconsideringfollowingparameters:

Siltparticlesizecoarserthan0.2 0.5mmaretoberemoved. Horizontalvelocity(Vh) 0.30 0.60m/s Settlingvelocity(Vf) 0.024 0.06m/s Crosssectionalareaofthetanki.e.Width(b)xdepth(d)= Q Lengthoftank= hVh Vf

Vh

DESILTINGTANK

4/27/2011

DESILTINGTANK DESIGNCALCULATIONS
Designdischarge = = FlowVelocity (Vh) Particlesizetoberemoved = Settlingvelocity(Vf) = Width(b)xdepth (d)= Letdepth Width(b) = = 8.00m3/s 0.4m/s 0.2mm&above 24 2.4 cm/sec Q

Vh
2.5m 8.0m hVh Vf

Lengthoftank=

= 41.67m Increaselengthby20%toarrestallthesiltparticleshavingsize0.2mmandabove Expansiontransitionslope<12.50 Contractiontransitionslope<300

DESILTINGTANKSIZING