COMPLETE REVISION
October 2006
Process Industry Practices
Electrical
PIP ELSMC11D
Data Sheet for Medium-Voltage
Motor Control Center Specification
PURPOSE AND USE OF PROCESS INDUSTRY PRACTICES
In an effort to minimize the cost of process industry facilities, this Practice has
been prepared from the technical requirements in the existing standards of major
industrial users, contractors, or standards organizations. By harmonizing these
technical requirements into a single set of Practices, administrative, application, and
engineering costs to both the purchaser and the manufacturer should be reduced. While
this Practice is expected to incorporate the majority of requirements of most users,
individual applications may involve requirements that will be appended to and take
precedence over this Practice. Determinations concerning fitness for purpose and
particular matters or application of the Practice to particular project or engineering
situations should not be made solely on information contained in these materials. The
use of trade names from time to time should not be viewed as an expression of
preference but rather recognized as normal usage in the trade. Other brands having the
same specifications are equally correct and may be substituted for those named. All
Practices or guidelines are intended to be consistent with applicable laws and
regulations including OSHA requirements. To the extent these Practices or guidelines
should conflict with OSHA or other applicable laws or regulations, such laws or
regulations must be followed. Consult an appropriate professional before applying or
acting on any material contained in or suggested by the Practice.
This Practice is subject to revision at any time.
Process Industry Practices (PIP), Construction Industry Institute, The
University of Texas at Austin, 3925 West Braker Lane (R4500), Austin,
Texas 78759. PIP member companies and subscribers may copy this Practice
for their internal use. Changes, overlays, addenda, or modifications of any
kind are not permitted within any PIP Practice without the express written
authorization of PIP.
PRINTING HISTORY
January 2001
Issued
October 2006
Complete Revision
Not printed with State funds
ASSOC. PIP
DATA SHEET
ELSMC11
ELSMC11D
PAGE 1 OF 2
MEDIUM-VOLTAGE
MOTOR CONTROL CENTERS
ISSUED FOR:
PROPOSAL
PURCHASE
OCTOBER 2006
AS BUILT
FACILITY NAME/LOCATION:
ITEM NAME:
PURCHASER/LOCATION:
ITEM TAG NO.:
JOB NO.:
SERVICE:
PURCHASER ORDER NO.:
UNIT:
SUPPLIER/LOCATION:
DWG. NO.:
SUPPLIER ORDER/SERIAL NOS.:
DATA PROVIDED BY:
PURCHASER
SUPPLIER IF NOT BY PURCHASER
SUPPLIER
REFER TO PIP ELSMC11 FOR GENERAL REQUIREMENTS
APPLICABLE STATE AND LOCAL CODES:
CONTROLLER GENERAL DATA (4.1.1.1, 4.1.1.2, 4.1.3.3, 4.1.5.5, 4.1.8.2b):
SITE CONDITIONS (4.1.1.8, 4.1,2):
ALTITUDE:
FT
AMBIENT TEMPERATURE:
SEISMIC ZONE:
MAX.:
AREA CLASSIFICATION:
MIN.:
UNCLASSIFIED
OTHER:
OTHER:
SYSTEM PARAMETERS:
VOLTS:
DRAWOUT
350 MVA @ 4.16 KV
OTHER:
VOLTAGE DIP RIDE-THROUGH:
% OF
NOMINAL VOLTAGE FOR:
CYCLES
METERING AND PROTECTIVE FUNCTIONS (4.1.9):
PHASE:
WYE
STATIONARY
HERTZ:
DELTA
EXT POWER:
OTHER:
FAULT CURRENT:
VAC
SOLID-STATE
X/R RATIO:
VDC
CPT POWER
MICROPROCESSOR BASED
OTHER:
ONE-LINE DWG. NO.:
OTHER REQUIREMENTS ATTACHED
SYSTEM GROUNDING:
DCPOWERED METERS AND PROTECTIVE DEVICES
HIGH RESISTANCE
LOW RESISTANCE
SOLIDLY GROUNDED
UNGROUNDED
REQUIRED
NOT REQUIRED
REQUIRED
4 - 20 MA
0 - 5 VOLTS
ETHERNET
OTHER:
VIEWING PORTS(4.1.1.9)
REMOTE COMMUNICATION (4.1.9.3):
RS 232
RS 485
SPACE HEATERS (4.1.12):
ENCLOSURE (4.1.3.1):
REQUIRED IN EACH SECTION
NEMA 1
NEMA 1 WITH GASKET
NEMA 12
OUTDOOR PER PIP ELSSG12
MFG. STD
POWER BY PURCHASER
WHITE
POWER BY SUPPLIER
WATTS @
CONTROL POWER TRANSFORMERS (4.1.15):
ANSI 61 LIGHT GRAY
OTHER:
ARC RESISTANT CONSTRUCTION(4.1.4)
REQUIRED
OTHER
BUS DUCT:
PT PRIMARY VOLTAGE:
VOLTS
CPT PRIMARY VOLTAGE:
VOLTS
EXTERNAL LOADS:
KVA
NAMEPLATES (4.1.16):
INCOMING POWER (4.1.5.10, 4.1.11.1):
AMPERES
SIZE/TYPE:
CLOSE COUPLED
BLACK LETTERS/WHITE BACKGROUND
NO./PHASE:
SHIELDED
UNSHIELDED
OTHER:
SHOP INSPECTION & TESTS (4.2):
ENTRY:
TOP
BOTTOM
MFR./ANSI STANDARD TESTS
CABLE LUGS:
BY PURCHASER
BY SUPPLIER
OTHER TESTS AS DESCRIBED
CONTROL CABLE ENTRY:
TOP
BOTTOM
WITNESSED
MAIN BUS & BUS RATING (4.1.5):
OTHER:
INSULATED COPPER
OTHER:
MFG. STD. PLATING
SILVER PLATED
CERTIFIED TEST REPORTS
OTHER:
TIN PLATED
SPECIAL BRACING REQUIREMENTS:
DOCUMENTATION (4.4):
ELECTRONIC DOCUMENT FORMAT:
GROUND BUS COMPRESSION LUGS (4.1.6.5):
2/0
DXF
4/0
UNSHIELDED
TOP
BOTTOM
CABLE LUGS:
BY PURCHASER
BY SUPPLIER
DATE
REPRODUCIBLE PLUS:
COPIES OF ALL DOCUMENTATION PLUS:
ENTRY:
NO.
OTHER:
MANUFACTURER TO PROVIDE:
LOAD CABLES (4.1.11.2):
SHIELDED
NOT WITNESSED
PRESHIPMENT SHOP INSPECTION
1200 AMPERES
1/0
VOLTS
OTHER:
EXTERIOR FINISH (4.1.3.7):
TYPE 2
HUMIDISTAT
TEST PUSHBUTTON FOR AMMETERS
SPACE HEATER LOAD:
INTERIOR FINISH (4.1.3.6):
CABLE:
THERMOSTAT
COPIES OF OPERATING MANUALS
OTHER REQUIREMENTS:
REVISION DESCRIPTION
BY
APVD.
ASSOC. PIP
DATA SHEET
ELSMC11
ELSMC11D
PAGE 2 OF 2
MEDIUM-VOLTAGE
MOTOR CONTROL CENTERS
OCTOBER 2006
LOAD SUMMARY:
MOTOR DATA
UNIT
NUMBER
SERVICE
HP
SPEED
(RPM)
S.F.
FULL
LOCKED
STALL
ACCEL.
MOTOR
MOTOR
LOAD
ROTOR
TIME
TIME
SPACE
FEEDER
AMPS
AMPS
(HOT/
HEATER
CABLE
COLD)
(WATTS)
(SIZE/NO.
PER PHASE)
REMARKS
(4.1.9 Manufacture and model
number of protective relay or
metering)