VIP Detention Centre Drainage Design

This document provides calculations for sizing a soak pit drainage system for a detention center project in Aweer. It determines that a soak pit is required based on the permeability rate and flow area. The required flow area for the soak pit is calculated to be 41.66 square meters. This can be accommodated by 2 soak pits, each with a flow area of 8.33 square meters and dimensions of 2 meters by 4 meters.

Uploaded by

razah
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
80% found this document useful (5 votes)
5K views1 page

VIP Detention Centre Drainage Design

This document provides calculations for sizing a soak pit drainage system for a detention center project in Aweer. It determines that a soak pit is required based on the permeability rate and flow area. The required flow area for the soak pit is calculated to be 41.66 square meters. This can be accommodated by 2 soak pits, each with a flow area of 8.33 square meters and dimensions of 2 meters by 4 meters.

Uploaded by

razah
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 1

SOAK PIT CALCULATION

Project: VIP Detention Centre, Aweer.

COMBINED PERFORATED PIPE & SOAK AWAY DRAINAGE SYSTEM DESIGN DATA: Intensity of Rainfall Area of the plot Duration of Rainfall Time Available to Drain Run Off co efficient Flow Rate Calculation: Volume collected in 1.5 hrs Volume flow rate Soak Pit Sizing : Permeability Rate in m/s Flow area Required v = Af = 0.0003333 m/s 41.66 m2 0.00 m 0.00 m 0.00 m 0.00 m2 As Apn>Af ,Soakaway pit is required. Soak away Size of L*W = Flow area of the Soapit No.of Soak pits Flow area required each Soakpit (Aesa) Volume of the Soak pit (V) Depth of the Soak pit (h) Diameter of Soak pit (D) Permeability Calculation Percolation Time , T - sec/mm Percolation Time , T - sec/cm Coefficient of Permeability, v - cm/sec 3 sec/mm 30 sec/cm 0.03333333 cm/sec 0.0003333 m/s
P.O.Box: 125786 Dubai- U.A.E

VALUE i= A= T = T= C= 7 mm/hr 32736 m2 1.5 hrs 4 hrs 0.8

REFERENCE Refer Annexure -1 (DM - TABLE 4.1.3) Architectural Drawings Refer Annexure -1 (DM - TABLE 4.1.3) Refer Annexure -3 (DM - TABLE 4.3.1) Refer Annexure -2 (DM - TABLE 4.2.1)

V= Vf =

274.98 m3 0.014 m3/s

Refer Details Below

Length of the single pipe from perforation point to soak pit Lp = Diameter of Pipe Thickness of gravel D= tgravel =

Perforated Flow area Available Apn=

As.a = 41.66 m2 4.00 10.42 m2 8.33 m3 2.00 m 2.30 m

Refer soil investigation report (SECL/AW/DS/043)

Coefficient of Permeability, v - m/sec


Tel.: 04-3979765 Fax.:04-3979756