ITEM
AMOUNT
606,144.00
606,144.00
#REF! #REF!
unit
Qty
Unit Price
Amount
75.00 37.50
m3
33.75
m3
67.50
33.75
m3
67.50
m3
60.00
m3
110.20
255.00
1.9
Hard basaltic or equivalent stone hard core well rolled consolidated and blinded with crushed stone to a finished 1.10 thickness of 25 cm Total carried to summary 2. CONCRETE WORK 5cm thick lean concrete in class C-10 with minimum 3 2.1 cement content of 240 kg/m under RC Beam. Reinforced concrete in class C-25 with minimum cement content of 360 kg/m3 filled in to form work and vibrated around reinforcement bar. (form work and reinforcement 2.2 bar measured separately). a. In RC beam (30 x 25) b. Manhole beam c. In 50 cm thick concrete floor slab. d. in mass concrete base Provide, cut and fix in position Wooden or metal form 2.3 work for: a. Beams b. Floor slab Provide and place steel reinforcement bars according to structural drawings. Price includes cutting, bending, 2.4 placing in position and tying wires. a. Diam. 6 mm deformed bar b. Diam10mm deformed bar c. Diam 20mm plain bar price includes with proper top & bottom anchorage length not greater than 4m as per the drawing & instruction of the engineer Total carried to summary
m2
m2
6.35
16.65 14.00
kg kg pcs
unit
Qty
Unit Price
Amount
221.76
1,600.00
354,816.00
m3
147.84
1,700.00
251,328.00
606,144.00
963.54
50.00
48,177.00
No _1
Take-off sheet
Project :Location :50MC UGT
No size
QTY
Description
A. SUB STRUCTURE 1. Excavation and Earth works
No size
4 0.4 0.25 1.5
QTY
Description
5 15
2.3. Form work 67.5 1.3 Pit Excavation for UGT not exceeding 150cm
6 0.3 4.25 7.65 8 1.4 Pit Excavation for UGT exceeding 150cm but 135 not exceeding 500cm 2 14 0.5 14 162 1.5 0.25 3 10.65 a.) In beams a.) beam
10 4.5 3
3.6 10 4.5
Deduction
1.0125 RC Beam
contractor ______________
supervisor _____________
No _2
Take-off sheet
Project :Location :EMPLOYEE (One pcs)
No size
1
QTY
Description
No size
2 15.15 3.2
QTY
Description
77.76
14.976
43.35 Total
24 0.25 1.65 0.25 1 3 Footing pad 12 5.2
15.2
12
30.4 Total
3.3. down pipe
62.4 Total
0 Footing pad
4.Steel structure
16 3.2 51.2 4.1. wall post unit weigt 32.37kg/m 1657.344 Total 30.3 4.2. Roof beam UW 32.37kg/m 980.811 47.7 4.3. Roof end beam UW 32.37kg/m 1544.049 121.2 4.4. Purlin UW 5.87kg/m 711.444 38.4 4.5. bracing wire uw 0.888kg/m 34.0992 16 4.6. embedde plates 16 64 4.7. embedde bolts 64
27.72 Total
1 6 3.2 Masonary above NGL 7.95
15.15
12
3.2
128.0175 Total
2 3.1. 80mm thick polystyrene sandwich color steel plate (with coating) wall cladding
16
65.508
8 3.2 3.2
16
81.92
No _3
Take-off sheet
Project :Location :EMPLOYEE (One pcs)
No size
QTY
5. Metal work
8 4 1 8 4
Description
a) Door 90 x 240 b.) Door 70 x 240 C.) Door 120 x 240 D) window 100 x 120 E) window70 x50
No size
QTY
Description
6. finishing
1 15.15 7.95 6.1. 50mm thick cement screed
120.4425 Total
1 15.15 7.95 6.2. 300 x 300 mm porciline ceramic
17.28
4 0.7 2.4
6.72
1 1.2 2.4
2.88
8 1 1.2
9.6
4 0.7 0.5
contractor ______________
TAKEOFF SHEET FOR REINFORCEMENT BARS Page:_1_____ No of Bars in mem a Length ber mem. 4.5 2 1 1.1 15.75 1.4 8.55 1.4 15.15 7.95 3 4 3 4 4 4 4 3 1 1 4 4 31 11 4 76 4 41 41 76 Length of bars
S. No 1 Beams
Description
Dia. 10 10 6 6 14 8 14 8 8 8
Shape
= 6mm
2 Manhole Beams 3 Beam stirrap 4 manhole Beam stirrap 5 Grade beam main bar 6 Grade beam stirrap 7 Grade beam main bar 8 Grade beam stirrap 9 Floor slab 10 Floor slab
93 48.4
Total length of bars in m Unit wt. Of bars Total Weight Of bars in Kg Contractor :____________________
0 0.888 0
86 0.618 53.1
0 1.579 0
0 2.467 0
0 3.552 0