0% found this document useful (0 votes)
169 views2 pages

Inspection Data Sheet (I.D.S.) : Company Job. Country Revision

This document outlines inspection and testing requirements for medium voltage switchboards. It includes requirements for type testing, visual and dimensional checks, and acceptance tests to check for compliance, measurements, operations, and protective devices.

Uploaded by

brome2014
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
169 views2 pages

Inspection Data Sheet (I.D.S.) : Company Job. Country Revision

This document outlines inspection and testing requirements for medium voltage switchboards. It includes requirements for type testing, visual and dimensional checks, and acceptance tests to check for compliance, measurements, operations, and protective devices.

Uploaded by

brome2014
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

M

O
D
.
E
L
E
.
M
V
S
.
0
0
2
/
4
S
h
.
0
1
/
0
2
PREP'd. CHK'd. APPR'd. DATE REV. DESCRIPTION
0
INSPECTION DATA SHEET ( I.D.S. )
COMPANIES CONCERNED :
TYPE OF INTERVENTION :
W - NOT BINDING PRESENCE. In case of unwitnessed test, the supplier is autho-
rized to continue the production cycle, suppling the appropriate documentation.
H - BINDING PRESENCE. The cycle continuation is bound to the presence.
R - CHECK OF CERTIFICATES AND/OR DOCUMENTS.
C - CHECK CARRIED OUT WITH RELEASE OF THE CERTIFICATE.
N - CHECK CARRIED OUT WITHOUT RELEASE OF THE CERTIFICATE.
D - SIMPLE DOCUMENTATION.
P - BINDING PRESENCE FOR THE % INDICATED IN THE NOTES.
NOTES :
Material :
CERTIFYING CONCERNED :
OTHER : OFFICIAL AUTHORITY :
CODES / SPECIFICATION / DRAWINGS / REFERENCE STANDARD :
AGIP S SUPPLIER A
MEDIUM VOLTAGE SWITCHBOARDS
1) The compliance of a switchboard with a prototype may be documented
through design similarity of the switchboard in its entirety or of
individual components,provided that approved by the employer.
2) The dimensional check shall be limited to main dimensions and to those
relevant to installation, as well as to the position and dimensions
of cable ways and busways connections.
3) Test carried out at a lower voltage compared to that of the type
test in accordance with the reference codes. it shall be limited to industrial
frequency voltage test on interconnections with closed circuits.
Tags :
This document is Company property. The Company lawfully reserves all rights.
Dept.
Agip
Sheet / of Compiled Date
Doc. n
/
COMPANY
Job.
AREA
COUNTRY
PLANT
Revision
0
INTERNAL NORMALIZATION

























M
O
D
.
E
L
E
.
M
V
S
.
0
0
2
/
4
S
h
.
0
2
/
0
2
INSPECTION DATA SHEET ( I.D.S. )
Material : MEDIUM VOLTAGE SWITCHBOARDS
Tags :
This document is Company property. The Company lawfully reserves all rights.
Dept.
Agip
Sheet / of Compiled Date
Doc. n
/
COMPANY
Job.
AREA
COUNTRY
PLANT
Revision
0
INTERNAL NORMALIZATION
POSIT. DESCRIPTION OF CHECKS AND TESTS REFERENCE
CODE OF
INTERVENTION
S A
TYPE TEST 1
1.1
codes.
1.2 Type test of main equipment and components.
VISUAL AND DIMENSIONAL CHECKS 2.1
2.1.1
Acceptance tests of main and auxiliary equipment and
components.
2.1.2
2.1.3
2.1.4
2.1.5
2.1.6
2.1.7
2.1.8
2.1.9
Check of compliance with the prototype.
Dimensional checks.
Check of structure, bus-bars, primary connections and wiring.
Check of painting and other protection devices against
environmental conditions.
Check of rated data and performances of the equipment.
Check of protection degree.
Check of auxiliaries and accessories.
Check of nameplates.
2.2 ACCEPTANCE TESTS
2.2.1
2.2.2
2.2.3
2.2.4
2.2.5
Dry industrial frequency voltage test on main
circuits.
Voltage test on the auxiliary circuits.
Measurement of the resistance of the main circuit of interrupting
Mechanical operation test and test of interchangeability of the
withdrawable parts that are similar.
Test of auxiliaries, of electric operation and of sequences.
( note 1 )
( note 2 )
( note 3 )
2.1.10
ACCEPTANCE CHECKS AND TESTS 2
2.1.11
devices.
2.2.6
of the current).
Test of protective devices and circuits (with primary injection
1.3 Type test of wiring cables.

You might also like