RLC-AH-QP-91-3001 Inspection Test Plan For Plumbing Works-1

This document provides the site inspection and test plan for plumbing works on the Ras Laffan C IWPP project in Qatar. It outlines 8 inspection points for materials, excavation, installation, fixtures, insulation, backfilling, and pressure testing. Inspection types include hold points, witness points, surveillance, and record reviews. Inspection responsibility is assigned to the subcontractor, Hyundai E&C, the owner, and HDEC quality control. Accompanying forms are included to document inspection results, pressure testing, and general checks against design drawings and specifications.

Uploaded by

nighttrasher
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
2K views6 pages

RLC-AH-QP-91-3001 Inspection Test Plan For Plumbing Works-1

This document provides the site inspection and test plan for plumbing works on the Ras Laffan C IWPP project in Qatar. It outlines 8 inspection points for materials, excavation, installation, fixtures, insulation, backfilling, and pressure testing. Inspection types include hold points, witness points, surveillance, and record reviews. Inspection responsibility is assigned to the subcontractor, Hyundai E&C, the owner, and HDEC quality control. Accompanying forms are included to document inspection results, pressure testing, and general checks against design drawings and specifications.

Uploaded by

nighttrasher
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 6

HYUNDAI E&C CO.

, LTD RAS LAFFAN C IWPP PROJECT

SITE INSPECTION & TEST PLAN


PIPING PULMBING WORKS

ITP NUMBER DATE ITEM/COMPONET PREPARED BY QCE

RLC-AH-QP-91-3001 JUNE 21, 2009 PLUMBING WORKS H. S. KIM

REVISION NO.

APPROVED BY QC MGR

B. H. LEE

- LEGEND H-HOLD(MANATORY HOLD POINT UNTIL INSPECTION COMPLETE) W-WITNESS INSPECTION POINT(PROCEED IF INSPECTION AUTHORITY NOT AVAILABLE) R-REVIEW(RECORD/REPORT REVIEW) S-SURVEILLANCE INSPECTION(RANDOM CHECK) - NOTE 1. ALL INTERNAL CONTROL DOCCUMENTS SHALL BE THE LATEST REVISION 2. CONSTRUCTION MATERIALS MUST BE APPROVED PRIOR TO START ANY WORKS 3. WHERE AN ACTIVITY IS NOT APPLICABLE THEN N/A SHALL BE INSERTED AGAINST THE APPROPRIATE OPERATION REMARK

RAS LAFFAN C IWPP / QATAR

DISCIPLINE :

HVAC

ITP No. Rev. No. Page Date

RLC-AH-QP-91-3001
A 1 OF 2 JUNE 21, 2009 REMARKS

WORK DESCRIPTION : PLUMBING WORKS APPLICABLE DOCUMENT REPORT FORM

SITE INSPECTION & TEST PLAN


No 1 DESCRIPTION OF INSPECTION TEST Material Receiving Inspection 2 Verify material type/size/quantity Physical Damage

PARTICIPATION BY S/C HDEC Owner

Material Spec. Packing List As per Design DWG.

PQM-06-06

Excavation of Trench Excavation Depth

RLC-AH-QP-913001-01

Bedding(Material & Thickness)

As per Design DWG.

RLC-AH-QP-913001-01

Plumbing Installation 1) Elevation of Pipe 2) Hanger and Support of Pipe in Accessible Area 3) Pipe Connection As per Design DWG. RLC-AH-QP-913001-01/03 H W S

Plumbing Fixture Installation Install proper fixture Check the location & elevation Method Statement RLC-AH-QS-94-001 Para. 9, 10 S : Surveillance R : Review RLC-AH-QP-913001-02 S/C : HDEC Subcontractor H H W As per Design DWG RLC-AH-QP-913001-01 H W S

Pressure Test Hydrostatic Test Water Pressure Test H : Hold W : Witness

Legend;

RAS LAFFAN C IWPP / QATAR

DISCIPLINE :

PIPING

ITP No. Rev. No. Page Date

RLC-AH-QP-91-3001
A 2 OF 2 JUNE 17, 2009 REMARKS

WORK DESCRIPTION : UNDERGROUND PIPING(HDPE) APPLICABLE DOCUMENT As per Design DWG. REPORT FORM RLC-AH-QP-913001-01

SITE INSPECTION & TEST PLAN


No 7 DESCRIPTION OF INSPECTION TEST Pipe Insulation (If applicable)

PARTICIPATION BY S/C H HDEC W Owner S

Backfilling Backfilling Material Backfilling H : Hold W : Witness S : Surveillance R : Review As per Design DWG. RLC-AH-QP-913001-01 S/C : HDEC Subcontractor H W R

Legend;

RAS LAFFAN C IWPP PROJECT


INSPECTION REPORT FOR PLUMBING WORKS
BUILDING : SYSTEM:
NO. 1 2 3 CHECK ITEM Material Verification Excavation of Trench Bedding(Material & Thickness) Plumbing Installation 1) Elevation of Pipe 4 2) Hanger and Support of Pipe in Accessible Area 3) 5 6 7 8 Pipe Connection

UNIT NO.: DWG. NO.:


RESULT REMARK

Piping Fixture Installation Pressure Test (Hydrostatic Test or Water Pressure Test) Insulation(if applicable) Backfilling

REMARKS :

SIGNATURE CHECKED BY SUBCON VERIFIED BY HDEC QC REVIEWED BY OWNER : : :

DATE

FORM NO. RLC-AH-QP-91-3001-01

RAS LAFFAN C IWPP PROJECT


PRESSURE TEST REPORT
PACKAGE NO. : SYSTEM : P & ID NO. :

DATE OF TEST : DESIGN PRESSURE / TEMP : REQUIRED TEST PRESSURE : ACTUAL TEST PRESSURE :

TYPE OF TEST :

HYDROSTATIC PNEUMATIC OTHERS


TEST MEDIUM / TEMP : PRESSURE GAUGE SERIAL NO.: PRESSURE HOLDING TIME : SKETCH OF TEST BOUNDARIES : MIN.,

START :

FINISH :

RESULT : REMARK :

ACCEPT

REJECT

SIGNATURE CHECKED BY SUBCON VERIFIED BY HDEC QC REVIEWED BY OWNER : : :

DATE

FORM NO. RLC-AH-QP-91-3001-02

RAS LAFFAN C IWPP PROJECT


GENERAL CHECK REPORT
Description EQPT Name TAG No. SKETCH : Unit No. DWG. No.

REMARK :

SIGNATURE CHECKED BY SUBCON VERIFIED BY HDEC QC REVIEWED BY OWNER : : :

DATE

FORM NO. RLC-AH-QP-91-3001-03