Software Testing: A Sample Test Plan
Software Testing: A Sample Test Plan
Home
Projects
Selenium Tool
Software Testing
Manual Testing, HP UFT, VBScript for UFT, Quality Center,
LoadRunner, C and SQL by G C Reddy (91-9247837478)
Manual Testing
QTP
SQL
C Language
Java
Oracle FAQ
Resum es
UFT Guide
G.C. REDDY
UFT Videos
Search
NO COMMENTS
G. C. REDDY
2 circles
Insurance Domain
967
V IE W M Y COM P LE TE
P ROF ILE
Sample Test
Configuration management planning
Sample Executive Summary
Creating Traceability matrix
Defining test environment setup
Test Internet
http://www.gcreddy.com/2012/07/sample-test-plan.html
1/10
8/9/2014
Output:
Test Plan document
Subscribe
Visit this group
POPULAR POSTS
VB Script for QTP
QTP Guide
Some type of unique company generated number to identify this test plan.
2) Introduction:
QTP Scripting
manual testing interview
questions
Describe the purpose of the Plan, possibly identifying the level of the plan
December (39)
November (19)
(System Test Plan etc.). This is essentially the executive summary part of the
plan.
October (3)
3) Test Items:
September (2)
These are things you intend to test within the scope of this test plan.
An overview on Test
Automation
4) References:
July (18)
List all documents that support this test plan. Refer to the actual
SQL Interview
Questions
management system.
Database Testing
5) Features to be Tested:
LoadRunner Interview
Questions
..
ANALYTICS
August (2)
This is a listing of what is to be tested from the Users viewpoint of what the
system does. This is not a technical description of the software, but a Users
Ecommerce domain
top 10
with all higher and lower levels of plans. Overall rules and processes should be
identified.
Automation Scenario
Defect Reporting
8) Entry Criteria:
It describes when to start Testing
ISTQB Paper 14
ISTQB Question
Paper
9) Exit Criteria:
ISTQB dumps 12
It describes when to stop testing
http://www.gcreddy.com/2012/07/sample-test-plan.html
ISTQB questions 11
A Sample Test Plan
June (21)
2/10
8/9/2014
February (2)
January (13)
2010 (138)
16) Approvals
Who can approve the process as complete and allow the project to proceed to
the next level.
17) Glossary:
Define terms and acronyms used in the document, it can be used to
understood the terms used in this plan.
-----------------------------------------------------------
3) Test Items:
Admin Interface:
Master Data
User Management
http://www.gcreddy.com/2012/07/sample-test-plan.html
3/10
8/9/2014
http://www.gcreddy.com/2012/07/sample-test-plan.html
4/10
8/9/2014
7) Entry Criteria:
a) Test Design
Team formation, Responsibilities, Schedule,
Requirements, Test Case Template etc...
Training on Domain, on Automation tools
b) Test Execution:
Readiness of Test Lab
Readiness of AUT
Requirements
Test Case docs
Test Data
Defect Report Template
Etc...
8) Exit Criteria:
All possible test cases executed
Maximum defects fixed, Final Regression performed successfully
Confidence on Test process
Time Limitations
Budget Limitations
9) Suspension Criteria:
http://www.gcreddy.com/2012/07/sample-test-plan.html
5/10
8/9/2014
Sno
Name
Role
Responsibilities
Kareemulla SK
Test Lead
Test Planning,
Remarks
guidance, Monitoring
and Test control
2
Venkat Rao P
Sr. Tester
Swapna DK
Tester
Test Case
Documentation, Test
execution, defect
reporting and tracking
for Admin module.
Srinivas V
Tester
Test Case
Documentation, Test
execution, defect
reporting and tracking
for Personal Banking
module.
Suneetha B
Tester
Test Case
Documentation, Test
execution, defect
reporting and tracking
for Corporate Banking
module.
11) Schedule:
Sno
Task
Days
Duration
1)
Understanding &
Remarks
Analyzing
Requirements.
2)
Review Meeting
01
9th July
3)
Generating Test
10
Scenarios.
July
4)
Reviews
02
5)
Test Case
40
Documentation
6)
Reviews
August
04
7)
Test Data
06
collection
8)
Reviews
01
28th August
9)
Verifying Test
01
29th August
Environment setup
http://www.gcreddy.com/2012/07/sample-test-plan.html
6/10
8/9/2014
Create Test
02
batches
11)
Sanity Testing
01
3rd September
12)
Comprehensive
25
4th September to
Testing
2nd October
13)
Sanity Testing
01
3rd October
14)
Selecting Test
02
cases
15)
Regression Testing
05
16)
Sanity Testing
01
15th October
17)
Selecting Test
01
16th October
04
17th October to
October
cases
18)
Regression Testing
Cycle 2
22nd October
28)
Final Regression
08
19th November to
28th November
29)
Evaluating exit
01 or 02
criteria
30)
Collecting all
29th, 30th of
November
02
01
5th December
artifacts
31)
Test Summary
Report
Server side:
Windows 2003 Server
http://www.gcreddy.com/2012/07/sample-test-plan.html
7/10
8/9/2014
http://www.gcreddy.com/2012/07/sample-test-plan.html
8/10
8/9/2014
Task/s
Author /Role
1)
Test Plan
Kareemulla SK (Test
Documentation
Lead)
2)
Review
3)
Approval
Manager)
17) Glossary
AUT -Application Under Test
.
.
.
PIN -Project Initiation Note
.
.
.
SRS- Software Requirements Specification
.
.
.
------------------------------------------------------------------------------
Also Visit:
New er Post
Home
Older Post
0 comments:
Post a Comment
Preview
anshuman biswas said...
bxsjsx
August 9, 2014 at 1:04 AM
http://www.gcreddy.com/2012/07/sample-test-plan.html
9/10
8/9/2014
http://www.gcreddy.com/2012/07/sample-test-plan.html
10/10