HYUNDAI E&C CO.
, LTD RAS LAFFAN C IWPP PROJECT
SITE INSPECTION & TEST PLAN
PIPING PULMBING WORKS
ITP NUMBER DATE ITEM/COMPONET PREPARED BY QCE
RLC-AH-QP-91-3001 JUNE 21, 2009 PLUMBING WORKS H. S. KIM
REVISION NO.
APPROVED BY QC MGR
B. H. LEE
- LEGEND H-HOLD(MANATORY HOLD POINT UNTIL INSPECTION COMPLETE) W-WITNESS INSPECTION POINT(PROCEED IF INSPECTION AUTHORITY NOT AVAILABLE) R-REVIEW(RECORD/REPORT REVIEW) S-SURVEILLANCE INSPECTION(RANDOM CHECK) - NOTE 1. ALL INTERNAL CONTROL DOCCUMENTS SHALL BE THE LATEST REVISION 2. CONSTRUCTION MATERIALS MUST BE APPROVED PRIOR TO START ANY WORKS 3. WHERE AN ACTIVITY IS NOT APPLICABLE THEN N/A SHALL BE INSERTED AGAINST THE APPROPRIATE OPERATION REMARK
RAS LAFFAN C IWPP / QATAR
DISCIPLINE :
HVAC
ITP No. Rev. No. Page Date
RLC-AH-QP-91-3001
A 1 OF 2 JUNE 21, 2009 REMARKS
WORK DESCRIPTION : PLUMBING WORKS APPLICABLE DOCUMENT REPORT FORM
SITE INSPECTION & TEST PLAN
No 1 DESCRIPTION OF INSPECTION TEST Material Receiving Inspection 2 Verify material type/size/quantity Physical Damage
PARTICIPATION BY S/C HDEC Owner
Material Spec. Packing List As per Design DWG.
PQM-06-06
Excavation of Trench Excavation Depth
RLC-AH-QP-913001-01
Bedding(Material & Thickness)
As per Design DWG.
RLC-AH-QP-913001-01
Plumbing Installation 1) Elevation of Pipe 2) Hanger and Support of Pipe in Accessible Area 3) Pipe Connection As per Design DWG. RLC-AH-QP-913001-01/03 H W S
Plumbing Fixture Installation Install proper fixture Check the location & elevation Method Statement RLC-AH-QS-94-001 Para. 9, 10 S : Surveillance R : Review RLC-AH-QP-913001-02 S/C : HDEC Subcontractor H H W As per Design DWG RLC-AH-QP-913001-01 H W S
Pressure Test Hydrostatic Test Water Pressure Test H : Hold W : Witness
Legend;
RAS LAFFAN C IWPP / QATAR
DISCIPLINE :
PIPING
ITP No. Rev. No. Page Date
RLC-AH-QP-91-3001
A 2 OF 2 JUNE 17, 2009 REMARKS
WORK DESCRIPTION : UNDERGROUND PIPING(HDPE) APPLICABLE DOCUMENT As per Design DWG. REPORT FORM RLC-AH-QP-913001-01
SITE INSPECTION & TEST PLAN
No 7 DESCRIPTION OF INSPECTION TEST Pipe Insulation (If applicable)
PARTICIPATION BY S/C H HDEC W Owner S
Backfilling Backfilling Material Backfilling H : Hold W : Witness S : Surveillance R : Review As per Design DWG. RLC-AH-QP-913001-01 S/C : HDEC Subcontractor H W R
Legend;
RAS LAFFAN C IWPP PROJECT
INSPECTION REPORT FOR PLUMBING WORKS
BUILDING : SYSTEM:
NO. 1 2 3 CHECK ITEM Material Verification Excavation of Trench Bedding(Material & Thickness) Plumbing Installation 1) Elevation of Pipe 4 2) Hanger and Support of Pipe in Accessible Area 3) 5 6 7 8 Pipe Connection
UNIT NO.: DWG. NO.:
RESULT REMARK
Piping Fixture Installation Pressure Test (Hydrostatic Test or Water Pressure Test) Insulation(if applicable) Backfilling
REMARKS :
SIGNATURE CHECKED BY SUBCON VERIFIED BY HDEC QC REVIEWED BY OWNER : : :
DATE
FORM NO. RLC-AH-QP-91-3001-01
RAS LAFFAN C IWPP PROJECT
PRESSURE TEST REPORT
PACKAGE NO. : SYSTEM : P & ID NO. :
DATE OF TEST : DESIGN PRESSURE / TEMP : REQUIRED TEST PRESSURE : ACTUAL TEST PRESSURE :
TYPE OF TEST :
HYDROSTATIC PNEUMATIC OTHERS
TEST MEDIUM / TEMP : PRESSURE GAUGE SERIAL NO.: PRESSURE HOLDING TIME : SKETCH OF TEST BOUNDARIES : MIN.,
START :
FINISH :
RESULT : REMARK :
ACCEPT
REJECT
SIGNATURE CHECKED BY SUBCON VERIFIED BY HDEC QC REVIEWED BY OWNER : : :
DATE
FORM NO. RLC-AH-QP-91-3001-02
RAS LAFFAN C IWPP PROJECT
GENERAL CHECK REPORT
Description EQPT Name TAG No. SKETCH : Unit No. DWG. No.
REMARK :
SIGNATURE CHECKED BY SUBCON VERIFIED BY HDEC QC REVIEWED BY OWNER : : :
DATE
FORM NO. RLC-AH-QP-91-3001-03