boundary Solarhart 2 panel roof mounted solar hot water system beyond
boundary photovoltaic panels, by others
boundary
boundary 1 off Daikin roof mounted condenser photovoltaic panels, by others C
5,100 B A
/Volumes/PPA Data/JOB FILES/12417 Bell:Tuzewski Residence 46 Mackinnon Parade /12417 Drawings/Cad Files/Model/Bell Residence 2013.09.26 C.pln
Solarhart 2 panel roof mounted solar hot water system
1 off A/C condenser to serve ground and first floor, Daikin model RMXS160EV1A
TDK new roofing
new barge capping TDK new roofing EXw EXw W1.7c EXw D1.7c
3,096
1,020 70x45 purlins at 600 max centres 170x45mm LVL rafters at 900 max centres W1.7c TCL
TDK
FOR CONSTRUCTION
TDK
neighbouring two storey residence W1.7e W1.7d
2 off Helioscreen HM 65-95, external shade blinds
EXB
EXB
EXT
Shadeform 'Shaderunner' retractable system beyond, refer detail 9- A700 FFL +2870 First Floor reinstate timber cladding new pergola framing and footings
EXw
EXw
TCL
TCL
TCL FYR
Retractable Shadeform 'Shaderunner' blind, stacking on northern facade
D1.7b
FG
D1.7a Link R1.06
W1.7a 2 off Helioscreen HM 65- 95 external shade blinds W1.6a
Courtyard glass balustrade, refer details A701
TCL
TCL
FFL +2870 First Floor
GF1 FFL +2870 First Floor FCL +2400 Ground Floor bulkhead for concealed wall spilt system Bedroom 3 RG.05 EXd ej W7a
EXR
FC1
OFC
open
EXR ej FC1 ej ej ej EXB
FYR
DP
existing wall
EXB G1 FE1
G1
W5a
EXcol
EXB
EXB
RWT
EXB
FE1
col
replace existing timber posts and battens
FFL +0 Ground Floor
EXw col
EXd col
EXw
EXw col
EXd
FFL +0 Ground Floor
EXd new Stratco 1000L 2 module Aqua- mod rainwater tank
FFL +0 Ground Floor
CP1
new gate
footings to engineers specifications
pad footing as per engineers specifications
NORTH ELEVATION 1:50
SOUTH ELEVATION 1:50
Solahart 2 panel roof mounted solar hot water system
NORTH ELEVATION/ SECTION 1:50
1 off A/C condenser to serve ground and first floor, Daikin model RMXS160EV1A roof line beyond
photovoltaic panels, by others
LEGEND:
EXB EXT TCL TDK CRS LL EXC FE1 Existing Brick Wall Existing Timber Cladding Timber Cladding
fire rated boundary wall, jointing and finishing of outer layer as per specification
TDK TDK
TDK
Lysaght Trimdek roof sheeting, zincalume
Lysaght Custom Orb Roof sheeting, galvanised
Lysaght Longline Roof Sheeting, galvanised Existing Off-form Concrete Hardwood slatted timber fencing/ screening, spanning vertically Hardwood slatted timber battens, spanning horizontally 6mm FC Sheet, Residential Expresswall CSR system 16mm Gyprock Fyrchek MR plasterboard hot- dip galvanised steel column, refer engineer
Issue
C5
ISSUED TO BUILDER FOR CONSTRUCTION
3/10/13
Revision
Date
new Lysaght Longline roof sheeting extend length of carport roof to match existing courtyard canopy extend length of existing slatted timber fence
Project North
PROJECT DIRECTORY
ARCHITECT: PHILLIPS/PILKINGTON ARCHITECTS PTY LTD STRUCTURAL ENGINEER: JOHN BOWLEY PRIVATE CERTIFIER: TECON ph: 8239 9000 ph: 8390 1332 ph: 8228 1688
TCL
FYR
FYR
EXB
FFL +2870 First Floor retain and protect existing olive tree
cj
cj
cj
Shadeform 'Shaderunner' retractable sail system, refer details A700 new pergola framing and footings
FE2 FC1 FYR col
LL
FYR
ex.col existing column
new raised garden bed by others surrounding existing olive tree timber post and hardwood cladding FFL +0 Ground Floor new post box, by others
WALL TYPES:
FE2 FE2
RWT
BUILDER MUST VERIFY ALL DIMENSIONS AT JOB BEFORE COMMENCING ANY WORK OR SHOP DRAWINGS. ALL DISCREPANCIES TO BE REPORTED TO ARCHITECT IMMEDIATELY.
EXB EXB
6mm wall tile, 6mm Villaboard, 70x35 studs, R2.0 insulation, 40mm air gap, existing brick wall externally
6mm wall tile, 10mm moisture resistant plasterboard, 90x45 studs, acoustic insulation, 10mm plasterboard finish
dp property boundary new Stratco 1000L Aqua Mod RWT beyond timber clad storage cupboard
10mm plasterboard, 90x45 studs, 10mm plasterboard finish 10mm plasterboard internally, 90x45 studs, R2.5 insulation, sarking, Timber cladding externally (spanning vertically) 90/90/90 FRL external wall1x16mm Gyprock Fyrchek MR plasterboard internally, 1 x 6mm CeminSeal Wallboard, 70x35 studs, 50 gap, 70x35 studs, R2.5 Insulation, sarking, 1 x 16mm Gyprock Fyrcheck MR plasterboard 1x 10mm plasterboard internally, 90x45 studs, R2.5 insulation, 10mm FC sheet, sarking, Timber cladding externally, spanning vertically 60/60/60 FRL external wall1x16mm Gyprock Fyrchek plasterboard internally, 90x45 studs, R2.5 Insulation, 1 x 16mm Gyprock Fyrcheck plasterboard, sarking, timber cladding externally, spanning vertically
glass balustrade, refer details A701 new Lysaght Longline roof sheeting neighbouring fence beyond retain and protect existing significant olive tree
copyright c PHILLIPS/PILKINGTON ARCHITECTS PTY LTD
EAST ELEVATON 1:50
Helioscreen HM 65-95, external shade blinds to W1.6a and W1.6b
TDK
TDK TDK
TDK
retain existing a/c cavity timber jambs; add fly screens and plywood louvres Shadeform 'Shaderunner' retractable sail system, refer details A700 new pergola framing and footings
ej W5a W5b W1.6a
W1.7b
Wendy Bell & Dave Tuzewski
Project
Client
TCL
1x 10mm plasterboard internally, 90x45 studs, R2.5 insulation, 40mm air gap, 90x 45 studs, 10mm FC sheet, sarking, Timber cladding externally, spanning vertically 1x 10mm plasterboard internally, 90x45 studs, R2.5 insulation, sarking, Timber cladding externally, spanning horizontally
Bell/ Tuzewski Residence
46 MacKinnon Parade North Adelaide South Australia 5006 Elevations
Drawing Title:
FC1
LL
EXB
EXB
EXB
RWT
new raised garden bed by others, surrounding existing olive tree new post box, by others timber post and hardwood cladding
Scale: 1:50@A1 Drawing By: Checked By:
Sheet No: Date: Date:
8 of 21
3/10/13 3/10/13
JO'R MP
Project No/Drawing No.:
Issue:
WEST ELEVATION 1:50
property boundary
12417- A200
Plot Date:
C5
3/10/13
70x45 purlins sarking roof pitch: 5 INS
3
CRS INS sarking
A 1
CRS TCL FC1 insulation as specified fence cap flashing to end of roof sheeting 90X45 studs SK2 +2870 FFL First Floor
225
C
16mm Gyprock Fyrcheck MR plasterboard 6mm CeminSeal Wallboard
BOUNDARY E2
Studio R1.07 PBD
W1.7a
/Volumes/PPA Data/JOB FILES/12417 Bell:Tuzewski Residence 46 Mackinnon Parade /12417 Drawings/Cad Files/Model/Bell Residence 2013.10.03 C6.pln
225
90/90/90 FRL external wall
16mm Gyprock Fyrcheck MR plasterboard INS +2870 FFL First Floor
SF STF
12
Rondo P50 shadowline SK2
12
FOR CONSTRUCTION
19
170x45mm roof beams Roof beam lintel 240x63 LVL GU1 +5270 AFL Top of Window W1.7b FG Rondo P50 shadow line typical, surrounding windows and doors and skirtings TCL packing to suit PBD 10mm plasterboard on 28mm furring channels Rondo P50 PBD PBD INS
200x63mm LVL TCL flashing to suit
170
170
170X45 LVL floor joists +2650 AFL TCL LL
259
19
70X35 studs FC sheet fixed to Expresswall top hats
NEIGHBORING PROPERTY
W1.7d
existing rafters providing blocking to suit retractable shaderunner system INS sarking existing gutter TDK
250X75 LVL beyond +2400 FCL Ground Floor +2360 AFL Existing Brick Wall
FC1
225
INS MRPB Bathroom RG.07 WT1 VBD Laundry RG.06
INS MRPB WT1 VBD 90x45 stud wall, fixed to existing brickwork 4 A300 SECTION DETAIL 4 1:10
+2400 FCL Ground Floor +2360 AFL Existing Brick Wall EXB
EXTERNAL EXB PBD timber panel to match existing 3 A300
PBD D1.7c 200 RHS +5070 AFL Ceiling Level- Link W1.6a PBD EXB
SECTION DETAIL 3 1:10
Balustrade, refer details A800 Link R1.06
infill timber jamb surround to match existing adjoining window Studio R1.07 Studio R1.07 SK2 SF SF STF
12 70
COL
FG1 SK2 SF STF Timber packing to suit +2870 FFL First Floor
220 170
COL beyond timber cladding SK2 SF STF +2870 FFL First Floor 200 PFC 170X45 LVL floor joists 250x75 LVL W1.6a
120
W1.7a
caulk 10mm gap between recycled solid timber floor boards
TFL
385
infill timber tread fixed to existing concrete beam
10
STF
C6
ISSUED TO BUILDER FOR CONSTRUCTION
17/10/13
19
170 19
apron flashing to suit
existing flooring and structure
+2870 FFL First Floor
170
12
70
60
200 PFC
TIM1 TDK
open
16 A701
17 A701
+2650 AFL EXC 70x35 studs INS 250x75 LVL 170X45 LVL TCL EXTERNAL COL 100 UC
70
Issue
C5
70
ISSUED TO BUILDER FOR CONSTRUCTION
03/10/13
Revision
Date
+2650 AFL TIM1 existing canopy roof beyond +2400 FCL Laundry +2360 AFL Existing Brick Wall MRPB FC1 COL 100 UC 180x75 PFC helioscreen model no. HM 65-95, helio 93 fabric, natural anodised and charcoal fabric pelmet box reversed fixed +4970 AFL Ceiling Level- Link LL INS FC sheet fixed to Expresswall top hats LL INS +2520 FCL Bedroom 3 W5b COL beyond timber cladding 2 A300 SECTION DETAIL 2 1:10 W5a INS PBD
+2400 FCL Ground Floor
EXTERNAL PBD FC1 fixed to residential Expresswall top hats
15
Project North
PROJECT DIRECTORY
ARCHITECT: PHILLIPS/PILKINGTON ARCHITECTS PTY LTD STRUCTURAL ENGINEER: JOHN BOWLEY PRIVATE CERTIFIER: TECON ph: 8239 9000 ph: 8390 1332 ph: 8228 1688
Rondo P50 shadow line
Bedroom 3 RG.05
EXw
+2360 AFL Existing Brick Wall
COL 100 UC EXB 8 SECTION DETAIL 8 1:10
WT1 Bathroom RG.07 7 125x75 PFC VBD
SECTION DETAIL 7 1:10 TCL reinstate timber cladding cL timber beam as per engineers specifications 200x70 timber beam existing timber fascia
200
existing gutter beyond
BUILDER MUST VERIFY ALL DIMENSIONS AT JOB BEFORE COMMENCING ANY WORK OR SHOP DRAWINGS. ALL DISCREPANCIES TO BE REPORTED TO ARCHITECT IMMEDIATELY.
cL
100 50 75 50
sarking
EXB
180
helioscreen model no. HM 65-95, helio 93 fabric, natural anodised and charcoal fabric 95mm three piece aluminium headbox
existing stud wall and cladding
400
600
50
PBD
INS
40x40 aluminium channel, anodised existing floor joists
Shaderunner eyebolt
200x50 beam 50 galvanised CHS
12 copyright c PHILLIPS/PILKINGTON ARCHITECTS PTY LTD 200
W1.6a GL3 5 A300
50
hardwood timber column beyond retractable Shaderunner system
bulkhead beyond
EXw W1.6b
column size packer 100x100 hardwood timber column
SECTION DETAIL 5 1:10
990 50
EXd remove and replace existing coverboard to fix Shaderunner system and CHS
GL3
9 A300 GF1
SECTION DETAIL 9 1:10
B
DP1 50 galvanised downpipe
70 70
C
GF1 apron flashing, scribed to roof sheeting
Wendy Bell & Dave Tuzewski
Project
Client
TFL +0 FFL Ground Floor +2870 FFL First Floor
Link R1.06
LL roofing at 2 fall
boundary wall
W5a
Bell/ Tuzewski Residence
60
roof sarking
14 701 110
exterior paving as specified E2 16mm Gyprock Fyrcheck MR plasterboard +0 FFL Ground Floor FALL
50
CP1
46 MacKinnon Parade North Adelaide South Australia 5006 Section Details
Scale: 1:10@A1 Drawing By: Sheet No: Date: Date: Drawing Title:
+2520 FCL Ground Floor
GU2 custom Fielders gutter 50
PBD
PBD INS
EXw
INS
EXC beyond
DP1 W5a
plasterboard ceiling on direct fixed furring channels
Bedroom 3 RG.05
18 of 21
17/10/13 17/10/13
JO'R MP
DPM footings as per engineers specifications
Checked By:
Project No/Drawing No.:
Issue:
6 A300 1 A300 WALL SECTION DETAIL 1 1:10
SECTION DETAIL 6 1:10 7 A300 SECTION DETAIL 10 1:10
8 A300
SECTION DETAIL 11 1:10
12417- A700
Plot Date:
C6
17/10/13