0% found this document useful (0 votes)
1K views3 pages

Adrm 10ed Toc 20140324

This document provides an overview of airport forecasting and planning. It discusses IATA's role in airport development and collaboration with Airports Council International. It covers topics such as forecasting passenger and air cargo demand, air transport movements, and peak period traffic. The document also addresses airport master planning, including the planning process, consultation, and using traffic forecasts and data collection to inform facility development.

Uploaded by

Elena Javier
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
1K views3 pages

Adrm 10ed Toc 20140324

This document provides an overview of airport forecasting and planning. It discusses IATA's role in airport development and collaboration with Airports Council International. It covers topics such as forecasting passenger and air cargo demand, air transport movements, and peak period traffic. The document also addresses airport master planning, including the planning process, consultation, and using traffic forecasts and data collection to inform facility development.

Uploaded by

Elena Javier
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 3

Table of Contents

Acknowledgements ........................................................................................................................................... vi
Section 1Introduction ..................................................................................................................................... 1
1.1

IATAWho We Are; What We Do ...................................................................................................... 1

1.2

IATA's Airport Activities ...................................................................................................................... 1


1.2.1

Airport Consultative Committees (ACCs) ..............................................................................2

1.2.2

IATA Consulting Services for Airports...................................................................................2

1.2.3

International Industry Working Group ...................................................................................3

1.3

Other IATA Airport Activities .............................................................................................................. 4

1.4

Airports Council International (ACI) Collaboration .............................................................................4


1.4.1

Introduction to Airports Council International (ACI)...............................................................4

1.5

Purpose of the Airport Development Reference Manual ...................................................................5

1.6

How to Use the ADRM ...................................................................................................................... 6

1.7

ADRM: New Format ........................................................................................................................... 7

Section 2Forecasting...................................................................................................................................... 9
2.1

Introduction and Definition ............................................................................................................... 10

2.2

Economic Base for Air Travel........................................................................................................... 12

2.3

2.4

2.2.1

Airport Catchment Area....................................................................................................... 12

2.2.2

Socioeconomic Base........................................................................................................... 13

2.2.3

Transfer Traffic .................................................................................................................... 14

2.2.4

Airline Yields........................................................................................................................ 14

2.2.5

Tourism ............................................................................................................................... 15

2.2.6

Trade ................................................................................................................................... 17

2.2.7

Intermodal Transportation ................................................................................................... 17

2.2.8

Economic Base Data Analysis ............................................................................................ 17

Historical Aviation Activity ................................................................................................................ 18


2.3.1

Data Collection .................................................................................................................... 19

2.3.2

Airport Role ......................................................................................................................... 23

2.3.3

Historical Passenger Volumes ............................................................................................ 23

2.3.4

Top Domestic and International Destinations .....................................................................23

2.3.5

Historical Market Share by Airline .......................................................................................24

2.3.6

Historical Air Cargo Tonnage .............................................................................................. 24

2.3.7

Historical Movements by Segment......................................................................................25

2.3.8

Forecast Impact Factors...................................................................................................... 25

Competitive Analysis ........................................................................................................................ 26

10TH EDITION, MARCH 2014

iii

Airport Development Reference Manual

2.5

Review of Existing Forecasts ........................................................................................................... 26

2.6

Common Forecasting Techniques ................................................................................................... 26

2.7

2.6.1

Trend/Time Series............................................................................................................... 27

2.6.2

Consensus Forecasts.......................................................................................................... 27

2.6.3

Market Share Forecasts ...................................................................................................... 28

2.6.4

Econometric/Regression Model ..........................................................................................29

Passenger Activity Forecast............................................................................................................. 32


2.7.1

Passenger Activity Segments.............................................................................................. 32

2.7.2

Passenger Activity Benchmarking.......................................................................................33

2.7.3

Passenger Activity Alternative Scenarios............................................................................34

2.8

Baggage Forecast ............................................................................................................................ 34

2.9

Air Cargo Activity Forecast............................................................................................................... 35

2.10

2.9.1

Air Cargo Supply and Demand ........................................................................................... 36

2.9.2

Cargo Data Analysis............................................................................................................ 37

2.9.3

Cargo Market Forecast Benchmarking ...............................................................................38

2.9.4

Cargo Activity Forecast ....................................................................................................... 39

Air Transport Movement Forecast.................................................................................................... 40


2.10.1 ATM Segments.................................................................................................................... 40
2.10.2 Passenger ATMs................................................................................................................. 41
2.10.3 Freighter ATM Forecast ...................................................................................................... 44
2.10.4 General Aviation ATM Forecast ..........................................................................................45
2.10.5 Military/Government ATM Forecast.....................................................................................47
2.10.6 Total ATM Forecast............................................................................................................. 47

2.11

Peak Period Forecast....................................................................................................................... 47


2.11.1 Peak Period Traffic Measure............................................................................................... 48
2.11.2 Incorporating Directionality into Peak Hour Analysis ..........................................................49
2.11.3 Peak Period Forecasts ........................................................................................................ 49
2.11.4 Conclusions Regarding Peak Period Analysis ....................................................................50

Section 3Planning ......................................................................................................................................... 52

iv

3.1

Introduction....................................................................................................................................... 52

3.2

Master Planning ............................................................................................................................... 52


3.2.1

Introduction.......................................................................................................................... 53

3.2.2

Consultation ........................................................................................................................ 57

3.2.3

The Master Planning Process ............................................................................................. 62

3.2.4

Preplanning ......................................................................................................................... 65

3.2.5

Traffic Forecasts.................................................................................................................. 69

3.2.6

Data Collection, Site Evaluation and Facility Potential .......................................................70

3.2.7

Requirements Analysis........................................................................................................ 76

3.2.8

Development of Options...................................................................................................... 92

10TH EDITION, MARCH 2014

Table of Contents

3.2.9

Environmental Responsibility ............................................................................................107

3.2.10 Land Use Planning ............................................................................................................117


3.2.11 Outline Development Plan.................................................................................................124
3.2.12 Financial Assessment .......................................................................................................128
3.2.13 Reporting/Deliverables ......................................................................................................128
3.2.14 Master Planning on a Greenfield Site ...............................................................................133
3.2.15 References ........................................................................................................................146
3.3

Airside Infrastructure  IXWXUHUROORXW ..........................................................46

3.4

Passenger Terminal .......................................................................................................................146


3.4.1

Introduction........................................................................................................................146

3.4.2

Terminal Design Considerations .......................................................................................147

3.4.3

Terminal Planning Concepts .............................................................................................164

3.4.4

Terminal Capacity and Level of Service ...........................................................................183

3.4.5

Level of Service Concept and Planning Guidelines ..........................................................191

3.4.6

DemandCapacity Assessment ........................................................................................195

3.4.7

The Optimum Solution and Balanced Capacity ..............................................................199

3.4.8

Passenger Process ...........................................................................................................200

3.4.9

Segregation and Security Requirements in Airport Terminals ..........................................204

3.4.10 Vertical and Horizontal Circulation ....................................................................................206


3.4.11 Departures.........................................................................................................................208
3.4.12 Transfers ...........................................................................................................................270
3.4.13 Arrivals ..............................................................................................................................273
3.4.14 Commercial and Retail Opportunities ...............................................................................303
3.4.15 Access to Air Travel for Persons with Reduced Mobility ..................................................311
3.4.16 Toilet Provisions ................................................................................................................319
3.4.17 Passenger Wayfinding and Signage .................................................................................322
3.4.18 Landside Access Systems and Forecourts .......................................................................326
3.5

Cargo Terminal IXWXUHUROORXW .......................................................................................................334

3.6

Airport Support Elements (future roll-out)....................................................................................... 334

3.7

Surface Access Systems (future roll-out)........................................................................................ 334

Glossary .......................................................................................................................................................... 335


Acronyms ........................................................................................................................................................342

10TH EDITION, MARCH 2014

You might also like