001 Catalogue of Company Standards
001 Catalogue of Company Standards
Company Standards
RT/LS/CAT001
ISSUE 46
This document is the property of Network Rail Infrastructure Ltd. It shall not be reproduced in whole or in part, nor disclosed
to a third party, without the written permission of the standard owner.
Copyright 2004 Network Rail Infrastructure Ltd.
Network Rail Infrastructure Ltd. is part of the Network Rail Group of Companies.
th
st
Page 1
Paul McAleer
Head of Standards Development
Process
Keith Hope
Standards Change Co-ordinator
Steve Smith
Standards Change Co-ordinator
John Winnifrith
Standards Change Co-ordinator
Richard Geldart
Standards Change Co-ordinator
Caroline Peach
Standards Publication Co-ordinator
Sheriff Olujide
Standards Publication Assistant
Chris Folwell
Database Co-ordinator
Johanna Grant
Database Assistant
Kim Yarger
Team Secretary
Other Information
Network Rail Company Standards Subscriptions
IHS Technical Indexes Ltd
Phone: 01344 404409
Rapidoc
Phone: 01344 861666 or email: [email protected]
Railway Group Standards
Rail Safety & Standards Board
Enquiry Desk
Phone: 020 7904 7518
(085 77518)
Network Rail Technical Drawings
National Records Group
Phone: 01904 524674
(03 74674)
Hard Copy Purchase of Rule Books; Handbooks & Forms
Willsons Printers Limited
Phone: 01636 702334
(03 79510)
Email: [email protected]
For all queries about the content of the Company
Standards please, in the first instance, contact the
Publication Team
On 3rd February 2003 Railtrack officially changed its name to Network Rail. Railtrack Company Standards will now be
officially known as Network Rail Company Standards. Newly published standards from April 2003 will reflect this name change.
All existing standards are still valid and will be changed as and when the standards are reviewed
th
st
Page 2
Contents
Contents
1. About this catalogue ....................................................................................................................6
1.1. How to use this catalogue .................................................................................................................................... 7
1.1.1. Example of Typical Entry ............................................................................................................................................................. 7
1.1.2. The Numbering System................................................................................................................................................................ 7
1.1.3. Quick Find Using the Index..................................................................................................................................................... 8
1.1.4. Referenced Documents................................................................................................................................................................ 8
1.1.5. Coloured Pages.............................................................................................................................................................................. 8
1.1.6. Compliance and Implementation ............................................................................................................................................... 9
1.1.7. Technical Standards for Inter-operability. ................................................................................................................................ 9
1.1.8. Notified National Standards........................................................................................................................................................ 9
1.1.9. Direct Maintenance Supplementary Instructions.................................................................................................................... 9
1.1.10. Ordering and Price List............................................................................................................................................................10
2C3. Ergonomics.....................................................................................................................................................................................42
2C3.1. Specifications ............................................................................................................................................................................................. 42
2C3.2. Procedures................................................................................................................................................................................................. 42
2C3.3. Guidance Notes........................................................................................................................................................................................ 42
th
st
Page 3
Contents
2C7. Telecommunications.................................................................................................................................................................... 91
2C7.1. Specifications ............................................................................................................................................................................................. 91
2C7.2. Procedures................................................................................................................................................................................................. 93
2C7.3. Codes of Practice..................................................................................................................................................................................... 94
2C7.4. Guidance Notes........................................................................................................................................................................................ 95
2C7.5. Special Inspection Notices ..................................................................................................................................................................... 95
2H2. Assurance.....................................................................................................................................................................................114
2H2.1. Specifications........................................................................................................................................................................................... 114
2H2.2. Procedures .............................................................................................................................................................................................. 114
2H2.3. Codes of Practice................................................................................................................................................................................... 114
st
Page 4
Contents
2H10. Security Specialist .................................................................................................................................................................... 128
2H10.1. Procedures.............................................................................................................................................................................................128
2H10.2. Codes of Practice.................................................................................................................................................................................128
2H10.3. Guidance Notes ...................................................................................................................................................................................128
th
st
Page 5
Section 2 is the Category Index of Network Rail Company Standards which lists all the
o
o
o
o
o
o
o
Specifications,
Product Specifications,
Procedures,
Codes of Practice,
Work Instructions,
Guidance Notes,
Special Inspection Notices
Product Specifications are grouped separately, in numeric order, for ease of reference. Each Directorate is divided into
recognisable sections (e.g. Civil Engineering; Operational Safety Policy, etc.) with a summary of each document to assist
the user in identifying standards applicable to their business. In addition, you will find information on the mandatory
requirements for each Company Standard as well as information relating to compliance, where applicable.
Section 3: A Reference Guide to Group Standards is a quick reference for users, which shows an up-to-date
listing of Railway Group Standards at present in force. For further information contact the Rail Safety & Standards
Board Enquiry Desk on 020 7557 8774 (internal 085 78774).
Section 4: Railway Group Standards and Catalogue Index. This section contains a listing of the Railway Group
Standards retained by Network Rail, and finally an Index to this catalogue.
th
st
Page 6
*EXAMPLE
Issue
Date
Status
Price
2 (1)
Up-Issued
New or Up-issued.
Blank = no change
Price band
See 1.1.9.
Colour
Compliance
Implementation
02/08/03
02/08/03
Six types of document are published as Network Rail Company Standards. The purpose of each is as follows:
TERM
DEFINITION
These set mandatory requirements upon Network Rail s employees, and also, when
designated in an agreed contract or lease, upon contractors or tenants. They may
contain procedural requirements. They require a formal remit, a Business case and
Stakeholder Review.
These have a special status in that applicants for product acceptance shall:
They do not require a Business Case, but require a formal remit & Stakeholder
Review.
Network Rail Company Procedures
th
st
These set mandatory requirements upon Network Rail employees only. They are
not always procedural in nature. These procedures may be incorporated in
contracts under the authority of a Network Rail Designated Employer s
Representative. They require a Formal Remit, a Business Case and Stakeholder
Review.
Page 7
These are Network Rail s equivalent of Specified Operations Publications. They are
mandatory and specify actions to be undertaken by employees of Network Rail and
others to ensure safety while working on Network Rail Controlled Infrastructure.
They differ from Company Specifications in that they are task-based. These require
a formal remit, stakeholder review and a business case.
These are intended to provide information for Network Rail and others on the
basis of past experience and knowledge. They are advisory documents and do not
necessarily represent best practice. They do not require a Business Case or
Stakeholder Review.
Rapid Response
The Rapid Response Procedure shall enable Network Rail to authorise Standards
Change which are required more urgently than the usual procedures would permit.
The Rapid Response Procedure may only be used where both the following criteria
are met:
Standards Change issued under the Rapid Response Procedure shall have an
applicability of one calendar year from Implementation Date.
Within 2 months of the Implementation Date, the Sponsor shall regularise the
Standards Change issued under the Rapid Response Procedure through the usual
procedures.
th
st
Page 8
* EXAMPLE
Issue
Date
Status
Price
4 (3)
Up-issued
Colour
Compliance
Implementation
01/04/04
01/04/04
The current standard is shown in (grey), indicating that the new edition, shown in black, will supersede it.
For reasons of clarity, this approach has been confined to the catalogue (paper and electronic versions), and does not appear in
the menu pages of the CD-ROM.
th
st
Page 9
Most Network Rail Company Standards are priced according to the number of pages in them and are divided into 6 main price
bands; these price bands are:
Price Band
Price
A
8
B
11
C
21
D
32
E
42
F
63
th
st
Page 10
2. Company Standards
A. General Information
Title
Issue
Issue Date
RT/CE/C/041
Issue 3
7-Aug-04
07-Aug-04
07-Aug-04
RT/CE/C/045
Issue 1
7-Aug-04
01-Sep-04
01-Sep-04
RT/CE/S/044
Issue 2
7-Aug-04
01-Nov-04
07-Aug-04
RT/CE/S/048
Issue 4
7-Aug-04
02-Oct-04
02-Oct-04
RT/CE/S/049
Issue 8
7-Aug-04
07-Aug-04
07-Aug-04
RT/CE/S/071
Issue 2
7-Aug-04
01-Nov-04
01-Nov-04
RT/CE/S/142
Issue 1
7-Aug-04
07-Feb-05
07-Feb-05
RT/D/P/095
Issue 1
7-Aug-04
07-Aug-04
07-Aug-04
RT/D/P/096
Issue 1
7-Aug-04
07-Aug-04
07-Aug-04
RT/D/S/002
Issue 3
7-Aug-04
07-Aug-04
07-Aug-04
RT/E/C/11115
Issue 3
7-Aug-04
07-Aug-04
07-Aug-04
RT/E/C/17904
Issue 1
7-Aug-04
07-Aug-04
07-Aug-04
RT/E/C/19020
Issue 3
7-Aug-04
07-Aug-04
07-Aug-04
RT/E/C/19272
Issue 1
7-Aug-04
07-Aug-04
07-Aug-04
RT/E/P/10024
Issue 4
7-Aug-04
01-Oct-04
01-Oct-04
RT/E/P/11120
Issue 6
7-Aug-04
07-Aug-04
07-Aug-04
RT/E/P/19607
Issue 1
7-Aug-04
02-Oct-04
02-Oct-04
RT/E/S/10040
Issue 6
7-Aug-04
07-Aug-04
07-Aug-04
RT/E/S/10662
Issue 2
7-Aug-04
07-Aug-04
07-Aug-04
RT/E/S/11129
Issue 3
7-Aug-04
07-Aug-04
07-Aug-04
RT/E/S/11630
Issue 7
7-Aug-04
07-Aug-04
07-Aug-04
RT/E/S/17002
Issue 13
7-Aug-04
07-Aug-04
07-Aug-04
RT/E/WI/00102
Issue 3
7-Aug-04
07-Aug-04
07-Aug-04
RT/E/WI/00103
Issue 1
7-Aug-04
07-Aug-04
07-Aug-04
th
st
Compliance Implementation
Page 11
2. Company Standards
A. General Information
Standard No
Title
Issue
Issue Date
RT/E/WI/00104
Issue 2
7-Aug-04
Compliance Implementation
07-Aug-04
07-Aug-04
RT/E/WI/00105
Issue 2
7-Aug-04
07-Aug-04
07-Aug-04
RT/E/WI/00110
Issue 1
1-May-04
21-May-04
21-May-04
RT/LS/C/101
Issue 4
7-Aug-04
07-Aug-04
RT/LS/C/102
Issue 4
7-Aug-04
07-Aug-04
RT/LS/CAT001
46
07-Aug-04
RT/LS/CAT005
22
7-Aug-04
07-Aug-04
RT/LS/CAT006
10
7-Aug-04
07-Aug-04
RT/LS/CAT007
7-Aug-04
07-Aug-04
RT/LS/G/00014
Issue 2
7-Aug-04
07-Aug-04
07-Aug-04
RT/LS/P/200
Issue E1
7-Aug-04
07-Aug-04
07-Aug-04
RT/LS/P/250
Issue E1
7-Aug-04
07-Aug-04
07-Aug-04
ff
th
st
Page 12
2. Company Standards
A. General Information
Date
Deleted
Standard No
Title
RT/CE/C/041
Issue 2
Aug 04
Superseded by Issue 3
RT/CE/S/044
Undertrack Crossings
Issue 1
Aug 04
Superseded by Issue 2
RT/CE/S/048
Issue 3
Aug 04
Superseded by Issue 4
RT/CE/S/049
Issue 7
Aug 04
Superseded by Issue 8
RT/CE/S/071
Issue 1
Aug 04
Superseded by Issue 2
RT/D/P/021
Issue 2
Aug 04
Superseded by RT/LS/P/052
RT/D/P/022
Issue 7
Aug 04
Withdrawn
RT/D/S/002
Issue 2
Aug 04
Superseded by Issue 3
RT/D/S/004
Issue 2
Aug 04
Superseded by RT/D/P/095
RT/D/S/005
Issue 2
Aug 04
Superseded by RT/D/P/096
RT/E/C/10048
Issue 1
Aug 04
RT/E/C/10094
Issue 2
Aug 04
Superseded by RT/E/S/10660
RT/E/C/10095
Issue 2
Aug 04
Superseded by RT/E/S/10660
RT/E/C/11115
Issue 2
Aug 04
Superseded by Issue 3
RT/E/C/19004
Issue 1
Aug 04
RT/E/C/19011
Issue 1
Aug 04
RT/E/C/19020
Issue 2
Aug 04
Superseded by Issue 3
RT/E/C/19031
Issue 1
Aug 04
RT/E/C/19034
Issue 1
Aug 04
RT/E/C/19255
Issue 1
Aug 04
Superseded by RT/E/C/19272
RT/E/C/19256
Issue 2
Aug 04
Superseded by RT/E/C/19272
RT/E/C/19260
Issue 2
Aug 04
Superseded by RT/E/C/19272
RT/E/C/19261
Issue 1
Aug 04
Superseded by RT/E/C/19272
RT/E/C/19264
Issue 1
Aug 04
Superseded by RT/E/C/19272
RT/E/C/19267
Issue 1
Aug 04
Superseded by RT/E/C/19272
RT/E/P/10024
Issue 3
Aug 04
Superseded by Issue 4
RT/E/P/11120
Issue 5
Aug 04
Superseded by Issue 6
RT/E/S/10040
Issue 5
Aug 04
Superseded by Issue 6
RT/E/S/10662
Issue 1
Aug 04
Superseded by Issue 2
RT/E/S/11129
Issue 2
Aug 04
Superseded by Issue 3
RT/E/S/11630
Issue 6
Aug 04
Superseded by Issue 7
RT/E/S/17002
Issue 12
Aug 04
Superseded by Issue 13
th
st
Change Made
Page 13
2. Company Standards
A. General Information
Date
Deleted
Issue 2
Aug 04
Superseded by Issue 3
Issue 1
Aug 04
Superseded by Issue 2
RT/E/WI/00105
Issue 1
Aug 04
Superseded by Issue 2
RT/LS/C/101
Issue 3
Aug 04
Superseded by Issue 4
RT/LS/C/102
Issue 3
Aug 04
Superseded by Issue 4
RT/LS/CAT005
Issue 21
Aug 04
Superseded by Issue 22
RT/LS/CAT006
Issue 9
Aug 04
Superseded by Issue 10
RT/LS/CAT007
Issue 1
Aug 04
Superseded by Issue 2
RT/LS/G/00014
Issue 1
Aug 04
Superseded by Issue 2
Standard No
Title
RT/E/WI/00102
RT/E/WI/00104
Change Made
th
st
Page 14
2. Company Standards
A. General Information
Title
RT/D/P/020
Issue
6
Aug-00
RT/D/P/027
Apr-00
Supply Chain
RT/D/P/030
Dec-02
Supply Chain
RT/D/P/034
Apr-00
Supply Chain
RT/D/P/036
Apr-00
Supply Chain
RT/D/P/047
Apr-00
Supply Chain
RT/E/P/02009
Oct-01
Business Engineering
RT/LS/P/052
Apr-04
Supplier Accreditation
Date
Status
Price
Colour
Compliance
Implementation
46
Aug 04
Up-Issued
The Company Standards Catalogue, formerly known as The Line Standards Catalogue, lists Standards issued by
Engineering, Safety & Environment, and Contract & Supply.
Date
Status
Price
Colour
Compliance
Implementation
4
Oct 00
This catalogue lists documents (drawings) relating to signalling equipment Mechanical and Electrical Drawings.
RT/LS/CAT004
Date
Status
Price
Colour
Compliance
Implementation
4
Feb 00
This catalogue lists documents (drawings) relating to signalling equipment Signalling Structure Drawings.
RT/LS/CAT005
Date
Status
Price
Colour
Compliance
22 (21)
Aug 04 (Feb 04)
Up-Issued
Yes
This catalogue lists documents (drawings) relating to signalling equipment Typical Circuits.
th
st
Implementation
07/08/04
Page 15
2. Company Standards
RT/LS/CAT006
A. General Information
Date
Status
Price
Colour
Compliance
Implementation
10 (9)
Aug 04 (Aug 01)
Up-Issued
07/08/04
This catalogue lists documents (drawings) relating to signalling equipment Equipment and Systems Specifications.
The standards shown in catalogue 6 are for reference purposes only, they may not reflect today s requirements nor Network
Rail s future asset strategy.
RT/LS/CAT007
Date
Status
Price
Colour
Compliance
Implementation
2 (1)
Aug 04 (Apr 04)
Up-Issued Phone
07/08/04
This catalogue contains Supplementary Instructions when maintenance is directly managed internally within
Network Rail the existing Company Standard to which it pertains will not be wholly appropriate. The changes
required are minor and there is no material change to the technical requirements of the Company Standard. The
changes are to be considered made to the existing Company Standard published by Business Standards only where
maintenance is undertaken directly by Network Rail employees.
RT/ETE/INDEX
Date
Status
Price
Colour
Compliance
Implementation
2
Aug 00
This document lists current electrical track equipment (ETE) drawings, together with the equivalent superseded
drawings.
th
st
Page 16
2. Company Standards
Date
Status
Price
Colour
Compliance
Implementation
5
Apr 00
C
This procedure details the rles and responsibilities of Network Rail staff in considering trends in Contractors
accidents and incidents and assisting in the setting up of Action Plans to reduce the likelihood of similar
occurrences.
Mandatory upon: Network Rail
Standards Ownership: Contracts & Procurement
RT/D/P/045
Date
Status
Price
Colour
Compliance
Implementation
1
Nov 96
B
It is essential that the Track Renewals Contractor has either a Contingency Plan in place for problems
encountered in complying with Specifications/Standards during Track Renewals Works or is aware of the
Procedure within Network Rail for resolution of the problem. This procedure sets out the roles and
responsibilities in relation to dealing with problems encountered during Track Renewals Works.
Mandatory upon: Network Rail
Standards Ownership: Contracts & Procurement
RT/D/P/064
Date
Status
Price
Colour
Compliance
Implementation
2
Apr 00
B
This procedure lays down the principles for monitoring contracts for clearance of litter from the track in station
areas both where this activity is carried out under the Infrastructure Maintenance Contract and under separate
bespoke contracts.
Mandatory upon: Network Rail
Standards Ownership: Contracts & Procurement
RT/K/P/013
Date
Status
Price
Colour
Compliance
Implementation
1
Jul 97
C
The purpose of this procedure is to support the Corporate Manual's requirement, by defining the steps that must
be followed by all parties in the various stages of engagement of management consultants. It also emphasises the
Corporate Manual's requirement to obtain prior approval of the Chairman or Chief Executive for the engagement
of all Management Consultants.
Mandatory upon: Network Rail
Standards Ownership: Contracts & Procurement
th
st
Page 17
2. Company Standards
Supplier Accreditation
Date
Status
Compliance
Implementation
1
Apr 04
The purpose of this procedure is to mandate the requirements for:
The effective accreditation and development of suppliers directly engaged by Network Rail
The use of pre-contract approval and accreditation information to ensure that appropriate suppliers are
selected to meet Network Rail contract requirements
Mandatory upon: Network Rail
Standards Ownership: Supplier Accreditation
This Standard is for Network Rail Use Only Not Available outside the Company
Date
Status
Price
Colour
Compliance
Implementation
2 (1)
Aug 04 (Apr 02)
Up-Issued D
07/08/04
07/08/04
Describes the Contractor Assurance System, i.e. Network Rail s contract & contractor assurance processes, in
order to clarify the purpose and interdependence of these processes.
Mandatory upon: Advisory only
Additional Information: This Guidance Note replaces RT/LS/C/003
Standards Ownership: Supplier Accreditation
th
st
Page 18
2. Company Standards
C. Engineering
Electrification
Date
Status
Price
Colour
Compliance
Implementation
Status
882C1
1997
Specification
AC2/3
1968
Specification
AC 8
1976
Specification
AC 129
1983
Specification
AC 174
1984
Specification
AC 199
1986
Specification
AC 239
1991
Specification
AC/DC 242
General Specification for Installation of Cable Routes, Cable Laying, Testing and
Jointing on Cable Routes forming part of the Traction Distribution System
1990
Specification
ECP 229
1989
Specification
EHQ/SP/C/501
Specification for the Design and Installation of Negative Bonding and Associated
Equipment on the High Current D.C. Electrified Lines of Network South East
1994
Specification
EHQ/SP/D/007
1992
Specification
EHQ/SP/D/025
1993
Specification
EHQ/SP/D/102
1991
Specification
EHQ/SP/D/134
1992
Specification
EHQ/SP/O/004 Specification for the Supply and Installation of OHL Equipment for 50Hz A.C.
Electrification
1991
Specification
1993
Specification
EHQ/SP/O/012 Specification for Test of Cross Spanwire Clamps on 19/2.1 Cad Cu Spanwire
1991
Specification
EHQ/SP/O/026 Specification for Track Datum Markers on all overhead electrified lines.
1990
Specification
EHQ/SP/O/049 Protective Coatings of Structure Bases & Foundation Caps of Overhead Line
Structures - CAUTION: Protective treatments - RT/CE/S/039 & RT/CE/C/002
apply now
1993
Specification
1992
Specification
EHQ/SP/S/001
1993
Specification
EHQ/SP/S/002
1991
Specification
EHQ/SP/S/004
Specification for the Installation & Operation of Buffer Sections & Permanently
Earthed Sections in A.C. OHLE
1992
Specification
EHQ/SP/S/030
1992
Specification
1994
Specification
1994
Specification
1994
Specification
th
st
Operations
Date
Maintenance
Issue
Installation
Document No Title
Design
11
Aug 02
D
To specify the application of documents relating to Electrical Distribution & Electromechanical Plant issued prior to
April 1994 and as listed in this Specification.
Mandatory upon: Network Rail & Contractors
Standards Ownership: Electrification & Plant
Page 19
Date
Status
1994
Specification
1994
Specification
1994
Specification
Operations
Issue
Maintenance
Document No Title
Electrification
Installation
C. Engineering
Design
2. Company Standards
1992
Specification
1992
Specification
1991
Specification
1992
Specification
EHQ/ST/S/001
1992
Specification
EHQ/ST/S/502
1993
Specification
EHQ/ST/S/505
1993
Specification
EHQ/ST/S/506
Standard for Site Safety for Non British Railways Personnel Working for the
Electrification Group
1994
Specification
OLEMI
12
Jun-02
Specification
SN27-93-002
Specification
SN53-324/007/2
EHQ/PR/C/501 Procedure for Application of Short Circuiting Straps for Conductor Rail
Isolation
1987
Specification
1994
Procedure
1990
Procedure
1990
Procedure
1992
Procedure
1990
Procedure
EHQ/PR/O/008 Fitting and Removal of OHL Connections To/From High/Low Voltage Terminals
on Transformers
1991
Procedure
1990
Procedure
EHQ/PR/O/012 Jointing of Universal Columns and Broad Flanged Beams for use as Masts for
OHL Structures - CAUTION: Protective treatments - RT/CE/S/039 &
RT/CE/C/002 apply now
1992
Procedure
EHQ/PR/O/013 Installation of "Preformed" Dead Ends for AL, AWAC & CU-PLY Conductors
1991
Procedure
1992
Procedure
EHQ/PR/O/016 Use of Permaquip Scissor-Type extending Platform Machine Used for Overhead
Line Maintenance
1993
Procedure
EHQ/PR/O/017 Installation of 'BICC-BURNDY Compression Splices for AL, AWAC & CopperCadmium Conductors
1992
Procedure
1992
Procedure
EHQ/PR/O/020 Application of High Performance Pressure sensitive Plastic Sheet Film Markers
to OHL Equipment
1992
Procedure
EHQ/PR/O/024 Use and Care of B.R. Type Overhead Live Line Testers
1992
Procedure
EHQ/PR/O/027 Installation of Contact Wire Splices for Hard-Drawn & Cadmium Copper
Conductors
1992
Procedure
1992
Procedure
1992
Procedure
1992
Procedure
1992
Procedure
1991
Procedure
1992
Procedure
1992
Procedure
EHQ/PR/O/046 Use of M.E. Mechanical Handling Conductor Drum Carriers Fitted With Caliper
Disc Brakes
1992
Procedure
1992
Procedure
th
st
Page 20
Operations
Issue
Date
Status
1992
Procedure
1992
Procedure
EHQ/PR/S/001
1990
Procedure
EHQ/PR/S/002
1990
Procedure
EHQ/PR/S/003
1991
Procedure
EHQ/PR/S/006
Procedure for the special action required for AC electrified lines in those joint
less track circuits areas listed in Appendix 1
1990
Procedure
EHQ/PR/S/031
Procedure for the Issue, Storage, Routine Inspection and Testing of Rubber
Gloves
1991
Procedure
EHQ/PR/S/134
1991
Procedure
EHQ/PR/S/602
1994
Procedure
EHQ/ST/S/501
1993
Procedure
SP-PM-018
Mar-92
Procedure
SP-PM-027
Mar-84
SP-PM-039
SP-PM-048
Mar-88
SP-PM-060
Jun. 1988
Procedure
SP-PM-063
Feb-90
SP-PM-066
SP-PM-111
AC 220
CP-PM-001
CP-PM-011
Design
Document No Title
Electrification
Maintenance
C. Engineering
Installation
2. Company Standards
Procedure
Nov-87
Procedure
May-90
Procedure
1991
Code of
Practice
Nov-89
Code of
Practice
Jun. 1985
Code of
Practice
CP-PM-017
Jul. 1987
Code of
Practice
CP-PM-018
Oct-89
Code of
Practice
CP-PM-019
Aug-92
Code of
Practice
CP-PM-023
Aug-92
Code of
Practice
CP-PM-033
Feb-90
Code of
Practice
CP-PM-045
Jun-93
Code of
Practice
CP-PM-046
Winches
Feb-92
Code of
Practice
ECP 34
1980
Code of
Practice
ECP 44
1977
Code of
Practice
ECP 227
1989
Code of
Practice
ECP 166
Code of Practice for Location and Design of Designated Earth Points (D.E.P.S.)
for Overhead Line Equipment
1985
Code of
Practice
ECP 236
Code of
Practice
EHQ/CP/P/039
Code of
Practice
th
st
Procedure
Procedure
1993
Procedure
Page 21
Date
Status
Operations
Issue
Maintenance
Document No Title
Electrification
Installation
C. Engineering
Design
2. Company Standards
EHQ/CP/P/209
1993
Code of
Practice
EHQ/CP/S/136
Code of Practice for the Application and Removal of Local Earth's and
Temporary Continuity Jumpers for A.C. Electrified Lines
1991
Code of
Practice
EHQ/ST/C/502 Reporting and Investigation into the Cause of Displaced Conductor Rails
1993
Code of
Practice
1994
Code of
Practice
1995
Code of
Practice
TPS/MC/401
Planning, Installation & Maintenance of Cable Routes & Other Works in Cess
1987
Code of
Practice
BR 29740
Instructions
BR 29987/9
Instructions
EHQ/IN/D/001 Instruction for the Inspection of 25 kV A.C. Feeder Station Buildings and Other
Track Sectioning Cabins/ Enclosures
1992
1990
Instructions
EHQ/IN/D/008 Instruction for Routine Testing and Maintenance of Transformer and Switchgear
Oil
1993
Instructions
EHQ/IN/D/009 Instruction for the Inspection and Maintenance of 25 kV Cables and Cable
Routes
1993
Instructions
EHQ/IN/D/010 Instruction for the Routine Inspection and Secondary Injection of F.G.L.
Instantaneous Attracted Armature Relays
1993
Instructions
EHQ/IN/D/011 Instruction for Method of Applying Zone Reach and Timer Settings to DZA and
AKE Protection Relays Using BR DZ Test Set
1993
Instructions
EHQ/IN/D/012 Instruction for Routine Inspection and Secondary Injection Testing of DZA &
XFE Protection Relays
1993
Instructions
EHQ/IN/D/013 Instruction for Routine Inspection and Secondary Injection Testing of T.F.H.
Protection Relays
1993
Instructions
EHQ/IN/D/014 Instruction for Routine Inspection and Secondary Injection Testing of CAG 19
Instantaneous Overcurrent and Earth Fault Relays
1993
Instructions
EHQ/IN/D/016 Instruction for Routine Inspection and Secondary Injection Testing of YTG 14
Distance Protection Relays
1993
Instructions
EHQ/IN/D/019 Instruction for Routine Inspection and Secondary Injection Testing of CDG and
HO4 Protection Relays
1993
Instructions
1993
Instructions
1993
Instructions
1990
Instructions
EHQ/IN/D/101 Instruction for the Inspection & Maintenance of South Wales Switchgear Type
RD 100 Double Pole Disconnector
1992
Instructions
1990
Instructions
1990
Instructions
EHQ/IN/D/106 Instruction for the Maintenance of ASEA Minimum Oil Circuit Breakers Type
HKSJ 600Amp & HKSJB 800Amp Including Associated Busbar and Breaker
Circuit Chambers
1993
Instructions
EHQ/IN/D/108 Instruction for the Maintenance of 25 kV GEC Type OX36 Vacuum Switchgear
(Structure Mounted Outdoor Switchgear)
1993
Instructions
EHQ/IN/D/109 Instruction for the Routine Maintenance of ABB Sace Esaflour SFE 25 Structure
Mounted Outdoor Switchgear
1993
Instructions
1990
Instructions
EHQ/IN/D/201 Instruction for Maintenance of Free Breathing and Sealed Booster Transformers
1991
Instructions
EHQ/IN/D/302 Instruction for Stationary Batteries Nickel Cadmium Type and Associated
Charger and Changeover Relay-West Coast 25 kV Electrified Line Only
1990
Instructions
th
st
Instructions
Page 22
Operations
Issue
Date
Status
1990
Instructions
1990
Instructions
EHQ/IN/D/406 Instruction for Routine Inspection and Maintenance of Diesel and Electrically
Driven Compressed Air Installations
1991
Instructions
1990
Instructions
1990
Instructions
1992
Instructions
EHQ/IN/D/415 Instruction for the Inspection and Examination of Harmonic Filter Equipment
1993
Instructions
EHQ/IN/D/616 Instruction for Electrical Testing of Glass Fibre Height & Stagger Gauge
1991
Instructions
EHQ/IN/D/617 Instruction for Electrical Testing of Glass Fibre Hollow Section Height Stick and
Glass Fibre System Height Pole used on Live Overhead Equipment
1991
Instructions
EHQ/IN/D/618 Instruction for the Examination and Testing of a Primary Insulator Pole which
may Contact Live Overhead Line Equipment
1992
Instructions
EHQ/IN/D/622 Instructions for Checking Operation and General care of 25 kV L.M.R. Design
Live Line Tester (Meter Type)
1991
Instructions
EHQ/IN/O/003 Instruction for the Preparation, Care and Maintenance of Local Earths
1992
Instructions
EHQ/IN/O/005 Instruction for the Maintenance of BICC Single Wire Porcelain Section
Insulators
1990
Instructions
Design
Document No Title
Electrification
Maintenance
C. Engineering
Installation
2. Company Standards
1992
Instructions
1990
Instructions
1992
Instructions
EHQ/IN/O/031 Installation of 'CCL-Reliable' Automatic Connectors for HD copper, CopperCadmium & AWAC Catenary
1991
Instructions
1991
Instructions
1992
Instructions
EHQ/IN/O/037 Instruction for the Installation of Overhead Line Equipment, Planted and Bolted
Base Side Bearing Foundations
1992
Instructions
1993
Instructions
1992
Instructions
EHQ/IN/P/002
1992
Instructions
EHQ/IN/P/004
1993
Instructions
EHQ/IN/S/001
1993
Instructions
EHQ/IN/S/002
1990
Instructions
EHQ/IN/S/003
1992
Instructions
EHQ/IN/S/007
Instructions for Isolation and Earthing for Feeder Switch Maintenance for A.C.
Electrified Lines
1990
Instructions
EHQ/IN/S/008
1990
Instructions
EHQ/IN/S/011
1992
Instructions
EHQ/IN/S/012
1993
Instructions
EHQ/IN/S/014
1991
Instructions
EHQ/IN/S/015
1992
Instructions
EHQ/IN/S/027
1993
Instructions
EHQ/IN/S/035
1992
Instructions
EHQ/IN/S/036
1993
Instructions
EHQ/IN/S/037
Isolation & Earthing for Isolating Transformers, Associated Cables & equipment
at W. London J., Mitre Bridge and Scrubbs Lane
1993
Instructions
EHQ/IN/S/038
1993
Instructions
th
st
Page 23
EHQ/IN/S/039
Date
Status
1993
Instructions
EHQ/IN/S/040
1993
Instructions
EHQ/IN/S/212
1991
Instructions
EHQ/IN/S/801
1995
Instructions
1993
Instructions
OM.1
Jun-79
Instructions
OM.2
Oct-84
Instructions
OM.3
Apr-84
Instructions
OM.52
Jul-81
Instructions
OM.53
Aug-82
Instructions
OM.58
Sep-83
Instructions
Operations
Issue
Maintenance
Document No Title
Electrification
Installation
C. Engineering
Design
2. Company Standards
PMTK 0028
May-90
Instructions
PMTK 0041
Jul-90
Instructions
PMTK 0042
Plant Maintenance Technical Kit For Shot Blaster And Cleaning Cabinet
Feb-91
Instructions
PMTK 0057
Jan-91
Instructions
TPS/MC/400
1988
Instructions
TPS/O/100
Loss of High Voltage Supply to, or the Tripping of a HV Circuit Breaker for no
known reason in a substation building containing metal clad switchgear with
bitumastic compound filled busbar chambers
1993
Instructions
TPS/O/451
1989
Instructions
TPS/O/452
1990
Instructions
TPS/O/605
1991
Instructions
TPS/O/607
1994
Instructions
TPS/O/624
1994
Instructions
TPS/O/702
1988
Instructions
TPS/O/803
1984
Instructions
TPS/O/805
1992
Instructions
TPS/P/154
1993
Instructions
TPS/P/155
1992
Instructions
TPS/P/157
1992
Instructions
TPS/P/158
1993
Instructions
TPS/P/206
1990
Instructions
TPS/P/254
1988
Instructions
TPS/P/454
1992
Instructions
TPS/S/008
1993
Instructions
TPS/T/010
1992
Instructions
th
st
Page 24
2. Company Standards
RT/E/S/21000
C. Engineering
Electrification
Operational, Environmental and General Requirements for Remote Control Equipment for
Electrical Distribution Systems
Issue
Date
Status
Price
Colour
Compliance
Implementation
1
Feb 98
C
This specification states the Directorate s operational, environmental and general requirements for remote control
equipment and systems (also known as supervisory control and data acquisition, SCADA equipment) used on AC
or DC traction systems.
Mandatory upon: Contractors
Caution: See notei below.
Standards Ownership: Electrification & Plant
RT/E/S/21001
Date
Status
Price
Colour
Compliance
Implementation
1
Feb 98
B
This specification states the Directorate s requirements for outstation (remote terminal unit) equipment for use
on AC or DC traction systems.
Mandatory upon: Network Rail
Standards Ownership: Electrification & Plant
RT/E/S/21002
Design of Software Associated with Remote Control Equipment for Electrical Distribution Systems
Issue
Date
Status
Price
Colour
Compliance
Implementation
1
Aug 97
C
This specification states the Directorate s requirements for the safety assurance of high integrity software for use
within control centre equipment and outstations of an electronic type forming a supervisory control and data
acquisition system, associated with an AC or DC traction network.
Mandatory upon: Network Rail
Further Information: Procurement specification
Standards Ownership: Electrification & Plant
RT/E/S/21003
Data Communications for Remote Control Systems for Electrical Distribution Systems
Issue
Date
Status
Price
Colour
Compliance
Implementation
2
Apr 01
B
This specification states the Directorate s requirements for data communication, as part of a supervisory control
and data acquisition (SCADA) system, used for the remote monitoring and control of electrification equipment
associated with AC or DC traction electrification systems.
Mandatory upon: Network Rail
Further Information: Performance Specification mandates testing installation
Standards Ownership: Electrification & Plant
RT/E/S/21004
Date
Status
Price
Colour
Compliance
Implementation
1
Feb 98
B
This specification states the Directorate s requirements for voice communication to, and telephone equipment within the
electrical control room (ECR) or control centre associated with an AC or DC traction network. This specification states
system configuration requirements and performance requirements.
Mandatory upon: Network Rail
Further Information: Performance requirements
Standards Ownership: Electrification & Plant
CAUTION! The requirements for protective treatments materials and their application referred to in this Specification have been superseded by:
RT/CE/S/039 - Specification RT98 - Protective Treatment for Railtrack Infrastructure;
RT/CE/C/002 - Application and Reapplication of Protective Treament to Metallic Structures
th
st
Page 25
2. Company Standards
RT/E/S/21005
C. Engineering
Electrification
Mandatory upon:
Further Information:
Caution:
Standards Ownership:
RT/E/S/21006
Date
Status
Price
Colour
Compliance
Implementation
1
Feb 98
D
This specification states the Directorate s environmental requirements for electrical control rooms (ECR s) or
control centres. The specification states overall requirements, including for the man-machine interface, amenities
and equipment rooms.
Network Rail
Performance specification
See notei below
Electrification & Plant
Computer Systems Located at Electrical Control Rooms
Issue
Date
Status
Price
Colour
Compliance
Implementation
1
Feb 98
B
This specification states the Directorate s requirements for the main computer installation at electrical control
rooms (ECRs) or control centres.
Mandatory upon: Network Rail
Further Information: Performance specification
Standards Ownership: Electrification & Plant
RT/E/S/21007
Date
Status
Price
Colour
Compliance
Implementation
1
Feb 98
B
This specification states the Directorate s requirements for all types of man-machine interface equipment at
electrical control rooms (ECRs) or control centres.
Mandatory upon: Network Rail
Further Information: Performance specification
Standards Ownership: Electrification & Plant
RT/E/S/21008
Overall Operation, Integration and Performance of Remote Control for Electrical Distribution
Systems
Issue
Date
Status
Price
Colour
Compliance
Implementation
1
Feb 98
C
This specification states the Directorate s requirements for overall system operation, integration and performance
relating to remote control equipment, associated with an AC or DC traction network. The specification states
requirements for basic functionality, speed of response, system integration and performance.
Mandatory upon: Network Rail
Standards Ownership: Electrification & Plant
RT/E/S/21009
Date
Status
Price
Colour
Compliance
Implementation
1
Feb 98
B
This specification states the Directorate s requirements for security measures which apply at electrical control
room buildings, associated with an AC or DC traction network. The specification states requirements for security
fencing and gates, and surveillance and lighting systems.
Mandatory upon: Network Rail
Standards Ownership: Electrification & Plant
CAUTION! The requirements for protective treatments materials and their application referred to in this Specification have been superseded by:
RT/CE/S/039 - Specification RT98 - Protective Treatment for Railtrack Infrastructure;
RT/CE/C/002 - Application and Reapplication of Protective Treament to Metallic Structures
th
st
Page 26
2. Company Standards
RT/E/S/21010
C. Engineering
Electrification
Date
Status
Price
Colour
Compliance
Implementation
1
Feb 98
B
This specification states the Directorate s requirements for point-to-point equipment used to extend control and
indication from a SCADA outstation to a lineside location, associated with an AC or DC traction network. The
specification states performance, operational and technical requirements.
Mandatory upon: Network Rail
Further Information: Performance/Technical/Operational specification
Standards Ownership: Electrification & Plant
RT/E/S/21011
Date
Status
Price
Colour
Compliance
Implementation
1
Feb 98
B
This specification states the Directorate s requirements for data communication circuits associated with point-topoint equipment used to extend control and indication from a SCADA outstation to a lineside location, associated
with an AC or DC traction network. The specification states performance, operational and technical requirements.
Mandatory upon: Network Rail
Further Information: Performance/Technical/Operational specification
Standards Ownership: Electrification & Plant
RT/E/S/21012
Power Supplies to Remote Control Equipment at Electrical Control Rooms and Outstation
Locations
Issue
Date
Status
Price
Colour
Compliance
Implementation
1
Feb 98
C
This specification states the Directorate s requirements for the nature of the supply to control centre equipment
and outstations forming part of a SCADA system, associated with an AC or DC traction network. The
specification states requirements for UPS and battery performance.
Mandatory upon: Network Rail
Further Information: Performance specification
Standards Ownership: Electrification & Plant
RT/E/S/21014
Voltage Testing of High Voltage Electrical Distribution Equipment (Including Cables) on AC and
DC Electrified Lines
Issue
Date
Status
Price
Colour
Compliance
Implementation
1
Nov 97
D
This specification states the Directorate s requirements for voltage testing (pressure testing) of major items of
electrical distribution equipment, in the range 3.3kV to 66kV, 50Hz, on AC and DC Electrified Lines when the
performance of insulation has been affected by refurbishment, modification, repair or relocation. The test voltage
values and acceptance criteria are included.
Mandatory upon: Network Rail
Further Information: Procurement specification
Standards Ownership: Electrification & Plant
RT/E/S/21015
Maintenance of Negative Traction Cables and Bonding for DC Conductor Rail Systems
Issue
Date
Status
Price
Colour
Compliance
Implementation
1
Dec 95
B
This document defines the minimum planned maintenance to be carried out on negative traction cables and
bonding on D.C electrified lines, including record keeping, reporting and corrective action requirements.
Mandatory upon: Contractors
Standards Ownership: Electrification & Plant
RT/E/S/21016
Date
Status
Price
Colour
Compliance
Implementation
2
Mar 96
C
This specification covers Network Rails technical and commercial requirements for the supply of electricity for
traction purposes through Network Rail s Supply Points.
Mandatory upon: Network Rail
Further Information: Performance specification
Standards Ownership: Electrification & Plant
th
st
Page 27
2. Company Standards
RT/E/S/21018
C. Engineering
Electrification
Indoor Switchgear for 11, 22, 33kV Distribution Systems for DC Traction Substations.
Issue
Mandatory upon:
Further Information:
Caution:
Standards Ownership:
RT/E/S/21019
Date
Status
Price
Colour
Compliance
Implementation
1
Aug 96
D
This specification states the directorate s requirements for indoor switchgear for 11, 22, & 33kV distribution
systems for DC traction substations. The specification states requirements for overall performance and technical
details including testing.
Network Rail
Performance specification mandates testing
See note below
Electrification & Plant
Transformer/Rectifier Equipments for DC Traction Substations
Issue
Mandatory upon:
Further Information:
Caution:
Standards Ownership:
RT/E/S/21020
Date
Status
Price
Colour
Compliance
Implementation
1
Aug 96
D
This specification states the directorate s requirements for transformer/rectifier equipment for use in DC traction
substations. The specification states requirements for overall performance and technical details including testing.
Network Rail
Performance specification mandates testing
See notei below
Electrification & Plant
11, 22, 33 kV AUX. Transformer up to and including 500kVA for DC Traction Substations
Issue
Mandatory upon:
Further Information:
Caution:
Standards Ownership:
RT/E/S/21021
Date
Status
Price
Colour
Compliance
Implementation
1
Aug 96
D
This specification states the directorate s requirements for 11, 22 & 33kV oil/synthetic filled or dry type auxiliary
transformers up to and including 500 kA for DC traction substations. The specification states requirements for
overall performance and technical details including testing.
Network Rail
Performance specification mandates testing
See notei below
Electrification & Plant
Step-Down 3 Phase Transformers for Power Distribution in DC Traction Systems
Issue
Date
Status
Price
Colour
Compliance
Implementation
1
Aug 96
D
This specification states the directorate s requirements for 33/11kV and 33/22kV oil/synthetic filled step-down
transformers including neutral earthing resistors for distribution in DC traction systems. The specification states
requirements for overall performance and technical details including testing.
Mandatory upon: Network Rail
i
Caution: See note below
Standards Ownership: Electrification & Plant
RT/E/S/21023
Date
Status
Price
Colour
Compliance
Implementation
1
Mar 98
D
This specification states the Directorate s requirements for the design, manufacture and testing of 650/750V DC
disconnector switches (DCDS) for use on DC Electrified Lines.
Mandatory upon: Network Rail
Standards Ownership: Electrification & Plant
CAUTION! The requirements for protective treatments materials and their application referred to in this Specification have been superseded by:
RT/CE/S/039 - Specification RT98 - Protective Treatment for Railtrack Infrastructure;
RT/CE/C/002 - Application and Reapplication of Protective Treament to Metallic Structures
th
st
Page 28
2. Company Standards
RT/E/S/21024
C. Engineering
Electrification
Date
Status
Price
Colour
Compliance
Implementation
1
Mar 97
D
This specification states the Directorate s requirements for an impedance protection relay for use in association
with 650/750V DC track feeder circuit breakers. The specification states requirements for overall performance and
technical details including construction and testing.
Mandatory upon: Network Rail
Further Information: Performance specification mandates testing
Standards Ownership: Electrification & Plant
RT/E/S/21025
Date
Status
Price
Colour
Compliance
Implementation
1
Mar 98
D
This specification states the Directorate s requirements for the design, manufacture and testing of 650/750VDC
remotely controlled track devices for use on DC Electrified Lines.
Mandatory upon: Network Rail
Standards Ownership: Electrification & Plant
RT/E/S/21026
Date
Status
Price
Colour
Compliance
Implementation
1
Mar 98
D
This specification states the Directorate s requirements for 415V and 440V changeover switchboards for DC
traction substations. The specification includes requirements for overall performance and technical details including
the construction and testing.
Mandatory upon: Network Rail
Standards Ownership: Electrification & Plant
RT/E/S/21028
Date
Status
Price
Colour
Compliance
Implementation
1
Dec 98
D
This specification states the Directorate s requirements for the design, manufacture, installation and testing of
ancillary wiring between main items of electrical distribution equipment on AC and DC Electrified Lines.
Mandatory upon: Contractors
Standards Ownership: Electrification & Plant
RT/E/S/21030
Prefabricated and Modular Steel Housings for Electrical Distribution Equipment on DC Electrified
Lines
Issue
Mandatory upon:
Further Information:
Caution:
Standards Ownership:
Date
Status
Price
Colour
Compliance
Implementation
1
Nov 97
D
This specification states the Directorate s requirements for secure and weatherproof prefabricated and modular
housings of steel construction for indoor electrical distribution equipment for DC Electrified Lines. The
specification states requirements for overall performance and technical details including construction and testing.
Network Rail
Performance Specification mandates testing/construction
i
See note below
Electrification & Plant
CAUTION! The requirements for protective treatments materials and their application referred to in this Specification have been superseded by:
RT/CE/S/039 - Specification RT98 - Protective Treatment for Railtrack Infrastructure;
RT/CE/C/002 - Application and Reapplication of Protective Treament to Metallic Structures
th
st
Page 29
2. Company Standards
RT/E/S/21032
C. Engineering
Electrification
Earthing Systems for DC Traction Substations, Track Paralleling Huts and Similar Equipment
Locations
Issue
Mandatory upon:
Further Information:
Caution:
Standards Ownership:
RT/E/S/21033
Date
Status
Price
Colour
Compliance
Implementation
1
Oct 96
C
This specification states the Directorate s requirements for the supply and installation of earthing systems at DC
Traction Substations, track paralleling huts and similar equipment locations. The specification states requirements
for overall performance, and technical details including construction and testing.
Network Rail
Performance Specification mandates testing/construction
See note i below
Electrification & Plant
The Welding of Power Transformer Tanks and Conservators during Manufacture
Issue
Date
Status
Price
Colour
Compliance
Implementation
1
Oct 96
C
This specification states the directorate s requirements for the control of welding including approval of welders
and operators during the manufacture of power transformer tanks and conservators.
Mandatory upon: Network Rail
Further Information: Procurement specification
Standards Ownership: Electrification & Plant
RT/E/S/21035
Date
Status
Price
Colour
Compliance
Implementation
1
Mar 98
D
This specification states the Directorate s requirements for protection equipment for use in conjunction with high
voltage switchgear on AC Electrified Lines. The specification states the requirements for overall performance and
technical details including testing.
Mandatory upon: Network Rail
Standards Ownership: Electrification & Plant
RT/E/S/21046
Date
Status
Price
Colour
Compliance
Implementation
2
Sep 97
C
This document specifies the requirements for inspection of DC Traction Electrification Equipment in Light
Maintenance Depot.
Mandatory upon: Contractors
Standards Ownership: Electrification & Plant
RT/E/S/21051
Date
Status
Price
Colour
Compliance
Implementation
1
Oct 98
C
This specification states the Directorate s requirements to be used for DC protection calculations and protection
equipment settings for DC track feeder circuit breakers. The specification states the requirements for overall
performance and technical details.
Mandatory upon: Network Rail & Contractors
Standards Ownership: Electrification & Plant
RT/E/S/21053
Date
Status
Price
Colour
Compliance
Implementation
1
Mar 97
A
This specification states the Directorate s minimum periodic maintenance requirements for low voltage AC
changeover equipment and similar assemblies, associated with the electric traction distribution system in order to
ensure its safety and reliability.
Mandatory upon: Contractors
Standards Ownership: Electrification & Plant
CAUTION! The requirements for protective treatments materials and their application referred to in this Specification have been superseded by:
RT/CE/S/039 - Specification RT98 - Protective Treatment for Railtrack Infrastructure;
RT/CE/C/002 - Application and Reapplication of Protective Treament to Metallic Structures
th
st
Page 30
2. Company Standards
RT/E/S/21054
C. Engineering
Electrification
Date
Status
Price
Colour
Compliance
Implementation
Iss 2
Apr 01
A
This specification states the Directorate s minimum periodic maintenance requirements for three phase high
voltage switchgear in order to ensure the safety and reliability of the electrical distribution system.
Mandatory upon: Contractors
Standards Ownership: Electrification & Plant
RT/E/S/21055
Maintenance of Rectifiers
Issue
Date
Status
Price
Colour
Compliance
Implementation
1
Mar 98
B
This specification states the Directorate s minimum periodic maintenance requirements for rectifiers to ensure the
safety of the electric traction distribution system.
Mandatory upon: Contractors
Standards Ownership: Electrification & Plant
RT/E/S/21056
Date
Status
Price
Colour
Compliance
Implementation
2
Apr 01
C
This specification states the Directorate s minimum periodic maintenance requirements for high voltage transformers
rated above 10kVA in order to ensure the safety and reliability of the electrical distribution system.
Mandatory upon: Contractors
Standards Ownership: Electrification & Plant
RT/E/S/21057
Maintenance of DC Switchgear
Issue
Date
Status
Price
Colour
Compliance
Implementation
1
Mar 98
B
This specification states the Directorate s minimum periodic maintenance requirements for DC circuit breakers
and their associated trucks and switchgear assemblies in order to ensure the safety and reliability of the electric
traction system.
Mandatory upon: Contractors
Standards Ownership: Electrification & Plant
RT/E/S/21060
Date
Status
Price
Colour
Compliance
Implementation
1
Mar 98
D
This standard sets out the requirements for isolation of apparatus and issue of safety documentation which are
necessary before work is to take place on electrical distribution equipment which can be made live at 650/750V
DC.
Mandatory upon: Network Rail
Standards Ownership: Electrification & Plant
RT/E/S/21063
Date
Status
Price
Colour
Compliance
Implementation
1
Dec 01
B
This specification states the Chief Engineers minimum periodic maintenance requirements for electrical protection
systems in order to ensure the safety and reliability of the a.c. and d.c. electrification systems.
Mandatory upon: Contractors
Further Information: To be used in conjunction with RT/E/S/21111
Standards Ownership: Electrification & Plant
RT/E/S/21064
Date
Status
Price
Colour
Compliance
Implementation
1
Mar 98
B
This specification states the Directorate s minimum periodic maintenance requirements for batteries and battery
charging equipment in order to ensure the safety and reliability of the electric traction distribution system.
Mandatory upon: Contractors
Standards Ownership: Electrification & Plant
th
st
Page 31
2. Company Standards
RT/E/S/21066
C. Engineering
Electrification
Restrictions on Entry into Substations Equipped with GEC Type KC 33kV Switchgear
Issue
Date
Status
Price
Colour
Compliance
Implementation
3
Jun 99
C
This specification details the special arrangements necessary for persons requiring the entry into certain
substations equipped with GEC type KC 33kV Switchgear. There have been several busbar failures at substations
equipped with this type of switchgear and measurements of discharge levels has enabled those substations at
greatest risk to be identified.
Mandatory upon: Contractors
Standards Ownership: Electrification & Plant
RT/E/S/21067
Instructions for Making Out Issuing and Cancelling High Voltage Permits-to-Work,
Sanctions-for-Test and Circuit State Certificates
Issue
Date
Status
Price
Colour
Compliance
Implementation
1
Mar 98
D
This specification gives instructions for making out, issuing and cancelling Permits-to-Work, Sanctions-for-Test and
Circuit State Certificates for work on or near high voltage electrical equipment forming part of the Network Rail
electrical distribution system.
Mandatory upon: Contractors
Standards Ownership: Electrification & Plant
RT/E/S/21068
Date
Status
Price
Colour
Compliance
Implementation
1
Mar 98
C
This specification provides the standard procedure for the amendment of isolation Documents (for example,
Isolation Diagrams and Isolation Instructions) throughout the Network Rail Electrified system.
Mandatory upon: Network Rail
Standards Ownership: Electrification & Plant
RT/E/S/21070
Date
Status
Price
Colour
Compliance
Implementation
2
Feb 04
C
The purpose of this specification is to set out the requirements to ensure that persons working on or having
access to electrical power supply equipment have sufficient technical knowledge, education and experience to
ensure their competence to carry out their duties without risk of danger to themselves or other persons, and
without damage to the equipment concerned.
Mandatory upon: Network Rail & Contractors
Standards Ownership: Electrification & Plant
RT/E/S/21071
Date
Status
Price
Colour
Compliance
Implementation
1
Mar 98
B
This specification states the Directorate s minimum periodic maintenance requirements for DC positive electric
track equipment to ensure the safety of the electric traction distribution system.
Mandatory upon: Network Rail
Standards Ownership: Electrification & Plant
RT/E/S/21074
Date
Status
Price
Colour
Compliance
Implementation
1
Mar 98
C
This specification states the Directorate s requirements for the allocation of overhead line equipment basic designs
for use on Network Rail s Infrastructure.
Mandatory upon: Contractors
Standards Ownership: Electrification & Plant
th
st
Page 32
2. Company Standards
RT/E/S/21075
C. Engineering
Electrification
DC Immune 25kV Single Phase Isolating Transformers for Interfaces between AC and DC
Electrified Lines
Issue
Mandatory upon:
Further Information:
Caution:
Standards Ownership:
RT/E/S/21078
Date
Status
Price
Colour
Compliance
Implementation
1
Nov 97
D
This specification states the Directorate s requirements for outdoor DC immune 25kV, single phase, isolating
transformers for use at interfaces between AC and DC Electrified Lines. The specification states requirements for
overall performance and technical details including testing.
Network Rail
Performance specification mandates testing
See note i below
Electrification & Plant
Design of Return Conductor Systems for AC Electrified Lines
Issue
Date
Status
Price
Colour
Compliance
Implementation
1
Mar 98
C
This specification states the Directorate s requirements for the design of the spatial arrangement of return
conductor systems, with or without booster transformers, for the suppression at source of electromagnetic
interference on AC electrified lines, in order to reduce the level of interference induced into adjacent signalling and
telecommunication circuits.
Mandatory upon: Network Rail
Standards Ownership: Electrification & Plant
RT/E/S/21081
Security Palisade Fencing for Electrical Distribution Installations for AC and DC Electrified Lines
Issue
Date
Status
Price
Colour
Compliance
Implementation
1
Mar 98
C
This specification states the Directorate s requirements for palisade fencing of the security type around electric
traction distribution installations on AC and DC Electrified Lines. This specification contains requirements for
overall performance, technical and construction details.
Mandatory upon: Network Rail
Standards Ownership: Electrification & Plant
RT/E/S/21085
Date
Status
Price
Colour
Compliance
Implementation
1
Oct 98
D
This specification states the requirements for the design of earthing and bonding systems for 25kV Electrified Lines
to provide a continuous return circuit for traction load and fault current and to ensure that unacceptable
accessible and touch voltages do not occur.
Mandatory upon: Contractors
Standards Ownership: Electrification & Plant
RT/E/S/21087
Date
Status
Price
Colour
Compliance
Implementation
1
Feb 98
D
This specification states the Directorate s minimum maintenance requirements to be carried our on 25kv
overhead line electrification equipment in order to ensure safety and reliability.
Mandatory upon: Network Rail
Standards Ownership: Electrification & Plant
RT/E/S/21088
Date
Status
Price
Colour
Compliance
Implementation
1
Feb 98
C
This specification states the Directorate s maintenance parameters for 25kV overhead line electrification
equipment in order to ensure safety and reliability.
Mandatory upon: Network Rail
Standards Ownership: Electrification & Plant
CAUTION! The requirements for protective treatments materials and their application referred to in this Specification have been superseded by:
RT/CE/S/039 - Specification RT98 - Protective Treatment for Railtrack Infrastructure;
RT/CE/C/002 - Application and Reapplication of Protective Treament to Metallic Structures
th
st
Page 33
2. Company Standards
RT/E/S/21094
C. Engineering
Electrification
Date
Status
Price
Colour
Compliance
Implementation
1
Mar 98
C
This specification states the Directorate s requirements for the periodic inspection and testing of voltage
breakdown devices.
Mandatory upon: Network Rail
Standards Ownership: Electrification & Plant
RT/E/S/21096
Design of High Resolution Graphic VDU Displays for Electrical Distribution Systems
Issue
Date
Status
Price
Colour
Compliance
Implementation
2
Jun 02
D
Yes
This specification states the requirements for the design of visual display unit (VDU) displays where high-resolution
graphics (HRG) equipment forms the man-machine interface (MMI) for remote control equipment (also known as
Supervisory Control And Data Acquisition, (SCADA) equipment) used for the remote monitoring and control of
electrical distribution systems.
Mandatory upon: Network Rail
Further Information: Performance specification
Standards Ownership: Electrification & Plant
RT/E/S/21104
Date
Status
Price
Colour
Compliance
Implementation
1
Mar 98
D
This specification gives the design and installation requirements for electric track equipment, including conductor
rail and negative bonding, installed in the third rail DC Electrified Lines for both high current and standard current
applications.
Mandatory upon: Network Rail
Standards Ownership: Electrification & Plant
RT/E/S/21106
Date
Status
Price
Colour
Compliance
Implementation
1
Dec 98
C
This specification states the directorate s requirements for system protection calculations for 25kV AC traction
installations. The specification states the requirements for overall performance and technical details.
Mandatory upon: Contractors
Standards Ownership: Electrification & Plant
RT/E/S/21107
Bolted Running Rail Connections for Traction Bonding on AC and DC Electrified Lines
Issue
Date
Status
Price
Colour
Compliance
Implementation
1
Mar 98
D
This specification states the Directorate s requirements for the bolted connection of cables to the running rails of
the permanent way of electrified lines for the purposes of traction continuity and for signalling track circuit
connections which also carry traction current.
Mandatory upon: Network Rail
Standards Ownership: Electrification & Plant
RT/E/S/21111
Date
Status
Price
Colour
Compliance
Implementation
1
Jan 97
C
This specification states the Directorate s general requirements that apply all maintenance undertaken on Network
Rail s electrical and plant equipment.
Mandatory upon: Network Rail
Standards Ownership: Electrification & Plant
RT/E/S/21112
Date
Status
Price
Colour
Compliance
Implementation
1
Dec 98
C
This specification states Network Rail s requirements for AC protection calculations and protection equipment
settings for the 3 phase h.v. distribution system.
Mandatory upon: Contractors
Standards Ownership: Electrification & Plant
th
st
Page 34
2. Company Standards
RT/E/S/21130
C. Engineering
Electrification
Date
Status
Price
Colour
Compliance
Implementation
1
Dec 98
C
This specification states the requirements for technical competency and accreditation for the supply of Overhead
Line Equipment design for use on Network Rail infrastructure.
Mandatory upon: Contractors
Standards Ownership: Electrification & Plant
RT/E/S/21131
Date
Status
Price
Colour
Compliance
Implementation
1
Nov 97
D
This specification states the requirements for the design and the display of signs on Network Rail infrastructure to
warn persons on or near AC and/or DC electrified lines of the risk of electric shock. It also includes the
requirements for certain other signs employed on Network Rail infrastructure in connection with electrified lines.
Mandatory upon: Network Rail
Standards Ownership: Electrification & Plant
RT/E/S/21140
Design of the Graphical User Interface for Electrical Distribution Network Management Systems
(NMS)
Issue
Date
Status
Price
Colour
Compliance
Implementation
1
Jun 03
D
This specification states the minimum design requirements for the Graphical User Interface (GUI) of non SCADAbased applications associated with managing the network s electrical distribution system (e.g. the Network
Management System).
Mandatory upon: Network Rail, Contractors and Lessees
Standards Ownership: Electrification & Plant
RT/E/S/29987
Date
Status
Price
Colour
Compliance
Implementation
1D
Dec 03
Phone
This specification is an introduction to the suite of modules that together form the composite Network Rail Company
Specification RT/E/S/29987 Working on or About 25kV AC Electrified Lines . The composite specification includes
responsibilities of persons required to work on, or so near to, electrified lines that danger may arise. Further
requirements when working on or about the electrified lines are contained in the Rule Book GE/RT8000 (Modules
AC 1, AC 2 & AC 3).
Mandatory upon: Network Rail & Contractors
Standards Ownership: Electrification & Plant
2C1.2. Procedures
RT/E/P/24000
Date
Status
Price
Colour
Compliance
Implementation
3
Dec 02
F
This procedure states the mandatory requirements for the content and preparation of Electrical Control Room
Instructions by Network Rail Zones for use at Electrical Control Rooms by Electrical Control Operators to ensure
that adequate and correct procedures are followed in the control and operation of the Electrification and Plant
equipment under their jurisdiction.
Mandatory upon: Network Rail
Standards Ownership: Electrification & Plant
th
st
Page 35
2. Company Standards
RT/E/P/24001
C. Engineering
Electrification
Date
Status
Price
Colour
Compliance
Implementation
2
Feb 04
D
This procedure sets out the arrangements for the appointment and duties of Examining and Issuing Officers and
the appointment of persons competent to work on or have access to electrical equipment forming part of
electrical power supply systems in accordance with RT/E/S/21070, Competence of Persons Working On or Having
Access to Electrical Power Supply Equipment.
Mandatory upon: Network Rail
Standards Ownership: Electrification & Plant
RT/E/P/24003
Date
Status
Price
Colour
Compliance
Implementation
1
Sep 96
B
This procedure details the actions to be taken for maintaining effective current collections on the DC conductor
rail systems throughout adverse winter weather conditions.
Mandatory upon: Network Rail
Standards Ownership: Electrification & Plant
RT/E/P/24009
Competence Requirements for Personnel Who Undertake Electrical Control Operators Duties
Issue
Date
Status
Price
Colour
Compliance
Implementation
2
Jun 02
F
Yes
This procedure details the specific requirements for competence assessment of Electrical Control Operators (ECO s).
Mandatory upon: Network Rail
Standards Ownership: Electrification & Plant
RT/E/P/24010
Management of Warnings and Alarms Received from Trackside Pantograph Monitoring Equipment
Issue
Date
Status
Price
Colour
Compliance
Implementation
1
Nov 97
C
This is a procedure for the reporting and investigating pantograph uplift exceedances detected by trackside pantograph
monitoring equipment operating on 25kV overhead line electrification equipment managed by Network Rail.
Mandatory upon: Network Rail
Further Information: Calls up 8 documents
Standards Ownership: Electrification & Plant
RT/E/P/24011
Date
Status
Price
Colour
Compliance
Implementation
1
Feb 02
C
This procedure defines the process for managing the outages of booster transformers on Network Rail s
25 kV AC, 50 Hz electrified lines. The procedure details the actions required to be taken by the Regional/ Zone
Electrification and Plant Engineer. Further and more detailed information on booster transformer outages can be
found in the Network Rail guidance notes RT/E/G/24015
Mandatory upon: Network Rail
Standards Ownership: Electrification & Plant
RT/E/P/24013
Date
Status
Price
Colour
Compliance
Implementation
2
Mar 98
C
This procedure states the requirements for the design and the display of posters, the publication of notices and the
provision of advice concerning the energisation of new, or extensions to AC and DC Electrified Lines.
Mandatory upon: Network Rail
Standards Ownership: Electrification & Plant
th
st
Page 36
2. Company Standards
C. Engineering
Electrification
Date
Status
Price
Colour
Compliance
Implementation
2
Feb 98
E
Yes
This Code of Practice offers assistance in identification of the generic cause of overhead line equipment component
failure.
Mandatory upon: Advisory only
Standards Ownership: Electrification & Plant
RT/E/C/27004
Wire Identification Codes for Ancillary Wiring of Electrical Distribution Equipment on AC & DC
Electrified Lines
Issue
Date
Status
Price
Colour
Compliance
Implementation
5
Oct 02
D
This code of practice states the best practice for wire identification codes for ancillary wiring BETWEEN main
items of electrical distribution equipment including SCADA outstation equipment on AC and DC Electrified Lines.
It may also be applied to wiring WITHIN an item of electrical distribution equipment.
Mandatory upon: Advisory only
Further Information: To be read in conjunction with RT/E/S/21028
Standards Ownership: Electrification & Plant
RT/E/C/27006
Date
Status
Price
Colour
Compliance
Implementation
1
Oct 98
E
This Code of Practice sets out approved procedures and data for the calculation of protection settings for track
feeders on DC electrified routes. An overview is given of protection systems currently in use, together with the
theoretical basis on which settings are calculated. This basis is then applied to the determination of settings for
each type of protection. Worked examples and relevant system data are included.
Mandatory upon: Advisory only
Standards Ownership: Electrification & Plant
RT/E/C/27009
Date
Status
Price
Colour
Compliance
Implementation
1
Mar 98
F
This Code of Practice lists all the known recommended campaign changes applied to Overhead Line Equipment in
accordance with instructions issued from both the former British Railways Board (D of M& EE) and can be used as
an aid to: a) identify areas of non-compliance; b) evaluate the risks associated with non-compliance.
Mandatory upon: Advisory only
Standards Ownership: Electrification & Plant
RT/E/C/27010
Date
Status
Price
Colour
Compliance
Implementation
1
Nov 97
C
This Code of Practice is for guidance when considering the evaluation process detailed in Railway Group Standard,
GM/RT1000 Compatibility between Electric Trains and Electrification Systems.
Mandatory upon: Advisory only
Standards Ownership: Electrification & Plant
RT/E/C/27017
Date
Status
Price
Colour
Compliance
Implementation
2
Feb 04
E
The purpose of this Code of Practice is to provide guidance to all organisations involved in work on the Network
Rail electrification and plant infrastructure, which are required to meet the conditions for safety critical work
specified in Railway Group and Network Rail Business Standards.
Mandatory upon: Advisory only
Standards Ownership: Electrification & Plant
th
st
Page 37
2. Company Standards
RT/E/C/27018
C. Engineering
Electrification
Date
Status
Price
Colour
Compliance
Implementation
2
Feb 04
C
The purpose of this code of practice is to set out good practice for the requirements for training and assessment
of persons working on or having access to electrical power supply equipment so they have sufficient technical
knowledge, education and experience to ensure their competence to carry out their duties without risk of danger
to themselves or other persons, and without damage to the equipment concerned.
Mandatory upon: Advisory only
Standards Ownership: Electrification & Plant
RT/E/C/27019
Design and Installation of Composite Aluminium/Stainless Steel Conductor Rail and Associated
Equipment on DC Electrified Lines
Issue
Date
Status
Price
Colour
Compliance
Implementation
1
Mar 98
D
This Code of Practice states the best practice for the design, manufacture, installation and testing of
aluminium/stainless steel composite conductor rail and associated equipment for use on Network Rail DC
Electrified Lines, designated standard current.
Mandatory upon: Advisory only
Standards Ownership: Electrification & Plant
RT/E/C/27020
Design and Installation of Steel Conductor Rail and Associated Equipment for DC Electrified Lines
Issue
Date
Status
Price
Colour
Compliance
Implementation
1
Mar 98
D
This Code of Practice states the best practice for the design and installation of conductor rail and its associated
equipment for use on Network Rail DC Electrified Lines.
Mandatory upon: Advisory only
Standards Ownership: Electrification & Plant
RT/E/C/27021
Date
Status
Price
Colour
Compliance
Implementation
1
Mar 98
D
This Code of Practice states the best practice for electric track equipment layout design, for use on Network Rail
DC Electrified Lines.
Mandatory upon: Advisory only
Standards Ownership: Electrification & Plant
RT/E/C/27022
Design & Installation of Negative Bonding & Associated Equipment on DC Electrified Lines
Issue
Date
Status
Price
Colour
Compliance
Implementation
1
Mar 98
C
This Code of Practice states the best practice for the design and installation of negative bonding and associated
equipment for use on Network Rail DC Electrified Lines.
Mandatory upon: Advisory only
Standards Ownership: Electrification & Plant
th
st
Page 38
2. Company Standards
C. Engineering
Electrification
Date
Status
Price
Colour
Compliance
Implementation
1
Aug 00
C
This guidance note is designed to supplement existing Line and Group Specifications and Procedures for the
management of incidents involving damage to overhead line equipment on Network Rail controlled Infrastructure
and its interfaces with other companies. It also covers infrastructure not controlled by Network Rail, but where
OLE is maintained by an Infrastructure Maintainer on an agency basis or by other contractual arrangements.
Mandatory upon: Advisory only
Standards Ownership: Electrification & Plant
RT/E/G/00004
Date
Status
Price
Colour
Compliance
Implementation
1
Aug 00
B
This guidance note is designed to supplement existing Group and Line Specifications for the design of earthing and
bonding systems for 25kV electrified lines.
Mandatory upon: Advisory only
Standards Ownership: Electrification & Plant
RT/E/G/00011
Date
Status
Price
Colour
Compliance
Implementation
2
Aug 02
D
These guidance notes are intended to advise Network Rail staff about the principal considerations regarding the
application of Uninterruptible Power Supplies (UPS) for railway infrastructure. This document is aimed at UPS
systems with a rating of 20kVA upwards for signalling installations however much of the guidance is applicable to
smaller units and other installations.
Mandatory upon: Advisory only
Standards Ownership: Electrification & Plant
RT/E/G/00015
Date
Status
Price
Colour
Compliance
Implementation
2
Jun 03
D
This Guidance Note is intended to advise Network Rail staff and contractors about the process required to
successfully design a signalling power supply for railway infrastructure.
Mandatory upon: Advisory only
Standards Ownership: Electrification & Plant
RT/E/G/24015
Date
Status
Price
Colour
Compliance
Implementation
1
Feb 02
C
These guidance notes support the Network Rail Company procedure for managing the outages of booster
transformers on 25kV a.c., 50 Hz electrified lines and assist the Zone Electrification and Plant Engineer in assessing
the actions required to be taken in the event of booster transformer outage(s).
Mandatory upon: Advisory only
Standards Ownership: Electrification & Plant
th
st
Page 39
2. Company Standards
C. Engineering
Electrification
Machine Switch Out in Conjunction With The Trial of on Track Maintenance Machines
Issue
Date
Status
Price
Colour
Compliance
Implementation
E1
Feb 04
C
The purpose of this document is to provide instruction for the use of On Track Maintenance Machines (OTM's)
with integral short-circuiting devices, in association with a Machine Switch Out (MSO).
Mandatory upon: Network Rail and Contractors
Standards Ownership: Electrification & Plant
RT/E/WI/00110
Date
Status
Price
Colour
Compliance
Implementation
1
May 04
D
This Work Instruction supplements existing maintenance instructions with asbestos related requirements for
electrification, plant, signalling and telecommunications equipment incorporating asbestos materials or components
to ensure compliance with current legislation.
Mandatory upon: Advisory only
Standards Ownership: Electrification & Plant
th
st
Page 40
2. Company Standards
C. Engineering
Business Engineering
Date
Status
Price
Colour
Compliance
Implementation
5
Apr 00
B
This specification gives the requirements for the content of Stewardship Reports that the Infrastructure
Maintenance Contractor is required to produce for each RT1A or IMC2 contract.
Mandatory upon: Contractors
Standards Ownership: Business Engineering
2C2.2. Procedures
RT/E/P/02009
Date
Status
Compliance
Implementation
2
Oct 01
This procedure gives the minimum requirements for managing engineering associated new works.
Mandatory upon: Network Rail
Standards Ownership: Business Engineering
These Standards are for Network Rail Use Only Not Available outside the Company
RT/E/P/02017
Date
Status
Price
Colour
Compliance
Implementation
2
Jan 99
D
This procedure describes the content, structure and preparation of a Contract Technical Workscope for a
Network Rail infrastructure project, and gives guidance to specifiers and keyboard operators in the use of the
Contract Technical Workscope template and data bank.
Mandatory upon: Network Rail
Standards Ownership: Business Engineering
RT/E/P/02106
Date
Status
Price
Colour
Compliance
Implementation
1
Jun 03
C
This procedure sets out the process for capturing and collating information on shortterm changes of traffic flows,
including engineering works, and for identifying exceptional situations, which may affect the maintenance and
renewal regime on a particular route, in the period before an updated Contract Area Profile is issued.
Mandatory upon: Network Rail
Standards Ownership: Business Engineering
RT/E/P/02201
Date
Status
Price
Colour
Compliance
Implementation
Emergency 1
Feb 04
C
For various reason, an asset renewal may be deferred beyond its due date. This procedure describes how to
prepare, implement and manage measures to ensure that the risks arising from deferral are controlled.
Mandatory upon: Network Rail
Standards Ownership: Business Engineering
th
st
Page 41
2. Company Standards
C. Engineering
Ergonomics
2C3. Ergonomics
2C3.1. Specifications
RT/E/S/24017
Date
Status
Price
Colour
Compliance
Implementation
2
Apr 04
E
This standard, recognises the industries increased awareness of the implication of ergonomics on the effective, safe
and reliable performance delivery. This draws on the ISO Standard, but sets specific requirements appropriate to
the railway environment using recent research findings.
Mandatory upon: Network Rail
Standards Ownership: Ergonomics
2C3.2. Procedures
RT/E/P/24020
Date
Status
Price
Colour
Compliance
Implementation
2
Apr 04
D
The purpose of this Network Rail Company Specification is to ensure that user issues are considered in a
systematic way throughout the design lifecycle of a range of projects including the replacement, upgrade and design
of new systems; through the correct and timely application of appropriate ergonomic techniques and practices
Mandatory upon: Network Rail & Contractors
Standards Ownership: Ergonomics
Date
Status
Price
Colour
Compliance
Implementation
2
Apr 04
D
The following Guidance Note provides greater detail about the way in which RT/E/P/24019: Incorporating
Ergonomics Within Engineering Design Projects: Requirements may be applied.
Mandatory upon: Advisory only
Standards Ownership: Ergonomics
th
st
Page 42
2. Company Standards
C. Engineering
Plant
2C4. Plant
2C4.1. Specifications
RT/E/S/21072
Mandatory upon:
Further Information:
Caution:
Standards Ownership:
RT/E/S/21073
Date
Status
Price
Colour
Compliance
Implementation
1
Nov 97
D
This specification states the Directorate s performance requirements for equipment to monitor the dynamic
performance of pantographs fitted to passing trains.
Network Rail
Performance specification
See note i below
Electrification & Plant
The Siting of Pantograph Monitoring Equipment
Issue
Date
Status
Price
Colour
Compliance
Implementation
1
Nov 97
B
This specification states the Dirctorate s requirements for siting pantograph monitoring equipment defined in
Network Rail Specification RT/E/S/21072.
Mandatory upon: Contractors
Standards Ownership: Electrification & Plant
RT/E/S/40001
Date
Status
Price
Colour
Compliance
Implementation
2
Jun 99
C
This document states the minimum requirements for the maintenance of standby generators.
Mandatory upon: Network Rail, Contractors & Lessees
Standards Ownership: Electrification & Plant
Date
Status
1
Apr 96
Electric Points Heating Installations within Depots.
Mandatory upon: Contractors
Standards Ownership: Electrification & Plant
RT/E/S/40004
Price
Colour
Compliance
Implementation
Compliance
Implementation
Date
Status
Price
Colour
1
Feb 96
D
This is a generalised maintenance specification for Non-Traction Substations in Depots and Stations.
Mandatory upon: Contractors
Standards Ownership: Electrification & Plant
RT/E/S/40005
Date
Status
Price
Colour
Compliance
Implementation
1
Feb 96
D
This is a generalised maintenance specification for Escalators and Passengers Conveyors.
Mandatory upon: Contractors
Standards Ownership: Electrification & Plant
CAUTION! The requirements for protective treatments materials and their application referred to in this Specification have been superseded by:
RT/CE/S/039 - Specification RT98 - Protective Treatment for Railtrack Infrastructure;
RT/CE/C/002 - Application and Reapplication of Protective Treament to Metallic Structures
th
st
Page 43
2. Company Standards
C. Engineering
Plant
Date
Status
Price
Colour
Compliance
Implementation
Compliance
Implementation
1
Feb 96
C
This is a generalised specification for maintenance for Lifts.
Mandatory upon: Contractors
Standards Ownership: Electrification & Plant
RT/E/S/40007
Date
Status
Price
Colour
1
Feb 96
C
This is a generalised maintenance specification for Fixed Electrical Installations in Depots and Stations.
Mandatory upon: Contractors
Standards Ownership: Electrification & Plant
RT/E/S/40008
Date
Status
Price
Colour
Compliance
Implementation
1
Feb 96
C
This is a generalised maintenance specification for Emergency Lighting in Depots and Stations.
Mandatory upon: Contractors
Standards Ownership: Electrification & Plant
RT/E/S/40010
Equipment and Infrastructure Associated with Oil Interceptor and Recovery Systems in Depots,
Stations & Other Areas
Issue
Date
Status
Price
Colour
Compliance
Implementation
2
Oct 00
C
This is a generalised maintenance specification specification for Equipment and Infrastructure associated with Oil
Interceptor and Recovery Systems within Depots, Stations and other areas.
Mandatory upon: Contractors
Standards Ownership: Electrification & Plant
RT/E/S/40011
Date
Status
Price
Colour
Compliance
Implementation
1
Feb 96
C
This is a generalised maintenance specification for Compressed Air/Vacuum Installations within Depots and
Stations.
Mandatory upon: Contractors
Standards Ownership: Electrification & Plant
RT/E/S/40013
Date
Status
Price
Colour
Compliance
Implementation
1
Feb 96
C
This is a generalised maintenance specification for Ventilation/Extraction and Air Conditioning Units in Depots and
Stations.
Mandatory upon: Contractors
Standards Ownership: Electrification & Plant
RT/E/S/40015
Date
Status
Price
Colour
Compliance
Implementation
2
Oct 00
C
This is a generalised maintenance specification for Gas/Oil Fired Heating Systems within Depots and Stations.
Mandatory upon: Contractors
Standards Ownership: Electrification & Plant
th
st
Page 44
2. Company Standards
C. Engineering
Plant
Date
Status
Price
Colour
Compliance
Implementation
1
Feb 96
C
This is a generalised maintenance specification for Fire Alarm Systems in Depots and Stations.
Mandatory upon: Contractors
Standards Ownership: Electrification & Plant
RT/E/S/40017
Powered Scrubber/Sweeper
Issue
Date
Status
Price
Colour
Compliance
Implementation
Compliance
Implementation
Compliance
Implementation
Compliance
Implementation
Colour
Compliance
Implementation
Colour
Compliance
Implementation
Compliance
Implementation
1
Feb 96
C
This is a generalised maintenance specification for Powered Scrubbers/Sweepers.
Mandatory upon: Contractors
Standards Ownership: Electrification & Plant
RT/E/S/40019
Date
Status
Price
Colour
1
Mar 96
C
This is a generalised maintenance specification for Diesel-Electrical Turntables.
Mandatory upon: Contractors
Standards Ownership: Electrification & Plant
RT/E/S/40022
Waste Compactors
Issue
Date
Status
Price
Colour
1
Feb 96
C
This is a generalised maintenance specification for Waste Compactors.
Mandatory upon: Contractors
Standards Ownership: Electrification & Plant
RT/E/S/40023
Date
Status
Price
Colour
1
Feb 96
C
This is a generalised maintenance specification for Depot Protection Equipment.
Mandatory upon: Contractors
Standards Ownership: Electrification & Plant
RT/E/S/40025
Conveyors
Issue
Date
Status
Price
1
Feb 96
C
This is a generalised maintenance specification for Conveyors.
Mandatory upon: Contractors
Standards Ownership: Electrification & Plant
RT/E/S/40026
Date
Status
Price
1
Feb 96
C
This is a generalised maintenance specification for Sewage Disposal Plant.
Mandatory upon: Contractors
Standards Ownership: Electrification & Plant
RT/E/S/40027
Date
Status
Price
Colour
1
Feb 96
C
This is a generalised maintenance specification for Train Pre-Heating Shore Supplies.
Mandatory upon: Contractors
Standards Ownership: Electrification & Plant
th
st
Page 45
2. Company Standards
C. Engineering
Plant
Date
Status
Price
Colour
Compliance
Implementation
Colour
Compliance
Implementation
1
Feb 96
C
This is a generalised maintenance specification for Traversers.
Mandatory upon: Contractors
Standards Ownership: Electrification & Plant
RT/E/S/40029
Date
Status
Price
1
Feb 96
C
This is a generalised maintenance specification for Automatic Turnstiles and Ticket Machines.
Mandatory upon: Contractors
Standards Ownership: Electrification & Plant
RT/E/S/40030
Industrial Doors
Issue
Date
Status
Price
Colour
Compliance
Implementation
Colour
Compliance
Implementation
Colour
Compliance
Implementation
Compliance
Implementation
Compliance
Implementation
1
Feb 96
C
This is a generalised maintenance specification for Industrial Doors.
Mandatory upon: Contractors
Standards Ownership: Electrification & Plant
RT/E/S/40031
Wheeldrops
Issue
Date
Status
Price
1
Feb 96
C
This is a generalised maintenance specification for Wheeldrops.
Mandatory upon: Contractors
Standards Ownership: Electrification & Plant
RT/E/S/40032
Fixed Battery Chargers
Issue
Date
Status
Price
1
Mar 96
C
This is a generalised maintenance specification for Fixed Battery Chargers.
Mandatory upon: Contractors
Standards Ownership: Electrification & Plant
RT/E/S/40033
Overhead Cranes
Issue
Date
Status
Price
Colour
1
Feb 96
C
This is a generalised maintenance specification for Overhead Cranes.
Mandatory upon: Contractors
Standards Ownership: Electrification & Plant
RT/E/S/40034
Date
Status
Price
Colour
1
Feb 96
C
This is a generalised maintenance specification for Building Maintenance Platforms.
Mandatory upon: Contractors
Standards Ownership: Electrification & Plant
RT/E/S/40035
Equipment and Infrastructure Associated with Fuel, Chemical and Oil Storage and Dispensing
Systems
Issue
Date
Status
Price
Colour
Compliance
Implementation
2
Oct 00
C
This is a generalised maintenance specification for Equipment and Infrastructure associated with Fuel, Chemical and
Oil Storage and Dispensing Systems.
Mandatory upon: Contractors
Standards Ownership: Electrification & Plant
th
st
Page 46
2. Company Standards
C. Engineering
Plant
Date
Status
Price
Colour
Compliance
Implementation
Compliance
Implementation
1
Feb 96
C
This is a generalised maintenance specification for Car Park Equipment.
Mandatory upon: Contractors
Standards Ownership: Electrification & Plant
RT/E/S/40039
Date
Status
Price
Colour
1
Feb 96
C
This document is the Technical Specification for the maintenance of Illuminated Advertising Signs.
Mandatory upon: Contractors
Standards Ownership: Electrification & Plant
RT/E/S/40040
Date
Status
Price
Colour
Compliance
Implementation
Compliance
Implementation
Compliance
Implementation
1
Feb 96
C
This is a generalised maintenance specification for Electronic Left Luggage Lockers.
Mandatory upon: Contractors
Standards Ownership: Electrification & Plant
RT/E/S/40041
Date
Status
Price
Colour
1
Mar 96
C
This is a generalised maintenance specification for Overhead Trolley Jumper Systems.
Mandatory upon: Contractors
Standards Ownership: Electrification & Plant
RT/E/S/40043
Passenger Lifts
Issue
Date
Status
Price
Colour
1
Feb 96
C
This standard states the requirements for the installation of new or the refurbishment of existing lifts on Network
Rail owned stations where public operation is required.
Mandatory upon: Network Rail
Further Information: Performance specification
Standards Ownership: Electrification & Plant
RT/E/S/40044
Responsibilities of Depot Facility Owners to Maintain Depot Electromechanical Plant and Services
and Associated Infrastructure
Issue
Date
Status
Price
Colour
Compliance
Implementation
2
Oct 00
B
This standard defines the responsibilities of Depot Facility Owners having Depot Leasing Agreements with
Network Rail to maintain depot plant and services.
Mandatory upon: Contractors
Standards Ownership: Electrification & Plant
RT/E/S/40045
Date
Status
Price
Colour
Compliance
Implementation
4
Jun 03
D
This specification states the requirements for the design, manufacture and testing of electric point heating
components and systems.
Mandatory upon: Network Rail
Further Information: Performance specification
Standards Ownership: Electrification & Plant
th
st
Page 47
2. Company Standards
RT/E/S/40047
C. Engineering
Plant
Date
Status
Price
Colour
Compliance
Implementation
3
Aug 01
C
This document states the minimum requirements for the maintenance of points heating installations.
Mandatory upon: Network Rail & Contractors
Standards Ownership: Electrification & Plant
RT/E/S/40049
Date
Status
Price
Colour
Compliance
Implementation
1
Apr 99
B
This document specifies the minimum requirements for the maintenance of Gas/Oil Fired Heating Systems.
Mandatory upon: Network Rail
Further Information: Performance specification
Standards Ownership: Electrification & Plant
RT/E/S/40050
Date
Status
Price
Colour
Compliance
Implementation
1
Apr 99
B
This document states the minimum requirements for the maintenance of Air Conditioning and Ventilation
equipment.
Mandatory upon: Network Rail
Further Information: Performance specification
Standards Ownership: Electrification & Plant
RT/E/S/40051
Date
Status
Price
Colour
Compliance
Implementation
1
Apr 99
B
This document specifies the minimum requirements for the maintenance of fixed electrical installation equipment.
Mandatory upon: Network Rail
Further Information: Performance specification
Standards Ownership: Electrification & Plant
RT/E/S/40052
Date
Status
Price
Colour
Compliance
Implementation
1
Apr 99
B
This document specifies the minimum requirements for the maintenance of lighting installations.
Mandatory upon: Network Rail
Further Information: Performance specification
Standards Ownership: Electrification & Plant
RT/E/S/40053
Date
Status
Price
Colour
Compliance
Implementation
1
Jun 99
B
This document specifies the minimum requirements for the maintenance of Emergency Lighting Systems.
Mandatory upon: Network Rail, Contractors & Lessees
Standards Ownership: Electrification & Plant
RT/E/S/40054
Date
Status
Price
Colour
Compliance
Implementation
1
Apr 99
B
This document specifies the minimum requirements for the maintenance water distribution systems.
Mandatory upon: Network Rail
Further Information: Performance specification
Standards Ownership: Electrification & Plant
th
st
Page 48
2. Company Standards
RT/E/S/40055
C. Engineering
Plant
Date
Status
Price
Colour
Compliance
Implementation
1
Jun 99
B
This document specifies the minimum requirements for the maintenance of Fire Alarm Systems.
Mandatory upon: Network Rail, Contractors & Lessees
Standards Ownership: Electrification & Plant
RT/E/S/40056
Date
Status
Price
Colour
Compliance
Implementation
1
Apr 99
B
This document specifies the minimum requirements for the maintenance of sewage disposal plant.
Mandatory upon: Network Rail
Further Information: Performance specification
Standards Ownership: Electrification & Plant
RT/E/S/40065
Date
Status
Price
Colour
Compliance
Implementation
1
Oct 01
E
This Specification is designed to supplement Network Rail Company Specification RT/E/S/40043 Passenger Lifts. It
offers additional information which will enable those wishing to specify new, or upgrade existing lifts, to identify
and evaluate the most cost effective options and tenders.
Mandatory upon: Network Rail
Further Information: Performance specification: Replaces RT/K/G/00001
Standards Ownership: Electrification & Plant
RT/E/S/40067
Date
Status
Price
Colour
Compliance
Implementation
1
Oct 01
E
This specification outlines the requirements for the Installation and upgrading of escalators and passenger
conveyors.
Mandatory upon: Network Rail
Further Information: Performance specification
Standards Ownership: Electrification & Plant
2C4.2. Procedures
RT/E/P/40042
Date
Status
Price
Colour
Compliance
Implementation
2
Dec 01
C
This procedure defines the process for determining the frequency of testing and examination and the minium standard
of testing that the installations, equipment and appliances shall undergo in order to ensure continued safe usage.
Mandatory upon: Network Rail
Standards Ownership: Electrification & Plant
RT/E/P/40064
Date
Status
Price
Colour
Compliance
Implementation
1
Oct 00
B
This procedure sets out Network Rail s management process for approval of bodies required to independently
assess certain work equipment.
Mandatory upon: Network Rail & Contractors
Standards Ownership: Electrification & Plant
th
st
Page 49
2. Company Standards
C. Engineering
Plant
Date
Status
Price
Colour
Compliance
Implementation
4
Jun 03
D
This Code of Practice states the best practice for the design, layout, installation, testing and commissioning of
generic types of electric point heating systems.
Mandatory upon: Advisory only
Further Information: Calls up 32 documents
Standards Ownership: Electrification & Plant
th
st
Page 50
2. Company Standards
C. Engineering
Signal Engineering
Date
Status
Price
Colour
Compliance
Implementation
1
Mar 96
C
This specification defines the appearance of temporary speed restriction retro-reflective equipment, the minimum
technical requirements to achieve safety and safe interworking, and positioning of equipment clear of trains.
Mandatory upon: Contractors
Standards Ownership: Signal Engineering
RT/E/S/02023
Date
Status
Price
Colour
Compliance
Implementation
1
Dec 03
F
This specification defines the design requirements for the Tilt Authorisation and Speed Supervision (TASS) system
developed to deliver the principal requirements of Railway Group Standards GE/RT8012 Controlling The Speed Of
Tilting Trains Through Curves and GE/RT8019 Tilting Trains: Controlling Tilt Systems To Maintain Clearances .
Mandatory upon: Contractors
Standards Ownership: Signal Engineering
RT/E/S/02024
Date
Status
Price
Colour
Compliance
Implementation
1
Dec 03
E
Yes
This specification defines the installation, test and maintenance requirements for the track-based equipment
associated with the Tilt Authorisation and Speed Supervision (TASS) system developed to deliver the principal
requirements of Railway Group Standards GE/RT8012 Controlling The Speed Of Tilting Trains Through Curves
and GE/RT8019 Tilting Trains: Controlling Tilt Systems To Maintain Clearances .
Mandatory upon: Contractors
Standards Ownership: Signal Engineering
RT/E/S/10028
Date
Status
Price
Colour
Compliance
Implementation
Rapid Response
E3
Apr 04
C
This specification is intended to augment and amplify the responsibilities placed upon the infrastructure controller
as stated in Clause 8.3 Railway Group Standard GK/RT0210.
Mandatory upon: Network Rail & Contractors
Further Information: Not required if GK/RT0171 is achieved
Standards Ownership: Signal Engineering
RT/E/S/10029
Operation and Maintenance of Non-intrusive Earth Leakage Test Adapter for Reed FDM Systems
Produced to Specification EDS 01/96 MOD State 3
Issue
Date
Status
Price
Colour
Compliance
Implementation
1
Aug 98
C
This standard specifies the user and maintenance requirements for the Non-Intrusive FDM Earth Leakage Adapter. The
adapter allows a standard multimeter to be adapted to allow it to measure the cable resistance to earth of the FDM
system. Existing instruments for measuring the resistance pose the hazard of generating an interfering signal through its
power supply and can therefore not be used on a live system.
Mandatory upon: Network Rail & Contractors
Standards Ownership: Signal Engineering
RT/E/S/10039
Date
Status
Price
Colour
Compliance
Implementation
2
Oct 03
B
This specification defines the detailed Operational Requirements for Miniature Stop Light level crossings.
Mandatory upon: Network Rail
Further Information: Performance specification
Standards Ownership: Signal Engineering
th
st
Page 51
2. Company Standards
RT/E/S/10040
Signal Engineering
C. Engineering
Date
Status
Price
Colour
Compliance
Implementation
6 (5)
Aug 04 (Aug 03)
Up-Issued D
07/08/04
07/08/04
This specification mandates the use of the IECC Applications Manual for all new and existing IECC schemes and
lists all documents contained therein.
Mandatory upon: Network Rail & Contractors
Standards Ownership: Signal Engineering
RT/E/S/10047
Date
Status
Price
Colour
Compliance
Implementation
9 (8)
Feb 04 (Apr 02)
D
This company specification defines the requirements for a safety management system for failures of the Signalling
and Infrastructure.
Mandatory upon: Network Rail
Standards Ownership: Signal Engineering
RT/E/S/10060
Date
Status
Price
Colour
Compliance
Implementation
1
Feb 99
D
This document has been prepared to define the performance requirements for a Vital Signalling Timer unit for
use in signalling circuitry.
Mandatory upon: Network Rail & Contractors
Standards Ownership: Signal Engineering
RT/E/S/10062
Date
Status
Price
Colour
Compliance
Implementation
1
Aug 99
D
This specification is for the performance requirements of long range colour light signals.
Mandatory upon: Network Rail & Contractors
Standards Ownership: Signal Engineering
RT/E/S/10064
Date
Status
Price
Colour
Compliance
Implementation
Emergency 1
Jan 98
E
This specification states the general requirements for staff working on S & T Systems and Equipment.
Mandatory upon: Contractors
Standards Ownership: Signal Engineering
RT/E/S/10067
Date
Status
Price
Colour
Compliance
Implementation
2
Aug 03
D
Yes
The purpose of this Requirement Specification is to define the essential and desirable requirements for a VDU based
Signalling Control System (VSCS) for signalling applications.
Mandatory upon: Network Rail & Contractors
Standards Ownership: Signal Engineering
RT/E/S/10071
Date
Status
Price
Colour
Compliance
Implementation
1
Dec 97
C
New signalling equipment, and changes to existing equipment, shall be assessed to ensure that any risks are controlled
and minimised. Explicit, documented approval shall be obtained before introduction into service.
Mandatory upon: Network Rail
Standards Ownership: Signal Engineering
th
st
Page 52
2. Company Standards
RT/E/S/10073
C. Engineering
Signal Engineering
Date
Status
Price
Colour
Compliance
Implementation
1
Feb 98
B
This specification states the requirements for light units used on level crossing barrier booms.
Mandatory upon: Network Rail
Further Information: Performance Specification
Standards Ownership: Signal Engineering
RT/E/S/10075
Date
Status
Price
Colour
Compliance
Implementation
1
Jun 00
D
This document has been prepared to define the detailed requirements for production of level crossing ground plans.
Mandatory upon: Network Rail & Contractor
Standards Ownership: Signal Engineering
RT/E/S/10081
Date
Status
Price
Colour
Compliance
Implementation
1
Dec 97
C
This specification identifies the requirements for those managing and undertaking signalling maintenance activities
on Network Rail infrastructure. It is particularly concerned with the preventative and corrective maintenance
activities applicable to mechanical signalling lever frames in order that they remain available to perform their
intended functions.
Mandatory upon: Contractors
Standards Ownership: Signal Engineering
RT/E/S/10083
Preventative and Corrective Maintenance of Mechanical Signalling Wire Runs and Rodding
Issue
Date
Status
Price
Colour
Compliance
Implementation
1
Dec 97
C
This specification identifies the requirements for those managing and undertaking signalling maintenance activities
on Network Rail infrastructure. It is particularly concerned with the preventative and corrective maintenance
activities applicable to mechanical signalling wire runs and rodding in order that they remain available to perform
their intended functions.
Mandatory upon: Contractors
Standards Ownership: Signal Engineering
RT/E/S/10110
Date
Status
Price
Colour
Compliance
Implementation
1
Aug 99
D
This specification is for the performance requirements of position light signals.
Mandatory upon: Network Rail & Contractors
Standards Ownership: Signal Engineering
RT/E/S/10127
Equipment Specification for the Filament Lamp (Type SL35) for use in the Long Range Colour Light
Signal
Issue
Date
Status
Price
Colour
Compliance
Implementation
1
Apr 99
C
This document specifies the requirements for SL35 filament lamps used with the Long Range Colour Light Signals.
Mandatory upon: Network Rail & Contractors
Standards Ownership: Signal Engineering
RT/E/S/10129
Date
Status
Price
Colour
Compliance
Implementation
1
Feb 99
D
This specification is for systems providing train detection using axle counters. It defines the requirements of such a
system, and specifies the interfaces with which such a system is required to work.
Mandatory upon: Network Rail & Contractors
Standards Ownership: Signal Engineering
th
st
Page 53
2. Company Standards
RT/E/S/10131
C. Engineering
Signal Engineering
Date
Status
Price
Colour
Compliance
Implementation
2
Aug 03
C
The purpose of this specification is to define the requirements for Signals On Controls for use with Railtrack
infrastructure equipped with Solid State Interlocking (SSI).
Mandatory upon: Network Rail & Contractors
Standards Ownership: Signal Engineering
RT/E/S/10133
Date
Status
Price
Colour
Compliance
Implementation
3
Apr 04
F
Yes
This Specification details the requirements for the design of the signalling interface associated with the fitment of
the Train Protection and Warning System (TPWS) to Network Rail infrastructure.
Mandatory upon: Network Rail & Contractors
Standards Ownership: Signal Engineering
RT/E/S/10134
Date
Status
Price
Colour
Compliance
Implementation
3
Apr 04
D
This specification defines the detailed requirements for the track sub-system equipment associated with TPWS.
Mandatory upon: Network Rail & Contractors
Standards Ownership: Signal Engineering
RT/E/S/10135
Date
Status
Price
Colour
Compliance
Implementation
3
Apr 04
D
This Company Specification has been prepared to provide Signal Works Testers with details of the minimum
requirements for the testing and commissioning procedures necessary to validate the intended functionality and to
verify the installation of the Train Protection and Warning System (TPWS).
Mandatory upon: Network Rail & Contractors
Standards Ownership: Signal Engineering
RT/E/S/10137
TPWS Selection of Signals and Other Locations for Provision of Track Sub-System
Issue
Date
Status
Price
Colour
Compliance
Implementation
3
Apr 04
E
This Specification describes the process for assessing the requirement to provide Train Protection & Warning
System (TPWS) equipment at signals, speed restrictions and Buffer Stops as defined in the Railway Safety
Regulations 1999.
Mandatory upon: Network Rail & Contractors
Standards Ownership: Signal Engineering
RT/E/S/10138
Date
Status
Price
Colour
Compliance
Implementation
3
Apr 04
E
This Specification defines the criteria for the positioning of Train Protection and Warning System (TPWS)
transmitter loops and determination of the need for Overspeed Sensor Systems (OSS).
Mandatory upon: Network Rail & Contractors
Standards Ownership: Signal Engineering
th
st
Page 54
2. Company Standards
RT/E/S/10157
C. Engineering
Signal Engineering
Signal Sighting
Issue
Date
Status
Price
Colour
Compliance
Implementation
1
Feb 04
E
Signal Sighting is a key process in the provision and maintenance of the Railway Signalling system. Signals act as interface
between the fixed infrastructure and the train driver. It is imperative that signals convey the messages intended in a
conspicuous, unambiguous and standard manner. This specification details how signal sighting shall be undertaken to ensure
that signals are placed in the best position possible, subject to the constraints of legal requiements, Railway Group and
Network Rail Company standards.
Mandatory upon: Network Rail, Contractors & Lessees
Standards Ownership: Signal Engineering
RT/E/S/10161
Date
Status
Price
Colour
Compliance
Implementation
Rapid Response
E1
Apr 04
C
This specification sets out the principles and methods for the inspection and surveillance of signal engineering
activities. Thus areas such as installation and equipment renewal are deemed to be included within the scope of
this document.
Mandatory upon: Network Rail & Contractors
Standards Ownership: Signal Engineering
RT/E/S/10172
Date
Status
Price
Colour
Compliance
Implementation
9
Feb 01
C
This specification states the requirements for a rapid action process when Control Systems or Telecommunications defects are identified that may create a hazard throughout the Industry.
Mandatory upon: Network Rail & Contractors
Standards Ownership: Signal Engineering
Additional Information: The SINs are now listed separately.
RT/E/S/10173
Date
Status
Price
Colour
Compliance
Implementation
3
Apr04
F
Yes
This Specification has been prepared to define the detailed requirements for installation of the track sub-system
equipment associated with the Train Protection and Warning System (TPWS).
Mandatory upon: Network Rail & Contractors
Standards Ownership: Signal Engineering
RT/E/S/10178
Date
Status
Price
Colour
Compliance
Implementation
1
Apr04
F
Yes
This specification mandates the requirements for installing Train Protection and Warning System (TPWS) in areas
where the control of movement of trains is by Radio Electronic Token Block (RETB).
Mandatory upon: Network Rail & Contractors
Standards Ownership: Signal Engineering
RT/E/S/10660
Date
Status
Price
Colour
Compliance
Implementation
3
Apr 03
Phone
Yes
This Specification contains details of the authorised Signalling Maintenance Specifications, which represent current
best practice for signalling system maintenance
Mandatory upon: Network Rail & Contractors
Further Information: Replaces: RT/E/WI/00001 to RT/E/WI/00020 inclusive, and RT/E/C/11552.
Standards Ownership: Signal Engineering
RT/E/S/10661
Date
Status
Price
Colour
Compliance
Implementation
4
Feb 04
C
This Specification contains maintenance task intervals for signalling infrastrucuture
Mandatory upon: Network Rail & Contractors
Standards Ownership: Signal Engineering
th
st
Page 55
2. Company Standards
RT/E/S/10662
Signal Engineering
Process for the Introduction of New or Revised Maintenance Regimes for Signalling Assets
Issue
C. Engineering
Date
Status
Price
Colour
Compliance
Implementation
2 (1)
Aug 04 (Dec 00)
Up-Issued C
07/08/04
07/08/04
This specification defines the minimum requirements for the development and implementation of new or revised
maintenance regimes for signalling assets.
Mandatory upon: Network Rail & Contractors
Standards Ownership: Signal Engineering
RT/E/S/11010
Date
Status
Price
Colour
Compliance
Implementation
1
Dec 00
B
This Specification ensures that the managerial responsibility for train control and communications systems is not
divided in a way which increases risk.
Mandatory upon: Network Rail & Contractors
Standards Ownership: Signal Engineering
RT/E/S/11107
Silver Migration
Issue
Date
Status
Price
Colour
Compliance
Implementation
1
Dec 00
B
This Specification defines the policy for the management and prevention of silver migration within signalling
equipment.
Mandatory upon: Network Rail & Contractors
Standards Ownership: Signal Engineering
RT/E/S/11129
Date
Status
Price
Colour
Compliance
Implementation
3 (2)
Aug 04 (Oct 01)
Up-Issued D
07/08/04
07/08/04
This Specification details the requirement to control the risks presented by failures of signalling relays and electromechanical searchlight and banner signal mechanisms, so as to satisfy the mandatory requirements of Railway
Group Standard GK/RT0210, Asset Management for the Safety of Signalling and Operational Telecommunication
Systems and Equipment.
Mandatory upon: Network Rail & Contractors
Standards Ownership: Signal Engineering
RT/E/S/11130
Date
Status
Price
Colour
Compliance
Implementation
1
Dec 02
C
This specification defines the operational and technical requirements for the provision of SPAD alarms at signalling
control centres. The objective is to present a consistent approach that reflects best practice and to ensure that
human factors considerations are properly addressed.
Mandatory upon: Network Rail & Contractors
Standards Ownership: Signal Engineering
RT/E/S/11171
Date
Status
Price
Colour
Compliance
Implementation
1
Dec 00
C
This Specification provides the measures to control the risks presented by the deterioration of insulation in
signalling circuits.
Mandatory upon: Network Rail & Contractors
Standards Ownership: Signal Engineering
RT/E/S/11201
Date
Status
Price
Colour
Compliance
Implementation
3
Dec 03
E
This Specification, in support of GK/RT0207, sets out mandatory requirements and mandates Codes of Practice for
the production of signalling design detail to ensure: a) safe development and design of new and altered signalling
systems impacting on Network Rail controlled infrastructure; b) safe interfaces between all parties and systems; c)
design details are prepared and presented clearly, accurately, consistently and unambiguously; and d) client s
specified requirements are met and the design is fit for purpose.
Mandatory upon: Network Rail & Contractors
Standards Ownership: Signal Engineering
th
st
Page 56
2. Company Standards
RT/E/S/11221
C. Engineering
Signal Engineering
Date
Status
Price
Colour
Compliance
Implementation
3
Feb 04
D
This Specification, in support of GK/RT0209, sets out the mandatory procedures and process controls necessary
to ensure that new signalling installations, and alterations, are independently tested in a manner that assures
compliance with project Concept Design and Engineering Details and, Fitness for purpose before they are offered
for entry into service. It also ensures that, as far as practicable, procedures and process controls are consistent
across the Network Rail environment.
Mandatory upon: Network Rail & Contractors
Standards Ownership: Signal Engineering
RT/E/S/11231
Date
Status
Price
Colour
Compliance
Implementation
1
Dec 00
F
This Specification defines the testing requirements for previously working and commissioned signalling systems
during maintenance, renewals and faulting where the design remains unchanged.
Mandatory upon: Network Rail & Contractors
Standards Ownership: Signal Engineering
RT/E/S/11303
Date
Status
Price
Colour
Compliance
Implementation
1
Aug 00
B
This Specification defines the mandatory requirements for the installation of signalling systems and equipment to
satisfy Railway Group Standard GK/RT0208, Installation of Signalling and Operational Telecommunications
Equipment.
Mandatory upon: Network Rail & Contractors
Standards Ownership: Signal Engineering
RT/E/S/11304
Date
Status
Price
Colour
Compliance
Implementation
1
Feb 03
C
The purpose of this specification is to define the mandatory and desirable requirements for the Data Logging
Systems used to monitor signalling installations, to ensure consistency throughout Network Rail Infrastructure.
Mandatory upon: Network Rail & Contractors
Standards Ownership: Signal Engineering
RT/E/S/11630
Date
Status
Price
Colour
Compliance
Implementation
7 (6)
Aug 04 (Dec 03)
Up-Issued E
07/08/04
07/08/04
This Specification details the pin code configurations and the arrangement of contacts and other connections, so as
to satisfy the mandatory requirements of Railway Group Standard GK/RT0330.
Mandatory upon: Network Rail & Contractors
Standards Ownership: Signal Engineering
RT/E/S/11652
Date
Status
Price
Colour
Compliance
Implementation
2
Aug 99
D
This specification defines the control measures necessary to enable the definition and use of reliability Centred
maintenance (RCM) derived task lists for Network Rail infrastructure.
Mandatory upon: Network Rail & Contractors
Standards Ownership: Signal Engineering
RT/E/S/11655
Date
Status
Price
Colour
Compliance
Implementation
1
Oct 99
D
This document specifies methods of managing the degradation of insulation in signalling wires and cables.
Mandatory upon: Network Rail & Contractors
Standards Ownership: Signal Engineering
th
st
Page 57
2. Company Standards
RT/E/S/11752
C. Engineering
Signal Engineering
Train Detection
Issue
Date
Status
Price
Colour
Compliance
Implementation
2
Aug 01
Phone
This Specification gives the necessary requirements for train detection systems to satisfy the mandatory requirements
laid down in GK/RT0011.
Mandatory upon: Network Rail
Further Information: Mandated upon Contractors. This standard replaces RT/E/S/10002.
Standards Ownership: Signal Engineering
RT/E/S/14002
Date
Status
Price
Colour
Compliance
Implementation
2
Dec 00
C
This standard defines the arrangements for Signalling Testers to be formally assessed before they are authorised to
work on Network Rail Controlled Infrastructure, in support of RT/E/S/11221.
Mandatory upon: Network Rail
Standards Ownership: Signal Engineering
RT/E/S/14003
Date
Status
Price
Colour
Compliance
Implementation
2
Dec 00
B
This standard defines the arrangement for Signalling Testers to be authorised by the Tester in charge to work on
Network Rail Controlled Infrastructure, in support of RT/E/S/11221.
Mandatory upon: Network Rail
Standards Ownership: Signal Engineering
RT/E/S/14200
Date
Status
Price
Colour
Compliance
Implementation
1
Apr 03
D
This document is a system specification and contains the tools and techniques to support the Company Standard
RT/E/P14201, Prevention, and Mitigation of Overrun Risk Assessment of Signals. The tools and techniques
provide a structured approach to signal overrun, (i.e. Signal Passed at Danger (SPAD)) risk assessment and should
be used as part of the process shown in the standard.
Mandatory upon: Network Rail
Standards Ownership: Signal Engineering
RT/E/S/17002
Date
Status
Price
Colour
Compliance
Implementation
13 (12)
Aug 04 (Dec 02)
Up-Issued B
07/08/04
07/08/04
This specification mandates the use of the SSI Applications Manual for the design of signalling schemes employing
Solid State Interlocking (SSI) equipment on Network Rail infrastructure and lists all documents contained therein
to provide a record of which constituent documents are current and approved for use.
Mandatory upon: Network Rail & Contractors
Further Information: Calls up a number of other documents in a manual mandated as ACOP
Standards Ownership: Signal Engineering
RT/E/S/17004
Date
Status
Price
Colour
Compliance
Implementation
1
Feb 99
D
This document specifies a Technician s Terminal (TT) for the Solid State Interlocking system. The system specified
may be used as a replacement terminal for existing SSI schemes (currently using a TT built to the specification
BR1960A) or for installation in new schemes.
Mandatory upon: Network Rail
Standards Ownership: Signal Engineering
RT/E/S/17005
Date
Status
Price
Colour
Compliance
Implementation
1
Aug 99
C
This specification states Network Rail s functional requirements for telecommunications systems for use with Solid
State Interlocking Long Line Link incorporating Long Distance Terminal Modules.
Mandatory upon: Network Rail
Standards Ownership: Signal Engineering
th
st
Page 58
2. Company Standards
RT/E/S/17503
C. Engineering
Signal Engineering
Date
Status
Price
Colour
Compliance
Implementation
1
Jun 99
D
This specification mandates the internal subsystems communications requirements for all new and existing IECC
schemes.
Mandatory upon: Network Rail & Contractors
Standards Ownership: Signal Engineering
RT/E/S/17504
Date
Status
Price
Colour
Compliance
Implementation
3
Dec 03
F
Yes
This operating specification defines the mandatory requirements for signalling control and indications equipment
based on the use of colour visual display units (VDUs), and which forms a subsystem of the Integrated Electronic
Control Centre (IECC). It does not define the requirements for the PC SPAD Monitor (PSM), which are defined
elsewhere.
Mandatory upon: Network Rail & Contractors
Standards Ownership: Signal Engineering
RT/E/S/19551
Date
Status
Price
Colour
Compliance
Implementation
1
Jul 95
B
This specification defines the method of calculating statistical information on signalled routes throughout Network
Rail Infrastructure.
Mandatory upon: Network Rail
Standards Ownership: Signal Engineering
RT/E/S/19608
Date
Status
Price
Colour
Compliance
Implementation
1
Apr 04
E
This Code of Practice describes the processes to be followed for the maintenance management of operational level
crossing infrastructure and the inspection regime required to ensure level crossing systems are safe, reliable and
legally compliant.
Mandatory upon: Network Rail
Standards Ownership: Signal Engineering
2C5.2. Procedures
RT/E/P/10013
Date
Status
Price
Colour
Compliance
Implementation
1
Apr 96
C
This procedure defines the requirements for authorising the technical investigation of signalling equipment and
associated trainbourne equipment on Network Rail Infrastructure or property, undertaking the investigation and
distributing Investigation Reports.
Mandatory upon: Network Rail
Standards Ownership: Signal Engineering
RT/E/P/10016
Date
Status
Price
Colour
Compliance
Implementation
2
Dec 00
B
This line procedure does not seek to amend, alter or subtract from any other applicable legislation, Railway Group
Standard, Network Rail Line Specification or Procedure. This Line procedure defines the requirements for an asset
maintenance process which ensures Network Rail s signalling Infrastructure consistently operates within required
safety, business and technical parameters.
Mandatory upon: Network Rail
Standards Ownership: Signal Engineering
th
st
Page 59
2. Company Standards
RT/E/P/10024
Signal Engineering
Signallers Operating Guide for the use of the IECC Signalling Workstation
Issue
C. Engineering
Date
Status
Price
Colour
Compliance
Implementation
4 (3)
Aug 04 (Aug 03)
Up-Issued E
01/10/04
01/10/04
This document is the signaller's operating guide for the Integrated Electronic Control Centre (IECC).
Mandatory upon: Network Rail & Contractors
Standards Ownership: Signal Engineering
RT/E/P/10025
Date
Status
Price
Colour
Compliance
Implementation
3
Dec 01
E
This procedure provides instructions for the use of the IECC Timetable Processor User Edit Facilities.
Mandatory upon: Network Rail
Standards Ownership: Signal Engineering
RT/E/P/10072
Date
Status
Price
Colour
Compliance
Implementation
2
Dec 98
C
This procedure states the requirements for a rapid action process when Control Systems or Telecommunications
defects are identified that may create a hazard throughout the Industry.
Mandatory upon: Network Rail
Standards Ownership: Signal Engineering
RT/E/P/10160
Date
Status
Price
Colour
Compliance
Implementation
1
Apr 04
C
This company procedure sets out the requirement for the mandatory application of the IRSE
Licensing Scheme to Network Rail s own engineers and technicians as well as those of its
contractors and / or consultants.
Mandatory upon: Network Rail
Standards Ownership: Signal Engineering
RT/E/P/11120
Process for Management of Signal Engineering Technical Instructions and Notice Boards
Issue
Date
Status
Price
Colour
Compliance
Implementation
6 (5)
Aug 04 (Apr 04)
Up-Issued C
07/08/04
07/08/04
This Procedure details the process for managing the production of information that is specific to signal engineering
and needs to be published quickly to facilitate safe working and good practice.
Mandatory upon: Network Rail & Contractors
Standards Ownership: Signal Engineering
*
RT/E/P/11305
Date
Status
Price
Colour
Compliance
Implementation
1
Feb 03
C
The purpose of this Procedure is to provide a consistent means of planning, installing, testing and managing Data
Logging Systems on Network Rail controlled infrastructure.
Mandatory upon: Network Rail
Standards Ownership: Signal Engineering
RT/E/P/11654
Date
Status
Price
Colour
Compliance
Implementation
1
Oct 99
B
This procedure sets high-level responsibilities for the management of signalling wire insulation degradation.
Mandatory upon: Network Rail
Standards Ownership: Signal Engineering
th
st
Page 60
2. Company Standards
RT/E/P/13251
C. Engineering
Signal Engineering
Date
Status
Price
Colour
Compliance
Implementation
1
Mar 95
A
To ensure that Network Rail has in place arrangements for the management of signalling infrastructure conditions
assessment using the SICA model.
Mandatory upon: Network Rail
Standards Ownership: Signal Engineering
RT/E/P/14000
Date
Status
Price
Colour
Compliance
Implementation
1
May 95
B
This standard defines the arrangements for enabling existing SVVTH certificated testers to have their current
testing certification temporally revalidated to cater solely for the introduction of STH GK/RT 0221.
Mandatory upon: Network Rail
Standards Ownership: Signal Engineering
RT/E/P/14001
Date
Status
Price
Colour
Compliance
Implementation
2
Dec 00
B
This standard defines the arrangements for the appointment of Signalling Testers in charge, for work on Network
Rail Controlled Infrastructure, in support of RT/E/S/11221.
Mandatory upon: Network Rail
Standards Ownership: Signal Engineering
RT/E/P/14004
Date
Status
Price
Colour
Compliance
Implementation
2
Dec 00
B
This standard defines the competence arrangements for Network Rail Signalling Testing Staff, in support of
RT/E/S/11221.
Mandatory upon: Network Rail
Standards Ownership: Signal Engineering
RT/E/P/14201
Date
Status
Price
Colour
Compliance
Implementation
1
Apr 03
D
This procedure has been produced to ensure Network Rail complies with Railway Group Standard GI/RT7006
Prevention and Mitigation of Overruns - Risk Assessment.
Mandatory upon: Network Rail
Standards Ownership: Signal Engineering
RT/E/P/19000
Date
Status
Price
Colour
Compliance
Implementation
2
Apr 04
B
This procedure defines the arrangements for managing the production, authorisation and distribution of SIGTANs.
These controlled standards are the method by which Network Rail will advise its own Engineers and it s
contractors about changes to signalling equipment and problems with signalling equipment in service.
Mandatory upon: Network Rail
Further Information: SIGTANS are non mandatory advices
Standards Ownership: Signal Engineering
RT/E/P/19251
Date
Status
Price
Colour
Compliance
Implementation
2
Dec 03
B
This procedure defines the management of the production, authorisation and distribution of Signalling Equipment
Workshop Engineering Notices. These documents advise of additional or revised processes required in the
manufacture, repair or servicing of signalling equipment before it is released for use on Network Rail s signalling
infrastructure.
Mandatory upon: Network Rail
Further Information: SIGWENS are non mandatory advices
Standards Ownership: Signal Engineering
th
st
Page 61
2. Company Standards
RT/E/P/19607
Signal Engineering
C. Engineering
Date
Status
Price
Colour
Compliance
Implementation
1
Aug 04
New
D
02/10/04
02/10/04
This procedure, in support of GK/RT0207 and RT/E/S/11201, sets out the mandatory requirements that apply
when it is necessary to produce signalling design detail in reduced timescales, to ensure that risks are adequately
controlled. The process for authorisation of such relaxations is defined.
Mandatory upon: Network Rail
Standards Ownership: Signal Engineering
Date
Status
Price
Colour
Compliance
Implementation
2
Jul 96
B
To detail all documentation relevant to the Electrical Engineering and Control Systems (EE&CS) Engineering Safety
Management Systems (ESMS). This document will also provide high level guidance in using ESMS procedures and
work instructions for preparations of safety submissions.
Mandatory upon: Advisory only
Standards Ownership: Signal Engineering
RT/E/C/02022
Date
Status
Price
Colour
Compliance
Implementation
1
Dec 03
D
This code of practice describes the Tilt Authorisation And Speed Supervision (TASS) system developed to deliver
the principal requirements of Railway Group Standards GE/RT8012 Controlling The Speed of Tilting Trains
Through Curves and GE/RT8019 Tilting Trains: Controlling Tilt Systems To Maintain Clearances .
Mandatory upon: Advisory only
Standards Ownership: Signal Engineering
RT/E/C/02104
Date
Status
Price
Colour
Compliance
Implementation
1
Oct 99
D
This Code of Practice contains tasks and periodicity guidelines which represent current best practice for an
enhanced level of track circuit system maintenance.
Mandatory upon: Advisory only
Standards Ownership: Signal Engineering
RT/E/C/10026
Date
Status
Price
Colour
Compliance
Implementation
3
Dec 01
F
This Code of Practice provides examples in the use of the IECC Timetable Processor User Edit Facilities.
Mandatory upon: Advisory only
Standards Ownership: Signal Engineering
RT/E/C/10049
Date
Status
Price
Colour
Compliance
Implementation
1
Aug 99
B
This Code of Practice lists relays used in BRS SW67 Typical Circuits that have been assessed as not requiring
servicing, to be used in conjunction with RT/E/C/10048 Signalling Code of Practice For Relay And Searchlight
Mechanism Servicing to determine a servicing requirement for other relays.
Mandatory upon: Advisory only
Standards Ownership: Signal Engineering
RT/E/C/10050
Date
Status
Price
Colour
Compliance
Implementation
1
Aug 99
C
This Code of Practice lists relays used in Westinghouse Geographical Typical Circuits that have been assessed as
not requiring servicing, to be used in conjunction with RT/E/C/10048 Signalling Code of Practice For Relay And
Searchlight Mechanism Servicing to determine a servicing requirement for other relays.
Mandatory upon: Advisory only
Standards Ownership: Signal Engineering
th
st
Page 62
2. Company Standards
RT/E/C/10051
C. Engineering
Signal Engineering
Date
Status
Price
Colour
Compliance
Implementation
1
Aug 99
B
This Code of Practice lists relays used in GEC GEOGRAPHICAL Typical Circuits that have been assessed as not
requiring servicing, to be used in conjunction with RT/E/C/10048 Signalling Code of Practice For Relay And
Searchlight Mechanism Servicing to determine a servicing requirement for other relays.
Mandatory upon: Advisory only
Standards Ownership: Signal Engineering
RT/E/C/10099
Date
Status
Price
Colour
Compliance
Implementation
1
Dec 02
B
The purpose of this document is to provide guidance for the implementation of risk based maintenance regimes.
Mandatory upon: Advisory only
Standards Ownership: Signal Engineering
RT/E/C/10179
The Set Up and Maintenance of Adjustable Stretcher Bars - A Good Practice Guide
Issue
Date
Status
Price
Colour
Compliance
Implementation
1
Dec 03
D
Yes
This good practice guide applies to all Network Rail points with UIC54B switch rails and 113A flat bottom stock
rails, full depth switches using 113A vertical design, and switches with CEN60 rail section that are fitted with
threaded adjustable stretcher bars.
Mandatory upon: Advisory only
Standards Ownership: Signal Engineering
RT/E/C/11004
Date
Status
Price
Colour
Compliance
Implementation
2
Dec 03
D
This Code of Practice, in support of Line Specification RT/E/S/11201, Signalling Design: Production, defines the
symbols for plans and sketches used in signalling applications, to ensure that the correct information is always
conveyed without ambiguity.
Mandatory upon: Advisory only
Standards Ownership: Signal Engineering
RT/E/C/11110
Date
Status
Price
Colour
Compliance
Implementation
1
Aug 00
C
This Code of Practice sets out the procedure to ensure a consistent and structured planning approach for all proposed
signalling and operational telecommunication works and enable the mandatory requirement for the preparation of
OPSs in Line Specification RT/E/S/11201, Signalling Design: Production, to be met. It also sets out the procedures for
documenting and consulting on the working details prior to design and during the subsequent works.
Mandatory upon: Advisory only
Standards Ownership: Signal Engineering
RT/E/C/11115
Date
Status
Price
Colour
Compliance
Implementation
3 (2)
Aug 04 (Dec 03)
Up-Issued D
07/08/04
07/08/04
This Code of Practice, in support of Line Specification RT/E/S/11201, Signalling Design: Production, gives guidance
on the correlation of signalling records to actual wiring and equipment, prior to any design alterations.
Mandatory upon: Advisory only
Further Information: Replaces RT/E/S/10056 Management of Correlation of Signalling Infrastructure
Standards Ownership: Signal Engineering
RT/E/C/11116
Date
Status
Price
Colour
Compliance
Implementation
1
Aug 00
B
This Code of Practice, in support of Line Specification RT/E/S/11201, Signalling Design: Production, gives guidance
on assessing the condition of signalling systems before undertaking design alterations, to ensure that the integrity of
the system is not compromised during the works and that the safety of the railway is assured.
Mandatory upon: Advisory only
Standards Ownership: Signal Engineering
th
st
Page 63
2. Company Standards
RT/E/C/11191
C. Engineering
Signal Engineering
Signal and Telecomms Cable Laying from Rail Wagons or by Mole Plough
Issue
Date
Status
Price
Colour
Compliance
Implementation
1
Aug 00
C
This Code of Practice defines a policy to be adopted when laying cables and ducts from rail wagons or by mole
plough to ensure safe working practices and satisfy the mandatory requirements of Railway Group Standard
GK/RT0208, Installation of Signalling and Operational Telecommunications Equipment, and Line Specification
RT/E/S/11303, Requirements for Signalling Installation.
Mandatory upon: Advisory only
Standards Ownership: Signal Engineering
RT/E/C/11202
Date
Status
Price
Colour
Compliance
Implementation
3
Oct 02
E
This Code of Practice, in support of Line Specification RT/E/S/11201, Signalling Design: Production, defines the
requirements for railway signalling control tables to ensure that safety information is presented in a form which can
be read and understood without ambiguity.
Mandatory upon: Advisory only
Standards Ownership: Signal Engineering
RT/E/C/11205
Date
Status
Price
Colour
Compliance
Implementation
1
Aug 00
D
This Code of Practice, in support of Railway Group Standard GK/RT0201, Signalling Design: Production, defines
the symbols, nomenclature and presentation for use on all signalling circuit diagrams to ensure that the correct
information is always conveyed without ambiguity.
Mandatory upon: Advisory only
Standards Ownership: Signal Engineering
RT/E/C/11210
Signalling Installation
Issue
Date
Status
Price
Colour
Compliance
Implementation
1
Aug 00
Phone
Yes
This Code of Practice gives guidance on installation techniques that facilitate the safe installation of railway
signalling systems and equipment and satisfy the mandatory requirements of Railway Group Standard GK/RT0208,
Installation of Signalling and Operational Telecommunications Equipment, and Line Specification RT/E/S/11303,
Requirements for Signalling Installation.
Mandatory upon: Advisory only
Standards Ownership: Signal Engineering
RT/E/C/11213
Date
Status
Price
Colour
Compliance
Implementation
1
Aug 00
C
This Code of Practice defines alternative equivalent cables from current specifications, which may be used to
replace older sized cables shown on the design record, during cable renewals, and satisfy the mandatory
requirements for non-conceptual design given in RT/E/S/11201.
Mandatory upon: Advisory only
Standards Ownership: Signal Engineering
RT/E/C/11400
Date
Status
Price
Colour
Compliance
Implementation
3
June 03
E
Yes
This Code of Practice describes the processes to be followed in the installation, testing and commissioning,
maintenance and wrongside failure investigation of a High Performance Switch System. This initial issue only
addresses installation and testing and commissioning. The HPSS installation process is described in Appendix A; the
testing and commissioning process in Appendix B.
Mandatory upon: Advisory only
Standards Ownership: Signal Engineering
th
st
Page 64
2. Company Standards
RT/E/C/11600
C. Engineering
Signal Engineering
Date
Status
Price
Colour
Compliance
Implementation
1
Aug 00
Phone
Yes
This Code of Practice gives guidance on the technical details that enable the design of railway signalling systems to
meet the mandatory requirements of Railway Group Standard GK/RT0206, Signalling and Operational
Telecommunications Design: Safety Requirements.
Mandatory upon: Advisory only
Standards Ownership: Signal Engineering
RT/E/C/11653
Date
Status
Price
Colour
Compliance
Implementation
1
Aug 99
E
This Code of Practice details Reliability Centred Maintenance (RCM) analyses which have been formally approved
for use on Network Rail infrastructure as required by Specification RT/E/S/11652.
Mandatory upon: Advisory only
Standards Ownership: Signal Engineering
RT/E/C/11701
Date
Status
Price
Colour
Compliance
Implementation
3
Dec 03
Phone
Yes
This Code of Practice gives guidance on the production processes that enable the design of railway signalling
systems to meet the mandatory requirements of Railway Group Standard GK/RT0207 and Company Specification
RT/E/S/11201, Signalling Design: Production.
Mandatory upon: Advisory only
Standards Ownership: Signal Engineering
RT/E/C/11711
ERTMS Readiness
Issue
Date
Status
Price
Colour
Compliance
Implementation
1
Jun 03
C
This Code of Practice details the requirements for the configuration of signalling systems that should be
implemented prior to the future introduction of the ERTMS/ETCS across the Network Rail network. The use of
this document will ensure that disruption to the network, costs, risks and rework is minimised when ERTMS/ETCS
is implemented.
Mandatory upon: Advisory only
Standards Ownership: Signal Engineering
RT/E/C/11721
Date
Status
Price
Colour
Compliance
Implementation
2
Jun 02
F
This Code of Practice, in support of RT/E/S/11221, gives guidance on implementation of control table testing, signal
aspect testing and principles testing.
Mandatory upon: Advisory only
Standards Ownership: Signal Engineering
RT/E/C/11722
Date
Status
Price
Colour
Compliance
Implementation
2
Jun 02
D
Yes
This Code of Practice details the requirements for signalling Works Test Certification.
Mandatory upon: Advisory only
Standards Ownership: Signal Engineering
RT/E/C/11723
Date
Status
Price
Colour
Compliance
Implementation
2
Aug 02
C
Yes
This Code of Practice is produced in support of RT/E/S/11221. It describes a system of testing check marks and
recording that will enable a consistent presentation of such marks and records throughout Network Rail projects.
Mandatory upon: Advisory only
Standards Ownership: Signal Engineering
RT/E/C/11724
th
st
Date
Status
Price
Colour
Compliance
Implementation
Page 65
2. Company Standards
C. Engineering
Signal Engineering
1
Jun 02
E
This Code of Practice has been produced in support of GK/RT 0209 and Company Specification RT/E/S/11221. The
contents are designed as examples of Test Specification content that might be employed to ensure that suitable
and sufficient testing has been carried out to Infrastructure products during the process of Signalling Works
Testing.
Mandatory upon: Advisory only
Standards Ownership: Signal Engineering
RT/E/C/11729
Date
Status
Price
Colour
Compliance
Implementation
2
Apr 02
Phone
This Code of Practice supports RT/E/S/11231 and contains Maintenance and Missing Equipment Test Plans for use
during Signalling Maintenance Testing.
Mandatory upon: Advisory only
Standards Ownership: Signal Engineering
RT/E/C/11731
Date
Status
Price
Colour
Compliance
Implementation
2
Apr 02
E
This Code of Practice supports RT/E/S/11231 and defines the procedures for investigating reported signalling
equipment failures.
Mandatory upon: Advisory only
Standards Ownership: Signal Engineering
RT/E/C/11772
Date
Status
Price
Colour
Compliance
Implementation
1
Apr 01
E
This Code of Practice contains information which represents current best practice for supplementary point drives
and detection developed under British Rail.
Mandatory upon: Advisory only
Standards Ownership: Signal Engineering
RT/E/C/11774
Date
Status
Price
Colour
Compliance
Implementation
2
Feb 03
Phone
This Code of Practice gives details of best practice in respect of Rail Clamp Point Locks.
Mandatory upon: Advisory only
Standards Ownership: Signal Engineering
RT/E/C/11821
Date
Status
Price
Colour
Compliance
Implementation
1
Aug 00
C
This Code of Practice defines best practice for the support of, and safe working area around lineside apparatus housings
in order to minimise the risks associated with work on lineside signalling equipment and satisfy Railway Group Standard
GK/RT0208, Installation of Signalling and Operational Telecommunications Equipment, and Line Specification
RT/E/S/11303, Requirements for Signalling Installation.
Mandatory upon: Advisory only
Standards Ownership: Signal Engineering
RT/E/C/17901
Date
Status
Price
Colour
Compliance
Implementation
3
Oct 99
E
This document is a guide to the permitted configurations of SSI hardware, as in use by Network Rail.
Mandatory upon: Advisory only
Standards Ownership: Signal Engineering
th
st
Page 66
2. Company Standards
RT/E/C/17902
C. Engineering
Signal Engineering
Date
Status
Price
Colour
Compliance
Implementation
3
Apr 01
E
This document has been prepared to summarise significant problems with SSI programs and data that have been
found on Network Rail s Signalling Infrastructure.
Mandatory upon : Advisory only
Standards Ownership: Signal Engineering
RT/E/C/17903
Date
Status
Price
Colour
Compliance
Implementation
2
Apr 01
E
This document has been prepared to provide a summary of significant SSI hardware problems that have been found
on Network Rail s Infrastructure and that have been the subject of a technical investigation.
Mandatory upon: Advisory only
Standards Ownership: Signal Engineering
RT/E/C/17904
Date
Status
Price
Colour
Compliance
Implementation
1
Aug 04
New
C
07/08/04
07/08/04
This Code of Practice defines a process to assess the risks presented by failure of specific applications of signalling
control relays. By applying the process it is possible to determine which relays (if any) may be exempt from routine
replacement for a specific interlocking design.
Mandatory upon: Advisory only
Standards Ownership: Signal Engineering
RT/E/C/18301
Date
Status
Price
Colour
Compliance
Implementation
1
Mar 95
B
To provide a Code of Practice to ensure that information entered to SINCS records is: accurate, auditable, cross
referenced to other documentation, complete and that it addresses both immediate and underlying deficiencies.
Mandatory upon: Advisory only
Standards Ownership: Signal Engineering
RT/E/C/18302
Date
Status
Price
Colour
Compliance
Implementation
1
Jun 02
E
This Code of Practice ensures that all information entered to FRAME is relevant, accurate, auditable, cross
referenced to other relevant records and coded correctly. This will assist in effective management of failures and
provide accurate and meaningful information / statistics.
Mandatory upon: Network Rail
Standards Ownership: Signal Engineering
RT/E/C/19002
Date
Status
Price
Colour
Compliance
Implementation
2
Feb 99
C
This document has been prepared to provide advice on significant problems associated with Westinghouse Signals
Style 63 Point Machines.
Mandatory upon: Advisory only
Standards Ownership: Signal Engineering
RT/E/C/19008
Date
Status
Price
Colour
Compliance
Implementation
2
Oct 00
B
An investigation (Technical Investigation Report 94507) into the setting of Sangamo time switches highlighted the
lack of information available to staff relating to the use of these devices. Also, a separate investigation (Technical
Investigation Report 94535) into an incident at a level crossing identified the slow running timer switches, provide
advice on their subsequent replacement and to inform staff of the correct application of these devices.
Mandatory upon: Advisory only
Standards Ownership: Signal Engineering
RT/E/C/19010
th
SIGTAN010 Circuit Controllers used with BR843 Level Crossing Lifting Barrers
st
Page 67
2. Company Standards
Issue
C. Engineering
Date
Status
Signal Engineering
Price
Colour
Compliance
Implementation
1
Jun 96
B
In 1995, Opal Engineering were commissioned to investigate the reliability of circuit controller used with the
BR843 Standards Mk1 and Mk2 lifting barriers. The study reported that some reserviced circuit controlled were
not supplied preset for installation and recommended that existing stocks should be examined and unsuitable
circuit controllers and also addresses the method for carrying out fine adjustment during installation, when
necessary by individual site conditions.
Mandatory upon: Advisory only
Standards Ownership: Signal Engineering
RT/E/C/19012
Date
Status
Price
Colour
Compliance
Implementation
3
Feb 01
D
This code of practice summarises information relating to cables and wires including problems that have been found
and testing methods as applicable to Network Rail's Signalling infrastructure.
Mandatory upon: Advisory only
Standards Ownership: Signal Engineering
RT/E/C/19014
Date
Status
Price
Colour
Compliance
Implementation
1
Mar 97
E
This SIGTAN contains a draft copy of the Mechanical Handbook and is intended as a guidance document only.
Mandatory upon: Advisory only
Standards Ownership: Signal Engineering
RT/E/C/19015
Date
Status
Price
Colour
Compliance
Implementation
1
Feb 98
B
As a result of an investigation (Technical Investigation report 96626), into the contamination of relay plugboards,
this document has been prepared to give advice on dealing with such contamination. Advice on recognition,
contributory factors and preventative measures is also provided.
Mandatory upon: Advisory only
Standards Ownership: Signal Engineering
RT/E/C/19016
Date
Status
Price
Colour
Compliance
Implementation
1
Feb 98
B
An investigation (Technical Investigation Report 96508) revealed various Westinghouse M3 point machine
problems. This document provides advice on examining the locking of the main shaft bearing and includes the
temporary measures necessary until the point machine can be replaced.
Mandatory upon: Advisory only
Standards Ownership: Signal Engineering
RT/E/C/19019
Date
Status
Price
Colour
Compliance
Implementation
2
Apr 99
A
Investigations (Technical Investigation Reports 96051 and 98070) into two separate incidents, where signals were
stuck in the off position due to jammed signal machines have revealed that on both occasions, some on-site
repairs had been carried out and replacement components had been incorrectly fitted. This document has been
prepared to discuss the problems associated with carrying out on-site repairs and recommends that all repairs
(other than those considered to be associated with first line maintenance) and re-servicing are carried out in a
controlled workshop environment by staff who have received specialised craft training.
Mandatory upon: Advisory only
Standards Ownership: Signal Engineering
th
st
Page 68
2. Company Standards
RT/E/C/19020
Signal Engineering
C. Engineering
Date
Status
Price
Colour
Compliance
Implementation
3 (2)
Aug 04 (Apr 99)
Up-Issued D
07/08/04
07/08/04
This document has been prepared to summarise problems affecting railway signalling relays and searchlight
signalling mechanisms used on Network Rail s Signalling Infrastructure. It includes the measures necessary to
control the risks presented by these failures.
Mandatory upon: Advisory only
Standards Ownership: Signal Engineering
RT/E/C/19023
Date
Status
Price
Colour
Compliance
Implementation
1
Jun 00
B
This document has been prepared to provide advice on significant problems associated with the Signal Post
Replacement Switch.
Mandatory upon: Advisory only
Standards Ownership: Signal Engineering
RT/E/C/19024
Date
Status
Price
Colour
Compliance
Implementation
Iss 1
Apr 99
B
This document has been prepared to provide advice on problems affecting equipment/components associated with
Signalling Control Panels.
Mandatory upon: Advisory only
Standards Ownership: Signal Engineering
RT/E/C/19025
Date
Status
Price
Colour
Compliance
Implementation
2
Feb 01
C
This code of practice summarises technical information and advice on problems relating to Electric Lever Locks
and Circuit Controllers that form part of Network Rail's Signalling infrastructure.
Mandatory upon: Advisory only
Standards Ownership: Signal Engineering
RT/E/C/19026
Date
Status
Price
Colour
Compliance
Implementation
1
Dec 99
B
This document has been prepared to provide advice on problems affecting Track Circuit Equipment that forms
part of the railway infrastructure signalling control system.
Mandatory upon: Network Rail and Contractors
Standards Ownership: Signal Engineering
RT/E/C/19030
Date
Status
Price
Colour
Compliance
Implementation
Compliance
Implementation
1
Oct 00
B
This document has been prepared to provide advice on earth testing of busbars.
Mandatory upon: Advisory only
Standards Ownership: Signal Engineering
RT/E/C/19032
Date
Status
Price
Colour
1
Oct 00
C
This Code of Practice details the methods to be used for checking and adjusting the beam alignment of colour light
signals, so as to achieve compliance with Network Rail Group Standard GK/RT0037 Signal Sighting, Issue 3.
Mandatory upon: Advisory only
Standards Ownership: Signal Engineering
th
st
Page 69
2. Company Standards
RT/E/C/19036
C. Engineering
Signal Engineering
Date
Status
Price
Colour
Compliance
Implementation
1
Feb 01
B
This document has been prepared to provide advice on significant problems associated with the use of certain
models of Fluke digital multimeters (DMM).
Mandatory upon: Advisory only
Standards Ownership: Signal Engineering
RT/E/C/19039
Date
Status
Price
Colour
Compliance
Implementation
1
Feb 01
D
This document summarises a range of general issues relating to signals on Network Rail s Signalling Infrastructure.
Mandatory upon: Advisory only
Standards Ownership: Signal Engineering
RT/E/C/19040
Date
Status
Price
Colour
Compliance
Implementation
2
Aug 01
D
This code of practice summarises a range of general issues relating to train protection systems on Network Rail s
Signalling Infrastructure.
Mandatory upon: Advisory only
Standards Ownership: Signal Engineering
RT/E/C/19041
Date
Status
Price
Colour
Compliance
Implementation
1
Feb 01
C
This document summarises a range of general issues relating to cells on Network Rail s Signalling Infrastructure
Mandatory upon: Advisory only
Standards Ownership: Signal Engineering
RT/E/C/19042
Date
Status
Price
Colour
Compliance
Implementation
1
Feb 01
B
This code of practice summarises a range of general issues relating to control equipment Integrated Electronic
Control Centre on Network Rail s Signalling Infrastructure.
Mandatory upon: Advisory only
Standards Ownership: Signal Engineering
RT/E/C/19043
Date
Status
Price
Colour
Compliance
Implementation
1
Feb 01
B
This code of practice summarises a range of general issues relating to Solid State Interlocking on Network Rail s
Signalling Infrastructure.
Mandatory upon: Advisory only
Standards Ownership: Signal Engineering
RT/E/C/19044
Date
Status
Price
Colour
Compliance
Implementation
1
Feb 01
E
This code of practice summarises a range of general issues relating to Level Crossings on Network Rail s Signalling
Infrastructure
Mandatory upon: Advisory only
Standards Ownership: Signal Engineering
th
st
Page 70
2. Company Standards
RT/E/C/19045
C. Engineering
Signal Engineering
Date
Status
Price
Colour
Compliance
Implementation
1
Feb 01
B
This code of practice summarises a range of general issues relating to Power Supplies on Network Rail s Signalling
Infrastructure
Mandatory upon: Advisory only
Standards Ownership: Signal Engineering
RT/E/C/19046
SIGTAN046 Treadles
Issue
Date
Status
Price
Colour
Compliance
Implementation
1
Feb 01
B
This code of practice summarises a range of general issues relating to Treadles on Network Rail s Signalling
Infrastructure
Mandatory upon: Advisory only
Standards Ownership: Signal Engineering
RT/E/C/19047
Date
Status
Price
Colour
Compliance
Implementation
2
Dec 02
D
This code of practice summarises a range of general issues relating to Points on Network Rail s Signalling
Infrastructure
Mandatory upon: Advisory only
Standards Ownership: Signal Engineering
RT/E/C/19048
Date
Status
Price
Colour
Compliance
Implementation
1
Apr 03
D
Yes
This Code of Practice provides a record of best practice general information relating to the trackside sub-system
of the Train Protection and Warning System (TPWS) used on Network Rail Signalling Infrastructure, together with
relevant technical information
Mandatory upon: Advisory only
Standards Ownership: Signal Engineering
RT/E/C/19050
SIGTAN050 Western Region Type Barrier Machine Hydraulic Ram Ram Pin Failure
Issue
Date
Status
Price
Colour
Compliance
Implementation
1
Dec 02
B
This document has been prepared to provide advice on a potential failure mode of level crossing barrier machines
manufactured by the former Western Region. The pins that connect the hydraulic ram to the rear strut of the
barrier machine side arms and the bottom fulcrum bracket may not be compliant with the design specification.
Mandatory upon: Advisory only
Standards Ownership: Signal Engineering
RT/E/C/19051
Date
Status
Price
Colour
Compliance
Implementation
1
Dec 02
C
The aim of this Code of Practice is to describe the nature of certain in-service problems that have arisen with GEC
Reed equipment, the symptoms manifested, show how they can be avoided and where possible, what remedial
action can be taken if these problems are experienced. It also describes best practice for jointing the transmission
line cable used on Reed systems.
Mandatory upon: Advisory only
Standards Ownership: Signal Engineering
th
st
Page 71
2. Company Standards
RT/E/C/19052
C. Engineering
Signal Engineering
Date
Status
Price
Colour
Compliance
Implementation
1
Apr 04
D
Yes
This Code of Practice provides details of the faulting procedures, or cross-references to other faulting information
necessary to locate anomalies in the operation of the Trackside Radio Control Unit (TRCU) and its associated
subsystems, such that a fault can be determined down to the level of a Line Replaceable Unit (LRU). For further
information regarding the Train Protection and Warning System (TPWS) / Radio Electronic Token Block (RETB)
system see RT/E/S/10178.
Mandatory upon: Advisory only
Standards Ownership: Signal Engineering
RT/E/C/19253
Date
Status
Price
Colour
Compliance
Implementation
2
Feb 99
C
This document advises Network Rail s suppliers who manufacture, repair or service Westinghouse Signals Style 63 point
machines of processes that need to be adopted/ amended before the equipment is released for re-use on Network
Rail s infrastructure. This information is supplementary to manufacture, repair or servicing standards.
Mandatory upon: Advisory only
Standards Ownership: Signal Engineering
RT/E/C/19254
Date
Status
Price
Colour
Compliance
Implementation
4
Dec 02
C
This document advises Network Rail s Suppliers who Manufacture, repair or service the GEC-GS types HW 1000
and HW 2000 point machines of additional/ revised processes to be applied before the equipment is released to
the customer. This information is supplementary to manufacturing, repair or servicing standards.
Mandatory upon: Advisory only
Standards Ownership: Signal Engineering
RT/E/C/19257
Date
Status
Price
Colour
Compliance
Implementation
1
Aug 95
A
This document advises Network Rail s suppliers who manufacture, repair or service the Smiths Industries Clamp
Lock Power pack of additional/ revised processes to be applied before the equipment is released to the customer.
This information is supplementary to manufacturing, repair or servicing standards.
Mandatory upon: Advisory only
Standards Ownership: Signal Engineering
RT/E/C/19258
Date
Status
Price
Colour
Compliance
Implementation
1
Jun 96
A
This document advises Network Rail s suppliers who manufacture, repair or service BR843 Level Crossing Lifting
Barriers, including composite components, of additional/revised processes that need to be applied adopted before
the equipment is released to the customer. This information is supplementary to manufacturing, repair or servicing
standards.
Mandatory upon: Advisory only
Standards Ownership: Signal Engineering
RT/E/C/19259
Date
Status
Price
Colour
Compliance
Implementation
1
Apr 98
B
This document advises Network Rail s suppliers who repair or service Westinghouse Signal Machines of processes
that need to be adopted/amended before the equipment is released for re-use on Network Rail s infrastructure.
This information is supplementary to repair or servicing standards.
Mandatory upon: Advisory only
Standards Ownership: Signal Engineering
th
st
Page 72
2. Company Standards
RT/E/C/19262
C. Engineering
Signal Engineering
Date
Status
Price
Colour
Compliance
Implementation
2
Dec 02
B
This document advises Network Rail s suppliers who repair or service hydraulic clamp lock power packs to BR817 of
processes that need to be adopted/amended before the equipment is released for re-use on Network Rail s
infrastructure. This information is supplementary to manufacture, repair or servicing standards.
Mandatory upon: Advisory only
Standards Ownership: Signal Engineering
RT/E/C/19265
Date
Status
Price
Colour
Compliance
Implementation
1
Jun 03
B
This document advises Servicing Agents who repair or service signalling equipment of the labelling requirements
that should be applied before the equipment is released for re-use onto Network Rail s Infrastructure.
Mandatory upon: Advisory only
Standards Ownership: Signal Engineering
RT/E/C/19269
Date
Status
Price
Colour
Compliance
Implementation
1
Dec 02
B
The aim of this document is to identify to servicing agents specific additional servicing requirements that are
required on GEC FDM Reed receiver amplifiers.
Mandatory upon: Advisory only
Standards Ownership: Signal Engineering
RT/E/C/19272
Date
Status
Price
Colour
Compliance
Implementation
1
Aug 04
New
D
07/08/04
07/08/04
This document has been prepared to advise manufacturers, repair and service agents about problems affecting
railway signalling relays used on Network Rail s Signalling Infrastructure.
Mandatory upon: Advisory only
Standards Ownership: Signal Engineering
RT/E/C/50001
Methodology for the Demonstration of Electrical Compatibility Between Rolling Stock and
Infrastructure
Issue
Date
Status
Price
Colour
Compliance
Implementation
1
Feb 03
B
This Code of Practice is intended to assist train-builders, TOCs and ROSCOs in the production of Route
Acceptance Safety Cases for electric trains, by describing a methodology for demonstrating compatibility with
EE&CS systems on Network Rail s electrified routes.
Mandatory upon: Advisory only
Standards Ownership: Signal Engineering
RT/E/C/50002
Methodology for the Demonstration of Compliance with Single Rail Reed Track Circuits on the AC
Railway
Issue
Date
Status
Price
Colour
Compliance
Implementation
1
Feb 03
D
The purpose of this document is to provide a methodology to demonstrate compatibility with RT type single rail
track circuits on the a.c. railway on Network Rail controlled Infrastructure.
Mandatory upon: Advisory only
Standards Ownership: Signal Engineering
th
st
Page 73
2. Company Standards
RT/E/C/50004
C. Engineering
Signal Engineering
Date
Status
Price
Colour
Compliance
Implementation
1
Apr 03
D
Yes
Intended to assist train-builders, TOCs, and ROSCOs in the production of Route Acceptance Safety Cases for
electric trains, by describing a methodology for demonstrating compatibility with EE&CS systems on Network
Rail's electrified routes.
Mandatory upon: Advisory only
Standards Ownership: Signal Engineering
RT/E/C/50005
Methodology for the Demonstration of Compatibility with 50 Hertz Single Rail Track Circuits
Issue
Date
Status
Price
Colour
Compliance
Implementation
1
Feb 03
D
The purpose of this document is to provide a methodology for the demonstration of electromagnetic compatibility
(EMC) of rolling stock with 50 Hz single rail track circuits installed on Network Rail controlled infrastructure. It is
based upon previously accepted safety assessments which were undertaken for Traction and Rolling Stock thereby
allowing them to operate over 50 Hz single rail track circuits.
Mandatory upon: Advisory only
Standards Ownership: Signal Engineering
RT/E/C/50007
Date
Status
Price
Colour
Compliance
Implementation
1
Feb 03
D
The purpose of this document is to provide a methodology to demonstrate compatibility of trains with HVI track
circuits on the a.c. and d.c. railways on Network Rail controlled infrastructure.
Mandatory upon: Advisory only
Standards Ownership: Signal Engineering
RT/E/C/50008
Date
Status
Price
Colour
Compliance
Implementation
1
Feb 03
D
The purpose of this procedure is to provide a method for calculating the safe permissible maximum levels of
electrical interference that may be generated by electric trains designed to be used on tracks employing TI 21 track
circuits. The procedure lists all of the infrastructure aspects to be taken into account, characteristics of the TI 21
track circuits and possible failure modes. Worked examples are given for calculating maximum permissible levels of
electrical interference due to traction current, and axle-to-axle voltages.
Mandatory upon: Advisory only
Standards Ownership: Signal Engineering
RT/E/C/50009
Methodology for the Demonstration of Compatibility with FS2600 Track Circuits on the DC
Railway
Issue
Date
Status
Price
Colour
Compliance
Implementation
1
Feb 03
D
The purpose of this document is to provide a methodology to demonstrate compatibility with FS2600 track
circuits on Network Rail 750V d.c. electrified railway.
Mandatory upon: Advisory only
Standards Ownership: Signal Engineering
RT/E/C/50012
Date
Status
Price
Colour
Compliance
Implementation
1
Feb 03
C
The purpose of this document is to provide a methodology to demonstrate compatibility with Train Protection
and Warning System (TPWS) trackside equipment on the a.c. and d.c. railways on Network Rail controlled
infrastructure.
Mandatory upon: Advisory only
Standards Ownership: Signal Engineering
th
st
Page 74
2. Company Standards
RT/E/C/50013
C. Engineering
Signal Engineering
Date
Status
Price
Colour
Compliance
Implementation
1
Feb 03
C
The purpose of this document is to provide a methodology to demonstrate compatibility with interlocking systems
installed on the a.c. and d.c. electrified railway on Network Rail controlled infrastructure.
Mandatory upon: Advisory only
Standards Ownership: Signal Engineering
RT/E/C/50015
Methodology for the demonstration of compatibility with Reed FDM Systems on the AC and DC
Railways
Issue
Date
Status
Price
Colour
Compliance
Implementation
1
Feb 03
D
The purpose of this document is to provide a methodology to demonstrate compatibility with reed FDM systems
installed on the a.c. and d.c. electrified railway on Network Rail controlled infrastructure.
Mandatory upon: Advisory only
Standards Ownership: Signal Engineering
RT/E/C/50018
Date
Status
Price
Colour
Compliance
Implementation
1
Feb 03
D
The purpose of this code of practice is to provide a methodology to demonstrate compatibility of traction and
rolling stock operating on Network Rail electrified lines with the infrastructure of neighbouring railways & vice
versa.
Mandatory upon: Advisory only
Standards Ownership: Signal Engineering
th
st
Page 75
2. Company Standards
C. Engineering
Signal Engineering
Date
Status
Price
Colour
Compliance
Implementation
1
Jun 02
B
This Guidance Note gives advice to those engaged in various activities on the treatment of TPWS and the
precautions they should take in respect of TPWS.
Mandatory upon: Advisory only
Standards Ownership: Signal Engineering
RT/E/G/00028
Date
Status
Price
Colour
Compliance
Implementation
1
Dec 03
E
These guidelines form a detailed set of methodologies to cover this concept. The development of a significant
number of signalling schemes are presently at that critical position, where much signalling would be built without
these provisions, unless they are adopted for projects being developed and designed now. These principles are
already being applied to the West Coast Main Line Upgrade and Speed Enhancement projects.
Mandatory upon: Advisory only
Standards Ownership: Signal Engineering
RT/E/G/02025
Date
Status
Price
Colour
Compliance
Implementation
1
Dec 03
D
Yes
This Guidance Note gives advice to those engaged in various engineering activities on the treatment of the TASS
system and the precautions they should take in respect of it.
Mandatory upon: Advisory only
Standards Ownership: Signal Engineering
RT/E/G/11710
Date
Status
Price
Colour
Compliance
Implementation
2
Apr 01
Phone
This Handbook provides a location for Network Rail s suite of signalling design standards, both those
originating from Network Rail Line and those former Railway Group Standards transferred from Network
Rail Safety and Standards Directorate. Cross referencing to associated standards, a subject index and list of
definitions are also provided.
Mandatory upon: Advisory only
Further Information: The following related standards may be purchased as part of the handbook, or as separate items:
RT/E/S/11201, RT/E/C/11701, RT/E/C/11110, RT/E/C/11115, RT/E/C/11116, RT/E/C/11004, RT/E/C/11202,
RT/E/C/11205, RT/E/C/11600.
Standards Ownership: Signal Engineering
RT/E/G/11720
Date
Status
Price
Colour
Compliance
Implementation
1
Aug 00
Phone
This Handbook provides a location for Network Rail s suite of signalling installation standards, both those originating
from Network Rail Line and those former Railway Group Standards transferred from Network Rail Safety and Standards
Directorate. Cross referencing to associated standards, a subject index and list of definitions are also provided.
Mandatory upon: Advisory only
Further Information: The following related standards may be purchased as part of the handbook, or as separate items:
RT/E/S/11303, RT/E/C/11210, RT/E/C/11821, RT/E/C/11191, RT/E/C/11213
Standards Ownership: Signal Engineering
th
st
Page 76
2. Company Standards
RT/E/G/11730
C. Engineering
Signal Engineering
Date
Status
Price
Colour
Compliance
Implementation
2
Jun 02
Phone
This Guidance Note provides a location for Network Rail s suite of signalling works testing standards, both those
originating from Network Rail Line and those former Railway Group Standards transferred from Railway Group. Cross
referencing to associated standards, a subject index and list of definitions are also provided. Standards associated with
signalling maintenance testing are provided in a separate Guidance Note, RT/E/G/11740.
Mandatory upon: Advisory only
Additional Information: The following related standards may be purchased as part of the handbook, or as separate items:
RT/E/S/11221, RT/E/C/11721, RT/E/C/11722, RT/E/P/14001, RT/E/S/14002, RT/E/S/14003, RT/E/P/14004
Standards Ownership: Signal Engineering
RT/E/G/11740
Date
Status
Price
Colour
Compliance
Implementation
2
Apr 02
Phone
This Guidance Note provides a location for Network Rail s suite of maintenance testing standards, particularly those
former Railway Group Standards transferred from Network Rail Safety and Standards Directorate. Cross referencing to
associated standards, a subject index and list of definitions are also provided. Standards associated with works testing are
provided in a separate Guidance Note, RT/E/G/11730.
Mandatory upon: Advisory only
Additional Information: The following related standards may be purchased as part of the handbook, or as separate items:
RT/E/S/11231, RT/E/C/11729, RT/E/C/11731
Standards Ownership: Signal Engineering
RT/E/G/14202
Date
Status
Price
Colour
Compliance
Implementation
1
Apr 03
C
This Guidance Note has been produced to ensure Network Rail complies with the Railway Group Standard
GI/RT7006 Prevention and Mitigation of Overruns - Risk Assessment. RT/E/G/14202 provides guidance for
example on when to undertake a Layout Risk Method A.
Mandatory upon: Advisory only
Standards Ownership: Signal Engineering
RT/E/G/50003
Methodology for the Demonstration of Electrical Compatibility with Double Rail Reed Track
Circuits on the DC Railway
Issue
Date
Status
Price
Colour
Compliance
Implementation
1
Feb 03
D
Yes
The purpose of this document is to provide a methodology to demonstrate electrical compatibility with 'RT' type
double rail reed track circuits on the d.c. electrified railway on Network Rail controlled infrastructure.
Mandatory upon: Advisory only
Standards Ownership: Signal Engineering
RT/E/G/50014
Date
Status
Price
Colour
Compliance
Implementation
1
Feb 03
Phone
The purpose of this document is to provide a methodology to demonstrate compatibility with lineside equipment
installed on the a.c. and d.c. electrified railway on Network Rail controlled infrastructure.
Mandatory upon: Advisory only
Standards Ownership: Signal Engineering
th
st
Page 77
2. Company Standards
C. Engineering
Signal Engineering
SIN/040
Date
Status
Price
Colour
Compliance
Implementation
1
Jan 91
A
This document addresses wrong side failures occurring in Vital Type RR F.D.M. Reed systems and perishing of
resilient mounts.
Mandatory upon: Network Rail & Contractors
Standards Ownership: Signal Engineering
RT/SIN/055
Date
Status
Price
Colour
Compliance
Implementation
2
Apr 04
C
This Special Inspection Notice explains the necessity for checking clamp lock hydraulic fluid level and requires the
fitting of a level indicator.
Mandatory upon: Network Rail & Contractors
Standards Ownership: Signal Engineering
Further Information: This standard has been renumbered from GS/SIN/055
RT/SIN/061
Date
Status
Price
Colour
Compliance
Implementation
2
Aug 00
C
This SIN details the actions necessary to ensure that certain point configurations using a single BR 998 Detector
Box are identified and appropriate remedial action for the specified configurations.
Mandatory upon: Network Rail & Contractors
Standards Ownership: Signal Engineering
RT/SIN/062
Date
Status
Price
Colour
Compliance
Implementation
1
Mar 94
A
This standard defines the action required to change any W.B. & S. Co. QNE1 and QMN1 relays, still in service.
Mandatory upon: Network Rail & Contractors
Standards Ownership: Signal Engineering
RT/SIN/063
Date
Status
Price
Colour
Compliance
Implementation
1
Dec 98
C
This Notice sets out the actions required to ensure that lineside signals and indicators fitted with quartz halogen
lamps have a light output that is visible to train drivers. Formerly Group Standard GK/RT0401 Issue 3 May 1996.
Mandatory upon: Network Rail & Contractors
Standards Ownership: Signal Engineering
RT/SIN/064
Date
Status
Price
Colour
Compliance
Implementation
3
Aug 99
C
This Notice sets out the action required to ensure that the hydraulic system on all electro-hydraulic points are
checked for the content of air and susceptibility to the ingress of air. Formerly Group Standard GK/RT0402 Issue 1
December 1996.
Mandatory upon: Network Rail & Contractors
Standards Ownership: Signal Engineering
th
st
Page 78
2. Company Standards
RT/SIN/065
C. Engineering
Signal Engineering
Date
Status
Price
Colour
Compliance
Implementation
1
Dec 98
B
This Notice sets out the action required to ensure that flasher units manufactured by Westinghouse are checked
to ensure that they have been modified to prevent a known failure from occurring. Formerly Group Standard
GK/RT0403 Issue 1 August 1997.
Mandatory upon: Network Rail & Contractors
Standards Ownership: Signal Engineering
RT/SIN/067
Date
Status
Price
Colour
Compliance
Implementation
2
Dec 99
B
This Notice sets out the actions required to implement modifications to HVI type track circuits fitted with NCO
RVT. 600 receivers. The modification consists of the addition of one capacitor. Formerly Railway Group Standard
GK/RT0405. Issue 1 August 1997.
Mandatory upon: Network Rail, Contractors and Lessee
Standards Ownership: Signal Engineering
RT/SIN/068
Date
Status
Price
Colour
Compliance
Implementation
1
Dec 98
B
This Notice defines how defective ST16 Mark 6 Electronic Timers, manufactured by Adtranz and its predecessors,
are to be identified and, if necessary, replaced.
Mandatory upon: Network Rail & Contractors
Standards Ownership: Signal Engineering
RT/SIN/069
Date
Status
Price
Colour
Compliance
Implementation
1
Jun 99
C
This Notice requires the fitting of snorkel valves to power packs operating clamp lock or swing nose crossing point
apparatus, over which facing moves are signalled. Power packs fitted with snorkel valves shall be clearly and suitably
identified. Power packs held as spares shall also be fitted. The programme for changing the power packs shall be
prioritised according to the risk at each site.
Mandatory upon: Network Rail & Contractors
Standards Ownership: Signal Engineering
RT/SIN/070
Date
Status
Price
Colour
Compliance
Implementation
1
Oct 98
B
This Notice details the actions required to check BR 998 Electrical Detectors to ensure that defects which could
lead to electrical breakdown are not present.
Mandatory upon: Network Rail & Contractors
Standards Ownership: Signal Engineering
RT/SIN/071
Date
Status
Price
Colour
Compliance
Implementation
1
Aug 99
C
This Notice prescribes a revised test method which will detect air and directs that it shall be used on all electrohydraulic points.
Mandatory upon: Network Rail & Contractors
Standards Ownership: Signal Engineering
th
st
Page 79
2. Company Standards
RT/SIN/072
C. Engineering
Signal Engineering
Date
Status
Price
Colour
Compliance
Implementation
1
Dec 00
B
This SIN requires a survey to establish the existing distribution and modification status of REED equipment. It
applies to all RR2000-series Reed receiver applications
Mandatory upon: Network Rail & Contractors
Standards Ownership: Signal Engineering
RT/SIN/073
Date
Status
Price
Colour
Compliance
Implementation
Compliance
Implementation
1
Jul 00
B
This Special Inspection Notice requires signal alignment to be checked and recorded.
Mandatory upon: Network Rail & Contractors
Standards Ownership: Signal Engineering
RT/SIN/074
Date
Status
Price
Colour
2
Oct 2001
C
This Special Inspection Notice details the actions necessary to ensure Westlyte signal heads are identified and
remedial action is taken to prevent the occurrences detailed in this Notice.
Mandatory upon: Network Rail & Contractors
Standards Ownership: Signal Engineering
RT/SIN/077
Date
Status
Price
Colour
Compliance
Implementation
1
Apr 01
B
This Special Inspection Notice aims to establish records of where polycarbonate lenses are fitted and their present
condition so that their use can be properly managed.
Mandatory upon: Network Rail & Contractors
Standards Ownership: Signal Engineering
RT/SIN/078
Date
Status
Price
Colour
Compliance
Implementation
2
Apr 02
B
A design defect has been discovered in the ALSTOM Mk3, Mod. State 4, Solid State Interlocking (SSI) Signal Module that
could lead to failure to report a failed signal lamp. This Special Inspection Notice advises of this problem, requires a
special test and provides for records to be made to enable later replacement.
Mandatory upon: Network Rail & Contractors
Standards Ownership: Signal Engineering
RT/SIN/079
Date
Status
Price
Colour
Compliance
Implementation
1
May 01
B
This SIN requires that all loops installed on or before 30 April 2001 will have a retrospective correspondence test
undertaken, to mitigate against any further occurrence of TPWS loops been mistakenly installed and commissioned
with arming and trigger loops frequencies transposed for one TPWS function or with an adjacent signal; this is a
wrong side failure.
Mandatory upon: Network Rail & Contractors
Standards Ownership: Signal Engineering
th
st
Page 80
2. Company Standards
RT/SIN/080
C. Engineering
Signal Engineering
Date
Status
Price
Colour
Compliance
Implementation
2
Oct 02
C
Yes
This Special Inspection Notice is to ensure that immediate inspections are carried out on Network Rail switch and
crossing installations fitted with adjustable points stretcher bars.
Mandatory upon: Network Rail & Contractors
Further information: Compliance to this notice is mandatory and with immediate effect. Confirmation of receipt of this SIN
is required and clause 5 of the document must be complied with for confirmation of implementation.
Standards Ownership: Signal Engineering
RT/SIN/081
Date
Status
Price
Colour
Compliance
Implementation
1
Dec 03
B
This SIN defines two types of relays that possess potentially unsafe failure modes and details the action to be taken
to identify the number of each variant and the function which they perform within the signalling control circuitry.
Mandatory upon: Network Rail & Contractors
Further information: This SIN requires that information is collected to assist with the production of equivalents lists and the
prioritisation of replacement to be initiated by another SIN.
Standards Ownership: Signal Engineering
RT/SIN/083
Date
Status
Price
Colour
Compliance
Implementation
1
Oct 03
B
31/08/2004
This Special Inspection Notice defines the types of affected signals and the action to be taken to replace the front
screens with alternative materials not producing such serious effects.
Mandatory upon: Network Rail & Contractors
Standards Ownership: Signal Engineering
RT/SIN/084
Date
Status
Price
Colour
Compliance
Implementation
1
Oct 03
B
01/06/2008
This Special Inspection Notice defines the replacement actions required for existing polycarbonate lenses to
prevent life expired lenses remaining in service.
Mandatory upon: Network Rail & Contractors
Standards Ownership: Signal Engineering
RT/SIN/085
Date
Status
Price
Colour
Compliance
Implementation
1
Oct 03
B
This Special Inspection Notice defines a requirement to examine the rear barrier strut of Western Region-type
crossing barriers for signs of damage or developing fractures. This requirement is incorporated in Network Rail
Signalling Maintenance Specification RT/SMS LC91 issue 2, but this SIN requires checking to take place pending the
implementation of the new SMS.
Mandatory upon: Network Rail & Contractors
Standards Ownership: Signal Engineering
th
st
Page 81
2. Company Standards
C. Engineering
Signal Engineering
Date
Status
Price
Colour
Compliance
Implementation
1
Dec 02
C
To detail the maintenance tasks for DC track circuits for the DC track circuit risk based maintenance regime.
Mandatory upon: Advisory only
Standards Ownership: Signal Engineering
RT/E/WI/00101
Date
Status
Price
Colour
Compliance
Implementation
1
Dec 02
C
To detail the maintenance tasks required for the Rail Clamp Point Lock risk-based maintenance regime.
Mandatory upon: Advisory only
Standards Ownership: Signal Engineering
RT/E/WI/00102
Network Rail Company Work Instruction TI21 Track Circuit Risk Based Maintenance
Issue
RT/E/WI/00103
Colour
Compliance
Implementation
07/08/04
Date
Status
Price
Colour
Compliance
Implementation
07/08/04
Date
Status
Price
Colour
Compliance
2 (1)
Aug 04 (Dec 03)
Up-Issued D
07/08/04
To detail the maintenance tasks for the TPWS Track Subsystem risk based maintenance regime.
Mandatory upon: Advisory only
Standards Ownership: Signal Engineering
RT/E/WI/00105
Implementation
07/08/04
Price
1
Aug 04
New
D
07/08/04
To detail the maintenance tasks for the HW Point Machine Risk-Based Maintenance regime.
Mandatory upon: Advisory only
Standards Ownership: Signal Engineering
RT/E/WI/00104
*
Status
Date
3 (2)
Aug 04 (Feb 04)
Up-Issued D
07/08/04
To detail the maintenance tasks for the TI21 Track Circuit risk based maintenance regime.
Mandatory upon: Advisory only
Standards Ownership: Signal Engineering
Date
Status
Price
Colour
Compliance
Implementation
2 (1)
Aug 04 (Dec 03)
Up-Issued D
Yes
07/08/04
07/08/04
To detail the maintenance tasks required for the AzLM Axle Counter System risk-based maintenance regime.
Mandatory upon: Advisory only
Standards Ownership: Signal Engineering
RT/E/WI/00108
Date
Status
Price
Colour
Compliance
Implementation
1
Apr 04
D
To detail the maintenance tasks for the HPSS risk based maintenance regime.
Mandatory upon: Advisory only
Standards Ownership: Signal Engineering
th
st
Page 82
2. Company Standards
C. Engineering
Civil Engineering
Date
Status
Price
Colour
Compliance
Implementation
2
Apr 04
E
This purpose of this Specification is to control the risk to Network Rail s infrastructure, to railway operations, to
railway passengers, members of the public and the environment that may arise due to work activities associated
with the Design and construction of Permanent Way and the Design, construction and maintenance of Structures,
Buildings, and other Civil Engineering Infrastructure on, over, under or adjacent to Network Rail s infrastructure
by defining procedures to be followed.
Mandatory upon: Network Rail
Further Information: Responds to GC/RT5101 and GI/RT7003
Standards Ownership: Civil Engineering
RT/CE/S/007
Date
Status
Price
Colour
Compliance
Implementation
1
Feb 95
B
This specification defines standard design loading for new or reconstructed accommodation and occupation
Overbridges and gives criteria for when lesser design loadings may be permissible.
Mandatory upon: Network Rail
Further Information: Responds to GC/RT5110, GC/RT5112
Standards Ownership: Civil Engineering
RT/CE/S/017
Date
Status
Price
Colour
Compliance
Implementation
2
Apr 04
E
Yes
The purpose of this Specification is to define the requirements for the examination of Bridges, Culverts and other
structures within the scope of this Specification that are on, over or under Network Rail s infrastructure, such that
there is no unacceptable risk to safety as a result of their condition, and for recording and reporting the
examination findings, and the provision of information for Regulatory reporting.
Mandatory upon: Network Rail
Further Information: Responds to GC/RT5100, GC/RT5123 and GC/RT5143
Standards Ownership: Civil Engineering
RT/CE/S/035
Assessment of Structures
Issue
Date
Status
Price
Colour
Compliance
Implementation
2
Feb 04
E
This document defines the Specification to be followed for the Assessment of Structures for which Network Rail
has responsibility, either as owner of the Structure or as a result of a specific agreement.
Mandatory upon: Network Rail & Contractors
Further Information: Incorporates and supersedes RT/CE/P/010
Standards Ownership: Civil Engineering
RT/CE/S/044
Undertrack Crossings
Issue
Date
Status
Price
Colour
Compliance
Implementation
2 (1)
Aug 04 (Apr 98)
Up-Issued D
01/10/04
07/08/04
The purpose of this Network Rail Business Process Document is to define the requirements for the Design and
construction of Undertrack Crossings.
Mandatory upon: Network Rail
Further Information: Responds to GC/RT5110 (Issue 2), GI/RT7008 (Clauses B4.1.1 & B6.3).
Standards Ownership: Civil Engineering
th
st
Page 83
2. Company Standards
RT/CE/S/047
C. Engineering
Civil Engineering
Date
Status
Price
Colour
Compliance
Implementation
2
Feb 01
F
This Specification provides the standards of competence against which persons examining structures should be
assessed. Compliance with this Specification will ensure compliance with Railway Group Standard GC/RT5100: Safe
Management of Structures in respect of competence of the Structures Manager and GO/RT3260: Competence
Management for Safety-Critical Work for other persons in the structure examination process.
Mandatory upon: Network Rail and Contractor
Standards Ownership: Civil Engineering
RT/CE/S/048
RT/CE/S/071
Status
Price
Colour
Compliance
Implementation
Date
4 (3)
Aug 04 (Oct 02)
Up-Issued E
02/10/04
02/10/04
The purpose of this Specification is to define the Standards of Competence against which persons examining
Bridges following a reported Bridge Strike in order to authorise train movements shall be assessed.
Mandatory upon: Network Rail
Further Information: Responds to GC/RT/5122 (Issue 4) and GO/RT3260 (Issue 2)
Standards Ownership: Civil Engineering
Date
Status
Price
Colour
Compliance
Implementation
2 (1)
Aug 04 (Aug 03)
Up-Issued D
01/11/04
01/11/04
The purpose of this Specification is to set out requirements for the Design of Earthworks, Earthwork
Remediations, and geotechnical aspects of the design of foundations for structures as identified in the scope, for
which Network Rail is wholly or partially responsible, with the aims of ensuring that such Earthworks and
structure foundations will perform safely and satisfactorily in service and that they can be constructed with
reasonable economy.
Mandatory upon: Network Rail & Contractors
Standards Ownership: Civil Engineering
RT/CE/S/076
Date
Status
Price
Colour
Compliance
Implementation
1
Oct 02
E
Yes
This specification defines requirements for:
- Management procedures to be followed to mitigate the risk from bridge strikes,
- Procedures to be followed to enable trains to pass safely over or under a bridge following a reported
bridge strike
- Recording and reporting bridge strike accidents
Mandatory upon: Network Rail
Further Information: Replaces RT/CE/P/023 and RT/CE/S/222
Standards Ownership: Civil Engineering
RT/CE/S/080
Date
Status
Price
Colour
Compliance
Implementation
1
Apr 04
D
Yes
The purpose of this Specification is to define the requirements for the management of existing Bridges and
Culverts on, over or under Network Rail s infrastructure such that there is no unacceptable risk to safety as a
result of their condition, use or location.
Mandatory upon: Network Rail
Further Information: Replaces RT/CE/P/023 and RT/CE/S/222
Standards Ownership: Civil Engineering
th
st
Page 84
2. Company Standards
RT/CE/S/082
C. Engineering
Civil Engineering
Date
Status
Price
Colour
Compliance
Implementation
1
Apr 04
D
Yes
The purpose of this Specification is to define the requirements for the management of existing Retaining Walls on
Network Rail s infrastructure such that there is no unacceptable risk to safety as a result of their condition, use or
location.
Mandatory upon: Network Rail
Further Information: Replaces RT/CE/P/023 and RT/CE/S/222
Standards Ownership: Civil Engineering
RT/CE/S/083
Date
Status
Price
Colour
Compliance
Implementation
1
Apr 04
E
Yes
The purpose of this Specification is to define the requirements for the examination of Retaining Walls on Network
Rail s infrastructure, such that there is no unacceptable risk to safety as a result of their condition, and for
recording and reporting the examination findings, and the provision of information for Regulatory reporting.
Mandatory upon: Network Rail
Further Information: Replaces RT/CE/P/023 and RT/CE/S/222
Standards Ownership: Civil Engineering
RT/CE/S/084
Date
Status
Price
Colour
Compliance
Implementation
1
Apr 04
D
Yes
The purpose of this Specification is to define the requirements for the management of existing Tunnels within
Network Rail s infrastructure such that there is no unacceptable risk to safety as a result of their condition, use or
location.
Mandatory upon: Network Rail
Further Information: Replaces RT/CE/P/023 and RT/CE/S/222
Standards Ownership: Civil Engineering
RT/CE/S/085
Examination of Tunnels
Issue
Date
Status
Price
Colour
Compliance
Implementation
1
Apr 04
E
Yes
The purpose of this Specification is to define the requirements for the examination of Tunnels within Network
Rail s infrastructure such that there is no unacceptable risk to safety as a result of their condition, and for
recording and reporting the examination findings, and the provision of information for Regulatory reporting.
Mandatory upon: Network Rail
Further Information: Replaces RT/CE/P/023 and RT/CE/S/222
Standards Ownership: Civil Engineering
RT/CE/S/087
Date
Status
Price
Colour
Compliance
Implementation
1
Apr 04
D
Yes
The purpose of this Specification is to define the requirements for the management of existing Buildings and station
structures on, over or under Network Rail s infrastructure such that there is no unacceptable risk to safety as a
result of their condition, use or location.
Mandatory upon: Network Rail
Further Information: Replaces RT/CE/P/023 and RT/CE/S/222
Standards Ownership: Civil Engineering
RT/CE/S/088
Date
Status
Price
Colour
Compliance
Implementation
1
Apr 04
E
Yes
The purpose of this Specification is to define the requirements for the examination of Buildings and station
structures on, over or under Network Rail s infrastructure, such that there is no unacceptable risk to safety as a
result of their condition, and for recording and reporting the examination findings.
Mandatory upon: Network Rail
Further Information: Replaces RT/CE/P/023 and RT/CE/S/222
Standards Ownership: Civil Engineering
th
st
Page 85
2. Company Standards
RT/CE/S/089
C. Engineering
Civil Engineering
Date
Status
Price
Colour
Compliance
Implementation
1
Apr 04
D
Yes
The purpose of this Specification is to define the requirements for the management of existing Coastal, Estuarine
and River Defences on Network Rail s infrastructure such that there is no unacceptable risk to safety as a result of
their condition.
Mandatory upon: Network Rail
Further Information: Replaces RT/CE/P/023 and RT/CE/S/222
Standards Ownership: Civil Engineering
RT/CE/S/090
Date
Status
Price
Colour
Compliance
Implementation
1
Apr 04
E
Yes
The purpose of this Specification is to define the requirements for the examination of Coastal, Estuarine and River
Defences on Network Rail s infrastructure, such that there is no unacceptable risk to safety as a result of their
condition, and for recording and reporting the examination findings.
Mandatory upon: Network Rail
Further Information: Replaces RT/CE/P/023 and RT/CE/S/222
Standards Ownership: Civil Engineering
RT/CE/S/091
Date
Status
Price
Colour
Compliance
Implementation
1
Apr 04
D
Yes
The purpose of this Specification is to define the requirements for the management of existing Ancillary Structures
on, over or under Network Rail s infrastructure such that there is no unacceptable risk to safety as a result of
their condition, use or location.
Mandatory upon: Network Rail
Further Information: Replaces RT/CE/P/023 and RT/CE/S/222
Standards Ownership: Civil Engineering
RT/CE/S/092
Date
Status
Price
Colour
Compliance
Implementation
1
Apr 04
E
Yes
The purpose of this Specification is to define the requirements for the examination of ancillary structures on, over
or under Network Rail s infrastructure, such that there is no unacceptable risk to safety as a result of their
condition, and for recording and reporting the examination findings.
Mandatory upon: Network Rail
Further Information: Replaces RT/CE/P/023 and RT/CE/S/222
Standards Ownership: Civil Engineering
RT/CE/S/140
Date
Status
Price
Colour
Compliance
Implementation
1
Apr 04
B
The purpose of this Specification is to define the requirements for the production and use of the Model Clauses
for Specifying Civil Engineering Works, so that when they are used within Technical Workscopes in Network
Rail s contracts, they comply with Railway Group Standards, Network Rail Standards and industry good practice.
Mandatory upon: Network Rail
Standards Ownership: Civil Engineering
RT/CE/S/142
Date
Status
Price
Colour
Compliance
Implementation
1
Aug 04
New
C
07/02/05
07/02/05
The purpose of this Specification is to define the requirements for the management of the movement of Abnormal
Road Loads over Bridges owned by Network Rail.
Mandatory upon: Network Rail
Standards Ownership: Civil Engineering
th
st
Page 86
2. Company Standards
C. Engineering
Civil Engineering
2C6.2. Procedures
RT/CE/P/008
Approval and Use of the Model Clauses for Specifying Civil Engineering Works
Issue
Date
Status
Price
Colour
Compliance
Implementation
2
Jun 97
B
This document defines procedures for the approval, maintenance, issue and use of Network Rail s Model Clauses
for Specifying Civil Engineering Works (Network Rail Line Code of Practice RT/CE/C/008).
Mandatory upon: Network Rail
Standards Ownership: Civil Engineering
RT/CE/P/020
Use of Model Works Agreements for the Construction of New Bridges by or for Outside Parties
Issue
Date
Status
Price
Colour
Compliance
Implementation
1
Aug 95
B
This documents defines the procedures for the use of the model agreement to be used for the production of
Works Agreements to regulate the construction of new bridges by or for outside parties.
Mandatory upon: Network Rail
Further Information: Responds to GC/RT5131
Standards Ownership: Civil Engineering
RT/CE/P/022
Controlling the Use of Public Road Bridges by Heavy Abnormal Road Loads
Issue
Date
Status
Price
Colour
Compliance
Implementation
1
Sep 96
B
This document sets out the procedure to be used for receiving, processing and responding to abnormal heavy road
notifications from road hauliers.
Mandatory upon: Network Rail
Further Information: Responds to GC/RT5100
Standards Ownership: Civil Engineering
RT/CE/P/032
Date
Status
Price
Colour
Compliance
Implementation
1
Apr 04
D
Yes
The purpose of this Company Standard is to define the requirements for the management of existing structures
on, over or under Network Rail s infrastructure such that there is no unacceptable risk to safety as a result of
their condition, use or location.
Mandatory upon: Network Rail
Further Information: Responds to GC/RT5151 and GC/RT5143
Standards Ownership: Civil Engineering
RT/CE/P/037
Date
Status
Price
Colour
Compliance
Implementation
2
Apr 04
D
This procedure specifies the minimum requirements and actions to be taken by Network Rail Line to manage risk
arising from subsidence damage and surface instability associated with mineral extraction and hazards associated
with Landfill.
Mandatory upon: Network Rail, Contractors & Lessee
Further Information: Responds to GC/RT5152
Standards Ownership: Civil Engineering
RT/CE/P/042
Date
Status
Price
Colour
Compliance
Implementation
1
Oct 01
D
The purpose of this Procedure is to define the procedures to be followed to maintain the structural integrity of
Tunnels on Network Rail infrastructure to ensure that Tunnels remain fit for purpose.
Mandatory upon: Network Rail, Contractors & Lessee
Further Information: Responds to GC/RT5180, GC/RT5203 and GK/RT0033
Standards Ownership: Civil Engineering
th
st
Page 87
2. Company Standards
RT/CE/P/044
C. Engineering
Civil Engineering
Date
Status
Price
Colour
Compliance
Implementation
1
Apr 04
D
Yes
The purpose of this Company Standard is to define the requirements for works to new and existing structures on,
over or under Network Rail s infrastructure such that there is no unacceptable risk to safety as a result of their
Design or construction.
Mandatory upon: Network Rail, Contractors & Lessee
Further Information: Responds to GC/RT5180, GC/RT5203 and GK/RT0033
Standards Ownership: Civil Engineering
Date
Status
Price
Colour
Compliance
Implementation
2
Aug 01
D
This Code of Practice gives general guidance on the waterproofing of railway underline bridge decks including
selection, preparation, application and protection.
Mandatory upon: Advisory only
Further Information: Refer to RT/CE/S/041
Standards Ownership: Civil Engineering
RT/CE/C/002
Date
Status
Price
Colour
Compliance
Implementation
4
Feb 02
F
This Code of Practice gives recommendations for the selection, application and reapplication of protective
treatment to metallic bridges and structures, and is to be read in conjunction with Network Rail Line Specification
RT/CE/S/039: Specification RT98 Protective Treatments for Network Rail Infrastructure.
Mandatory upon: Advisory only
Further Information: Refer to RT/CE/S/039
Standards Ownership: Civil Engineering
RT/CE/C/008
Date
Status
Price
Colour
Compliance
Implementation
1
May 95
Phone
This Code of Practice sets out Network Rail s Model Clauses for specifying Civil Engineering Works, for use in
accordance with Network Rail Line Procedure RT/CE/P/008 Approval and Use of the Model Clauses for
Specifying Civil Engineering Works. [Listed below are the current revision dates for sections within RT/CE/C/008].
Mandatory upon: Advisory only
Additional Information:All queries regarding this COP, please contact Keith Ross; Civil Engineering, 020 7557 8360
Standards Ownership: Civil Engineering
Sections
10
21, 22, 25
23
30 35
40
50 53
70 79
80
83
85
90
93
100
th
Title
Railtrack Line Code of Practice RT/CE/C/008
Guidance notes for Users
Contents
List of Appendices
Appendix B
Appendix C
Appendix D
General
Surveys
Structural Repair Surveys
Ground Investigation
Demolition
Earthworks and Excavations
Piling and Embedded Retaining Walls
Concrete (BS 5400)
Concrete Repairs
Concrete for Ancillary Purposes
Steelwork (BS 5400)
Metalwork Repairs
Bearings
Bridge Bearings Guidelines for Designers
st
Date of Validity
May 1995
30 April 1997
31 May 1997
30 April 1997
31 March 1997
11 April 1997
See below
3 April 1997
30 Sept 1997
13 Feb 1997
31 Dec 1996
31 Jan 1996
29 Feb 1996
31 Dec 1996
31 Mar 1996
13 Feb 1997
30 Nov 1995
31 Jan 1996
13 Feb 1997
31 Jan 1996
31 Jan 1996
Page 88
2. Company Standards
Sections
110 115
120 126
130 134
140, 141
150
153
160 164
170 176
180 182
185 186
190 191
200 204
210
211
212
213
214
215
216
217
218
219
220
221
225
226
227
230 233
240
250 253
255 257
C. Engineering
Civil Engineering
Title
Waterproofing
Bridge Installation Method and Temporary Works
Inspection of new Fabricated Steelwork, Precast Concrete Protective Treatment and Waterproofing
Steelwork (BS 5950)
Brickwork, Blockwork and Masonry
Brickwork and Masonry Repairs
Structural Timber
Structural Timber Guidance Notes
Protective Treatment
Building and Structure Drainage
Track Drainage
External Service Ducts and Cable Troughing
Roads and Paving
Permanent Way General
Permanent Way Design
Installation of New and Renewal of Existing Perm Way
Permanent Way Acceptance Standards
Inspection of Permanent Way
Maintenance of Permanent Way
Permanent Way Materials
Construction Standards for Permanent Way
Permanent Way Small Plant, Tools and Equipment
Permanent Way Ancillary Items
Permanent Way Incident Management
Permanent Way for Bridgework
Permanent Way Particular Specification for Plain Line
Permanent Way Particular Specification for S&C
Permanent Way Particular Specification for Bridgeworks
Level Crossings
Level Crossing Guidance Notes
Fencing and Gates
Landscaping
Management of Lineside Vegetation
RT/CE/C/015
Date of Validity
29 Feb 1996
31 Dec 1996
31 Jan 1997
31 Mar 1996
30 Sep 1994
05 May 1997
31 Dec 1996
31 Dec 1996
31 Oct 1995
31 Mar 1996
31 Jan 1997
29 Feb 1996
31 Oct 1996
31 Mar 1997
31 Mar 1997
31 Mar 1997
31 Mar 1997
31 Mar 1997
31 Mar 1997
31 Mar 1997
31 Mar 1997
31 Mar 1997
31 Mar 1997
31 Mar 1997
31 Mar 1997
31 Mar 1997
31 Mar 1997
31 Mar 1997
31 Jan 1997
31 Jan 1997
31 Mar 1996
31 Mar 1996
31 Mar 1996
Date
Status
Price
Colour
Compliance
Implementation
1
Nov 95
F
Defines parameters and methods for the assessment of underbridges owned by Network Rail.
Mandatory upon: Advisory only
Further Information: Responds to GC/RT5100
Standards Ownership: Civil Engineering
RT/CE/C/018
Date
Status
Price
Colour
Compliance
Implementation
1
Aug 95
D
This Code of Practice sets out the minimum engineering contents, suggested commercial contents and approved layout of
any Work Agreement completed to cover the design, Construction and future maintenance of a new underbridge for an
outside party.
Mandatory upon: Advisory only
Further Information: Refer RT/CE/P/020
Standards Ownership: Civil Engineering
RT/CE/C/019
Date
Status
Price
Colour
Compliance
Implementation
1
Aug 95
D
This Code of Practice sets out the minimum engineering contents, suggested commercial contents and approved layout of
any Work Agreement completed to cover the design, construction and future maintenance of a new overbridge by an
outside party.
Mandatory upon: Advisory only
Further Information: Calls up 3 documents. Refer RT/CE/P/020
Standards Ownership: Civil Engineering
RT/CE/C/025
th
Page 89
2. Company Standards
Issue
C. Engineering
Date
Status
Civil Engineering
Price
Colour
Compliance
Implementation
2
Feb 03
Phone
Yes
This Code of Practice provides recommendations for the parameters and methods to be used for the assessment
of underbridges in accordance with RT/CE/S035.
Mandatory upon: Advisory only
Standards Ownership: Civil Engineering
RT/CE/C/026
Examination of Tunnels
Issue
Date
Status
Price
Colour
Compliance
Implementation
1
Jan 96
D
This Code of Practice gives guidance on the techniques for examining tunnels, the frequency of the examination,
the competency of the Examiners, and the recording and processing of the findings.
Mandatory upon: Advisory only
Further Information: Responds to GC/RT5100
Standards Ownership: Civil Engineering
RT/CE/C/041
RT/CE/C/045
Status
Price
Colour
Compliance
Implementation
Code of Practice for Terms and Definitions for Use in Civil Engineering Standards
Issue
Date
3 (2)
Aug 04 (Apr 01)
Up-Issued F
Yes
07/08/04
07/08/04
This Code of Practice provides advice on the application of a quantitative condition marking system for
underbridges, overbridges, intersection bridges, side bridges and viaducts.
Mandatory upon: Advisory only
Standards Ownership: Civil Engineering
Date
Status
Price
Colour
Compliance
Implementation
1
Aug 04
New
D
01/09/04
01/09/04
This Code of Practice has been produced with the aim of ensuring that standard terms and definitions are used
within all Company Standards and Business Process Documents produced for and on behalf of the Head of Civil
Engineering.
Mandatory upon: Advisory only
Standards Ownership: Civil Engineering
th
st
Page 90
2. Company Standards
C. Engineering
Telecommunications
2C7. Telecommunications
2C7.1. Specifications
RT/E/S/11189
Date
Status
Price
Colour
Compliance
Implementation
2
Aug 01
C
This Specification defines the mandatory requirements for the testing of level crossing telephones before they are
placed into service.
Mandatory upon: Network Rail & Contractors
Standards Ownership: Telecommunications Engineering
RT/E/S/30002
Date
Status
Price
Colour
Compliance
Implementation
3
Dec 01
D
This document defines the requirements to be met by a signal box telephone concentrator system.
Mandatory upon: Network Rail
Further Information: Performance specification
Standards Ownership: Telecommunications Engineering
RT/E/S/30003
Date
Status
Price
Colour
Compliance
Implementation
1
Jun 99
C
This specification details the conditions of electrical interference under which telecommunications equipment is
required to operate and the standard of performance required from the equipment under such conditions.
Mandatory upon: Network Rail & Contractors
Standards Ownership: Telecommunications Engineering
RT/E/S/30023
Date
Status
Price
Colour
Compliance
Implementation
2
Aug 01
C
This document sets out the optical arrangements for CCTV equipment intended to be used by drivers to monitor
train doors at a station operated under Driver Only Operation (Passenger) rules as required in Railway Group
Standards GO/RT3271, Driver Only Operations.
Mandatory upon: Network Rail & Contractors
Standards Ownership: Telecommunications Engineering
RT/E/S/30024
Date
Status
Price
Colour
Compliance
Implementation
2
Aug 01
C
This document defines the fault priority and associated response and target corrective action times which shall be
applied as a minimum requirement for Operational Telecommunications Services.
Mandatory upon: Network Rail & Contractors
Standards Ownership: Telecommunications Engineering
RT/E/S/30025
Date
Status
Price
Colour
Compliance
Implementation
2
Aug 01
B
This document sets out the requirements for standby power supplies to enable operational telecommunications
equipment to continue to function when the main power supply source has failed.
Mandatory upon: Network Rail & Contractors
Standards Ownership: Telecommunications Engineering
th
st
Page 91
2. Company Standards
RT/E/S/30028
C. Engineering
Telecommunications
Date
Status
Price
Colour
Compliance
Implementation
1
Apr 01
C
This specification sets out the minimum requirements for the installation of Operational Telecommunications
equipment to ensure that the systems performs in accordance with its safety requirements and continues to do so
throughout its design life.
Mandatory upon: Network Rail & Contractors
Standards Ownership: Telecommunications Engineering
RT/E/S/30031
Date
Status
Price
Colour
Compliance
Implementation
1
Dec 01
B
This document defines the minimum requirements to be applied in the design of a signal box concentrator system
and in the application of requirements to meet railway operating rules.
Mandatory upon: Network Rail & Contractors
Standards Ownership: Telecommunications Engineering
RT/E/S/30032
Date
Status
Price
Colour
Compliance
Implementation
2
Aug 03
C
Yes
This specification defines how the requirements of the Railway Group Standard GE/RT8048 issue 1- Positioning
and Labelling of Lineside Telephones, are to be applied to Network Rail controlled infrastructure. It revises the
emergency issue of RT/E/S/30032 to include retrospective actions to bring the position of telephones installed
since April 2002 into compliance and to bring the labelling of all telephones irrespective of age up to date
Mandatory upon: Network Rail & Contractors
Standards Ownership: Telecommunications Engineering
RT/E/S/30033
Date
Status
Price
Colour
Compliance
Implementation
3 (E2)
Feb 04 (Aug 02)
B
To maintain the integrity and functionality of telecommunications systems and equipment by ensuring that systems
and equipment retain conformity with the conditions of approval and design.
Mandatory upon: Network Rail & Contractors
Standards Ownership: Telecommunications Engineering
RT/E/S/30034
Date
Status
Price
Colour
Compliance
Implementation
1
Jun 03
C
Yes
This specification details the design requirements for a Lightning Protection and Earthing System (LP&ES) for
permanent radio mast structures, located on Network Rail land, property or TOC leased land.
Mandatory upon: Network Rail & Contractors
Standards Ownership: Telecommunications Engineering
RT/E/S/30035
Date
Status
Price
Colour
Compliance
Implementation
1
Jun 03
D
Yes
This Specification defines the boundaries between different parts of the telecoms network. It sets out a clear
demarcation of maintenance responsibilities. In particular, it provides clear direction when failures arise as to what
extent a contractor needs to investigate to establish whether their equipment is working normally.
Mandatory upon: Network Rail & Contractors
Standards Ownership: Telecommunications Engineering
th
st
Page 92
2. Company Standards
RT/E/S/30036
C. Engineering
Telecommunications
Date
Status
Price
Colour
Compliance
Implementation
1
Aug 03
C
This specification details the actions to be taken during a booster transformer outage to protect staff from the
possibility of receiving an electric shock from contact with telecoms cables or circuits connected to them.
Mandatory upon: Network Rail & Contractors
Standards Ownership: Telecommunications Engineering
RT/E/S/30047
Date
Status
Price
Colour
Compliance
Implementation
1
Feb 04
D
The purpose of this specification is to define Network Rail's requirements for ensuring all safety related failures to
telecommunications equipment and services, owned by Network Rail or provided by third parties, are subject to a
unified national system of classification, investigation and review.
Mandatory upon: Network Rail & Contractors
Standards Ownership: Telecommunications Engineering
RT/E/S/31001
Date
Status
Price
Colour
Compliance
Implementation
1
Jun 02
D
This specification defines the minimum requirements to ensure that the reinstatement of previously working
operational telecommunications equipment is tested properly to assure continued safe working when returned to
service and that all safety related failures are thoroughly investigated. In this manner compliance to GK/RT0209
part A, B, D & E will be achieved.
Mandatory upon: Network Rail & Contractors
Standards Ownership: Telecommunications Engineering
2C7.2. Procedures
RT/E/P/30022
Date
Status
Price
Colour
Compliance
Implementation
2
Feb 01
B
To define procedures for the application of GC/RT5101 Technical Approval requirements for Changes to the
Infrastructure to Telecommunications Schemes and Services.
Mandatory upon: Network Rail
Standards Ownership: Telecommunications Engineering
RT/E/P/30026
Date
Status
Price
Colour
Compliance
Implementation
1
Feb 02
D
The purpose of this document is to describe the Network Rail company policy to support the operation and
management of the National Radio Network.
Mandatory upon: Network Rail
Standards Ownership: Telecommunications Engineering
RT/E/P/30027
Date
Status
Price
Colour
Compliance
Implementation
1
Aug 01
C
This procedure sets out the technical requirements that must be met to ensure compliance with Network Rail
Group Standard GO/RT3410 for Radio Communication to trains on Network Rail controlled infrastructure.
Mandatory upon: Network Rail
Standards Ownership: Telecommunications Engineering
th
st
Page 93
2. Company Standards
RT/E/P/30029
C. Engineering
Telecommunications
Date
Status
Price
Colour
Compliance
Implementation
1
Apr 01
B
This procedure sets out the requirements for Network Rail Line to ensure that the installation of Operational
Telecommunications equipment is such that it performs in accordance with its safety requirements and continues
to do so throughout its design life.
Mandatory upon: Network Rail
Standards Ownership: Telecommunications Engineering
RT/E/P/30030
Managing the Optical Requirements of CCTV Systems for Driver Only Operation (Passenger)
Issue
Date
Status
Price
Colour
Compliance
Implementation
2
Apr 02
B
This procedure sets out the minimum requirements for Network Rail to ensure that the management of optical
arrangements for CCTV equipment intended to be used by drivers to monitor train doors at a station operated
under Driver Only Operation (passenger) rules, is as required in GT/EH H804. These requirements, together with
the use of RT/E/S/30023, will ensure compliance to GO/RT3271.
Mandatory upon: Network Rail
Standards Ownership: Telecommunications Engineering
Signalling & Telecommunications Technical Clearance for Radio Antenna Systems
RT/E/P/30066
Issue
Date
Status
Price
Colour
Compliance
Implementation
1
Feb 04
D
Yes
This procedure details the Technical Clearance process that shall be applied for new radio antenna systems,
upgraded radio masts or other RF transmission equipment on Network Rail land or property.
Mandatory upon: Network Rail
Standards Ownership: Telecommunications Engineering
Date
Status
Price
Colour
Compliance
Implementation
1
Jun 98
D
This Code of Practice is issued to provide guidance to organisations involved in safety critical work on the
Network Rail control and communications infrastructure who are required to meet the conditions of Network
Rail Standards on competence management. It also gives detailed requirements for the operation of Competence
Management Systems.
Mandatory upon: Advisory only
Standards Ownership: Telecommunications Engineering
RT/E/C/30037
Date
Status
Price
Colour
Compliance
Implementation
1
Aug 03
E
This Code of Practice details the work requirements for the installation of office telephone systems from initial
work instigation through to the project management of the final system installation.
Mandatory upon: Advisory only
Standards Ownership: Telecommunications Engineering
RT/E/C/31100
Date
Status
Price
Colour
Compliance
Implementation
1
Jun 02
D
The purpose of this Code of Practice is to define the requirements for compliance with Network Rail Specification
RT/E/S/31001 which mandates the investigation arrangements for telecommunications equipment following the
reporting of safety related telecommunications failures.
Mandatory upon: Advisory only
Standards Ownership: Telecommunications Engineering
th
st
Page 94
2. Company Standards
RT/E/C/31101
C. Engineering
Telecommunications
Date
Status
Price
Colour
Compliance
Implementation
1
Dec 02
D
The purpose of this Code of Practice is to provide specific failure investigation guides for Operational
Telecommunications Systems.
Mandatory upon: Advisory only
Standards Ownership: Telecommunications Engineering
RT/E/C/31200
Date
Status
Price
Colour
Compliance
Implementation
1
Jun 02
D
This Code of Practice sets out the requirements for compliance with Network Rail Specification RT/E/S/31001
which mandates the maintenance testing arrangements for operational telecommunications equipment following
repair or replacement.
Mandatory upon: Advisory only
Standards Ownership: Telecommunications Engineering
RT/E/C/31201
Date
Status
Price
Colour
Compliance
Implementation
1
Dec 02
D
The purpose of this Code of Practice is to provide the specific maintenance testing plans for repair and
replacement of Operational Telecommunications equipment and for replacement of missing equipment.
Mandatory upon: Advisory only
Standards Ownership: Telecommunications Engineering
Date
Status
Price
Colour
Compliance
Implementation
1
Feb 04
C
The purpose of this guidance note is to provide information, help and worked examples to Network Rail and its
contractors to ensure compliance with Network Rail specification RT/E/S/30047.
Mandatory upon: Advisory only
Standards Ownership: Telecommunications Engineering
RT/E/G/50016
Date
Status
Price
Colour
Compliance
Implementation
1
Feb 03
D
The purpose of this document is to provide a methodology to demonstrate electro-magnetic compatibility with
operational telecommunications equipment and systems on the AC and DC electrified railway on Network Rail
Controlled Infrastructure.
Mandatory upon: Advisory only
Standards Ownership: Telecommunications Engineering
Date
Status
Price
Colour
Compliance
Implementation
1
Feb 03
D
This notice applies retrospectively to all installed DT70 Screen and Keyboard Power Supply Units.
Mandatory upon: Advisory only
Standards Ownership: Telecommunications Engineering
th
st
Page 95
2. Company Standards
C. Engineering
Track Engineering
Date
Status
Price
Colour
Compliance
Implementation
2
Aug 99
C
This specification gives the requirements for the selection and use of serviceable rail in jointed and welded
applications, and for replacement of isolated defects.
Mandatory upon: Network Rail
Further Information: Not mandated : use & equipment. Responds to GC/RT5019
Standards Ownership: Track Engineering
RT/CE/S/008
Date
Status
Price
Colour
Compliance
Implementation
2
Feb 98
B
This specification gives the quality of finish and dimensional tolerance requirements for saw- or disc-cut rail ends
and for holes drilled in rails, both factory and site situation.
Mandatory upon: Contractors
Further Information: Responds to GC/RT5019, GC/RT5020
Standards Ownership: Track Engineering
RT/CE/S/009
Date
Status
Price
Colour
Compliance
Implementation
1
Jul 96
A
This specification gives the requirements for track ballast returned directly to the track by use of on-track
automatic ballast cleaners, including physical properties and test.
Mandatory upon: Network Rail
Further Information: Material specification. Responds to GC/RT5014
Standards Ownership: Track Engineering
RT/CE/S/011
Date
Status
Price
Colour
Compliance
Implementation
4
Feb 02
E
This specification gives requirements for the design, installation and maintenance of continuous welded rail (CWR)
track, whether installed new or converted from jointed track using existing sleepers and ballast. It also specifies the
methods to be used when stressing CWR in both plain line and through switches and crossings (S&C).
Mandatory upon: Network Rail
Further Information: Lays down mandated process. Responds to GC/RT5010, GC/RT5015, GC/RT5019, GC/RT5020.
Standards Ownership: Track Engineering
RT/CE/S/014
Date
Status
Price
Colour
Compliance
Implementation
1A
Oct 97
B
This document defines the performance specification for non destructive testing of normal (pearlitic) rail and is
expressed in terms of defect size thresholds and their probabilities of detection.
Mandatory upon: Contractors
Further Information: Responds to GC/RT5019
Standards Ownership: Track Engineering
th
st
Page 96
2. Company Standards
RT/CE/S/032
C. Engineering
Track Engineering
Date
Status
Price
Colour
Compliance
Implementation
2 (1)
Feb 03 (Feb 96)
F
01/10/04
01/02/03
This specification defines the standards for carrying out of track welding. It details the processes that are to be
used when carrying out alumino-thermic welding of rail joints, maintenance and repair welding of plain rails and
crossings, alumino-thermic welding and electric pin brazing of bond attachments.
Mandatory upon: Contractors
Further Information: Responds to GC/RT5019, GC/RT5020
Standards Ownership: Track Engineering
RT/CE/S/034
Requirements for Processes for Cold-expanding Fishbolt Holes by the Split Sleeve Method.
Issue
Date
Status
Price
Colour
Compliance
Implementation
1
Aug 97
A
This specification gives the requirements for processes to be used for the cold-expansion of fish bolt holes in
railway rails and cast crossings using the split sleeve method.
Mandatory upon: Contractors
Further Information: Responds to GC/RT5020
Standards Ownership: Track Engineering
RT/CE/S/036
Date
Status
Price
Colour
Compliance
Implementation
Emergency 1
Apr 00
C
This specification establishes a management framework within Network Rail Line for assessing and authorizing
gauging clearances for new or transferred rail vehicles.
Mandatory upon: Network Rail
Further Information: Emergency issue responding to HSE discussions.
Standards Ownership: Track Engineering
RT/CE/S/037
Date
Status
Price
Colour
Compliance
Implementation
3
Dec 00
B
This document specifies the requirements for inspection and maintenance of trackwork within depots by Depot
Facility Operators having Depot Leasing Agreements with Network Rail.
Mandatory upon: Network Rail & Contractors/Lessee
Further Information: Can only mandate through terms of lease.
Standards Ownership: Track Engineering
RT/CE/S/038
Date
Status
Price
Colour
Compliance
Implementation
4
Oct 01
C
This specification defines the minimum requirements for the design, supply, installation, inspection and maintenance
of Longitudinal Timbers Systems on Network Rail infrastructure, and specifies procedures to be used for the
management of the interface of Longitudinal Timbers Systems with supporting structures and the rails, baseplates,
chairs and where applicable, sleepers. Compliance with this Specification will ensure compliance with the
requirements of Railway Group Standard GC/RT5021: Track System Requirements in respect of Longitudinal
Timbers.
Mandatory upon: Contractors
Further Information: Responds to GC/RT5021
Standards Ownership: Track Engineering
th
st
Page 97
2. Company Standards
RT/CE/S/042
C. Engineering
Track Engineering
Date
Status
Price
Colour
Compliance
Implementation
1
Apr 95
C
This specification gives the requirements for the provision of a track geometry recording service. It defines the
parameters to be recorded, the types of report to be produced and the mode of up loading recording data to the
mainframe Track Quality System. It is intended to accord with, but in some respects enhance, Railway Group Standard
GC/HE038 Track Recording Handbook.
Mandatory upon: Network Rail & Contractors
Further Information: Responds to GC/RT5010, GC/RT5017.
Standards Ownership: Track Engineering
RT/CE/S/049
Date
Status
Price
Colour
Compliance
Implementation
8 (7)
Aug 04 (Feb 03)
Up-Issued Phone
07/08/04
07/08/04
This specification gives the requirements for the design of track alignments and layouts. Information provided on
track geometry, the mathematics of track layouts, switch and crossing (S&C) assemblies, sleepers and rail fastenings
is intended to ensure that designs take proper account of the speed of traffic.
Mandatory upon: Network Rail
Standards Ownership: Track Engineering
RT/CE/S/050
Process for Cold-Expanding New Fishbolt Holes by the Split Sleeve Method Using FTI Tooling and
Consumables
Issue
Date
Status
Price
Colour
Compliance
Implementation
1
Jan 96
C
This specification gives the procedure to be used for the cold-expansion of new fishbolt holes in railway rails and
cast crossings using the split sleeve method and FTI tooling and consumables.
Mandatory upon: Contractor
Further Information: Responds to GC/RT5019, GC/RT5020
Standards Ownership: Track Engineering
RT/CE/S/051
Process for Cold-Expanding Existing Fishbolt Holes by the Split Sleeve Method Using FTI Tooling
and Consumables
Issue
Date
Status
Price
Colour
Compliance
Implementation
1
Jan 96
C
This specification gives the method to be used for the cold-expansion of existing fishbolt holes in railway rails by
the split sleeve process, using FTI tooling and consumables.
Mandatory upon: Contractor
Further Information: Responds to GC/RT5019, GC/RT5020
Standards Ownership: Track Engineering
RT/CE/S/053
Date
Status
Price
Colour
Compliance
Implementation
3
Oct 02
D
This specification identifies five potential derailment situations which arise at switches. It describes tell tale signs
which should provide an advance warning of possible problems, describes the use of a selection of gauges which
are necessary to monitor the wear and/or damage of switch and stock rails, sets out the mandatory inspection
frequencies in such situations and draws attention to the need to comply with necessary associated maintenance
work on the switch and stock rail components and geometry.
Mandatory upon: Network Rail & Contractors
Further Information: Responds to GC/RT5011
Standards Ownership: Track Engineering
th
st
Page 98
2. Company Standards
RT/CE/S/054
C. Engineering
Track Engineering
Date
Status
Price
Colour
Compliance
Implementation
2
Aug 03
C
This specification gives the requirements for the inspection and identification of defects and wear in cast crossing
and cast vees. The specification includes details of minimum actions to be taken when significant defects are
discovered.
Mandatory upon: Network Rail & Contractor
Standards Ownership: Track Engineering
RT/CE/S/055
Date
Status
Price
Colour
Compliance
Implementation
1A
Feb 98
E
The purpose of this specification is to define ultrasonic testing procedures for: The detection of defects in rolled
steel rails; Estimation of crack size in rolled steels rails; The measurement of rail depth and gall, and The detection
of fusion face detects in alumino-thermic welds and rail head weld repairs. In addition, the specification details the
linking procedures defining their use together with requirements for the training and certification of operators
applying the procedures.
Mandatory upon: Contractor
Further Information: Responds to GC/RT5019
Standards Ownership: Track Engineering
RT/CE/S/056
Date
Status
Price
Colour
Compliance
Implementation
1
Mar 96
C
This specification defines the procedures to be adopted for the testing of rail by non-ultrasonic means. The
methods described are magnetic particle inspection, dye penetrant inspection, visual examination and rail
measurement using calipers.
Mandatory upon: Contractor
Further Information: Responds to GC/RT5019
Standards Ownership: Track Engineering
RT/CE/S/057
Date
Status
Price
Colour
Compliance
Implementation
4
Oct 01
Phone
Yes
This specification defines reporting requirements for rail failures and the different types of rail failure that may
occur.
Mandatory upon: Network Rail & Contractor
Further Information: Responds to GC/RT5019
Standards Ownership: Track Engineering
RT/CE/S/061
Pearlitic Rails
Issue
Date
Status
Price
Colour
Compliance
Implementation
2
Aug 02
D
This specification lays down the requirements for new pearlitic rails to be supplied to Network Rail, or for
installation in Network Rail's network. The profiles covered are 56E1, 60E and 95RBH, and the assymmetric switch
rails 54E1, 60E1A1 and 60E1A4.
Mandatory upon: Network Rail
Further Information: Performance specification. Responds to GC/RT5019
Standards Ownership: Track Engineering
RT/CE/S/062
Date
Status
Price
Colour
Compliance
Implementation
3
Oct 01
C
This specification gives the requirements for the selection and use of serviceable concrete sleepers in running lines
and sidings.
Mandatory upon: Network Rail
Further Information: Responds to GC/RT5015
Standards Ownership: Track Engineering
th
st
Page 99
2. Company Standards
RT/CE/S/063
C. Engineering
Track Engineering
Date
Status
Price
Colour
Compliance
Implementation
1
Oct 96
C
This specification sets out the minimum standards to be observed for serviceable switches and crossings being
considered for reinstallation in Network Rail infrastructure.
Mandatory upon: Network Rail
Further Information: Performance specification. Responds to GC/RT5011
Standards Ownership: Track Engineering
RT/CE/S/064
Date
Status
Price
Colour
Compliance
Implementation
2
Dec 03
C
To set out the process for the assembly of BR MkIII glued insulated rail joints, so that when installed in Network
Rail's infrastructure they are reliable and durable.
Mandatory upon: Contractor
Standards Ownership: Track Engineering
RT/CE/S/072
Date
Status
Price
Colour
Compliance
Implementation
1
Feb 03
D
01/03/06
01/02/03
This Specification supports Railway Group Standard GC/RT5201 Lineside Security by mandating lineside security
measures commensurate with the assessed risks posed by the adjacent environment and incorporates a method of
assessing these risks. For the purposes of this Specification, security measures are a physical barrier such as, but
not limited to, a fence or wall.
Mandatory upon: Network Rail & Contractors
Standards Ownership: Track Engineering
RT/CE/S/073
Date
Status
Price
Colour
Compliance
Implementation
1
Dec 03
D
This specification defines Network Rail s requirements for the design, manufacture and installation of RT60 S&C.
Mandatory upon: Network Rail & Contractors
Standards Ownership: Track Engineering
RT/CE/S/077
Date
Status
Price
Colour
Compliance
Implementation
1
Oct 03
C
Yes
This specification defines the storage, installation and testing requirements for AWS speed restriction magnets. It is
primarily aimed at front line staff responsible for the correct installation of speed restriction magnets.
Mandatory upon: Network Rail & Contractors
Standards Ownership: Track Engineering
RT/CE/S/096
Date
Status
Price
Colour
Compliance
Implementation
1
Aug 03
D
This specification sets out mandatory requirements for the Training and assessment of Persons New to Track.
Initially, the scope of the specification is restricted to mandating attendance on the Network Rail Track Induction
Course and subsequent assessment.
Mandatory upon: Network Rail & Contractors
Standards Ownership: Track Engineering
RT/CE/S/097
Date
Status
Price
Colour
Compliance
Implementation
1
Aug 03
C
This specification details mandatory requirements for training organisations which deliver Permanent Way
Engineering training.
Mandatory upon: Network Rail & Contractors
Standards Ownership: Track Engineering
th
st
Page 100
2. Company Standards
RT/CE/S/101
C. Engineering
Track Engineering
Date
Status
Price
Colour
Compliance
Implementation
1A
Oct 97
B
This specification gives the minimum engineering requirements for the design of track construction, alignments,
layouts and components. It refers where appropriate to more detailed Company Standards.
Mandatory upon: Network Rail & Contractors
Further Information: Performance specification. Responds to GC/RT5011, GC/RT5013-15, GC/RT5019-20.
Standards Ownership: Track Engineering
RT/CE/S/102
Date
Status
Price
Colour
Compliance
Implementation
5
Feb 02
D
This specification gives the minimum requirements for the construction of new or relaid track material to be used,
ballast shoulder profiles and sleeper spacing. It also sets out acceptance criteria for new or relaid track in terms of
workmanship and geometry.
Mandatory upon: Network Rail & Contractors
Further Information: Performance specification. Responds to GC/RT5010-11, GC/RT5013-15, GC/RT5017, GC/RT5019.
Standards Ownership: Track Engineering
RT/CE/S/103
Date
Status
Price
Colour
Compliance
Implementation
4
Apr 01
E
The specification gives the minimum requirements for the inspection of track. It sets out mandatory inspection
frequencies and defines the track defects which, if found, require immediate blocking of the line to traffic or imposition
of an emergency speed restriction. It also sets out inspection methods for certain major track components.
Mandatory upon: Network Rail & Contractors
Further Information: Mandates inspection frequencies & processes. Responds to GC/RT5010 11, GC/RT5013-15, GC/RT5017,
GC/RT5019, GC/RT5208. Please see entry for RT/CE/PWSI/004 in respect of rolling contact fatigue
Standards Ownership: Track Engineering
RT/CE/S/104
Date
Status
Price
Colour
Compliance
Implementation
5
Jun 00
D
This specification gives the requirements for the maintenance of track. It includes limits of wear (sidewear & depth)
of rails, and minimum actions in the event of serious defects. It also defines the maximum and target values of track
geometry parameters to be complied with in maintaining the track.
Mandatory upon: Network Rail & Contractors.
Further Information: Also mandates actions. Responds to GC/RT5010 11, GC/RT5013-15, GC/RT5017, GC/RT5019, GC/RT5208.
Standards Ownership: Track Engineering
RT/CE/S/132
Date
Status
Price
Colour
Compliance
Implementation
3 (2)
Feb 03 (Aug 00)
C
01/08/05
01/02/03
This specification details the switch weld repairs which are permitted, together with associated requirements and
the procedures which shall be followed using the specific electric arc process.
Mandatory upon: Contractors
Standards Ownership: Track Engineering
th
st
Page 101
2. Company Standards
C. Engineering
Track Engineering
2C8.2. Procedures
RT/CE/P/015
Date
Status
Price
Colour
Compliance
Implementation
1
Jun 97
B
Defines procedures to be adopted in selecting the structure gauge to be adopted for the construction of new or
reconstruction or alteration of existing structures or the alignment of permanaent way to ensure the structure
gauge provided is suitable for existing and envisaged rail vehicles.
Mandatory upon: Network Rail
Further Information: Responds to GC/RT5204, GC/RT5102
Standards Ownership: Track Engineering
RT/CE/P/018
Requirements for the Operation of the Dynamic Track Stabiliser on or Adjacent to Structures
Issue
Date
Status
Price
Colour
Compliance
Implementation
1
Aug 97
B
This procedure defines the procedures to be followed to permit the use of the dynamic track stabiliser and the
limitations on its use over or adjacent to structures to ensure the integrity of structures is safeguarded.
Mandatory upon: Network Rail
Further Information: Responds to GC/RT5100
Standards Ownership: Track Engineering
RT/CE/P/027
Date
Status
Price
Colour
Compliance
Implementation
1
Jan 96
A
This procedure sets out the Network Rail s policy on ballast gluing as means of providing increased lateral
restraint of the permanent way.
Mandatory upon: Network Rail
Further Information: Mandates upon procurer. Responds to GC/RT5014
Standards Ownership: Track Engineering
RT/CE/P/034
Date
Status
Price
Colour
Compliance
Implementation
1
Apr 97
B
This procedure gives the requirements for the reporting of track buckles. It defines: reportable track buckles; the
necessary reports; and, by whom and to whom the reports must be sent, and within what timescales. The reporting
procedures described are in addition to any notification to signalling staff in connection with the protection of traffic.
Mandatory upon: Network Rail
Standards Ownership: Track Engineering
RT/CE/P/038
Date
Status
Price
Colour
Compliance
Implementation
4
Apr 04
C
This procedure defines the actions and responsibilities for those individuals involved in the management and repair
of track geometry defects as reported by approved track recording vehicles.
Mandatory upon: Network Rail
Further Information: Responds to GC/RT5017
Standards Ownership: Track Engineering
RT/D/P/085
Date
Status
Price
Colour
Compliance
Implementation
4
Apr 04
B
Company Procedure RT/CE/P/038 gives the requirements for managing the Track Geometry Recording Service
and the actions required to deal with the detected Track Irregularities. This Procedure summarises only those
actions to be taken to deal with defects requiring Immediate or Urgent actions and the processes which the
Regional/Territory Track Engineer must put in place in order to comply with RT/CE/P/038 in those respects. It also
summarises the actions to be taken by the Track Geometry Supplier in dealing with detected Track Irregularities. It
does not supplant RT/CE/P/038 in any respect.
Mandatory upon: Network Rail & Contractor
Standards Ownership: Track Engineering
th
st
Page 102
2. Company Standards
RT/LS/P/030
C. Engineering
Track Engineering
Date
Status
Price
Colour
Compliance
Implementation
Emergency 2
Dec 00
B
This procedure gives the actions to be taken when vertical wheel-rail forces exceed 200kn due to wheel
flats/irregularities.
Mandatory upon: Network Rail
Standards Ownership: Track Engineering
Date
Status
Price
Colour
Compliance
Implementation
1
Apr 01
F
Yes
This Code of Practice gives recommendations for the installation and maintenance of longitudinal timbers, and
procedures for the management of the interface with bridges structures and the track. Compliance with the
recommendations in this document will ensure compliance with RT/CE/S/038.
Mandatory upon: Advisory only
Standards Ownership: Track Engineering
RT/CE/C/004
Date
Status
Price
Colour
Compliance
Implementation
1
Jun 98
C
This Code of Practice lists the current suite of Network Rail s RE/PW standard drawings. It also explains how
copies of the drawings may be obtained by users.
Mandatory upon: Advisory only
Standards Ownership: Track Engineering
RT/CE/C/006
Date
Status
Price
Colour
Compliance
Implementation
2
Oct 02
D
This code of practice defines the procedures to be adopted for the design, installation and maintenance of piped and
open-channel lineside drainage. It does not cover the requirements of sewage (foul water) drains.
Mandatory upon: Advisory only
Further Information: COP contains mandatory procedures. Refer RT/CE/S/101-103.
Standards Ownership: Track Engineering
RT/CE/C/007
Date
Status
Price
Colour
Compliance
Implementation
1
May 95
D
This Code of Practice describes the preferred method of creating standard component drawings; also associated
general arrangement drawings using standard components.
Mandatory upon: Advisory only
Standards Ownership: Track Engineering
RT/CE/C/016
Date
Status
Price
Colour
Compliance
Implementation
1
Jun 00
C
This code of practice sets out a recommended procedure for assessing the strength of rails where localised head
loss has occurred, so that the appropriate decision can be taken regarding replacement of the rail. It applies to
Normal and Grade A rails, on concrete, timber and steel sleepers, and on slab.
Mandatory upon: Advisory only
Standards Ownership: Track Engineering
RT/CE/C/017
Date
Status
Price
Colour
Compliance
Implementation
1
Apr 01
D
This code of practice provides information in respect of components and processes associated with CEN60E1 rail.
Mandatory upon: Advisory only
Standards Ownership: Track Engineering
th
st
Page 103
2. Company Standards
RT/CE/C/030
C. Engineering
Track Engineering
Lineside Security
Issue
Date
Status
Price
Colour
Compliance
Implementation
1
Aug 00
C
The purpose of this code of practice is to advise on measures to prevent unauthorised assess to Network Rail
controlled infrastructure and to support Railway Group Standard GC/RT5201.
Mandatory upon: Advisory only
Standards Ownership: Track Engineering
RT/CE/C/033
Date
Status
Price
Colour
Compliance
Implementation
2
Dec 00
C
This code of practice gives recommendations for the competence of personnel who undertake safety-critical
permanent way work on Network Rail's infrastructure. It is for use in the preparation of Standards of Competence
and in the operation of Competence Management Systems in respect of such persons.
Mandatory upon: Advisory only
Standards Ownership: Track Engineering
RT/CE/C/039
Formation Treatments
Issue
Date
Status
Price
Colour
Compliance
Implementation
2
Dec 03
D
Yes
This code of practice sets out Network Rail s recommendations for the investigation, design and installation of
existing trackbed. It includes a lineside sampling protocol for chemical analysis of used ballast.
Mandatory upon: Advisory only
Standards Ownership: Track Engineering
RT/E/C/02012
Date
Status
Price
Colour
Compliance
Implementation
1
Feb 99
D
This Code of Practice contains tasks and periodicity guidelines which represent current best practice for an
enhanced level of switch and crossing system maintenance.
Mandatory upon: Advisory only
Standards Ownership: Track Engineering
th
st
Page 104
2. Company Standards
C. Engineering
Track Engineering
Instruction on Management of Rails to Control Rolling Contact Fatigue (Gauge Corner Cracking
and Head Checking)
Issue
Date
Status
Price
Colour
Compliance
Implementation
3 (revised)
Sept 03
D
Yes
Knowledge on the causes of Rolling Contact Fatigue (RCF) and how to control it continues to grow. This
instruction contains changes to previous requirements. These result from laboratory testing of samples, increased
knowledge on the types of RCF, advice from world experts and analysis of data.
Mandatory upon: Network Rail & Contractors
Further Information: Permits Temporary Non-compliance in respect of rolling contact fatigue with Appendix D4 of
RT/CE/S/103 issue 4. This document takes precedence over RT/CE/S/103 issue 4.
Standards Ownership: Track Engineering
RT/CE/PWSI/006
Date
Status
Price
Colour
Compliance
Implementation
2
Apr 03
B
This instruction outlines the minimum requirements for the Installation, Maintenance and Recording of Rail
Mounted Lubricators. This Instruction applies to Rail Mounted Lubricators of all types.
Mandatory upon: Network Rail & Contractors
Standards Ownership: Track Engineering
RT/CE/PWSI/007
Date
Status
Price
Colour
Compliance
Implementation
1
Dec 01
A
This Special Instruction has the status of a Company Standard. It insists on the use of manufacturers recommended
tools for the installation of Permanent Way components and rules on replacement of incorrectly installed or
damaged components.
Mandatory upon: Network Rail & Contractors
Standards Ownership: Track Engineering
RT/CE/PWSI/009
Date
Status
Price
Colour
Compliance
Implementation
2
Dec 01
A
This PWSI has the status of a Company Standard and is issued pending the issue of Company Standard
RT/CE/S/075, Management of Lineside Vegetation. It deals with the essential clearance of vegetation to ensure a
minimum 10 seconds signal sighting at various speeds.
Mandatory upon: Network Rail & Contractors
Standards Ownership: Track Engineering
RT/CE/PWSI/010
Date
Status
Price
Colour
Compliance
Implementation
1
Feb 02
A
It is not acceptable for anyone working on the infrastructure to leave it in a condition where it is open for people
to trespass, or provides malicious persons with materials to use to cause accidents or derailments.
Mandatory upon: Network Rail & Contractors
Standards Ownership: Track Engineering
RT/CE/PWSI/011
Date
Status
Price
Colour
Compliance
Implementation
1
Nov 01
A
This instruction applies to all track on Network Rail s network where Pan 8 lockspiked baseplates exists.
It also applies to other lockspike baseplates track such as Pan 5 and Heyback.
Mandatory upon: Network Rail & Contractors
Standards Ownership: Track Engineering
th
st
Page 105
2. Company Standards
C. Engineering
Date
Status
Price
Colour
Compliance
Implementation
Compliance
Implementation
Compliance
Implementation
Compliance
Implementation
Compliance
Implementation
1
Feb 96
C
This is a generalised maintenance specification for vehicle Washing Plant.
Mandatory upon: Contractors
Standards Ownership: Rail Vehicle Engineering
RT/E/S/40018
Date
Status
Price
Colour
1
Feb 96
C
This is a generalised maintenance specification for Underfloor Wheel Lathes.
Mandatory upon: Contractors
Standards Ownership: Rail Vehicle Engineering
RT/E/S/40020
Portable/Mobile Plant
Issue
Date
Status
Price
Colour
1
Feb 96
D
This is a generalised maintenance specification for Portable/Mobile Plant.
Mandatory upon: Contractors
Standards Ownership: Rail Vehicle Engineering
RT/E/S/40021
Electric Jacks
Issue
Date
Status
Price
Colour
1
Feb 96
C
This is a generalised maintenance specification for Electrically Operated Jacks.
Mandatory upon: Contractors
Standards Ownership: Rail Vehicle Engineering
RT/E/S/40063
Date
Status
Price
Colour
1
Oct 00
B
This specification sets out the requirements for acceptance of work equipment intended for use on Network Rail s
infrastructure. It provides for self-assessment by contractors who have an accepted railway safety case and for
generic acceptance by a Network Rail approved acceptance body.
Mandatory upon: Network Rail
Further Information: Performance specification
Standards Ownership: Rail Vehicle Engineering
Date
Status
Price
Colour
Compliance
Implementation
1
Jun 03
D
This Code of Practice states the current best practice for a system consideration of the effects of modifying or
introducing equipment to the railway. This document is intended as guidance only for Network Rail commercial
and infrastructure design staff.
Mandatory upon: Advisory only
Standards Ownership: Rail Vehicle Engineering
th
st
Page 106
2. Company Standards
D. Information Management
Information Management
Date
Status
Price
Colour
Compliance
Implementation
2
Apr 04
D
This procedure mandates the use of GEOGIS and the processes for the management of the asset data held in
GEOGIS and the accuracy, currency and completeness of the asset data held therein as specified in the Network
Rail Asset Data Management Manual.
Mandatory upon: Network Rail
Further Information: Replaces: RT/CE/P/005, RT/CE/P/006, RT/CE/P/007, RT/CE/S/058, RT/CE/S/059, RT/CE/S/060
Standards Ownership: Information Management
RT/E/P/02015
Date
Status
Price
Colour
Compliance
Implementation
3
Apr 04
D
This procedure defines the roles and responsibilties for the implementation, maintenance and development of the
Network Rail Asset Register.
Mandatory upon: Network Rail
Standards Ownership: Information Management
RT/E/P/02018
Date
Status
Price
Colour
Compliance
Implementation
2
Apr 04
D
This Procedure describes the management of new and altered records for which the Network Records Group are
custodians.
Mandatory upon: Network Rail, Contractor & Lessees
Standards Ownership: Information Management
RT/E/P/02020
Date
Status
Price
Colour
Compliance
Implementation
4
Apr 04
D
This Procedure sets out the roles and responsibilities for the implementation, use and upkeep of the MIMS system.
This issue of the procedure reflects as far as possible emerging organisations hence some of the roles and
responsibilities may be subject to further change.
Mandatory upon: Network Rail, Contractor & Lessees
Standards Ownership: Information Management
2D1.2. Specifications
RT/E/S/02019
Mandatory upon:
Standards Ownership:
th
st
Date
Status
Price
Colour
Compliance
Implementation
2
Apr 04
C
To specify the format of records for which the Network Records Group are custodians.
Network Rail, Contractor & Lessees
Information Management
Page 107
2. Company Standards
Date
Status
Price
Colour
Compliance
Implementation
2
May 04
D
This Procedure sets out the requirements for ensuring that new assets and existing assets undergoing change or
that are affected by project works are maintained safely and effectively at all times that they are in operational use,
whether the works to them are complete or not, and that the responsibilities for maintenance of such assets are
clearly identified.
Mandatory upon: Network Rail & Contractors
Standards Ownership: Major Projects and Investments
Date
Status
Price
Colour
Compliance
Implementation
1
Feb 01
C
This Guidance Note designed to assist Project Managers and Asset Managers/ Infrastructure Contracts Managers
to develop Project Maintenance Strategies as required by Line Procedure RT/D/P/088 ( Responsibility for
Maintenance of Changed Assets ) such that they address all matters required to ensure the safe introduction of
changed assets into operational use.
Mandatory upon: Network Rail
Standards Ownership: Major Projects and Investments
th
st
Page 108
2. Company Standards
F. Maintenance
Maintenance
Date
Status
Price
Colour
Compliance
Implementation
5
Oct 01
D
This specification gives the requirements for the content of Annual and Eight week Programmes and Progress
Reports that the Infrastructure Maintenance Contractor is required to produce for each Contract covering RT1A
or IMC2 works.
Mandatory upon: Contractors
Standards Ownership: Maintenance
RT/D/S/020
Date
Status
Price
Colour
Compliance
Implementation
1
Dec 02
C
Yes
This document specifies a procedure for capturing unit cost data and ensuring consistency of unit definitions and
cost allocation principles.
Mandatory upon: Network Rail and Contractors
Standards Ownership: Maintenance
2F1.2. Procedures
RT/D/P/020
Date
Status
Compliance
Implementation
6
Aug 00
The purpose of this Procedure is to define the responsibilities and processes for the development of all RT1a
Asset Change Proposals.
Mandatory upon : Network Rail
Standards Ownership: Business Engineering
RT/D/P/027
Infrastructure Maintenance Contracts Changes to Contract Lump Sums, Prices, Targets and Fees
Issue
Date
Status
Compliance
Implementation
5
Apr 00
This procedure details the roles and responsibilities required to ensure information is gathered to allow annual
changes to the IMC Contract Lump Sum in compliance with Clause 5.13 of the RT1A General Conditions of
Contract and Clause 40 of IMC2 Conditions of Contract and also adjustments to IMC2000 Guaranteed Maximum
Prices, Target Costs and Fees.
Mandatory upon: Network Rail
Standards Ownership: Maintenance
RT/D/P/030
Date
Status
Compliance
Implementation
8
Dec 02
This procedure details the requirements, roles and responsibilities for payment cost control and reporting
relative to the RT1A, IMC2 and IMC2000 Infrastructure Maintenance Contracts. It does not cover issue of
variations, the provisions for which are covered in Supply Chain Procedure: Authority to Settle Claims Variations to Supply Contracts and Claims.
Mandatory upon: Network Rail
Standards Ownership: Maintenance
These Standards are for Network Rail Use Only - Not Available outside the Company
th
st
Page 109
2. Company Standards
RT/D/P/034
F. Maintenance
Maintenance
Date
Status
Compliance
Implementation
4
Apr 00
This procedure defines the Delegated Levels of Contractual powers within Infrastructure Contract Management
and the clauses with the Conditions of Contract for RT1a works where agreement of the Director, Engineering &
Production must be obtained prior to use of those powers.
Mandatory upon: Network Rail
Standards Ownership: Maintenance
RT/D/P/036
Date
Status
Compliance
Implementation
5
Apr 00
This procedure details the process for the monitoring of RT1a Contractors stewardship and progress reports by
Infrastructure Contract Managers staff.
Mandatory upon: Network Rail
Standards Ownership: Maintenance
This Standard is for Network Rail Use Only - Not Available outside the Company
RT/D/P/044
Date
Status
Price
Colour
Compliance
Implementation
6
Apr 00
B
This procedure has been produced to show the method of issue of Group Standards, Line Specifications and Codes of
Practice to RT/IA and IMC2 Contractors and the reviews necessary to consider implications on the Infrastructure
Maintenance Contracts.
Mandatory upon: Network Rail
Standards Ownership: Maintenance
RT/D/P/047
Date
Status
Compliance
Implementation
6
Apr 00
This Procedure identifies the requirements for managing the Infrastructure Maintenance Contract Incentive
Schemes as follows: RT1A Train Performance and Track Quality IMC2 & IMC2000 Train Performance (only).
Mandatory upon: Network Rail
Standards Ownership: Maintenance
This Standard is for Network Rail Use Only Not Available outside the Company
RT/D/P/049
Date
Status
Price
Colour
Compliance
Implementation
4
Apr 00
B
This procedure defines the roles and responsibilities and process for feedback of lessons learnt and problems
identified in connection with the RT1A, IMC2 and IMC2000 infrastructure maintenance contracts.
Mandatory upon: Network Rail
Standards Ownership: Maintenance
th
st
Page 110
2. Company Standards
RT/D/P/090
F. Maintenance
Maintenance
Date
Status
Price
Colour
Compliance
Implementation
1
Dec 02
C
This Procedure sets out the the process to be used by Network Rail representatives (the Reviewers) when
checking periodic accounts submitted by Contractors in accordance with condition 35 of the IMC 2000 Conditions
of Contract.
Mandatory upon: Network Rail
Standards Ownership: Maintenance
RT/E/P/02200
Date
Status
Price
Colour
Compliance
Implementation
1
Dec 03
B
This document mandates the use of the NMP, and all the processes and procedures contained in the NMP Manual. It
provides an overview of the key elements of the NMP, and identifies the prime responsibilities for its implementation.
Mandatory upon: Contractors
Standards Ownership: Maintenance
Date
Status
Price
Colour
Compliance
Implementation
1
Oct 00
C
This code of practice summarises recommended procedure for preparation of contract documents, seeking
tenders and the subsequent award of new Infrastructure Maintenance Contracts to a programme which allows an
adequate Mobilisation Period for the transfer of responsibilities from the Outgoing to the Incoming Contractor
such that the Incoming Contractor can assume his full responsibilities under the contract from the date for
Commencement of Asset Maintenance
Mandatory upon: Network Rail
Standards Ownership: Maintenance
Date
Status
Price
Colour
Compliance
Implementation
1
Oct 02
D
This guidance note sets out the process to be used by the Zones Commercial Representatives and the MIP
Commercial Manager in order to validate periodic accounts, relating to the implementation of MIMS, submitted by
Contractors in accordance with condition 35 of the IMC2000 conditions of contract.
Mandatory upon: Network Rail
Standards Ownership: Maintenance
th
st
Page 111
2. Company Standards
G. Railway Estates
Responsive Maintenance
Issue
Date
Status
Price
Colour
Compliance
Implementation
2
Apr 01
D
This guidance note has been developed to provide practical advice for use at an operational level to maximise the
value for money spent on common reactive repairs, it also contains guidance maintenance specifications intended
to setablish indicative standard reactive maintenance repairs.
Mandatory upon: Advisory only
Standards Ownership: Railway Estates Policy and Planning
th
st
Page 112
2. Company Standards
Acceptance Services
Date
Status
Price
Colour
Compliance
Implementation
5
Apr 04
C
To specify the roles of System Review Panels and Technical Review Groups within the engineering and change
management element of Network Rail s Safety Management System.
Mandatory upon: Network Rail
Standards Ownership: Interoperability & Acceptance
RT/LS/P/015
Date
Status
Price
Colour
Compliance
Implementation
4
Apr 04
D
To define the role of the Network Rail Acceptance Board (NRAB) within the engineering and change management
element of Network Rail s Safety Management System.
Mandatory upon: Network Rail
Standards Ownership: Interoperability & Acceptance
RT/LS/P/029
Product Acceptance
Issue
Date
Status
Price
Colour
Compliance
Implementation
4
Apr 04
D
This procedure mandates the Network Rail process for the acceptance of new or modified products and change of
application of, materials, equipment, and systems; fitness for purpose of road rail vehicles/attachments and rail
mounted maintenance machines, On-Track Machines, contractor s road plant and Portable and Transportable
Work Equipment that could effect or interact with the infrastructure.
Mandatory upon: Network Rail
Further Information: Responds to: GI/RT7002 (Acceptance of Systems, Equipment and Materials for use on Network Rail Controlled
Infrastructure
Standards Ownership: Interoperability & Acceptance
th
st
Page 113
2. Company Standards
Assurance
2H2. Assurance
2H2.1. Specifications
RT/LS/S/016
Date
Status
Price
Colour
Compliance
Implementation
4
Aug 03
C
This document defines the Network quality criteria with which Contractors shall comply.
Mandatory: Network Rail & Contractors
Standards Ownership: Assurance
2H2.2. Procedures
RT/D/P/015
Date
Status
Price
Colour
Compliance
Implementation
8
Feb 02
C
This procedure describes the process by which surveillance checking of asset maintenance will be carried. The
purpose is to verify that Maintenance Contractors are planning and controlling their activities to Group and
Company Standards and relevant contract clauses as well as giving assurance of their ability to identify, record,
prioritise and rectify faults.
Mandatory upon: Contractors
Standards Ownership: Assurance
RT/LS/P/032
Self Assessment and Self Certification of the Application of Railtrack Management Systems
Issue
Date
Status
Price
Colour
Compliance
Implementation
2
Jun 02
D
The application of this process is to those Business Units and projects subject to the Network Rail Railway Safety
Case control. The process checks that the designated Safety Management Systems are in place as risk control
measures and assesses their application through self assessment and self certification.
Mandatory upon: Network Rail
Additional Information: Code of Practice RT/LS/C/004 supports this Procedure.
Standards Ownership: Assurance
RT/LS/P/036
Date
Status
Price
Colour
Compliance
Implementation
2
Oct 02
D
Yes
This Manual provides direction and guidance on the general principles of management system and technical
auditing, the management of audit programmes, the process for carrying out management system audits and the
qualifications for management system auditors.
Mandatory upon: Network Rail
Standards Ownership: Assurance
Self Assessment and Self Certification of the Application of Railtrack Management Systems
Issue
Date
Status
Price
Colour
Compliance
Implementation
3
Jun 02
C
This Code of Practice is issued to provide assistance to Network Rail Business Units in implementing the process
of assurance for self-assessment and self-certification of the application of Network Rail systems.
Mandatory upon: Advisory only
Additional Information: This Code of Practice supports Procedure RT/LS/P/032
Standards Ownership: Assurance
th
st
Page 114
2. Company Standards
Business Standards
Date
Status
Price
Colour
Compliance
Implementation
12
Apr 04
D
This standard separates out the process for the management of non-compliance authority from the management of
standards as defined by RT/LS/P/001.
Mandatory upon: Network Rail
Standards Ownership: Standards Development Process
RT/LS/P/045
Date
Status
Price
Colour
Compliance
Implementation
2
Apr 04
D
This Standard defines the procedures by which non-compliance authority for Railway Group Standards and
Network Rail Standards shall be managed within the Network Rail. The procedure also provides for derogation to
Technical Specifications for Interoperability.
Mandatory upon: Network Rail
Standards Ownership: Standards Development Process
th
st
Page 115
2. Company Standards
Environmental Policy
Date
Status
Price
Colour
Compliance
Implementation
5
Apr 04
D
This document specifies the mandatory environment requirements and particular (selectable) environment
requirements that are to be specified for any contract applicable to work on Network Rail Infrastructure and
Premises on behalf of Network Rail.
Mandatory: Network Rail & Contractors
Standards Ownership: Environment Policy
2H4.2. Procedures
RT/CE/P/030
Date
Status
Price
Colour
Compliance
Implementation
2
Dec 02
B
This Procedure sets out Network Rail s policy on the management of Earthworks and the action to be taken to
maintain them to ensure that the risk to the operational railway from their condition is as low as reasonably
practicable. It defines a frequency for examinations of Embankments, Cuttings and Natural Slopes.
Mandatory upon: Network Rail
Further Information: Responds to GC/RT5151 and GC/RT5143
Standards Ownership: Environment Policy
RT/D/P/003
Date
Status
Price
Colour
Compliance
Implementation
2
Apr 04
C
This procedure describes how complaints arising from noise and vibration, and how the handling of legal action
under the Environmental Protection Act 1990 (EPA), the Control of Pollution Act 1974 (COPA) and common law
noise nuisance actions should be dealt with.
Mandatory upon: Network Rail
Standards Ownership: Environment Policy
RT/LS/P/007
Date
Status
Price
Colour
Compliance
Implementation
2
Apr 04
D
This procedure describes the process that shall be followed to ensure that environmental issues are properly
managed as part of the project management process. It requires the environment to be addressed at the remit
stage and for an appraisal to be carried out at the feasibility stage and updated at specified times. A management
plan to an appropriate level shall be developed and maintained to deal with the identified issues.
Mandatory upon: Network Rail
Standards Ownership: Environment Policy
RT/LS/P/044
Date
Status
Price
Colour
Compliance
Implementation
2
Apr 04
C
This document sets out a standardised approach and uniform procedures to be used in planning and execution of
engineering work which involves the removal of used railway ballast and used railway infrastructure material.
Mandatory upon: Network Rail & Contractors
Standards Ownership: Environment Policy
th
st
Page 116
2. Company Standards
Environmental Policy
Date
Status
Price
Colour
Compliance
Implementation
2
Apr 04
D
This guidance note is intended for use by Network Rail and its tenants at Light Maintenance Depots, to provide
generic general advice on environmental management. It is not intended to be exhaustive nor does it constitute
part of the Depot Access conditions or any other lease condition.
Mandatory upon: Advisory only
Standards Ownership: Environment Policy
RT/LS/G/00022
Date
Status
Price
Colour
Compliance
Implementation
2
Apr 04
E
The purpose of this guidance document is to provide an overview of how the risks from construction noise can be
mitigated by obtaining consent under Section 61 of the Control of Pollution Act, 1974 (COPA) and in particular
the benefits of this approach and a recommended course of action for securing a Section 61 consent.
Mandatory upon: Advisory only
Standards Ownership: Environment Policy
RT/LS/G/00023
Best Practicable Means: Control of Noise and Vibration from Construction Operations
Issue
Date
Status
Price
Colour
Compliance
Implementation
2
Apr 04
C
The purpose of this environmental guidance note is to provide a reference for Network Rail managers and contractors
wishing to implement best practicable means (BPM) in controlling noise and vibration on construction sites.
Mandatory upon: Advisory only
Standards Ownership: Environment Policy
th
st
Page 117
2. Company Standards
Date
Status
Price
Colour
Compliance
Implementation
2
Jun 03
C
The Company Fire Safety Handbook is a suite of documents, comprising the corporate fire safety policy and
mandatory instructions, together with Codes of Practice, setting out guidance for implementation of the policy
within generic business areas for the effective management of fire safety.
Mandatory upon: Network Rail
Further Information: Replaces RT/P/P/002 and RT/LS/P025
Standards Ownership: Fire Safety Policy
RT/LS/C/102
Status
Price
Colour
Compliance
Implementation
Date
4 (3)
Aug 04 (Dec 03)
Up-Issued F
Yes
07/08/04
The Major Stations Fire Safety Handbook, for use by Station Managers to assist them with their responsibility for
carrying out the day-to-day management of fire safety within their premises.
Mandatory upon: Network Rail
Further Information: Replaces RT/P/P/002 and RT/LS/P025
Standards Ownership: Fire Safety Policy
Date
Status
Price
Colour
Compliance
Implementation
4 (3)
Aug 04 (Dec 03)
Up-Issued E
Yes
07/08/04
This Code of Practice provides guidance to all staff with responsibility for the management of fire safety within the
Operational Estate. The document sets out guidance for implementation of the fire safety policy deliverables
contained within the Company Fire Safety Handbook RT/LS/P/100.
Mandatory upon: Network Rail
Further Information: Replaces RT/P/P/002 and RT/LS/P025
Standards Ownership: Fire Safety Policy
RT/LS/C/103
Date
Status
Price
Colour
Compliance
Implementation
2
Apr 03
F
Yes
This Code of Practice provides guidance to all staff with responsibility for the management of fire safety within
Corporate Offices. The document sets out guidance for the implementation of the fire safety deliverables
contained within The Company Fire Safety Handbook RT/LS/P/100, which should be read in conjunction with this
Code of Practice.
Mandatory upon: Network Rail, Contractors and Lessees
Standards Ownership: Fire Safety Policy
RT/LS/C/105
Date
Status
Price
Colour
Compliance
Implementation
1
Dec 03
D
This Code of Practice provides guidance to all staff with responsibility for the management of fire safety within
Network Rail. The document sets out guidance for the implementation of the fire safety deliverables contained within
The Company Fire Safety Handbook RT/LS/P/100, which should be read in conjunction with this Code of Practice.
Mandatory upon: Network Rail, Contractors and Lessees
Standards Ownership: Fire Safety Policy
th
st
Page 118
2. Company Standards
Date
Status
Price
Colour
Compliance
Implementation
3 (2)
Aug 04 (Aug 03)
Up-Issued D
Yes
07/08/04
07/08/04
This Specification defines the process by which Network Rail ensures that all riding in driving cabs is undertaken
only by those Network Rail employees whose essential duties (other than those occasions described in the Rule
Book) require them to enter the driving cab environment. Network Rail Routes and Territories must have systems
in place to ensure compliance with the requirements of this Company Specification.
Mandatory upon: Network Rail & Contractors
Standards Ownership: Operational Safety Policy
RT/D/S/009
Date
Status
Price
Colour
Compliance
Implementation
3
Feb 00
C
This document specifies the arrangements to be complied with to enable the safe operation of Steam Locomotives
on Network Rail controlled infrastructure.
Mandatory upon: Network Rail
Standards Ownership: Operational Safety Policy
RT/D/S/010
Date
Status
Price
Colour
Compliance
Implementation
1
May 96
B
This Specification specifies the actions to be taken by Network Rail Zones when a signal post telephone is
identified as being between two lines that have a clearance of less than 10 feet (12 6 for lines with a speed in
excess of 100 mph) between the running edges of the nearest rails.
Mandatory upon: Network Rail
Standards Ownership: Operational Safety Policy
RT/LS/S/012
Inspection & Risk Assessment Forms for User-Worked, Footpath & Bridleway Level Crossings
Issue
Date
Status
Price
Colour
Compliance
Implementation
3
Jun 02
D
Yes
This specification supports the risk assessment methodology detailed in RT/LS/P/026 by providing the appropriate
inspection forms and risk assessment forms with guidance for inclusion in contracts as required by a zone/region.
Mandatory upon: Network Rail & Contractors
Standards Ownership: Operational Safety Policy
RT/LS/S/021
Date
Status
Price
Colour
Compliance
Implementation
1
Aug 03
C
To mandate how Network Rail will manage the operational risks arising from adverse and extreme weather,
including the use of weather forecast information, to give adequate preparation for such events.
Mandatory upon: Network Rail & Contractors
Standards Ownership: Operational Safety Policy
th
st
Page 119
2. Company Standards
2H6.2. Procedures
RT/D/P/010
Date
Status
Price
Colour
Compliance
Implementation
E7
Apr 04
D
The purpose of this procedure is, in accordance with Railway Group Standard GO/RT3252, to provide a
consistent, comprehensive and structured process, for the immediate actions required in dealing with a Category
A SPAD, gathering evidence following a Category A SPAD, the investigation, and subsequent management of
Category A SPAD issues within Network Rail and in conjunction with Train Operators.
Mandatory upon: Network Rail
Standards Ownership: Operational Safety Policy
RT/D/P/011
Date
Status
Price
Colour
Compliance
Implementation
3
Dec 00
C
This Procedure sets out the managerial actions to be taken by Network Rail Zones when a signaller receives a
report of a signal irregularity on Network Rail's controlled infrastructure.
Mandatory upon: Network Rail
Standards Ownership: Operational Safety Policy
RT/D/P/061
Date
Status
Price
Colour
Compliance
Implementation
2
Apr 04
C
This procedure details a consistent approach for Network Rail Zones to assess risk at Level Crossings, for which
they are responsible, and to take the required actions to comply with the Network Rail Level Crossing Safety
Strategy as determined by the Network Rail Executive Group.
Mandatory upon: Network Rail
Standards Ownership: Operational Safety Policy
RT/D/P/084
Date
Status
Price
Colour
Compliance
Implementation
2
Apr 04
C
To define the requirements to control the risk of train collisions when signalled in accordance with the permissive
working arrangements.
Mandatory upon: Network Rail
Standards Ownership: Operational Safety Policy
RT/D/P/095
Determining High Risk Sites for Wrong Side Track Circuit Failures in Leaf Fall Areas
Issue
RT/D/P/096
Status
Price
Colour
Compliance
Implementation
Date
1
Apr 04
New
B
07/08/04
07/08/04
The purpose of this procedure is to ensure that all sites which may be high risk in respect of being likely to cause
wrong side track circuit failures (WSTCF) under leaf fall contamination conditions are defined in a consistent way
across all Network Rail controlled infrastructure, and that a structured process exists to alter the status of sites.
Mandatory upon: Network Rail
Standards Ownership: Operational Safety Policy
Date
Status
Price
Colour
Compliance
Implementation
1
Apr 04
New
B
07/08/04
07/08/04
The purpose of this procedure is to ensure that all long term or known sites which may be high risk in respect of
low rail adhesion are defined in a consistent way across all Network Rail controlled infrastructure, and that a
structured process exists to alter the status of sites.
Mandatory upon: Network Rail
Standards Ownership: Operational Safety Policy
th
st
Page 120
2. Company Standards
RT/LS/P/009
Date
Status
Price
Colour
Compliance
Implementation
2
Apr 99
B
This procedure defines a process for identifying where T-CODs can be used and the necessary conditions for their
application taking into account safety and commercial requirements.
Mandatory upon: Network Rail, Contractors & Lessees
Standards Ownership: Operational Safety Policy
RT/LS/P/026
Inspection and Risk Assesment Methodology for User-worked, Footpath and Bridleway Level
Crossings
Issue
Date
Status
Price
Colour
Compliance
Implementation
2
Jun 02
C
This procedure specifies the risk assessment methodology and inspection forms to be used by Zone's/Region's
Directors at user-worked, footpath and bridleway level crossing and competency requirements of assessors. It is
supported by RT/LS/S/012.
Mandatory upon: Network Rail
Standards Ownership: Operational Safety Policy
RT/LS/P/031
Date
Status
Price
Colour
Compliance
Implementation
2
Apr 04
C
This Procedure sets out the process to be adopted by all Network Rail Zones to ensure the risks associated with
timetable change are controlled to as low as reasonably practicable. It also specifies responsibilities for the
production, together with the format and contents of the timetable change brief.
Mandatory upon: Network Rail
Standards Ownership: Operational Safety Policy
RT/LS/P/035
Date
Status
Price
Colour
Compliance
Implementation
1
Apr 01
B
This procedure explains the process for disseminating urgent operating information within Network Rail
Infrastructure Ltd and to other Railway Group members.
Mandatory upon: Network Rail
Standards Ownership: Operational Safety Policy
RT/LS/P/037
Date
Status
Price
Colour
Compliance
Implementation
1
Oct 01
C
This Procedure defines the minimum actions to be taken by Network Rail Infrastructure Ltd to review safety
critical voice communication to ensure that the required standards of voice communication are achieved, and to
collect and preserve voice recording media following an accident or incident.
Mandatory upon: Network Rail
Standards Ownership: Operational Safety Policy
RT/LS/P/039
Date
Status
Price
Colour
Compliance
Implementation
1
Dec 01
D
There are times in an operators working life when personal issues or other behavioural factors may affect their
concentration and application to the tasks in hand. This policy is designed to provide both the operator and the
line manager with a process for exploring such matters in a supportive environment. It provides guidance about the
types of support available and outlines some actions that may be used to help support the operator whilst
maintaining the safety of the railway.
Mandatory upon: Network Rail
Standards Ownership: Operational Safety Policy
th
st
Page 121
2. Company Standards
RT/LS/P/041
Date
Status
Price
Colour
Compliance
Implementation
2
Apr 04
B
To mandate the use of the Operations Manual and to describe the processes that shall be used to control the issue, use
and amendment of the content.
Mandatory upon: Network Rail
Standards Ownership: Operational Safety Policy
RT/LS/P/046
Date
Status
Price
Colour
Compliance
Implementation
2
Apr 04
B
To mandate the use of the Train Operations Manual and to describe the processes that shall be used to control
the issue, use and amendment of the content.
Mandatory upon: Network Rail & Contractors
Standards Ownership: Operational Safety Policy
Date
Status
Price
Colour
Compliance
Implementation
1
Feb 00
B
This code of practice is issued to provide guidance to organisations involved in the safe operation of steam
locomotives on Network Rail controlled infrastructure.
Mandatory upon: Network Rail
Standards Ownership: Operational Safety Policy
RT/LS/C/005
Date
Status
Price
Colour
Compliance
Implementation
1
Aug 02
C
The purpose of this Code of Practice is to provide advice to Network Rail Zones/Regions and Projects on a
process for controlling to as low as reasonably practicable (ALARP) the hazards and risks arising from the testing
of new rolling stock without taking an absolute possession of the line in accordance with the Rule Book Section
T(iii).
Mandatory upon: Advisory only
Further Information: Supplements the advice given in GM/RC2559
Standards Ownership: Operational Safety Policy
Date
Status
Price
Colour
Compliance
Implementation
2
Apr 04
C
This guidance note has been produced to assist in the process described in RT/LS/P/031 Risk Assessment and
Briefing of Timetable Change.
Mandatory upon: Network Rail
Standards Ownership: Operational Safety Policy
th
st
Page 122
2. Company Standards
Date
Status
Price
Colour
Compliance
Implementation
7
Apr 04
C
This procedure provides a process for acceptance of safety validation submissions in line with the new Railways
(Safety Case) Regulations 2000.
Mandatory upon: Network Rail
Standards Ownership: Safety Case Management
RT/LS/P/034
Date
Status
Price
Colour
Compliance
Implementation
Emergency 1
Oct 00
A
This Procedure describes the arrangements to be adopted within Network Rail Infrastructure Ltd for the
management and application of the Network Rail Zone Assurance Manual (ZAM).
Mandatory upon: Network Rail
Standards Ownership: Safety Case Management
th
st
Page 123
2. Company Standards
Accident Investigation
Date
Status
Price
Colour
Compliance
Implementation
7
Apr 04
D
This company standard is updated to include changes required to ensure compliance with the new Railway Group
Standard. It establishes the steps required to ensure accidents and incidents are properly investigated and that any
recommendations from inquiries and investigations are properly handled.
Mandatory upon: Network Rail
Standards Ownership: Accident Investigation
Recommendations Management
Issue
Date
Status
Price
Colour
Compliance
Implementation
1
Feb 04
D
This Guidance Note contains useful information and templates for managing recommendations from Inquiries and
Investigations. Its purpose is to provide direction to those involved in the progression of recommendations. It has
been derived from best practice as demonstrated throughout the Company.
Mandatory upon: Advisory only
Standards Ownership: Accident Investigation
th
st
Page 124
2. Company Standards
Date
Status
Price
Colour
Compliance
Implementation
1
Dec 98
C
Yes
This specification sets out the design, construction and maintenance requirements for facilities providing access
onto, along and across the track for persons whose duties require them to be on or near the line. It covers access
points, Authorised Walking Routes, Cess Walkways, Positions of Safety and individual features such as access
ladders.
Mandatory upon: Network Rail
Standards Ownership: Occupational Health & Safety Policy
RT/LS/S/004
Date
Status
Price
Colour
Compliance
Implementation
1
Apr 97
A
To mandate the Network Rail Safety & Standards Directorate Code of Practice entitled 'Reporting of Injuries,
Diseases and Dangerous Occurrences Regulations 1995 - Supplementary Guidance of Statutory Reporting'
throughout Network Rail Line.
Mandatory upon: Network Rail
Standards Ownership: Occupational Health & Safety Policy
RT/LS/S/008
Date
Status
Price
Colour
Compliance
Implementation
10
Apr 04
Phone
Yes
Specifies the mandatory safety conditions and particular (selectable) safety requirements that are to be specified for
any contract applicable to work on Network Rail Controlled Infrastructure on behalf of Network Rail. The
principles should also be used for outside party schemes whenever work impacts on Network Rail Controlled
Infrastructure.
Mandatory upon: Network Rail
Further Information: Calls up 55 documents
Standards Ownership: Occupational Health & Safety Policy
RT/LS/S/011
Date
Status
Price
Colour
Compliance
Implementation
3
Feb 02
D
This document specifies the process to be followed in order to minimise the risk arising from damage to, and danger
from those services located on Network Rail owned infrastructure and Major Stations where the ground provides
containment or forms a significant part of the support given to that particular service. Associated Procedure RT/LS/P/028
mandates the actions Network Rail personnel must take to implement this specification.
Mandatory upon: Network Rail & Contractors
Standards Ownership: Occupational Health & Safety Policy
RT/LS/S/013
Date
Status
Price
Colour
Compliance
Implementation
1
Jun 99
E
This specification states the competence requirements for Persons in Charge of Possession (PICOP).
Mandatory: Network Rail & Contractors
Standards Ownership: Occupational Health & Safety Policy
th
st
Page 125
2. Company Standards
RT/LS/S/014
Date
Status
Price
Colour
Compliance
Implementation
1
Jun 99
D
This specification states the competence requirements for Engineering Supervisor.
Mandatory: Network Rail & Contractors
Standards Ownership: Occupational Health & Safety Policy
RT/LS/S/018
Safety Requirements for Track Safety Medical & Alcohol & Drugs Screening & Certification
Issue
Date
Status
Price
Colour
Compliance
Implementation
1
Jun 00
C
This Document details the minimum requirements that suppliers must meet to deliver Medical Assessments and
Alcohol & Drugs Screening to allow registration as an approved Network Rail supplier. It also details the required
certification.
Mandatory: Network Rail & Contractors
Standards Ownership: Occupational Health & Safety Policy
RT/LS/S/019
Date
Status
Price
Colour
Compliance
Implementation
3
Apr 04
D
To control the risks to personnel from train movements by requiring effective planning of on track activities and
establishing a hierarchy of protection methods.
Mandatory: Network Rail, Contractors & Lessees
Standards Ownership: Occupational Health & Safety Policy
RT/LS/S/020
Date
Status
Price
Colour
Compliance
Implementation
3
Apr 04
C
To set out arrangements for the issue and control of Visitor's permits issued in accordance with Railway Group
Standard GE/RT8067 to people without Personal Track Safety (PTS) certification.
Mandatory: Network Rail, Contractors & Lessees
Standards Ownership: Occupational Health & Safety Policy
2H9.2. Procedures
RT/LS/P/003
Control of Excessive Working Hours for Persons Undertaking Safety Critical Work
Issue
Date
Status
Price
Colour
Compliance
Implementation
2
Aug 02
D
This procedure sets out the processes to be followed in order to control the hours worked by Railtrack
employees carrying out safety critical work (SCW) and ensure excessive hours are kept to a minimum.
Mandatory upon: Network Rail
Standards Ownership: Occupational Health & Safety Policy
RT/LS/P/005
High StreetEnvironment & Conditions for Work Outside Railtrack Controlled Infrastructure
Issue
Date
Status
Price
Colour
Compliance
Implementation
Emergency 3
Aug 00
C
This procedure explain how the environment and conditions generally found in the typical High Street may be
created within the Network Rail context for work which will take place outside Network Rail s Controlled
Infrastructure and in a manner which will not affect railway operations.
Mandatory upon: Network Rail & Contractors
Standards Ownership: Occupational Health & Safety Policy
RT/LS/P/006
Date
Status
Price
Colour
Compliance
Implementation
2
Apr 04
C
The purpose of the standard is to provide the minimum specification for the contents of the National Hazard
Directory, together with the upkeep and publication arrangements so that contractors and others can be supplied
with current details of systematic hazards at a site specific location.
Mandatory upon: Network Rail
Standards Ownership: Occupational Health & Safety Policy
th
st
Page 126
2. Company Standards
RT/LS/P/017
Date
Status
Price
Colour
Compliance
Implementation
2
Apr 04
C
The purpose of the standard is to specify the framework of the Network Rail Company Competence Management
System and process by which an individual s competence to work for or on behalf of Network Rail Company will
be assured.
Mandatory upon: Network Rail
Further Information: Calls up 11 documents
Standards Ownership: Occupational Health & Safety Policy
RT/LS/P/028
Date
Status
Price
Colour
Compliance
Implementation
1
Feb 99
B
This document specifies the arrangements to be used within Network Rail Line for provision of information on
surface and buried Services to Contractors. The associated Specification RT/LS/S/011 Prevention of damage to and
danger from, surface and buried Services is to be used to mandate action on Contractors.
Mandatory upon: Network Rail
Standards Ownership: Occupational Health & Safety Policy
RT/LS/P/040
Safety Tours
Issue
Date
Status
Price
Colour
Compliance
Implementation
2
Apr 04
C
This standard mandates the requirement, frequency and process for undertaking, recording, identifying follow-up
actions and communicating findings from safety tours.
Mandatory upon: Network Rail
Standards Ownership: Occupational Health & Safety Policy
RT/LS/P/043
Date
Status
Price
Colour
Compliance
Implementation
1
Feb 04
D
This Standard sets out the requirements to be followed when external bodies (often referred to as Third Parties)
who wish to specify, manage and/or deliver infrastructure projects upon Network Rail's controlled infrastructure,
so as to ensure that equivalent controls and processes are applied to the safety management of these
infrastructure projects when undertaken as Third Party Works.
Mandatory upon: Network Rail
Standards Ownership: Occupational Health & Safety Policy
RT/LS/P/050
Date
Status
Price
Colour
Compliance
Implementation
1
Dec 03
D
The purpose of this document is to define the procedure and the mandatory requirements associated with NCCA
and the Sentinel Scheme Rules.
Mandatory upon: Network Rail & Contractors
Standards Ownership: Operational Safety Policy
RT/LS/P/051
Date
Status
Price
Colour
Compliance
Implementation
1
Feb 04
B
The purpose of this standard is to set out Network Rail s policy and related implementation arrangements to
control the risks of employees or contractors being under the influence of alcohol and drugs at work.
Mandatory upon: Network Rail & Contractors
Standards Ownership: Occupational Health & Safety Policy
th
st
Page 127
2. Company Standards
Security Specialist/Risk
Date
Status
Price
Colour
Compliance
Implementation
* Rapid Reponse
E1
Aug 04
New
C
07/08/04
07/08/04
To mandate the use of the Network Rail Security Manual and to describe the processes that shall be used to
control the issue, use and amendment of the content.
Mandatory upon: Network Rail
Standards Ownership: Security Specialist
RT/LS/P/250
Date
Status
Price
Colour
Compliance
Implementation
* Rapid Reponse
E1
Aug 04
New
B
07/08/04
07/08/04
To mandate the use of the Incident Response - Planning & Management Manual and to describe the processes that
shall be used to control the issue, use and amendment of the content.
Mandatory upon: Network Rail
Further Information: Contains instructions to Zones
Standards Ownership: Security Specialist
Police, Fire Brigade or Other Emergency Services Personnel on or About the Track
Issue
Date
Status
Price
Colour
Compliance
Implementation
1
Jul 96
B
This Code of Practice sets out the arrangements for Zones to comply with when receiving requests from the
Emergency Services to go on or about the line or to isolate traction current.
Mandatory upon: Network Rail
Further Information: Contains instructions to Zones
Standards Ownership: Security Specialist
Date
Status
Price
Colour
Compliance
Implementation
1
Feb 03
C
Railway Group Standard GC/RT5201, Lineside Security requires the infrastructure controller to assess the risks
arising from unwanted intrusion and unauthorised access to all sections of Network Rail Controlled Infrastructure
including bridges, level crossings and stations and apply appropriate controls.
Mandatory upon: Advisory only
Standards Ownership: Security Specialist
2H11. Risk
2H11.1. Guidance Notes
RT/LS/G/00012
Date
Status
Price
Colour
Compliance
Implementation
1
Jun 03
D
The DfT report Managing the accidental obstruction of the railway by road vehicles was published in February
2003. It contains a number of risk assessment tools to be used to assess the risk and recommend mitigation works.
This guidance note assists Network rail staff in the implementation of this report, by providing information on
application of the tools and interfaces with highways authorities.
Mandatory upon: Advisory only
Standards Ownership: Risk
th
st
Page 128
2. Company Standards
K. Product Specifications
Date
Status
Price
Colour
Compliance
Implementation
1
Jun 00
B
This product specification states Network Rail s requirements for the minimum performance requirements for a
Resistive Type Live Line Indicating device for use on the overhead line and switching station equipment that will
provide an indication that it is safe to earth or isolate the equipment.
Mandatory upon: Network Rail, Contractors & Lessee
Standards Ownership: Electrification & Plant
RT/E/PS/00006
Date
Status
Price
Colour
Compliance
Implementation
1
Apr 00
D
This Product Specification states the minimum requirements for portable short-circuiting devices to be used on dcelectrified lines.
Mandatory upon: Network Rail, Contractors & Lessee
Standards Ownership: Electrification & Plant
RT/E/PS/00007
Date
Status
Price
Colour
Compliance
Implementation
2
Jun 03
D
This Product Specification states the minimum requirements for the provision of Uninterruptible Power Supply
units for installation on Network Rail s operational infrastructure.
Mandatory upon: Network Rail & Contractors
Standards Ownership: Electrification & Plant
RT/E/PS/00008
Date
Status
Price
Colour
Compliance
Implementation
2
Dec 01
D
This Product Specification states the Directorate s requirements for polymeric insulated 6.35/11 kV, 12.7/22 kV and
19/33 kV single and three-core cables for D.C. Electrified Lines and 25 kV two-core concentric and single-core
cables and accessories for A.C. Electrified Lines.
Mandatory upon: Network Rail & Contractors
Standards Ownership: Electrification & Plant
RT/E/PS/00018
750V D.C. Switchgear for Traction Substations and Track Paralleling Huts
Issue
Date
Status
Price
Colour
Compliance
Implementation
2
Dec 01
D
This product specification states the Directorate s requirements for 750V rated dc switchgear assemblies for
traction substations and track paralleling huts. The product specification states requirements for overall
performance and technical details including construction and testing.
Mandatory upon: Network Rail & Contractors
Standards Ownership: Electrification & Plant
RT/E/PS/00021
Date
Status
Price
Colour
Compliance
Implementation
1
Oct 01
D
This Product Specification states the requirements for the design, manufacture, testing at both supplier premises
and at site, delivery and commissioning of the generating set, together with the preparation and supply of associated
documentation, drawings and manuals. This document will be utilised to specify the requirements for generating
sets other than those for signalling supplies where stated by the purchaser.
Mandatory upon: Network Rail & Contractors
Standards Ownership: Electrification & Plant
th
st
Page 129
2. Company Standards
RT/E/PS/00022
K. Product Specifications
400V 3 phase a.c. Shore Supply Equipment for use in Non Electrified Areas
Issue
Date
Status
Price
Colour
Compliance
Implementation
1
Apr 01
D
This product specification states the Directorate s requirements for 400V, 3 phase, 3 wire a.c. shore supply
equipment for use in non electrified areas. The product specification includes requirements for overall performance
and technical details including design, manufacture, construction, installation, testing and commissioning.
Mandatory upon: Network Rail & Contractors
Standards Ownership: Electrification & Plant
RT/E/S/21036
Date
Status
Price
Colour
Compliance
Implementation
1
Mar 98
D
This specification states the Directorate s requirements for 25kV booster transformers for use as part of a return
conductor system for the suppression at source of electromagnetic interference on AC Electrified Lines, in order
to reduce the level of interference induced into adjacent signalling and communications circuits. The specification
states requirements for overall performance and technical details including testing.
Mandatory upon: Network Rail
Standards Ownership: Electrification & Plant
RT/E/S/21041
Mandatory upon:
Further Information:
Caution:
Standards Ownership:
RT/E/S/21082
Date
Status
Price
Colour
Compliance
Implementation
1
Nov 97
D
This specification states the Directorate s requirements for batteries and battery charging equipment for use in
substations, switching stations and for other associated electrification applications. The specification states
requirements for overall performance and technical details including construction and testing.
Network Rail
Performance Specification mandates testing/construction
See note i below
Electrification & Plant
25kV Overhead Line Equipment Insulators
Issue
Date
Status
Price
Colour
Compliance
Implementation
1
Mar 98
D
This specification states the Directorate s requirements for the design, manufacture and testing of insulators for use
on 25kV AC Electrified Lines. The specification states the requirements for overall performance and technical
details including testing.
Mandatory upon: Network Rail
Standards Ownership: Electrification & Plant
RT/E/S/21101
Date
Status
Price
Colour
Compliance
Implementation
1
Mar 98
C
This specification states the Directorate s requirement for track cable for DC Electrified lines.
Mandatory upon: Network Rail
Standards Ownership: Electrification & Plant
RT/SEL/2004
Date
Status
Price
Colour
Compliance
Implementation
1
Oct 00
D
This product specification states the Directorate s requirements for 25 kV a.c. single phase indoor, outdoor,
cubicle, metalclad, circuit breakers, disconnectors, switches, switchfuses and ancillary equipment for use on A.C.
Electrified Lines. The product specification states the requirements for overall performance and technical details
including any special testing.
Mandatory upon: Network Rail
Standards Ownership: Electrification & Plant
CAUTION! The requirements for protective treatments materials and their application referred to in this Specification have been superseded by:
RT/CE/S/039 - Specification RT98 - Protective Treatment for Railtrack Infrastructure;
RT/CE/C/002 - Application and Reapplication of Protective Treament to Metallic Structures
th
st
Page 130
2. Company Standards
K. Product Specifications
Railway Systems
Date
Status
Price
Colour
Compliance
Implementation
1
Oct 02
C
This Product Specification states the technical requirements for Hot Axle Bearing Detector (HABD) systems to be
installed on Network Rail s operational infrastructure. Their purpose is to observe the rolling stock and identify and
provide warning of an overheating axle bearing..
Mandatory upon: Network Rail and Contractors
Standards Ownership: Railway Systems
th
st
Page 131
2. Company Standards
K. Product Specifications
Signal Engineering
Date
Status
Price
Colour
Compliance
Implementation
1
Dec 99
C
This line specification details the design, functional, physical, interface, performance and safety requirements for an
Adjustable Tie Bar used on Rail Clamp Point Locks.
Mandatory upon: Network Rail & Contractors
Standards Ownership: Signal Engineering
RT/E/PS/00005
Date
Status
Price
Colour
Compliance
Implementation
1
Apr 2000
D
This Line Specification specifies the manufacturing requirements for railway signalling cables detailed in the scope of
this Specification.
Mandatory upon: Contractors
Further Information: Superseded document reference number GS/ES0872 Issue 2 Sept 93
Standards Ownership: Signal Engineering
RT/E/PS/00009
Message Handling & Data Transmission Requirements Between Processor Based Systems
Issue
Date
Status
Price
Colour
Compliance
Implementation
2
Apr 04
E
To ensure that Network Rail s electronic Signalling and Telecommunications Systems can be expected to
communicate and interact with each other, a common protocol and message classification needs to be specified.
This document builds on past experience and best practice to ensure future compatibility.
Mandatory upon: Network Rail & Contractors
Standards Ownership: Signal Engineering
RT/E/PS/00011
Date
Status
Price
Colour
Compliance
Implementation
1
Apr 01
C
This specification has been prepared to define the requirements for a Train Protection and Warning System
(TPWS) Failure Indication Unit that is to be provided for the reporting of failed TPWS trackside sub-systems within
mechanically signalled areas.
Mandatory upon: Network Rail & Contractors
Standards Ownership: Signal Engineering
RT/E/PS/00012
Specification for the Preparation & Implementation of Train Describer System Parameter Tables
Issue
Date
Status
Price
Colour
Compliance
Implementation
1
Aug 01
F
This Company Product Specification defines the necessary features and information required by a Train Describer
database to ensure a standard format throughout Network Rail s infrastructure.
Mandatory upon: Network Rails & Contractors
Standards Ownership: Signal Engineering
RT/E/PS/00032
Date
Status
Price
Colour
Compliance
Implementation
1
Dec 03
B
This product specification states the requirements for the design, manufacture and testing of a battery suitable for
use in a Train Protection and Warning System (TPWS) Self Powered Overspeed Sensor System (SPOSS).
Mandatory upon: Network Rails & Contractors
Standards Ownership: Signal Engineering
RT/E/PS/00801
Date
Status
Price
Colour
Compliance
Implementation
1
Feb 04
D
Yes
The aim of this specification is to define the requirements for a basic bit to bit Time Division Multiplex (TDM)
transmission system suitable for use in a variety of signalling applications on Network Rail.
Mandatory upon: Network Rail & Contractors
Standards Ownership: Signal Engineering
th
st
Page 132
2. Company Standards
RT/E/PS/11755
K. Product Specifications
Signal Engineering
DC Track Circuits
Issue
Date
Status
Price
Colour
Compliance
Implementation
1
Dec 00
E
This Line Specification states the minimum requirements for DC track circuits. It includes life-cycle requirements
from design, safety and environmental through to installation, testing and maintenance.
Mandatory upon: Network Rail & Contractors
Standards Ownership: Signal Engineering
RT/E/PS/11756
Date
Status
Price
Colour
Compliance
Implementation
2
Aug 01
E
This Company Specification states the minimum requirements for Alstom High Voltage Impulse (HVI) track circuits.
It includes lifecycle requirements from design, safety and environmental through to installation, testing and
maintenance.
Mandatory upon: Network Rail & Contractors
Standards Ownership: Signal Engineering
RT/E/PS/11757
Date
Status
Price
Colour
Compliance
Implementation
1
Dec 00
F
This Line Specification states the minimum requirements for a.c. phase sensitive track circuits. It includes lifecycle
requirements from design, safety and environmental to installation, testing and maintenance.
Mandatory upon: Network Rail & Contractors
Standards Ownership: Signal Engineering
RT/E/PS/11760
Date
Status
Price
Colour
Compliance
Implementation
1
Dec 00
F
This Line Specification states the minimum requirements for Westinghouse FS2600 track circuits. It includes
lifecycle requirements from design, safety and environmental to installation, testing and maintenance.
Mandatory upon: Network Rail & Contractors
Standards Ownership: Signal Engineering
RT/E/PS/11761
Date
Status
Price
Colour
Compliance
Implementation
1
Dec 00
E
This Line Specification states the minimum requirements for TI.21 Audio Frequency track circuits. It includes
lifecycle requirements from design, safety and environmental to installation, testing and maintenance.
Mandatory upon: Network Rail & Contractors
Standards Ownership: Signal Engineering
RT/E/PS/11762
Date
Status
Price
Colour
Compliance
Implementation
1
Dec 00
E
This Line Specification states the minimum requirements for Track Circuit Assister Interference Detectors. It
includes lifecycle requirements from design, safety and environmental to installation, testing and maintenance.
Mandatory upon: Network Rail & Contractors
Standards Ownership: Signal Engineering
RT/E/PS/11763
Date
Status
Price
Colour
Compliance
Implementation
1
Dec 00
E
This Line Specification states the minimum requirements for Alstom Reed Type RT Track Circuits. It includes lifecycle
requirements from design, safety and environmental to installation, testing and maintenance.
Mandatory upon: Network Rail & Contractors
Standards Ownership: Signal Engineering
th
st
Page 133
2. Company Standards
RT/E/PS/11764
K. Product Specifications
Signal Engineering
Date
Status
Price
Colour
Compliance
Implementation
1
Dec 00
C
This Line Specification states the minimum requirements for track circuit interrupters. It includes lifecycle
requirements from design, safety and environmental to installation, testing and maintenance.
Mandatory upon: Network Rail & Contractors
Standards Ownership: Signal Engineering
RT/E/PS/11765
Impedance Bonds
Issue
Date
Status
Price
Colour
Compliance
Implementation
1
Dec 00
E
This Line Specification states the minimum requirements for Impedance Bonds. It includes lifecycle requirements
from design, safety and environmental to installation, testing and maintenance.
Mandatory upon: Network Rail & Contractors
Standards Ownership: Signal Engineering
RT/E/S/10015
Rail Clamp Point Lock Performance Specification for the Microswitch with Independent Contacts
Issue
Date
Status
Price
Colour
Compliance
Implementation
1
Feb 98
C
This standard defines the performance requirements for microswitches with independent contacts used in Rail
Point Clamp Lock detection circuitry.
Mandatory upon: Network Rail & Contractors
Further Information: Performance specification
Standards Ownership: Signal Engineering
RT/E/S/10031
Date
Status
Price
Colour
Compliance
Implementation
1
Mar 97
D
This document has been prepared to define the detailed requirements for a Miniature Stop Light unit for use on a
level crossing.
Mandatory upon: Network Rail
Further Information: Material Specification
Standards Ownership: Signal Engineering
RT/E/S/10041
Date
Status
Price
Colour
Compliance
Implementation
1
Dec 99
D
This document specifies the requirements for an IECC System Monitor (ISM) Terminal. This terminal is a
replacement for the Lynwood J500 which is now obsolete and no longer available for purchase.
Mandatory upon: Network Rail & Product Suppliers
Standards Ownership: Signal Engineering
RT/E/S/10059
Date
Status
Price
Colour
Compliance
Implementation
1
Aug 98
C
This standard specifies the requirements for the Non-Intrusive FDM Earth Leakage Adapter. The adapter allows a
standard multi-meter to be adapted to allow it to measure the cable resistance to earth of the FDM system. Existing
instruments for measuring the resistance pose the hazard of generating an interfering signal through its power supply and
can therefore not be used on a live system.
Mandatory upon: Network Rail & Contractors
Standards Ownership: Signal Engineering
th
st
Page 134
2. Company Standards
RT/E/S/10065
K. Product Specifications
Signal Engineering
Date
Status
Price
Colour
Compliance
Implementation
1
Feb 99
D
This specification identifies the requirements for a Barrier Operation Relay (24V DC Working) for controlling level
crossing barriers.
Mandatory upon: Network Rail & Contractors
Standards Ownership: Signal Engineering
RT/E/S/21136
Date
Status
Price
Colour
Compliance
Implementation
Compliance
Implementation
2
Oct 99
D
This specification states the performance requirements for track circuit operating devices.
Mandatory upon: Network Rail & Contractors
Standards Ownership: Signal Engineering
RT/SRS/2001
Date
Status
Price
Colour
2
Dec 01
D
This Company Specification details the functional, physical, interface, performance and safety requirements for Point
Operating Equipment.
Mandatory upon: Network Rail, Contractor & Lessee
Standards Ownership: Signal Engineering
th
st
Page 135
2. Company Standards
K. Product Specifications
Date
Status
Price
Colour
Compliance
Implementation
4
Feb 02
E
This specification provides the performance specifications for paints, sealants and ancillary materials to be used for
protective treatment on Network Rail Infrastructure.
Mandatory upon: Network Rail / Lessee
Further Information: Material specification. Should be mandated in lease. Responds to GC/RT5110
Standards Ownership: Civil Engineering
RT/CE/S/041
Date
Status
Price
Colour
Compliance
Implementation
2
Aug 01
E
This specification provides the performance criteria for waterproofing systems proposed to be used on Network
Rail s underline bridge decks and provides recommendations for tests to be carried out to prove compliance with
the performance requirements.
Mandatory upon: Network Rail
Further Information: Responds to GC/RT5110
Standards Ownership: Civil Engineering
Date
Status
Price
Colour
Compliance
Implementation
1
Oct 02
D
This Specification provides specification requirements for manufactured platform components and pre-fabricated
platform systems to be installed at Network Rail owned stations.
Mandatory upon: Network Rail and Contractors
Standards Ownership: Railway Estates Policy & Planning
th
st
Page 136
2. Company Standards
K. Product Specifications
Telecommunications
2J6. Telecommunications
RT/E/PS/00013
Cable Troughing
Issue
Date
Status
Price
Colour
Compliance
Implementation
1
Feb 01
C
This Product Specification states Network Rail's minimum performance requirements for cable troughing products
to be installed upon Network Rail's infrastructure
Mandatory upon: Network Rail, Contractors & Lessee
Standards Ownership: Telecommunications Engineering
RT/E/PS/00014
Date
Status
Price
Colour
Compliance
Implementation
3
Jun 03
D
This document is for use in procuring polyethylene sheathed ZHLS sheathed optical fibre trunk telecommunications cables.
Mandatory upon: Network Rail & Contractors
Standards Ownership: Telecommunications Engineering
RT/E/PS/00015
Date
Status
Price
Colour
Compliance
Implementation
2
Jun 03
D
This specification details Network Rail s requirements for Unit Twin Copper Telecommunications Cables, generally
to BS 3573, for external use. Single-sheathed, armoured and ZHLS cables are specified.
Mandatory upon: Network Rail & Contractors
Standards Ownership: Telecommunications Engineering
RT/E/PS/00025
Date
Status
Price
Colour
Compliance
Implementation
1
Feb 02
C
This product specification states the minimum requirements for Synchronous Digital Hierarchy Multiplexing
Equipment forming part of telecommunications systems providing services for operational railway and business
applications.
Mandatory upon: Network Rail & Contractors
Standards Ownership: Telecommunications Engineering
RT/E/PS/00026
Date
Status
Price
Colour
Compliance
Implementation
1
Feb 02
C
This product specification states the minimum requirements for Primary PCM Multiplex Equipment forming part of
telecommunications systems providing services for operational railway and business applications.
Mandatory upon: Network Rail & Contractors
Standards Ownership: Telecommunications Engineering
RT/E/PS/00027
Date
Status
Price
Colour
Compliance
Implementation
1
Feb 02
C
This product specification states the minimum requirements for Digital Subscriber Line Transmission Equipment
forming part of telecommunications systems providing services for operational railway and business applications.
Mandatory upon: Network Rail & Contractors
Standards Ownership: Telecommunications Engineering
RT/E/PS/00028
Date
Status
Price
Colour
Compliance
Implementation
1
Feb 02
C
This Product Specification states the minimum requirements for Controlled Climate Trackside Housings for
Telecommunications Equipment supporting operational railway and business services.
Mandatory upon: Network Rail & Contractors
Standards Ownership: Telecommunications Engineering
th
st
Page 137
2. Company Standards
K. Product Specifications
Track
2J7. Track
RT/CE/S/001
Date
Status
Price
Colour
Compliance
Implementation
3
Aug 03
F
This specification covers long welded strings manufactured by the flash welding of new rails at fixed plant. The
following rail profiles and grades are covered. Only joints between rails of the same grade are covered.
Mandatory upon: Network Rail & Contractors
Standards Ownership: Track Engineering
RT/CE/S/004
Date
Status
Price
Colour
Compliance
Implementation
1
Sep 96
C
This specification sets down the mandatory requirements for manufacture and supply of switch & crossing work for
use in Network Rail-owned infrastructure.
Mandatory upon: Network Rail
Further Information: Mandated equipment. Responds to GC/RT5011
Standards Ownership: Track Engineering
RT/CE/S/005
Date
Status
Price
Colour
Compliance
Implementation
1
Aug 96
B
This document defines the performance specification for portable ultrasonic rail flaw detector units used for testing
rail on Network Rail-owned permanent way. This document applies to all portable ultrasonic rail flaw detectors
used to carry out the procedures defined in Network Rail Line Specification RT/CE/S/055 Rail-testing: ultrasonic
procedures.
Mandatory upon: Network Rail
Further Information: Equipment Specification. Performance mandated. Responds to GC/RT5019
Standards Ownership: Track Engineering
RT/CE/S/006
Date
Status
Price
Colour
Compliance
Implementation
3
Aug 00
C
This specification gives the requirements for track ballast and aggregate used by Stoneblowing machines, including
physical properties and tests. It does not apply to ballast returned directly to the track by a ballast cleaning machine.
Mandatory upon: Network Rail
Further Information: Material Specification. Responds to GC/RT5014
Standards Ownership: Track Engineering
RT/CE/S/010
Geotextiles
Issue
Date
Status
Price
Colour
Compliance
Implementation
2
Oct 96
B
This specification gives the requirements for geotextiles, including physical properties and tests.
Mandatory upon: Network Rail
Further Information: Materials Specification. Responds to GC/RT5014
Standards Ownership: Track Engineering
RT/CE/S/012
Date
Status
Price
Colour
Compliance
Implementation
2
Feb 02
D
This specification defines Network Rail's criteria for the approval of designs of cast austenitic manganese steel crossings and
for control of the manufacturing process. It also specifies the documentation that the supplier shall provide describing the
recommended handling and maintenance of the product.
Mandatory upon: Network Rail
Further Information: Material/performance specification. Responds to GC/RT5011.
Standards Ownership: Track Engineering
th
st
Page 138
2. Company Standards
RT/CE/S/013
K. Product Specifications
Track
Date
Status
Price
Colour
Compliance
Implementation
1
Jun 96
D
This specification gives the requirements for welded crossings manufactured using the electroslag welding process.
Mandatory upon: Network Rail
Further Information: Material specification. Responds to GC/RT5011
Standards Ownership: Track Engineering
RT/CE/S/015
Self-Shielding Flux-Cored Wires for the Weld Repair of BS11 Normal and A Grade Rails
Issue
Date
Status
Price
Colour
Compliance
Implementation
1
Dec 95
C
This specification gives the requirements for the manufacture and acceptance of shelf-shielding flux-cored wires for
use on BS11 Normal and A Grade rail steels.
Mandatory upon: Network Rail
Further Information: Material Spec. Responds to GC/RT5021
Standards Ownership: Track Engineering
RT/CE/S/016
Date
Status
Price
Colour
Compliance
Implementation
1
Oct 97
B
This specification lays down the requirements for new check rails of the 33C1 profile (previously known as U69 or
UIC33) to be supplied to Network Rail or for use on Network Rail s infrastructure.
Mandatory upon: Network Rail
Further Information: Material spec. Responds to GC/RT5019
Standards Ownership: Track Engineering
RT/CE/S/019
Date
Status
Price
Colour
Compliance
Implementation
1
Apr 95
B
This specification gives the requirements for the material and dimensions of cast chairs, baseplates and blocks for
use in Network Rail s permanent way.
Mandatory upon: Network Rail
Further Information: Material specification. Responds to GC/RT5015
Standards Ownership: Track Engineering
RT/CE/S/021
Steel Sleepers
Issue
Date
Status
Price
Colour
Compliance
Implementation
2
Feb 03
C
This specification gives the requirements for the performance of steel sleepers which are to be installed for use in
Network Rail s permanent way.
Mandatory upon: Network Rail
Further Information: Material/Performance specification. Responds to GC/RT5015
Standards Ownership: Track Engineering
RT/CE/S/023
Date
Status
Price
Colour
Compliance
Implementation
1
Mar 96
C
This specification gives the requirements for the geometry and the mechanical and electrical performance of
insulated rail joints for use in Network Rail.
Mandatory upon: Network Rail
Further Information: Material/performance specification. Responds to GC/RT5020
Standards Ownership: Track Engineering
th
st
Page 139
2. Company Standards
RT/CE/S/024
K. Product Specifications
Track
Date
Status
Price
Colour
Compliance
Implementation
1
Mar 96
A
This specification defines the items required (excluding rails, bolts, MGL pins and adhesive) to make up a
component kit for the production of glued insulated rail joints of the BR Mk111 4- or 6-hole design.
Mandatory upon: Network Rail
Further Information: Material specification. Responds to GC/RT5020
Standards Ownership: Track Engineering
RT/CE/S/025
Date
Status
Price
Colour
Compliance
Implementation
1A
Oct 97
A
This specification gives the requirements for the material and dimensions (by reference to drawings) of steel rail
keys for use in Network Rail s permanent way.
Mandatory upon: Network Rail
Further Information: Material specification. Responds to GC/RT5013
Standards Ownership: Track Engineering
RT/CE/S/026
Date
Status
Price
Colour
Compliance
Implementation
1
May 95
A
This specification gives the requirements for the material and dimensions of oak rail keys for use in Network Rail s
permanent way.
Mandatory upon: Network Rail
Further Information: Material specification. Responds to GC/RT5013
Standards Ownership: Track Engineering
RT/CE/S/027
Plastic Ferrules
Issue
Date
Status
Price
Colour
Compliance
Implementation
1
Apr 95
B
This specification gives the requirements for the materials and dimensions of plastic ferrules for use in Network
Rail s permanent way.
Mandatory upon: Network Rail
Further Information: Material specification. Responds to GC/RT5013
Standards Ownership: Track Engineering
RT/CE/S/028
Date
Status
Price
Colour
Compliance
Implementation
1
Apr 95
B
This specification gives the requirements for the material and dimensions of thermoplastic insulators for use with
concrete sleepers with Pandrol shoulders.
Mandatory upon: Network Rail
Further Information: Material specification. Responds to GC/RT5013
Standards Ownership: Track Engineering
RT/CE/S/029
Date
Status
Price
Colour
Compliance
Implementation
3
Feb 00
C
This specification defines the requirements for the supply of wood sleepers and bearers, and longitudinal timbers,
for use in Network Rail s permanent way.
Mandatory upon: Network Rail
Further Information: Materials specification. Responds to GC/RT5015
Standards Ownership: Track Engineering
th
st
Page 140
2. Company Standards
RT/CE/S/030
K. Product Specifications
Track
Date
Status
Price
Colour
Compliance
Implementation
2
Aug 03
C
This specification gives technical requirements to be met by newly-manufactured concrete sleepers, bearers and related
items procured for use in Network Rail s permanent way. The specification should be read in association with the
appropriate Network Rail standard drawings (RE/PW/XXX) for the particular sleeper or bearer design or with the
manufacturer s accepted alternative designs.
Mandatory upon: Network Rail & Contractors
Standards Ownership: Track Engineering
RT/CE/S/033
Date
Status
Price
Colour
Compliance
Implementation
2
Feb 98
B
This specification gives the requirements for blanketing sand, including physical properties and tests, for use as filter
layers in track substructures.
Mandatory upon: Network Rail
Further Information: Material specification. Responds to GC/RT5014
Standards Ownership: Track Engineering
RT/CE/S/040
Date
Status
Price
Colour
Compliance
Implementation
1
Dec 97
B
This specification provides the performance specification for manufactured level crossing surface systems and
contains approval procedures to be followed by manufacturers of level crossing surface systems proposed for use
on Network Rail s public vehicular level crossings.
Mandatory upon: Network Rail
Further Information: Performance specification & mandated process. Responds to GC/RT5208
Standards Ownership: Track Engineering
RT/CE/S/043
Rail Anchors
Issue
Date
Status
Price
Colour
Compliance
Implementation
Compliance
Implementation
1A
Oct 97
B
This specification gives the performance requirements for rail anchors.
Mandatory upon: Network Rail
Further Information: Performance specification. Responds to GC/RT5010, GC/RT5013.
Standards Ownership: Track Engineering
RT/CE/S/052
Date
Status
Price
Colour
3
Oct 02
C
This specification gives the requirements for the resilient rail pads for use between either flat bottom rails and
concrete sleepers, flat bottom rails and cast iron baseplates; or flat bottom rails and steel sleepers.
Mandatory upon: Network Rail
Further Information: Performance specification. Responds to GC/RT5013
Standards Ownership: Track Engineering
RT/CE/S/130
Date
Status
Price
Colour
Compliance
Implementation
1
Aug 03
D
To ensure the serviceability of flash welded strings installed in Network Rail's permanent way.
Mandatory upon: Network Rail & Contractors
Standards Ownership: Track Engineering
RT/CE/S/131
Date
Status
Price
Colour
Compliance
Implementation
1
Aug 03
D
To ensure the serviceability of flash welded joints incorporated in cast austenitic manganese steel crossings, switch
rails and transition rails.
Mandatory upon: Network Rail & Contractors
Standards Ownership: Track Engineering
th
st
Page 141
2. Company Standards
Title
Issue
Change Made
RT/D/P/093
TPWS interventions
Withdrawn
RT/E/C/11400
Superseded by Issue 3
RT/E/C/45002
Superseded by Issue 4
RT/E/G/00015
Superseded by Issue 2
RT/E/P/10175
10
Superseded by Issue 11
RT/E/PS/00007
Superseded by Issue 2
RT/E/PS/00014
Superseded by Issue 3
RT/E/PS/00015
Superseded by Issue 2
RT/E/S/40045
Superseded by Issue 4
RT/LS/CAT/005
18
Superseded by Issue 19
RT/LS/P/001
Superseded by Issue 10
RT/LS/P/013
Superseded by Issue 4
RT/LS/P/014
Superseded by Issue 4
RT/LS/P/015
Superseded by Issue 3
RT/LS/P/100
Superseded by Issue 2
RT/LS/S/020
Superseded by Issue 2
RT/CE/PWSI/004
Superseded by Issue 3
RT/CE/PWSI/008
Superseded by
RT/CE/PWSI/004 Issue 3
Title
Issue
Change Made
RT/CE/S/001
Superseded by Issue 3
RT/CE/S/030
Superseded by Issue 2
RT/CE/S/054
Superseded by Issue 2
RT/D/S/002
Superseded by Issue 2
RT/E/P/10024
Superseded by Issue 3
11
Superseded by Issue 12
RT/E/S/10040
Superseded by Issue 5
RT/E/S/10067
Superseded by Issue 2
RT/E/S/10131
Superseded by Issue 2
RT/E/S/30032
Superseded by Issue 2
RT/LS/CAT005
19
Superseded by Issue 20
RT/LS/S/016
Superseded by Issue 4
Issue
Change Made
Title
RT/SIN/076
Deleted
RT/CE/PWSI/005
Incorporated in
RT/CE/S/102 Issue 5
th
st
Page 142
2. Company Standards
Change Made
RT/E/P/10175
Reference
Title
12
Superseded by Issue 13
RT/E/P/11120
Superseded by Issue 2
RT/E/S/10039
Superseded by Issue 2
RT/E/S/11630
Superseded by Issue 5
RT/LS/P/020
Superseded by Issue 6
Issue
Change Made
Title
RT/CE/C/039
1A
Superseded by Issue 2
RT/CE/S/064
Superseded by Issue 2
RT/D/P/010
E5
Superseded by Emergency
Issue 6
RT/E/C/11004
Superseded by Issue 2
RT/E/C/11115
Superseded by Issue 2
RT/E/C/11701
Superseded by Issue 3
RT/E/P/10175
13
Superseded by Issue 14
RT/E/P/11120
Superseded by Issue 3
RT/E/P/19251
Superseded by Issue 2
RT/E/S/10056
Superseded by
RT/E/C/11115 Issue 2
RT/E/S/11201
Superseded by Issue 3
RT/E/S/11630
Superseded by Issue 6
RT/E/S/17504
Superseded by Issue 3
RT/E/S/29987
1C
Superseded by Issue 1D
RT/LS/C/101
Superseded by Issue 3
RT/LS/C/102
Superseded by Issue 3
RT/LS/P/001
10
Superseded by Issue 11
RT/LS/P/016
Superseded by Issue 9
RT/LS/G/00005
Withdrawn
Title
Issue
Change Made
RT/E/C/27017
Superseded by Issue 2
RT/E/C/27018
Superseded by Issue 2
RT/E/P/10175
14
Superseded by Issue 15
RT/E/P/11120
Superseded by Issue 4
RT/E/P/24001
Superseded by Issue 2
RT/E/PS/00801
Superseded by Issue 2
th
st
Page 143
2. Company Standards
Reference
Title
RT/E/S/10047
Issue
Change Made
Superseded by Issue 9
RT/E/S/10661
Superseded by Issue 4
RT/E/S/11221
Superseded by Issue 3
RT/E/S/21070
Superseded by Issue 2
RT/E/S/30033
E2
Superseded by Issue 3
RT/E/WI/00102
Superseded by Issue 2
RT/LS/CAT/005
20
Superseded by Issue 21
RT/LS/P/029
Product Acceptance
Superseded by Issue 3
RT/CE/C/025
Apr-04
RT/CE/P/016
Apr-04
RT/CE/P/037
Apr-04
Superseded by Issue 2
RT/CE/P/038
Apr-04
Superseded by Issue 4
RT/CE/P/050
Apr-04
Superseded by Issue 2
RT/CE/S/003
Apr-04
Superseded by Issue 2
RT/CE/S/017
Examination Of Structures
Apr-04
Superseded by Issue 2
RT/CE/S/035
Assessment of Structures
Apr-04
Superseded by Issue 2
(published Feb 2004)
RT/D/P/003
1A
Apr-04
Superseded by Issue 2
RT/D/P/010
E6
Apr-04
Superseded by Issue E7
RT/D/P/012
Apr-04
RT/D/P/053
Apr-04
Withdrawn to be replaced by
instructions in the Control Manual
RT/D/P/061
Apr-04
Superseded bu Issue 2
RT/D/P/084
Apr-04
Superseded by Issue 2
RT/D/P/085
Apr-04
Superseded by Issue 4
RT/E/G/00007
Apr-04
Superseded by Issue 2
RT/E/G/00008
Apr-04
RT/E/G/00027
Apr-04
Superseded by Issue 2
th
st
Issue
Date
Deleted
Standard No
Change Made
Page 144
2. Company Standards
Issue
Date
Deleted
Standard No
Title
Change Made
RT/E/P/02010
Apr-04
RT/E/P/02015
Apr-04
Superseded by Issue 3
RT/E/P/02018
Apr-04
Superseded by Issue 2
RT/E/P/02020
Apr-04
Superseded by Issue 4
RT/E/P/10175
15
Apr-04
RT/E/P/11120
Apr-04
Superseded by Issue 5
RT/E/P/19000
Apr-04
Superseded by Issue 2
RT/E/P/24020
Apr-04
Superseded by Issue 2
RT/E/P/30007
Apr-04
RT/E/PS/00009
Apr-04
Superseded by Issue 2
RT/E/S/02019
Apr-04
Superseded by Issue 2
RT/E/S/10028
Apr-04
Superseded by Issue 3
RT/E/S/10133
Apr-04
Superseded by Issue 3
RT/E/S/10134
Apr-04
Superseded by Issue 3
RT/E/S/10135
Apr-04
Superseded by Issue 3
RT/E/S/10137
TPWS - Train Protection & Warning System Selection of Signals and Other Locations for Provision
of Track Sub-System
Apr-04
Superseded by Issue 3
RT/E/S/10138
Apr-04
Superseded by Issue 3
RT/E/S/10173
Apr-04
Superseded by Issue 3
RT/E/S/24017
Apr-04
Superseded by Issue 2
RT/LS/G/00022
Apr-04
Superseded by Issue 2
RT/LS/G/00023
Apr-04
Superseded by Issue 2
RT/LS/G/00030
Apr-04
Superseded by Issue 2
RT/LS/G/001
Apr-04
th
st
Page 145
2. Company Standards
Issue
Date
Deleted
Standard No
Title
Change Made
RT/LS/P/001
11
Apr-04
Superseded by Issue 12
RT/LS/P/002
Apr-04
Superseded by Issue 7
RT/LS/P/006
Apr-04
Superseded by Issue 2
RT/LS/P/007
Apr-04
Superseded by Issue 2
RT/LS/P/013
Apr-04
Superseded by Issue 5
RT/LS/P/016
Apr-04
Superseded by RT/LS/P/052
(restricted document)
RT/LS/P/017
Apr-04
Superseded by Issue 2
RT/LS/P/020
Apr-04
Superseded by Issue 7
RT/LS/P/027
Apr-04
Withdrawn, to be replaced by
instructions in the Operations
Manual
RT/LS/P/029
Product Acceptance
Apr-04
Superseded by Issue 4
RT/LS/P/031
Apr-04
Superseded by Issue 2
RT/LS/P/040
E1
Apr-04
Superseded by Issue 2
RT/LS/P/041
E1
Apr-04
Superseded by Issue 2
RT/LS/P/044
Apr-04
Superseded by Issue 2
RT/LS/P/045
Apr-04
Superseded by Issue 2
RT/LS/P/046
E1
Apr-04
Superseded by Issue 2
RT/LS/P014
Apr-04
Re-Org changes
RT/LS/P015
Apr-04
Superseded by Issue 4
RT/LS/S/008
Apr-04
Superseded by Issue 10
RT/LS/S/015
Apr-04
Superseded by Issue 5
RT/LS/S/019
Apr-04
Superseded by Issue 3
RT/LS/S/020
Apr-04
Superseded by Issue 3
RT/SIN/055
Apr-04
Superseded by Issue 2
TPWS/TGN/001
Apr-04
TPWS/TGN/003
Apr-04
TPWS/TGN/005
Apr-04
TPWS/TGN/006
Apr-04
TPWS/TGN/007
Apr-04
TPWS/TGN/008
Apr-04
TPWS/TGN/009
Apr-04
TPWS/TGN/011
Apr-04
TPWS/TGN/012
TPWS UPS
Apr-04
TPWS/TGN/013
Apr-04
TPWS/TGN/014
Apr-04
th
st
Page 146
2. Company Standards
Title
TPWS/TGN/016
Apr-04
TPWS/TGN/017
Apr-04
TPWS/TGN/018
Apr-04
TPWS/TGN/019
Apr-04
TPWS/TGN/020
Apr-04
TPWS/TI/004
Apr-04
TPWS/TI/006
Apr-04
TPWS/TI/007
Apr-04
TPWS/TI/008
Apr-04
TPWS/TI/009
Apr-04
TPWS/TI/011
Apr-04
TPWS/TI/012
Apr-04
TPWS/TI/013
Apr-04
TPWS/TI/014
Apr-04
TPWS/TI/015
Apr-04
TPWS/TI/016
Apr-04
TPWS/TI/018
Apr-04
TPWS/TI/019
Apr-04
TPWS/TI/020
Apr-04
TPWS/TI/021
Apr-04
TPWS/TI/022
Apr-04
TPWS/TI/023
Apr-04
TPWS/TI/024
Apr-04
TPWS/TI/025
Apr-04
TPWS/TI/026
Apr-04
TPWS/TI/027
Apr-04
TPWS/TI/028
Apr-04
th
st
Issue
Date
Deleted
Standard No
Change Made
Page 147
2. Company Standards
Issue
Date
Deleted
Standard No
Title
Change Made
TPWS/TI/030
Apr-04
TPWS/TI/031
Apr-04
TPWS/TI/032
Apr-04
TPWS/TI/033
Apr-04
TPWS/TI/034
Apr-04
TPWS/TI/036
Apr-04
TPWS/TI/037
Apr-04
TPWS/TI/038
Apr-04
TPWS/TI/039
Apr-04
TPWS/TI/040
Apr-04
TPWS/TI/042
Apr-04
TPWS/TI/046
Apr-04
TPWS/TI/047
Apr-04
Title
RT/LS/P/014
Issue
4
Change Made
Withdrawn
Reference
Title
Change Made
RT/CE/C/041
Issue 2
RT/CE/S/044
Undertrack Crossings
Issue 1
Superseded by Issue 2
RT/CE/S/048
Issue 3
Superseded by Issue 4
Superseded by Issue 3
RT/CE/S/049
Issue 7
Superseded by Issue 8
RT/CE/S/071
Issue 1
Superseded by Issue 2
RT/D/P/021
Issue 2
Superseded by RT/LS/P/052
RT/D/P/022
Issue 7
Withdrawn
RT/D/S/002
Issue 2
Superseded by Issue 3
RT/D/S/004
Railtrack Specification for Determining High Risk Sites for Wrong Side Track
Circuit Failures in Leaf Fall Areas
Issue 2
Superseded by RT/D/P/095
RT/D/S/005
Railtrack Specification for Determining High Risk Sites for Low Rail Adhesion
as Defined in Group Standard GO/RT3356
Issue 2
Superseded by RT/D/P/096
RT/E/C/10048
Issue 1
Superseded by RT/E/S/11129
Issue 3
RT/E/C/10094
Issue 2
Superseded by RT/E/S/10660
RT/E/C/10095
Issue 2
Superseded by RT/E/S/10660
RT/E/C/11115
Issue 2
Superseded by Issue 3
th
st
Page 148
2. Company Standards
Reference
Title
RT/E/C/19004
SIGTAN 004 Replacing relays - type sj 8211 relay units gec geographical units
Issue 1
Superseded by
RT/E/C/19020 Issue 3
RT/E/C/19011
Issue 1
Superseded by
RT/E/C/19020 Issue 3
RT/E/C/19020
Issue 2
Superseded by Issue 3
RT/E/C/19031
Issue 1
Superseded by
RT/E/C/19020 Issue 3
RT/E/C/19034
Issue 1
Superseded by
RT/E/C/19020 Issue 3
RT/E/C/19255
Issue 1
Superseded by
RT/E/C/19272
RT/E/C/19256
Issue 2
Superseded by
RT/E/C/19272
RT/E/C/19260
Issue 2
Superseded by
RT/E/C/19272
RT/E/C/19261
Issue 1
Superseded by
RT/E/C/19272
RT/E/C/19264
Issue 1
Superseded by
RT/E/C/19272
RT/E/C/19267
Issue 1
Superseded by
RT/E/C/19272
RT/E/P/10024
Issue 3
Superseded by Issue 4
RT/E/P/11120
Issue 5
Superseded by Issue 6
RT/E/S/10040
Issue 5
Superseded by Issue 6
RT/E/S/10662
Issue 1
Superseded by Issue 2
RT/E/S/11129
Issue 2
Superseded by Issue 3
RT/E/S/11630
Issue 6
Superseded by Issue 7
th
st
Change Made
Page 149
GA/RT6002
GA/RT6004
GA/RT6005
GA/RT6006
GC/GN5523
GC/GN5533
GC/RC5510
GC/RC5511
GC/RC5521
GC/RC5603
GC/RT5011
GC/RT5014
GC/RT5021
GC/RT5021/1
GC/RT5022
GC/RT5023
GC/RT5024
GC/RT5033
GC/RT5060
GC/RT5100
GC/RT5101
GC/RT5110
GC/RT5112
th
Title
Issue Issue Date Directorate Ownership
50HZ Single Phase AC Electrification- Immunisation of Sig. & Telecomms Systems 1
01-Feb-79 Engineering
Telecommunications
Engineering
Radio Electronic Token Block
2
01-Dec-86 Engineering
Signal Engineering
Platform Stepping Distances
1
01-Jul-98
Engineering
Rail Vehicle
Engineering
Operations of Trams and Light Rail or Metro Vehicles over Railtrack
1
01-Feb-99 Safety &
Interoperability &
Compliance Acceptance
Managing the Risks from Contaminated Land
1
01-Oct-99 Engineering
Civil Engineering
European Train Control System: The Management of Packet 44
1
05-Apr-03 Safety &
Signal Engineering
Compliance
Personal Track Safety
1
05-Oct-02 Safety &
Occupational Health
Compliance & Safety Policy
Drugs and Alcohol
1
04-Oct-03 Safety &
Occupational Health
Compliance & Safety Policy
Introduction and use of Axle Counters - Managing the Risk
2
01-Feb-03 Engineering
Signal Engineering
Safety Performance Monitoring and Defect Reporting of Rail Vehicles- Plant and 1
02-Jun-01 Engineering
Rail Vehicle
Machinery
Engineering
Signalling and Operational Telecommunications Design: Safety Requirements
2
06-Apr-02 Engineering
Signal Engineering
Signalling Design Production
1
05-Aug-00 Engineering
Signal Engineering
Installation of Signalling and Operational Telecommunications Equipment
1
05-Aug-00 Engineering
Signal Engineering
Testing and Commissioning of Signalling and Operational Telecommunications
1
02-Dec-00 Engineering
Signal Engineering
Systems
Train Driving
4
05-Oct-02 Safety &
Operational Safety
Compliance Policy
Signals Passed at Danger (SPADs)
5
04-Oct-03 Safety &
Operational Safety
Compliance Policy
Checking the Speed of Trains
1
01-Mar-95 Safety &
Operational Safety
Compliance Policy
Train Working: Competence and Fitness
2
07-Oct-00 Safety &
Operational Safety
Compliance Policy
Criteria for the Assessment by Railway Safety of Railtrack s Railway Safety Case 1
01-Aug-01 Safety &
Safety Case
Compliance Management
Guidance on Train and Station Operators Railway Safety Cases for Assessment 2
02-Jun-01 Safety &
Safety Case
by Railway Safety
Compliance Management
Guidance on Submitting Material Revisions to Railway Safety Cases
2
02-Jun-01 Safety &
Safety Case
Compliance Management
Railway Group Standards Change Procedures
3
01-Aug-98 Safety &
Standards
Compliance Development
Process
Translation of roles and terminology for Group Standards authorised before
1
01-Mar-94 Safety &
Standards
1/4/94
Compliance Development
Process
Temporary non-compliance with Railway Group Standards
2
01-Aug-98 Safety &
Standards
Compliance Development
Process
Subject Committees
1
01-Aug-98 Safety &
Standards
Compliance Development
Process
Derogations from Railway Group Standards
1
01-Aug-98 Safety &
Standards
Compliance Development
Process
Changes to Track Standards - A Response to the Hatfield Derailment
1
02-Dec-00 Engineering
Track Engineering
Assessment of Risks from Train Overruns at Terminal or Bay Platforms
1
01-Dec-01 Engineering
Track Engineering
Recommendations for the Design of Bridges
2
05-Aug-00 Engineering
Civil Engineering
Recommendations for the safe Management of structures
3
03-Apr-04 Engineering
Civil Engineering
Calculation of Enhanced Permissible Speeds for Tilting Trains
1
02-Jun-01 Engineering
Track Engineering
Standard Definitions of Civil Engineering Terms
1
01-Nov-96 Engineering
Track Engineering
Switches and Crossings
2
02-Dec-00 Engineering
Track Engineering
Track Standards Manual: Section 6 - Formation and Ballast
1
01-Sep-95 Engineering
Track Engineering
Track System Requirements
2
04-Oct-03 Engineering
Track Engineering
Track System Requirements
1
01-Apr-00 Engineering
Track Engineering
Rails and Rail Joints
2
05-Oct-02 Engineering
Track Engineering
Categorisation of Track
2
01-Oct-99 Engineering
Track Engineering
Rail Fastenings & Supports
1
07-Apr-01 Engineering
Track Engineering
Terminal Track - Managing the Risk
1
01-Oct-99 Engineering
Track Engineering
Equipment for the Signing of Temporary and Emergency Speed Restrictions
2
01-Dec-96 Engineering
Track Engineering
Safe Management of Structures
3
03-Apr-04 Engineering
Civil Engineering
Technical Approval Requirements for Changes to the Infrastructure
1
01-Jul-96
Engineering
Civil Engineering
Design Requirements for Structures
2
05-Aug-00 Engineering
Civil Engineering
Loading Requirements for the Design of Bridges
1
01-May-97 Engineering
Civil Engineering
st
TSI's
TRUE
TRUE
TRUE
FALSE
FALSE
FALSE
FALSE
TRUE
FALSE
FALSE
TRUE
TRUE
TRUE
TRUE
FALSE
TRUE
TRUE
TRUE
TRUE
FALSE
TRUE
TRUE
TRUE
TRUE
TRUE
TRUE
FALSE
FALSE
TRUE
TRUE
TRUE
FALSE
TRUE
TRUE
TRUE
TRUE
FALSE
TRUE
TRUE
TRUE
FALSE
TRUE
TRUE
TRUE
TRUE
Page 150
Reference
GC/RT5122
GC/RT5143
GC/RT5151
GC/RT5152
GC/RT5153
Title
Bridge Strikes from Road Vehicles or Waterborne Vessels
Scour and Flooding - Managing the Risk
Safe Asset Management - Embankments and Cuttings
Mineral Extraction - Controlling the Risk
Subterranean Fires - Managing the Risk
Issue
4
2
2
2
1
GC/RT5161
GC/RT5164
GC/RT5180
GC/RT5201
GC/RT5202
GC/RT5203
2
1
2
2
1
3
GC/RT5212
GE/GN8510
1
2
GE/GN8518
GE/GN8521
Directorate
Engineering
Engineering
Engineering
Engineering
Safety &
Compliance
05-Aug-00 Engineering
01-Nov-95 Engineering
03-Jun-00 Engineering
01-Dec-99 Engineering
05-Dec-98 Engineering
03-Feb-01 Safety &
Compliance
01-Feb-03 Engineering
01-Feb-03 Safety &
Compliance
02-Feb-02 Railway
Estates
06-Apr-02 Engineering
GE/GN8522
01-Oct-99
GE/GN8526
GE/GN8532
1
1
GE/GN8547
GE/GN8549
GE/GN8550
Guidance on Issues between Railway Group Standards and TSIs for High Speed
Operation
Guidance on the Preparation of Risk Assessments Within Railway Safety Cases
GE/GN8566
GE/GN8658
05-Oct-02
GE/RC8505
07-Apr-01
GE/RC8514
02-Jun-01
GE/RC8517
02-Jun-01
GE/RC8546
GE/RC8554
01-Jun-02
GE/RT8000 -M4
01-Jun-03
GE/RT8000-AC1
07-Jun-03
GE/RT8000-AC2
07-Jun-03
GE/RT8000-AC3
07-Jun-03
GE/RT8000-G1
07-Jun-03
GE/RT8000-G2
Personal Safety when walking on or near the line, or when on the lineside
07-Jun-03
GE/RT8000-M1
07-Jun-03
GE/RT8000-M2
07-Jun-03
GE/RT8000-M4
07-Jun-03
GE/RT8000-M5
Managing accidents
07-Jun-03
07-Jun-03
GE/RT8000-OTP
On-track plant
03-Apr-04
GE/RT8000-P1
07-Jun-03
GE/GN8561
th
st
Issue Date
05-Oct-02
01-Nov-95
01-Dec-99
01-Dec-99
01-Nov-95
Safety &
Compliance
02-Dec-00 Engineering
07-Apr-01 Safety &
Compliance
01-Feb-03 Safety &
Compliance
01-Dec-01 Railway
Systems
04-Oct-03 Safety &
Compliance
01-Jun-02 Safety &
Compliance
01-Jun-02 Safety &
Compliance
05-Oct-02
Safety &
Compliance
Safety &
Compliance
Railway
Systems
Engineering
Safety &
Compliance
Safety &
Compliance
Safety &
Compliance
Safety &
Compliance
Safety &
Compliance
Safety &
Compliance
Safety &
Compliance
Safety &
Compliance
Safety &
Compliance
Safety &
Compliance
Safety &
Compliance
Safety &
Compliance
Safety &
Compliance
Safety &
Compliance
Safety &
Compliance
Ownership
Civil Engineering
Civil Engineering
Civil Engineering
Civil Engineering
Fire Safety Policy
TSI's
FALSE
FALSE
FALSE
FALSE
FALSE
Civil Engineering
Civil Engineering
Civil Engineering
Track Engineering
Track Engineering
Occupational Health
& Safety Policy
Track Engineering
Safety Support
TRUE
TRUE
FALSE
TRUE
FALSE
TRUE
Maintenance
TRUE
FALSE
FALSE
FALSE
FALSE
TRUE
TRUE
TRUE
FALSE
FALSE
FALSE
FALSE
FALSE
FALSE
FALSE
FALSE
FALSE
FALSE
FALSE
FALSE
FALSE
FALSE
FALSE
Page 151
Reference
GE/RT8000-P2
GE/RT8000-S1
GE/RT8000-S2
GE/RT8000-S3
GE/RT8000-S4
GE/RT8000-S5
GE/RT8000-SP
GE/RT8000-SS1
GE/RT8000-SS2
GE/RT8000-T10
GE/RT8000-T11
GE/RT8000-T12
GE/RT8000-T1A
GE/RT8000-T1B
GE/RT8000-T2
GE/RT8000-T3
GE/RT8000-T4
GE/RT8000-T5
GE/RT8000-T6
GE/RT8000-T7
GE/RT8000-T8
GE/RT8000-T9
GE/RT8000-TS1
GE/RT8000-TS2
GE/RT8000-TS3
GE/RT8000-TS4
GE/RT8000-TS5
GE/RT8000-TS6
GE/RT8000-TS7
GE/RT8000-TS8
GE/RT8000-TW1
GE/RT8000-TW2
GE/RT8000-TW3
GE/RT8000-TW5
GE/RT8000-TW6
GE/RT8000-TW7
GE/RT8000-TW8
th
Title
Working single and bi-directional lines by pilotman
st
TSI's
FALSE
FALSE
FALSE
FALSE
FALSE
FALSE
FALSE
FALSE
FALSE
FALSE
FALSE
FALSE
FALSE
FALSE
FALSE
FALSE
FALSE
FALSE
FALSE
FALSE
FALSE
FALSE
FALSE
FALSE
FALSE
FALSE
FALSE
FALSE
FALSE
FALSE
FALSE
FALSE
FALSE
FALSE
FALSE
FALSE
FALSE
Page 152
Reference
GE/RT8004
Title
Local Operations Instructions
GE/RT8005
GE/RT8006
GE/RT8012
GE/RT8014
GE/RT8015
GE/RT8016
GE/RT8018
GE/RT8019
GE/RT8021
GE/RT8023
GE/RT8024
GE/RT8025
GE/RT8026
GE/RT8030
GE/RT8033
GE/RT8034
GE/RT8035
GE/RT8040
GE/RT8046
GE/RT8047
GE/RT8048
GE/RT8049
GE/RT8050
GE/RT8051
GE/RT8054
GE/RT8060
GE/RT8063
GE/RT8270
GH/RT4000
GH/RT4003
GH/RT4004
GI/GN7515
GI/GN7606
GI/GN7607
GI/GN7611
GI/RC7503
GI/RT7002
GI/RT7003
GI/RT7004
GI/RT7006
GI/RT7007
GI/RT7008
th
st
Page 153
Reference
GI/RT7010
Title
Lighting of Railway Premises
GI/RT7011
GI/RT7014
GI/RT7015
GI/RT7016
GI/RT7033
GK/GN0525
GK/GN0611
GK/GN0802
GK/GN0806
GK/RC0606
22
21
2
1
2
1
3
2
1
2
2
1
1
4
2
E3
4
1
04-Oct-03
07-Jun-03
01-Oct-99
01-Oct-95
04-Oct-03
01-Jan-97
05-Aug-00
04-Oct-03
01-Sep-97
01-Apr-99
01-Jun-98
01-Dec-95
01-Dec-95
02-Feb-02
02-Feb-02
01-Jul-96
02-Dec-00
01-Nov-96
Engineering
Engineering
Engineering
Engineering
Engineering
Engineering
Engineering
Engineering
Engineering
Engineering
Engineering
Engineering
Engineering
Engineering
Engineering
Engineering
Engineering
Engineering
Signal Engineering
Signal Engineering
Signal Engineering
Signal Engineering
Signal Engineering
Signal Engineering
Signal Engineering
Signal Engineering
Signal Engineering
Signal Engineering
Signal Engineering
Signal Engineering
Signal Engineering
Signal Engineering
Signal Engineering
Signal Engineering
Signal Engineering
Signal Engineering
FALSE
FALSE
TRUE
TRUE
TRUE
TRUE
TRUE
TRUE
TRUE
TRUE
TRUE
TRUE
FALSE
TRUE
TRUE
TRUE
TRUE
FALSE
GK/RT0037
GK/RT0038
GK/RT0039
GK/RT0041
GK/RT0042
GK/RT0044
GK/RT0051
GK/RT0054
GK/RT0061
GK/RT0063
GK/RT0064
GK/RT0091
4
2
1
1
1
1
1
1
2
1
1
2
06-Oct-01
02-Dec-00
01-Jul-97
01-Jul-97
01-Jul-97
01-Feb-00
01-Apr-99
01-Mar-98
01-Mar-98
01-Nov-96
02-Dec-00
02-Dec-00
Engineering
Engineering
Engineering
Engineering
Engineering
Engineering
Engineering
Engineering
Engineering
Engineering
Engineering
Engineering
TRUE
TRUE
TRUE
TRUE
TRUE
TRUE
TRUE
TRUE
FALSE
TRUE
TRUE
TRUE
GK/RT0101
GK/RT0105
GK/RT0106
GK/RT0114
GK/RT0186
1
2
2
2
1
01-May-94
01-Oct-96
01-Aug-99
01-Nov-96
01-Oct-96
Engineering
Engineering
Engineering
Engineering
Engineering
GK/RT0193
01-Jun-96
Engineering
GK/RT0210
GK/RT0217
GK/RT0300
GK/RT0330
GL/RT1252
Signal Engineering
Signal Engineering
Signal Engineering
Signal Engineering
Signal Engineering
Signal Engineering
Signal Engineering
Signal Engineering
Signal Engineering
Signal Engineering
Signal Engineering
Rail Vehicle
Engineering
Signal Engineering
Signal Engineering
Signal Engineering
Signal Engineering
Telecommunications
Engineering
Telecommunications
Engineering
Signal Engineering
01-Feb-03
01-Aug-98
01-Oct-98
01-Apr-00
Engineering
Engineering
Engineering
Engineering
GL/RT1253
01-Apr-00
Engineering
GL/RT1254
01-Apr-00
Engineering
GM/GN2560
07-Oct-00
Engineering
GM/GN2561
03-Aug-02
Engineering
GM/GN2571
01-Jun-02
Engineering
GM/GN2572
02-Jun-01
Engineering
GK/RM0501
GK/RM0501/21
GK/RT0005
GK/RT0007
GK/RT0009
GK/RT0009/1
GK/RT0011
GK/RT0025
GK/RT0025/1
GK/RT0026
GK/RT0027
GK/RT0029
GK/RT0030
GK/RT0031
GK/RT0032
GK/RT0033
GK/RT0034
GK/RT0036
th
st
02-Dec-00 Engineering
TRUE
TRUE
TRUE
FALSE
TRUE
FALSE
FALSE
Signal Engineering
TRUE
Signal Engineering
FALSE
Signal Engineering
TRUE
Electrification & Plant TRUE
Engineering
Electrification & Plant FALSE
Engineering
Electrification & Plant TRUE
Engineering
Rail Vehicle
TRUE
Engineering
Rail Vehicle
FALSE
Engineering
Rail Vehicle
FALSE
Engineering
Rail Vehicle
TRUE
Engineering
Page 154
Reference
GM/GN2575
GM/GN2575
GM/GN2576
GM/GN2590
GM/GN2690
GM/RC1500
GM/RC1501
GM/RC1503
GM/RC2509
GM/RC2510
GM/RC2513
GM/RC2514
GM/RC2515
GM/RC2516
GM/RC2516
GM/RC2518
GM/RC2519
GM/RC2559
GM/RC2566
GM/RC2680
GM/RM2525
GM/RM2525
GM/RT1040
GM/RT1041
GM/RT1042
GM/RT1201
GM/RT1251
GM/RT1310
GM/RT1403
GM/RT2000
GM/RT2001
GM/RT2003
GM/RT2004
GM/RT2020
GM/RT2023
GM/RT2025
GM/RT2026
GM/RT2027
th
Title
Guidance on Engineering Acceptance of On-Track Machines
Page 155
Reference
GM/RT2028
Title
Wheelset Design
GM/RT2030
GM/RT2040
GM/RT2041
GM/RT2042
GM/RT2043
GM/RT2044
GM/RT2045
GM/RT2046
Braking System Requirements and Performance for Trains which Operate above
125 mile/h
Structural Requirements for Railway Vehicles
GM/RT2100
GM/RT2101
GM/RT2102
Requirements for the Design- Construction- Test & Use of Tanks of Rail Tank
Wagons
Structural Requirements for Drawgear and Buffers on Railway Vehicles
GM/RT2120
Requirement for the Control of Risks Arising from Fire on Railway Vehicles
GM/RT2141
GM/RT2142
GM/RT2149
GM/RT2160
GM/RT2161
GM/RT2162
GM/RT2176
Air Quality and Lighting Environment for Traincrew Inside Railway Vehicles
GM/RT2177
GM/RT2180
GM/RT2181
Overhead Line Equipment (OLE) Warning Line on Traction and Rolling Stock
GM/RT2185
GM/RT2190
GM/RT2190
GM/RT2210
GM/RT2260
GM/RT2273
GM/RT2300
Warning signs & Labels fittes to Electrical Equipment on Rail Mounted Vehicles
GM/RT2304
GM/RT2307
GM/RT2400
GM/RT2450
GM/RT2451
GM/RT2452
GM/RT2453
th
st
TSI's
TRUE
TRUE
TRUE
TRUE
TRUE
TRUE
TRUE
TRUE
TRUE
TRUE
TRUE
TRUE
TRUE
TRUE
TRUE
FALSE
TRUE
TRUE
TRUE
TRUE
TRUE
TRUE
TRUE
TRUE
TRUE
FALSE
TRUE
TRUE
TRUE
TRUE
TRUE
TRUE
TRUE
TRUE
FALSE
FALSE
TRUE
Page 156
Reference
GM/RT2455
Title
Freight Vehicle In-Service Inspections
st
Page 157
Reference
GO/RC3555
Title
Railtrack Approved Code of Practice - Train Working
GO/RC3558
GO/RC3560
GO/RC3571
GO/RC3900
GO/RM3053
GO/RM3056
GO/RM3420
GO/RT3053/1
GO/RT3053/2
GO/RT3053/A
GO/RT3053/C
GO/RT3053/D
GO/RT3053/E
GO/RT3053/F
GO/RT3053/G
GO/RT3053/H
GO/RT3090
GO/RT3091
GO/RT3093
GO/RT3100
GO/RT3100/11
GO/RT3201
GO/RT3204
GO/RT3208
GO/RT3209
GO/RT3210
GO/RT3259
GO/RT3260
GO/RT3261
GO/RT3263
GO/RT3271
GO/RT3272
GO/RT3279
GO/RT3350
GO/RT3352
GO/RT3355
th
st
Page 158
Reference
GO/RT3358
Title
Persons Responsible for Protecting Work On or Near the Line
GO/RT3400
GO/RT3406
GO/RT3407
GO/RT3410
GO/RT3411
GO/RT3421
GO/RT3422
GO/RT3423
GO/RT3425
GO/RT3434/10
GO/RT3436
GO/RT3437
GO/RT3471
GO/RT3472
GO/RT3473
GO/RT3475
GO/RT3607
GO/RT3612
GO/RT4100
GO/RT4100/1
GT/EHH802
GT/TDCAB091
GT/TDINT100
JDPC006
RS/102
RS/210
RS/601
RT3181/1
RT3199/1
SSP050
TD CAB018
TD GEN096
TD INT 023
TD RAD054
TMI TGEN0073
th
st
Page 159
Internal
085-77518
085-77791
The Enquiry Desk is available between the hours of 09:00 and 17:00.
th
st
Page 160
Title
EH H202
EHQ/SP/S/030
GK/EHV609
GK/RC0689
GK/RT0108
GK/RT0187
GK/RT0188
GK/RT0191
GK/RT0320
GS/DH2E30
GS/ES1937
2A
SSI-ELS-DOC-3733
SSI-ELS-DOC-4057
SSI-ELS-DOC-4254
SSI-9503
SSI-MI303
TII BRAD9049
TI/TTEL 9071
th
st
Health Warning
Date
Nov 93
Jan 1996
Page 161
Page
GS/SIN/055...............................78
GS/SIN/061...............................78
GS/SIN/062...............................78
RT/CE/C/001............................88
RT/CE/C/002............................88
RT/CE/C/003......................... 103
RT/CE/C/004......................... 103
RT/CE/C/006......................... 103
RT/CE/C/007......................... 103
RT/CE/C/008............................88
RT/CE/C/015............................89
RT/CE/C/016......................... 103
RT/CE/C/017......................... 103
RT/CE/C/018............................89
RT/CE/C/019............................89
RT/CE/C/025............................90
RT/CE/C/026............................90
RT/CE/C/030......................... 104
RT/CE/C/033......................... 104
RT/CE/C/039......................... 104
RT/CE/C/041............................90
RT/CE/C/045............................90
RT/CE/P/008.............................87
RT/CE/P/015.......................... 102
RT/CE/P/018.......................... 102
RT/CE/P/020.............................87
RT/CE/P/022.............................87
RT/CE/P/027.......................... 102
RT/CE/P/030.......................... 116
RT/CE/P/032.............................87
RT/CE/P/034.......................... 102
RT/CE/P/037.............................87
RT/CE/P/038.......................... 102
RT/CE/P/042.............................87
RT/CE/P/044.............................88
RT/CE/P/050.......................... 107
RT/CE/PWSI/004.................. 105
RT/CE/PWSI/006.................. 105
RT/CE/PWSI/007.................. 105
RT/CE/PWSI/009.................. 105
RT/CE/PWSI/010.................. 105
RT/CE/PWSI/011.................. 105
RT/CE/S/001.......................... 138
RT/CE/S/002.............................96
RT/CE/S/003.............................83
RT/CE/S/004.......................... 138
RT/CE/S/005.......................... 138
RT/CE/S/006.......................... 138
RT/CE/S/007.............................83
RT/CE/S/008.............................96
RT/CE/S/009.............................96
RT/CE/S/010.......................... 138
RT/CE/S/011.............................96
RT/CE/S/012.......................... 138
RT/CE/S/013.......................... 139
th
st
Standard
Page
RT/CE/S/014 ............................ 96
RT/CE/S/015 .......................... 139
RT/CE/S/016 .......................... 139
RT/CE/S/017 ............................ 83
RT/CE/S/019 .......................... 139
RT/CE/S/021 .......................... 139
RT/CE/S/023 .......................... 139
RT/CE/S/024 .......................... 140
RT/CE/S/025 .......................... 140
RT/CE/S/026 .......................... 140
RT/CE/S/027 .......................... 140
RT/CE/S/028 .......................... 140
RT/CE/S/029 .......................... 140
RT/CE/S/030 .......................... 141
RT/CE/S/032 ............................ 97
RT/CE/S/033 .......................... 141
RT/CE/S/034 ............................ 97
RT/CE/S/035 ............................ 83
RT/CE/S/036 ............................ 97
RT/CE/S/037 ............................ 97
RT/CE/S/038 ............................ 97
RT/CE/S/039 .......................... 136
RT/CE/S/040 .......................... 141
RT/CE/S/041 .......................... 136
RT/CE/S/042 ............................ 98
RT/CE/S/043 .......................... 141
RT/CE/S/044 ............................ 83
RT/CE/S/047 ............................ 84
RT/CE/S/048 ............................ 84
RT/CE/S/049 ............................ 98
RT/CE/S/050 ............................ 98
RT/CE/S/051 ............................ 98
RT/CE/S/052 .......................... 141
RT/CE/S/053 ............................ 98
RT/CE/S/054 ............................ 99
RT/CE/S/055 ............................ 99
RT/CE/S/056 ............................ 99
RT/CE/S/057 ............................ 99
RT/CE/S/061 ............................ 99
RT/CE/S/062 ............................ 99
RT/CE/S/063 .......................... 100
RT/CE/S/064 .......................... 100
RT/CE/S/069 .......................... 125
RT/CE/S/071 ............................ 84
RT/CE/S/072 .......................... 100
RT/CE/S/073 .......................... 100
RT/CE/S/076 ............................ 84
RT/CE/S/077 .......................... 100
RT/CE/S/080 ............................ 84
RT/CE/S/082 ............................ 85
RT/CE/S/083 ............................ 85
RT/CE/S/084 ............................ 85
RT/CE/S/085 ............................ 85
RT/CE/S/087 ............................ 85
RT/CE/S/088 ............................ 85
Catalogue of Company Standards
Standard
Page
RT/CE/S/089 ............................ 86
RT/CE/S/090 ............................ 86
RT/CE/S/091 ............................ 86
RT/CE/S/092 ............................ 86
RT/CE/S/096 ..........................100
RT/CE/S/097 ..........................100
RT/CE/S/101 ..........................101
RT/CE/S/102 ..........................101
RT/CE/S/103 ..........................101
RT/CE/S/104 ..........................101
RT/CE/S/130 ..........................141
RT/CE/S/131 ..........................141
RT/CE/S/132 ..........................101
RT/CE/S/140 ............................ 86
RT/CE/S/142 ............................ 86
RT/D/C/004 ...........................128
RT/D/C/087 ...........................122
RT/D/C/089 ...........................111
RT/D/G/091 ...........................111
RT/D/P/003 ............................116
RT/D/P/010 ............................120
RT/D/P/011 ............................120
RT/D/P/015 ............................114
RT/D/P/020 ............................109
RT/D/P/026 .............................. 17
RT/D/P/027 ............................109
RT/D/P/030 ............................109
RT/D/P/034 ............................110
RT/D/P/036 ............................110
RT/D/P/044 ............................110
RT/D/P/045 .............................. 17
RT/D/P/047 ............................110
RT/D/P/049 ............................110
RT/D/P/061 ............................120
RT/D/P/064 .............................. 17
RT/D/P/084 ............................120
RT/D/P/085 ............................102
RT/D/P/088 ............................108
RT/D/P/090 ............................111
RT/D/P/095 ............................120
RT/D/P/096 ............................120
RT/D/S/002 ............................119
RT/D/S/006 .............................. 51
RT/D/S/009 ............................119
RT/D/S/010 ............................119
RT/D/S/011 ............................109
RT/D/S/012 .............................. 41
RT/D/S/020 ............................109
RT/E/C/001 .............................. 62
RT/E/C/02012........................104
RT/E/C/02022.......................... 62
RT/E/C/02104.......................... 62
RT/E/C/10026.......................... 62
RT/E/C/10049.......................... 62
RT/E/C/10050.......................... 62
Page 162
st
RT/E/C/19050.......................... 71
RT/E/C/19051.......................... 71
RT/E/C/19052.......................... 72
RT/E/C/19253.......................... 72
RT/E/C/19254.......................... 72
RT/E/C/19257.......................... 72
RT/E/C/19258.......................... 72
RT/E/C/19259.......................... 72
RT/E/C/19262.......................... 73
RT/E/C/19265.......................... 73
RT/E/C/19269.......................... 73
RT/E/C/19272.......................... 73
RT/E/C/27003.......................... 37
RT/E/C/27004.......................... 37
RT/E/C/27006.......................... 37
RT/E/C/27009.......................... 37
RT/E/C/27010.......................... 37
RT/E/C/27017.......................... 37
RT/E/C/27018.......................... 38
RT/E/C/27019.......................... 38
RT/E/C/27020.......................... 38
RT/E/C/27021.......................... 38
RT/E/C/27022.......................... 38
RT/E/C/30037.......................... 94
RT/E/C/31100.......................... 94
RT/E/C/31101.......................... 95
RT/E/C/31200.......................... 95
RT/E/C/31201.......................... 95
RT/E/C/45002.......................... 50
RT/E/C/50001.......................... 73
RT/E/C/50002.......................... 73
RT/E/C/50004.......................... 74
RT/E/C/50005.......................... 74
RT/E/C/50007.......................... 74
RT/E/C/50008.......................... 74
RT/E/C/50009.......................... 74
RT/E/C/50012.......................... 74
RT/E/C/50013.......................... 75
RT/E/C/50015.......................... 75
RT/E/C/50018.......................... 75
RT/E/C/65000........................ 106
RT/E/G/00003 ......................... 39
RT/E/G/00004 ......................... 39
RT/E/G/00007 ....................... 117
RT/E/G/00011 ......................... 39
RT/E/G/00013 ......................... 76
RT/E/G/00015 ......................... 39
RT/E/G/00018 ....................... 128
RT/E/G/00027 ......................... 42
RT/E/G/00028 ......................... 76
RT/E/G/02025 ......................... 76
RT/E/G/11710 ......................... 76
RT/E/G/11720 ......................... 76
RT/E/G/11730 ......................... 77
RT/E/G/11740 ......................... 77
RT/E/G/14202 ......................... 77
RT/E/G/24015 ......................... 39
RT/E/G/30065 ......................... 95
RT/E/G/50003 ......................... 77
Catalogue of Company Standards
RT/E/G/50014.......................... 77
RT/E/G/50016.......................... 95
RT/E/P/02009........................... 41
RT/E/P/02015.........................107
RT/E/P/02017........................... 41
RT/E/P/02018.........................107
RT/E/P/02020.........................107
RT/E/P/02106........................... 41
RT/E/P/02200.........................111
RT/E/P/02201........................... 41
RT/E/P/10013........................... 59
RT/E/P/10016........................... 59
RT/E/P/10024........................... 60
RT/E/P/10025........................... 60
RT/E/P/10072........................... 60
RT/E/P/10160........................... 60
RT/E/P/11120........................... 60
RT/E/P/11305........................... 60
RT/E/P/11654........................... 60
RT/E/P/13251........................... 61
RT/E/P/14000........................... 61
RT/E/P/14001........................... 61
RT/E/P/14004........................... 61
RT/E/P/14201........................... 61
RT/E/P/19000........................... 61
RT/E/P/19251........................... 61
RT/E/P/19607........................... 62
RT/E/P/24000........................... 35
RT/E/P/24001........................... 36
RT/E/P/24003........................... 36
RT/E/P/24009........................... 36
RT/E/P/24010........................... 36
RT/E/P/24011........................... 36
RT/E/P/24013........................... 36
RT/E/P/24020........................... 42
RT/E/P/30022........................... 93
RT/E/P/30026........................... 93
RT/E/P/30027........................... 93
RT/E/P/30029........................... 94
RT/E/P/30030........................... 94
RT/E/P/30066........................... 94
RT/E/P/40042........................... 49
RT/E/P/40064........................... 49
RT/E/PS/00002.......................132
RT/E/PS/00003.......................129
RT/E/PS/00005.......................132
RT/E/PS/00006.......................129
RT/E/PS/00007.......................129
RT/E/PS/00008.......................129
RT/E/PS/00009.......................132
RT/E/PS/00011.......................132
RT/E/PS/00012.......................132
RT/E/PS/00013.......................137
RT/E/PS/00014.......................137
RT/E/PS/00015.......................137
RT/E/PS/00016.......................131
RT/E/PS/00018.......................129
RT/E/PS/00021.......................129
RT/E/PS/00022.......................130
Page 163
st
RT/E/S/11171........................... 56
RT/E/S/11189........................... 91
RT/E/S/11201........................... 56
RT/E/S/11221........................... 57
RT/E/S/11231........................... 57
RT/E/S/11303........................... 57
RT/E/S/11304........................... 57
RT/E/S/11630........................... 57
RT/E/S/11652........................... 57
RT/E/S/11655........................... 57
RT/E/S/11752........................... 58
RT/E/S/14002........................... 58
RT/E/S/14003........................... 58
RT/E/S/14200........................... 58
RT/E/S/17002........................... 58
RT/E/S/17004........................... 58
RT/E/S/17005........................... 58
RT/E/S/17503........................... 59
RT/E/S/17504........................... 59
RT/E/S/19551........................... 59
RT/E/S/19608........................... 59
RT/E/S/20000........................... 19
RT/E/S/21000........................... 25
RT/E/S/21001........................... 25
RT/E/S/21002........................... 25
RT/E/S/21003........................... 25
RT/E/S/21004........................... 25
RT/E/S/21005........................... 26
RT/E/S/21006........................... 26
RT/E/S/21007........................... 26
RT/E/S/21008........................... 26
RT/E/S/21009........................... 26
RT/E/S/21010........................... 27
RT/E/S/21011........................... 27
RT/E/S/21012........................... 27
RT/E/S/21014........................... 27
RT/E/S/21015........................... 27
RT/E/S/21016........................... 27
RT/E/S/21018........................... 28
RT/E/S/21019........................... 28
RT/E/S/21020........................... 28
RT/E/S/21021........................... 28
RT/E/S/21023........................... 28
RT/E/S/21024........................... 29
RT/E/S/21025........................... 29
RT/E/S/21026........................... 29
RT/E/S/21028........................... 29
RT/E/S/21030........................... 29
RT/E/S/21032........................... 30
RT/E/S/21033........................... 30
RT/E/S/21035........................... 30
RT/E/S/21036......................... 130
RT/E/S/21041......................... 130
RT/E/S/21046........................... 30
RT/E/S/21051........................... 30
RT/E/S/21053........................... 30
RT/E/S/21054........................... 31
RT/E/S/21055........................... 31
RT/E/S/21056........................... 31
Catalogue of Company Standards
RT/E/S/21057........................... 31
RT/E/S/21060........................... 31
RT/E/S/21063........................... 31
RT/E/S/21064........................... 31
RT/E/S/21066........................... 32
RT/E/S/21067........................... 32
RT/E/S/21068........................... 32
RT/E/S/21070........................... 32
RT/E/S/21071........................... 32
RT/E/S/21072........................... 43
RT/E/S/21073........................... 43
RT/E/S/21074........................... 32
RT/E/S/21075........................... 33
RT/E/S/21078........................... 33
RT/E/S/21081........................... 33
RT/E/S/21082.........................130
RT/E/S/21085........................... 33
RT/E/S/21087........................... 33
RT/E/S/21088........................... 33
RT/E/S/21094........................... 34
RT/E/S/21096........................... 34
RT/E/S/21101.........................130
RT/E/S/21104........................... 34
RT/E/S/21106........................... 34
RT/E/S/21107........................... 34
RT/E/S/21111........................... 34
RT/E/S/21112........................... 34
RT/E/S/21130........................... 35
RT/E/S/21131........................... 35
RT/E/S/21136.........................135
RT/E/S/21140........................... 35
RT/E/S/24017........................... 42
RT/E/S/29987........................... 35
RT/E/S/30002........................... 91
RT/E/S/30003........................... 91
RT/E/S/30023........................... 91
RT/E/S/30024........................... 91
RT/E/S/30025........................... 91
RT/E/S/30028........................... 92
RT/E/S/30031........................... 92
RT/E/S/30032........................... 92
RT/E/S/30033........................... 92
RT/E/S/30034........................... 92
RT/E/S/30035........................... 92
RT/E/S/30036........................... 93
RT/E/S/30047........................... 93
RT/E/S/31001........................... 93
RT/E/S/40001........................... 43
RT/E/S/40002.........................106
RT/E/S/40003........................... 43
RT/E/S/40004........................... 43
RT/E/S/40005........................... 43
RT/E/S/40006........................... 44
RT/E/S/40007........................... 44
RT/E/S/40008........................... 44
RT/E/S/40010........................... 44
RT/E/S/40011........................... 44
RT/E/S/40013........................... 44
RT/E/S/40015........................... 44
Page 164
th
st
RT/ETE/INDEX ....................... 16
RT/K/P/013 .............................. 17
RT/LS/C/004 .......................... 114
RT/LS/C/005 .......................... 122
RT/LS/C/101 .......................... 118
RT/LS/C/102 .......................... 118
RT/LS/C/103 .......................... 118
RT/LS/C/105 .......................... 118
RT/LS/CAT001........................ 15
RT/LS/CAT003........................ 15
RT/LS/CAT004........................ 15
RT/LS/CAT005........................ 15
RT/LS/CAT006........................ 16
RT/LS/CAT007........................ 16
RT/LS/G/00002 ..................... 112
RT/LS/G/00009 ..................... 108
RT/LS/G/00012 ..................... 128
RT/LS/G/00014 ....................... 18
RT/LS/G/00022 ..................... 117
RT/LS/G/00023 ..................... 117
RT/LS/G/00030 ..................... 122
RT/LS/G/00032 ..................... 124
RT/LS/P/001 ........................... 115
RT/LS/P/002 ........................... 124
RT/LS/P/003 ........................... 126
RT/LS/P/005 ........................... 126
RT/LS/P/006 ........................... 126
RT/LS/P/007 ........................... 116
RT/LS/P/009 ........................... 121
RT/LS/P/013 ........................... 113
RT/LS/P/015 ........................... 113
RT/LS/P/017 ........................... 127
RT/LS/P/020 ........................... 123
RT/LS/P/026 ........................... 121
RT/LS/P/028 ........................... 127
RT/LS/P/029 ........................... 113
RT/LS/P/030 ........................... 103
RT/LS/P/031 ........................... 121
RT/LS/P/032 ........................... 114
RT/LS/P/034 ........................... 123
RT/LS/P/035 ........................... 121
RT/LS/P/036 ........................... 114
RT/LS/P/037 ........................... 121
RT/LS/P/039 ........................... 121
RT/LS/P/040 ........................... 127
RT/LS/P/041 ........................... 122
RT/LS/P/043 ........................... 127
RT/LS/P/044 ...........................116
RT/LS/P/045 ...........................115
RT/LS/P/046 ...........................122
RT/LS/P/050 ...........................127
RT/LS/P/051 ...........................127
RT/LS/P/052 ............................. 18
RT/LS/P/100 ...........................118
RT/LS/S/004............................125
RT/LS/S/008............................125
RT/LS/S/011............................125
RT/LS/S/012............................119
RT/LS/S/013............................125
RT/LS/S/014............................126
RT/LS/S/015............................116
RT/LS/S/016............................114
RT/LS/S/018............................126
RT/LS/S/019............................126
RT/LS/S/020............................126
RT/LS/S/021............................119
RT/S/P/200..............................128
RT/S/P/250..............................128
RT/SEL/2004 ..........................130
RT/SIN/055 .............................. 78
RT/SIN/063 .............................. 78
RT/SIN/064 .............................. 78
RT/SIN/065 .............................. 79
RT/SIN/067 .............................. 79
RT/SIN/068 .............................. 79
RT/SIN/069 .............................. 79
RT/SIN/070 .............................. 79
RT/SIN/071 .............................. 79
RT/SIN/072 .............................. 80
RT/SIN/073 .............................. 80
RT/SIN/074 .............................. 80
RT/SIN/077 .............................. 80
RT/SIN/078 .............................. 80
RT/SIN/079 .............................. 80
RT/SIN/080 .............................. 81
RT/SIN/081 .............................. 81
RT/SIN/083 .............................. 81
RT/SIN/084 .............................. 81
RT/SIN/085 .............................. 81