The Gorgon Project A brief Overview
Rick Causebrook Geoscience Australia 2010 CAGS Workshop II Wuhan, Hubei Province, PRC Oct 26th-29th 2010
The Gorgon Project
Acknowledgements
This presentation was sourced from material made publically available by the Gorgon Joint Venture. The Gorgon Project Web-site
http://www.chevronaustralia.com/ourbusinesses/gorgon.aspx#z
Principle sources :
The Gorgon Environmental Approvals Site:
http://www.chevronaustralia.com/ourbusinesses/gorgon/environmentalresponsibility/environmen talapprovals.aspx
Gorgon Presentation to the CSLF Technical Committee Meeting, Pau March 2010
http://www.cslforum.org/publications/documents/Pau2010/FosterGorgonPau0310.pdf
With thanks to Chevron Australia
The Gorgon Project
Project by Joint venture Chevron (47.333%) Shell (25%) ExxonMobil (25%) Osaka Gas (1.25%) Tokyo Gas (1%) Chubu Electric Power (0.417%)
http://www.gorgon.com.au/index.html
Barrow Island a class A nature reserve
Nature and Industry co-existing, Barrow island also is the site of Australias largest onshore oilfield which has been producing for 40 years.
The Gorgon Project
$43 billion LNG project Single biggest project in Australia Worlds biggest CCS program Recognised by Carbon Sequestration Leadership Forum Only new CCS project launched in 2010 which satisfied all 7 criteria agreed by the G8 at L'Aquila in 2009
The Gorgon Project: Gas Fields
Greater Gorgon Fields lie 130-200km offshore and contain about 40 trillion cubic feet of gas Average 14% CO2 in gas fields Processing Facility onshore Barrow Island 3x5Mtpa trains.
The Gorgon Project: CCS
Gas piped and separated on Barrow Island CO2 removed for sales gas CO2 compression attached to gas facility Up to 3.4Mtpa of CO2 will be captured, piped and stored in deep formations below Barrow Island
The Gorgon Project: CCS
Injection 8-9 injection wells ~4 pressure management wells Monitoring repeat seismic data observation wells near surface soil gas monitoring
Plume after 1000 yrs
Barrow Island outline
Chapter 13 Gorgon Draft Environmental Impact Statement/Environmental Review
Regional Stratigraphy
Chapter 13 Gorgon Draft Environmental Impact Statement/Environmental Review
Geology
Depth: 2300 m Reservoir Dupuy Formation Massive sands Turbidite fan deposit Seal Barrow Group
http://www.gorgon.com.au/index.html
Chapter 13 Gorgon Draft Environmental Impact Statement/Environmental Review
Geology
Cores of the Dupuy Formation and Basal Barrow Group Shale
SANDSTONE (Dupuy Formation Upper Massive Sand) very few internal barriers. This will enable the CO2 to migrate relatively freely through the formation.
BIOTURBATED SILTSTONE (Upper Dupuy Formation) Low permeability bioturbated siltstone, finely bedded siltstone. The siltstone is slightly permeable to CO2 and will act as a baffle to migration.
SHALE (Basal Barrow Group Shale) The basal Barrow Group shale is a marine shale and represents an effective barrier to vertical migration of CO2.
Chapter 13 Gorgon Draft Environmental Impact Statement/Environmental Review
Simulation
Predicted migration of CO2 plume during the operational phase
Plume extent after 40 years
Chapter 13 Gorgon Draft Environmental Impact Statement/Environmental Review
Simulation
CO2 plume (in beige) after 40-years Incorporates: migration baffles barriers seals
Horizontal scale exaggerated Chapter 13 Gorgon Draft Environmental Impact Statement/Environmental Review
Simulation
Reservoir simulation based on the preferred injection scenario showing the extent of the CO2 plume over 1000 years at the base of the Barrow Group Shale
Chapter 13 Gorgon Draft Environmental Impact Statement/Environmental Review
Base of Barrow Group Shale
Monitoring
CO2 Injection & Pressure Management wells Surveillance wells 4D Surface Seismic Soil Gas Pressure sensors
Chapter 13 Gorgon Draft Environmental Impact Statement/Environmental Review
Current Status of project
All necessary permits and approvals have now been obtained Construction of the facilities started in November 2009 with a ground breaking ceremony and are now underway
Whats in a name?
The Gorgon field was named after a nearby geological feature on the sea bed the Gorgon Patch. The Gorgon Patch was named after the SS Gorgon the ship which first identified the feature.
Questions