100% found this document useful (2 votes)
2K views

Welding Run Sheet

This document summarizes the procedure qualification record for a welding test. It lists details of the base metal, filler metal, welding position, parameters, and test results. The base metal was 500mm thick steel. Shielding and backing gases were used during the welding process, which was done in the vertical position. Test results included weld bead width and depth, travel speed, voltage, current, heat input, and interpass and preheat temperatures. The weld deposit was removed by back gouging and found to be acceptable.

Uploaded by

ittiphon31
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
100% found this document useful (2 votes)
2K views

Welding Run Sheet

This document summarizes the procedure qualification record for a welding test. It lists details of the base metal, filler metal, welding position, parameters, and test results. The base metal was 500mm thick steel. Shielding and backing gases were used during the welding process, which was done in the vertical position. Test results included weld bead width and depth, travel speed, voltage, current, heat input, and interpass and preheat temperatures. The weld deposit was removed by back gouging and found to be acceptable.

Uploaded by

ittiphon31
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

Procedure Qualification Records (PQR)

(ASME BOILER AND PRESSURE VESSEL CODE SECTION IX)

PQR NO.
Weld Date:

Item No.

Heat
Number

Base Metal

Size
mm

Thickness
(mm)

500
DETAIL OF WELD JOINT
Welding Position :
Welder :
Stamp No.:
Welding Machine No.:
Welding Quiver No. :

Clamp Meter No.:


Infrared Thermometer :
Stop Watch :
Welding Oven No. :

Test Coupon Size:


Shielding Gas :
Backing Gas :
Method of Back Gouging :

TEST PARAMETERS
Filler Metal
Weld Layer(s)

Process

Class

Size
(mm)

Manufacturer

Current
Lot No.

Type & Polarity

Note
Welding Rod Baking and holding Report see attachment.
Weld Deposit remove during back gounging
Back Gouging is done and found accepted.

Recorded by :_______________________
Name and signature

Witness by :_______________________
Name and signature

Amp. Range
(A)

Volt Range
(V)

Weld Deposit
Depth
(mm)

Weld beads
Width
(mm)

Weld Time
min:sec

Travel Speed
Range
(mm/min)

QW-409.1
Heat Input = 60 (A) (V)
Travel Speed x 1,000

Witness by :_______________________
Name and signature

Pre-heat
Temp.
(C)

Travel Speed =

Interpass
Temp.
(C)

Heat Input
(KJ/mm.)

Length of Specimen
Weld Time

Witness by :_______________________