0% found this document useful (1 vote)
1K views165 pages

001 Catalogue of Company Standards

001 Catalogue of Company Standards

Uploaded by

Michael Batley
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (1 vote)
1K views165 pages

001 Catalogue of Company Standards

001 Catalogue of Company Standards

Uploaded by

Michael Batley
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 165

Catalogue of

Company Standards
RT/LS/CAT001

ISSUE 46

7th August 1st October 2004

This document is the property of Network Rail Infrastructure Ltd. It shall not be reproduced in whole or in part, nor disclosed
to a third party, without the written permission of the standard owner.
Copyright 2004 Network Rail Infrastructure Ltd.

Network Rail Infrastructure Ltd. is part of the Network Rail Group of Companies.

th

st

Issue 46: 7 August 1 October 2004

Catalogue of Company Standards

Page 1

Whos Who & Support Contacts


Network Rail Standards Development Process
Team

Paul McAleer
Head of Standards Development
Process
Keith Hope
Standards Change Co-ordinator

020 7557 8691


(085 78691)

Steve Smith
Standards Change Co-ordinator

020 7557 8695


(085 78695)

John Winnifrith
Standards Change Co-ordinator

020 7557 8462


(085 78462)

Richard Geldart
Standards Change Co-ordinator
Caroline Peach
Standards Publication Co-ordinator

020 7557 8768


(085 78768)
020 7557 8679
(085 78679)

Sheriff Olujide
Standards Publication Assistant
Chris Folwell
Database Co-ordinator
Johanna Grant
Database Assistant
Kim Yarger
Team Secretary

020 7557 8715


(085 78715)

020 7557 8832


(085 78832)

Technical Problems and Search Support Contacts


(Please note it will help save time if you have available
your
System Number, Company Name and the Product Code.
For CD, the Product Code is written on the right hand side
of the disc eg RTL1, RTL5. For Online the code is RTI.
For Online Historic the code is RTIH)
Technical Support
Installation and technical matters
Phone: 01344 404428 or email [email protected]
Customer Support
For search queries and all other enquiries
Phone: 01344 404429 or email [email protected]

Other Information
Network Rail Company Standards Subscriptions
IHS Technical Indexes Ltd
Phone: 01344 404409

020 7557 8714


(085 78714)

Network Rail Company Standards


Hard Copy Document Centre

020 7557 8677


(085 78677)
020 7557 9635
(085 79635)

Rapidoc
Phone: 01344 861666 or email: [email protected]
Railway Group Standards
Rail Safety & Standards Board
Enquiry Desk
Phone: 020 7904 7518
(085 77518)
Network Rail Technical Drawings
National Records Group
Phone: 01904 524674
(03 74674)
Hard Copy Purchase of Rule Books; Handbooks & Forms
Willsons Printers Limited
Phone: 01636 702334
(03 79510)

Email: [email protected]
For all queries about the content of the Company
Standards please, in the first instance, contact the
Publication Team

Updated 2nd July 2004

On 3rd February 2003 Railtrack officially changed its name to Network Rail. Railtrack Company Standards will now be
officially known as Network Rail Company Standards. Newly published standards from April 2003 will reflect this name change.
All existing standards are still valid and will be changed as and when the standards are reviewed

th

st

Issue 46: 7 August 1 October 2004

Catalogue of Company Standards

Page 2

Contents

Contents
1. About this catalogue ....................................................................................................................6
1.1. How to use this catalogue .................................................................................................................................... 7
1.1.1. Example of Typical Entry ............................................................................................................................................................. 7
1.1.2. The Numbering System................................................................................................................................................................ 7
1.1.3. Quick Find Using the Index..................................................................................................................................................... 8
1.1.4. Referenced Documents................................................................................................................................................................ 8
1.1.5. Coloured Pages.............................................................................................................................................................................. 8
1.1.6. Compliance and Implementation ............................................................................................................................................... 9
1.1.7. Technical Standards for Inter-operability. ................................................................................................................................ 9
1.1.8. Notified National Standards........................................................................................................................................................ 9
1.1.9. Direct Maintenance Supplementary Instructions.................................................................................................................... 9
1.1.10. Ordering and Price List............................................................................................................................................................10

2. Category Index of Network Rail Company Standards............................................................11


2A. General Information............................................................................................................................................. 11
2A1. Changes from previous issue......................................................................................................................................................11
2A1.1. New or Re-issued Standards ................................................................................................................................................................. 11
2A1.2. Deleted or Withdrawn Standards ........................................................................................................................................................ 13
2A1.3. Restricted Documents ............................................................................................................................................................................ 15
2A1.4. Network Rail Catalogues........................................................................................................................................................................ 15

2B. Contracts & Procurement Directorate............................................................................................................ 17


2B1. Contracts & Procurement...........................................................................................................................................................17
2B1.1. Procedures.................................................................................................................................................................................................. 17

2B2. Supplier Accreditation..................................................................................................................................................................18


2B2.1. Procedures.................................................................................................................................................................................................. 18
2B2.2. Guidance Notes......................................................................................................................................................................................... 18

2C. Engineering Directorate ...................................................................................................................................... 19


2C1. Electrification .................................................................................................................................................................................19
2C1.1. Specifications ............................................................................................................................................................................................. 19
2C1.2. Procedures................................................................................................................................................................................................. 35
2C1.3. Codes of Practice ..................................................................................................................................................................................... 37
2C1.4. Guidance Notes........................................................................................................................................................................................ 39
2C1.5. Work Instructions.................................................................................................................................................................................... 40

2C2. Business Engineering ....................................................................................................................................................................41


2C2.1. Specifications ............................................................................................................................................................................................. 41
2C2.2. Procedures................................................................................................................................................................................................. 41

2C3. Ergonomics.....................................................................................................................................................................................42
2C3.1. Specifications ............................................................................................................................................................................................. 42
2C3.2. Procedures................................................................................................................................................................................................. 42
2C3.3. Guidance Notes........................................................................................................................................................................................ 42

2C4. Plant .................................................................................................................................................................................................43


2C4.1. Specifications ............................................................................................................................................................................................. 43
2C4.2. Procedures................................................................................................................................................................................................. 49
2C4.3. Codes of Practice ..................................................................................................................................................................................... 50

2C5. Signal Engineering..........................................................................................................................................................................51


2C5.1. Specifications ............................................................................................................................................................................................. 51
2C5.2. Procedures................................................................................................................................................................................................. 59
2C5.3. Codes of Practice ..................................................................................................................................................................................... 62
2C5.4. Guidance Notes........................................................................................................................................................................................ 76
2C5.5. Special Inspection Notices...................................................................................................................................................................... 78
2C5.6. Work Instructions.................................................................................................................................................................................... 82

2C6. Civil Engineering............................................................................................................................................................................83


2C6.1. Specifications ............................................................................................................................................................................................. 83
2C6.2. Procedures................................................................................................................................................................................................. 87
2C6.3. Codes of Practice ..................................................................................................................................................................................... 88

th

st

Issue 46: 7 August 1 October 2004

Catalogue of Company Standards

Page 3

Contents

2C7. Telecommunications.................................................................................................................................................................... 91
2C7.1. Specifications ............................................................................................................................................................................................. 91
2C7.2. Procedures................................................................................................................................................................................................. 93
2C7.3. Codes of Practice..................................................................................................................................................................................... 94
2C7.4. Guidance Notes........................................................................................................................................................................................ 95
2C7.5. Special Inspection Notices ..................................................................................................................................................................... 95

2C8. Track Engineering......................................................................................................................................................................... 96


2C8.1. Specifications ............................................................................................................................................................................................. 96
2C8.2. Procedures............................................................................................................................................................................................... 102
2C8.3. Codes of Practice................................................................................................................................................................................... 103
2C8.4. Permanent Way Special Instructions................................................................................................................................................. 105

2C9. Rail Vehicle Engineering ............................................................................................................................................................106


2C9.1. Specifications ........................................................................................................................................................................................... 106
2C9.2. Codes of Practice................................................................................................................................................................................... 106

2D. Information Management Directorate .......................................................................................................... 107


2D1. Information Management..........................................................................................................................................................107
2D1.1. Procedures .............................................................................................................................................................................................. 107
2D1.2. Specifications........................................................................................................................................................................................... 107

2E. Major Projects and Investments ...................................................................................................................... 108


2E1. Major Projects and Investments...............................................................................................................................................108
2E1.1. Procedures................................................................................................................................................................................................ 108
2E1.2. Guidance Notes ...................................................................................................................................................................................... 108

2F. Maintenance Directorate................................................................................................................................... 109


2F1. Maintenance..................................................................................................................................................................................109
2F1.1. Specifications ............................................................................................................................................................................................ 109
2F1.2. Procedures................................................................................................................................................................................................ 109
2F1.3. Codes of Practice.................................................................................................................................................................................... 111
2F1.4. Guidance Notes....................................................................................................................................................................................... 111

2G. Railway Estates Directorate ............................................................................................................................ 112


2G1. Railway Estates Policy and Planning........................................................................................................................................112
2G1.1. Guidance Notes ..................................................................................................................................................................................... 112

2H. Safety & Compliance Directorates ............................................................................................................... 113


2H1. Interoperability & Acceptance.................................................................................................................................................113
2H1.1. Procedures .............................................................................................................................................................................................. 113

2H2. Assurance.....................................................................................................................................................................................114
2H2.1. Specifications........................................................................................................................................................................................... 114
2H2.2. Procedures .............................................................................................................................................................................................. 114
2H2.3. Codes of Practice................................................................................................................................................................................... 114

2H3. Standards Development Process ............................................................................................................................................115


2H3.1. Procedures .............................................................................................................................................................................................. 115

2H4. Environment Policy ....................................................................................................................................................................116


2H4.1. Specifications........................................................................................................................................................................................... 116
2H4.2. Procedures .............................................................................................................................................................................................. 116
2H4.3. Guidance Notes ..................................................................................................................................................................................... 117

2H5. Fire Safety Policy ........................................................................................................................................................................118


2H5.1. Procedures .............................................................................................................................................................................................. 118
2H5.2. Codes of Practice................................................................................................................................................................................... 118

2H6. Operational Safety Policy .........................................................................................................................................................119


2H6.1. Specifications........................................................................................................................................................................................... 119
2H6.2. Procedures .............................................................................................................................................................................................. 120
2H6.3. Codes of Practice................................................................................................................................................................................... 122
2H6.4. Guidance Notes ..................................................................................................................................................................................... 122

2H7. Safety Case Management ..........................................................................................................................................................123


2H7.1. Procedures .............................................................................................................................................................................................. 123

2H8. Accident Investigation ...............................................................................................................................................................124


2H8.1. Procedures .............................................................................................................................................................................................. 124
2H8.2. Guidance Notes ..................................................................................................................................................................................... 124

2H9. Occupational Health & Safety Policy......................................................................................................................................125


2H9.1. Specifications........................................................................................................................................................................................... 125
2H9.2. Procedures .............................................................................................................................................................................................. 126
th

st

Issue 46: 7 August 1 October 2004

Catalogue of Company Standards

Page 4

Contents
2H10. Security Specialist .................................................................................................................................................................... 128
2H10.1. Procedures.............................................................................................................................................................................................128
2H10.2. Codes of Practice.................................................................................................................................................................................128
2H10.3. Guidance Notes ...................................................................................................................................................................................128

2H11. Risk ............................................................................................................................................................................................. 128


2H11.1. Guidance Notes ...................................................................................................................................................................................128

2J. Product Specifications..........................................................................................................................................129


2J1. Electrification & Plant.................................................................................................................................................................. 129
2J2. Railway Systems ........................................................................................................................................................................... 131
2J3. Signal Engineering......................................................................................................................................................................... 132
2J4. Civil Engineering........................................................................................................................................................................... 136
2J5. Railway Estates Policy and Planning ......................................................................................................................................... 136
2J6. Telecommunications ................................................................................................................................................................... 137
2J7. Track .............................................................................................................................................................................................. 138

2L. Documents Archived in the Last 14 Months.................................................................................................142


2L1. Historic 06/03.............................................................................................................................................................................. 142
2L2. Historic 08/03.............................................................................................................................................................................. 142
2L3. Historic 10/03.............................................................................................................................................................................. 142
2L4. Historic 12/03.............................................................................................................................................................................. 143
2L5. Historic 02/04.............................................................................................................................................................................. 143
2L6. Historic 04/04.............................................................................................................................................................................. 144
2L7. Historic 06/04.............................................................................................................................................................................. 148
2L8. Historic 08/04.............................................................................................................................................................................. 148

3. Reference Guide to Group Standards.....................................................................................150


4. Railway Group Standards and Catalogue Index ....................................................................161
4.1. Railway Group Standards retained by Network Rail .................................................................................161
4.2. Catalogue Index ..................................................................................................................................................162

th

st

Issue 46: 7 August 1 October 2004

Catalogue of Company Standards

Page 5

1. About this Catalogue

1. About this catalogue


Welcome to the Network Rail Catalogue of Company Standards, it is divided into 4 sections:
Section 1: This introduction, including a How to use this catalogue gives the user information on the Company
Standards numbering system and the process for ordering documents.
As a result of customer concerns over numbering change, and the suspension of the Project Release project, we will
revert to the numbering system as at June 2000. Standards given the new numbers from June to October 2000 will not be
renumbered. If you have any queries please contact the Business Standards Team on 020 7830 5687 (085 75687).

Section 2 is the Category Index of Network Rail Company Standards which lists all the
o
o
o
o
o
o
o

Specifications,
Product Specifications,
Procedures,
Codes of Practice,
Work Instructions,
Guidance Notes,
Special Inspection Notices

by Directorate, Discipline and then by number, title, issue and authorisation.


There is also a list of changes from the previous issue, and all standards that have been deleted in the last 14 months.
The Category Index of Network Rail Company Standards is divided into the following Directorates:
o
o
o
o
o
o
o

Contracts & Procurement


Engineering
Information Management
Maintenance
Major Projects and Investments
Railway Estates
Safety & Compliance

Product Specifications are grouped separately, in numeric order, for ease of reference. Each Directorate is divided into
recognisable sections (e.g. Civil Engineering; Operational Safety Policy, etc.) with a summary of each document to assist
the user in identifying standards applicable to their business. In addition, you will find information on the mandatory
requirements for each Company Standard as well as information relating to compliance, where applicable.
Section 3: A Reference Guide to Group Standards is a quick reference for users, which shows an up-to-date
listing of Railway Group Standards at present in force. For further information contact the Rail Safety & Standards
Board Enquiry Desk on 020 7557 8774 (internal 085 78774).
Section 4: Railway Group Standards and Catalogue Index. This section contains a listing of the Railway Group
Standards retained by Network Rail, and finally an Index to this catalogue.

th

st

Issue 46: 7 August 1 October 2004

Catalogue of Company Standards

Page 6

1. About this Catalogue

1.1. How to use this catalogue


1.1.1. Example of Typical Entry
RT/CE/S/054

Inspection of Cast Crossings and Cast Vees in the Track

*EXAMPLE

Issue

Date

Status

Price

2 (1)

Aug 03 (Aug 96)

Up-Issued

Issue Number and Issue Date


See note.

New or Up-issued.
Blank = no change

* Indicates a new or up-issued document


(For the current catalogue issue only)

Price band
See 1.1.9.

Colour

Yes = colour pages


available separately

Compliance

Implementation

02/08/03

02/08/03

Compliance & Implementation


dates, used for new and
up-issued standards. See note.

Note: See section 1.1.6 for more details on Compliance &


Implementation, including Issue Number and Issue Date

1.1.2. The Numbering System


RT / x / y / z

The general format of a typical Standard Reference Number is as follows:

3 to 5 digit identifying number


1 or 2 character reference for the six types of Standard
C Code of Practice,
G Guidance
P Procedure
PS Product Specification S Specification WI Work Instruction
1 or 2 character reference for the Standard Ownership:
CE Track/Structures, Operations/Control Management
E Electrification & Plant, Railfleet, Telecommunications, Signalling
K Procurement
LS Line Safety
RT Denotes a Network Rail Standard.
This is the general format used for the majority of entries in the catalogue.
Please note however, that there are a few exceptions, not shown here.

Six types of document are published as Network Rail Company Standards. The purpose of each is as follows:
TERM

DEFINITION

Network Rail Company Specifications

These set mandatory requirements upon Network Rail s employees, and also, when
designated in an agreed contract or lease, upon contractors or tenants. They may
contain procedural requirements. They require a formal remit, a Business case and
Stakeholder Review.

Network Rail Company Product Specifications

These have a special status in that applicants for product acceptance shall:

demonstrate compliance with the Product Specification; or

demonstrate that their product has equivalent performance to that


required by the Product Specification and is thus acceptable.

They do not require a Business Case, but require a formal remit & Stakeholder
Review.
Network Rail Company Procedures

th

st

Issue 46: 7 August 1 October 2004

These set mandatory requirements upon Network Rail employees only. They are
not always procedural in nature. These procedures may be incorporated in
contracts under the authority of a Network Rail Designated Employer s
Representative. They require a Formal Remit, a Business Case and Stakeholder
Review.

Catalogue of Company Standards

Page 7

1. About this Catalogue


Network Rail Company Codes of Practice

These Non-Mandatory Documents communicate good practice for use by Network


Rail s employees and contractors. An alternative practice that achieves the same
goals may be adopted provided that adequate records are kept, although prior
acceptance by Network Rail may be required. Further advice is available from the
Standard Owner. They require a formal remit & Stakeholder Reviewed only.

Network Rail Company Work Instructions

These are Network Rail s equivalent of Specified Operations Publications. They are
mandatory and specify actions to be undertaken by employees of Network Rail and
others to ensure safety while working on Network Rail Controlled Infrastructure.
They differ from Company Specifications in that they are task-based. These require
a formal remit, stakeholder review and a business case.

Network Rail Company Guidance Notes

These are intended to provide information for Network Rail and others on the
basis of past experience and knowledge. They are advisory documents and do not
necessarily represent best practice. They do not require a Business Case or
Stakeholder Review.

Rapid Response

The Rapid Response Procedure shall enable Network Rail to authorise Standards
Change which are required more urgently than the usual procedures would permit.
The Rapid Response Procedure may only be used where both the following criteria
are met:

either there is:


o

an immediate threat to safety, where safety would be prejudiced


through delay arising from the usual procedures; or

a time critical non-safety issue which cannot readily be dealt


with via the usual procedures or a non-compliance; and

the solution which constitutes the Standards Change is readily apparent.

Standards Change issued under the Rapid Response Procedure shall have an
applicability of one calendar year from Implementation Date.
Within 2 months of the Implementation Date, the Sponsor shall regularise the
Standards Change issued under the Rapid Response Procedure through the usual
procedures.

1.1.3. Quick Find Using the Index


If you have a document you want to find the status of, the quickest way to find your document is to look in the Index at the
end of the catalogue. All current standards are listed, along with the page number where you will find more information on that
document.

1.1.4. Referenced Documents


Some Network Rail Company Standards grant mandatory or advisory status to other documents produced by Network Rail or
other organisations.
Referenced Documents include a wide range of documents inherited from the former British Rail Board (BRB) or developed by
Network Rail, e.g. Signalling Special Inspection Notices (SINs), Railway Executive Permanent Way (REPW) drawings, and the
Overhead Line Equipment Master Index (OLEMI).
Referenced Documents derive their authority from Network Rail Company Standards and therefore shall only be applied in the
circumstances and to the extent shown in any relevant Network Rail Company Standard.

1.1.5. Coloured Pages


Some documents contain coloured pages, and these are marked where relevant. These colour pages may be purchased
separately from the Rapidoc Document Centre. Please see the section on ordering documents for contact details.

th

st

Issue 46: 7 August 1 October 2004

Catalogue of Company Standards

Page 8

1. About this Catalogue


1.1.6. Compliance and Implementation
Each Mandatory Network Rail Company Standard remains in force and has to be complied with until replaced or withdrawn.
The issue of a replacement standard does not necessarily cancel a previous issue until the Implementation period has been
completed and the Compliance date reached. This is normally at least two months from the issue date of a Network Rail
Company Standard. This applies to re-issues of existing standards as well as replacements and deletions.
To assist users, the catalogue entry for a superseded standard will henceforth show the standard that replaces it, and vice versa.
Users will thus be able to see not only the standard to which they presently work, but also which standard they will need to
follow in future. An example is shown below:
RT/E/S/10661

Signalling Maintenance Task Intervals

* EXAMPLE

Issue

Date

Status

Price

4 (3)

Feb 04 (Apr 03)

Up-issued

Colour

Compliance

Implementation

01/04/04

01/04/04

The current standard is shown in (grey), indicating that the new edition, shown in black, will supersede it.
For reasons of clarity, this approach has been confined to the catalogue (paper and electronic versions), and does not appear in
the menu pages of the CD-ROM.

1.1.7. Technical Standards for Inter-operability.


Technical Standards for Inter-operability (TSIs) are derived from the following two pieces of European Union legislation:
Directive 2001/16/EC on the Interoperability of the Trans-European Conventional Rail System; and
Directive 96/48/EC on the Interoperability of the Trans-European High Speed Rail System.
There is currently a major piece of work in hand by Rail Safety and Standards Board to identify any issues or conflicts between
TSIs for High speed and RGSs (Railway Group Standards). The objective is to resolve or remove any conflicts where possible by
amending the RGS. It is anticipated that this work will generate a significant amount of work on RGSs.
Where this work identifies such issues, it is the Rail Safety and Standards Board intention to publish the identified conflicts in a
Railway Group Guidance Note (GN/GE8550) in order to provide guidance to the industry pending the resolution of the
conflict and amendment of the RGSs.
RGSs are classified as being subordinate.

1.1.8. Notified National Standards


All notified standards in this catalogue are marked as

in the left hand column.

1.1.9. Direct Maintenance Supplementary Instructions


Following Network Rail s decision to bring certain track maintenance jobs in-house a number of standards are being
incorporated into a new catalogue (RT/LS/CAT007), marked thus: , containing supplementary information. It is essential
that you first read and understand the supplement pertaining to the standard before proceeding to the standard. You must then
apply the requirements of the supplement to the standard.
With regard to Direct Maintenance Transition, a new catalogue, RT/LS/CAT007 'Direct Maintenance Supplementary Instruction
Catalogue' has been introduced. This catalogue contains a suite of Direct Maintenance Instructions, which necessarily modify
existing Company Standards where they do not currently cover maintenance undertaken directly by Network Rail employees.
The changes required are minor and there is no material change to the technical requirements of the Company Standard. A
Direct Maintenance Supplementary Instruction holds the same status as the Company Standard it modifies.
The Supplementary Instructions will be superseded after the modifications have been made to the relevant standards.

th

st

Issue 46: 7 August 1 October 2004

Catalogue of Company Standards

Page 9

1. About this Catalogue


1.1.10. Ordering and Price List
Complete suite of Standards in electronic format.
Subscription only, from:

Paper copies available individually or on subscription


from:

Network Rail Document Centre


IHS Rapidoc
IHS Technical Indexes
Willoughby Road
Bracknell RG12 8DW
Tel: 01344 861666
Fax: 01344 714440
Email: mailto:[email protected]

IHS Technical Indexes


Willoughby Road
Bracknell RG12 8DW
Tel: 01344 404409
Fax: 01344 404421

Most Network Rail Company Standards are priced according to the number of pages in them and are divided into 6 main price
bands; these price bands are:

Price Band
Price

A
8

B
11

C
21

D
32

E
42

F
63

Price list correct at date of publishing.


Please note that certain publications are not within the above price bands, please contact Rapidoc (details above) for the prices
of these documents.
Orders received will be dispatched within five working days.
When placing an order for Standards, please have the following details to hand:
Contact and delivery details, Standard No., Title, Price, Quantity.
Please also have your credit card/payment details to hand
Please note: Company Standards for Network Rail Employees only are available from Connect under Business Standards.

th

st

Issue 46: 7 August 1 October 2004

Catalogue of Company Standards

Page 10

2. Company Standards

A. General Information

Changes from previous Issue

2. Category Index of Network Rail Company Standards


2A. General Information
2A1. Changes from previous issue
2A1.1. New or Re-issued Standards
The following standards are New or Re-issued.
Standard No

Title

Issue

Issue Date

RT/CE/C/041

Structures Condition Marking Index Handbook for


Bridges

Issue 3

7-Aug-04

07-Aug-04

07-Aug-04

RT/CE/C/045

Code of Practice for Terms and Definitions for Use


in Civil Engineering Standards

Issue 1

7-Aug-04

01-Sep-04

01-Sep-04

RT/CE/S/044

Design & Construction of Undertrack Crossings

Issue 2

7-Aug-04

01-Nov-04

07-Aug-04

RT/CE/S/048

Standards of Competence for Examination of a


Bridge Following a Bridge Strike

Issue 4

7-Aug-04

02-Oct-04

02-Oct-04

RT/CE/S/049

Track Design Handbook

Issue 8

7-Aug-04

07-Aug-04

07-Aug-04

RT/CE/S/071

Design of Earthworks, Earthwork Remediations and


Geotechnical aspects of Foundations for Structures

Issue 2

7-Aug-04

01-Nov-04

01-Nov-04

RT/CE/S/142

Management of Abnormal Road Loads

Issue 1

7-Aug-04

07-Feb-05

07-Feb-05

RT/D/P/095

Determining High Risk Sites for Wrong Side Track


Circuit Failures in Leaf Fall Areas

Issue 1

7-Aug-04

07-Aug-04

07-Aug-04

RT/D/P/096

Determining High Risk Sites for Low Rail Adhesion

Issue 1

7-Aug-04

07-Aug-04

07-Aug-04

RT/D/S/002

Driving Cab Passes

Issue 3

7-Aug-04

07-Aug-04

07-Aug-04

RT/E/C/11115

Correlation of Signalling Records

Issue 3

7-Aug-04

07-Aug-04

07-Aug-04

RT/E/C/17904

Risk Analysis of Signalling Relays

Issue 1

7-Aug-04

07-Aug-04

07-Aug-04

RT/E/C/19020

Signalling Equipment Technical Advice Notice


(SIGTAN020) Signalling Relays

Issue 3

7-Aug-04

07-Aug-04

07-Aug-04

RT/E/C/19272

Signalling Equipment Workshop Engineering Notice


(SIGWEN021) Signalling Relays

Issue 1

7-Aug-04

07-Aug-04

07-Aug-04

RT/E/P/10024

Signaller's Operating Guide for the Use of the IECC


Signalling Workstation

Issue 4

7-Aug-04

01-Oct-04

01-Oct-04

RT/E/P/11120

Process for Management of Signal Engineering


Technical Instructions and Notice Boards

Issue 6

7-Aug-04

07-Aug-04

07-Aug-04

RT/E/P/19607

Management of Overlapping and Parallel Signalling


Design

Issue 1

7-Aug-04

02-Oct-04

02-Oct-04

RT/E/S/10040

IECC Applications Manual Contents

Issue 6

7-Aug-04

07-Aug-04

07-Aug-04

RT/E/S/10662

Process for Introduction of New or Revised


Maintenance Regimes for Signalling Assets

Issue 2

7-Aug-04

07-Aug-04

07-Aug-04

RT/E/S/11129

Life Management of Signalling Relays, Searchlight and


Banner Signals

Issue 3

7-Aug-04

07-Aug-04

07-Aug-04

RT/E/S/11630

BR930 Series Pin Code Allocations and Contact


Arrangements

Issue 7

7-Aug-04

07-Aug-04

07-Aug-04

RT/E/S/17002

SSI Applications Manual Contents

Issue 13

7-Aug-04

07-Aug-04

07-Aug-04

RT/E/WI/00102

TI21 Track Circuit Risk Based Maintenance

Issue 3

7-Aug-04

07-Aug-04

07-Aug-04

RT/E/WI/00103

HW Risk Based Maintenance

Issue 1

7-Aug-04

07-Aug-04

07-Aug-04

th

st

Issue 46: 7 August 1 October 2004

Catalogue of Company Standards

Compliance Implementation

Page 11

2. Company Standards

A. General Information

Changes from previous Issue

Standard No

Title

Issue

Issue Date

RT/E/WI/00104

TPWS Track Subsystem Risk Based Maintenance

Issue 2

7-Aug-04

Compliance Implementation
07-Aug-04

07-Aug-04

RT/E/WI/00105

AzLM Axle Counter System Risk-Based Maintenance

Issue 2

7-Aug-04

07-Aug-04

07-Aug-04

RT/E/WI/00110

Maintenance of Electrification, Plant, Signalling and


Telecommunications Equipment, Incorporating
Asbestos Materials or Components

Issue 1

1-May-04

21-May-04

21-May-04

RT/LS/C/101

Managed Stations Fire Safety

Issue 4

7-Aug-04

07-Aug-04

RT/LS/C/102

Operational Estate Fire Safety

Issue 4

7-Aug-04

07-Aug-04

RT/LS/CAT001

Catalogue of Company Standards

46

07-Aug-04

RT/LS/CAT005

Index of Network Rail Documents Relating to


Signalling & communications Equipment - Part 3
Typical Circuits

22

7-Aug-04

07-Aug-04

RT/LS/CAT006

Index of Network Rail Documents Relating to


Signalling & Communications Equipment - Part 4
Equipment and Systems Specifications

10

7-Aug-04

07-Aug-04

RT/LS/CAT007

Direct Maintenance Supplementary Instruction


Catalogue

7-Aug-04

07-Aug-04

RT/LS/G/00014

Contractor Assurance System

Issue 2

7-Aug-04

07-Aug-04

07-Aug-04

RT/LS/P/200

Network Rail Security Manual

Issue E1

7-Aug-04

07-Aug-04

07-Aug-04

RT/LS/P/250

Incident Response - Planning & Management Manual

Issue E1

7-Aug-04

07-Aug-04

07-Aug-04

ff

th

st

Issue 46: 7 August 1 October 2004

Catalogue of Company Standards

Page 12

2. Company Standards

A. General Information

Changes from previous Issue

2A1.2. Deleted or Withdrawn Standards


Issue
Deleted

Date
Deleted

Standard No

Title

RT/CE/C/041

Structures Condition Marking Index Handbook

Issue 2

Aug 04

Superseded by Issue 3

RT/CE/S/044

Undertrack Crossings

Issue 1

Aug 04

Superseded by Issue 2

RT/CE/S/048

Standards of Competence for Examination of a Bridge


following a Bridge Strike

Issue 3

Aug 04

Superseded by Issue 4

RT/CE/S/049

Track Design Handbook

Issue 7

Aug 04

Superseded by Issue 8

RT/CE/S/071

Design of Earthworks and Earthworks Remediations

Issue 1

Aug 04

Superseded by Issue 2

RT/D/P/021

Acceptance- Audit & Review of the Contractor's Safety


Case

Issue 2

Aug 04

Superseded by RT/LS/P/052

RT/D/P/022

Management of the Monitoring of Contracts and


Corrective Actions

Issue 7

Aug 04

Withdrawn

RT/D/S/002

Driving Cab Passes

Issue 2

Aug 04

Superseded by Issue 3

RT/D/S/004

Railtrack Specification for Determining High Risk Sites


for Wrong Side Track Circuit Failures in Leaf Fall Areas

Issue 2

Aug 04

Superseded by RT/D/P/095

RT/D/S/005

Railtrack Specification for Determining High Risk Sites


for Low Rail Adhesion as Defined in Group Standard
GO/RT3356

Issue 2

Aug 04

Superseded by RT/D/P/096

RT/E/C/10048

Signalling Relay and Searchlight Mechanism Servicing

Issue 1

Aug 04

Superseded by RT/E/S/11129 Issue 3

RT/E/C/10094

Signal Light Beam Alignment (SG21)

Issue 2

Aug 04

Superseded by RT/E/S/10660

RT/E/C/10095

Signal Lamp Maintenance Addendum to Signal


Maintenance Specification (SMS) SG31

Issue 2

Aug 04

Superseded by RT/E/S/10660

RT/E/C/11115

Correlation of Signalling Records

Issue 2

Aug 04

Superseded by Issue 3

RT/E/C/19004

SIGTAN 004 Replacing relays - type sj 8211 relay units


gec geographical units

Issue 1

Aug 04

Superseded by RT/E/C/19020 Issue 3

RT/E/C/19011

SIGTAN 001 Silver to Silver Contacts - DC Polarised


Moving Iron Relays

Issue 1

Aug 04

Superseded by RT/E/C/19020 Issue 3

RT/E/C/19020

Signalling Equipment Technical Advice Notice


(SIGTAN020) AEI - GRS Type M

Issue 2

Aug 04

Superseded by Issue 3

RT/E/C/19031

Signalling Equipment Technical Advice Notice


(SIGTAN031) Full-Size Plug-In Relays

Issue 1

Aug 04

Superseded by RT/E/C/19020 Issue 3

RT/E/C/19034

(SIGTAN034) Thermal Timer Relays

Issue 1

Aug 04

Superseded by RT/E/C/19020 Issue 3

RT/E/C/19255

Signalling Equipment Workshop Engineering Notice


(SIGWEN004) GEC - GS Geographical Units

Issue 1

Aug 04

Superseded by RT/E/C/19272

RT/E/C/19256

SIGWEN 005 - Westinghouse Signals style 'P' relays

Issue 2

Aug 04

Superseded by RT/E/C/19272

RT/E/C/19260

SIGWEN 009 - Westinghouse Signals style 'B' relays

Issue 2

Aug 04

Superseded by RT/E/C/19272

RT/E/C/19261

SIGWEN 009 - Westinghouse Signals style 'B' relays

Issue 1

Aug 04

Superseded by RT/E/C/19272

RT/E/C/19264

Signalling Equipment Workshop Engineering Notice


(SIGWEN013) GEC-GS Style Z Relays

Issue 1

Aug 04

Superseded by RT/E/C/19272

RT/E/C/19267

Signalling Equipment Workshop Engineering Notice


(SIGWEN016) Setting Thermal Timer Relays

Issue 1

Aug 04

Superseded by RT/E/C/19272

RT/E/P/10024

Signallers Operating Guide for the use of IECC


Signalling Workstation

Issue 3

Aug 04

Superseded by Issue 4

RT/E/P/11120

Process for Management of Signal Engineering Technical


Instructions and Notice Boards

Issue 5

Aug 04

Superseded by Issue 6

RT/E/S/10040

IECC Applications Manual Contents

Issue 5

Aug 04

Superseded by Issue 6

RT/E/S/10662

Process for the Introduction of New or Revised


Maintenance Regimes for Signalling Assets

Issue 1

Aug 04

Superseded by Issue 2

RT/E/S/11129

Life Management of Signalling Relays

Issue 2

Aug 04

Superseded by Issue 3

RT/E/S/11630

BR930 Series Pin Code Allocations December 2003


and Contact Arrangements

Issue 6

Aug 04

Superseded by Issue 7

RT/E/S/17002

SSI Applications Manual Contents

Issue 12

Aug 04

Superseded by Issue 13

th

st

Issue 46: 7 August 1 October 2004

Catalogue of Company Standards

Change Made

Page 13

2. Company Standards

A. General Information

Changes from previous Issue


Issue
Deleted

Date
Deleted

TI21 Track Circuit Risk Based Maintenance

Issue 2

Aug 04

Superseded by Issue 3

Network Rail Company Work Instruction TPWS Risk


Based Maintenance

Issue 1

Aug 04

Superseded by Issue 2

RT/E/WI/00105

AzLM Axle Counter System Risk Based Maintenance

Issue 1

Aug 04

Superseded by Issue 2

RT/LS/C/101

Managed Stations Fire Safety

Issue 3

Aug 04

Superseded by Issue 4

RT/LS/C/102

Operational Estate Fire Safety

Issue 3

Aug 04

Superseded by Issue 4

RT/LS/CAT005

Index of Network Rail Documents Relating to Signalling


& communications Equipment - Part 3 Typical Circuits

Issue 21

Aug 04

Superseded by Issue 22

RT/LS/CAT006

Index of Railtrack Documents Relating to Signalling and


Communications Equipment: Part 1 - Equipments and
Systems Specifications

Issue 9

Aug 04

Superseded by Issue 10

RT/LS/CAT007

Direct Maintenance Supplementary Instruction


Catalogue

Issue 1

Aug 04

Superseded by Issue 2

RT/LS/G/00014

Contractor Assurance System

Issue 1

Aug 04

Superseded by Issue 2

Standard No

Title

RT/E/WI/00102
RT/E/WI/00104

Change Made

Note regarding Standards superseded or deleted in April 2004


In the last 2 issues of the catalogue (44 and 45), it has been noted that the listing for Standards superseded or replaced in April 2004 was
incomplete. A full listing may now be found on page 151

th

st

Issue 46: 7 August 1 October 2004

Catalogue of Company Standards

Page 14

2. Company Standards

A. General Information

2A1.3. Restricted Documents


The following Standards are for Network Rail Use Only and are not Available outside the Company.
There are currently 8 procedures listed in the Catalogue but unavailable on the CD-ROM or on the Company Standards Website.
Reference

Title

RT/D/P/020

Management of RT1A Asset Change Proposals

Issue
6

Aug-00

Issue Date HQ Owner


Business Engineering

RT/D/P/027

Infrastructure Maintenance Contracts Changes to Contract Lump


Sums, Prices, Targets and Fees

Apr-00

Supply Chain

RT/D/P/030

RTIA; IMC2 & IMC2000 Payment Cost Control and Reporting

Dec-02

Supply Chain

RT/D/P/034

Delegation and Use of Contractual Powers RT1A and IMC2

Apr-00

Supply Chain

RT/D/P/036

Monitoring of Contractor s Stewardship, Progress and Financial


Reports

Apr-00

Supply Chain

RT/D/P/047

Management of Infrastructure Maintenance Contract Regimes

Apr-00

Supply Chain

RT/E/P/02009

Engineering Management Projects

Oct-01

Business Engineering

RT/LS/P/052

Accreditation and Development of Suppliers

Apr-04

Supplier Accreditation

2A1.4. Network Rail Catalogues


RT/LS/CAT001

Catalogue of Company Standards


Issue

Date

Status

Price

Colour

Compliance

Implementation

46
Aug 04
Up-Issued
The Company Standards Catalogue, formerly known as The Line Standards Catalogue, lists Standards issued by
Engineering, Safety & Environment, and Contract & Supply.

Index of Network Rail Documents Relating to Signalling and Communications Equipment:


RT/LS/CAT003
Part 1: Mechanical & Electrical Drawings
Issue

Date

Status

Price

Colour

Compliance

Implementation

4
Oct 00
This catalogue lists documents (drawings) relating to signalling equipment Mechanical and Electrical Drawings.

RT/LS/CAT004

Part 2: Signalling Structure Drawings


Issue

Date

Status

Price

Colour

Compliance

Implementation

4
Feb 00
This catalogue lists documents (drawings) relating to signalling equipment Signalling Structure Drawings.

RT/LS/CAT005

Part 3: Typical Circuits


Issue

Date

Status

Price

Colour

Compliance

22 (21)
Aug 04 (Feb 04)
Up-Issued
Yes
This catalogue lists documents (drawings) relating to signalling equipment Typical Circuits.

th

st

Issue 46: 7 August 1 October 2004

Catalogue of Company Standards

Implementation

07/08/04

Page 15

2. Company Standards

RT/LS/CAT006

A. General Information

Part 4: Equipment & Systems Specifications


Issue

Date

Status

Price

Colour

Compliance

Implementation

10 (9)
Aug 04 (Aug 01)
Up-Issued
07/08/04
This catalogue lists documents (drawings) relating to signalling equipment Equipment and Systems Specifications.
The standards shown in catalogue 6 are for reference purposes only, they may not reflect today s requirements nor Network
Rail s future asset strategy.

RT/LS/CAT007

Direct Maintenance Supplementary Instruction Catalogue


Issue

Date

Status

Price

Colour

Compliance

Implementation

2 (1)
Aug 04 (Apr 04)
Up-Issued Phone
07/08/04
This catalogue contains Supplementary Instructions when maintenance is directly managed internally within
Network Rail the existing Company Standard to which it pertains will not be wholly appropriate. The changes
required are minor and there is no material change to the technical requirements of the Company Standard. The
changes are to be considered made to the existing Company Standard published by Business Standards only where
maintenance is undertaken directly by Network Rail employees.

RT/ETE/INDEX

DC Electric Traction Equipment Drawing Index


Issue

Date

Status

Price

Colour

Compliance

Implementation

2
Aug 00
This document lists current electrical track equipment (ETE) drawings, together with the equivalent superseded
drawings.

th

st

Issue 46: 7 August 1 October 2004

Catalogue of Company Standards

Page 16

2. Company Standards

B. Contracts & Procurement

Contracts & Procurement

2B. Contracts & Procurement Directorate


2B1. Contracts & Procurement
2B1.1. Procedures
RT/D/P/026

Reporting Trends in Infrastructure Maintenance Contractors Accidents and Incidents


Issue

Date

Status

Price

Colour

Compliance

Implementation

5
Apr 00
C
This procedure details the rles and responsibilities of Network Rail staff in considering trends in Contractors
accidents and incidents and assisting in the setting up of Action Plans to reduce the likelihood of similar
occurrences.
Mandatory upon: Network Rail
Standards Ownership: Contracts & Procurement
RT/D/P/045

Change During the Course of Track Renewals Work


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Nov 96
B
It is essential that the Track Renewals Contractor has either a Contingency Plan in place for problems
encountered in complying with Specifications/Standards during Track Renewals Works or is aware of the
Procedure within Network Rail for resolution of the problem. This procedure sets out the roles and
responsibilities in relation to dealing with problems encountered during Track Renewals Works.
Mandatory upon: Network Rail
Standards Ownership: Contracts & Procurement
RT/D/P/064

Monitoring of the Track Litter Clearance Contract (Station Areas)


Issue

Date

Status

Price

Colour

Compliance

Implementation

2
Apr 00
B
This procedure lays down the principles for monitoring contracts for clearance of litter from the track in station
areas both where this activity is carried out under the Infrastructure Maintenance Contract and under separate
bespoke contracts.
Mandatory upon: Network Rail
Standards Ownership: Contracts & Procurement
RT/K/P/013

Engagement of Management Consultants


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Jul 97
C
The purpose of this procedure is to support the Corporate Manual's requirement, by defining the steps that must
be followed by all parties in the various stages of engagement of management consultants. It also emphasises the
Corporate Manual's requirement to obtain prior approval of the Chairman or Chief Executive for the engagement
of all Management Consultants.
Mandatory upon: Network Rail
Standards Ownership: Contracts & Procurement

th

st

Issue 46: 7 August 1 October 2004

Catalogue of Company Standards

Page 17

2. Company Standards

B. Contracts & Procurement

Supplier Accreditation

2B2. Supplier Accreditation


2B2.1. Procedures
RT/LS/P/052

Accreditation and Development of Suppliers


Issue

Date

Status

Compliance

Implementation

1
Apr 04
The purpose of this procedure is to mandate the requirements for:

The effective accreditation and development of suppliers directly engaged by Network Rail

The Supplier Accreditation Department's contribution to the maintenance and development of an


adequate and continually improving base of service suppliers to support the delivery of Network Rail's
business objectives

The use of pre-contract approval and accreditation information to ensure that appropriate suppliers are
selected to meet Network Rail contract requirements
Mandatory upon: Network Rail
Standards Ownership: Supplier Accreditation

This Standard is for Network Rail Use Only Not Available outside the Company

2B2.2. Guidance Notes


RT/LS/G/00014

Contractor Assurance System


Issue

Date

Status

Price

Colour

Compliance

Implementation

2 (1)
Aug 04 (Apr 02)
Up-Issued D
07/08/04
07/08/04
Describes the Contractor Assurance System, i.e. Network Rail s contract & contractor assurance processes, in
order to clarify the purpose and interdependence of these processes.
Mandatory upon: Advisory only
Additional Information: This Guidance Note replaces RT/LS/C/003
Standards Ownership: Supplier Accreditation

th

st

Issue 46: 7 August 1 October 2004

Catalogue of Company Standards

Page 18

2. Company Standards

C. Engineering

Electrification

2C. Engineering Directorate


2C1. Electrification
2C1.1. Specifications
RT/E/S/20000

Index of Railtrack Documents Relating to Electrical Distribution & Electro-Mechanical Plant


Engineering Activities
Issue

Date

Status

Price

Colour

Compliance

Implementation

Status

882C1

Insulating Shroud for Foot of Conductor Rail

1997

Specification

AC2/3

50 HZ, 25 kV Overhead Line Equipment (OHLE)

1968

Specification

AC 8

Specification for 25 kV Isolators

1976

Specification

AC 129

Specification for the Installation of Switching Station Slab Foundation Bases

1983

Specification

AC 174

General Specification for Fused Isolators

1984

Specification

AC 199

Specification for Silicone Rubber Covered Primary Insulated Poles

1986

Specification

AC 239

General Specification for Ancillary Equipment Enclosures for 25 kV Structure


Mounted Switchgear

1991

Specification

AC/DC 242

General Specification for Installation of Cable Routes, Cable Laying, Testing and
Jointing on Cable Routes forming part of the Traction Distribution System

1990

Specification

ECP 229

Conductor Running Out Pulley Servicing Requirements

1989

Specification

EHQ/SP/C/501

Specification for the Design and Installation of Negative Bonding and Associated
Equipment on the High Current D.C. Electrified Lines of Network South East

1994

Specification

EHQ/SP/D/007

Specification for Earthing and Bonding at Dolland's Moor International Freight


Yard

1992

Specification

EHQ/SP/D/025

General Specification for 25 kV Power Transformers and Solid State Voltage


Regulators for Signalling Supplies - CAUTION: Protective treatments RT/CE/S/039 & RT/CE/C/002 apply now

1993

Specification

EHQ/SP/D/102

Specification for Earthing and Bonding at North Pole Depot

1991

Specification

EHQ/SP/D/134

Procurement Specification for the Supply, Delivery & Installation of Outdoor


Ancillary Cubicles for 25 kV Isolation Transformers

1992

Specification

EHQ/SP/O/004 Specification for the Supply and Installation of OHL Equipment for 50Hz A.C.
Electrification

1991

Specification

EHQ/SP/O/006 Specification for Identification of Bonds on Electrified Lines Except Southern


Divisions of NOS.

1993

Specification

EHQ/SP/O/012 Specification for Test of Cross Spanwire Clamps on 19/2.1 Cad Cu Spanwire

1991

Specification

EHQ/SP/O/026 Specification for Track Datum Markers on all overhead electrified lines.

1990

Specification

EHQ/SP/O/049 Protective Coatings of Structure Bases & Foundation Caps of Overhead Line
Structures - CAUTION: Protective treatments - RT/CE/S/039 & RT/CE/C/002
apply now

1993

Specification

EHQ/SP/O/105 Specification for Concrete for OHLE Structure Foundations

1992

Specification

EHQ/SP/S/001

Specification for the Provision of Isolation, Earthing and Indication Facilities


where Local Isolations are Permitted on AC Electrified Lines

1993

Specification

EHQ/SP/S/002

Specification for the screening of signals

1991

Specification

EHQ/SP/S/004

Specification for the Installation & Operation of Buffer Sections & Permanently
Earthed Sections in A.C. OHLE

1992

Specification

EHQ/SP/S/030

Specification for the Preparation of Isolation Diagrams and Instructions for AC


Electrified Lines.

1992

Specification

EHQ/ST/D/615 Standard for Routine Maintenance of Electrical Protection Systems

1994

Specification

EHQ/ST/D/622 Standard for Routine Maintenance of Buildings

1994

Specification

EHQ/ST/D/629 Standard for Maintenance of Oil Pressure in Oil Filled Cables

1994

Specification

th

st

Issue 46: 7 August 1 October 2004

Catalogue of Company Standards

Operations

Date

Maintenance

Issue

Installation

Document No Title

Design

11
Aug 02
D
To specify the application of documents relating to Electrical Distribution & Electromechanical Plant issued prior to
April 1994 and as listed in this Specification.
Mandatory upon: Network Rail & Contractors
Standards Ownership: Electrification & Plant

Page 19

Date

Status

EHQ/ST/D/630 Standard for Routine Maintenance of HV Feeders

1994

Specification

EHQ/ST/D/631 Standard for Maintenance of SCADA Equipment

1994

Specification

EHQ/ST/D/632 Standard for Routine Maintenance of Pilot Cables and Systems

1994

Specification

Operations

Issue

Maintenance

Document No Title

Electrification

Installation

C. Engineering

Design

2. Company Standards

EHQ/ST/O/001 Maintenance of Mark I OHLE

1992

Specification

EHQ/ST/O/002 Maintenance of Mark IIIA OHLE

1992

Specification

EHQ/ST/O/003 Maintenance of Mark IIIB OHLE

1991

Specification

EHQ/ST/O/009 Design of Overhead Line Structures

1992

Specification

EHQ/ST/S/001

Safety Requirements for Contractors Undertaking OHLE Contracts

1992

Specification

EHQ/ST/S/502

Standard for the Emergency Disconnection of Grid Supply Feeders for DC


Electrification

1993

Specification

EHQ/ST/S/505

Standard for the Preparation or Modification of Comprehensive Track


Diagrams for SE, SW & SC Divisions

1993

Specification

EHQ/ST/S/506

Standard for Site Safety for Non British Railways Personnel Working for the
Electrification Group

1994

Specification

OLEMI

Railtrack Index of Accepted Design Drawings. Note: Issue 12 is a two volume


publication with a separate revision table that lists changes that have occurred
between June 2000 and June 2002

12

Jun-02

Specification

SN27-93-002

General Specification for 750 V D.C. Track Voltage Relays

Specification

SN53-324/007/2

General Technical Specification for Paired Core Compound Filled Supervisory


Cables

EHQ/PR/C/501 Procedure for Application of Short Circuiting Straps for Conductor Rail
Isolation

1987

Specification

1994

Procedure

EHQ/PR/O/002 Maintenance of Ceramic Bead Neutral Sections

1990

Procedure

EHQ/PR/O/003 Examination and Maintenance of Steatite and Porcelain Insulators

1990

Procedure

EHQ/PR/O/004 Maintenance of Overhead Line Isolators

1992

Procedure

EHQ/PR/O/006 Examination and Adjustment of Balance Weight Termination's of Mark I Design

1990

Procedure

EHQ/PR/O/008 Fitting and Removal of OHL Connections To/From High/Low Voltage Terminals
on Transformers

1991

Procedure

EHQ/PR/O/011 Use of Ladders on Permaquip High Capacity Trolley on Overhead Equipment

1990

Procedure

EHQ/PR/O/012 Jointing of Universal Columns and Broad Flanged Beams for use as Masts for
OHL Structures - CAUTION: Protective treatments - RT/CE/S/039 &
RT/CE/C/002 apply now

1992

Procedure

EHQ/PR/O/013 Installation of "Preformed" Dead Ends for AL, AWAC & CU-PLY Conductors

1991

Procedure

EHQ/PR/O/014 Installation of "Preformed" Splices for AL & AWAC Conductors

1992

Procedure

EHQ/PR/O/016 Use of Permaquip Scissor-Type extending Platform Machine Used for Overhead
Line Maintenance

1993

Procedure

EHQ/PR/O/017 Installation of 'BICC-BURNDY Compression Splices for AL, AWAC & CopperCadmium Conductors

1992

Procedure

EHQ/PR/O/019 Installation of Compression Lugs for Aluminium, Copper and Copper-Ply


Conductors

1992

Procedure

EHQ/PR/O/020 Application of High Performance Pressure sensitive Plastic Sheet Film Markers
to OHL Equipment

1992

Procedure

EHQ/PR/O/024 Use and Care of B.R. Type Overhead Live Line Testers

1992

Procedure

EHQ/PR/O/027 Installation of Contact Wire Splices for Hard-Drawn & Cadmium Copper
Conductors

1992

Procedure

EHQ/PR/O/029 Thermit Welding for Traction Bonding

1992

Procedure

EHQ/PR/O/032 Installation of Standard Type Neutral Sections

1992

Procedure

EHQ/PR/O/034 Installation of Brown Boveri 25 kV Section Insulators

1992

Procedure

EHQ/PR/O/037 Installation and Maintenance of Pneumatic Tensioning Units in OHLE

1992

Procedure

EHQ/PR/O/040 Installation of Bolts in Masonry, Brickworks or Concrete using Polyester Resin


Cartridges

1991

Procedure

EHQ/PR/O/042 Installation of Heat Shrink Tubing for Aluminium Conductors

1992

Procedure

EHQ/PR/O/045 Touch Up Painting of Tubular Pile Foundations - CAUTION: Protective


treatments - RT/CE/S/039 & RT/CE/C/002 apply now

1992

Procedure

EHQ/PR/O/046 Use of M.E. Mechanical Handling Conductor Drum Carriers Fitted With Caliper
Disc Brakes

1992

Procedure

EHQ/PR/O/050 Installation of FARGO Automatic Splices for AWAC Catenary

1992

Procedure

th

st

Issue 46: 7 August 1 October 2004

Catalogue of Company Standards

Page 20

Operations

Issue

Date

Status

EHQ/PR/O/057 Compression Jointing of End Fittings

1992

Procedure

EHQ/PR/O/061 Installation of Cone-End fittings for Termination of Overhead Line Conductors

1992

Procedure

EHQ/PR/S/001

Procedure for Inspection of Bonds Attached to Scaffolding on A.C. Electrified


Lines

1990

Procedure

EHQ/PR/S/002

Procedure for the disconnection of "yellow" bonds or action to be taken when


reported broken or disconnected, on AC electrified Lines

1990

Procedure

EHQ/PR/S/003

Procedure for the Isolation of Switching Stations at Electrical Control Room


Boundaries to Comply with Issue of Permits to Work and Sanctions for Test

1991

Procedure

EHQ/PR/S/006

Procedure for the special action required for AC electrified lines in those joint
less track circuits areas listed in Appendix 1

1990

Procedure

EHQ/PR/S/031

Procedure for the Issue, Storage, Routine Inspection and Testing of Rubber
Gloves

1991

Procedure

EHQ/PR/S/134

Procedure to be followed when a return Conductor to Rail Connection or


other "Red" Bonds are reported broken or disconnected

1991

Procedure

EHQ/PR/S/602

Procedure for Application of Short Circuiting Bar in an Emergency

1994

Procedure

EHQ/ST/S/501

Notification to Electrical Control Room of Staff Authorised to take Pre-planned


Isolations of the Conductor Rail

1993

Procedure

SP-PM-018

Acceptance Of High Mast Winch Mechanisms

Mar-92

Procedure

SP-PM-027

Design Of Retention Toilet Servicing Installations

Mar-84

SP-PM-039

Exam Codes Used In Standard Maintenance Specs.

SP-PM-048

Setting Axle Loads On 76t. Breakdown Cranes

Mar-88

SP-PM-060

Contract Statutory Examination Of Pressure Vessels

Jun. 1988

Procedure

SP-PM-063

Cleaning Windscreens And Replacement Of Wiper Blades Under A.C.


Overhead Lines

Feb-90

SP-PM-066

Operation Of Escalators And Escalator Trolleys

SP-PM-111

Minor Works Contract For Electrical Cable And Mechanical Installations

AC 220

Code of Practice for OLE "As Installed" Data Records

CP-PM-001

Lineside Equipment For Use With High Capacity Wagons

CP-PM-011

Design

Document No Title

Electrification
Maintenance

C. Engineering

Installation

2. Company Standards

Procedure

Nov-87

Procedure

May-90

Procedure

1991

Code of
Practice

Nov-89

Code of
Practice

External Carriage Washing Machines, Guidelines Of Design With Liquid


Concentrates

Jun. 1985

Code of
Practice

CP-PM-017

Under floor Wheel Lathe, Design Of Facilities

Jul. 1987

Code of
Practice

CP-PM-018

Electricity Supplies To Computers

Oct-89

Code of
Practice

CP-PM-019

Design, Specification And Maintenance Of Hydraulic Systems

Aug-92

Code of
Practice

CP-PM-023

Depot Protection Equipment List

Aug-92

Code of
Practice

CP-PM-033

Electric Cable Installation Associated With P&M In Br Underground Locations

Feb-90

Code of
Practice

CP-PM-045

Electrical Installations On Rail Premises

Jun-93

Code of
Practice

CP-PM-046

Winches

Feb-92

Code of
Practice

ECP 34

Wind Loading on OHLE and Structures

1980

Code of
Practice

ECP 44

Passage of High /Long loads over level crossings (BR 12009)

1977

Code of
Practice

ECP 227

Code of Practice for Winching Overhead Line Conductors

1989

Code of
Practice

ECP 166

Code of Practice for Location and Design of Designated Earth Points (D.E.P.S.)
for Overhead Line Equipment

1985

Code of
Practice

ECP 236

Code of Practice for Protection Settings and Methods of Calculation for 25 kV


Electrified Lines

Code of
Practice

EHQ/CP/P/039

Code of Practice for the Allocation of Designations for Switching Stations,


Auxiliary Supply Points, Electrical Sections, Overhead Line Switches, Circuit
Breakers and the Like, for AC Electrified Lines

Code of
Practice

th

st

Issue 46: 7 August 1 October 2004

Catalogue of Company Standards

Procedure

Procedure

1993

Procedure

Page 21

Date

Status

Operations

Issue

Maintenance

Document No Title

Electrification

Installation

C. Engineering

Design

2. Company Standards

EHQ/CP/P/209

Code of Practice for the Preparation of Section Diagrams for AC Electrified


Lines

1993

Code of
Practice

EHQ/CP/S/136

Code of Practice for the Application and Removal of Local Earth's and
Temporary Continuity Jumpers for A.C. Electrified Lines

1991

Code of
Practice

EHQ/ST/C/502 Reporting and Investigation into the Cause of Displaced Conductor Rails

1993

Code of
Practice

EHQ/ST/C/612 Standard for the Maintenance of Positive Conductor Rail

1994

Code of
Practice

EHQ/ST/D/645 Code of Practice for Access to Trackside Supervisory Equipment

1995

Code of
Practice

TPS/MC/401

Planning, Installation & Maintenance of Cable Routes & Other Works in Cess

1987

Code of
Practice

BR 29740

DC Electrified Lines Working Instructions (Merseyrail Only)

Instructions

BR 29987/9

DC Electrified Lines Working Instructions (Drayton Park - Moorgate Only)

Instructions

EHQ/IN/D/001 Instruction for the Inspection of 25 kV A.C. Feeder Station Buildings and Other
Track Sectioning Cabins/ Enclosures

1992

EHQ/IN/D/003 Instruction for Documents to be kept in Switching Station Buildings

1990

Instructions

EHQ/IN/D/008 Instruction for Routine Testing and Maintenance of Transformer and Switchgear
Oil

1993

Instructions

EHQ/IN/D/009 Instruction for the Inspection and Maintenance of 25 kV Cables and Cable
Routes

1993

Instructions

EHQ/IN/D/010 Instruction for the Routine Inspection and Secondary Injection of F.G.L.
Instantaneous Attracted Armature Relays

1993

Instructions

EHQ/IN/D/011 Instruction for Method of Applying Zone Reach and Timer Settings to DZA and
AKE Protection Relays Using BR DZ Test Set

1993

Instructions

EHQ/IN/D/012 Instruction for Routine Inspection and Secondary Injection Testing of DZA &
XFE Protection Relays

1993

Instructions

EHQ/IN/D/013 Instruction for Routine Inspection and Secondary Injection Testing of T.F.H.
Protection Relays

1993

Instructions

EHQ/IN/D/014 Instruction for Routine Inspection and Secondary Injection Testing of CAG 19
Instantaneous Overcurrent and Earth Fault Relays

1993

Instructions

EHQ/IN/D/016 Instruction for Routine Inspection and Secondary Injection Testing of YTG 14
Distance Protection Relays

1993

Instructions

EHQ/IN/D/019 Instruction for Routine Inspection and Secondary Injection Testing of CDG and
HO4 Protection Relays

1993

Instructions

EHQ/IN/D/021 Instruction for Vacuum Interrupter Pressure Testing on 25 kV VCB Equipment


(GEC Type XE2, X82S and SWS Type 82XEM)

1993

Instructions

EHQ/IN/D/030 Inspection and Maintenance of Enclosed Transformer Return Current Isolating


Switches

1993

Instructions

EHQ/IN/D/100 Instruction for Maintenance of 25 kV A.C. Switchgear Type K11 on 25 kV A.C.


Electrified Lines

1990

Instructions

EHQ/IN/D/101 Instruction for the Inspection & Maintenance of South Wales Switchgear Type
RD 100 Double Pole Disconnector

1992

Instructions

EHQ/IN/D/102 Instruction for Maintenance of 25 kV GEC Type OX SF6 Insulated Vacuum


Switchgear Incorporating Sequential Isolators and Associated Equipment

1990

Instructions

EHQ/IN/D/104 Instruction for the Routine Maintenance of 25 kV Vacuum Circuit Breakers:


GEC Type XE2, X82S, South Wales Switchgear Type 82XEM and Other
equipment Within the HV Chamber

1990

Instructions

EHQ/IN/D/106 Instruction for the Maintenance of ASEA Minimum Oil Circuit Breakers Type
HKSJ 600Amp & HKSJB 800Amp Including Associated Busbar and Breaker
Circuit Chambers

1993

Instructions

EHQ/IN/D/108 Instruction for the Maintenance of 25 kV GEC Type OX36 Vacuum Switchgear
(Structure Mounted Outdoor Switchgear)

1993

Instructions

EHQ/IN/D/109 Instruction for the Routine Maintenance of ABB Sace Esaflour SFE 25 Structure
Mounted Outdoor Switchgear

1993

Instructions

EHQ/IN/D/200 Instructions for Maintenance of Oil Filled Transformers Except Booster


Transformers

1990

Instructions

EHQ/IN/D/201 Instruction for Maintenance of Free Breathing and Sealed Booster Transformers

1991

Instructions

EHQ/IN/D/302 Instruction for Stationary Batteries Nickel Cadmium Type and Associated
Charger and Changeover Relay-West Coast 25 kV Electrified Line Only

1990

Instructions

th

st

Issue 46: 7 August 1 October 2004

Catalogue of Company Standards

Instructions

Page 22

Operations

Issue

Date

Status

EHQ/IN/D/402 Instructions for Maintenance of All Voltage Regulators and Regulating


Transformers

1990

Instructions

EHQ/IN/D/405 Instructions for Single to Three Phase Converter Installations

1990

Instructions

EHQ/IN/D/406 Instruction for Routine Inspection and Maintenance of Diesel and Electrically
Driven Compressed Air Installations

1991

Instructions

EHQ/IN/D/409 Instruction for Maintenance of MVAC Distribution Boards

1990

Instructions

EHQ/IN/D/413 Instruction for Maintenance of Motor Wound Spring Mechanism on OHL


switches Manufactured by Morris Line Equipment

1990

Instructions

EHQ/IN/D/414 Instruction for Installation modification of Interconnecting Wiring

1992

Instructions

EHQ/IN/D/415 Instruction for the Inspection and Examination of Harmonic Filter Equipment

1993

Instructions

EHQ/IN/D/616 Instruction for Electrical Testing of Glass Fibre Height & Stagger Gauge

1991

Instructions

EHQ/IN/D/617 Instruction for Electrical Testing of Glass Fibre Hollow Section Height Stick and
Glass Fibre System Height Pole used on Live Overhead Equipment

1991

Instructions

EHQ/IN/D/618 Instruction for the Examination and Testing of a Primary Insulator Pole which
may Contact Live Overhead Line Equipment

1992

Instructions

EHQ/IN/D/622 Instructions for Checking Operation and General care of 25 kV L.M.R. Design
Live Line Tester (Meter Type)

1991

Instructions

EHQ/IN/O/003 Instruction for the Preparation, Care and Maintenance of Local Earths

1992

Instructions

EHQ/IN/O/005 Instruction for the Maintenance of BICC Single Wire Porcelain Section
Insulators

1990

Instructions

Design

Document No Title

Electrification
Maintenance

C. Engineering

Installation

2. Company Standards

EHQ/IN/O/006 Instruction for the Layout of Overhead Line Equipment.

1992

Instructions

EHQ/IN/O/012 Instruction for the Retensioning of Fixed Termination OLE

1990

Instructions

EHQ/IN/O/030 Inspection of OHL Structures and Foundations

1992

Instructions

EHQ/IN/O/031 Installation of 'CCL-Reliable' Automatic Connectors for HD copper, CopperCadmium & AWAC Catenary

1991

Instructions

EHQ/IN/O/035 Protective Greasing of OLE Assemblies & Components

1991

Instructions

EHQ/IN/O/036 Installation of BICC-BURNDY Compression Connections in Overhead Line


Equipment

1992

Instructions

EHQ/IN/O/037 Instruction for the Installation of Overhead Line Equipment, Planted and Bolted
Base Side Bearing Foundations

1992

Instructions

EHQ/IN/O/042 Instruction for the Attachment of Spanwire to Tube Clamps

1993

Instructions

EHQ/IN/O/056 Installation of Skidless Neutral Sections

1992

Instructions

EHQ/IN/P/002

Instruction for the Production of Mean and Peak Currents for 25 kV


Electrification

1992

Instructions

EHQ/IN/P/004

Control of Major feeding Diagrams

1993

Instructions

EHQ/IN/S/001

Instructions for Isolation and Earthing of 25 kV A.C. Switchgear Manufactured


by Messrs. Switchgear and Cowans type K11 and Cable Connections

1993

Instructions

EHQ/IN/S/002

Isolation & Earthing at Hackney Downs No. 2 TSC

1990

Instructions

EHQ/IN/S/003

Isolation & Earthing 25 kV Switching Stations Incorporating VCB's

1992

Instructions

EHQ/IN/S/007

Instructions for Isolation and Earthing for Feeder Switch Maintenance for A.C.
Electrified Lines

1990

Instructions

EHQ/IN/S/008

Instructions for the Installation and Removal of Traction Bonding on all


Electrified Lines

1990

Instructions

EHQ/IN/S/011

Instructions for Isolating and Earthing Structure Mounted Outdoor Switchgear


(SMOS) Locations (where the working Instructions for A.C. Electrified Lines BR
29987 apply)

1992

Instructions

EHQ/IN/S/012

Instructions for Isolation and Earthing at 25 kV A.C. Feeder Stations with


Harmonic Filters and Vacuum Circuit Breakers

1993

Instructions

EHQ/IN/S/014

Isolation & Earthing at York Way TSC

1991

Instructions

EHQ/IN/S/015

Isolation & Earthing at Incline TSC

1992

Instructions

EHQ/IN/S/027

Isolation & Earthing for Isolating Transformers at Dolland's Moor

1993

Instructions

EHQ/IN/S/035

Instruction for the Use of Ladders & Other Equipment on OHLE

1992

Instructions

EHQ/IN/S/036

Instructions for Isolation & Earthing of SMOS Location not Adjacent to


Overhead Line equipment, using BR 12011

1993

Instructions

EHQ/IN/S/037

Isolation & Earthing for Isolating Transformers, Associated Cables & equipment
at W. London J., Mitre Bridge and Scrubbs Lane

1993

Instructions

EHQ/IN/S/038

Isolation & Earthing for Old Oak Common Isolation Transformers

1993

Instructions

th

st

Issue 46: 7 August 1 October 2004

Catalogue of Company Standards

Page 23

EHQ/IN/S/039

Instruction for the Urgent Communication of Information of a Serious Safety or


Technical Nature Concerning Electrification Fixed Equipment Except the SC, SE
& SW Divisions of Network SouthEast

Date

Status

1993

Instructions

EHQ/IN/S/040

Safety of Staff Using the Roof of Wiring Trains

1993

Instructions

EHQ/IN/S/212

Instructions for the carrying out of Testing on all Electrified Lines.

1991

Instructions

EHQ/IN/S/801

Arrangements for Isolation of the Conductor Rail for Pre-planned Possessions


of the Line

1995

Instructions

EHQ/ST/D/502 Standard for Replacement to be Used on Electrification Equipment

1993

Instructions

OM.1

Inspection And Cleaning Of Propane Gas Storage Tanks

Jun-79

Instructions

OM.2

Calibration & Associated Test Of S.L.I.S On Cranes

Oct-84

Instructions

OM.3

Maintenance In Safe Order, S.L.I.S On Cranes

Apr-84

Instructions

OM.52

Inspection Of Spring Hanger Bolts (Cranes)

Jul-81

Instructions

OM.53

Safety Of The Line Brake Test & Special Post Derailment

Aug-82

Instructions

OM.58

Rail Crane Air Brake System: Exam Of Air Receivers

Sep-83

Instructions

Operations

Issue

Maintenance

Document No Title

Electrification

Installation

C. Engineering

Design

2. Company Standards

PMTK 0028

Plant Maintenance Technical Kit For Domestic Equipment

May-90

Instructions

PMTK 0041

Plant Maintenance Technical Kit For 76t. Converted Breakdown Cranes

Jul-90

Instructions

PMTK 0042

Plant Maintenance Technical Kit For Shot Blaster And Cleaning Cabinet

Feb-91

Instructions

PMTK 0057

Plant Maintenance Technical Kit For Buffer Stops

Jan-91

Instructions

TPS/MC/400

Crossing of Cable Routes

1988

Instructions

TPS/O/100

Loss of High Voltage Supply to, or the Tripping of a HV Circuit Breaker for no
known reason in a substation building containing metal clad switchgear with
bitumastic compound filled busbar chambers

1993

Instructions

TPS/O/451

Testing Electrification and Emergency Telephones

1989

Instructions

TPS/O/452

Testing of all Direct Telephone Circuits

1990

Instructions

TPS/O/605

Operation of Slade Green 11kV Supply

1991

Instructions

TPS/O/607

Operation of Ashford IECC 11 kV Supply

1994

Instructions

TPS/O/624

BR/Euro Tunnel Electrical Interface at Folkestone Operating and Maintenance


Procedures

1994

Instructions

TPS/O/702

Operation of Victoria Station 11 kV Supply

1988

Instructions

TPS/O/803

Frimley Reversible Line Alternative Track Feeding Arrangements

1984

Instructions

TPS/O/805

Local operation Instruction Weymouth Station Alternative Feeding


Arrangements

1992

Instructions

TPS/P/154

High Voltage and Pilot/Supervisory Cables, and Accessory Defect Report

1993

Instructions

TPS/P/155

Substation Plant, Remote Control and Protection Equipment Defect Reporting

1992

Instructions

TPS/P/157

Reporting of Telemetry Failures on Microprocessor Based Supervisory Systems

1992

Instructions

TPS/P/158

Reporting of Electric Track Equipment Defects

1993

Instructions

TPS/P/206

D.C. 'Safe' Setting Calculation Recording Procedures

1990

Instructions

TPS/P/254

Procedures for Issue Receipt Cancellation of Permits to Work and Sanctions to


Test

1988

Instructions

TPS/P/454

Transmission Multiplexed Intertrip System

1992

Instructions

TPS/S/008

DC Electrified Track Electrical Protection arrangements for work on or near


Conductor Rails

1993

Instructions

TPS/T/010

Routine Sampling - Inspection & Testing of Insulating Oil

1992

Instructions

th

st

Issue 46: 7 August 1 October 2004

Catalogue of Company Standards

Page 24

2. Company Standards

RT/E/S/21000

C. Engineering

Electrification

Operational, Environmental and General Requirements for Remote Control Equipment for
Electrical Distribution Systems
Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Feb 98
C
This specification states the Directorate s operational, environmental and general requirements for remote control
equipment and systems (also known as supervisory control and data acquisition, SCADA equipment) used on AC
or DC traction systems.
Mandatory upon: Contractors
Caution: See notei below.
Standards Ownership: Electrification & Plant
RT/E/S/21001

Remote Control Outstation Equipment for Electrical Distribution Systems


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Feb 98
B
This specification states the Directorate s requirements for outstation (remote terminal unit) equipment for use
on AC or DC traction systems.
Mandatory upon: Network Rail
Standards Ownership: Electrification & Plant
RT/E/S/21002

Design of Software Associated with Remote Control Equipment for Electrical Distribution Systems
Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Aug 97
C
This specification states the Directorate s requirements for the safety assurance of high integrity software for use
within control centre equipment and outstations of an electronic type forming a supervisory control and data
acquisition system, associated with an AC or DC traction network.
Mandatory upon: Network Rail
Further Information: Procurement specification
Standards Ownership: Electrification & Plant
RT/E/S/21003

Data Communications for Remote Control Systems for Electrical Distribution Systems
Issue

Date

Status

Price

Colour

Compliance

Implementation

2
Apr 01
B
This specification states the Directorate s requirements for data communication, as part of a supervisory control
and data acquisition (SCADA) system, used for the remote monitoring and control of electrification equipment
associated with AC or DC traction electrification systems.
Mandatory upon: Network Rail
Further Information: Performance Specification mandates testing installation
Standards Ownership: Electrification & Plant
RT/E/S/21004

Voice Communication to Electrical Control Rooms


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Feb 98
B
This specification states the Directorate s requirements for voice communication to, and telephone equipment within the
electrical control room (ECR) or control centre associated with an AC or DC traction network. This specification states
system configuration requirements and performance requirements.
Mandatory upon: Network Rail
Further Information: Performance requirements
Standards Ownership: Electrification & Plant

CAUTION! The requirements for protective treatments materials and their application referred to in this Specification have been superseded by:
RT/CE/S/039 - Specification RT98 - Protective Treatment for Railtrack Infrastructure;
RT/CE/C/002 - Application and Reapplication of Protective Treament to Metallic Structures
th

st

Issue 46: 7 August 1 October 2004

Catalogue of Company Standards

Page 25

2. Company Standards

RT/E/S/21005

C. Engineering

Electrification

Electrical Control Room Environment


Issue

Mandatory upon:
Further Information:
Caution:
Standards Ownership:
RT/E/S/21006

Date

Status

Price

Colour

Compliance

Implementation

1
Feb 98
D
This specification states the Directorate s environmental requirements for electrical control rooms (ECR s) or
control centres. The specification states overall requirements, including for the man-machine interface, amenities
and equipment rooms.
Network Rail
Performance specification
See notei below
Electrification & Plant
Computer Systems Located at Electrical Control Rooms
Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Feb 98
B
This specification states the Directorate s requirements for the main computer installation at electrical control
rooms (ECRs) or control centres.
Mandatory upon: Network Rail
Further Information: Performance specification
Standards Ownership: Electrification & Plant
RT/E/S/21007

Remote Control Man-Machine Interface for Electrical Distribution Systems


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Feb 98
B
This specification states the Directorate s requirements for all types of man-machine interface equipment at
electrical control rooms (ECRs) or control centres.
Mandatory upon: Network Rail
Further Information: Performance specification
Standards Ownership: Electrification & Plant
RT/E/S/21008

Overall Operation, Integration and Performance of Remote Control for Electrical Distribution
Systems
Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Feb 98
C
This specification states the Directorate s requirements for overall system operation, integration and performance
relating to remote control equipment, associated with an AC or DC traction network. The specification states
requirements for basic functionality, speed of response, system integration and performance.
Mandatory upon: Network Rail
Standards Ownership: Electrification & Plant
RT/E/S/21009

Electrical Control Room Security


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Feb 98
B
This specification states the Directorate s requirements for security measures which apply at electrical control
room buildings, associated with an AC or DC traction network. The specification states requirements for security
fencing and gates, and surveillance and lighting systems.
Mandatory upon: Network Rail
Standards Ownership: Electrification & Plant

CAUTION! The requirements for protective treatments materials and their application referred to in this Specification have been superseded by:
RT/CE/S/039 - Specification RT98 - Protective Treatment for Railtrack Infrastructure;
RT/CE/C/002 - Application and Reapplication of Protective Treament to Metallic Structures
th

st

Issue 46: 7 August 1 October 2004

Catalogue of Company Standards

Page 26

2. Company Standards

RT/E/S/21010

C. Engineering

Electrification

Remote Control Point-to-Point Equipment used on Electrical Distribution Systems


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Feb 98
B
This specification states the Directorate s requirements for point-to-point equipment used to extend control and
indication from a SCADA outstation to a lineside location, associated with an AC or DC traction network. The
specification states performance, operational and technical requirements.
Mandatory upon: Network Rail
Further Information: Performance/Technical/Operational specification
Standards Ownership: Electrification & Plant
RT/E/S/21011

Data Communication Circuits Associated with Point-to-Point Equipment used on Electrical


Distribution Systems
Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Feb 98
B
This specification states the Directorate s requirements for data communication circuits associated with point-topoint equipment used to extend control and indication from a SCADA outstation to a lineside location, associated
with an AC or DC traction network. The specification states performance, operational and technical requirements.
Mandatory upon: Network Rail
Further Information: Performance/Technical/Operational specification
Standards Ownership: Electrification & Plant
RT/E/S/21012

Power Supplies to Remote Control Equipment at Electrical Control Rooms and Outstation
Locations
Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Feb 98
C
This specification states the Directorate s requirements for the nature of the supply to control centre equipment
and outstations forming part of a SCADA system, associated with an AC or DC traction network. The
specification states requirements for UPS and battery performance.
Mandatory upon: Network Rail
Further Information: Performance specification
Standards Ownership: Electrification & Plant
RT/E/S/21014

Voltage Testing of High Voltage Electrical Distribution Equipment (Including Cables) on AC and
DC Electrified Lines
Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Nov 97
D
This specification states the Directorate s requirements for voltage testing (pressure testing) of major items of
electrical distribution equipment, in the range 3.3kV to 66kV, 50Hz, on AC and DC Electrified Lines when the
performance of insulation has been affected by refurbishment, modification, repair or relocation. The test voltage
values and acceptance criteria are included.
Mandatory upon: Network Rail
Further Information: Procurement specification
Standards Ownership: Electrification & Plant
RT/E/S/21015

Maintenance of Negative Traction Cables and Bonding for DC Conductor Rail Systems
Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Dec 95
B
This document defines the minimum planned maintenance to be carried out on negative traction cables and
bonding on D.C electrified lines, including record keeping, reporting and corrective action requirements.
Mandatory upon: Contractors
Standards Ownership: Electrification & Plant
RT/E/S/21016

Specification for the Supply of Traction Electricity.


Issue

Date

Status

Price

Colour

Compliance

Implementation

2
Mar 96
C
This specification covers Network Rails technical and commercial requirements for the supply of electricity for
traction purposes through Network Rail s Supply Points.
Mandatory upon: Network Rail
Further Information: Performance specification
Standards Ownership: Electrification & Plant

th

st

Issue 46: 7 August 1 October 2004

Catalogue of Company Standards

Page 27

2. Company Standards

RT/E/S/21018

C. Engineering

Electrification

Indoor Switchgear for 11, 22, 33kV Distribution Systems for DC Traction Substations.
Issue

Mandatory upon:
Further Information:
Caution:
Standards Ownership:
RT/E/S/21019

Date

Status

Price

Colour

Compliance

Implementation

1
Aug 96
D
This specification states the directorate s requirements for indoor switchgear for 11, 22, & 33kV distribution
systems for DC traction substations. The specification states requirements for overall performance and technical
details including testing.
Network Rail
Performance specification mandates testing
See note below
Electrification & Plant
Transformer/Rectifier Equipments for DC Traction Substations
Issue

Mandatory upon:
Further Information:
Caution:
Standards Ownership:
RT/E/S/21020

Date

Status

Price

Colour

Compliance

Implementation

1
Aug 96
D
This specification states the directorate s requirements for transformer/rectifier equipment for use in DC traction
substations. The specification states requirements for overall performance and technical details including testing.
Network Rail
Performance specification mandates testing
See notei below
Electrification & Plant
11, 22, 33 kV AUX. Transformer up to and including 500kVA for DC Traction Substations
Issue

Mandatory upon:
Further Information:
Caution:
Standards Ownership:
RT/E/S/21021

Date

Status

Price

Colour

Compliance

Implementation

1
Aug 96
D
This specification states the directorate s requirements for 11, 22 & 33kV oil/synthetic filled or dry type auxiliary
transformers up to and including 500 kA for DC traction substations. The specification states requirements for
overall performance and technical details including testing.
Network Rail
Performance specification mandates testing
See notei below
Electrification & Plant
Step-Down 3 Phase Transformers for Power Distribution in DC Traction Systems
Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Aug 96
D
This specification states the directorate s requirements for 33/11kV and 33/22kV oil/synthetic filled step-down
transformers including neutral earthing resistors for distribution in DC traction systems. The specification states
requirements for overall performance and technical details including testing.
Mandatory upon: Network Rail
i
Caution: See note below
Standards Ownership: Electrification & Plant
RT/E/S/21023

Rectifier DC Disconnector Switch for DC Traction Substations


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Mar 98
D
This specification states the Directorate s requirements for the design, manufacture and testing of 650/750V DC
disconnector switches (DCDS) for use on DC Electrified Lines.
Mandatory upon: Network Rail
Standards Ownership: Electrification & Plant

CAUTION! The requirements for protective treatments materials and their application referred to in this Specification have been superseded by:
RT/CE/S/039 - Specification RT98 - Protective Treatment for Railtrack Infrastructure;
RT/CE/C/002 - Application and Reapplication of Protective Treament to Metallic Structures
th

st

Issue 46: 7 August 1 October 2004

Catalogue of Company Standards

Page 28

2. Company Standards

RT/E/S/21024

C. Engineering

Electrification

Impedance Protection Relay For 650/750V DC Track Feeder Circuit Breakers


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Mar 97
D
This specification states the Directorate s requirements for an impedance protection relay for use in association
with 650/750V DC track feeder circuit breakers. The specification states requirements for overall performance and
technical details including construction and testing.
Mandatory upon: Network Rail
Further Information: Performance specification mandates testing
Standards Ownership: Electrification & Plant
RT/E/S/21025

Controlled Track Devices for DC Electrified Lines


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Mar 98
D
This specification states the Directorate s requirements for the design, manufacture and testing of 650/750VDC
remotely controlled track devices for use on DC Electrified Lines.
Mandatory upon: Network Rail
Standards Ownership: Electrification & Plant
RT/E/S/21026

415V and 440V Changeover Switchboards for DC Traction Substations


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Mar 98
D
This specification states the Directorate s requirements for 415V and 440V changeover switchboards for DC
traction substations. The specification includes requirements for overall performance and technical details including
the construction and testing.
Mandatory upon: Network Rail
Standards Ownership: Electrification & Plant
RT/E/S/21028

Ancillary Wiring of Electrical Distribution Equipment on AC and DC Electrified Lines


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Dec 98
D
This specification states the Directorate s requirements for the design, manufacture, installation and testing of
ancillary wiring between main items of electrical distribution equipment on AC and DC Electrified Lines.
Mandatory upon: Contractors
Standards Ownership: Electrification & Plant
RT/E/S/21030

Prefabricated and Modular Steel Housings for Electrical Distribution Equipment on DC Electrified
Lines
Issue

Mandatory upon:
Further Information:
Caution:
Standards Ownership:

Date

Status

Price

Colour

Compliance

Implementation

1
Nov 97
D
This specification states the Directorate s requirements for secure and weatherproof prefabricated and modular
housings of steel construction for indoor electrical distribution equipment for DC Electrified Lines. The
specification states requirements for overall performance and technical details including construction and testing.
Network Rail
Performance Specification mandates testing/construction
i
See note below
Electrification & Plant

CAUTION! The requirements for protective treatments materials and their application referred to in this Specification have been superseded by:
RT/CE/S/039 - Specification RT98 - Protective Treatment for Railtrack Infrastructure;
RT/CE/C/002 - Application and Reapplication of Protective Treament to Metallic Structures
th

st

Issue 46: 7 August 1 October 2004

Catalogue of Company Standards

Page 29

2. Company Standards

RT/E/S/21032

C. Engineering

Electrification

Earthing Systems for DC Traction Substations, Track Paralleling Huts and Similar Equipment
Locations
Issue

Mandatory upon:
Further Information:
Caution:
Standards Ownership:
RT/E/S/21033

Date

Status

Price

Colour

Compliance

Implementation

1
Oct 96
C
This specification states the Directorate s requirements for the supply and installation of earthing systems at DC
Traction Substations, track paralleling huts and similar equipment locations. The specification states requirements
for overall performance, and technical details including construction and testing.
Network Rail
Performance Specification mandates testing/construction
See note i below
Electrification & Plant
The Welding of Power Transformer Tanks and Conservators during Manufacture
Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Oct 96
C
This specification states the directorate s requirements for the control of welding including approval of welders
and operators during the manufacture of power transformer tanks and conservators.
Mandatory upon: Network Rail
Further Information: Procurement specification
Standards Ownership: Electrification & Plant
RT/E/S/21035

Protection Equipment for 25kV Electrification


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Mar 98
D
This specification states the Directorate s requirements for protection equipment for use in conjunction with high
voltage switchgear on AC Electrified Lines. The specification states the requirements for overall performance and
technical details including testing.
Mandatory upon: Network Rail
Standards Ownership: Electrification & Plant
RT/E/S/21046

Inspection of DC Traction Electrification Equipment in Light Maintenance Depot


Issue

Date

Status

Price

Colour

Compliance

Implementation

2
Sep 97
C
This document specifies the requirements for inspection of DC Traction Electrification Equipment in Light
Maintenance Depot.
Mandatory upon: Contractors
Standards Ownership: Electrification & Plant
RT/E/S/21051

Calculation of Protection Settings for DC Circuit Breakers


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Oct 98
C
This specification states the Directorate s requirements to be used for DC protection calculations and protection
equipment settings for DC track feeder circuit breakers. The specification states the requirements for overall
performance and technical details.
Mandatory upon: Network Rail & Contractors
Standards Ownership: Electrification & Plant
RT/E/S/21053

Maintenance of Low Voltage AC Switchgear


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Mar 97
A
This specification states the Directorate s minimum periodic maintenance requirements for low voltage AC
changeover equipment and similar assemblies, associated with the electric traction distribution system in order to
ensure its safety and reliability.
Mandatory upon: Contractors
Standards Ownership: Electrification & Plant

CAUTION! The requirements for protective treatments materials and their application referred to in this Specification have been superseded by:
RT/CE/S/039 - Specification RT98 - Protective Treatment for Railtrack Infrastructure;
RT/CE/C/002 - Application and Reapplication of Protective Treament to Metallic Structures
th

st

Issue 46: 7 August 1 October 2004

Catalogue of Company Standards

Page 30

2. Company Standards

RT/E/S/21054

C. Engineering

Electrification

Maintenance of High Voltage Switchgear


Issue

Date

Status

Price

Colour

Compliance

Implementation

Iss 2
Apr 01
A
This specification states the Directorate s minimum periodic maintenance requirements for three phase high
voltage switchgear in order to ensure the safety and reliability of the electrical distribution system.
Mandatory upon: Contractors
Standards Ownership: Electrification & Plant
RT/E/S/21055

Maintenance of Rectifiers
Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Mar 98
B
This specification states the Directorate s minimum periodic maintenance requirements for rectifiers to ensure the
safety of the electric traction distribution system.
Mandatory upon: Contractors
Standards Ownership: Electrification & Plant
RT/E/S/21056

Maintenance of High Voltage Transformers


Issue

Date

Status

Price

Colour

Compliance

Implementation

2
Apr 01
C
This specification states the Directorate s minimum periodic maintenance requirements for high voltage transformers
rated above 10kVA in order to ensure the safety and reliability of the electrical distribution system.
Mandatory upon: Contractors
Standards Ownership: Electrification & Plant
RT/E/S/21057

Maintenance of DC Switchgear
Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Mar 98
B
This specification states the Directorate s minimum periodic maintenance requirements for DC circuit breakers
and their associated trucks and switchgear assemblies in order to ensure the safety and reliability of the electric
traction system.
Mandatory upon: Contractors
Standards Ownership: Electrification & Plant
RT/E/S/21060

Issue of Safety Documentation for work on 650/750V DC Apparatus


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Mar 98
D
This standard sets out the requirements for isolation of apparatus and issue of safety documentation which are
necessary before work is to take place on electrical distribution equipment which can be made live at 650/750V
DC.
Mandatory upon: Network Rail
Standards Ownership: Electrification & Plant
RT/E/S/21063

Maintenance of Electrical Protection Systems


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Dec 01
B
This specification states the Chief Engineers minimum periodic maintenance requirements for electrical protection
systems in order to ensure the safety and reliability of the a.c. and d.c. electrification systems.
Mandatory upon: Contractors
Further Information: To be used in conjunction with RT/E/S/21111
Standards Ownership: Electrification & Plant
RT/E/S/21064

Maintenance of Electrical & Plant Batteries and Battery Charging Equipment


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Mar 98
B
This specification states the Directorate s minimum periodic maintenance requirements for batteries and battery
charging equipment in order to ensure the safety and reliability of the electric traction distribution system.
Mandatory upon: Contractors
Standards Ownership: Electrification & Plant

th

st

Issue 46: 7 August 1 October 2004

Catalogue of Company Standards

Page 31

2. Company Standards

RT/E/S/21066

C. Engineering

Electrification

Restrictions on Entry into Substations Equipped with GEC Type KC 33kV Switchgear
Issue

Date

Status

Price

Colour

Compliance

Implementation

3
Jun 99
C
This specification details the special arrangements necessary for persons requiring the entry into certain
substations equipped with GEC type KC 33kV Switchgear. There have been several busbar failures at substations
equipped with this type of switchgear and measurements of discharge levels has enabled those substations at
greatest risk to be identified.
Mandatory upon: Contractors
Standards Ownership: Electrification & Plant
RT/E/S/21067

Instructions for Making Out Issuing and Cancelling High Voltage Permits-to-Work,
Sanctions-for-Test and Circuit State Certificates
Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Mar 98
D
This specification gives instructions for making out, issuing and cancelling Permits-to-Work, Sanctions-for-Test and
Circuit State Certificates for work on or near high voltage electrical equipment forming part of the Network Rail
electrical distribution system.
Mandatory upon: Contractors
Standards Ownership: Electrification & Plant
RT/E/S/21068

Procedure for the Amendment of Isolation Documents


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Mar 98
C
This specification provides the standard procedure for the amendment of isolation Documents (for example,
Isolation Diagrams and Isolation Instructions) throughout the Network Rail Electrified system.
Mandatory upon: Network Rail
Standards Ownership: Electrification & Plant
RT/E/S/21070

Competence of Persons Working on or Having Access to Electrical Power Supply Equipment


Issue

Date

Status

Price

Colour

Compliance

Implementation

2
Feb 04
C
The purpose of this specification is to set out the requirements to ensure that persons working on or having
access to electrical power supply equipment have sufficient technical knowledge, education and experience to
ensure their competence to carry out their duties without risk of danger to themselves or other persons, and
without damage to the equipment concerned.
Mandatory upon: Network Rail & Contractors
Standards Ownership: Electrification & Plant
RT/E/S/21071

Maintenance of Positive Electric Track Equipment (Including DC Feeder Cables)


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Mar 98
B
This specification states the Directorate s minimum periodic maintenance requirements for DC positive electric
track equipment to ensure the safety of the electric traction distribution system.
Mandatory upon: Network Rail
Standards Ownership: Electrification & Plant
RT/E/S/21074

Overhead Line Equipment Allocation Design for Railway Electrification


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Mar 98
C
This specification states the Directorate s requirements for the allocation of overhead line equipment basic designs
for use on Network Rail s Infrastructure.
Mandatory upon: Contractors
Standards Ownership: Electrification & Plant

th

st

Issue 46: 7 August 1 October 2004

Catalogue of Company Standards

Page 32

2. Company Standards

RT/E/S/21075

C. Engineering

Electrification

DC Immune 25kV Single Phase Isolating Transformers for Interfaces between AC and DC
Electrified Lines
Issue

Mandatory upon:
Further Information:
Caution:
Standards Ownership:
RT/E/S/21078

Date

Status

Price

Colour

Compliance

Implementation

1
Nov 97
D
This specification states the Directorate s requirements for outdoor DC immune 25kV, single phase, isolating
transformers for use at interfaces between AC and DC Electrified Lines. The specification states requirements for
overall performance and technical details including testing.
Network Rail
Performance specification mandates testing
See note i below
Electrification & Plant
Design of Return Conductor Systems for AC Electrified Lines
Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Mar 98
C
This specification states the Directorate s requirements for the design of the spatial arrangement of return
conductor systems, with or without booster transformers, for the suppression at source of electromagnetic
interference on AC electrified lines, in order to reduce the level of interference induced into adjacent signalling and
telecommunication circuits.
Mandatory upon: Network Rail
Standards Ownership: Electrification & Plant
RT/E/S/21081

Security Palisade Fencing for Electrical Distribution Installations for AC and DC Electrified Lines
Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Mar 98
C
This specification states the Directorate s requirements for palisade fencing of the security type around electric
traction distribution installations on AC and DC Electrified Lines. This specification contains requirements for
overall performance, technical and construction details.
Mandatory upon: Network Rail
Standards Ownership: Electrification & Plant
RT/E/S/21085

Design of Earthing and Bonding Systems for 25kV AC Electrified Lines


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Oct 98
D
This specification states the requirements for the design of earthing and bonding systems for 25kV Electrified Lines
to provide a continuous return circuit for traction load and fault current and to ensure that unacceptable
accessible and touch voltages do not occur.
Mandatory upon: Contractors
Standards Ownership: Electrification & Plant
RT/E/S/21087

Maintenance of 25kV Overhead Line Electrification Equipment


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Feb 98
D
This specification states the Directorate s minimum maintenance requirements to be carried our on 25kv
overhead line electrification equipment in order to ensure safety and reliability.
Mandatory upon: Network Rail
Standards Ownership: Electrification & Plant
RT/E/S/21088

Maintenance Parameters for 25kV Overhead Line Electrification Equipment


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Feb 98
C
This specification states the Directorate s maintenance parameters for 25kV overhead line electrification
equipment in order to ensure safety and reliability.
Mandatory upon: Network Rail
Standards Ownership: Electrification & Plant

CAUTION! The requirements for protective treatments materials and their application referred to in this Specification have been superseded by:
RT/CE/S/039 - Specification RT98 - Protective Treatment for Railtrack Infrastructure;
RT/CE/C/002 - Application and Reapplication of Protective Treament to Metallic Structures
th

st

Issue 46: 7 August 1 October 2004

Catalogue of Company Standards

Page 33

2. Company Standards

RT/E/S/21094

C. Engineering

Electrification

Maintenance of Voltage Breakdown Devices


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Mar 98
C
This specification states the Directorate s requirements for the periodic inspection and testing of voltage
breakdown devices.
Mandatory upon: Network Rail
Standards Ownership: Electrification & Plant
RT/E/S/21096

Design of High Resolution Graphic VDU Displays for Electrical Distribution Systems
Issue

Date

Status

Price

Colour

Compliance

Implementation

2
Jun 02
D
Yes
This specification states the requirements for the design of visual display unit (VDU) displays where high-resolution
graphics (HRG) equipment forms the man-machine interface (MMI) for remote control equipment (also known as
Supervisory Control And Data Acquisition, (SCADA) equipment) used for the remote monitoring and control of
electrical distribution systems.
Mandatory upon: Network Rail
Further Information: Performance specification
Standards Ownership: Electrification & Plant
RT/E/S/21104

Design and Installation of Electric Track Equipment for DC Electrified Lines


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Mar 98
D
This specification gives the design and installation requirements for electric track equipment, including conductor
rail and negative bonding, installed in the third rail DC Electrified Lines for both high current and standard current
applications.
Mandatory upon: Network Rail
Standards Ownership: Electrification & Plant
RT/E/S/21106

25kV AC System Protection Calculations


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Dec 98
C
This specification states the directorate s requirements for system protection calculations for 25kV AC traction
installations. The specification states the requirements for overall performance and technical details.
Mandatory upon: Contractors
Standards Ownership: Electrification & Plant
RT/E/S/21107

Bolted Running Rail Connections for Traction Bonding on AC and DC Electrified Lines
Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Mar 98
D
This specification states the Directorate s requirements for the bolted connection of cables to the running rails of
the permanent way of electrified lines for the purposes of traction continuity and for signalling track circuit
connections which also carry traction current.
Mandatory upon: Network Rail
Standards Ownership: Electrification & Plant
RT/E/S/21111

General Requirements for Maintenance of Electrical and Plant Equipment.


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Jan 97
C
This specification states the Directorate s general requirements that apply all maintenance undertaken on Network
Rail s electrical and plant equipment.
Mandatory upon: Network Rail
Standards Ownership: Electrification & Plant
RT/E/S/21112

Calculation of Protection Settings for 3 Phase H.V. Distribution Systems


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Dec 98
C
This specification states Network Rail s requirements for AC protection calculations and protection equipment
settings for the 3 phase h.v. distribution system.
Mandatory upon: Contractors
Standards Ownership: Electrification & Plant

th

st

Issue 46: 7 August 1 October 2004

Catalogue of Company Standards

Page 34

2. Company Standards

RT/E/S/21130

C. Engineering

Electrification

Technical Competency Requirements for Design of Overhead Line Equipment


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Dec 98
C
This specification states the requirements for technical competency and accreditation for the supply of Overhead
Line Equipment design for use on Network Rail infrastructure.
Mandatory upon: Contractors
Standards Ownership: Electrification & Plant
RT/E/S/21131

Warning and Other Signs for AC and DC Electrified Lines


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Nov 97
D
This specification states the requirements for the design and the display of signs on Network Rail infrastructure to
warn persons on or near AC and/or DC electrified lines of the risk of electric shock. It also includes the
requirements for certain other signs employed on Network Rail infrastructure in connection with electrified lines.
Mandatory upon: Network Rail
Standards Ownership: Electrification & Plant
RT/E/S/21140

Design of the Graphical User Interface for Electrical Distribution Network Management Systems
(NMS)
Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Jun 03
D
This specification states the minimum design requirements for the Graphical User Interface (GUI) of non SCADAbased applications associated with managing the network s electrical distribution system (e.g. the Network
Management System).
Mandatory upon: Network Rail, Contractors and Lessees
Standards Ownership: Electrification & Plant
RT/E/S/29987

Working on or About 25kV AC Electrified Lines


Issue

Date

Status

Price

Colour

Compliance

Implementation

1D
Dec 03
Phone
This specification is an introduction to the suite of modules that together form the composite Network Rail Company
Specification RT/E/S/29987 Working on or About 25kV AC Electrified Lines . The composite specification includes
responsibilities of persons required to work on, or so near to, electrified lines that danger may arise. Further
requirements when working on or about the electrified lines are contained in the Rule Book GE/RT8000 (Modules
AC 1, AC 2 & AC 3).
Mandatory upon: Network Rail & Contractors
Standards Ownership: Electrification & Plant

2C1.2. Procedures
RT/E/P/24000

Content and Preparation of Control Room Instructions


Issue

Date

Status

Price

Colour

Compliance

Implementation

3
Dec 02
F
This procedure states the mandatory requirements for the content and preparation of Electrical Control Room
Instructions by Network Rail Zones for use at Electrical Control Rooms by Electrical Control Operators to ensure
that adequate and correct procedures are followed in the control and operation of the Electrification and Plant
equipment under their jurisdiction.
Mandatory upon: Network Rail
Standards Ownership: Electrification & Plant

th

st

Issue 46: 7 August 1 October 2004

Catalogue of Company Standards

Page 35

2. Company Standards

RT/E/P/24001

C. Engineering

Electrification

Appointment of Persons Working on or Having Access to Electrical Power Supply Equipment


Issue

Date

Status

Price

Colour

Compliance

Implementation

2
Feb 04
D
This procedure sets out the arrangements for the appointment and duties of Examining and Issuing Officers and
the appointment of persons competent to work on or have access to electrical equipment forming part of
electrical power supply systems in accordance with RT/E/S/21070, Competence of Persons Working On or Having
Access to Electrical Power Supply Equipment.
Mandatory upon: Network Rail
Standards Ownership: Electrification & Plant
RT/E/P/24003

De-Icing of Conductor Rails on DC Electrified Lines


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Sep 96
B
This procedure details the actions to be taken for maintaining effective current collections on the DC conductor
rail systems throughout adverse winter weather conditions.
Mandatory upon: Network Rail
Standards Ownership: Electrification & Plant
RT/E/P/24009

Competence Requirements for Personnel Who Undertake Electrical Control Operators Duties
Issue

Date

Status

Price

Colour

Compliance

Implementation

2
Jun 02
F
Yes
This procedure details the specific requirements for competence assessment of Electrical Control Operators (ECO s).
Mandatory upon: Network Rail
Standards Ownership: Electrification & Plant
RT/E/P/24010

Management of Warnings and Alarms Received from Trackside Pantograph Monitoring Equipment
Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Nov 97
C
This is a procedure for the reporting and investigating pantograph uplift exceedances detected by trackside pantograph
monitoring equipment operating on 25kV overhead line electrification equipment managed by Network Rail.
Mandatory upon: Network Rail
Further Information: Calls up 8 documents
Standards Ownership: Electrification & Plant
RT/E/P/24011

Booster Transformer Outages


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Feb 02
C
This procedure defines the process for managing the outages of booster transformers on Network Rail s
25 kV AC, 50 Hz electrified lines. The procedure details the actions required to be taken by the Regional/ Zone
Electrification and Plant Engineer. Further and more detailed information on booster transformer outages can be
found in the Network Rail guidance notes RT/E/G/24015
Mandatory upon: Network Rail
Standards Ownership: Electrification & Plant
RT/E/P/24013

Notification of Energisation of New AC and DC Electrified Lines


Issue

Date

Status

Price

Colour

Compliance

Implementation

2
Mar 98
C
This procedure states the requirements for the design and the display of posters, the publication of notices and the
provision of advice concerning the energisation of new, or extensions to AC and DC Electrified Lines.
Mandatory upon: Network Rail
Standards Ownership: Electrification & Plant

th

st

Issue 46: 7 August 1 October 2004

Catalogue of Company Standards

Page 36

2. Company Standards

C. Engineering

Electrification

2C1.3. Codes of Practice


RT/E/C/27003

Identification of Component Failures in 25kV Overhead Line Equipment


Issue

Date

Status

Price

Colour

Compliance

Implementation

2
Feb 98
E
Yes
This Code of Practice offers assistance in identification of the generic cause of overhead line equipment component
failure.
Mandatory upon: Advisory only
Standards Ownership: Electrification & Plant
RT/E/C/27004

Wire Identification Codes for Ancillary Wiring of Electrical Distribution Equipment on AC & DC
Electrified Lines
Issue

Date

Status

Price

Colour

Compliance

Implementation

5
Oct 02
D
This code of practice states the best practice for wire identification codes for ancillary wiring BETWEEN main
items of electrical distribution equipment including SCADA outstation equipment on AC and DC Electrified Lines.
It may also be applied to wiring WITHIN an item of electrical distribution equipment.
Mandatory upon: Advisory only
Further Information: To be read in conjunction with RT/E/S/21028
Standards Ownership: Electrification & Plant
RT/E/C/27006

Calculation of Protection Settings for DC Track Feeders


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Oct 98
E
This Code of Practice sets out approved procedures and data for the calculation of protection settings for track
feeders on DC electrified routes. An overview is given of protection systems currently in use, together with the
theoretical basis on which settings are calculated. This basis is then applied to the determination of settings for
each type of protection. Worked examples and relevant system data are included.
Mandatory upon: Advisory only
Standards Ownership: Electrification & Plant
RT/E/C/27009

Overhead Line Equipment Campaign Changes


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Mar 98
F
This Code of Practice lists all the known recommended campaign changes applied to Overhead Line Equipment in
accordance with instructions issued from both the former British Railways Board (D of M& EE) and can be used as
an aid to: a) identify areas of non-compliance; b) evaluate the risks associated with non-compliance.
Mandatory upon: Advisory only
Standards Ownership: Electrification & Plant
RT/E/C/27010

Compatibility between Electric Trains and Electrification Systems


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Nov 97
C
This Code of Practice is for guidance when considering the evaluation process detailed in Railway Group Standard,
GM/RT1000 Compatibility between Electric Trains and Electrification Systems.
Mandatory upon: Advisory only
Standards Ownership: Electrification & Plant
RT/E/C/27017

Competence Management Systems for Work on Electrification and Plant Systems


Issue

Date

Status

Price

Colour

Compliance

Implementation

2
Feb 04
E
The purpose of this Code of Practice is to provide guidance to all organisations involved in work on the Network
Rail electrification and plant infrastructure, which are required to meet the conditions for safety critical work
specified in Railway Group and Network Rail Business Standards.
Mandatory upon: Advisory only
Standards Ownership: Electrification & Plant

th

st

Issue 46: 7 August 1 October 2004

Catalogue of Company Standards

Page 37

2. Company Standards

RT/E/C/27018

C. Engineering

Electrification

Training of Persons Working on or Having Access to Electrical Power Supply Equipment


Issue

Date

Status

Price

Colour

Compliance

Implementation

2
Feb 04
C
The purpose of this code of practice is to set out good practice for the requirements for training and assessment
of persons working on or having access to electrical power supply equipment so they have sufficient technical
knowledge, education and experience to ensure their competence to carry out their duties without risk of danger
to themselves or other persons, and without damage to the equipment concerned.
Mandatory upon: Advisory only
Standards Ownership: Electrification & Plant
RT/E/C/27019

Design and Installation of Composite Aluminium/Stainless Steel Conductor Rail and Associated
Equipment on DC Electrified Lines
Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Mar 98
D
This Code of Practice states the best practice for the design, manufacture, installation and testing of
aluminium/stainless steel composite conductor rail and associated equipment for use on Network Rail DC
Electrified Lines, designated standard current.
Mandatory upon: Advisory only
Standards Ownership: Electrification & Plant
RT/E/C/27020

Design and Installation of Steel Conductor Rail and Associated Equipment for DC Electrified Lines
Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Mar 98
D
This Code of Practice states the best practice for the design and installation of conductor rail and its associated
equipment for use on Network Rail DC Electrified Lines.
Mandatory upon: Advisory only
Standards Ownership: Electrification & Plant
RT/E/C/27021

Electric Track Equipment Layout Design for DC Electrified Lines


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Mar 98
D
This Code of Practice states the best practice for electric track equipment layout design, for use on Network Rail
DC Electrified Lines.
Mandatory upon: Advisory only
Standards Ownership: Electrification & Plant
RT/E/C/27022

Design & Installation of Negative Bonding & Associated Equipment on DC Electrified Lines
Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Mar 98
C
This Code of Practice states the best practice for the design and installation of negative bonding and associated
equipment for use on Network Rail DC Electrified Lines.
Mandatory upon: Advisory only
Standards Ownership: Electrification & Plant

th

st

Issue 46: 7 August 1 October 2004

Catalogue of Company Standards

Page 38

2. Company Standards

C. Engineering

Electrification

2C1.4. Guidance Notes


RT/E/G/00003

AC Electrified Lines Management of Incidents Involving Damage to Overhead Line Equipment


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Aug 00
C
This guidance note is designed to supplement existing Line and Group Specifications and Procedures for the
management of incidents involving damage to overhead line equipment on Network Rail controlled Infrastructure
and its interfaces with other companies. It also covers infrastructure not controlled by Network Rail, but where
OLE is maintained by an Infrastructure Maintainer on an agency basis or by other contractual arrangements.
Mandatory upon: Advisory only
Standards Ownership: Electrification & Plant
RT/E/G/00004

AC Electrified Lines Earthing & Bonding


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Aug 00
B
This guidance note is designed to supplement existing Group and Line Specifications for the design of earthing and
bonding systems for 25kV electrified lines.
Mandatory upon: Advisory only
Standards Ownership: Electrification & Plant
RT/E/G/00011

Uninterruptible Power Supply (UPS) Equipment


Issue

Date

Status

Price

Colour

Compliance

Implementation

2
Aug 02
D
These guidance notes are intended to advise Network Rail staff about the principal considerations regarding the
application of Uninterruptible Power Supplies (UPS) for railway infrastructure. This document is aimed at UPS
systems with a rating of 20kVA upwards for signalling installations however much of the guidance is applicable to
smaller units and other installations.
Mandatory upon: Advisory only
Standards Ownership: Electrification & Plant
RT/E/G/00015

Signalling Power Supply Design


Issue

Date

Status

Price

Colour

Compliance

Implementation

2
Jun 03
D
This Guidance Note is intended to advise Network Rail staff and contractors about the process required to
successfully design a signalling power supply for railway infrastructure.
Mandatory upon: Advisory only
Standards Ownership: Electrification & Plant
RT/E/G/24015

Technical Management of Booster Transformer Outages


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Feb 02
C
These guidance notes support the Network Rail Company procedure for managing the outages of booster
transformers on 25kV a.c., 50 Hz electrified lines and assist the Zone Electrification and Plant Engineer in assessing
the actions required to be taken in the event of booster transformer outage(s).
Mandatory upon: Advisory only
Standards Ownership: Electrification & Plant

th

st

Issue 46: 7 August 1 October 2004

Catalogue of Company Standards

Page 39

2. Company Standards

C. Engineering

Electrification

2C1.5. Work Instructions


RT/E/WI/00109

Machine Switch Out in Conjunction With The Trial of on Track Maintenance Machines
Issue

Date

Status

Price

Colour

Compliance

Implementation

E1
Feb 04
C
The purpose of this document is to provide instruction for the use of On Track Maintenance Machines (OTM's)
with integral short-circuiting devices, in association with a Machine Switch Out (MSO).
Mandatory upon: Network Rail and Contractors
Standards Ownership: Electrification & Plant
RT/E/WI/00110

Maintenance of Electrification, Plant, Signalling and Telecommunications Equipment, Incorporating


Asbestos Materials or Components
Issue

Date

Status

Price

Colour

Compliance

Implementation

1
May 04
D
This Work Instruction supplements existing maintenance instructions with asbestos related requirements for
electrification, plant, signalling and telecommunications equipment incorporating asbestos materials or components
to ensure compliance with current legislation.
Mandatory upon: Advisory only
Standards Ownership: Electrification & Plant

th

st

Issue 46: 7 August 1 October 2004

Catalogue of Company Standards

Page 40

2. Company Standards

C. Engineering

Business Engineering

2C2. Business Engineering


2C2.1. Specifications
RT/D/S/012

Content of Railtrack Infrastructure Maintenance Contractors Stewardship Report


Issue

Date

Status

Price

Colour

Compliance

Implementation

5
Apr 00
B
This specification gives the requirements for the content of Stewardship Reports that the Infrastructure
Maintenance Contractor is required to produce for each RT1A or IMC2 contract.
Mandatory upon: Contractors
Standards Ownership: Business Engineering

2C2.2. Procedures
RT/E/P/02009

Engineering Management for Projects


Issue

Date

Status

Compliance

Implementation

2
Oct 01
This procedure gives the minimum requirements for managing engineering associated new works.
Mandatory upon: Network Rail
Standards Ownership: Business Engineering
These Standards are for Network Rail Use Only Not Available outside the Company

RT/E/P/02017

Content and Preparation of a Contract Technical Workscope


Issue

Date

Status

Price

Colour

Compliance

Implementation

2
Jan 99
D
This procedure describes the content, structure and preparation of a Contract Technical Workscope for a
Network Rail infrastructure project, and gives guidance to specifiers and keyboard operators in the use of the
Contract Technical Workscope template and data bank.
Mandatory upon: Network Rail
Standards Ownership: Business Engineering
RT/E/P/02106

Management of the Effects of Changing Traffic Flows on Maintenance


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Jun 03
C
This procedure sets out the process for capturing and collating information on shortterm changes of traffic flows,
including engineering works, and for identifying exceptional situations, which may affect the maintenance and
renewal regime on a particular route, in the period before an updated Contract Area Profile is issued.
Mandatory upon: Network Rail
Standards Ownership: Business Engineering
RT/E/P/02201

Management of Risk Arising From Deferred Renewals


Issue

Date

Status

Price

Colour

Compliance

Implementation

Emergency 1
Feb 04
C
For various reason, an asset renewal may be deferred beyond its due date. This procedure describes how to
prepare, implement and manage measures to ensure that the risks arising from deferral are controlled.
Mandatory upon: Network Rail
Standards Ownership: Business Engineering

th

st

Issue 46: 7 August 1 October 2004

Catalogue of Company Standards

Page 41

2. Company Standards

C. Engineering

Ergonomics

2C3. Ergonomics
2C3.1. Specifications
RT/E/S/24017

Control Room Design Specification, Process and Guidance


Issue

Date

Status

Price

Colour

Compliance

Implementation

2
Apr 04
E
This standard, recognises the industries increased awareness of the implication of ergonomics on the effective, safe
and reliable performance delivery. This draws on the ISO Standard, but sets specific requirements appropriate to
the railway environment using recent research findings.
Mandatory upon: Network Rail
Standards Ownership: Ergonomics

2C3.2. Procedures
RT/E/P/24020

Incorporating Ergonomics Within Engineering Design Projects: Requirements


Issue

Date

Status

Price

Colour

Compliance

Implementation

2
Apr 04
D
The purpose of this Network Rail Company Specification is to ensure that user issues are considered in a
systematic way throughout the design lifecycle of a range of projects including the replacement, upgrade and design
of new systems; through the correct and timely application of appropriate ergonomic techniques and practices
Mandatory upon: Network Rail & Contractors
Standards Ownership: Ergonomics

2C3.3. Guidance Notes


RT/E/G/00027

Incorporating Ergonomics Within Engineering Design Projects: Guidance Note


Issue

Date

Status

Price

Colour

Compliance

Implementation

2
Apr 04
D
The following Guidance Note provides greater detail about the way in which RT/E/P/24019: Incorporating
Ergonomics Within Engineering Design Projects: Requirements may be applied.
Mandatory upon: Advisory only
Standards Ownership: Ergonomics

th

st

Issue 46: 7 August 1 October 2004

Catalogue of Company Standards

Page 42

2. Company Standards

C. Engineering

Plant

2C4. Plant
2C4.1. Specifications
RT/E/S/21072

Trackside Pantograph Monitoring Equipment.


Issue

Mandatory upon:
Further Information:
Caution:
Standards Ownership:
RT/E/S/21073

Date

Status

Price

Colour

Compliance

Implementation

1
Nov 97
D
This specification states the Directorate s performance requirements for equipment to monitor the dynamic
performance of pantographs fitted to passing trains.
Network Rail
Performance specification
See note i below
Electrification & Plant
The Siting of Pantograph Monitoring Equipment
Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Nov 97
B
This specification states the Dirctorate s requirements for siting pantograph monitoring equipment defined in
Network Rail Specification RT/E/S/21072.
Mandatory upon: Contractors
Standards Ownership: Electrification & Plant
RT/E/S/40001

Maintenance of Standby Generators


Issue

Date

Status

Price

Colour

Compliance

Implementation

2
Jun 99
C
This document states the minimum requirements for the maintenance of standby generators.
Mandatory upon: Network Rail, Contractors & Lessees
Standards Ownership: Electrification & Plant

Core Maintenance Specification for:


RT/E/S/40003

Electric Points Heating Installations in Depots


Issue

Date

Status

1
Apr 96
Electric Points Heating Installations within Depots.
Mandatory upon: Contractors
Standards Ownership: Electrification & Plant
RT/E/S/40004

Price

Colour

Compliance

Implementation

Compliance

Implementation

Non Traction Electrical Sub-Stations in Depots & Stations


Issue

Date

Status

Price

Colour

1
Feb 96
D
This is a generalised maintenance specification for Non-Traction Substations in Depots and Stations.
Mandatory upon: Contractors
Standards Ownership: Electrification & Plant
RT/E/S/40005

Escalators and Passengers Conveyors


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Feb 96
D
This is a generalised maintenance specification for Escalators and Passengers Conveyors.
Mandatory upon: Contractors
Standards Ownership: Electrification & Plant

CAUTION! The requirements for protective treatments materials and their application referred to in this Specification have been superseded by:
RT/CE/S/039 - Specification RT98 - Protective Treatment for Railtrack Infrastructure;
RT/CE/C/002 - Application and Reapplication of Protective Treament to Metallic Structures
th

st

Issue 46: 7 August 1 October 2004

Catalogue of Company Standards

Page 43

2. Company Standards

C. Engineering

Plant

Core Maintenance Specification for: (cont)


RT/E/S/40006
Lifts
Issue

Date

Status

Price

Colour

Compliance

Implementation

Compliance

Implementation

1
Feb 96
C
This is a generalised specification for maintenance for Lifts.
Mandatory upon: Contractors
Standards Ownership: Electrification & Plant
RT/E/S/40007

Fixed Electrical Installation Equipment in Depots & Stations


Issue

Date

Status

Price

Colour

1
Feb 96
C
This is a generalised maintenance specification for Fixed Electrical Installations in Depots and Stations.
Mandatory upon: Contractors
Standards Ownership: Electrification & Plant
RT/E/S/40008

Emergency Lighting in Depots & Stations


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Feb 96
C
This is a generalised maintenance specification for Emergency Lighting in Depots and Stations.
Mandatory upon: Contractors
Standards Ownership: Electrification & Plant
RT/E/S/40010

Equipment and Infrastructure Associated with Oil Interceptor and Recovery Systems in Depots,
Stations & Other Areas
Issue

Date

Status

Price

Colour

Compliance

Implementation

2
Oct 00
C
This is a generalised maintenance specification specification for Equipment and Infrastructure associated with Oil
Interceptor and Recovery Systems within Depots, Stations and other areas.
Mandatory upon: Contractors
Standards Ownership: Electrification & Plant
RT/E/S/40011

Compressed Air/Vacuum Installations within Depots & Stations


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Feb 96
C
This is a generalised maintenance specification for Compressed Air/Vacuum Installations within Depots and
Stations.
Mandatory upon: Contractors
Standards Ownership: Electrification & Plant
RT/E/S/40013

Ventilation/Extraction & Air Conditioning Units in Depots & Stations


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Feb 96
C
This is a generalised maintenance specification for Ventilation/Extraction and Air Conditioning Units in Depots and
Stations.
Mandatory upon: Contractors
Standards Ownership: Electrification & Plant
RT/E/S/40015

Gas & Oil Fired Heating Systems in Depots & Stations


Issue

Date

Status

Price

Colour

Compliance

Implementation

2
Oct 00
C
This is a generalised maintenance specification for Gas/Oil Fired Heating Systems within Depots and Stations.
Mandatory upon: Contractors
Standards Ownership: Electrification & Plant

th

st

Issue 46: 7 August 1 October 2004

Catalogue of Company Standards

Page 44

2. Company Standards

C. Engineering

Plant

Core Maintenance Specification for: (cont)


RT/E/S/40016
Fire Alarms in Depots & Stations
Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Feb 96
C
This is a generalised maintenance specification for Fire Alarm Systems in Depots and Stations.
Mandatory upon: Contractors
Standards Ownership: Electrification & Plant
RT/E/S/40017

Powered Scrubber/Sweeper
Issue

Date

Status

Price

Colour

Compliance

Implementation

Compliance

Implementation

Compliance

Implementation

Compliance

Implementation

Colour

Compliance

Implementation

Colour

Compliance

Implementation

Compliance

Implementation

1
Feb 96
C
This is a generalised maintenance specification for Powered Scrubbers/Sweepers.
Mandatory upon: Contractors
Standards Ownership: Electrification & Plant
RT/E/S/40019

Diesel Electric Turntables


Issue

Date

Status

Price

Colour

1
Mar 96
C
This is a generalised maintenance specification for Diesel-Electrical Turntables.
Mandatory upon: Contractors
Standards Ownership: Electrification & Plant
RT/E/S/40022

Waste Compactors
Issue

Date

Status

Price

Colour

1
Feb 96
C
This is a generalised maintenance specification for Waste Compactors.
Mandatory upon: Contractors
Standards Ownership: Electrification & Plant
RT/E/S/40023

Depot Protection Equipment


Issue

Date

Status

Price

Colour

1
Feb 96
C
This is a generalised maintenance specification for Depot Protection Equipment.
Mandatory upon: Contractors
Standards Ownership: Electrification & Plant
RT/E/S/40025

Conveyors
Issue

Date

Status

Price

1
Feb 96
C
This is a generalised maintenance specification for Conveyors.
Mandatory upon: Contractors
Standards Ownership: Electrification & Plant
RT/E/S/40026

Sewage Disposal Plant


Issue

Date

Status

Price

1
Feb 96
C
This is a generalised maintenance specification for Sewage Disposal Plant.
Mandatory upon: Contractors
Standards Ownership: Electrification & Plant
RT/E/S/40027

Train Pre-Heating Shore Supplies


Issue

Date

Status

Price

Colour

1
Feb 96
C
This is a generalised maintenance specification for Train Pre-Heating Shore Supplies.
Mandatory upon: Contractors
Standards Ownership: Electrification & Plant

th

st

Issue 46: 7 August 1 October 2004

Catalogue of Company Standards

Page 45

2. Company Standards

C. Engineering

Plant

Core Maintenance Specification for: (cont)


RT/E/S/40028
Traversers
Issue

Date

Status

Price

Colour

Compliance

Implementation

Colour

Compliance

Implementation

1
Feb 96
C
This is a generalised maintenance specification for Traversers.
Mandatory upon: Contractors
Standards Ownership: Electrification & Plant
RT/E/S/40029

Automatic Turnstiles and Ticket Machines


Issue

Date

Status

Price

1
Feb 96
C
This is a generalised maintenance specification for Automatic Turnstiles and Ticket Machines.
Mandatory upon: Contractors
Standards Ownership: Electrification & Plant
RT/E/S/40030

Industrial Doors
Issue

Date

Status

Price

Colour

Compliance

Implementation

Colour

Compliance

Implementation

Colour

Compliance

Implementation

Compliance

Implementation

Compliance

Implementation

1
Feb 96
C
This is a generalised maintenance specification for Industrial Doors.
Mandatory upon: Contractors
Standards Ownership: Electrification & Plant
RT/E/S/40031

Wheeldrops
Issue

Date

Status

Price

1
Feb 96
C
This is a generalised maintenance specification for Wheeldrops.
Mandatory upon: Contractors
Standards Ownership: Electrification & Plant
RT/E/S/40032
Fixed Battery Chargers
Issue

Date

Status

Price

1
Mar 96
C
This is a generalised maintenance specification for Fixed Battery Chargers.
Mandatory upon: Contractors
Standards Ownership: Electrification & Plant
RT/E/S/40033

Overhead Cranes
Issue

Date

Status

Price

Colour

1
Feb 96
C
This is a generalised maintenance specification for Overhead Cranes.
Mandatory upon: Contractors
Standards Ownership: Electrification & Plant
RT/E/S/40034

Building Maintenance Platforms


Issue

Date

Status

Price

Colour

1
Feb 96
C
This is a generalised maintenance specification for Building Maintenance Platforms.
Mandatory upon: Contractors
Standards Ownership: Electrification & Plant
RT/E/S/40035

Equipment and Infrastructure Associated with Fuel, Chemical and Oil Storage and Dispensing
Systems
Issue

Date

Status

Price

Colour

Compliance

Implementation

2
Oct 00
C
This is a generalised maintenance specification for Equipment and Infrastructure associated with Fuel, Chemical and
Oil Storage and Dispensing Systems.
Mandatory upon: Contractors
Standards Ownership: Electrification & Plant

th

st

Issue 46: 7 August 1 October 2004

Catalogue of Company Standards

Page 46

2. Company Standards

C. Engineering

Plant

Core Maintenance Specification for: (cont)


RT/E/S/40036
Car Park Equipment
Issue

Date

Status

Price

Colour

Compliance

Implementation

Compliance

Implementation

1
Feb 96
C
This is a generalised maintenance specification for Car Park Equipment.
Mandatory upon: Contractors
Standards Ownership: Electrification & Plant
RT/E/S/40039

Illuminated Advertising Signs


Issue

Date

Status

Price

Colour

1
Feb 96
C
This document is the Technical Specification for the maintenance of Illuminated Advertising Signs.
Mandatory upon: Contractors
Standards Ownership: Electrification & Plant
RT/E/S/40040

Electronic Left Luggage Lockers


Issue

Date

Status

Price

Colour

Compliance

Implementation

Compliance

Implementation

Compliance

Implementation

1
Feb 96
C
This is a generalised maintenance specification for Electronic Left Luggage Lockers.
Mandatory upon: Contractors
Standards Ownership: Electrification & Plant
RT/E/S/40041

Overhead Trolley Jumper Systems


Issue

Date

Status

Price

Colour

1
Mar 96
C
This is a generalised maintenance specification for Overhead Trolley Jumper Systems.
Mandatory upon: Contractors
Standards Ownership: Electrification & Plant

RT/E/S/40043

Passenger Lifts
Issue

Date

Status

Price

Colour

1
Feb 96
C
This standard states the requirements for the installation of new or the refurbishment of existing lifts on Network
Rail owned stations where public operation is required.
Mandatory upon: Network Rail
Further Information: Performance specification
Standards Ownership: Electrification & Plant
RT/E/S/40044

Responsibilities of Depot Facility Owners to Maintain Depot Electromechanical Plant and Services
and Associated Infrastructure
Issue

Date

Status

Price

Colour

Compliance

Implementation

2
Oct 00
B
This standard defines the responsibilities of Depot Facility Owners having Depot Leasing Agreements with
Network Rail to maintain depot plant and services.
Mandatory upon: Contractors
Standards Ownership: Electrification & Plant
RT/E/S/40045

Electric Point Heating


Issue

Date

Status

Price

Colour

Compliance

Implementation

4
Jun 03
D
This specification states the requirements for the design, manufacture and testing of electric point heating
components and systems.
Mandatory upon: Network Rail
Further Information: Performance specification
Standards Ownership: Electrification & Plant

th

st

Issue 46: 7 August 1 October 2004

Catalogue of Company Standards

Page 47

2. Company Standards

RT/E/S/40047

C. Engineering

Plant

Maintenance of Points Heating Installations


Issue

Date

Status

Price

Colour

Compliance

Implementation

3
Aug 01
C
This document states the minimum requirements for the maintenance of points heating installations.
Mandatory upon: Network Rail & Contractors
Standards Ownership: Electrification & Plant
RT/E/S/40049

Maintenance of Gas/Oil Fired Heating Systems


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Apr 99
B
This document specifies the minimum requirements for the maintenance of Gas/Oil Fired Heating Systems.
Mandatory upon: Network Rail
Further Information: Performance specification
Standards Ownership: Electrification & Plant
RT/E/S/40050

Maintenance of Air Conditioning and Ventilation Equipment


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Apr 99
B
This document states the minimum requirements for the maintenance of Air Conditioning and Ventilation
equipment.
Mandatory upon: Network Rail
Further Information: Performance specification
Standards Ownership: Electrification & Plant
RT/E/S/40051

Maintenance of Fixed Electrical Installation Equipment


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Apr 99
B
This document specifies the minimum requirements for the maintenance of fixed electrical installation equipment.
Mandatory upon: Network Rail
Further Information: Performance specification
Standards Ownership: Electrification & Plant
RT/E/S/40052

Maintenance of Lighting Installations


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Apr 99
B
This document specifies the minimum requirements for the maintenance of lighting installations.
Mandatory upon: Network Rail
Further Information: Performance specification
Standards Ownership: Electrification & Plant
RT/E/S/40053

Maintenance of Emergency Lighting Equipment


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Jun 99
B
This document specifies the minimum requirements for the maintenance of Emergency Lighting Systems.
Mandatory upon: Network Rail, Contractors & Lessees
Standards Ownership: Electrification & Plant
RT/E/S/40054

Maintenance of Water Distribution Systems


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Apr 99
B
This document specifies the minimum requirements for the maintenance water distribution systems.
Mandatory upon: Network Rail
Further Information: Performance specification
Standards Ownership: Electrification & Plant

th

st

Issue 46: 7 August 1 October 2004

Catalogue of Company Standards

Page 48

2. Company Standards

RT/E/S/40055

C. Engineering

Plant

Maintenance of Fire Alarm Systems


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Jun 99
B
This document specifies the minimum requirements for the maintenance of Fire Alarm Systems.
Mandatory upon: Network Rail, Contractors & Lessees
Standards Ownership: Electrification & Plant
RT/E/S/40056

Maintenance of Sewage Disposal Plant


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Apr 99
B
This document specifies the minimum requirements for the maintenance of sewage disposal plant.
Mandatory upon: Network Rail
Further Information: Performance specification
Standards Ownership: Electrification & Plant
RT/E/S/40065

The Installation and Upgrading of Lifts


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Oct 01
E
This Specification is designed to supplement Network Rail Company Specification RT/E/S/40043 Passenger Lifts. It
offers additional information which will enable those wishing to specify new, or upgrade existing lifts, to identify
and evaluate the most cost effective options and tenders.
Mandatory upon: Network Rail
Further Information: Performance specification: Replaces RT/K/G/00001
Standards Ownership: Electrification & Plant
RT/E/S/40067

The Installation and Upgrading of Escalators and Passenger Conveyors


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Oct 01
E
This specification outlines the requirements for the Installation and upgrading of escalators and passenger
conveyors.
Mandatory upon: Network Rail
Further Information: Performance specification
Standards Ownership: Electrification & Plant

2C4.2. Procedures
RT/E/P/40042

Periodic Inspection and Testing of Electrical Installations, Appliances and Equipment


Issue

Date

Status

Price

Colour

Compliance

Implementation

2
Dec 01
C
This procedure defines the process for determining the frequency of testing and examination and the minium standard
of testing that the installations, equipment and appliances shall undergo in order to ensure continued safe usage.
Mandatory upon: Network Rail
Standards Ownership: Electrification & Plant
RT/E/P/40064

Approval of Plant Acceptance Bodies


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Oct 00
B
This procedure sets out Network Rail s management process for approval of bodies required to independently
assess certain work equipment.
Mandatory upon: Network Rail & Contractors
Standards Ownership: Electrification & Plant

th

st

Issue 46: 7 August 1 October 2004

Catalogue of Company Standards

Page 49

2. Company Standards

C. Engineering

Plant

2C4.3. Codes of Practice


RT/E/C/45002

The Installation of Electric Point Heating


Issue

Date

Status

Price

Colour

Compliance

Implementation

4
Jun 03
D
This Code of Practice states the best practice for the design, layout, installation, testing and commissioning of
generic types of electric point heating systems.
Mandatory upon: Advisory only
Further Information: Calls up 32 documents
Standards Ownership: Electrification & Plant

th

st

Issue 46: 7 August 1 October 2004

Catalogue of Company Standards

Page 50

2. Company Standards

C. Engineering

Signal Engineering

2C5. Signal Engineering


2C5.1. Specifications
RT/D/S/006

Retro-Reflective Temporary Speed Equipment


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Mar 96
C
This specification defines the appearance of temporary speed restriction retro-reflective equipment, the minimum
technical requirements to achieve safety and safe interworking, and positioning of equipment clear of trains.
Mandatory upon: Contractors
Standards Ownership: Signal Engineering
RT/E/S/02023

Requirements for TASS Infrastructure System Design


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Dec 03
F
This specification defines the design requirements for the Tilt Authorisation and Speed Supervision (TASS) system
developed to deliver the principal requirements of Railway Group Standards GE/RT8012 Controlling The Speed Of
Tilting Trains Through Curves and GE/RT8019 Tilting Trains: Controlling Tilt Systems To Maintain Clearances .
Mandatory upon: Contractors
Standards Ownership: Signal Engineering
RT/E/S/02024

Requirements for TASS Infrastructure Installation, Test and Maintenance


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Dec 03
E
Yes
This specification defines the installation, test and maintenance requirements for the track-based equipment
associated with the Tilt Authorisation and Speed Supervision (TASS) system developed to deliver the principal
requirements of Railway Group Standards GE/RT8012 Controlling The Speed Of Tilting Trains Through Curves
and GE/RT8019 Tilting Trains: Controlling Tilt Systems To Maintain Clearances .
Mandatory upon: Contractors
Standards Ownership: Signal Engineering
RT/E/S/10028

Inspection and Surveillance of Signal Engineering Activities


Issue

Date

Status

Price

Colour

Compliance

Implementation

Rapid Response

E3
Apr 04
C
This specification is intended to augment and amplify the responsibilities placed upon the infrastructure controller
as stated in Clause 8.3 Railway Group Standard GK/RT0210.
Mandatory upon: Network Rail & Contractors
Further Information: Not required if GK/RT0171 is achieved
Standards Ownership: Signal Engineering

RT/E/S/10029

Operation and Maintenance of Non-intrusive Earth Leakage Test Adapter for Reed FDM Systems
Produced to Specification EDS 01/96 MOD State 3
Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Aug 98
C
This standard specifies the user and maintenance requirements for the Non-Intrusive FDM Earth Leakage Adapter. The
adapter allows a standard multimeter to be adapted to allow it to measure the cable resistance to earth of the FDM
system. Existing instruments for measuring the resistance pose the hazard of generating an interfering signal through its
power supply and can therefore not be used on a live system.
Mandatory upon: Network Rail & Contractors
Standards Ownership: Signal Engineering
RT/E/S/10039

Operational Requirements for Miniature Stop Light Level Crossings


Issue

Date

Status

Price

Colour

Compliance

Implementation

2
Oct 03
B
This specification defines the detailed Operational Requirements for Miniature Stop Light level crossings.
Mandatory upon: Network Rail
Further Information: Performance specification
Standards Ownership: Signal Engineering

th

st

Issue 46: 7 August 1 October 2004

Catalogue of Company Standards

Page 51

2. Company Standards

RT/E/S/10040

Signal Engineering

IECC Applications Manual Contents


Issue

C. Engineering

Date

Status

Price

Colour

Compliance

Implementation

6 (5)
Aug 04 (Aug 03)
Up-Issued D
07/08/04
07/08/04
This specification mandates the use of the IECC Applications Manual for all new and existing IECC schemes and
lists all documents contained therein.
Mandatory upon: Network Rail & Contractors
Standards Ownership: Signal Engineering

RT/E/S/10047

Management of Safety Related Reports for Signalling Failures


Issue

Date

Status

Price

Colour

Compliance

Implementation

9 (8)
Feb 04 (Apr 02)
D
This company specification defines the requirements for a safety management system for failures of the Signalling
and Infrastructure.
Mandatory upon: Network Rail
Standards Ownership: Signal Engineering
RT/E/S/10060

Vital Signalling Timer


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Feb 99
D
This document has been prepared to define the performance requirements for a Vital Signalling Timer unit for
use in signalling circuitry.
Mandatory upon: Network Rail & Contractors
Standards Ownership: Signal Engineering
RT/E/S/10062

Requirement Specification for Performance of Long Range Colour Light Signals


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Aug 99
D
This specification is for the performance requirements of long range colour light signals.
Mandatory upon: Network Rail & Contractors
Standards Ownership: Signal Engineering
RT/E/S/10064

General Instructions to Staff Working on S & T Equipment


Issue

Date

Status

Price

Colour

Compliance

Implementation

Emergency 1
Jan 98
E
This specification states the general requirements for staff working on S & T Systems and Equipment.
Mandatory upon: Contractors
Standards Ownership: Signal Engineering
RT/E/S/10067

VDU Based Signalling Control System


Issue

Date

Status

Price

Colour

Compliance

Implementation

2
Aug 03
D
Yes
The purpose of this Requirement Specification is to define the essential and desirable requirements for a VDU based
Signalling Control System (VSCS) for signalling applications.
Mandatory upon: Network Rail & Contractors
Standards Ownership: Signal Engineering
RT/E/S/10071

Approval of Signalling Equipment


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Dec 97
C
New signalling equipment, and changes to existing equipment, shall be assessed to ensure that any risks are controlled
and minimised. Explicit, documented approval shall be obtained before introduction into service.
Mandatory upon: Network Rail
Standards Ownership: Signal Engineering

th

st

Issue 46: 7 August 1 October 2004

Catalogue of Company Standards

Page 52

2. Company Standards

RT/E/S/10073

C. Engineering

Signal Engineering

Barrier Boom Light Units for Level Crossings


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Feb 98
B
This specification states the requirements for light units used on level crossing barrier booms.
Mandatory upon: Network Rail
Further Information: Performance Specification
Standards Ownership: Signal Engineering
RT/E/S/10075

Level Crossing Ground Plans


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Jun 00
D
This document has been prepared to define the detailed requirements for production of level crossing ground plans.
Mandatory upon: Network Rail & Contractor
Standards Ownership: Signal Engineering
RT/E/S/10081

Preventative and Corrective Maintenance of Lever Frames


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Dec 97
C
This specification identifies the requirements for those managing and undertaking signalling maintenance activities
on Network Rail infrastructure. It is particularly concerned with the preventative and corrective maintenance
activities applicable to mechanical signalling lever frames in order that they remain available to perform their
intended functions.
Mandatory upon: Contractors
Standards Ownership: Signal Engineering
RT/E/S/10083

Preventative and Corrective Maintenance of Mechanical Signalling Wire Runs and Rodding
Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Dec 97
C
This specification identifies the requirements for those managing and undertaking signalling maintenance activities
on Network Rail infrastructure. It is particularly concerned with the preventative and corrective maintenance
activities applicable to mechanical signalling wire runs and rodding in order that they remain available to perform
their intended functions.
Mandatory upon: Contractors
Standards Ownership: Signal Engineering
RT/E/S/10110

Requirement Specification for Performance of Position Light Signals


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Aug 99
D
This specification is for the performance requirements of position light signals.
Mandatory upon: Network Rail & Contractors
Standards Ownership: Signal Engineering
RT/E/S/10127

Equipment Specification for the Filament Lamp (Type SL35) for use in the Long Range Colour Light
Signal
Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Apr 99
C
This document specifies the requirements for SL35 filament lamps used with the Long Range Colour Light Signals.
Mandatory upon: Network Rail & Contractors
Standards Ownership: Signal Engineering
RT/E/S/10129

Requirement Specification for Train Detection Using Axle Counters


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Feb 99
D
This specification is for systems providing train detection using axle counters. It defines the requirements of such a
system, and specifies the interfaces with which such a system is required to work.
Mandatory upon: Network Rail & Contractors
Standards Ownership: Signal Engineering

th

st

Issue 46: 7 August 1 October 2004

Catalogue of Company Standards

Page 53

2. Company Standards

RT/E/S/10131

C. Engineering

Signal Engineering

Requirement Specification for Signals On Controls for SSI Schemes


Issue

Date

Status

Price

Colour

Compliance

Implementation

2
Aug 03
C
The purpose of this specification is to define the requirements for Signals On Controls for use with Railtrack
infrastructure equipped with Solid State Interlocking (SSI).
Mandatory upon: Network Rail & Contractors
Standards Ownership: Signal Engineering
RT/E/S/10133

TPWS Signalling Interface Design Requirements


Issue

Date

Status

Price

Colour

Compliance

Implementation

3
Apr 04
F
Yes
This Specification details the requirements for the design of the signalling interface associated with the fitment of
the Train Protection and Warning System (TPWS) to Network Rail infrastructure.
Mandatory upon: Network Rail & Contractors
Standards Ownership: Signal Engineering
RT/E/S/10134

TPWS Track Sub-System Equipment


Issue

Date

Status

Price

Colour

Compliance

Implementation

3
Apr 04
D
This specification defines the detailed requirements for the track sub-system equipment associated with TPWS.
Mandatory upon: Network Rail & Contractors
Standards Ownership: Signal Engineering
RT/E/S/10135

TPWS Track Sub-system Works Testing Requirements


Issue

Date

Status

Price

Colour

Compliance

Implementation

3
Apr 04
D
This Company Specification has been prepared to provide Signal Works Testers with details of the minimum
requirements for the testing and commissioning procedures necessary to validate the intended functionality and to
verify the installation of the Train Protection and Warning System (TPWS).
Mandatory upon: Network Rail & Contractors
Standards Ownership: Signal Engineering
RT/E/S/10137

TPWS Selection of Signals and Other Locations for Provision of Track Sub-System
Issue

Date

Status

Price

Colour

Compliance

Implementation

3
Apr 04
E
This Specification describes the process for assessing the requirement to provide Train Protection & Warning
System (TPWS) equipment at signals, speed restrictions and Buffer Stops as defined in the Railway Safety
Regulations 1999.
Mandatory upon: Network Rail & Contractors
Standards Ownership: Signal Engineering
RT/E/S/10138

TPWS Transmitter Loop Requirements and Positioning


Issue

Date

Status

Price

Colour

Compliance

Implementation

3
Apr 04
E
This Specification defines the criteria for the positioning of Train Protection and Warning System (TPWS)
transmitter loops and determination of the need for Overspeed Sensor Systems (OSS).
Mandatory upon: Network Rail & Contractors
Standards Ownership: Signal Engineering

th

st

Issue 46: 7 August 1 October 2004

Catalogue of Company Standards

Page 54

2. Company Standards

RT/E/S/10157

C. Engineering

Signal Engineering

Signal Sighting
Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Feb 04
E
Signal Sighting is a key process in the provision and maintenance of the Railway Signalling system. Signals act as interface
between the fixed infrastructure and the train driver. It is imperative that signals convey the messages intended in a
conspicuous, unambiguous and standard manner. This specification details how signal sighting shall be undertaken to ensure
that signals are placed in the best position possible, subject to the constraints of legal requiements, Railway Group and
Network Rail Company standards.
Mandatory upon: Network Rail, Contractors & Lessees
Standards Ownership: Signal Engineering
RT/E/S/10161

Inspection and Survellance of Signal Engineering Installation Activities


Issue

Date

Status

Price

Colour

Compliance

Implementation

Rapid Response

E1
Apr 04
C
This specification sets out the principles and methods for the inspection and surveillance of signal engineering
activities. Thus areas such as installation and equipment renewal are deemed to be included within the scope of
this document.
Mandatory upon: Network Rail & Contractors
Standards Ownership: Signal Engineering

RT/E/S/10172

Special Inspection Notices (SINs)


Issue

Date

Status

Price

Colour

Compliance

Implementation

9
Feb 01
C
This specification states the requirements for a rapid action process when Control Systems or Telecommunications defects are identified that may create a hazard throughout the Industry.
Mandatory upon: Network Rail & Contractors
Standards Ownership: Signal Engineering
Additional Information: The SINs are now listed separately.
RT/E/S/10173

TPWS Track Sub-System Installation Requirements


Issue

Date

Status

Price

Colour

Compliance

Implementation

3
Apr04
F
Yes
This Specification has been prepared to define the detailed requirements for installation of the track sub-system
equipment associated with the Train Protection and Warning System (TPWS).
Mandatory upon: Network Rail & Contractors
Standards Ownership: Signal Engineering
RT/E/S/10178

TPWS in Areas where the Control of Train Movements is by RETB Signalling


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Apr04
F
Yes
This specification mandates the requirements for installing Train Protection and Warning System (TPWS) in areas
where the control of movement of trains is by Radio Electronic Token Block (RETB).
Mandatory upon: Network Rail & Contractors
Standards Ownership: Signal Engineering
RT/E/S/10660

Implementation of Signalling Maintenance Specifications


Issue

Date

Status

Price

Colour

Compliance

Implementation

3
Apr 03
Phone
Yes
This Specification contains details of the authorised Signalling Maintenance Specifications, which represent current
best practice for signalling system maintenance
Mandatory upon: Network Rail & Contractors
Further Information: Replaces: RT/E/WI/00001 to RT/E/WI/00020 inclusive, and RT/E/C/11552.
Standards Ownership: Signal Engineering
RT/E/S/10661

Signalling Maintenance Task Intervals


Issue

Date

Status

Price

Colour

Compliance

Implementation

4
Feb 04
C
This Specification contains maintenance task intervals for signalling infrastrucuture
Mandatory upon: Network Rail & Contractors
Standards Ownership: Signal Engineering

th

st

Issue 46: 7 August 1 October 2004

Catalogue of Company Standards

Page 55

2. Company Standards
RT/E/S/10662

Signal Engineering

Process for the Introduction of New or Revised Maintenance Regimes for Signalling Assets
Issue

C. Engineering

Date

Status

Price

Colour

Compliance

Implementation

2 (1)
Aug 04 (Dec 00)
Up-Issued C
07/08/04
07/08/04
This specification defines the minimum requirements for the development and implementation of new or revised
maintenance regimes for signalling assets.
Mandatory upon: Network Rail & Contractors
Standards Ownership: Signal Engineering

RT/E/S/11010

Management of Signalling and Communication Systems


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Dec 00
B
This Specification ensures that the managerial responsibility for train control and communications systems is not
divided in a way which increases risk.
Mandatory upon: Network Rail & Contractors
Standards Ownership: Signal Engineering
RT/E/S/11107

Silver Migration
Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Dec 00
B
This Specification defines the policy for the management and prevention of silver migration within signalling
equipment.
Mandatory upon: Network Rail & Contractors
Standards Ownership: Signal Engineering
RT/E/S/11129

Life Management of Signalling Relays, Searchlight and Banner Signals


Issue

Date

Status

Price

Colour

Compliance

Implementation

3 (2)
Aug 04 (Oct 01)
Up-Issued D
07/08/04
07/08/04
This Specification details the requirement to control the risks presented by failures of signalling relays and electromechanical searchlight and banner signal mechanisms, so as to satisfy the mandatory requirements of Railway
Group Standard GK/RT0210, Asset Management for the Safety of Signalling and Operational Telecommunication
Systems and Equipment.
Mandatory upon: Network Rail & Contractors
Standards Ownership: Signal Engineering

RT/E/S/11130

Requirements for the Provision of SPAD Alarms at Signalling Control Centres


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Dec 02
C
This specification defines the operational and technical requirements for the provision of SPAD alarms at signalling
control centres. The objective is to present a consistent approach that reflects best practice and to ensure that
human factors considerations are properly addressed.
Mandatory upon: Network Rail & Contractors
Standards Ownership: Signal Engineering
RT/E/S/11171

Maintenance of Signalling Circuit Insulation


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Dec 00
C
This Specification provides the measures to control the risks presented by the deterioration of insulation in
signalling circuits.
Mandatory upon: Network Rail & Contractors
Standards Ownership: Signal Engineering
RT/E/S/11201

Signalling Design: Production


Issue

Date

Status

Price

Colour

Compliance

Implementation

3
Dec 03
E
This Specification, in support of GK/RT0207, sets out mandatory requirements and mandates Codes of Practice for
the production of signalling design detail to ensure: a) safe development and design of new and altered signalling
systems impacting on Network Rail controlled infrastructure; b) safe interfaces between all parties and systems; c)
design details are prepared and presented clearly, accurately, consistently and unambiguously; and d) client s
specified requirements are met and the design is fit for purpose.
Mandatory upon: Network Rail & Contractors
Standards Ownership: Signal Engineering

th

st

Issue 46: 7 August 1 October 2004

Catalogue of Company Standards

Page 56

2. Company Standards

RT/E/S/11221

C. Engineering

Signal Engineering

Signalling Works Testing


Issue

Date

Status

Price

Colour

Compliance

Implementation

3
Feb 04
D
This Specification, in support of GK/RT0209, sets out the mandatory procedures and process controls necessary
to ensure that new signalling installations, and alterations, are independently tested in a manner that assures
compliance with project Concept Design and Engineering Details and, Fitness for purpose before they are offered
for entry into service. It also ensures that, as far as practicable, procedures and process controls are consistent
across the Network Rail environment.
Mandatory upon: Network Rail & Contractors
Standards Ownership: Signal Engineering
RT/E/S/11231

Signalling Maintenance Testing


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Dec 00
F
This Specification defines the testing requirements for previously working and commissioned signalling systems
during maintenance, renewals and faulting where the design remains unchanged.
Mandatory upon: Network Rail & Contractors
Standards Ownership: Signal Engineering
RT/E/S/11303

Requirements for Signalling Installation


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Aug 00
B
This Specification defines the mandatory requirements for the installation of signalling systems and equipment to
satisfy Railway Group Standard GK/RT0208, Installation of Signalling and Operational Telecommunications
Equipment.
Mandatory upon: Network Rail & Contractors
Standards Ownership: Signal Engineering
RT/E/S/11304

Requirement for Data Logging Systems used to Monitor Signalling Installations


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Feb 03
C
The purpose of this specification is to define the mandatory and desirable requirements for the Data Logging
Systems used to monitor signalling installations, to ensure consistency throughout Network Rail Infrastructure.
Mandatory upon: Network Rail & Contractors
Standards Ownership: Signal Engineering
RT/E/S/11630

BR930 Series Pin Code Allocations and Contact Arrangements


Issue

Date

Status

Price

Colour

Compliance

Implementation

7 (6)
Aug 04 (Dec 03)
Up-Issued E
07/08/04
07/08/04
This Specification details the pin code configurations and the arrangement of contacts and other connections, so as
to satisfy the mandatory requirements of Railway Group Standard GK/RT0330.
Mandatory upon: Network Rail & Contractors
Standards Ownership: Signal Engineering

RT/E/S/11652

Definition and Implementation of Reliability Centred Maintenance Derived Task Lists


Issue

Date

Status

Price

Colour

Compliance

Implementation

2
Aug 99
D
This specification defines the control measures necessary to enable the definition and use of reliability Centred
maintenance (RCM) derived task lists for Network Rail infrastructure.
Mandatory upon: Network Rail & Contractors
Standards Ownership: Signal Engineering
RT/E/S/11655

Management of Signalling Wire and Cable Insulation Degradation


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Oct 99
D
This document specifies methods of managing the degradation of insulation in signalling wires and cables.
Mandatory upon: Network Rail & Contractors
Standards Ownership: Signal Engineering

th

st

Issue 46: 7 August 1 October 2004

Catalogue of Company Standards

Page 57

2. Company Standards

RT/E/S/11752

C. Engineering

Signal Engineering

Train Detection
Issue

Date

Status

Price

Colour

Compliance

Implementation

2
Aug 01
Phone
This Specification gives the necessary requirements for train detection systems to satisfy the mandatory requirements
laid down in GK/RT0011.
Mandatory upon: Network Rail
Further Information: Mandated upon Contractors. This standard replaces RT/E/S/10002.
Standards Ownership: Signal Engineering
RT/E/S/14002

Signalling Testing Staff Competence Assessment


Issue

Date

Status

Price

Colour

Compliance

Implementation

2
Dec 00
C
This standard defines the arrangements for Signalling Testers to be formally assessed before they are authorised to
work on Network Rail Controlled Infrastructure, in support of RT/E/S/11221.
Mandatory upon: Network Rail
Standards Ownership: Signal Engineering
RT/E/S/14003

Signalling Testers Authorities to Work


Issue

Date

Status

Price

Colour

Compliance

Implementation

2
Dec 00
B
This standard defines the arrangement for Signalling Testers to be authorised by the Tester in charge to work on
Network Rail Controlled Infrastructure, in support of RT/E/S/11221.
Mandatory upon: Network Rail
Standards Ownership: Signal Engineering
RT/E/S/14200

Prevention and Mitigation of Overruns Risk Assessment Tools


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Apr 03
D
This document is a system specification and contains the tools and techniques to support the Company Standard
RT/E/P14201, Prevention, and Mitigation of Overrun Risk Assessment of Signals. The tools and techniques
provide a structured approach to signal overrun, (i.e. Signal Passed at Danger (SPAD)) risk assessment and should
be used as part of the process shown in the standard.
Mandatory upon: Network Rail
Standards Ownership: Signal Engineering
RT/E/S/17002

SSI Applications Manual Contents


Issue

Date

Status

Price

Colour

Compliance

Implementation

13 (12)
Aug 04 (Dec 02)
Up-Issued B
07/08/04
07/08/04
This specification mandates the use of the SSI Applications Manual for the design of signalling schemes employing
Solid State Interlocking (SSI) equipment on Network Rail infrastructure and lists all documents contained therein
to provide a record of which constituent documents are current and approved for use.
Mandatory upon: Network Rail & Contractors
Further Information: Calls up a number of other documents in a manual mandated as ACOP
Standards Ownership: Signal Engineering

RT/E/S/17004

Requirement Specification for a SSI Technicians Terminal


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Feb 99
D
This document specifies a Technician s Terminal (TT) for the Solid State Interlocking system. The system specified
may be used as a replacement terminal for existing SSI schemes (currently using a TT built to the specification
BR1960A) or for installation in new schemes.
Mandatory upon: Network Rail
Standards Ownership: Signal Engineering
RT/E/S/17005

SSI Long Line Link Telecommunications


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Aug 99
C
This specification states Network Rail s functional requirements for telecommunications systems for use with Solid
State Interlocking Long Line Link incorporating Long Distance Terminal Modules.
Mandatory upon: Network Rail
Standards Ownership: Signal Engineering
th

st

Issue 46: 7 August 1 October 2004

Catalogue of Company Standards

Page 58

2. Company Standards

RT/E/S/17503

C. Engineering

Signal Engineering

IECC Internal Subsystems Communications Requirements


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Jun 99
D
This specification mandates the internal subsystems communications requirements for all new and existing IECC
schemes.
Mandatory upon: Network Rail & Contractors
Standards Ownership: Signal Engineering
RT/E/S/17504

IECC Operating Specification for Signalling Control and Indications Purposes


Issue

Date

Status

Price

Colour

Compliance

Implementation

3
Dec 03
F
Yes
This operating specification defines the mandatory requirements for signalling control and indications equipment
based on the use of colour visual display units (VDUs), and which forms a subsystem of the Integrated Electronic
Control Centre (IECC). It does not define the requirements for the PC SPAD Monitor (PSM), which are defined
elsewhere.
Mandatory upon: Network Rail & Contractors
Standards Ownership: Signal Engineering
RT/E/S/19551

Calculation of Signal Route Statistics


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Jul 95
B
This specification defines the method of calculating statistical information on signalled routes throughout Network
Rail Infrastructure.
Mandatory upon: Network Rail
Standards Ownership: Signal Engineering
RT/E/S/19608

Level Crossing Infrastructure (Inspection & Maintenance) Handbook


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Apr 04
E
This Code of Practice describes the processes to be followed for the maintenance management of operational level
crossing infrastructure and the inspection regime required to ensure level crossing systems are safe, reliable and
legally compliant.
Mandatory upon: Network Rail
Standards Ownership: Signal Engineering

2C5.2. Procedures
RT/E/P/10013

Investigation of Signalling Equipment & Associated Trainborne Equipment


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Apr 96
C
This procedure defines the requirements for authorising the technical investigation of signalling equipment and
associated trainbourne equipment on Network Rail Infrastructure or property, undertaking the investigation and
distributing Investigation Reports.
Mandatory upon: Network Rail
Standards Ownership: Signal Engineering
RT/E/P/10016

Requirements for an Asset Maintenance Process


Issue

Date

Status

Price

Colour

Compliance

Implementation

2
Dec 00
B
This line procedure does not seek to amend, alter or subtract from any other applicable legislation, Railway Group
Standard, Network Rail Line Specification or Procedure. This Line procedure defines the requirements for an asset
maintenance process which ensures Network Rail s signalling Infrastructure consistently operates within required
safety, business and technical parameters.
Mandatory upon: Network Rail
Standards Ownership: Signal Engineering

th

st

Issue 46: 7 August 1 October 2004

Catalogue of Company Standards

Page 59

2. Company Standards

RT/E/P/10024

Signal Engineering

Signallers Operating Guide for the use of the IECC Signalling Workstation
Issue

C. Engineering

Date

Status

Price

Colour

Compliance

Implementation

4 (3)
Aug 04 (Aug 03)
Up-Issued E
01/10/04
01/10/04
This document is the signaller's operating guide for the Integrated Electronic Control Centre (IECC).
Mandatory upon: Network Rail & Contractors
Standards Ownership: Signal Engineering

RT/E/P/10025

IECC Timetable Processor Edit Facilities User Guide


Issue

Date

Status

Price

Colour

Compliance

Implementation

3
Dec 01
E
This procedure provides instructions for the use of the IECC Timetable Processor User Edit Facilities.
Mandatory upon: Network Rail
Standards Ownership: Signal Engineering
RT/E/P/10072

Special Inspection Notices (SINS)


Issue

Date

Status

Price

Colour

Compliance

Implementation

2
Dec 98
C
This procedure states the requirements for a rapid action process when Control Systems or Telecommunications
defects are identified that may create a hazard throughout the Industry.
Mandatory upon: Network Rail
Standards Ownership: Signal Engineering
RT/E/P/10160

Signal Engineering: Implementation of IRSE Licensing Scheme - The Route to Competence


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Apr 04
C
This company procedure sets out the requirement for the mandatory application of the IRSE
Licensing Scheme to Network Rail s own engineers and technicians as well as those of its
contractors and / or consultants.
Mandatory upon: Network Rail
Standards Ownership: Signal Engineering
RT/E/P/11120

Process for Management of Signal Engineering Technical Instructions and Notice Boards
Issue

Date

Status

Price

Colour

Compliance

Implementation

6 (5)
Aug 04 (Apr 04)
Up-Issued C
07/08/04
07/08/04
This Procedure details the process for managing the production of information that is specific to signal engineering
and needs to be published quickly to facilitate safe working and good practice.
Mandatory upon: Network Rail & Contractors
Standards Ownership: Signal Engineering
*

RT/E/P/11305

The Provision of Data Loggers used to Monitor Signalling Systems


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Feb 03
C
The purpose of this Procedure is to provide a consistent means of planning, installing, testing and managing Data
Logging Systems on Network Rail controlled infrastructure.
Mandatory upon: Network Rail
Standards Ownership: Signal Engineering
RT/E/P/11654

Management of Signalling Wire and Cable Insulation Degradation


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Oct 99
B
This procedure sets high-level responsibilities for the management of signalling wire insulation degradation.
Mandatory upon: Network Rail
Standards Ownership: Signal Engineering

th

st

Issue 46: 7 August 1 October 2004

Catalogue of Company Standards

Page 60

2. Company Standards

RT/E/P/13251

C. Engineering

Signal Engineering

Management of Signalling Infrastructure Condition Assessment (SICA) Process


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Mar 95
A
To ensure that Network Rail has in place arrangements for the management of signalling infrastructure conditions
assessment using the SICA model.
Mandatory upon: Network Rail
Standards Ownership: Signal Engineering
RT/E/P/14000

Arrangements for Temporary Revalidation of Signalling Testing Certification


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
May 95
B
This standard defines the arrangements for enabling existing SVVTH certificated testers to have their current
testing certification temporally revalidated to cater solely for the introduction of STH GK/RT 0221.
Mandatory upon: Network Rail
Standards Ownership: Signal Engineering
RT/E/P/14001

Appointment of Signalling Testers in Charge


Issue

Date

Status

Price

Colour

Compliance

Implementation

2
Dec 00
B
This standard defines the arrangements for the appointment of Signalling Testers in charge, for work on Network
Rail Controlled Infrastructure, in support of RT/E/S/11221.
Mandatory upon: Network Rail
Standards Ownership: Signal Engineering
RT/E/P/14004

Competence of Railtrack Testing Staff


Issue

Date

Status

Price

Colour

Compliance

Implementation

2
Dec 00
B
This standard defines the competence arrangements for Network Rail Signalling Testing Staff, in support of
RT/E/S/11221.
Mandatory upon: Network Rail
Standards Ownership: Signal Engineering
RT/E/P/14201

Prevention and Mitigation of Overruns Risk Assessment of Signals


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Apr 03
D
This procedure has been produced to ensure Network Rail complies with Railway Group Standard GI/RT7006
Prevention and Mitigation of Overruns - Risk Assessment.
Mandatory upon: Network Rail
Standards Ownership: Signal Engineering
RT/E/P/19000

Management of Signalling Equipment Technical Advice Notices (SIGTAN000)


Issue

Date

Status

Price

Colour

Compliance

Implementation

2
Apr 04
B
This procedure defines the arrangements for managing the production, authorisation and distribution of SIGTANs.
These controlled standards are the method by which Network Rail will advise its own Engineers and it s
contractors about changes to signalling equipment and problems with signalling equipment in service.
Mandatory upon: Network Rail
Further Information: SIGTANS are non mandatory advices
Standards Ownership: Signal Engineering
RT/E/P/19251

Management of Signalling Equipment Workshop Engineering Notices (SIGWEN000)


Issue

Date

Status

Price

Colour

Compliance

Implementation

2
Dec 03
B
This procedure defines the management of the production, authorisation and distribution of Signalling Equipment
Workshop Engineering Notices. These documents advise of additional or revised processes required in the
manufacture, repair or servicing of signalling equipment before it is released for use on Network Rail s signalling
infrastructure.
Mandatory upon: Network Rail
Further Information: SIGWENS are non mandatory advices
Standards Ownership: Signal Engineering

th

st

Issue 46: 7 August 1 October 2004

Catalogue of Company Standards

Page 61

2. Company Standards
RT/E/P/19607

Signal Engineering

Management of Overlapping and Parallel Signalling Design


Issue

C. Engineering

Date

Status

Price

Colour

Compliance

Implementation

1
Aug 04
New
D
02/10/04
02/10/04
This procedure, in support of GK/RT0207 and RT/E/S/11201, sets out the mandatory requirements that apply
when it is necessary to produce signalling design detail in reduced timescales, to ensure that risks are adequately
controlled. The process for authorisation of such relaxations is defined.
Mandatory upon: Network Rail
Standards Ownership: Signal Engineering

2C5.3. Codes of Practice


RT/E/C/001

Electrical Engineering & Control Systems Engineering Safety Management System


Issue

Date

Status

Price

Colour

Compliance

Implementation

2
Jul 96
B
To detail all documentation relevant to the Electrical Engineering and Control Systems (EE&CS) Engineering Safety
Management Systems (ESMS). This document will also provide high level guidance in using ESMS procedures and
work instructions for preparations of safety submissions.
Mandatory upon: Advisory only
Standards Ownership: Signal Engineering
RT/E/C/02022

Requirements for TASS Infrastructure System Description


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Dec 03
D
This code of practice describes the Tilt Authorisation And Speed Supervision (TASS) system developed to deliver
the principal requirements of Railway Group Standards GE/RT8012 Controlling The Speed of Tilting Trains
Through Curves and GE/RT8019 Tilting Trains: Controlling Tilt Systems To Maintain Clearances .
Mandatory upon: Advisory only
Standards Ownership: Signal Engineering
RT/E/C/02104

Enhanced Maintenance for Track Circuit Systems


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Oct 99
D
This Code of Practice contains tasks and periodicity guidelines which represent current best practice for an
enhanced level of track circuit system maintenance.
Mandatory upon: Advisory only
Standards Ownership: Signal Engineering
RT/E/C/10026

IECC Timetable Processor Edit Facilities User Tutorial


Issue

Date

Status

Price

Colour

Compliance

Implementation

3
Dec 01
F
This Code of Practice provides examples in the use of the IECC Timetable Processor User Edit Facilities.
Mandatory upon: Advisory only
Standards Ownership: Signal Engineering
RT/E/C/10049

BRS SW67 Typical Signalling Circuits: Relays Exempt from Servicing


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Aug 99
B
This Code of Practice lists relays used in BRS SW67 Typical Circuits that have been assessed as not requiring
servicing, to be used in conjunction with RT/E/C/10048 Signalling Code of Practice For Relay And Searchlight
Mechanism Servicing to determine a servicing requirement for other relays.
Mandatory upon: Advisory only
Standards Ownership: Signal Engineering
RT/E/C/10050

Westinghouse Geographical Typical Signalling Circuits: Relays Exempt from Servicing


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Aug 99
C
This Code of Practice lists relays used in Westinghouse Geographical Typical Circuits that have been assessed as
not requiring servicing, to be used in conjunction with RT/E/C/10048 Signalling Code of Practice For Relay And
Searchlight Mechanism Servicing to determine a servicing requirement for other relays.
Mandatory upon: Advisory only
Standards Ownership: Signal Engineering

th

st

Issue 46: 7 August 1 October 2004

Catalogue of Company Standards

Page 62

2. Company Standards
RT/E/C/10051

C. Engineering

Signal Engineering

GEC Geographical Typical Signalling Circuits: Relays Exempt from Servicing


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Aug 99
B
This Code of Practice lists relays used in GEC GEOGRAPHICAL Typical Circuits that have been assessed as not
requiring servicing, to be used in conjunction with RT/E/C/10048 Signalling Code of Practice For Relay And
Searchlight Mechanism Servicing to determine a servicing requirement for other relays.
Mandatory upon: Advisory only
Standards Ownership: Signal Engineering
RT/E/C/10099

Risk Based Maintenance Implementation Guidance


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Dec 02
B
The purpose of this document is to provide guidance for the implementation of risk based maintenance regimes.
Mandatory upon: Advisory only
Standards Ownership: Signal Engineering
RT/E/C/10179

The Set Up and Maintenance of Adjustable Stretcher Bars - A Good Practice Guide
Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Dec 03
D
Yes
This good practice guide applies to all Network Rail points with UIC54B switch rails and 113A flat bottom stock
rails, full depth switches using 113A vertical design, and switches with CEN60 rail section that are fitted with
threaded adjustable stretcher bars.
Mandatory upon: Advisory only
Standards Ownership: Signal Engineering
RT/E/C/11004

Symbols for Plans and Sketches Used in Signalling Applications


Issue

Date

Status

Price

Colour

Compliance

Implementation

2
Dec 03
D
This Code of Practice, in support of Line Specification RT/E/S/11201, Signalling Design: Production, defines the
symbols for plans and sketches used in signalling applications, to ensure that the correct information is always
conveyed without ambiguity.
Mandatory upon: Advisory only
Standards Ownership: Signal Engineering
RT/E/C/11110

Outline Project Specifications (OPS) for Signalling Schemes


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Aug 00
C
This Code of Practice sets out the procedure to ensure a consistent and structured planning approach for all proposed
signalling and operational telecommunication works and enable the mandatory requirement for the preparation of
OPSs in Line Specification RT/E/S/11201, Signalling Design: Production, to be met. It also sets out the procedures for
documenting and consulting on the working details prior to design and during the subsequent works.
Mandatory upon: Advisory only
Standards Ownership: Signal Engineering
RT/E/C/11115

Correlation of Signalling Records


Issue

Date

Status

Price

Colour

Compliance

Implementation

3 (2)
Aug 04 (Dec 03)
Up-Issued D
07/08/04
07/08/04
This Code of Practice, in support of Line Specification RT/E/S/11201, Signalling Design: Production, gives guidance
on the correlation of signalling records to actual wiring and equipment, prior to any design alterations.
Mandatory upon: Advisory only
Further Information: Replaces RT/E/S/10056 Management of Correlation of Signalling Infrastructure
Standards Ownership: Signal Engineering

RT/E/C/11116

Assessment of Signalling Systems Before Design Alterations


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Aug 00
B
This Code of Practice, in support of Line Specification RT/E/S/11201, Signalling Design: Production, gives guidance
on assessing the condition of signalling systems before undertaking design alterations, to ensure that the integrity of
the system is not compromised during the works and that the safety of the railway is assured.
Mandatory upon: Advisory only
Standards Ownership: Signal Engineering

th

st

Issue 46: 7 August 1 October 2004

Catalogue of Company Standards

Page 63

2. Company Standards

RT/E/C/11191

C. Engineering

Signal Engineering

Signal and Telecomms Cable Laying from Rail Wagons or by Mole Plough
Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Aug 00
C
This Code of Practice defines a policy to be adopted when laying cables and ducts from rail wagons or by mole
plough to ensure safe working practices and satisfy the mandatory requirements of Railway Group Standard
GK/RT0208, Installation of Signalling and Operational Telecommunications Equipment, and Line Specification
RT/E/S/11303, Requirements for Signalling Installation.
Mandatory upon: Advisory only
Standards Ownership: Signal Engineering
RT/E/C/11202

Signalling Design Control Tables


Issue

Date

Status

Price

Colour

Compliance

Implementation

3
Oct 02
E
This Code of Practice, in support of Line Specification RT/E/S/11201, Signalling Design: Production, defines the
requirements for railway signalling control tables to ensure that safety information is presented in a form which can
be read and understood without ambiguity.
Mandatory upon: Advisory only
Standards Ownership: Signal Engineering
RT/E/C/11205

Symbols for Signalling Circuit Diagrams


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Aug 00
D
This Code of Practice, in support of Railway Group Standard GK/RT0201, Signalling Design: Production, defines
the symbols, nomenclature and presentation for use on all signalling circuit diagrams to ensure that the correct
information is always conveyed without ambiguity.
Mandatory upon: Advisory only
Standards Ownership: Signal Engineering
RT/E/C/11210

Signalling Installation
Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Aug 00
Phone
Yes
This Code of Practice gives guidance on installation techniques that facilitate the safe installation of railway
signalling systems and equipment and satisfy the mandatory requirements of Railway Group Standard GK/RT0208,
Installation of Signalling and Operational Telecommunications Equipment, and Line Specification RT/E/S/11303,
Requirements for Signalling Installation.
Mandatory upon: Advisory only
Standards Ownership: Signal Engineering
RT/E/C/11213

Signalling Cable Equivalent Sizes


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Aug 00
C
This Code of Practice defines alternative equivalent cables from current specifications, which may be used to
replace older sized cables shown on the design record, during cable renewals, and satisfy the mandatory
requirements for non-conceptual design given in RT/E/S/11201.
Mandatory upon: Advisory only
Standards Ownership: Signal Engineering
RT/E/C/11400

HPSS Equipment Handbook


Issue

Date

Status

Price

Colour

Compliance

Implementation

3
June 03
E
Yes
This Code of Practice describes the processes to be followed in the installation, testing and commissioning,
maintenance and wrongside failure investigation of a High Performance Switch System. This initial issue only
addresses installation and testing and commissioning. The HPSS installation process is described in Appendix A; the
testing and commissioning process in Appendix B.
Mandatory upon: Advisory only
Standards Ownership: Signal Engineering

th

st

Issue 46: 7 August 1 October 2004

Catalogue of Company Standards

Page 64

2. Company Standards

RT/E/C/11600

C. Engineering

Signal Engineering

Signalling and Operational Telecommunications Design: Technical Guidance


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Aug 00
Phone
Yes
This Code of Practice gives guidance on the technical details that enable the design of railway signalling systems to
meet the mandatory requirements of Railway Group Standard GK/RT0206, Signalling and Operational
Telecommunications Design: Safety Requirements.
Mandatory upon: Advisory only
Standards Ownership: Signal Engineering
RT/E/C/11653

Railtrack Approved Reliability Centred Maintenance Analyses


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Aug 99
E
This Code of Practice details Reliability Centred Maintenance (RCM) analyses which have been formally approved
for use on Network Rail infrastructure as required by Specification RT/E/S/11652.
Mandatory upon: Advisory only
Standards Ownership: Signal Engineering
RT/E/C/11701

Signalling Design: Production Guidance


Issue

Date

Status

Price

Colour

Compliance

Implementation

3
Dec 03
Phone
Yes
This Code of Practice gives guidance on the production processes that enable the design of railway signalling
systems to meet the mandatory requirements of Railway Group Standard GK/RT0207 and Company Specification
RT/E/S/11201, Signalling Design: Production.
Mandatory upon: Advisory only
Standards Ownership: Signal Engineering
RT/E/C/11711

ERTMS Readiness
Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Jun 03
C
This Code of Practice details the requirements for the configuration of signalling systems that should be
implemented prior to the future introduction of the ERTMS/ETCS across the Network Rail network. The use of
this document will ensure that disruption to the network, costs, risks and rework is minimised when ERTMS/ETCS
is implemented.
Mandatory upon: Advisory only
Standards Ownership: Signal Engineering
RT/E/C/11721

The Verification and Validation of Signalling Interlockings


Issue

Date

Status

Price

Colour

Compliance

Implementation

2
Jun 02
F
This Code of Practice, in support of RT/E/S/11221, gives guidance on implementation of control table testing, signal
aspect testing and principles testing.
Mandatory upon: Advisory only
Standards Ownership: Signal Engineering
RT/E/C/11722

Good Practice Test Certificates and Related Forms


Issue

Date

Status

Price

Colour

Compliance

Implementation

2
Jun 02
D
Yes
This Code of Practice details the requirements for signalling Works Test Certification.
Mandatory upon: Advisory only
Standards Ownership: Signal Engineering
RT/E/C/11723

Good Practice Check Marking and Recording on Signalling Engineering Drawings


Issue

Date

Status

Price

Colour

Compliance

Implementation

2
Aug 02
C
Yes
This Code of Practice is produced in support of RT/E/S/11221. It describes a system of testing check marks and
recording that will enable a consistent presentation of such marks and records throughout Network Rail projects.
Mandatory upon: Advisory only
Standards Ownership: Signal Engineering
RT/E/C/11724

Signalling Works Test Specifications and Historical Test Value Data


Issue

th

st

Issue 46: 7 August 1 October 2004

Date

Status

Price

Catalogue of Company Standards

Colour

Compliance

Implementation
Page 65

2. Company Standards

C. Engineering

Signal Engineering

1
Jun 02
E
This Code of Practice has been produced in support of GK/RT 0209 and Company Specification RT/E/S/11221. The
contents are designed as examples of Test Specification content that might be employed to ensure that suitable
and sufficient testing has been carried out to Infrastructure products during the process of Signalling Works
Testing.
Mandatory upon: Advisory only
Standards Ownership: Signal Engineering
RT/E/C/11729

Maintenance and Missing Equipment Test Plans


Issue

Date

Status

Price

Colour

Compliance

Implementation

2
Apr 02
Phone
This Code of Practice supports RT/E/S/11231 and contains Maintenance and Missing Equipment Test Plans for use
during Signalling Maintenance Testing.
Mandatory upon: Advisory only
Standards Ownership: Signal Engineering
RT/E/C/11731

Signalling Failure Investigation


Issue

Date

Status

Price

Colour

Compliance

Implementation

2
Apr 02
E
This Code of Practice supports RT/E/S/11231 and defines the procedures for investigating reported signalling
equipment failures.
Mandatory upon: Advisory only
Standards Ownership: Signal Engineering
RT/E/C/11772

Supplementary Point Drives and Detection


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Apr 01
E
This Code of Practice contains information which represents current best practice for supplementary point drives
and detection developed under British Rail.
Mandatory upon: Advisory only
Standards Ownership: Signal Engineering
RT/E/C/11774

Clamp Lock Handbook


Issue

Date

Status

Price

Colour

Compliance

Implementation

2
Feb 03
Phone
This Code of Practice gives details of best practice in respect of Rail Clamp Point Locks.
Mandatory upon: Advisory only
Standards Ownership: Signal Engineering
RT/E/C/11821

Siting Requirements for Lineside Apparatus Housings


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Aug 00
C
This Code of Practice defines best practice for the support of, and safe working area around lineside apparatus housings
in order to minimise the risks associated with work on lineside signalling equipment and satisfy Railway Group Standard
GK/RT0208, Installation of Signalling and Operational Telecommunications Equipment, and Line Specification
RT/E/S/11303, Requirements for Signalling Installation.
Mandatory upon: Advisory only
Standards Ownership: Signal Engineering
RT/E/C/17901

SSI Configuration Guide


Issue

Date

Status

Price

Colour

Compliance

Implementation

3
Oct 99
E
This document is a guide to the permitted configurations of SSI hardware, as in use by Network Rail.
Mandatory upon: Advisory only
Standards Ownership: Signal Engineering

th

st

Issue 46: 7 August 1 October 2004

Catalogue of Company Standards

Page 66

2. Company Standards

RT/E/C/17902

C. Engineering

Signal Engineering

SSI Program and Data Problems


Issue

Date

Status

Price

Colour

Compliance

Implementation

3
Apr 01
E
This document has been prepared to summarise significant problems with SSI programs and data that have been
found on Network Rail s Signalling Infrastructure.
Mandatory upon : Advisory only
Standards Ownership: Signal Engineering
RT/E/C/17903

SSI Hardware Problems


Issue

Date

Status

Price

Colour

Compliance

Implementation

2
Apr 01
E
This document has been prepared to provide a summary of significant SSI hardware problems that have been found
on Network Rail s Infrastructure and that have been the subject of a technical investigation.
Mandatory upon: Advisory only
Standards Ownership: Signal Engineering
RT/E/C/17904

Risk Analysis of Signalling Relays


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Aug 04
New
C
07/08/04
07/08/04
This Code of Practice defines a process to assess the risks presented by failure of specific applications of signalling
control relays. By applying the process it is possible to determine which relays (if any) may be exempt from routine
replacement for a specific interlocking design.
Mandatory upon: Advisory only
Standards Ownership: Signal Engineering

RT/E/C/18301

Sincs Data Entry


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Mar 95
B
To provide a Code of Practice to ensure that information entered to SINCS records is: accurate, auditable, cross
referenced to other documentation, complete and that it addresses both immediate and underlying deficiencies.
Mandatory upon: Advisory only
Standards Ownership: Signal Engineering
RT/E/C/18302

FRAME Data Entry


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Jun 02
E
This Code of Practice ensures that all information entered to FRAME is relevant, accurate, auditable, cross
referenced to other relevant records and coded correctly. This will assist in effective management of failures and
provide accurate and meaningful information / statistics.
Mandatory upon: Network Rail
Standards Ownership: Signal Engineering
RT/E/C/19002

SIGTAN002 Westinghouse Signals Style 63 Point Machine


Issue

Date

Status

Price

Colour

Compliance

Implementation

2
Feb 99
C
This document has been prepared to provide advice on significant problems associated with Westinghouse Signals
Style 63 Point Machines.
Mandatory upon: Advisory only
Standards Ownership: Signal Engineering
RT/E/C/19008

SIGTAN008 Sangamo/Schlumberger Time Switches used at Level Crossings


Issue

Date

Status

Price

Colour

Compliance

Implementation

2
Oct 00
B
An investigation (Technical Investigation Report 94507) into the setting of Sangamo time switches highlighted the
lack of information available to staff relating to the use of these devices. Also, a separate investigation (Technical
Investigation Report 94535) into an incident at a level crossing identified the slow running timer switches, provide
advice on their subsequent replacement and to inform staff of the correct application of these devices.
Mandatory upon: Advisory only
Standards Ownership: Signal Engineering
RT/E/C/19010
th

SIGTAN010 Circuit Controllers used with BR843 Level Crossing Lifting Barrers
st

Issue 46: 7 August 1 October 2004

Catalogue of Company Standards

Page 67

2. Company Standards
Issue

C. Engineering
Date

Status

Signal Engineering
Price

Colour

Compliance

Implementation

1
Jun 96
B
In 1995, Opal Engineering were commissioned to investigate the reliability of circuit controller used with the
BR843 Standards Mk1 and Mk2 lifting barriers. The study reported that some reserviced circuit controlled were
not supplied preset for installation and recommended that existing stocks should be examined and unsuitable
circuit controllers and also addresses the method for carrying out fine adjustment during installation, when
necessary by individual site conditions.
Mandatory upon: Advisory only
Standards Ownership: Signal Engineering
RT/E/C/19012

SIGTAN012 Cables and Wiring used for Signalling Systems


Issue

Date

Status

Price

Colour

Compliance

Implementation

3
Feb 01
D
This code of practice summarises information relating to cables and wires including problems that have been found
and testing methods as applicable to Network Rail's Signalling infrastructure.
Mandatory upon: Advisory only
Standards Ownership: Signal Engineering
RT/E/C/19014

SIGTAN014 Mechanical Handbook


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Mar 97
E
This SIGTAN contains a draft copy of the Mechanical Handbook and is intended as a guidance document only.
Mandatory upon: Advisory only
Standards Ownership: Signal Engineering
RT/E/C/19015

SIGTAN015 Relay Plugboard Problems


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Feb 98
B
As a result of an investigation (Technical Investigation report 96626), into the contamination of relay plugboards,
this document has been prepared to give advice on dealing with such contamination. Advice on recognition,
contributory factors and preventative measures is also provided.
Mandatory upon: Advisory only
Standards Ownership: Signal Engineering
RT/E/C/19016

SIGTAN016 Westinghouse M3 Point Machine


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Feb 98
B
An investigation (Technical Investigation Report 96508) revealed various Westinghouse M3 point machine
problems. This document provides advice on examining the locking of the main shaft bearing and includes the
temporary measures necessary until the point machine can be replaced.
Mandatory upon: Advisory only
Standards Ownership: Signal Engineering
RT/E/C/19019

SIGTAN019 Westinghouse Signal Machines


Issue

Date

Status

Price

Colour

Compliance

Implementation

2
Apr 99
A
Investigations (Technical Investigation Reports 96051 and 98070) into two separate incidents, where signals were
stuck in the off position due to jammed signal machines have revealed that on both occasions, some on-site
repairs had been carried out and replacement components had been incorrectly fitted. This document has been
prepared to discuss the problems associated with carrying out on-site repairs and recommends that all repairs
(other than those considered to be associated with first line maintenance) and re-servicing are carried out in a
controlled workshop environment by staff who have received specialised craft training.
Mandatory upon: Advisory only
Standards Ownership: Signal Engineering

th

st

Issue 46: 7 August 1 October 2004

Catalogue of Company Standards

Page 68

2. Company Standards

RT/E/C/19020

Signal Engineering

SIGTAN020 Signalling Relay Problems


Issue

C. Engineering

Date

Status

Price

Colour

Compliance

Implementation

3 (2)
Aug 04 (Apr 99)
Up-Issued D
07/08/04
07/08/04
This document has been prepared to summarise problems affecting railway signalling relays and searchlight
signalling mechanisms used on Network Rail s Signalling Infrastructure. It includes the measures necessary to
control the risks presented by these failures.
Mandatory upon: Advisory only
Standards Ownership: Signal Engineering

RT/E/C/19023

SIGTAN023 Signal Post Replacement Switches


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Jun 00
B
This document has been prepared to provide advice on significant problems associated with the Signal Post
Replacement Switch.
Mandatory upon: Advisory only
Standards Ownership: Signal Engineering
RT/E/C/19024

SIGTAN024 Signalling Control Panels


Issue

Date

Status

Price

Colour

Compliance

Implementation

Iss 1
Apr 99
B
This document has been prepared to provide advice on problems affecting equipment/components associated with
Signalling Control Panels.
Mandatory upon: Advisory only
Standards Ownership: Signal Engineering
RT/E/C/19025

SIGTAN025 Electric Lever Locks & Circuit Controllers


Issue

Date

Status

Price

Colour

Compliance

Implementation

2
Feb 01
C
This code of practice summarises technical information and advice on problems relating to Electric Lever Locks
and Circuit Controllers that form part of Network Rail's Signalling infrastructure.
Mandatory upon: Advisory only
Standards Ownership: Signal Engineering
RT/E/C/19026

SIGTAN026 Track Circuit Equipment


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Dec 99
B
This document has been prepared to provide advice on problems affecting Track Circuit Equipment that forms
part of the railway infrastructure signalling control system.
Mandatory upon: Network Rail and Contractors
Standards Ownership: Signal Engineering
RT/E/C/19030

SIGTAN030 Earth Testing of Bus-bars


Issue

Date

Status

Price

Colour

Compliance

Implementation

Compliance

Implementation

1
Oct 00
B
This document has been prepared to provide advice on earth testing of busbars.
Mandatory upon: Advisory only
Standards Ownership: Signal Engineering
RT/E/C/19032

SIGTAN032 Alignment of Colour Light signals


Issue

Date

Status

Price

Colour

1
Oct 00
C
This Code of Practice details the methods to be used for checking and adjusting the beam alignment of colour light
signals, so as to achieve compliance with Network Rail Group Standard GK/RT0037 Signal Sighting, Issue 3.
Mandatory upon: Advisory only
Standards Ownership: Signal Engineering

th

st

Issue 46: 7 August 1 October 2004

Catalogue of Company Standards

Page 69

2. Company Standards

RT/E/C/19036

C. Engineering

Signal Engineering

SIGTAN036 Test and Measurement Meters


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Feb 01
B
This document has been prepared to provide advice on significant problems associated with the use of certain
models of Fluke digital multimeters (DMM).
Mandatory upon: Advisory only
Standards Ownership: Signal Engineering
RT/E/C/19039

SIGTAN039 Signals (General)


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Feb 01
D
This document summarises a range of general issues relating to signals on Network Rail s Signalling Infrastructure.
Mandatory upon: Advisory only
Standards Ownership: Signal Engineering
RT/E/C/19040

SIGTAN040 Train Protection Systems


Issue

Date

Status

Price

Colour

Compliance

Implementation

2
Aug 01
D
This code of practice summarises a range of general issues relating to train protection systems on Network Rail s
Signalling Infrastructure.
Mandatory upon: Advisory only
Standards Ownership: Signal Engineering
RT/E/C/19041

SIGTAN041 Battery Cells


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Feb 01
C
This document summarises a range of general issues relating to cells on Network Rail s Signalling Infrastructure
Mandatory upon: Advisory only
Standards Ownership: Signal Engineering
RT/E/C/19042

SIGTAN042 Control Equipment Integrated Electronic Control Centre


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Feb 01
B
This code of practice summarises a range of general issues relating to control equipment Integrated Electronic
Control Centre on Network Rail s Signalling Infrastructure.
Mandatory upon: Advisory only
Standards Ownership: Signal Engineering
RT/E/C/19043

SIGTAN043 Solid State Interlocking


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Feb 01
B
This code of practice summarises a range of general issues relating to Solid State Interlocking on Network Rail s
Signalling Infrastructure.
Mandatory upon: Advisory only
Standards Ownership: Signal Engineering
RT/E/C/19044

SIGTAN044 Level Crossings


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Feb 01
E
This code of practice summarises a range of general issues relating to Level Crossings on Network Rail s Signalling
Infrastructure
Mandatory upon: Advisory only
Standards Ownership: Signal Engineering

th

st

Issue 46: 7 August 1 October 2004

Catalogue of Company Standards

Page 70

2. Company Standards

RT/E/C/19045

C. Engineering

Signal Engineering

SIGTAN045 Power Supplies


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Feb 01
B
This code of practice summarises a range of general issues relating to Power Supplies on Network Rail s Signalling
Infrastructure
Mandatory upon: Advisory only
Standards Ownership: Signal Engineering
RT/E/C/19046

SIGTAN046 Treadles
Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Feb 01
B
This code of practice summarises a range of general issues relating to Treadles on Network Rail s Signalling
Infrastructure
Mandatory upon: Advisory only
Standards Ownership: Signal Engineering
RT/E/C/19047

SIGTAN047 Points (General)


Issue

Date

Status

Price

Colour

Compliance

Implementation

2
Dec 02
D
This code of practice summarises a range of general issues relating to Points on Network Rail s Signalling
Infrastructure
Mandatory upon: Advisory only
Standards Ownership: Signal Engineering
RT/E/C/19048

SIGTAN048 TPWS Trackside Equipment


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Apr 03
D
Yes
This Code of Practice provides a record of best practice general information relating to the trackside sub-system
of the Train Protection and Warning System (TPWS) used on Network Rail Signalling Infrastructure, together with
relevant technical information
Mandatory upon: Advisory only
Standards Ownership: Signal Engineering
RT/E/C/19050

SIGTAN050 Western Region Type Barrier Machine Hydraulic Ram Ram Pin Failure
Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Dec 02
B
This document has been prepared to provide advice on a potential failure mode of level crossing barrier machines
manufactured by the former Western Region. The pins that connect the hydraulic ram to the rear strut of the
barrier machine side arms and the bottom fulcrum bracket may not be compliant with the design specification.
Mandatory upon: Advisory only
Standards Ownership: Signal Engineering
RT/E/C/19051

SIGTAN051 GEC FDM Reed Equipment


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Dec 02
C
The aim of this Code of Practice is to describe the nature of certain in-service problems that have arisen with GEC
Reed equipment, the symptoms manifested, show how they can be avoided and where possible, what remedial
action can be taken if these problems are experienced. It also describes best practice for jointing the transmission
line cable used on Reed systems.
Mandatory upon: Advisory only
Standards Ownership: Signal Engineering

th

st

Issue 46: 7 August 1 October 2004

Catalogue of Company Standards

Page 71

2. Company Standards

RT/E/C/19052

C. Engineering

Signal Engineering

SIGTAN052 TPWS In Radio Electronic Token Block (RETB) - Faulting Guidance


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Apr 04
D
Yes
This Code of Practice provides details of the faulting procedures, or cross-references to other faulting information
necessary to locate anomalies in the operation of the Trackside Radio Control Unit (TRCU) and its associated
subsystems, such that a fault can be determined down to the level of a Line Replaceable Unit (LRU). For further
information regarding the Train Protection and Warning System (TPWS) / Radio Electronic Token Block (RETB)
system see RT/E/S/10178.
Mandatory upon: Advisory only
Standards Ownership: Signal Engineering
RT/E/C/19253

SIGWEN002 Westinghouse Signals Style 63 Point Machine


Issue

Date

Status

Price

Colour

Compliance

Implementation

2
Feb 99
C
This document advises Network Rail s suppliers who manufacture, repair or service Westinghouse Signals Style 63 point
machines of processes that need to be adopted/ amended before the equipment is released for re-use on Network
Rail s infrastructure. This information is supplementary to manufacture, repair or servicing standards.
Mandatory upon: Advisory only
Standards Ownership: Signal Engineering
RT/E/C/19254

SIGWEN003 GEC-GS HW Point Machine


Issue

Date

Status

Price

Colour

Compliance

Implementation

4
Dec 02
C
This document advises Network Rail s Suppliers who Manufacture, repair or service the GEC-GS types HW 1000
and HW 2000 point machines of additional/ revised processes to be applied before the equipment is released to
the customer. This information is supplementary to manufacturing, repair or servicing standards.
Mandatory upon: Advisory only
Standards Ownership: Signal Engineering
RT/E/C/19257

SIGWEN006 Smiths Industries Clamp Lock Power Pack


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Aug 95
A
This document advises Network Rail s suppliers who manufacture, repair or service the Smiths Industries Clamp
Lock Power pack of additional/ revised processes to be applied before the equipment is released to the customer.
This information is supplementary to manufacturing, repair or servicing standards.
Mandatory upon: Advisory only
Standards Ownership: Signal Engineering
RT/E/C/19258

SIGWEN007 BR843 Level Crossing Lifting Barriers


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Jun 96
A
This document advises Network Rail s suppliers who manufacture, repair or service BR843 Level Crossing Lifting
Barriers, including composite components, of additional/revised processes that need to be applied adopted before
the equipment is released to the customer. This information is supplementary to manufacturing, repair or servicing
standards.
Mandatory upon: Advisory only
Standards Ownership: Signal Engineering
RT/E/C/19259

SIGWEN008 Westinghouse Signal Machines


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Apr 98
B
This document advises Network Rail s suppliers who repair or service Westinghouse Signal Machines of processes
that need to be adopted/amended before the equipment is released for re-use on Network Rail s infrastructure.
This information is supplementary to repair or servicing standards.
Mandatory upon: Advisory only
Standards Ownership: Signal Engineering

th

st

Issue 46: 7 August 1 October 2004

Catalogue of Company Standards

Page 72

2. Company Standards

RT/E/C/19262

C. Engineering

Signal Engineering

SIGWEN011 BR817 Hydraulic Clamp Lock Power Packs


Issue

Date

Status

Price

Colour

Compliance

Implementation

2
Dec 02
B
This document advises Network Rail s suppliers who repair or service hydraulic clamp lock power packs to BR817 of
processes that need to be adopted/amended before the equipment is released for re-use on Network Rail s
infrastructure. This information is supplementary to manufacture, repair or servicing standards.
Mandatory upon: Advisory only
Standards Ownership: Signal Engineering
RT/E/C/19265

SIGWEN014 Labelling of Signalling Equipment


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Jun 03
B
This document advises Servicing Agents who repair or service signalling equipment of the labelling requirements
that should be applied before the equipment is released for re-use onto Network Rail s Infrastructure.
Mandatory upon: Advisory only
Standards Ownership: Signal Engineering
RT/E/C/19269

SIGWEN018 GEC FDM Reed Equipment


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Dec 02
B
The aim of this document is to identify to servicing agents specific additional servicing requirements that are
required on GEC FDM Reed receiver amplifiers.
Mandatory upon: Advisory only
Standards Ownership: Signal Engineering
RT/E/C/19272

SIGWEN021 Signalling Relays


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Aug 04
New
D
07/08/04
07/08/04
This document has been prepared to advise manufacturers, repair and service agents about problems affecting
railway signalling relays used on Network Rail s Signalling Infrastructure.
Mandatory upon: Advisory only
Standards Ownership: Signal Engineering

RT/E/C/50001

Methodology for the Demonstration of Electrical Compatibility Between Rolling Stock and
Infrastructure
Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Feb 03
B
This Code of Practice is intended to assist train-builders, TOCs and ROSCOs in the production of Route
Acceptance Safety Cases for electric trains, by describing a methodology for demonstrating compatibility with
EE&CS systems on Network Rail s electrified routes.
Mandatory upon: Advisory only
Standards Ownership: Signal Engineering
RT/E/C/50002

Methodology for the Demonstration of Compliance with Single Rail Reed Track Circuits on the AC
Railway
Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Feb 03
D
The purpose of this document is to provide a methodology to demonstrate compatibility with RT type single rail
track circuits on the a.c. railway on Network Rail controlled Infrastructure.
Mandatory upon: Advisory only
Standards Ownership: Signal Engineering

th

st

Issue 46: 7 August 1 October 2004

Catalogue of Company Standards

Page 73

2. Company Standards

RT/E/C/50004

C. Engineering

Signal Engineering

Methodology for the Demonstration of Electrical Compatibility with DC (AC-immune) Track


Circuits
Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Apr 03
D
Yes
Intended to assist train-builders, TOCs, and ROSCOs in the production of Route Acceptance Safety Cases for
electric trains, by describing a methodology for demonstrating compatibility with EE&CS systems on Network
Rail's electrified routes.
Mandatory upon: Advisory only
Standards Ownership: Signal Engineering
RT/E/C/50005

Methodology for the Demonstration of Compatibility with 50 Hertz Single Rail Track Circuits
Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Feb 03
D
The purpose of this document is to provide a methodology for the demonstration of electromagnetic compatibility
(EMC) of rolling stock with 50 Hz single rail track circuits installed on Network Rail controlled infrastructure. It is
based upon previously accepted safety assessments which were undertaken for Traction and Rolling Stock thereby
allowing them to operate over 50 Hz single rail track circuits.
Mandatory upon: Advisory only
Standards Ownership: Signal Engineering
RT/E/C/50007

Methodology for the Demonstration of Compatibility with HVI Track Circuits


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Feb 03
D
The purpose of this document is to provide a methodology to demonstrate compatibility of trains with HVI track
circuits on the a.c. and d.c. railways on Network Rail controlled infrastructure.
Mandatory upon: Advisory only
Standards Ownership: Signal Engineering
RT/E/C/50008

Methodology for the Demonstration of Compatibility with TI 21 Track Circuits


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Feb 03
D
The purpose of this procedure is to provide a method for calculating the safe permissible maximum levels of
electrical interference that may be generated by electric trains designed to be used on tracks employing TI 21 track
circuits. The procedure lists all of the infrastructure aspects to be taken into account, characteristics of the TI 21
track circuits and possible failure modes. Worked examples are given for calculating maximum permissible levels of
electrical interference due to traction current, and axle-to-axle voltages.
Mandatory upon: Advisory only
Standards Ownership: Signal Engineering
RT/E/C/50009

Methodology for the Demonstration of Compatibility with FS2600 Track Circuits on the DC
Railway
Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Feb 03
D
The purpose of this document is to provide a methodology to demonstrate compatibility with FS2600 track
circuits on Network Rail 750V d.c. electrified railway.
Mandatory upon: Advisory only
Standards Ownership: Signal Engineering
RT/E/C/50012

Methodology for the Demonstration of Compatibility with TPWS Trackside Equipment


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Feb 03
C
The purpose of this document is to provide a methodology to demonstrate compatibility with Train Protection
and Warning System (TPWS) trackside equipment on the a.c. and d.c. railways on Network Rail controlled
infrastructure.
Mandatory upon: Advisory only
Standards Ownership: Signal Engineering

th

st

Issue 46: 7 August 1 October 2004

Catalogue of Company Standards

Page 74

2. Company Standards

RT/E/C/50013

C. Engineering

Signal Engineering

Methodology for the Demonstration of Compatibility with Interlockings


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Feb 03
C
The purpose of this document is to provide a methodology to demonstrate compatibility with interlocking systems
installed on the a.c. and d.c. electrified railway on Network Rail controlled infrastructure.
Mandatory upon: Advisory only
Standards Ownership: Signal Engineering
RT/E/C/50015

Methodology for the demonstration of compatibility with Reed FDM Systems on the AC and DC
Railways
Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Feb 03
D
The purpose of this document is to provide a methodology to demonstrate compatibility with reed FDM systems
installed on the a.c. and d.c. electrified railway on Network Rail controlled infrastructure.
Mandatory upon: Advisory only
Standards Ownership: Signal Engineering
RT/E/C/50018

Methodology for the Determination of Interaction with Neighbouring Railways


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Feb 03
D
The purpose of this code of practice is to provide a methodology to demonstrate compatibility of traction and
rolling stock operating on Network Rail electrified lines with the infrastructure of neighbouring railways & vice
versa.
Mandatory upon: Advisory only
Standards Ownership: Signal Engineering

th

st

Issue 46: 7 August 1 October 2004

Catalogue of Company Standards

Page 75

2. Company Standards

C. Engineering

Signal Engineering

2C5.4. Guidance Notes


RT/E/G/00013

Guidance for Consideration of TPWS During Railway Engineering Activities


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Jun 02
B
This Guidance Note gives advice to those engaged in various activities on the treatment of TPWS and the
precautions they should take in respect of TPWS.
Mandatory upon: Advisory only
Standards Ownership: Signal Engineering
RT/E/G/00028

General Guidelines on Train Protection & the Provision of Signalling


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Dec 03
E
These guidelines form a detailed set of methodologies to cover this concept. The development of a significant
number of signalling schemes are presently at that critical position, where much signalling would be built without
these provisions, unless they are adopted for projects being developed and designed now. These principles are
already being applied to the West Coast Main Line Upgrade and Speed Enhancement projects.
Mandatory upon: Advisory only
Standards Ownership: Signal Engineering
RT/E/G/02025

Guidance for Consideration of TASS Balises During Railway Engineering Activities


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Dec 03
D
Yes
This Guidance Note gives advice to those engaged in various engineering activities on the treatment of the TASS
system and the precautions they should take in respect of it.
Mandatory upon: Advisory only
Standards Ownership: Signal Engineering
RT/E/G/11710

Signalling Design Handbook


Issue

Date

Status

Price

Colour

Compliance

Implementation

2
Apr 01
Phone
This Handbook provides a location for Network Rail s suite of signalling design standards, both those
originating from Network Rail Line and those former Railway Group Standards transferred from Network
Rail Safety and Standards Directorate. Cross referencing to associated standards, a subject index and list of
definitions are also provided.
Mandatory upon: Advisory only
Further Information: The following related standards may be purchased as part of the handbook, or as separate items:
RT/E/S/11201, RT/E/C/11701, RT/E/C/11110, RT/E/C/11115, RT/E/C/11116, RT/E/C/11004, RT/E/C/11202,
RT/E/C/11205, RT/E/C/11600.
Standards Ownership: Signal Engineering
RT/E/G/11720

Signalling Installation Handbook


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Aug 00
Phone
This Handbook provides a location for Network Rail s suite of signalling installation standards, both those originating
from Network Rail Line and those former Railway Group Standards transferred from Network Rail Safety and Standards
Directorate. Cross referencing to associated standards, a subject index and list of definitions are also provided.
Mandatory upon: Advisory only
Further Information: The following related standards may be purchased as part of the handbook, or as separate items:
RT/E/S/11303, RT/E/C/11210, RT/E/C/11821, RT/E/C/11191, RT/E/C/11213
Standards Ownership: Signal Engineering

th

st

Issue 46: 7 August 1 October 2004

Catalogue of Company Standards

Page 76

2. Company Standards

RT/E/G/11730

C. Engineering

Signal Engineering

Signalling Works Testing


Issue

Date

Status

Price

Colour

Compliance

Implementation

2
Jun 02
Phone
This Guidance Note provides a location for Network Rail s suite of signalling works testing standards, both those
originating from Network Rail Line and those former Railway Group Standards transferred from Railway Group. Cross
referencing to associated standards, a subject index and list of definitions are also provided. Standards associated with
signalling maintenance testing are provided in a separate Guidance Note, RT/E/G/11740.
Mandatory upon: Advisory only
Additional Information: The following related standards may be purchased as part of the handbook, or as separate items:
RT/E/S/11221, RT/E/C/11721, RT/E/C/11722, RT/E/P/14001, RT/E/S/14002, RT/E/S/14003, RT/E/P/14004
Standards Ownership: Signal Engineering
RT/E/G/11740

Signalling Maintenance Testing


Issue

Date

Status

Price

Colour

Compliance

Implementation

2
Apr 02
Phone
This Guidance Note provides a location for Network Rail s suite of maintenance testing standards, particularly those
former Railway Group Standards transferred from Network Rail Safety and Standards Directorate. Cross referencing to
associated standards, a subject index and list of definitions are also provided. Standards associated with works testing are
provided in a separate Guidance Note, RT/E/G/11730.
Mandatory upon: Advisory only
Additional Information: The following related standards may be purchased as part of the handbook, or as separate items:
RT/E/S/11231, RT/E/C/11729, RT/E/C/11731
Standards Ownership: Signal Engineering
RT/E/G/14202

Prevention and Mitigation of Overruns Risk Assessment of Signals


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Apr 03
C
This Guidance Note has been produced to ensure Network Rail complies with the Railway Group Standard
GI/RT7006 Prevention and Mitigation of Overruns - Risk Assessment. RT/E/G/14202 provides guidance for
example on when to undertake a Layout Risk Method A.
Mandatory upon: Advisory only
Standards Ownership: Signal Engineering
RT/E/G/50003

Methodology for the Demonstration of Electrical Compatibility with Double Rail Reed Track
Circuits on the DC Railway
Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Feb 03
D
Yes
The purpose of this document is to provide a methodology to demonstrate electrical compatibility with 'RT' type
double rail reed track circuits on the d.c. electrified railway on Network Rail controlled infrastructure.
Mandatory upon: Advisory only
Standards Ownership: Signal Engineering
RT/E/G/50014

Methodology for the demonstration of compatibility with Lineside Equipment


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Feb 03
Phone
The purpose of this document is to provide a methodology to demonstrate compatibility with lineside equipment
installed on the a.c. and d.c. electrified railway on Network Rail controlled infrastructure.
Mandatory upon: Advisory only
Standards Ownership: Signal Engineering

th

st

Issue 46: 7 August 1 October 2004

Catalogue of Company Standards

Page 77

2. Company Standards

C. Engineering

Signal Engineering

2C5.5. Special Inspection Notices


SIN/039

Track Circuit Phase or Polarity Stagger


1
Jan 91
A
This document addresses wrong side failures where a track circuit showed clear when occupied where the cause
was found to be defective IBJs or something shorting out the joint.
Mandatory upon: Network Rail & Contractors
Standards Ownership: Signal Engineering

SIN/040

G.E.C. Reed Filter Units


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Jan 91
A
This document addresses wrong side failures occurring in Vital Type RR F.D.M. Reed systems and perishing of
resilient mounts.
Mandatory upon: Network Rail & Contractors
Standards Ownership: Signal Engineering
RT/SIN/055

Clamp Lock Hydraulic Fluid Level Indicators


Issue

Date

Status

Price

Colour

Compliance

Implementation

2
Apr 04
C
This Special Inspection Notice explains the necessity for checking clamp lock hydraulic fluid level and requires the
fitting of a level indicator.
Mandatory upon: Network Rail & Contractors
Standards Ownership: Signal Engineering
Further Information: This standard has been renumbered from GS/SIN/055
RT/SIN/061

Point Configurations Using Single BR 998 Detector Boxes


Issue

Date

Status

Price

Colour

Compliance

Implementation

2
Aug 00
C
This SIN details the actions necessary to ensure that certain point configurations using a single BR 998 Detector
Box are identified and appropriate remedial action for the specified configurations.
Mandatory upon: Network Rail & Contractors
Standards Ownership: Signal Engineering
RT/SIN/062

WB&Sco QNE1 & QMN1 Relays: Contact Welding


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Mar 94
A
This standard defines the action required to change any W.B. & S. Co. QNE1 and QMN1 relays, still in service.
Mandatory upon: Network Rail & Contractors
Standards Ownership: Signal Engineering
RT/SIN/063

Quartz Halogen Lamps Poor Light Output


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Dec 98
C
This Notice sets out the actions required to ensure that lineside signals and indicators fitted with quartz halogen
lamps have a light output that is visible to train drivers. Formerly Group Standard GK/RT0401 Issue 3 May 1996.
Mandatory upon: Network Rail & Contractors
Standards Ownership: Signal Engineering
RT/SIN/064

Loss of Hydraulic Fluid in Electro-Hydraulic Points


Issue

Date

Status

Price

Colour

Compliance

Implementation

3
Aug 99
C
This Notice sets out the action required to ensure that the hydraulic system on all electro-hydraulic points are
checked for the content of air and susceptibility to the ingress of air. Formerly Group Standard GK/RT0402 Issue 1
December 1996.
Mandatory upon: Network Rail & Contractors
Standards Ownership: Signal Engineering

th

st

Issue 46: 7 August 1 October 2004

Catalogue of Company Standards

Page 78

2. Company Standards

RT/SIN/065

C. Engineering

Signal Engineering

Westinghouse PCA1 Flasher Units


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Dec 98
B
This Notice sets out the action required to ensure that flasher units manufactured by Westinghouse are checked
to ensure that they have been modified to prevent a known failure from occurring. Formerly Group Standard
GK/RT0403 Issue 1 August 1997.
Mandatory upon: Network Rail & Contractors
Standards Ownership: Signal Engineering
RT/SIN/067

HVI Track Circuits on AC Electrified Lines


Issue

Date

Status

Price

Colour

Compliance

Implementation

2
Dec 99
B
This Notice sets out the actions required to implement modifications to HVI type track circuits fitted with NCO
RVT. 600 receivers. The modification consists of the addition of one capacitor. Formerly Railway Group Standard
GK/RT0405. Issue 1 August 1997.
Mandatory upon: Network Rail, Contractors and Lessee
Standards Ownership: Signal Engineering
RT/SIN/068

Adtranz ST16 Mark 6 Electronic Timers


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Dec 98
B
This Notice defines how defective ST16 Mark 6 Electronic Timers, manufactured by Adtranz and its predecessors,
are to be identified and, if necessary, replaced.
Mandatory upon: Network Rail & Contractors
Standards Ownership: Signal Engineering
RT/SIN/069

Snorkel Valves Clamp Lock Power Packs


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Jun 99
C
This Notice requires the fitting of snorkel valves to power packs operating clamp lock or swing nose crossing point
apparatus, over which facing moves are signalled. Power packs fitted with snorkel valves shall be clearly and suitably
identified. Power packs held as spares shall also be fitted. The programme for changing the power packs shall be
prioritised according to the risk at each site.
Mandatory upon: Network Rail & Contractors
Standards Ownership: Signal Engineering
RT/SIN/070

BR 998 Electrical Detectors


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Oct 98
B
This Notice details the actions required to check BR 998 Electrical Detectors to ensure that defects which could
lead to electrical breakdown are not present.
Mandatory upon: Network Rail & Contractors
Standards Ownership: Signal Engineering
RT/SIN/071

Test for Locking of Electro-Hydraulic Point Systems


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Aug 99
C
This Notice prescribes a revised test method which will detect air and directs that it shall be used on all electrohydraulic points.
Mandatory upon: Network Rail & Contractors
Standards Ownership: Signal Engineering

th

st

Issue 46: 7 August 1 October 2004

Catalogue of Company Standards

Page 79

2. Company Standards

RT/SIN/072

C. Engineering

Signal Engineering

Reed Receiver Amplifiers


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Dec 00
B
This SIN requires a survey to establish the existing distribution and modification status of REED equipment. It
applies to all RR2000-series Reed receiver applications
Mandatory upon: Network Rail & Contractors
Standards Ownership: Signal Engineering
RT/SIN/073

Signal Light Beam Alignment


Issue

Date

Status

Price

Colour

Compliance

Implementation

Compliance

Implementation

1
Jul 00
B
This Special Inspection Notice requires signal alignment to be checked and recorded.
Mandatory upon: Network Rail & Contractors
Standards Ownership: Signal Engineering
RT/SIN/074

Westlyte Signal Heads


Issue

Date

Status

Price

Colour

2
Oct 2001
C
This Special Inspection Notice details the actions necessary to ensure Westlyte signal heads are identified and
remedial action is taken to prevent the occurrences detailed in this Notice.
Mandatory upon: Network Rail & Contractors
Standards Ownership: Signal Engineering
RT/SIN/077

Polycarbonate Signal Lenses


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Apr 01
B
This Special Inspection Notice aims to establish records of where polycarbonate lenses are fitted and their present
condition so that their use can be properly managed.
Mandatory upon: Network Rail & Contractors
Standards Ownership: Signal Engineering
RT/SIN/078

Alstom Mk3, Mod. State 4 SSI Signal Modules


Issue

Date

Status

Price

Colour

Compliance

Implementation

2
Apr 02
B
A design defect has been discovered in the ALSTOM Mk3, Mod. State 4, Solid State Interlocking (SSI) Signal Module that
could lead to failure to report a failed signal lamp. This Special Inspection Notice advises of this problem, requires a
special test and provides for records to be made to enable later replacement.
Mandatory upon: Network Rail & Contractors
Standards Ownership: Signal Engineering
RT/SIN/079

TPWS Final Correspondence Test


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
May 01
B
This SIN requires that all loops installed on or before 30 April 2001 will have a retrospective correspondence test
undertaken, to mitigate against any further occurrence of TPWS loops been mistakenly installed and commissioned
with arming and trigger loops frequencies transposed for one TPWS function or with an adjacent signal; this is a
wrong side failure.
Mandatory upon: Network Rail & Contractors
Standards Ownership: Signal Engineering

th

st

Issue 46: 7 August 1 October 2004

Catalogue of Company Standards

Page 80

2. Company Standards

RT/SIN/080

C. Engineering

Signal Engineering

Integrity of Adjustable Points Stretcher Bars


Issue

Date

Status

Price

Colour

Compliance

Implementation

2
Oct 02
C
Yes
This Special Inspection Notice is to ensure that immediate inspections are carried out on Network Rail switch and
crossing installations fitted with adjustable points stretcher bars.
Mandatory upon: Network Rail & Contractors
Further information: Compliance to this notice is mandatory and with immediate effect. Confirmation of receipt of this SIN
is required and clause 5 of the document must be complied with for confirmation of implementation.
Standards Ownership: Signal Engineering
RT/SIN/081

AEI-GS Type Z & AEI-GRS Type M Relays


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Dec 03
B
This SIN defines two types of relays that possess potentially unsafe failure modes and details the action to be taken
to identify the number of each variant and the function which they perform within the signalling control circuitry.
Mandatory upon: Network Rail & Contractors
Further information: This SIN requires that information is collected to assist with the production of equivalents lists and the
prioritisation of replacement to be initiated by another SIN.
Standards Ownership: Signal Engineering
RT/SIN/083

Signal House Fibre-Optic Position Light Signals


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Oct 03
B
31/08/2004
This Special Inspection Notice defines the types of affected signals and the action to be taken to replace the front
screens with alternative materials not producing such serious effects.
Mandatory upon: Network Rail & Contractors
Standards Ownership: Signal Engineering
RT/SIN/084

Life Management of Polycarbonate lenses


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Oct 03
B
01/06/2008
This Special Inspection Notice defines the replacement actions required for existing polycarbonate lenses to
prevent life expired lenses remaining in service.
Mandatory upon: Network Rail & Contractors
Standards Ownership: Signal Engineering
RT/SIN/085

Western Region-type Barrier Rear Struts


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Oct 03
B
This Special Inspection Notice defines a requirement to examine the rear barrier strut of Western Region-type
crossing barriers for signs of damage or developing fractures. This requirement is incorporated in Network Rail
Signalling Maintenance Specification RT/SMS LC91 issue 2, but this SIN requires checking to take place pending the
implementation of the new SMS.
Mandatory upon: Network Rail & Contractors
Standards Ownership: Signal Engineering

th

st

Issue 46: 7 August 1 October 2004

Catalogue of Company Standards

Page 81

2. Company Standards

C. Engineering

Signal Engineering

2C5.6. Work Instructions


RT/E/WI/00100

Risk Based Maintenance - DC Track Circuit


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Dec 02
C
To detail the maintenance tasks for DC track circuits for the DC track circuit risk based maintenance regime.
Mandatory upon: Advisory only
Standards Ownership: Signal Engineering
RT/E/WI/00101

Risk Based Maintenance - Rail Clamp Point Lock


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Dec 02
C
To detail the maintenance tasks required for the Rail Clamp Point Lock risk-based maintenance regime.
Mandatory upon: Advisory only
Standards Ownership: Signal Engineering
RT/E/WI/00102

Network Rail Company Work Instruction TI21 Track Circuit Risk Based Maintenance
Issue

RT/E/WI/00103

Colour

Compliance

Implementation

07/08/04

Date

Status

Price

Colour

Compliance

Implementation

07/08/04

Network Rail Company Work Instruction TPWS Risk Based Maintenance


Issue

Date

Status

Price

Colour

Compliance

2 (1)
Aug 04 (Dec 03)
Up-Issued D
07/08/04
To detail the maintenance tasks for the TPWS Track Subsystem risk based maintenance regime.
Mandatory upon: Advisory only
Standards Ownership: Signal Engineering

RT/E/WI/00105

Implementation

07/08/04

AzLM Axle Counter System Risk Based Maintenance


Issue

Price

1
Aug 04
New
D
07/08/04
To detail the maintenance tasks for the HW Point Machine Risk-Based Maintenance regime.
Mandatory upon: Advisory only
Standards Ownership: Signal Engineering

RT/E/WI/00104
*

Status

HW Risk Based Maintenance


Issue

Date

3 (2)
Aug 04 (Feb 04)
Up-Issued D
07/08/04
To detail the maintenance tasks for the TI21 Track Circuit risk based maintenance regime.
Mandatory upon: Advisory only
Standards Ownership: Signal Engineering

Date

Status

Price

Colour

Compliance

Implementation

2 (1)
Aug 04 (Dec 03)
Up-Issued D
Yes
07/08/04
07/08/04
To detail the maintenance tasks required for the AzLM Axle Counter System risk-based maintenance regime.
Mandatory upon: Advisory only
Standards Ownership: Signal Engineering

RT/E/WI/00108

HPSS Risk Based Maintenance


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Apr 04
D
To detail the maintenance tasks for the HPSS risk based maintenance regime.
Mandatory upon: Advisory only
Standards Ownership: Signal Engineering

th

st

Issue 46: 7 August 1 October 2004

Catalogue of Company Standards

Page 82

2. Company Standards

C. Engineering

Civil Engineering

2C6. Civil Engineering


2C6.1. Specifications
RT/CE/S/003

Technical Approval of Design, Construction & Maintenance of Civil Engineering Infrastructure


Issue

Date

Status

Price

Colour

Compliance

Implementation

2
Apr 04
E
This purpose of this Specification is to control the risk to Network Rail s infrastructure, to railway operations, to
railway passengers, members of the public and the environment that may arise due to work activities associated
with the Design and construction of Permanent Way and the Design, construction and maintenance of Structures,
Buildings, and other Civil Engineering Infrastructure on, over, under or adjacent to Network Rail s infrastructure
by defining procedures to be followed.
Mandatory upon: Network Rail
Further Information: Responds to GC/RT5101 and GI/RT7003
Standards Ownership: Civil Engineering
RT/CE/S/007

Design Loading for Accommodation and Occupation Overbridges


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Feb 95
B
This specification defines standard design loading for new or reconstructed accommodation and occupation
Overbridges and gives criteria for when lesser design loadings may be permissible.
Mandatory upon: Network Rail
Further Information: Responds to GC/RT5110, GC/RT5112
Standards Ownership: Civil Engineering
RT/CE/S/017

Examination of Bridges and Culverts


Issue

Date

Status

Price

Colour

Compliance

Implementation

2
Apr 04
E
Yes
The purpose of this Specification is to define the requirements for the examination of Bridges, Culverts and other
structures within the scope of this Specification that are on, over or under Network Rail s infrastructure, such that
there is no unacceptable risk to safety as a result of their condition, and for recording and reporting the
examination findings, and the provision of information for Regulatory reporting.
Mandatory upon: Network Rail
Further Information: Responds to GC/RT5100, GC/RT5123 and GC/RT5143
Standards Ownership: Civil Engineering
RT/CE/S/035

Assessment of Structures
Issue

Date

Status

Price

Colour

Compliance

Implementation

2
Feb 04
E
This document defines the Specification to be followed for the Assessment of Structures for which Network Rail
has responsibility, either as owner of the Structure or as a result of a specific agreement.
Mandatory upon: Network Rail & Contractors
Further Information: Incorporates and supersedes RT/CE/P/010
Standards Ownership: Civil Engineering
RT/CE/S/044

Undertrack Crossings
Issue

Date

Status

Price

Colour

Compliance

Implementation

2 (1)
Aug 04 (Apr 98)
Up-Issued D
01/10/04
07/08/04
The purpose of this Network Rail Business Process Document is to define the requirements for the Design and
construction of Undertrack Crossings.
Mandatory upon: Network Rail
Further Information: Responds to GC/RT5110 (Issue 2), GI/RT7008 (Clauses B4.1.1 & B6.3).
Standards Ownership: Civil Engineering

th

st

Issue 46: 7 August 1 October 2004

Catalogue of Company Standards

Page 83

2. Company Standards

RT/CE/S/047

C. Engineering

Civil Engineering

Standards of Competence for Examination of Structures


Issue

Date

Status

Price

Colour

Compliance

Implementation

2
Feb 01
F
This Specification provides the standards of competence against which persons examining structures should be
assessed. Compliance with this Specification will ensure compliance with Railway Group Standard GC/RT5100: Safe
Management of Structures in respect of competence of the Structures Manager and GO/RT3260: Competence
Management for Safety-Critical Work for other persons in the structure examination process.
Mandatory upon: Network Rail and Contractor
Standards Ownership: Civil Engineering
RT/CE/S/048

Standards of Competence for Examination of a Bridge Following a Bridge Strike


Issue

RT/CE/S/071

Status

Price

Colour

Compliance

Implementation

Design of Earthworks, Earthwork Remediations and Geotechnical aspects of Foundations for


Structures
Issue

Date

4 (3)
Aug 04 (Oct 02)
Up-Issued E
02/10/04
02/10/04
The purpose of this Specification is to define the Standards of Competence against which persons examining
Bridges following a reported Bridge Strike in order to authorise train movements shall be assessed.
Mandatory upon: Network Rail
Further Information: Responds to GC/RT/5122 (Issue 4) and GO/RT3260 (Issue 2)
Standards Ownership: Civil Engineering

Date

Status

Price

Colour

Compliance

Implementation

2 (1)
Aug 04 (Aug 03)
Up-Issued D
01/11/04
01/11/04
The purpose of this Specification is to set out requirements for the Design of Earthworks, Earthwork
Remediations, and geotechnical aspects of the design of foundations for structures as identified in the scope, for
which Network Rail is wholly or partially responsible, with the aims of ensuring that such Earthworks and
structure foundations will perform safely and satisfactorily in service and that they can be constructed with
reasonable economy.
Mandatory upon: Network Rail & Contractors
Standards Ownership: Civil Engineering

RT/CE/S/076

Management of Bridge Strikes from Road Vehicles and Waterborne Vessels


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Oct 02
E
Yes
This specification defines requirements for:
- Management procedures to be followed to mitigate the risk from bridge strikes,
- Procedures to be followed to enable trains to pass safely over or under a bridge following a reported
bridge strike
- Recording and reporting bridge strike accidents
Mandatory upon: Network Rail
Further Information: Replaces RT/CE/P/023 and RT/CE/S/222
Standards Ownership: Civil Engineering
RT/CE/S/080

Management of Existing Bridges & Culverts


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Apr 04
D
Yes
The purpose of this Specification is to define the requirements for the management of existing Bridges and
Culverts on, over or under Network Rail s infrastructure such that there is no unacceptable risk to safety as a
result of their condition, use or location.
Mandatory upon: Network Rail
Further Information: Replaces RT/CE/P/023 and RT/CE/S/222
Standards Ownership: Civil Engineering

th

st

Issue 46: 7 August 1 October 2004

Catalogue of Company Standards

Page 84

2. Company Standards

RT/CE/S/082

C. Engineering

Civil Engineering

Management of Existing Retaining Walls


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Apr 04
D
Yes
The purpose of this Specification is to define the requirements for the management of existing Retaining Walls on
Network Rail s infrastructure such that there is no unacceptable risk to safety as a result of their condition, use or
location.
Mandatory upon: Network Rail
Further Information: Replaces RT/CE/P/023 and RT/CE/S/222
Standards Ownership: Civil Engineering
RT/CE/S/083

Examination of Retaining Walls


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Apr 04
E
Yes
The purpose of this Specification is to define the requirements for the examination of Retaining Walls on Network
Rail s infrastructure, such that there is no unacceptable risk to safety as a result of their condition, and for
recording and reporting the examination findings, and the provision of information for Regulatory reporting.
Mandatory upon: Network Rail
Further Information: Replaces RT/CE/P/023 and RT/CE/S/222
Standards Ownership: Civil Engineering
RT/CE/S/084

Management of Existing Tunnels


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Apr 04
D
Yes
The purpose of this Specification is to define the requirements for the management of existing Tunnels within
Network Rail s infrastructure such that there is no unacceptable risk to safety as a result of their condition, use or
location.
Mandatory upon: Network Rail
Further Information: Replaces RT/CE/P/023 and RT/CE/S/222
Standards Ownership: Civil Engineering
RT/CE/S/085

Examination of Tunnels
Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Apr 04
E
Yes
The purpose of this Specification is to define the requirements for the examination of Tunnels within Network
Rail s infrastructure such that there is no unacceptable risk to safety as a result of their condition, and for
recording and reporting the examination findings, and the provision of information for Regulatory reporting.
Mandatory upon: Network Rail
Further Information: Replaces RT/CE/P/023 and RT/CE/S/222
Standards Ownership: Civil Engineering
RT/CE/S/087

Management of Existing Buildings & Station Structures


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Apr 04
D
Yes
The purpose of this Specification is to define the requirements for the management of existing Buildings and station
structures on, over or under Network Rail s infrastructure such that there is no unacceptable risk to safety as a
result of their condition, use or location.
Mandatory upon: Network Rail
Further Information: Replaces RT/CE/P/023 and RT/CE/S/222
Standards Ownership: Civil Engineering
RT/CE/S/088

Examination of Buildings and Station Structures


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Apr 04
E
Yes
The purpose of this Specification is to define the requirements for the examination of Buildings and station
structures on, over or under Network Rail s infrastructure, such that there is no unacceptable risk to safety as a
result of their condition, and for recording and reporting the examination findings.
Mandatory upon: Network Rail
Further Information: Replaces RT/CE/P/023 and RT/CE/S/222
Standards Ownership: Civil Engineering

th

st

Issue 46: 7 August 1 October 2004

Catalogue of Company Standards

Page 85

2. Company Standards

RT/CE/S/089

C. Engineering

Civil Engineering

Management of Existing Coastal, Estuarine & River Defences


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Apr 04
D
Yes
The purpose of this Specification is to define the requirements for the management of existing Coastal, Estuarine
and River Defences on Network Rail s infrastructure such that there is no unacceptable risk to safety as a result of
their condition.
Mandatory upon: Network Rail
Further Information: Replaces RT/CE/P/023 and RT/CE/S/222
Standards Ownership: Civil Engineering
RT/CE/S/090

Examination of Coastal, Estuarine & River Defences


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Apr 04
E
Yes
The purpose of this Specification is to define the requirements for the examination of Coastal, Estuarine and River
Defences on Network Rail s infrastructure, such that there is no unacceptable risk to safety as a result of their
condition, and for recording and reporting the examination findings.
Mandatory upon: Network Rail
Further Information: Replaces RT/CE/P/023 and RT/CE/S/222
Standards Ownership: Civil Engineering
RT/CE/S/091

Management of Existing Ancillary Structures


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Apr 04
D
Yes
The purpose of this Specification is to define the requirements for the management of existing Ancillary Structures
on, over or under Network Rail s infrastructure such that there is no unacceptable risk to safety as a result of
their condition, use or location.
Mandatory upon: Network Rail
Further Information: Replaces RT/CE/P/023 and RT/CE/S/222
Standards Ownership: Civil Engineering
RT/CE/S/092

Examination of Ancillary Structures


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Apr 04
E
Yes
The purpose of this Specification is to define the requirements for the examination of ancillary structures on, over
or under Network Rail s infrastructure, such that there is no unacceptable risk to safety as a result of their
condition, and for recording and reporting the examination findings.
Mandatory upon: Network Rail
Further Information: Replaces RT/CE/P/023 and RT/CE/S/222
Standards Ownership: Civil Engineering
RT/CE/S/140

Control and Use of Model Clauses


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Apr 04
B
The purpose of this Specification is to define the requirements for the production and use of the Model Clauses
for Specifying Civil Engineering Works, so that when they are used within Technical Workscopes in Network
Rail s contracts, they comply with Railway Group Standards, Network Rail Standards and industry good practice.
Mandatory upon: Network Rail
Standards Ownership: Civil Engineering
RT/CE/S/142

Management of Abnormal Road Loads


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Aug 04
New
C
07/02/05
07/02/05
The purpose of this Specification is to define the requirements for the management of the movement of Abnormal
Road Loads over Bridges owned by Network Rail.
Mandatory upon: Network Rail
Standards Ownership: Civil Engineering

th

st

Issue 46: 7 August 1 October 2004

Catalogue of Company Standards

Page 86

2. Company Standards

C. Engineering

Civil Engineering

2C6.2. Procedures
RT/CE/P/008

Approval and Use of the Model Clauses for Specifying Civil Engineering Works
Issue

Date

Status

Price

Colour

Compliance

Implementation

2
Jun 97
B
This document defines procedures for the approval, maintenance, issue and use of Network Rail s Model Clauses
for Specifying Civil Engineering Works (Network Rail Line Code of Practice RT/CE/C/008).
Mandatory upon: Network Rail
Standards Ownership: Civil Engineering
RT/CE/P/020

Use of Model Works Agreements for the Construction of New Bridges by or for Outside Parties
Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Aug 95
B
This documents defines the procedures for the use of the model agreement to be used for the production of
Works Agreements to regulate the construction of new bridges by or for outside parties.
Mandatory upon: Network Rail
Further Information: Responds to GC/RT5131
Standards Ownership: Civil Engineering
RT/CE/P/022

Controlling the Use of Public Road Bridges by Heavy Abnormal Road Loads
Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Sep 96
B
This document sets out the procedure to be used for receiving, processing and responding to abnormal heavy road
notifications from road hauliers.
Mandatory upon: Network Rail
Further Information: Responds to GC/RT5100
Standards Ownership: Civil Engineering
RT/CE/P/032

Managing Existing Structures


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Apr 04
D
Yes
The purpose of this Company Standard is to define the requirements for the management of existing structures
on, over or under Network Rail s infrastructure such that there is no unacceptable risk to safety as a result of
their condition, use or location.
Mandatory upon: Network Rail
Further Information: Responds to GC/RT5151 and GC/RT5143
Standards Ownership: Civil Engineering
RT/CE/P/037

Managing the Risk Arising from Mineral Extraction and Landfill


Issue

Date

Status

Price

Colour

Compliance

Implementation

2
Apr 04
D
This procedure specifies the minimum requirements and actions to be taken by Network Rail Line to manage risk
arising from subsidence damage and surface instability associated with mineral extraction and hazards associated
with Landfill.
Mandatory upon: Network Rail, Contractors & Lessee
Further Information: Responds to GC/RT5152
Standards Ownership: Civil Engineering
RT/CE/P/042

Management of Tunnel Structures


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Oct 01
D
The purpose of this Procedure is to define the procedures to be followed to maintain the structural integrity of
Tunnels on Network Rail infrastructure to ensure that Tunnels remain fit for purpose.
Mandatory upon: Network Rail, Contractors & Lessee
Further Information: Responds to GC/RT5180, GC/RT5203 and GK/RT0033
Standards Ownership: Civil Engineering

th

st

Issue 46: 7 August 1 October 2004

Catalogue of Company Standards

Page 87

2. Company Standards

RT/CE/P/044

C. Engineering

Civil Engineering

Managing Structures Works


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Apr 04
D
Yes
The purpose of this Company Standard is to define the requirements for works to new and existing structures on,
over or under Network Rail s infrastructure such that there is no unacceptable risk to safety as a result of their
Design or construction.
Mandatory upon: Network Rail, Contractors & Lessee
Further Information: Responds to GC/RT5180, GC/RT5203 and GK/RT0033
Standards Ownership: Civil Engineering

2C6.3. Codes of Practice


RT/CE/C/001

Waterproofing of Underline Bridge Decks


Issue

Date

Status

Price

Colour

Compliance

Implementation

2
Aug 01
D
This Code of Practice gives general guidance on the waterproofing of railway underline bridge decks including
selection, preparation, application and protection.
Mandatory upon: Advisory only
Further Information: Refer to RT/CE/S/041
Standards Ownership: Civil Engineering
RT/CE/C/002

Application and Re-application of Protective Treatment to Railtrack Infrastructure


Issue

Date

Status

Price

Colour

Compliance

Implementation

4
Feb 02
F
This Code of Practice gives recommendations for the selection, application and reapplication of protective
treatment to metallic bridges and structures, and is to be read in conjunction with Network Rail Line Specification
RT/CE/S/039: Specification RT98 Protective Treatments for Network Rail Infrastructure.
Mandatory upon: Advisory only
Further Information: Refer to RT/CE/S/039
Standards Ownership: Civil Engineering
RT/CE/C/008

Model Clauses for Specifying Civil Engineering Works.


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
May 95
Phone
This Code of Practice sets out Network Rail s Model Clauses for specifying Civil Engineering Works, for use in
accordance with Network Rail Line Procedure RT/CE/P/008 Approval and Use of the Model Clauses for
Specifying Civil Engineering Works. [Listed below are the current revision dates for sections within RT/CE/C/008].
Mandatory upon: Advisory only
Additional Information:All queries regarding this COP, please contact Keith Ross; Civil Engineering, 020 7557 8360
Standards Ownership: Civil Engineering
Sections

10
21, 22, 25
23
30 35
40
50 53
70 79
80
83
85
90
93
100

th

Title
Railtrack Line Code of Practice RT/CE/C/008
Guidance notes for Users
Contents
List of Appendices
Appendix B
Appendix C
Appendix D
General
Surveys
Structural Repair Surveys
Ground Investigation
Demolition
Earthworks and Excavations
Piling and Embedded Retaining Walls
Concrete (BS 5400)
Concrete Repairs
Concrete for Ancillary Purposes
Steelwork (BS 5400)
Metalwork Repairs
Bearings
Bridge Bearings Guidelines for Designers

st

Issue 46: 7 August 1 October 2004

Catalogue of Company Standards

Date of Validity
May 1995
30 April 1997
31 May 1997
30 April 1997
31 March 1997
11 April 1997
See below
3 April 1997
30 Sept 1997
13 Feb 1997
31 Dec 1996
31 Jan 1996
29 Feb 1996
31 Dec 1996
31 Mar 1996
13 Feb 1997
30 Nov 1995
31 Jan 1996
13 Feb 1997
31 Jan 1996
31 Jan 1996

Page 88

2. Company Standards
Sections
110 115
120 126
130 134
140, 141
150
153
160 164
170 176
180 182
185 186
190 191
200 204
210
211
212
213
214
215
216
217
218
219
220
221
225
226
227
230 233
240
250 253
255 257

C. Engineering

Civil Engineering

Title
Waterproofing
Bridge Installation Method and Temporary Works
Inspection of new Fabricated Steelwork, Precast Concrete Protective Treatment and Waterproofing
Steelwork (BS 5950)
Brickwork, Blockwork and Masonry
Brickwork and Masonry Repairs
Structural Timber
Structural Timber Guidance Notes
Protective Treatment
Building and Structure Drainage
Track Drainage
External Service Ducts and Cable Troughing
Roads and Paving
Permanent Way General
Permanent Way Design
Installation of New and Renewal of Existing Perm Way
Permanent Way Acceptance Standards
Inspection of Permanent Way
Maintenance of Permanent Way
Permanent Way Materials
Construction Standards for Permanent Way
Permanent Way Small Plant, Tools and Equipment
Permanent Way Ancillary Items
Permanent Way Incident Management
Permanent Way for Bridgework
Permanent Way Particular Specification for Plain Line
Permanent Way Particular Specification for S&C
Permanent Way Particular Specification for Bridgeworks
Level Crossings
Level Crossing Guidance Notes
Fencing and Gates
Landscaping
Management of Lineside Vegetation

RT/CE/C/015

Date of Validity
29 Feb 1996
31 Dec 1996
31 Jan 1997
31 Mar 1996
30 Sep 1994
05 May 1997
31 Dec 1996
31 Dec 1996
31 Oct 1995
31 Mar 1996
31 Jan 1997
29 Feb 1996
31 Oct 1996
31 Mar 1997
31 Mar 1997
31 Mar 1997
31 Mar 1997
31 Mar 1997
31 Mar 1997
31 Mar 1997
31 Mar 1997
31 Mar 1997
31 Mar 1997
31 Mar 1997
31 Mar 1997
31 Mar 1997
31 Mar 1997
31 Mar 1997
31 Jan 1997
31 Jan 1997
31 Mar 1996
31 Mar 1996
31 Mar 1996

The Assessment of Underbridge Capacity


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Nov 95
F
Defines parameters and methods for the assessment of underbridges owned by Network Rail.
Mandatory upon: Advisory only
Further Information: Responds to GC/RT5100
Standards Ownership: Civil Engineering
RT/CE/C/018

Agreement for the Construction of New Underbridges for Outside Parties


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Aug 95
D
This Code of Practice sets out the minimum engineering contents, suggested commercial contents and approved layout of
any Work Agreement completed to cover the design, Construction and future maintenance of a new underbridge for an
outside party.
Mandatory upon: Advisory only
Further Information: Refer RT/CE/P/020
Standards Ownership: Civil Engineering
RT/CE/C/019

Agreement for the Construction of New Overbridges by Outside Parties


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Aug 95
D
This Code of Practice sets out the minimum engineering contents, suggested commercial contents and approved layout of
any Work Agreement completed to cover the design, construction and future maintenance of a new overbridge by an
outside party.
Mandatory upon: Advisory only
Further Information: Calls up 3 documents. Refer RT/CE/P/020
Standards Ownership: Civil Engineering
RT/CE/C/025
th

The Structural Assessment of Underbridges


st

Issue 46: 7 August 1 October 2004

Catalogue of Company Standards

Page 89

2. Company Standards
Issue

C. Engineering
Date

Status

Civil Engineering
Price

Colour

Compliance

Implementation

2
Feb 03
Phone
Yes
This Code of Practice provides recommendations for the parameters and methods to be used for the assessment
of underbridges in accordance with RT/CE/S035.
Mandatory upon: Advisory only
Standards Ownership: Civil Engineering
RT/CE/C/026

Examination of Tunnels
Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Jan 96
D
This Code of Practice gives guidance on the techniques for examining tunnels, the frequency of the examination,
the competency of the Examiners, and the recording and processing of the findings.
Mandatory upon: Advisory only
Further Information: Responds to GC/RT5100
Standards Ownership: Civil Engineering
RT/CE/C/041

Structures Condition Marking Index Handbook for Bridges


Issue

RT/CE/C/045

Status

Price

Colour

Compliance

Implementation

Code of Practice for Terms and Definitions for Use in Civil Engineering Standards
Issue

Date

3 (2)
Aug 04 (Apr 01)
Up-Issued F
Yes
07/08/04
07/08/04
This Code of Practice provides advice on the application of a quantitative condition marking system for
underbridges, overbridges, intersection bridges, side bridges and viaducts.
Mandatory upon: Advisory only
Standards Ownership: Civil Engineering

Date

Status

Price

Colour

Compliance

Implementation

1
Aug 04
New
D
01/09/04
01/09/04
This Code of Practice has been produced with the aim of ensuring that standard terms and definitions are used
within all Company Standards and Business Process Documents produced for and on behalf of the Head of Civil
Engineering.
Mandatory upon: Advisory only
Standards Ownership: Civil Engineering

th

st

Issue 46: 7 August 1 October 2004

Catalogue of Company Standards

Page 90

2. Company Standards

C. Engineering

Telecommunications

2C7. Telecommunications
2C7.1. Specifications
RT/E/S/11189

Testing Telephones at Level Crossings


Issue

Date

Status

Price

Colour

Compliance

Implementation

2
Aug 01
C
This Specification defines the mandatory requirements for the testing of level crossing telephones before they are
placed into service.
Mandatory upon: Network Rail & Contractors
Standards Ownership: Telecommunications Engineering
RT/E/S/30002

Signal Post Telephone Concentrator Systems


Issue

Date

Status

Price

Colour

Compliance

Implementation

3
Dec 01
D
This document defines the requirements to be met by a signal box telephone concentrator system.
Mandatory upon: Network Rail
Further Information: Performance specification
Standards Ownership: Telecommunications Engineering
RT/E/S/30003

The Performance of Telecommunications Equipment Under Conditions of Electrical Interference


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Jun 99
C
This specification details the conditions of electrical interference under which telecommunications equipment is
required to operate and the standard of performance required from the equipment under such conditions.
Mandatory upon: Network Rail & Contractors
Standards Ownership: Telecommunications Engineering
RT/E/S/30023

Optical Requirements of CCTV Systems for Driver Only Operation (Passenger)


Issue

Date

Status

Price

Colour

Compliance

Implementation

2
Aug 01
C
This document sets out the optical arrangements for CCTV equipment intended to be used by drivers to monitor
train doors at a station operated under Driver Only Operation (Passenger) rules as required in Railway Group
Standards GO/RT3271, Driver Only Operations.
Mandatory upon: Network Rail & Contractors
Standards Ownership: Telecommunications Engineering
RT/E/S/30024

Fault Priority and Response Times for Operational Telecommunications Services


Issue

Date

Status

Price

Colour

Compliance

Implementation

2
Aug 01
C
This document defines the fault priority and associated response and target corrective action times which shall be
applied as a minimum requirement for Operational Telecommunications Services.
Mandatory upon: Network Rail & Contractors
Standards Ownership: Telecommunications Engineering
RT/E/S/30025

Standby Power Supply Requirements for Operational Telecommunications Equipment


Issue

Date

Status

Price

Colour

Compliance

Implementation

2
Aug 01
B
This document sets out the requirements for standby power supplies to enable operational telecommunications
equipment to continue to function when the main power supply source has failed.
Mandatory upon: Network Rail & Contractors
Standards Ownership: Telecommunications Engineering

th

st

Issue 46: 7 August 1 October 2004

Catalogue of Company Standards

Page 91

2. Company Standards

RT/E/S/30028

C. Engineering

Telecommunications

Installation of Operational Telecommunications Equipment


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Apr 01
C
This specification sets out the minimum requirements for the installation of Operational Telecommunications
equipment to ensure that the systems performs in accordance with its safety requirements and continues to do so
throughout its design life.
Mandatory upon: Network Rail & Contractors
Standards Ownership: Telecommunications Engineering
RT/E/S/30031

Signal Box Telephone Concentrator System Design & Application Requirements


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Dec 01
B
This document defines the minimum requirements to be applied in the design of a signal box concentrator system
and in the application of requirements to meet railway operating rules.
Mandatory upon: Network Rail & Contractors
Standards Ownership: Telecommunications Engineering
RT/E/S/30032

Positioning & Labelling of Lineside Telephones


Issue

Date

Status

Price

Colour

Compliance

Implementation

2
Aug 03
C
Yes
This specification defines how the requirements of the Railway Group Standard GE/RT8048 issue 1- Positioning
and Labelling of Lineside Telephones, are to be applied to Network Rail controlled infrastructure. It revises the
emergency issue of RT/E/S/30032 to include retrospective actions to bring the position of telephones installed
since April 2002 into compliance and to bring the labelling of all telephones irrespective of age up to date
Mandatory upon: Network Rail & Contractors
Standards Ownership: Telecommunications Engineering
RT/E/S/30033

Inspection and Surveillance of Telecoms Engineering Activities


Issue

Date

Status

Price

Colour

Compliance

Implementation

3 (E2)
Feb 04 (Aug 02)
B
To maintain the integrity and functionality of telecommunications systems and equipment by ensuring that systems
and equipment retain conformity with the conditions of approval and design.
Mandatory upon: Network Rail & Contractors
Standards Ownership: Telecommunications Engineering
RT/E/S/30034

Radio Mast Lightning Protection and Earthing System


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Jun 03
C
Yes
This specification details the design requirements for a Lightning Protection and Earthing System (LP&ES) for
permanent radio mast structures, located on Network Rail land, property or TOC leased land.
Mandatory upon: Network Rail & Contractors
Standards Ownership: Telecommunications Engineering
RT/E/S/30035

Telecoms Network Terminating Points


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Jun 03
D
Yes
This Specification defines the boundaries between different parts of the telecoms network. It sets out a clear
demarcation of maintenance responsibilities. In particular, it provides clear direction when failures arise as to what
extent a contractor needs to investigate to establish whether their equipment is working normally.
Mandatory upon: Network Rail & Contractors
Standards Ownership: Telecommunications Engineering

th

st

Issue 46: 7 August 1 October 2004

Catalogue of Company Standards

Page 92

2. Company Standards

RT/E/S/30036

C. Engineering

Telecommunications

Booster Transformer Outages: Managing the Consequences for Telecommunication Systems


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Aug 03
C
This specification details the actions to be taken during a booster transformer outage to protect staff from the
possibility of receiving an electric shock from contact with telecoms cables or circuits connected to them.
Mandatory upon: Network Rail & Contractors
Standards Ownership: Telecommunications Engineering
RT/E/S/30047

Management of Safety Related Reports for Telecoms Failures


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Feb 04
D
The purpose of this specification is to define Network Rail's requirements for ensuring all safety related failures to
telecommunications equipment and services, owned by Network Rail or provided by third parties, are subject to a
unified national system of classification, investigation and review.
Mandatory upon: Network Rail & Contractors
Standards Ownership: Telecommunications Engineering
RT/E/S/31001

Telecommunications Maintenance Testing and Failure Investigation


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Jun 02
D
This specification defines the minimum requirements to ensure that the reinstatement of previously working
operational telecommunications equipment is tested properly to assure continued safe working when returned to
service and that all safety related failures are thoroughly investigated. In this manner compliance to GK/RT0209
part A, B, D & E will be achieved.
Mandatory upon: Network Rail & Contractors
Standards Ownership: Telecommunications Engineering

2C7.2. Procedures
RT/E/P/30022

Technical Requirements for Communications Engineering Schemes and Services


Issue

Date

Status

Price

Colour

Compliance

Implementation

2
Feb 01
B
To define procedures for the application of GC/RT5101 Technical Approval requirements for Changes to the
Infrastructure to Telecommunications Schemes and Services.
Mandatory upon: Network Rail
Standards Ownership: Telecommunications Engineering
RT/E/P/30026

Operation and Management of the National Radio Network


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Feb 02
D
The purpose of this document is to describe the Network Rail company policy to support the operation and
management of the National Radio Network.
Mandatory upon: Network Rail
Standards Ownership: Telecommunications Engineering
RT/E/P/30027

Technical Requirements for Train Radio Communication


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Aug 01
C
This procedure sets out the technical requirements that must be met to ensure compliance with Network Rail
Group Standard GO/RT3410 for Radio Communication to trains on Network Rail controlled infrastructure.
Mandatory upon: Network Rail
Standards Ownership: Telecommunications Engineering

th

st

Issue 46: 7 August 1 October 2004

Catalogue of Company Standards

Page 93

2. Company Standards

RT/E/P/30029

C. Engineering

Telecommunications

Requirements for Installation of Operational Telecommunications Equipment


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Apr 01
B
This procedure sets out the requirements for Network Rail Line to ensure that the installation of Operational
Telecommunications equipment is such that it performs in accordance with its safety requirements and continues
to do so throughout its design life.
Mandatory upon: Network Rail
Standards Ownership: Telecommunications Engineering
RT/E/P/30030

Managing the Optical Requirements of CCTV Systems for Driver Only Operation (Passenger)
Issue

Date

Status

Price

Colour

Compliance

Implementation

2
Apr 02
B
This procedure sets out the minimum requirements for Network Rail to ensure that the management of optical
arrangements for CCTV equipment intended to be used by drivers to monitor train doors at a station operated
under Driver Only Operation (passenger) rules, is as required in GT/EH H804. These requirements, together with
the use of RT/E/S/30023, will ensure compliance to GO/RT3271.
Mandatory upon: Network Rail
Standards Ownership: Telecommunications Engineering
Signalling & Telecommunications Technical Clearance for Radio Antenna Systems

RT/E/P/30066

Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Feb 04
D
Yes
This procedure details the Technical Clearance process that shall be applied for new radio antenna systems,
upgraded radio masts or other RF transmission equipment on Network Rail land or property.
Mandatory upon: Network Rail
Standards Ownership: Telecommunications Engineering

2C7.3. Codes of Practice


RT/E/C/10117

Competence Management Systems for Work on Control and Communication Systems


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Jun 98
D
This Code of Practice is issued to provide guidance to organisations involved in safety critical work on the
Network Rail control and communications infrastructure who are required to meet the conditions of Network
Rail Standards on competence management. It also gives detailed requirements for the operation of Competence
Management Systems.
Mandatory upon: Advisory only
Standards Ownership: Telecommunications Engineering
RT/E/C/30037

Office Telephone System Installations


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Aug 03
E
This Code of Practice details the work requirements for the installation of office telephone systems from initial
work instigation through to the project management of the final system installation.
Mandatory upon: Advisory only
Standards Ownership: Telecommunications Engineering
RT/E/C/31100

Telecommunications Failure Investigation


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Jun 02
D
The purpose of this Code of Practice is to define the requirements for compliance with Network Rail Specification
RT/E/S/31001 which mandates the investigation arrangements for telecommunications equipment following the
reporting of safety related telecommunications failures.
Mandatory upon: Advisory only
Standards Ownership: Telecommunications Engineering

th

st

Issue 46: 7 August 1 October 2004

Catalogue of Company Standards

Page 94

2. Company Standards

RT/E/C/31101

C. Engineering

Telecommunications

Telecommunications Failure Investigation: Investigation Guides


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Dec 02
D
The purpose of this Code of Practice is to provide specific failure investigation guides for Operational
Telecommunications Systems.
Mandatory upon: Advisory only
Standards Ownership: Telecommunications Engineering
RT/E/C/31200

Telecommunications Maintenance Testing


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Jun 02
D
This Code of Practice sets out the requirements for compliance with Network Rail Specification RT/E/S/31001
which mandates the maintenance testing arrangements for operational telecommunications equipment following
repair or replacement.
Mandatory upon: Advisory only
Standards Ownership: Telecommunications Engineering
RT/E/C/31201

Telecommunications Maintenance Testing: Maintenance & Missing Equipment Test Plans


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Dec 02
D
The purpose of this Code of Practice is to provide the specific maintenance testing plans for repair and
replacement of Operational Telecommunications equipment and for replacement of missing equipment.
Mandatory upon: Advisory only
Standards Ownership: Telecommunications Engineering

2C7.4. Guidance Notes


RT/E/G/30065

Management of Safety Related Reports for Telecoms Failures


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Feb 04
C
The purpose of this guidance note is to provide information, help and worked examples to Network Rail and its
contractors to ensure compliance with Network Rail specification RT/E/S/30047.
Mandatory upon: Advisory only
Standards Ownership: Telecommunications Engineering
RT/E/G/50016

Methodology for the Demonstration of Compatibility with Telecoms Systems


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Feb 03
D
The purpose of this document is to provide a methodology to demonstrate electro-magnetic compatibility with
operational telecommunications equipment and systems on the AC and DC electrified railway on Network Rail
Controlled Infrastructure.
Mandatory upon: Advisory only
Standards Ownership: Telecommunications Engineering

2C7.5. Special Inspection Notices


RT/SIN/300

Telecoms DT70 Power Supply Units


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Feb 03
D
This notice applies retrospectively to all installed DT70 Screen and Keyboard Power Supply Units.
Mandatory upon: Advisory only
Standards Ownership: Telecommunications Engineering

th

st

Issue 46: 7 August 1 October 2004

Catalogue of Company Standards

Page 95

2. Company Standards

C. Engineering

Track Engineering

2C8. Track Engineering


2C8.1. Specifications
RT/CE/S/002

Serviceable Rail for Use in Running Lines and Sidings


Issue

Date

Status

Price

Colour

Compliance

Implementation

2
Aug 99
C
This specification gives the requirements for the selection and use of serviceable rail in jointed and welded
applications, and for replacement of isolated defects.
Mandatory upon: Network Rail
Further Information: Not mandated : use & equipment. Responds to GC/RT5019
Standards Ownership: Track Engineering
RT/CE/S/008

Saw and Disc Cutting and Drilling of Rail


Issue

Date

Status

Price

Colour

Compliance

Implementation

2
Feb 98
B
This specification gives the quality of finish and dimensional tolerance requirements for saw- or disc-cut rail ends
and for holes drilled in rails, both factory and site situation.
Mandatory upon: Contractors
Further Information: Responds to GC/RT5019, GC/RT5020
Standards Ownership: Track Engineering
RT/CE/S/009

Track Ballast Returned by Automatic Ballast Cleaners


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Jul 96
A
This specification gives the requirements for track ballast returned directly to the track by use of on-track
automatic ballast cleaners, including physical properties and test.
Mandatory upon: Network Rail
Further Information: Material specification. Responds to GC/RT5014
Standards Ownership: Track Engineering
RT/CE/S/011

Continuous Welded Rail (CWR) Track


Issue

Date

Status

Price

Colour

Compliance

Implementation

4
Feb 02
E
This specification gives requirements for the design, installation and maintenance of continuous welded rail (CWR)
track, whether installed new or converted from jointed track using existing sleepers and ballast. It also specifies the
methods to be used when stressing CWR in both plain line and through switches and crossings (S&C).
Mandatory upon: Network Rail
Further Information: Lays down mandated process. Responds to GC/RT5010, GC/RT5015, GC/RT5019, GC/RT5020.
Standards Ownership: Track Engineering
RT/CE/S/014

Rail Testing Detection Criteria


Issue

Date

Status

Price

Colour

Compliance

Implementation

1A
Oct 97
B
This document defines the performance specification for non destructive testing of normal (pearlitic) rail and is
expressed in terms of defect size thresholds and their probabilities of detection.
Mandatory upon: Contractors
Further Information: Responds to GC/RT5019
Standards Ownership: Track Engineering

th

st

Issue 46: 7 August 1 October 2004

Catalogue of Company Standards

Page 96

2. Company Standards

RT/CE/S/032

C. Engineering

Track Engineering

Joining of Rails by Aluminothermic Welding


Issue

Date

Status

Price

Colour

Compliance

Implementation

2 (1)
Feb 03 (Feb 96)
F
01/10/04
01/02/03
This specification defines the standards for carrying out of track welding. It details the processes that are to be
used when carrying out alumino-thermic welding of rail joints, maintenance and repair welding of plain rails and
crossings, alumino-thermic welding and electric pin brazing of bond attachments.
Mandatory upon: Contractors
Further Information: Responds to GC/RT5019, GC/RT5020
Standards Ownership: Track Engineering
RT/CE/S/034

Requirements for Processes for Cold-expanding Fishbolt Holes by the Split Sleeve Method.
Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Aug 97
A
This specification gives the requirements for processes to be used for the cold-expansion of fish bolt holes in
railway rails and cast crossings using the split sleeve method.
Mandatory upon: Contractors
Further Information: Responds to GC/RT5020
Standards Ownership: Track Engineering
RT/CE/S/036

Management of Gauging and Clearances


Issue

Date

Status

Price

Colour

Compliance

Implementation

Emergency 1
Apr 00
C
This specification establishes a management framework within Network Rail Line for assessing and authorizing
gauging clearances for new or transferred rail vehicles.
Mandatory upon: Network Rail
Further Information: Emergency issue responding to HSE discussions.
Standards Ownership: Track Engineering
RT/CE/S/037

Requirements for Maintenance of Trackwork in Depots by Depot Facility Operators


Issue

Date

Status

Price

Colour

Compliance

Implementation

3
Dec 00
B
This document specifies the requirements for inspection and maintenance of trackwork within depots by Depot
Facility Operators having Depot Leasing Agreements with Network Rail.
Mandatory upon: Network Rail & Contractors/Lessee
Further Information: Can only mandate through terms of lease.
Standards Ownership: Track Engineering
RT/CE/S/038

Longitudinal Timbers Design, Installation and Maintenance


Issue

Date

Status

Price

Colour

Compliance

Implementation

4
Oct 01
C
This specification defines the minimum requirements for the design, supply, installation, inspection and maintenance
of Longitudinal Timbers Systems on Network Rail infrastructure, and specifies procedures to be used for the
management of the interface of Longitudinal Timbers Systems with supporting structures and the rails, baseplates,
chairs and where applicable, sleepers. Compliance with this Specification will ensure compliance with the
requirements of Railway Group Standard GC/RT5021: Track System Requirements in respect of Longitudinal
Timbers.
Mandatory upon: Contractors
Further Information: Responds to GC/RT5021
Standards Ownership: Track Engineering

th

st

Issue 46: 7 August 1 October 2004

Catalogue of Company Standards

Page 97

2. Company Standards

RT/CE/S/042

C. Engineering

Track Engineering

Track Geometry Recording


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Apr 95
C
This specification gives the requirements for the provision of a track geometry recording service. It defines the
parameters to be recorded, the types of report to be produced and the mode of up loading recording data to the
mainframe Track Quality System. It is intended to accord with, but in some respects enhance, Railway Group Standard
GC/HE038 Track Recording Handbook.
Mandatory upon: Network Rail & Contractors
Further Information: Responds to GC/RT5010, GC/RT5017.
Standards Ownership: Track Engineering
RT/CE/S/049

Track Design Handbook


Issue

Date

Status

Price

Colour

Compliance

Implementation

8 (7)
Aug 04 (Feb 03)
Up-Issued Phone
07/08/04
07/08/04
This specification gives the requirements for the design of track alignments and layouts. Information provided on
track geometry, the mathematics of track layouts, switch and crossing (S&C) assemblies, sleepers and rail fastenings
is intended to ensure that designs take proper account of the speed of traffic.
Mandatory upon: Network Rail
Standards Ownership: Track Engineering

RT/CE/S/050

Process for Cold-Expanding New Fishbolt Holes by the Split Sleeve Method Using FTI Tooling and
Consumables
Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Jan 96
C
This specification gives the procedure to be used for the cold-expansion of new fishbolt holes in railway rails and
cast crossings using the split sleeve method and FTI tooling and consumables.
Mandatory upon: Contractor
Further Information: Responds to GC/RT5019, GC/RT5020
Standards Ownership: Track Engineering
RT/CE/S/051

Process for Cold-Expanding Existing Fishbolt Holes by the Split Sleeve Method Using FTI Tooling
and Consumables
Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Jan 96
C
This specification gives the method to be used for the cold-expansion of existing fishbolt holes in railway rails by
the split sleeve process, using FTI tooling and consumables.
Mandatory upon: Contractor
Further Information: Responds to GC/RT5019, GC/RT5020
Standards Ownership: Track Engineering
RT/CE/S/053

Inspection and Repair Procedures to Reduce the Risk of Derailment at Switches


Issue

Date

Status

Price

Colour

Compliance

Implementation

3
Oct 02
D
This specification identifies five potential derailment situations which arise at switches. It describes tell tale signs
which should provide an advance warning of possible problems, describes the use of a selection of gauges which
are necessary to monitor the wear and/or damage of switch and stock rails, sets out the mandatory inspection
frequencies in such situations and draws attention to the need to comply with necessary associated maintenance
work on the switch and stock rail components and geometry.
Mandatory upon: Network Rail & Contractors
Further Information: Responds to GC/RT5011
Standards Ownership: Track Engineering

th

st

Issue 46: 7 August 1 October 2004

Catalogue of Company Standards

Page 98

2. Company Standards

RT/CE/S/054

C. Engineering

Track Engineering

Inspection of Cast Crossings and Cast Vees in the Track


Issue

Date

Status

Price

Colour

Compliance

Implementation

2
Aug 03
C
This specification gives the requirements for the inspection and identification of defects and wear in cast crossing
and cast vees. The specification includes details of minimum actions to be taken when significant defects are
discovered.
Mandatory upon: Network Rail & Contractor
Standards Ownership: Track Engineering
RT/CE/S/055

Rail Testing: Ultrasonic Procedures


Issue

Date

Status

Price

Colour

Compliance

Implementation

1A
Feb 98
E
The purpose of this specification is to define ultrasonic testing procedures for: The detection of defects in rolled
steel rails; Estimation of crack size in rolled steels rails; The measurement of rail depth and gall, and The detection
of fusion face detects in alumino-thermic welds and rail head weld repairs. In addition, the specification details the
linking procedures defining their use together with requirements for the training and certification of operators
applying the procedures.
Mandatory upon: Contractor
Further Information: Responds to GC/RT5019
Standards Ownership: Track Engineering
RT/CE/S/056

Rail Testing: Non Ultrasonic Procedures


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Mar 96
C
This specification defines the procedures to be adopted for the testing of rail by non-ultrasonic means. The
methods described are magnetic particle inspection, dye penetrant inspection, visual examination and rail
measurement using calipers.
Mandatory upon: Contractor
Further Information: Responds to GC/RT5019
Standards Ownership: Track Engineering
RT/CE/S/057

Rail Failure Handbook


Issue

Date

Status

Price

Colour

Compliance

Implementation

4
Oct 01
Phone
Yes
This specification defines reporting requirements for rail failures and the different types of rail failure that may
occur.
Mandatory upon: Network Rail & Contractor
Further Information: Responds to GC/RT5019
Standards Ownership: Track Engineering
RT/CE/S/061

Pearlitic Rails
Issue

Date

Status

Price

Colour

Compliance

Implementation

2
Aug 02
D
This specification lays down the requirements for new pearlitic rails to be supplied to Network Rail, or for
installation in Network Rail's network. The profiles covered are 56E1, 60E and 95RBH, and the assymmetric switch
rails 54E1, 60E1A1 and 60E1A4.
Mandatory upon: Network Rail
Further Information: Performance specification. Responds to GC/RT5019
Standards Ownership: Track Engineering
RT/CE/S/062

Serviceable Concrete Sleepers for use in Running Lines and Sidings.


Issue

Date

Status

Price

Colour

Compliance

Implementation

3
Oct 01
C
This specification gives the requirements for the selection and use of serviceable concrete sleepers in running lines
and sidings.
Mandatory upon: Network Rail
Further Information: Responds to GC/RT5015
Standards Ownership: Track Engineering

th

st

Issue 46: 7 August 1 October 2004

Catalogue of Company Standards

Page 99

2. Company Standards

RT/CE/S/063

C. Engineering

Track Engineering

Serviceable Switches and Crossings


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Oct 96
C
This specification sets out the minimum standards to be observed for serviceable switches and crossings being
considered for reinstallation in Network Rail infrastructure.
Mandatory upon: Network Rail
Further Information: Performance specification. Responds to GC/RT5011
Standards Ownership: Track Engineering
RT/CE/S/064

Assembly of BR Mk111 4- and 6-Hole Insulated Joints


Issue

Date

Status

Price

Colour

Compliance

Implementation

2
Dec 03
C
To set out the process for the assembly of BR MkIII glued insulated rail joints, so that when installed in Network
Rail's infrastructure they are reliable and durable.
Mandatory upon: Contractor
Standards Ownership: Track Engineering
RT/CE/S/072

Prevention of Unauthorised Access to the Lineside


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Feb 03
D
01/03/06
01/02/03
This Specification supports Railway Group Standard GC/RT5201 Lineside Security by mandating lineside security
measures commensurate with the assessed risks posed by the adjacent environment and incorporates a method of
assessing these risks. For the purposes of this Specification, security measures are a physical barrier such as, but
not limited to, a fence or wall.
Mandatory upon: Network Rail & Contractors
Standards Ownership: Track Engineering
RT/CE/S/073

Design, Assembly and Installation of RT60 Switches and Crossings


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Dec 03
D
This specification defines Network Rail s requirements for the design, manufacture and installation of RT60 S&C.
Mandatory upon: Network Rail & Contractors
Standards Ownership: Track Engineering
RT/CE/S/077

Storage, Installation & Testing of TSR & ESR AWS Magnets


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Oct 03
C
Yes
This specification defines the storage, installation and testing requirements for AWS speed restriction magnets. It is
primarily aimed at front line staff responsible for the correct installation of speed restriction magnets.
Mandatory upon: Network Rail & Contractors
Standards Ownership: Track Engineering
RT/CE/S/096

Training and Assessment Permanent Way Engineering


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Aug 03
D
This specification sets out mandatory requirements for the Training and assessment of Persons New to Track.
Initially, the scope of the specification is restricted to mandating attendance on the Network Rail Track Induction
Course and subsequent assessment.
Mandatory upon: Network Rail & Contractors
Standards Ownership: Track Engineering
RT/CE/S/097

Quality Assurance of Training Permanent Way Engineering


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Aug 03
C
This specification details mandatory requirements for training organisations which deliver Permanent Way
Engineering training.
Mandatory upon: Network Rail & Contractors
Standards Ownership: Track Engineering

th

st

Issue 46: 7 August 1 October 2004

Catalogue of Company Standards

Page 100

2. Company Standards

RT/CE/S/101

C. Engineering

Track Engineering

Track Design Requirements


Issue

Date

Status

Price

Colour

Compliance

Implementation

1A
Oct 97
B
This specification gives the minimum engineering requirements for the design of track construction, alignments,
layouts and components. It refers where appropriate to more detailed Company Standards.
Mandatory upon: Network Rail & Contractors
Further Information: Performance specification. Responds to GC/RT5011, GC/RT5013-15, GC/RT5019-20.
Standards Ownership: Track Engineering
RT/CE/S/102

Track Construction Standards


Issue

Date

Status

Price

Colour

Compliance

Implementation

5
Feb 02
D
This specification gives the minimum requirements for the construction of new or relaid track material to be used,
ballast shoulder profiles and sleeper spacing. It also sets out acceptance criteria for new or relaid track in terms of
workmanship and geometry.
Mandatory upon: Network Rail & Contractors
Further Information: Performance specification. Responds to GC/RT5010-11, GC/RT5013-15, GC/RT5017, GC/RT5019.
Standards Ownership: Track Engineering
RT/CE/S/103

Track Inspection Requirements


Issue

Date

Status

Price

Colour

Compliance

Implementation

4
Apr 01
E
The specification gives the minimum requirements for the inspection of track. It sets out mandatory inspection
frequencies and defines the track defects which, if found, require immediate blocking of the line to traffic or imposition
of an emergency speed restriction. It also sets out inspection methods for certain major track components.
Mandatory upon: Network Rail & Contractors
Further Information: Mandates inspection frequencies & processes. Responds to GC/RT5010 11, GC/RT5013-15, GC/RT5017,
GC/RT5019, GC/RT5208. Please see entry for RT/CE/PWSI/004 in respect of rolling contact fatigue
Standards Ownership: Track Engineering
RT/CE/S/104

Track Maintenance Requirements


Issue

Date

Status

Price

Colour

Compliance

Implementation

5
Jun 00
D
This specification gives the requirements for the maintenance of track. It includes limits of wear (sidewear & depth)
of rails, and minimum actions in the event of serious defects. It also defines the maximum and target values of track
geometry parameters to be complied with in maintaining the track.
Mandatory upon: Network Rail & Contractors.
Further Information: Also mandates actions. Responds to GC/RT5010 11, GC/RT5013-15, GC/RT5017, GC/RT5019, GC/RT5208.
Standards Ownership: Track Engineering
RT/CE/S/132

Weld Repair of Rails


Issue

Date

Status

Price

Colour

Compliance

Implementation

3 (2)
Feb 03 (Aug 00)
C
01/08/05
01/02/03
This specification details the switch weld repairs which are permitted, together with associated requirements and
the procedures which shall be followed using the specific electric arc process.
Mandatory upon: Contractors
Standards Ownership: Track Engineering

th

st

Issue 46: 7 August 1 October 2004

Catalogue of Company Standards

Page 101

2. Company Standards

C. Engineering

Track Engineering

2C8.2. Procedures
RT/CE/P/015

Structure Gauge Policy


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Jun 97
B
Defines procedures to be adopted in selecting the structure gauge to be adopted for the construction of new or
reconstruction or alteration of existing structures or the alignment of permanaent way to ensure the structure
gauge provided is suitable for existing and envisaged rail vehicles.
Mandatory upon: Network Rail
Further Information: Responds to GC/RT5204, GC/RT5102
Standards Ownership: Track Engineering
RT/CE/P/018

Requirements for the Operation of the Dynamic Track Stabiliser on or Adjacent to Structures
Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Aug 97
B
This procedure defines the procedures to be followed to permit the use of the dynamic track stabiliser and the
limitations on its use over or adjacent to structures to ensure the integrity of structures is safeguarded.
Mandatory upon: Network Rail
Further Information: Responds to GC/RT5100
Standards Ownership: Track Engineering
RT/CE/P/027

Use of Ballast Gluing to Increase the Lateral Resistance of Track


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Jan 96
A
This procedure sets out the Network Rail s policy on ballast gluing as means of providing increased lateral
restraint of the permanent way.
Mandatory upon: Network Rail
Further Information: Mandates upon procurer. Responds to GC/RT5014
Standards Ownership: Track Engineering
RT/CE/P/034

Reporting of Track Buckles


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Apr 97
B
This procedure gives the requirements for the reporting of track buckles. It defines: reportable track buckles; the
necessary reports; and, by whom and to whom the reports must be sent, and within what timescales. The reporting
procedures described are in addition to any notification to signalling staff in connection with the protection of traffic.
Mandatory upon: Network Rail
Standards Ownership: Track Engineering
RT/CE/P/038

Track Geometry: Management of Recording and of Immediate and Urgent Actions


Issue

Date

Status

Price

Colour

Compliance

Implementation

4
Apr 04
C
This procedure defines the actions and responsibilities for those individuals involved in the management and repair
of track geometry defects as reported by approved track recording vehicles.
Mandatory upon: Network Rail
Further Information: Responds to GC/RT5017
Standards Ownership: Track Engineering
RT/D/P/085

Management of Track Faults Found by Track Recording Vehicle


Issue

Date

Status

Price

Colour

Compliance

Implementation

4
Apr 04
B
Company Procedure RT/CE/P/038 gives the requirements for managing the Track Geometry Recording Service
and the actions required to deal with the detected Track Irregularities. This Procedure summarises only those
actions to be taken to deal with defects requiring Immediate or Urgent actions and the processes which the
Regional/Territory Track Engineer must put in place in order to comply with RT/CE/P/038 in those respects. It also
summarises the actions to be taken by the Track Geometry Supplier in dealing with detected Track Irregularities. It
does not supplant RT/CE/P/038 in any respect.
Mandatory upon: Network Rail & Contractor
Standards Ownership: Track Engineering

th

st

Issue 46: 7 August 1 October 2004

Catalogue of Company Standards

Page 102

2. Company Standards

RT/LS/P/030

C. Engineering

Track Engineering

Control of Wheel Impact Forces


Issue

Date

Status

Price

Colour

Compliance

Implementation

Emergency 2
Dec 00
B
This procedure gives the actions to be taken when vertical wheel-rail forces exceed 200kn due to wheel
flats/irregularities.
Mandatory upon: Network Rail
Standards Ownership: Track Engineering

2C8.3. Codes of Practice


RT/CE/C/003

Installation and Maintenance of Longitudinal Timbers


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Apr 01
F
Yes
This Code of Practice gives recommendations for the installation and maintenance of longitudinal timbers, and
procedures for the management of the interface with bridges structures and the track. Compliance with the
recommendations in this document will ensure compliance with RT/CE/S/038.
Mandatory upon: Advisory only
Standards Ownership: Track Engineering
RT/CE/C/004

Catalogue of Permanent Way (RE/PW) Drawings


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Jun 98
C
This Code of Practice lists the current suite of Network Rail s RE/PW standard drawings. It also explains how
copies of the drawings may be obtained by users.
Mandatory upon: Advisory only
Standards Ownership: Track Engineering
RT/CE/C/006

Design, Installation and Maintenance of Lineside Drainage


Issue

Date

Status

Price

Colour

Compliance

Implementation

2
Oct 02
D
This code of practice defines the procedures to be adopted for the design, installation and maintenance of piped and
open-channel lineside drainage. It does not cover the requirements of sewage (foul water) drains.
Mandatory upon: Advisory only
Further Information: COP contains mandatory procedures. Refer RT/CE/S/101-103.
Standards Ownership: Track Engineering
RT/CE/C/007

Permanent Way Standard Drawings (RE/PW SERIES)


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
May 95
D
This Code of Practice describes the preferred method of creating standard component drawings; also associated
general arrangement drawings using standard components.
Mandatory upon: Advisory only
Standards Ownership: Track Engineering
RT/CE/C/016

Assessment of Strength of Rails with Localised Head Loss in Tunnels


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Jun 00
C
This code of practice sets out a recommended procedure for assessing the strength of rails where localised head
loss has occurred, so that the appropriate decision can be taken regarding replacement of the rail. It applies to
Normal and Grade A rails, on concrete, timber and steel sleepers, and on slab.
Mandatory upon: Advisory only
Standards Ownership: Track Engineering
RT/CE/C/017

CEN60E1 Rail Components and Process


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Apr 01
D
This code of practice provides information in respect of components and processes associated with CEN60E1 rail.
Mandatory upon: Advisory only
Standards Ownership: Track Engineering

th

st

Issue 46: 7 August 1 October 2004

Catalogue of Company Standards

Page 103

2. Company Standards
RT/CE/C/030

C. Engineering

Track Engineering

Lineside Security
Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Aug 00
C
The purpose of this code of practice is to advise on measures to prevent unauthorised assess to Network Rail
controlled infrastructure and to support Railway Group Standard GC/RT5201.
Mandatory upon: Advisory only
Standards Ownership: Track Engineering
RT/CE/C/033

Competence Requirements for Safety-Critical Permanent Way Work


Issue

Date

Status

Price

Colour

Compliance

Implementation

2
Dec 00
C
This code of practice gives recommendations for the competence of personnel who undertake safety-critical
permanent way work on Network Rail's infrastructure. It is for use in the preparation of Standards of Competence
and in the operation of Competence Management Systems in respect of such persons.
Mandatory upon: Advisory only
Standards Ownership: Track Engineering
RT/CE/C/039

Formation Treatments
Issue

Date

Status

Price

Colour

Compliance

Implementation

2
Dec 03
D
Yes
This code of practice sets out Network Rail s recommendations for the investigation, design and installation of
existing trackbed. It includes a lineside sampling protocol for chemical analysis of used ballast.
Mandatory upon: Advisory only
Standards Ownership: Track Engineering
RT/E/C/02012

Enhanced Switch & Crossing Maintenance


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Feb 99
D
This Code of Practice contains tasks and periodicity guidelines which represent current best practice for an
enhanced level of switch and crossing system maintenance.
Mandatory upon: Advisory only
Standards Ownership: Track Engineering

th

st

Issue 46: 7 August 1 October 2004

Catalogue of Company Standards

Page 104

2. Company Standards

C. Engineering

Track Engineering

2C8.4. Permanent Way Special Instructions


RT/CE/PWSI/004

Instruction on Management of Rails to Control Rolling Contact Fatigue (Gauge Corner Cracking
and Head Checking)
Issue

Date

Status

Price

Colour

Compliance

Implementation

3 (revised)
Sept 03
D
Yes
Knowledge on the causes of Rolling Contact Fatigue (RCF) and how to control it continues to grow. This
instruction contains changes to previous requirements. These result from laboratory testing of samples, increased
knowledge on the types of RCF, advice from world experts and analysis of data.
Mandatory upon: Network Rail & Contractors
Further Information: Permits Temporary Non-compliance in respect of rolling contact fatigue with Appendix D4 of
RT/CE/S/103 issue 4. This document takes precedence over RT/CE/S/103 issue 4.
Standards Ownership: Track Engineering
RT/CE/PWSI/006

Instruction on Installation and Management of Rail Mounted Lubricators


Issue

Date

Status

Price

Colour

Compliance

Implementation

2
Apr 03
B
This instruction outlines the minimum requirements for the Installation, Maintenance and Recording of Rail
Mounted Lubricators. This Instruction applies to Rail Mounted Lubricators of all types.
Mandatory upon: Network Rail & Contractors
Standards Ownership: Track Engineering
RT/CE/PWSI/007

Installation of P Way Components use of Correct Tools


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Dec 01
A
This Special Instruction has the status of a Company Standard. It insists on the use of manufacturers recommended
tools for the installation of Permanent Way components and rules on replacement of incorrectly installed or
damaged components.
Mandatory upon: Network Rail & Contractors
Standards Ownership: Track Engineering
RT/CE/PWSI/009

Instruction on the Management of Lineside Vegetation in Rear of Signals


Issue

Date

Status

Price

Colour

Compliance

Implementation

2
Dec 01
A
This PWSI has the status of a Company Standard and is issued pending the issue of Company Standard
RT/CE/S/075, Management of Lineside Vegetation. It deals with the essential clearance of vegetation to ensure a
minimum 10 seconds signal sighting at various speeds.
Mandatory upon: Network Rail & Contractors
Standards Ownership: Track Engineering
RT/CE/PWSI/010

Leave Site Safe and Secure Campaign


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Feb 02
A
It is not acceptable for anyone working on the infrastructure to leave it in a condition where it is open for people
to trespass, or provides malicious persons with materials to use to cause accidents or derailments.
Mandatory upon: Network Rail & Contractors
Standards Ownership: Track Engineering
RT/CE/PWSI/011

Management of Pan 8 and Lockspiked Track


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Nov 01
A
This instruction applies to all track on Network Rail s network where Pan 8 lockspiked baseplates exists.
It also applies to other lockspike baseplates track such as Pan 5 and Heyback.
Mandatory upon: Network Rail & Contractors
Standards Ownership: Track Engineering

th

st

Issue 46: 7 August 1 October 2004

Catalogue of Company Standards

Page 105

2. Company Standards

C. Engineering

Rail Vehicle Engineering

2C9. Rail Vehicle Engineering


2C9.1. Specifications
Core Maintenance Specification for:
RT/E/S/40002

Vehicle Washing Plant


Issue

Date

Status

Price

Colour

Compliance

Implementation

Compliance

Implementation

Compliance

Implementation

Compliance

Implementation

Compliance

Implementation

1
Feb 96
C
This is a generalised maintenance specification for vehicle Washing Plant.
Mandatory upon: Contractors
Standards Ownership: Rail Vehicle Engineering
RT/E/S/40018

Underfloor Wheel Lathe


Issue

Date

Status

Price

Colour

1
Feb 96
C
This is a generalised maintenance specification for Underfloor Wheel Lathes.
Mandatory upon: Contractors
Standards Ownership: Rail Vehicle Engineering
RT/E/S/40020

Portable/Mobile Plant
Issue

Date

Status

Price

Colour

1
Feb 96
D
This is a generalised maintenance specification for Portable/Mobile Plant.
Mandatory upon: Contractors
Standards Ownership: Rail Vehicle Engineering
RT/E/S/40021

Electric Jacks
Issue

Date

Status

Price

Colour

1
Feb 96
C
This is a generalised maintenance specification for Electrically Operated Jacks.
Mandatory upon: Contractors
Standards Ownership: Rail Vehicle Engineering
RT/E/S/40063

Assessment and Acceptance of Work Equipment


Issue

Date

Status

Price

Colour

1
Oct 00
B
This specification sets out the requirements for acceptance of work equipment intended for use on Network Rail s
infrastructure. It provides for self-assessment by contractors who have an accepted railway safety case and for
generic acceptance by a Network Rail approved acceptance body.
Mandatory upon: Network Rail
Further Information: Performance specification
Standards Ownership: Rail Vehicle Engineering

2C9.2. Codes of Practice


RT/E/C/65000

Assessment and Supply of Vehicle/Track Interface Parameters


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Jun 03
D
This Code of Practice states the current best practice for a system consideration of the effects of modifying or
introducing equipment to the railway. This document is intended as guidance only for Network Rail commercial
and infrastructure design staff.
Mandatory upon: Advisory only
Standards Ownership: Rail Vehicle Engineering

th

st

Issue 46: 7 August 1 October 2004

Catalogue of Company Standards

Page 106

2. Company Standards

D. Information Management

Information Management

2D. Information Management Directorate


2D1. Information Management
2D1.1. Procedures
RT/CE/P/050

GEOGIS for Railtrack Asset Management


Issue

Date

Status

Price

Colour

Compliance

Implementation

2
Apr 04
D
This procedure mandates the use of GEOGIS and the processes for the management of the asset data held in
GEOGIS and the accuracy, currency and completeness of the asset data held therein as specified in the Network
Rail Asset Data Management Manual.
Mandatory upon: Network Rail
Further Information: Replaces: RT/CE/P/005, RT/CE/P/006, RT/CE/P/007, RT/CE/S/058, RT/CE/S/059, RT/CE/S/060
Standards Ownership: Information Management
RT/E/P/02015

Network Rail Railway Asset Register


Issue

Date

Status

Price

Colour

Compliance

Implementation

3
Apr 04
D
This procedure defines the roles and responsibilties for the implementation, maintenance and development of the
Network Rail Asset Register.
Mandatory upon: Network Rail
Standards Ownership: Information Management
RT/E/P/02018

Management of Records Held by Network Records Group


Issue

Date

Status

Price

Colour

Compliance

Implementation

2
Apr 04
D
This Procedure describes the management of new and altered records for which the Network Records Group are
custodians.
Mandatory upon: Network Rail, Contractor & Lessees
Standards Ownership: Information Management
RT/E/P/02020

MIMS For Network Rail Work Management


Issue

Date

Status

Price

Colour

Compliance

Implementation

4
Apr 04
D
This Procedure sets out the roles and responsibilities for the implementation, use and upkeep of the MIMS system.
This issue of the procedure reflects as far as possible emerging organisations hence some of the roles and
responsibilities may be subject to further change.
Mandatory upon: Network Rail, Contractor & Lessees
Standards Ownership: Information Management

2D1.2. Specifications
RT/E/S/02019

Specification of Records Held by Network Records Group


Issue

Mandatory upon:
Standards Ownership:

th

st

Date

Status

Price

Colour

Compliance

Implementation

2
Apr 04
C
To specify the format of records for which the Network Records Group are custodians.
Network Rail, Contractor & Lessees
Information Management

Issue 46: 7 August 1 October 2004

Catalogue of Company Standards

Page 107

2. Company Standards

E. Major Projects & Investments

Major Projects & Investments

2E. Major Projects and Investments


2E1. Major Projects and Investments
2E1.1. Procedures
RT/D/P/088

Responsibility for Maintenance of Changed Assets


Issue

Date

Status

Price

Colour

Compliance

Implementation

2
May 04
D
This Procedure sets out the requirements for ensuring that new assets and existing assets undergoing change or
that are affected by project works are maintained safely and effectively at all times that they are in operational use,
whether the works to them are complete or not, and that the responsibilities for maintenance of such assets are
clearly identified.
Mandatory upon: Network Rail & Contractors
Standards Ownership: Major Projects and Investments

2E1.2. Guidance Notes


RT/LS/G/00009

Preparation of Maintenance Strategies to Line Procedure RT/D/P/088


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Feb 01
C
This Guidance Note designed to assist Project Managers and Asset Managers/ Infrastructure Contracts Managers
to develop Project Maintenance Strategies as required by Line Procedure RT/D/P/088 ( Responsibility for
Maintenance of Changed Assets ) such that they address all matters required to ensure the safe introduction of
changed assets into operational use.
Mandatory upon: Network Rail
Standards Ownership: Major Projects and Investments

th

st

Issue 46: 7 August 1 October 2004

Catalogue of Company Standards

Page 108

2. Company Standards

F. Maintenance

Maintenance

2F. Maintenance Directorate


2F1. Maintenance
2F1.1. Specifications
RT/D/S/011

Content of Railtrack Infrastructure Maintenance Contractors Annual and Eight Week


Programmes and Progress Reports
Issue

Date

Status

Price

Colour

Compliance

Implementation

5
Oct 01
D
This specification gives the requirements for the content of Annual and Eight week Programmes and Progress
Reports that the Infrastructure Maintenance Contractor is required to produce for each Contract covering RT1A
or IMC2 works.
Mandatory upon: Contractors
Standards Ownership: Maintenance
RT/D/S/020

Reporting of Maintenance Unit Costs


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Dec 02
C
Yes
This document specifies a procedure for capturing unit cost data and ensuring consistency of unit definitions and
cost allocation principles.
Mandatory upon: Network Rail and Contractors
Standards Ownership: Maintenance

2F1.2. Procedures
RT/D/P/020

Management of RT1a Asset Change Proposals


Issue

Date

Status

Compliance

Implementation

6
Aug 00
The purpose of this Procedure is to define the responsibilities and processes for the development of all RT1a
Asset Change Proposals.
Mandatory upon : Network Rail
Standards Ownership: Business Engineering
RT/D/P/027

Infrastructure Maintenance Contracts Changes to Contract Lump Sums, Prices, Targets and Fees
Issue

Date

Status

Compliance

Implementation

5
Apr 00
This procedure details the roles and responsibilities required to ensure information is gathered to allow annual
changes to the IMC Contract Lump Sum in compliance with Clause 5.13 of the RT1A General Conditions of
Contract and Clause 40 of IMC2 Conditions of Contract and also adjustments to IMC2000 Guaranteed Maximum
Prices, Target Costs and Fees.
Mandatory upon: Network Rail
Standards Ownership: Maintenance
RT/D/P/030

RTIa, IMC2 & IMC2000 Payment Cost Control and Reporting


Issue

Date

Status

Compliance

Implementation

8
Dec 02
This procedure details the requirements, roles and responsibilities for payment cost control and reporting
relative to the RT1A, IMC2 and IMC2000 Infrastructure Maintenance Contracts. It does not cover issue of
variations, the provisions for which are covered in Supply Chain Procedure: Authority to Settle Claims Variations to Supply Contracts and Claims.
Mandatory upon: Network Rail
Standards Ownership: Maintenance
These Standards are for Network Rail Use Only - Not Available outside the Company

th

st

Issue 46: 7 August 1 October 2004

Catalogue of Company Standards

Page 109

2. Company Standards

RT/D/P/034

F. Maintenance

Maintenance

Delegation and Use of Contractual Powers RT1a & IMC2


Issue

Date

Status

Compliance

Implementation

4
Apr 00
This procedure defines the Delegated Levels of Contractual powers within Infrastructure Contract Management
and the clauses with the Conditions of Contract for RT1a works where agreement of the Director, Engineering &
Production must be obtained prior to use of those powers.
Mandatory upon: Network Rail
Standards Ownership: Maintenance
RT/D/P/036

Monitoring of Contractors Stewardship, Progress, and Financial Reports


Issue

Date

Status

Compliance

Implementation

5
Apr 00
This procedure details the process for the monitoring of RT1a Contractors stewardship and progress reports by
Infrastructure Contract Managers staff.
Mandatory upon: Network Rail
Standards Ownership: Maintenance

This Standard is for Network Rail Use Only - Not Available outside the Company

RT/D/P/044

Changes to Contractual Standards - Issue to RT1A, IMC2 & IMC2000 Contractors


Issue

Date

Status

Price

Colour

Compliance

Implementation

6
Apr 00
B
This procedure has been produced to show the method of issue of Group Standards, Line Specifications and Codes of
Practice to RT/IA and IMC2 Contractors and the reviews necessary to consider implications on the Infrastructure
Maintenance Contracts.
Mandatory upon: Network Rail
Standards Ownership: Maintenance
RT/D/P/047

Management of Infrastructure Maintenance Contract Regimes


Issue

Date

Status

Compliance

Implementation

6
Apr 00
This Procedure identifies the requirements for managing the Infrastructure Maintenance Contract Incentive
Schemes as follows: RT1A Train Performance and Track Quality IMC2 & IMC2000 Train Performance (only).
Mandatory upon: Network Rail
Standards Ownership: Maintenance

This Standard is for Network Rail Use Only Not Available outside the Company
RT/D/P/049

Feedback of Lessons Learnt/Issues raised Infrastructure Maintenance Contracts


Issue

Date

Status

Price

Colour

Compliance

Implementation

4
Apr 00
B
This procedure defines the roles and responsibilities and process for feedback of lessons learnt and problems
identified in connection with the RT1A, IMC2 and IMC2000 infrastructure maintenance contracts.
Mandatory upon: Network Rail
Standards Ownership: Maintenance

th

st

Issue 46: 7 August 1 October 2004

Catalogue of Company Standards

Page 110

2. Company Standards

RT/D/P/090

F. Maintenance

Maintenance

Checking IMC2000 Periodic Accounts


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Dec 02
C
This Procedure sets out the the process to be used by Network Rail representatives (the Reviewers) when
checking periodic accounts submitted by Contractors in accordance with condition 35 of the IMC 2000 Conditions
of Contract.
Mandatory upon: Network Rail
Standards Ownership: Maintenance
RT/E/P/02200

Implementation and Management of the New Maintenance Programme


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Dec 03
B
This document mandates the use of the NMP, and all the processes and procedures contained in the NMP Manual. It
provides an overview of the key elements of the NMP, and identifies the prime responsibilities for its implementation.
Mandatory upon: Contractors
Standards Ownership: Maintenance

2F1.3. Codes of Practice


RT/D/C/089

Transfer of Responsibilities from Outgoing to Incoming Infrastructure Maintenance Contractors


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Oct 00
C
This code of practice summarises recommended procedure for preparation of contract documents, seeking
tenders and the subsequent award of new Infrastructure Maintenance Contracts to a programme which allows an
adequate Mobilisation Period for the transfer of responsibilities from the Outgoing to the Incoming Contractor
such that the Incoming Contractor can assume his full responsibilities under the contract from the date for
Commencement of Asset Maintenance
Mandatory upon: Network Rail
Standards Ownership: Maintenance

2F1.4. Guidance Notes


RT/D/G/091

Project and Commercial Management of the Implementation of MIMS


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Oct 02
D
This guidance note sets out the process to be used by the Zones Commercial Representatives and the MIP
Commercial Manager in order to validate periodic accounts, relating to the implementation of MIMS, submitted by
Contractors in accordance with condition 35 of the IMC2000 conditions of contract.
Mandatory upon: Network Rail
Standards Ownership: Maintenance

th

st

Issue 46: 7 August 1 October 2004

Catalogue of Company Standards

Page 111

2. Company Standards

G. Railway Estates

Railway Estates Policy and Planning

2G. Railway Estates Directorate


2G1. Railway Estates Policy and Planning
2G1.1. Guidance Notes
RT/LS/G/00002

Responsive Maintenance
Issue

Date

Status

Price

Colour

Compliance

Implementation

2
Apr 01
D
This guidance note has been developed to provide practical advice for use at an operational level to maximise the
value for money spent on common reactive repairs, it also contains guidance maintenance specifications intended
to setablish indicative standard reactive maintenance repairs.
Mandatory upon: Advisory only
Standards Ownership: Railway Estates Policy and Planning

th

st

Issue 46: 7 August 1 October 2004

Catalogue of Company Standards

Page 112

2. Company Standards

H. Safety & Compliance

Acceptance Services

2H. Safety & Compliance Directorates


2H1. Interoperability & Acceptance
2H1.1. Procedures
RT/LS/P/013

System Review Panel and Technical Review Groups


Issue

Date

Status

Price

Colour

Compliance

Implementation

5
Apr 04
C
To specify the roles of System Review Panels and Technical Review Groups within the engineering and change
management element of Network Rail s Safety Management System.
Mandatory upon: Network Rail
Standards Ownership: Interoperability & Acceptance
RT/LS/P/015

Network Rail Acceptance Board


Issue

Date

Status

Price

Colour

Compliance

Implementation

4
Apr 04
D
To define the role of the Network Rail Acceptance Board (NRAB) within the engineering and change management
element of Network Rail s Safety Management System.
Mandatory upon: Network Rail
Standards Ownership: Interoperability & Acceptance
RT/LS/P/029

Product Acceptance
Issue

Date

Status

Price

Colour

Compliance

Implementation

4
Apr 04
D
This procedure mandates the Network Rail process for the acceptance of new or modified products and change of
application of, materials, equipment, and systems; fitness for purpose of road rail vehicles/attachments and rail
mounted maintenance machines, On-Track Machines, contractor s road plant and Portable and Transportable
Work Equipment that could effect or interact with the infrastructure.
Mandatory upon: Network Rail
Further Information: Responds to: GI/RT7002 (Acceptance of Systems, Equipment and Materials for use on Network Rail Controlled
Infrastructure
Standards Ownership: Interoperability & Acceptance

th

st

Issue 46: 7 August 1 October 2004

Catalogue of Company Standards

Page 113

2. Company Standards

H. Safety & Compliance

Assurance

2H2. Assurance
2H2.1. Specifications
RT/LS/S/016

Contract Requirements Quality


Issue

Date

Status

Price

Colour

Compliance

Implementation

4
Aug 03
C
This document defines the Network quality criteria with which Contractors shall comply.
Mandatory: Network Rail & Contractors
Standards Ownership: Assurance

2H2.2. Procedures
RT/D/P/015

Surveillance Checking of Asset Maintenance


Issue

Date

Status

Price

Colour

Compliance

Implementation

8
Feb 02
C
This procedure describes the process by which surveillance checking of asset maintenance will be carried. The
purpose is to verify that Maintenance Contractors are planning and controlling their activities to Group and
Company Standards and relevant contract clauses as well as giving assurance of their ability to identify, record,
prioritise and rectify faults.
Mandatory upon: Contractors
Standards Ownership: Assurance
RT/LS/P/032

Self Assessment and Self Certification of the Application of Railtrack Management Systems
Issue

Date

Status

Price

Colour

Compliance

Implementation

2
Jun 02
D
The application of this process is to those Business Units and projects subject to the Network Rail Railway Safety
Case control. The process checks that the designated Safety Management Systems are in place as risk control
measures and assesses their application through self assessment and self certification.
Mandatory upon: Network Rail
Additional Information: Code of Practice RT/LS/C/004 supports this Procedure.
Standards Ownership: Assurance
RT/LS/P/036

Railtrack Audit Manual


Issue

Date

Status

Price

Colour

Compliance

Implementation

2
Oct 02
D
Yes
This Manual provides direction and guidance on the general principles of management system and technical
auditing, the management of audit programmes, the process for carrying out management system audits and the
qualifications for management system auditors.
Mandatory upon: Network Rail
Standards Ownership: Assurance

2H2.3. Codes of Practice


RT/LS/C/004

Self Assessment and Self Certification of the Application of Railtrack Management Systems
Issue

Date

Status

Price

Colour

Compliance

Implementation

3
Jun 02
C
This Code of Practice is issued to provide assistance to Network Rail Business Units in implementing the process
of assurance for self-assessment and self-certification of the application of Network Rail systems.
Mandatory upon: Advisory only
Additional Information: This Code of Practice supports Procedure RT/LS/P/032
Standards Ownership: Assurance

th

st

Issue 46: 7 August 1 October 2004

Catalogue of Company Standards

Page 114

2. Company Standards

H. Safety & Compliance

Business Standards

2H3. Standards Development Process


2H3.1. Procedures
RT/LS/P/001

Business Standards - Managing Standards


Issue

Date

Status

Price

Colour

Compliance

Implementation

12
Apr 04
D
This standard separates out the process for the management of non-compliance authority from the management of
standards as defined by RT/LS/P/001.
Mandatory upon: Network Rail
Standards Ownership: Standards Development Process
RT/LS/P/045

Business Standards - Managing the Process for Non-Compliance Authority


Issue

Date

Status

Price

Colour

Compliance

Implementation

2
Apr 04
D
This Standard defines the procedures by which non-compliance authority for Railway Group Standards and
Network Rail Standards shall be managed within the Network Rail. The procedure also provides for derogation to
Technical Specifications for Interoperability.
Mandatory upon: Network Rail
Standards Ownership: Standards Development Process

th

st

Issue 46: 7 August 1 October 2004

Catalogue of Company Standards

Page 115

2. Company Standards

H. Safety & Compliance

Environmental Policy

2H4. Environment Policy


2H4.1. Specifications
RT/LS/S/015

Network Rail Contract Requirements - Environment


Issue

Date

Status

Price

Colour

Compliance

Implementation

5
Apr 04
D
This document specifies the mandatory environment requirements and particular (selectable) environment
requirements that are to be specified for any contract applicable to work on Network Rail Infrastructure and
Premises on behalf of Network Rail.
Mandatory: Network Rail & Contractors
Standards Ownership: Environment Policy

2H4.2. Procedures
RT/CE/P/030

Management of Embankments, Cuttings and Natural Slopes


Issue

Date

Status

Price

Colour

Compliance

Implementation

2
Dec 02
B
This Procedure sets out Network Rail s policy on the management of Earthworks and the action to be taken to
maintain them to ensure that the risk to the operational railway from their condition is as low as reasonably
practicable. It defines a frequency for examinations of Embankments, Cuttings and Natural Slopes.
Mandatory upon: Network Rail
Further Information: Responds to GC/RT5151 and GC/RT5143
Standards Ownership: Environment Policy
RT/D/P/003

Noise and Vibration Complaints


Issue

Date

Status

Price

Colour

Compliance

Implementation

2
Apr 04
C
This procedure describes how complaints arising from noise and vibration, and how the handling of legal action
under the Environmental Protection Act 1990 (EPA), the Control of Pollution Act 1974 (COPA) and common law
noise nuisance actions should be dealt with.
Mandatory upon: Network Rail
Standards Ownership: Environment Policy
RT/LS/P/007

Project Management and the Environment


Issue

Date

Status

Price

Colour

Compliance

Implementation

2
Apr 04
D
This procedure describes the process that shall be followed to ensure that environmental issues are properly
managed as part of the project management process. It requires the environment to be addressed at the remit
stage and for an appraisal to be carried out at the feasibility stage and updated at specified times. A management
plan to an appropriate level shall be developed and maintained to deal with the identified issues.
Mandatory upon: Network Rail
Standards Ownership: Environment Policy
RT/LS/P/044

Track Maintenance, Renewal or Alteration Used Ballast Handling


Issue

Date

Status

Price

Colour

Compliance

Implementation

2
Apr 04
C
This document sets out a standardised approach and uniform procedures to be used in planning and execution of
engineering work which involves the removal of used railway ballast and used railway infrastructure material.
Mandatory upon: Network Rail & Contractors
Standards Ownership: Environment Policy

th

st

Issue 46: 7 August 1 October 2004

Catalogue of Company Standards

Page 116

2. Company Standards

H. Safety & Compliance

Environmental Policy

2H4.3. Guidance Notes


RT/E/G/00007

Generic Environmental Management For Light Maintenance Depots


Issue

Date

Status

Price

Colour

Compliance

Implementation

2
Apr 04
D
This guidance note is intended for use by Network Rail and its tenants at Light Maintenance Depots, to provide
generic general advice on environmental management. It is not intended to be exhaustive nor does it constitute
part of the Depot Access conditions or any other lease condition.
Mandatory upon: Advisory only
Standards Ownership: Environment Policy
RT/LS/G/00022

Construction Noise Mitigation Through Section 61 Consent Process


Issue

Date

Status

Price

Colour

Compliance

Implementation

2
Apr 04
E
The purpose of this guidance document is to provide an overview of how the risks from construction noise can be
mitigated by obtaining consent under Section 61 of the Control of Pollution Act, 1974 (COPA) and in particular
the benefits of this approach and a recommended course of action for securing a Section 61 consent.
Mandatory upon: Advisory only
Standards Ownership: Environment Policy
RT/LS/G/00023

Best Practicable Means: Control of Noise and Vibration from Construction Operations
Issue

Date

Status

Price

Colour

Compliance

Implementation

2
Apr 04
C
The purpose of this environmental guidance note is to provide a reference for Network Rail managers and contractors
wishing to implement best practicable means (BPM) in controlling noise and vibration on construction sites.
Mandatory upon: Advisory only
Standards Ownership: Environment Policy

th

st

Issue 46: 7 August 1 October 2004

Catalogue of Company Standards

Page 117

2. Company Standards

H. Safety & Compliance

Fire Safety Policy

2H5. Fire Safety Policy


2H5.1. Procedures
RT/LS/P/100

Company Fire Safety Handbook


Issue

Date

Status

Price

Colour

Compliance

Implementation

2
Jun 03
C
The Company Fire Safety Handbook is a suite of documents, comprising the corporate fire safety policy and
mandatory instructions, together with Codes of Practice, setting out guidance for implementation of the policy
within generic business areas for the effective management of fire safety.
Mandatory upon: Network Rail
Further Information: Replaces RT/P/P/002 and RT/LS/P025
Standards Ownership: Fire Safety Policy

2H5.2. Codes of Practice


RT/LS/C/101

Major Stations - Fire Safety


Issue

RT/LS/C/102

Status

Price

Colour

Compliance

Implementation

Operational Estate - Fire Safety


Issue

Date

4 (3)
Aug 04 (Dec 03)
Up-Issued F
Yes
07/08/04
The Major Stations Fire Safety Handbook, for use by Station Managers to assist them with their responsibility for
carrying out the day-to-day management of fire safety within their premises.
Mandatory upon: Network Rail
Further Information: Replaces RT/P/P/002 and RT/LS/P025
Standards Ownership: Fire Safety Policy

Date

Status

Price

Colour

Compliance

Implementation

4 (3)
Aug 04 (Dec 03)
Up-Issued E
Yes
07/08/04
This Code of Practice provides guidance to all staff with responsibility for the management of fire safety within the
Operational Estate. The document sets out guidance for implementation of the fire safety policy deliverables
contained within the Company Fire Safety Handbook RT/LS/P/100.
Mandatory upon: Network Rail
Further Information: Replaces RT/P/P/002 and RT/LS/P025
Standards Ownership: Fire Safety Policy

RT/LS/C/103

Corporate Offices - Fire Safety


Issue

Date

Status

Price

Colour

Compliance

Implementation

2
Apr 03
F
Yes
This Code of Practice provides guidance to all staff with responsibility for the management of fire safety within
Corporate Offices. The document sets out guidance for the implementation of the fire safety deliverables
contained within The Company Fire Safety Handbook RT/LS/P/100, which should be read in conjunction with this
Code of Practice.
Mandatory upon: Network Rail, Contractors and Lessees
Standards Ownership: Fire Safety Policy
RT/LS/C/105

Let Estate Fire Safety


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Dec 03
D
This Code of Practice provides guidance to all staff with responsibility for the management of fire safety within
Network Rail. The document sets out guidance for the implementation of the fire safety deliverables contained within
The Company Fire Safety Handbook RT/LS/P/100, which should be read in conjunction with this Code of Practice.
Mandatory upon: Network Rail, Contractors and Lessees
Standards Ownership: Fire Safety Policy

th

st

Issue 46: 7 August 1 October 2004

Catalogue of Company Standards

Page 118

2. Company Standards

H. Safety & Compliance

Operational Safety Policy

2H6. Operational Safety Policy


2H6.1. Specifications
RT/D/S/002

Driving Cab Passes


Issue

Date

Status

Price

Colour

Compliance

Implementation

3 (2)
Aug 04 (Aug 03)
Up-Issued D
Yes
07/08/04
07/08/04
This Specification defines the process by which Network Rail ensures that all riding in driving cabs is undertaken
only by those Network Rail employees whose essential duties (other than those occasions described in the Rule
Book) require them to enter the driving cab environment. Network Rail Routes and Territories must have systems
in place to ensure compliance with the requirements of this Company Specification.
Mandatory upon: Network Rail & Contractors
Standards Ownership: Operational Safety Policy

RT/D/S/009

Control of Risks Arising from Steam Operations


Issue

Date

Status

Price

Colour

Compliance

Implementation

3
Feb 00
C
This document specifies the arrangements to be complied with to enable the safe operation of Steam Locomotives
on Network Rail controlled infrastructure.
Mandatory upon: Network Rail
Standards Ownership: Operational Safety Policy
RT/D/S/010

Limited Clearance Signal Post Telephones


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
May 96
B
This Specification specifies the actions to be taken by Network Rail Zones when a signal post telephone is
identified as being between two lines that have a clearance of less than 10 feet (12 6 for lines with a speed in
excess of 100 mph) between the running edges of the nearest rails.
Mandatory upon: Network Rail
Standards Ownership: Operational Safety Policy
RT/LS/S/012

Inspection & Risk Assessment Forms for User-Worked, Footpath & Bridleway Level Crossings
Issue

Date

Status

Price

Colour

Compliance

Implementation

3
Jun 02
D
Yes
This specification supports the risk assessment methodology detailed in RT/LS/P/026 by providing the appropriate
inspection forms and risk assessment forms with guidance for inclusion in contracts as required by a zone/region.
Mandatory upon: Network Rail & Contractors
Standards Ownership: Operational Safety Policy
RT/LS/S/021

Weather Managing the Operational Risks


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Aug 03
C
To mandate how Network Rail will manage the operational risks arising from adverse and extreme weather,
including the use of weather forecast information, to give adequate preparation for such events.
Mandatory upon: Network Rail & Contractors
Standards Ownership: Operational Safety Policy

th

st

Issue 46: 7 August 1 October 2004

Catalogue of Company Standards

Page 119

2. Company Standards

H. Safety & Compliance

Operational Safety Policy

2H6.2. Procedures
RT/D/P/010

Category A Signals Passed at Danger


Issue

Date

Status

Price

Colour

Compliance

Implementation

E7
Apr 04
D
The purpose of this procedure is, in accordance with Railway Group Standard GO/RT3252, to provide a
consistent, comprehensive and structured process, for the immediate actions required in dealing with a Category
A SPAD, gathering evidence following a Category A SPAD, the investigation, and subsequent management of
Category A SPAD issues within Network Rail and in conjunction with Train Operators.
Mandatory upon: Network Rail
Standards Ownership: Operational Safety Policy
RT/D/P/011

Production Response to Signal Irregularities


Issue

Date

Status

Price

Colour

Compliance

Implementation

3
Dec 00
C
This Procedure sets out the managerial actions to be taken by Network Rail Zones when a signaller receives a
report of a signal irregularity on Network Rail's controlled infrastructure.
Mandatory upon: Network Rail
Standards Ownership: Operational Safety Policy
RT/D/P/061

Management of Risk at Level Crossings


Issue

Date

Status

Price

Colour

Compliance

Implementation

2
Apr 04
C
This procedure details a consistent approach for Network Rail Zones to assess risk at Level Crossings, for which
they are responsible, and to take the required actions to comply with the Network Rail Level Crossing Safety
Strategy as determined by the Network Rail Executive Group.
Mandatory upon: Network Rail
Standards Ownership: Operational Safety Policy
RT/D/P/084

Permissive Platform Working


Issue

Date

Status

Price

Colour

Compliance

Implementation

2
Apr 04
C
To define the requirements to control the risk of train collisions when signalled in accordance with the permissive
working arrangements.
Mandatory upon: Network Rail
Standards Ownership: Operational Safety Policy
RT/D/P/095

Determining High Risk Sites for Wrong Side Track Circuit Failures in Leaf Fall Areas
Issue

RT/D/P/096

Status

Price

Colour

Compliance

Implementation

Determining High Risk Sites for Low Rail Adhesion


Issue

Date

1
Apr 04
New
B
07/08/04
07/08/04
The purpose of this procedure is to ensure that all sites which may be high risk in respect of being likely to cause
wrong side track circuit failures (WSTCF) under leaf fall contamination conditions are defined in a consistent way
across all Network Rail controlled infrastructure, and that a structured process exists to alter the status of sites.
Mandatory upon: Network Rail
Standards Ownership: Operational Safety Policy

Date

Status

Price

Colour

Compliance

Implementation

1
Apr 04
New
B
07/08/04
07/08/04
The purpose of this procedure is to ensure that all long term or known sites which may be high risk in respect of
low rail adhesion are defined in a consistent way across all Network Rail controlled infrastructure, and that a
structured process exists to alter the status of sites.
Mandatory upon: Network Rail
Standards Ownership: Operational Safety Policy

th

st

Issue 46: 7 August 1 October 2004

Catalogue of Company Standards

Page 120

2. Company Standards

RT/LS/P/009

H. Safety & Compliance

Operational Safety Policy

Track Circuit Operating Device (T-COD) Identification of Locations for Use


Issue

Date

Status

Price

Colour

Compliance

Implementation

2
Apr 99
B
This procedure defines a process for identifying where T-CODs can be used and the necessary conditions for their
application taking into account safety and commercial requirements.
Mandatory upon: Network Rail, Contractors & Lessees
Standards Ownership: Operational Safety Policy
RT/LS/P/026

Inspection and Risk Assesment Methodology for User-worked, Footpath and Bridleway Level
Crossings
Issue

Date

Status

Price

Colour

Compliance

Implementation

2
Jun 02
C
This procedure specifies the risk assessment methodology and inspection forms to be used by Zone's/Region's
Directors at user-worked, footpath and bridleway level crossing and competency requirements of assessors. It is
supported by RT/LS/S/012.
Mandatory upon: Network Rail
Standards Ownership: Operational Safety Policy
RT/LS/P/031

Risk Assessment and Briefing of Timetable Change


Issue

Date

Status

Price

Colour

Compliance

Implementation

2
Apr 04
C
This Procedure sets out the process to be adopted by all Network Rail Zones to ensure the risks associated with
timetable change are controlled to as low as reasonably practicable. It also specifies responsibilities for the
production, together with the format and contents of the timetable change brief.
Mandatory upon: Network Rail
Standards Ownership: Operational Safety Policy
RT/LS/P/035

Dissemination of Urgent Operating Advice


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Apr 01
B
This procedure explains the process for disseminating urgent operating information within Network Rail
Infrastructure Ltd and to other Railway Group members.
Mandatory upon: Network Rail
Standards Ownership: Operational Safety Policy
RT/LS/P/037

Management of Safety Critical Voice Communication


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Oct 01
C
This Procedure defines the minimum actions to be taken by Network Rail Infrastructure Ltd to review safety
critical voice communication to ensure that the required standards of voice communication are achieved, and to
collect and preserve voice recording media following an accident or incident.
Mandatory upon: Network Rail
Standards Ownership: Operational Safety Policy
RT/LS/P/039

Operator Additional Monitoring and Support Procedure


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Dec 01
D
There are times in an operators working life when personal issues or other behavioural factors may affect their
concentration and application to the tasks in hand. This policy is designed to provide both the operator and the
line manager with a process for exploring such matters in a supportive environment. It provides guidance about the
types of support available and outlines some actions that may be used to help support the operator whilst
maintaining the safety of the railway.
Mandatory upon: Network Rail
Standards Ownership: Operational Safety Policy

th

st

Issue 46: 7 August 1 October 2004

Catalogue of Company Standards

Page 121

2. Company Standards

RT/LS/P/041

H. Safety & Compliance

Operational Safety Policy

The Operations Manual


Issue

Date

Status

Price

Colour

Compliance

Implementation

2
Apr 04
B
To mandate the use of the Operations Manual and to describe the processes that shall be used to control the issue, use
and amendment of the content.
Mandatory upon: Network Rail
Standards Ownership: Operational Safety Policy
RT/LS/P/046

The Train Operations Manual


Issue

Date

Status

Price

Colour

Compliance

Implementation

2
Apr 04
B
To mandate the use of the Train Operations Manual and to describe the processes that shall be used to control
the issue, use and amendment of the content.
Mandatory upon: Network Rail & Contractors
Standards Ownership: Operational Safety Policy

2H6.3. Codes of Practice


RT/D/C/087

Guidance to Operators of Steam Powered Traction


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Feb 00
B
This code of practice is issued to provide guidance to organisations involved in the safe operation of steam
locomotives on Network Rail controlled infrastructure.
Mandatory upon: Network Rail
Standards Ownership: Operational Safety Policy
RT/LS/C/005

Control of Testing of New Rolling Stock Using Special Operating Instructions


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Aug 02
C
The purpose of this Code of Practice is to provide advice to Network Rail Zones/Regions and Projects on a
process for controlling to as low as reasonably practicable (ALARP) the hazards and risks arising from the testing
of new rolling stock without taking an absolute possession of the line in accordance with the Rule Book Section
T(iii).
Mandatory upon: Advisory only
Further Information: Supplements the advice given in GM/RC2559
Standards Ownership: Operational Safety Policy

2H6.4. Guidance Notes


RT/LS/G/00030

Risk Assessment of Timetable Change


Issue

Date

Status

Price

Colour

Compliance

Implementation

2
Apr 04
C
This guidance note has been produced to assist in the process described in RT/LS/P/031 Risk Assessment and
Briefing of Timetable Change.
Mandatory upon: Network Rail
Standards Ownership: Operational Safety Policy

th

st

Issue 46: 7 August 1 October 2004

Catalogue of Company Standards

Page 122

2. Company Standards

H. Safety & Compliance

Safety Case Management

2H7. Safety Case Management


2H7.1. Procedures
RT/LS/P/020

Safety Validation of Organisation and Safety Management System Change


Issue

Date

Status

Price

Colour

Compliance

Implementation

7
Apr 04
C
This procedure provides a process for acceptance of safety validation submissions in line with the new Railways
(Safety Case) Regulations 2000.
Mandatory upon: Network Rail
Standards Ownership: Safety Case Management
RT/LS/P/034

Status of Zone Assurance Manual


Issue

Date

Status

Price

Colour

Compliance

Implementation

Emergency 1
Oct 00
A
This Procedure describes the arrangements to be adopted within Network Rail Infrastructure Ltd for the
management and application of the Network Rail Zone Assurance Manual (ZAM).
Mandatory upon: Network Rail
Standards Ownership: Safety Case Management

th

st

Issue 46: 7 August 1 October 2004

Catalogue of Company Standards

Page 123

2. Company Standards

H. Safety & Compliance

Accident Investigation

2H8. Accident Investigation


2H8.1. Procedures
RT/LS/P/002

Management of Inquiries & Investigations and their Recommendations by Network Rail


Issue

Date

Status

Price

Colour

Compliance

Implementation

7
Apr 04
D
This company standard is updated to include changes required to ensure compliance with the new Railway Group
Standard. It establishes the steps required to ensure accidents and incidents are properly investigated and that any
recommendations from inquiries and investigations are properly handled.
Mandatory upon: Network Rail
Standards Ownership: Accident Investigation

2H8.2. Guidance Notes


RT/LS/G/00032

Recommendations Management
Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Feb 04
D
This Guidance Note contains useful information and templates for managing recommendations from Inquiries and
Investigations. Its purpose is to provide direction to those involved in the progression of recommendations. It has
been derived from best practice as demonstrated throughout the Company.
Mandatory upon: Advisory only
Standards Ownership: Accident Investigation

th

st

Issue 46: 7 August 1 October 2004

Catalogue of Company Standards

Page 124

2. Company Standards

H. Safety & Compliance

Occupational Health & Safety Policy

2H9. Occupational Health & Safety Policy


2H9.1. Specifications
RT/CE/S/069

Lineside Facilities for Personal Safety


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Dec 98
C
Yes
This specification sets out the design, construction and maintenance requirements for facilities providing access
onto, along and across the track for persons whose duties require them to be on or near the line. It covers access
points, Authorised Walking Routes, Cess Walkways, Positions of Safety and individual features such as access
ladders.
Mandatory upon: Network Rail
Standards Ownership: Occupational Health & Safety Policy
RT/LS/S/004

Reporting of Injuries, Diseases and Dangerous Occurrences Regulations 1995


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Apr 97
A
To mandate the Network Rail Safety & Standards Directorate Code of Practice entitled 'Reporting of Injuries,
Diseases and Dangerous Occurrences Regulations 1995 - Supplementary Guidance of Statutory Reporting'
throughout Network Rail Line.
Mandatory upon: Network Rail
Standards Ownership: Occupational Health & Safety Policy
RT/LS/S/008

Network Rail Contract Requirements - Safety


Issue

Date

Status

Price

Colour

Compliance

Implementation

10
Apr 04
Phone
Yes
Specifies the mandatory safety conditions and particular (selectable) safety requirements that are to be specified for
any contract applicable to work on Network Rail Controlled Infrastructure on behalf of Network Rail. The
principles should also be used for outside party schemes whenever work impacts on Network Rail Controlled
Infrastructure.
Mandatory upon: Network Rail
Further Information: Calls up 55 documents
Standards Ownership: Occupational Health & Safety Policy
RT/LS/S/011

Prevention of Damage to and Danger from Surface & Buried Services


Issue

Date

Status

Price

Colour

Compliance

Implementation

3
Feb 02
D
This document specifies the process to be followed in order to minimise the risk arising from damage to, and danger
from those services located on Network Rail owned infrastructure and Major Stations where the ground provides
containment or forms a significant part of the support given to that particular service. Associated Procedure RT/LS/P/028
mandates the actions Network Rail personnel must take to implement this specification.
Mandatory upon: Network Rail & Contractors
Standards Ownership: Occupational Health & Safety Policy
RT/LS/S/013

Competence Standards for Persons in Charge of Possessions (PICOP)


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Jun 99
E
This specification states the competence requirements for Persons in Charge of Possession (PICOP).
Mandatory: Network Rail & Contractors
Standards Ownership: Occupational Health & Safety Policy

th

st

Issue 46: 7 August 1 October 2004

Catalogue of Company Standards

Page 125

2. Company Standards

RT/LS/S/014

H. Safety & Compliance

Occupational Health & Safety Policy

Competence Standards for Engineering Supervisors


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Jun 99
D
This specification states the competence requirements for Engineering Supervisor.
Mandatory: Network Rail & Contractors
Standards Ownership: Occupational Health & Safety Policy
RT/LS/S/018

Safety Requirements for Track Safety Medical & Alcohol & Drugs Screening & Certification
Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Jun 00
C
This Document details the minimum requirements that suppliers must meet to deliver Medical Assessments and
Alcohol & Drugs Screening to allow registration as an approved Network Rail supplier. It also details the required
certification.
Mandatory: Network Rail & Contractors
Standards Ownership: Occupational Health & Safety Policy
RT/LS/S/019

Protection of People Working on or Near the Line


Issue

Date

Status

Price

Colour

Compliance

Implementation

3
Apr 04
D
To control the risks to personnel from train movements by requiring effective planning of on track activities and
establishing a hierarchy of protection methods.
Mandatory: Network Rail, Contractors & Lessees
Standards Ownership: Occupational Health & Safety Policy
RT/LS/S/020

Track Visitor Permits


Issue

Date

Status

Price

Colour

Compliance

Implementation

3
Apr 04
C
To set out arrangements for the issue and control of Visitor's permits issued in accordance with Railway Group
Standard GE/RT8067 to people without Personal Track Safety (PTS) certification.
Mandatory: Network Rail, Contractors & Lessees
Standards Ownership: Occupational Health & Safety Policy

2H9.2. Procedures
RT/LS/P/003

Control of Excessive Working Hours for Persons Undertaking Safety Critical Work
Issue

Date

Status

Price

Colour

Compliance

Implementation

2
Aug 02
D
This procedure sets out the processes to be followed in order to control the hours worked by Railtrack
employees carrying out safety critical work (SCW) and ensure excessive hours are kept to a minimum.
Mandatory upon: Network Rail
Standards Ownership: Occupational Health & Safety Policy
RT/LS/P/005

High StreetEnvironment & Conditions for Work Outside Railtrack Controlled Infrastructure
Issue

Date

Status

Price

Colour

Compliance

Implementation

Emergency 3
Aug 00
C
This procedure explain how the environment and conditions generally found in the typical High Street may be
created within the Network Rail context for work which will take place outside Network Rail s Controlled
Infrastructure and in a manner which will not affect railway operations.
Mandatory upon: Network Rail & Contractors
Standards Ownership: Occupational Health & Safety Policy
RT/LS/P/006

Maintenance & Contents of the National Hazard Directory


Issue

Date

Status

Price

Colour

Compliance

Implementation

2
Apr 04
C
The purpose of the standard is to provide the minimum specification for the contents of the National Hazard
Directory, together with the upkeep and publication arrangements so that contractors and others can be supplied
with current details of systematic hazards at a site specific location.
Mandatory upon: Network Rail
Standards Ownership: Occupational Health & Safety Policy

th

st

Issue 46: 7 August 1 October 2004

Catalogue of Company Standards

Page 126

2. Company Standards

RT/LS/P/017

H. Safety & Compliance

Occupational Health & Safety Policy

Competence Management and Assurance


Issue

Date

Status

Price

Colour

Compliance

Implementation

2
Apr 04
C
The purpose of the standard is to specify the framework of the Network Rail Company Competence Management
System and process by which an individual s competence to work for or on behalf of Network Rail Company will
be assured.
Mandatory upon: Network Rail
Further Information: Calls up 11 documents
Standards Ownership: Occupational Health & Safety Policy
RT/LS/P/028

Provision of Information on Surface and Buried Services to Contractors


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Feb 99
B
This document specifies the arrangements to be used within Network Rail Line for provision of information on
surface and buried Services to Contractors. The associated Specification RT/LS/S/011 Prevention of damage to and
danger from, surface and buried Services is to be used to mandate action on Contractors.
Mandatory upon: Network Rail
Standards Ownership: Occupational Health & Safety Policy
RT/LS/P/040

Safety Tours
Issue

Date

Status

Price

Colour

Compliance

Implementation

2
Apr 04
C
This standard mandates the requirement, frequency and process for undertaking, recording, identifying follow-up
actions and communicating findings from safety tours.
Mandatory upon: Network Rail
Standards Ownership: Occupational Health & Safety Policy
RT/LS/P/043

Health and Safety Management of Third Party Works


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Feb 04
D
This Standard sets out the requirements to be followed when external bodies (often referred to as Third Parties)
who wish to specify, manage and/or deliver infrastructure projects upon Network Rail's controlled infrastructure,
so as to ensure that equivalent controls and processes are applied to the safety management of these
infrastructure projects when undertaken as Third Party Works.
Mandatory upon: Network Rail
Standards Ownership: Occupational Health & Safety Policy
RT/LS/P/050

Sentinel Scheme Rules


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Dec 03
D
The purpose of this document is to define the procedure and the mandatory requirements associated with NCCA
and the Sentinel Scheme Rules.
Mandatory upon: Network Rail & Contractors
Standards Ownership: Operational Safety Policy
RT/LS/P/051

Network Rail Alcohol & Drugs Policy


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Feb 04
B
The purpose of this standard is to set out Network Rail s policy and related implementation arrangements to
control the risks of employees or contractors being under the influence of alcohol and drugs at work.
Mandatory upon: Network Rail & Contractors
Standards Ownership: Occupational Health & Safety Policy

th

st

Issue 46: 7 August 1 October 2004

Catalogue of Company Standards

Page 127

2. Company Standards

H. Safety & Compliance

Security Specialist/Risk

2H10. Security Specialist


2H10.1. Procedures
RT/LS/P/200

Network Rail Security Manual


Issue

Date

Status

Price

Colour

Compliance

Implementation

* Rapid Reponse

E1
Aug 04
New
C
07/08/04
07/08/04
To mandate the use of the Network Rail Security Manual and to describe the processes that shall be used to
control the issue, use and amendment of the content.
Mandatory upon: Network Rail
Standards Ownership: Security Specialist

RT/LS/P/250

Incident Response - Planning & Management Manual


Issue

Date

Status

Price

Colour

Compliance

Implementation

* Rapid Reponse

E1
Aug 04
New
B
07/08/04
07/08/04
To mandate the use of the Incident Response - Planning & Management Manual and to describe the processes that
shall be used to control the issue, use and amendment of the content.
Mandatory upon: Network Rail
Further Information: Contains instructions to Zones
Standards Ownership: Security Specialist

2H10.2. Codes of Practice


RT/D/C/004

Police, Fire Brigade or Other Emergency Services Personnel on or About the Track
Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Jul 96
B
This Code of Practice sets out the arrangements for Zones to comply with when receiving requests from the
Emergency Services to go on or about the line or to isolate traction current.
Mandatory upon: Network Rail
Further Information: Contains instructions to Zones
Standards Ownership: Security Specialist

2H10.3. Guidance Notes


RT/E/G/00018

Index of Railtrack Documents Relating to Lineside Security Requirements


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Feb 03
C
Railway Group Standard GC/RT5201, Lineside Security requires the infrastructure controller to assess the risks
arising from unwanted intrusion and unauthorised access to all sections of Network Rail Controlled Infrastructure
including bridges, level crossings and stations and apply appropriate controls.
Mandatory upon: Advisory only
Standards Ownership: Security Specialist

2H11. Risk
2H11.1. Guidance Notes
RT/LS/G/00012

Road Vehicle Incursions: Risk Assessment of Bridge and Neighbouring Sites


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Jun 03
D
The DfT report Managing the accidental obstruction of the railway by road vehicles was published in February
2003. It contains a number of risk assessment tools to be used to assess the risk and recommend mitigation works.
This guidance note assists Network rail staff in the implementation of this report, by providing information on
application of the tools and interfaces with highways authorities.
Mandatory upon: Advisory only
Standards Ownership: Risk

th

st

Issue 46: 7 August 1 October 2004

Catalogue of Company Standards

Page 128

2. Company Standards

K. Product Specifications

Electrification & Plant

2J. Product Specifications


2J1. Electrification & Plant
RT/E/PS/00003

Resistive Type Live Line Indicators


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Jun 00
B
This product specification states Network Rail s requirements for the minimum performance requirements for a
Resistive Type Live Line Indicating device for use on the overhead line and switching station equipment that will
provide an indication that it is safe to earth or isolate the equipment.
Mandatory upon: Network Rail, Contractors & Lessee
Standards Ownership: Electrification & Plant
RT/E/PS/00006

Portable DC Short Circuiting Devices


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Apr 00
D
This Product Specification states the minimum requirements for portable short-circuiting devices to be used on dcelectrified lines.
Mandatory upon: Network Rail, Contractors & Lessee
Standards Ownership: Electrification & Plant
RT/E/PS/00007

Uninterruptible Power Supplies for Operational Infrastructure


Issue

Date

Status

Price

Colour

Compliance

Implementation

2
Jun 03
D
This Product Specification states the minimum requirements for the provision of Uninterruptible Power Supply
units for installation on Network Rail s operational infrastructure.
Mandatory upon: Network Rail & Contractors
Standards Ownership: Electrification & Plant
RT/E/PS/00008

High Voltage Cables and Accessories for Traction Supplies


Issue

Date

Status

Price

Colour

Compliance

Implementation

2
Dec 01
D
This Product Specification states the Directorate s requirements for polymeric insulated 6.35/11 kV, 12.7/22 kV and
19/33 kV single and three-core cables for D.C. Electrified Lines and 25 kV two-core concentric and single-core
cables and accessories for A.C. Electrified Lines.
Mandatory upon: Network Rail & Contractors
Standards Ownership: Electrification & Plant
RT/E/PS/00018

750V D.C. Switchgear for Traction Substations and Track Paralleling Huts
Issue

Date

Status

Price

Colour

Compliance

Implementation

2
Dec 01
D
This product specification states the Directorate s requirements for 750V rated dc switchgear assemblies for
traction substations and track paralleling huts. The product specification states requirements for overall
performance and technical details including construction and testing.
Mandatory upon: Network Rail & Contractors
Standards Ownership: Electrification & Plant
RT/E/PS/00021

Standby Diesel Generators for Signalling Supplies


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Oct 01
D
This Product Specification states the requirements for the design, manufacture, testing at both supplier premises
and at site, delivery and commissioning of the generating set, together with the preparation and supply of associated
documentation, drawings and manuals. This document will be utilised to specify the requirements for generating
sets other than those for signalling supplies where stated by the purchaser.
Mandatory upon: Network Rail & Contractors
Standards Ownership: Electrification & Plant

th

st

Issue 46: 7 August 1 October 2004

Catalogue of Company Standards

Page 129

2. Company Standards

RT/E/PS/00022

K. Product Specifications

Electrification & Plant

400V 3 phase a.c. Shore Supply Equipment for use in Non Electrified Areas
Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Apr 01
D
This product specification states the Directorate s requirements for 400V, 3 phase, 3 wire a.c. shore supply
equipment for use in non electrified areas. The product specification includes requirements for overall performance
and technical details including design, manufacture, construction, installation, testing and commissioning.
Mandatory upon: Network Rail & Contractors
Standards Ownership: Electrification & Plant
RT/E/S/21036

25kV Booster Transformers for AC Electrified Lines


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Mar 98
D
This specification states the Directorate s requirements for 25kV booster transformers for use as part of a return
conductor system for the suppression at source of electromagnetic interference on AC Electrified Lines, in order
to reduce the level of interference induced into adjacent signalling and communications circuits. The specification
states requirements for overall performance and technical details including testing.
Mandatory upon: Network Rail
Standards Ownership: Electrification & Plant
RT/E/S/21041

Batteries and Battery Charging Equipment for Electrification Applications


Issue

Mandatory upon:
Further Information:
Caution:
Standards Ownership:
RT/E/S/21082

Date

Status

Price

Colour

Compliance

Implementation

1
Nov 97
D
This specification states the Directorate s requirements for batteries and battery charging equipment for use in
substations, switching stations and for other associated electrification applications. The specification states
requirements for overall performance and technical details including construction and testing.
Network Rail
Performance Specification mandates testing/construction
See note i below
Electrification & Plant
25kV Overhead Line Equipment Insulators
Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Mar 98
D
This specification states the Directorate s requirements for the design, manufacture and testing of insulators for use
on 25kV AC Electrified Lines. The specification states the requirements for overall performance and technical
details including testing.
Mandatory upon: Network Rail
Standards Ownership: Electrification & Plant
RT/E/S/21101

Track Cable for DC Electrified Lines


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Mar 98
C
This specification states the Directorate s requirement for track cable for DC Electrified lines.
Mandatory upon: Network Rail
Standards Ownership: Electrification & Plant
RT/SEL/2004

25kV AC Single Phase Switchgear and Ancillary Equipment


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Oct 00
D
This product specification states the Directorate s requirements for 25 kV a.c. single phase indoor, outdoor,
cubicle, metalclad, circuit breakers, disconnectors, switches, switchfuses and ancillary equipment for use on A.C.
Electrified Lines. The product specification states the requirements for overall performance and technical details
including any special testing.
Mandatory upon: Network Rail
Standards Ownership: Electrification & Plant

CAUTION! The requirements for protective treatments materials and their application referred to in this Specification have been superseded by:
RT/CE/S/039 - Specification RT98 - Protective Treatment for Railtrack Infrastructure;
RT/CE/C/002 - Application and Reapplication of Protective Treament to Metallic Structures
th

st

Issue 46: 7 August 1 October 2004

Catalogue of Company Standards

Page 130

2. Company Standards

K. Product Specifications

Railway Systems

2J2. Railway Systems


RT/E/PS/00016

Lineside Hot Axle Bearing Detectors


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Oct 02
C
This Product Specification states the technical requirements for Hot Axle Bearing Detector (HABD) systems to be
installed on Network Rail s operational infrastructure. Their purpose is to observe the rolling stock and identify and
provide warning of an overheating axle bearing..
Mandatory upon: Network Rail and Contractors
Standards Ownership: Railway Systems

th

st

Issue 46: 7 August 1 October 2004

Catalogue of Company Standards

Page 131

2. Company Standards

K. Product Specifications

Signal Engineering

2J3. Signal Engineering


RT/E/PS/00002

Adjustable Tie Bar for Rail Clamp Point Lock


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Dec 99
C
This line specification details the design, functional, physical, interface, performance and safety requirements for an
Adjustable Tie Bar used on Rail Clamp Point Locks.
Mandatory upon: Network Rail & Contractors
Standards Ownership: Signal Engineering
RT/E/PS/00005

Railway Signalling Cable


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Apr 2000
D
This Line Specification specifies the manufacturing requirements for railway signalling cables detailed in the scope of
this Specification.
Mandatory upon: Contractors
Further Information: Superseded document reference number GS/ES0872 Issue 2 Sept 93
Standards Ownership: Signal Engineering
RT/E/PS/00009

Message Handling & Data Transmission Requirements Between Processor Based Systems
Issue

Date

Status

Price

Colour

Compliance

Implementation

2
Apr 04
E
To ensure that Network Rail s electronic Signalling and Telecommunications Systems can be expected to
communicate and interact with each other, a common protocol and message classification needs to be specified.
This document builds on past experience and best practice to ensure future compatibility.
Mandatory upon: Network Rail & Contractors
Standards Ownership: Signal Engineering
RT/E/PS/00011

Train Protection & Warning System (TPWS) Failure Indication Unit


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Apr 01
C
This specification has been prepared to define the requirements for a Train Protection and Warning System
(TPWS) Failure Indication Unit that is to be provided for the reporting of failed TPWS trackside sub-systems within
mechanically signalled areas.
Mandatory upon: Network Rail & Contractors
Standards Ownership: Signal Engineering
RT/E/PS/00012

Specification for the Preparation & Implementation of Train Describer System Parameter Tables
Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Aug 01
F
This Company Product Specification defines the necessary features and information required by a Train Describer
database to ensure a standard format throughout Network Rail s infrastructure.
Mandatory upon: Network Rails & Contractors
Standards Ownership: Signal Engineering
RT/E/PS/00032

TPWS Self Powered Overspeed Sensor (SPOSS) Battery Procurement Specification


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Dec 03
B
This product specification states the requirements for the design, manufacture and testing of a battery suitable for
use in a Train Protection and Warning System (TPWS) Self Powered Overspeed Sensor System (SPOSS).
Mandatory upon: Network Rails & Contractors
Standards Ownership: Signal Engineering
RT/E/PS/00801

Requirement Specification for TDM Systems


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Feb 04
D
Yes
The aim of this specification is to define the requirements for a basic bit to bit Time Division Multiplex (TDM)
transmission system suitable for use in a variety of signalling applications on Network Rail.
Mandatory upon: Network Rail & Contractors
Standards Ownership: Signal Engineering

th

st

Issue 46: 7 August 1 October 2004

Catalogue of Company Standards

Page 132

2. Company Standards

RT/E/PS/11755

K. Product Specifications

Signal Engineering

DC Track Circuits
Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Dec 00
E
This Line Specification states the minimum requirements for DC track circuits. It includes life-cycle requirements
from design, safety and environmental through to installation, testing and maintenance.
Mandatory upon: Network Rail & Contractors
Standards Ownership: Signal Engineering
RT/E/PS/11756

HVI Track Circuits


Issue

Date

Status

Price

Colour

Compliance

Implementation

2
Aug 01
E
This Company Specification states the minimum requirements for Alstom High Voltage Impulse (HVI) track circuits.
It includes lifecycle requirements from design, safety and environmental through to installation, testing and
maintenance.
Mandatory upon: Network Rail & Contractors
Standards Ownership: Signal Engineering
RT/E/PS/11757

AC Phase-sensitive Track Circuits


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Dec 00
F
This Line Specification states the minimum requirements for a.c. phase sensitive track circuits. It includes lifecycle
requirements from design, safety and environmental to installation, testing and maintenance.
Mandatory upon: Network Rail & Contractors
Standards Ownership: Signal Engineering
RT/E/PS/11760

Westinghouse Signals FS2600 Track Circuits


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Dec 00
F
This Line Specification states the minimum requirements for Westinghouse FS2600 track circuits. It includes
lifecycle requirements from design, safety and environmental to installation, testing and maintenance.
Mandatory upon: Network Rail & Contractors
Standards Ownership: Signal Engineering
RT/E/PS/11761

TI.21 Audio Frequency Track Circuits


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Dec 00
E
This Line Specification states the minimum requirements for TI.21 Audio Frequency track circuits. It includes
lifecycle requirements from design, safety and environmental to installation, testing and maintenance.
Mandatory upon: Network Rail & Contractors
Standards Ownership: Signal Engineering
RT/E/PS/11762

Track Circuit Assister Interference Detectors


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Dec 00
E
This Line Specification states the minimum requirements for Track Circuit Assister Interference Detectors. It
includes lifecycle requirements from design, safety and environmental to installation, testing and maintenance.
Mandatory upon: Network Rail & Contractors
Standards Ownership: Signal Engineering
RT/E/PS/11763

Reed Type RT Track Circuits


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Dec 00
E
This Line Specification states the minimum requirements for Alstom Reed Type RT Track Circuits. It includes lifecycle
requirements from design, safety and environmental to installation, testing and maintenance.
Mandatory upon: Network Rail & Contractors
Standards Ownership: Signal Engineering

th

st

Issue 46: 7 August 1 October 2004

Catalogue of Company Standards

Page 133

2. Company Standards

RT/E/PS/11764

K. Product Specifications

Signal Engineering

Track Circuit Interrupters


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Dec 00
C
This Line Specification states the minimum requirements for track circuit interrupters. It includes lifecycle
requirements from design, safety and environmental to installation, testing and maintenance.
Mandatory upon: Network Rail & Contractors
Standards Ownership: Signal Engineering
RT/E/PS/11765

Impedance Bonds
Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Dec 00
E
This Line Specification states the minimum requirements for Impedance Bonds. It includes lifecycle requirements
from design, safety and environmental to installation, testing and maintenance.
Mandatory upon: Network Rail & Contractors
Standards Ownership: Signal Engineering
RT/E/S/10015

Rail Clamp Point Lock Performance Specification for the Microswitch with Independent Contacts
Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Feb 98
C
This standard defines the performance requirements for microswitches with independent contacts used in Rail
Point Clamp Lock detection circuitry.
Mandatory upon: Network Rail & Contractors
Further Information: Performance specification
Standards Ownership: Signal Engineering
RT/E/S/10031

Miniature Stop Light Unit


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Mar 97
D
This document has been prepared to define the detailed requirements for a Miniature Stop Light unit for use on a
level crossing.
Mandatory upon: Network Rail
Further Information: Material Specification
Standards Ownership: Signal Engineering
RT/E/S/10041

Requirement Specification for an IECC System Monitor Terminal


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Dec 99
D
This document specifies the requirements for an IECC System Monitor (ISM) Terminal. This terminal is a
replacement for the Lynwood J500 which is now obsolete and no longer available for purchase.
Mandatory upon: Network Rail & Product Suppliers
Standards Ownership: Signal Engineering
RT/E/S/10059

Non-Intrusive Earth Leakage Test Adapter for Reed FDM Systems


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Aug 98
C
This standard specifies the requirements for the Non-Intrusive FDM Earth Leakage Adapter. The adapter allows a
standard multi-meter to be adapted to allow it to measure the cable resistance to earth of the FDM system. Existing
instruments for measuring the resistance pose the hazard of generating an interfering signal through its power supply and
can therefore not be used on a live system.
Mandatory upon: Network Rail & Contractors
Standards Ownership: Signal Engineering

th

st

Issue 46: 7 August 1 October 2004

Catalogue of Company Standards

Page 134

2. Company Standards

RT/E/S/10065

K. Product Specifications

Signal Engineering

Requirement Specification for a Barrier Operation Relay for L.C. Barriers


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Feb 99
D
This specification identifies the requirements for a Barrier Operation Relay (24V DC Working) for controlling level
crossing barriers.
Mandatory upon: Network Rail & Contractors
Standards Ownership: Signal Engineering
RT/E/S/21136

Track Circuit Operating Device


Issue

Date

Status

Price

Colour

Compliance

Implementation

Compliance

Implementation

2
Oct 99
D
This specification states the performance requirements for track circuit operating devices.
Mandatory upon: Network Rail & Contractors
Standards Ownership: Signal Engineering
RT/SRS/2001

Requirement for Powered Point Operating Equipment.


Issue

Date

Status

Price

Colour

2
Dec 01
D
This Company Specification details the functional, physical, interface, performance and safety requirements for Point
Operating Equipment.
Mandatory upon: Network Rail, Contractor & Lessee
Standards Ownership: Signal Engineering

th

st

Issue 46: 7 August 1 October 2004

Catalogue of Company Standards

Page 135

2. Company Standards

K. Product Specifications

Civil Engineering/Railway Estates Policy

2J4. Civil Engineering


RT/CE/S/039

Specification RT98 - Protective Treatments for Railtrack Infrastructure


Issue

Date

Status

Price

Colour

Compliance

Implementation

4
Feb 02
E
This specification provides the performance specifications for paints, sealants and ancillary materials to be used for
protective treatment on Network Rail Infrastructure.
Mandatory upon: Network Rail / Lessee
Further Information: Material specification. Should be mandated in lease. Responds to GC/RT5110
Standards Ownership: Civil Engineering
RT/CE/S/041

Waterproofing Systems for Underline Bridge Decks


Issue

Date

Status

Price

Colour

Compliance

Implementation

2
Aug 01
E
This specification provides the performance criteria for waterproofing systems proposed to be used on Network
Rail s underline bridge decks and provides recommendations for tests to be carried out to prove compliance with
the performance requirements.
Mandatory upon: Network Rail
Further Information: Responds to GC/RT5110
Standards Ownership: Civil Engineering

2J5. Railway Estates Policy and Planning


RT/E/PS/00030

Platform Components and Prefabricated Construction Systems


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Oct 02
D
This Specification provides specification requirements for manufactured platform components and pre-fabricated
platform systems to be installed at Network Rail owned stations.
Mandatory upon: Network Rail and Contractors
Standards Ownership: Railway Estates Policy & Planning

th

st

Issue 46: 7 August 1 October 2004

Catalogue of Company Standards

Page 136

2. Company Standards

K. Product Specifications

Telecommunications

2J6. Telecommunications
RT/E/PS/00013

Cable Troughing
Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Feb 01
C
This Product Specification states Network Rail's minimum performance requirements for cable troughing products
to be installed upon Network Rail's infrastructure
Mandatory upon: Network Rail, Contractors & Lessee
Standards Ownership: Telecommunications Engineering
RT/E/PS/00014

Telecommunications Optical Fibre Cable


Issue

Date

Status

Price

Colour

Compliance

Implementation

3
Jun 03
D
This document is for use in procuring polyethylene sheathed ZHLS sheathed optical fibre trunk telecommunications cables.
Mandatory upon: Network Rail & Contractors
Standards Ownership: Telecommunications Engineering
RT/E/PS/00015

Unit Twin Copper Telecommunications Cable


Issue

Date

Status

Price

Colour

Compliance

Implementation

2
Jun 03
D
This specification details Network Rail s requirements for Unit Twin Copper Telecommunications Cables, generally
to BS 3573, for external use. Single-sheathed, armoured and ZHLS cables are specified.
Mandatory upon: Network Rail & Contractors
Standards Ownership: Telecommunications Engineering
RT/E/PS/00025

Synchronous Digital Hierarchy Multiplexing Equipment


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Feb 02
C
This product specification states the minimum requirements for Synchronous Digital Hierarchy Multiplexing
Equipment forming part of telecommunications systems providing services for operational railway and business
applications.
Mandatory upon: Network Rail & Contractors
Standards Ownership: Telecommunications Engineering
RT/E/PS/00026

Primary PCM Multiplex Equipment


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Feb 02
C
This product specification states the minimum requirements for Primary PCM Multiplex Equipment forming part of
telecommunications systems providing services for operational railway and business applications.
Mandatory upon: Network Rail & Contractors
Standards Ownership: Telecommunications Engineering
RT/E/PS/00027

Digital Subscriber Line Transmission Equipment


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Feb 02
C
This product specification states the minimum requirements for Digital Subscriber Line Transmission Equipment
forming part of telecommunications systems providing services for operational railway and business applications.
Mandatory upon: Network Rail & Contractors
Standards Ownership: Telecommunications Engineering
RT/E/PS/00028

Controlled Climate Trackside Housing for Telecommunications Equipment


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Feb 02
C
This Product Specification states the minimum requirements for Controlled Climate Trackside Housings for
Telecommunications Equipment supporting operational railway and business services.
Mandatory upon: Network Rail & Contractors
Standards Ownership: Telecommunications Engineering

th

st

Issue 46: 7 August 1 October 2004

Catalogue of Company Standards

Page 137

2. Company Standards

K. Product Specifications

Track

2J7. Track
RT/CE/S/001

Flash-Weld Rails: Depot-Welded Strings


Issue

Date

Status

Price

Colour

Compliance

Implementation

3
Aug 03
F
This specification covers long welded strings manufactured by the flash welding of new rails at fixed plant. The
following rail profiles and grades are covered. Only joints between rails of the same grade are covered.
Mandatory upon: Network Rail & Contractors
Standards Ownership: Track Engineering
RT/CE/S/004

Switch & Crossing Assemblies


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Sep 96
C
This specification sets down the mandatory requirements for manufacture and supply of switch & crossing work for
use in Network Rail-owned infrastructure.
Mandatory upon: Network Rail
Further Information: Mandated equipment. Responds to GC/RT5011
Standards Ownership: Track Engineering
RT/CE/S/005

Rail Testing: Portable Ultrasonic Equipment


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Aug 96
B
This document defines the performance specification for portable ultrasonic rail flaw detector units used for testing
rail on Network Rail-owned permanent way. This document applies to all portable ultrasonic rail flaw detectors
used to carry out the procedures defined in Network Rail Line Specification RT/CE/S/055 Rail-testing: ultrasonic
procedures.
Mandatory upon: Network Rail
Further Information: Equipment Specification. Performance mandated. Responds to GC/RT5019
Standards Ownership: Track Engineering
RT/CE/S/006

Track Ballast and Stoneblower Aggregate


Issue

Date

Status

Price

Colour

Compliance

Implementation

3
Aug 00
C
This specification gives the requirements for track ballast and aggregate used by Stoneblowing machines, including
physical properties and tests. It does not apply to ballast returned directly to the track by a ballast cleaning machine.
Mandatory upon: Network Rail
Further Information: Material Specification. Responds to GC/RT5014
Standards Ownership: Track Engineering
RT/CE/S/010

Geotextiles
Issue

Date

Status

Price

Colour

Compliance

Implementation

2
Oct 96
B
This specification gives the requirements for geotextiles, including physical properties and tests.
Mandatory upon: Network Rail
Further Information: Materials Specification. Responds to GC/RT5014
Standards Ownership: Track Engineering
RT/CE/S/012

Cast Austenitic Manganese Steel Crossings


Issue

Date

Status

Price

Colour

Compliance

Implementation

2
Feb 02
D
This specification defines Network Rail's criteria for the approval of designs of cast austenitic manganese steel crossings and
for control of the manufacturing process. It also specifies the documentation that the supplier shall provide describing the
recommended handling and maintenance of the product.
Mandatory upon: Network Rail
Further Information: Material/performance specification. Responds to GC/RT5011.
Standards Ownership: Track Engineering

th

st

Issue 46: 7 August 1 October 2004

Catalogue of Company Standards

Page 138

2. Company Standards

RT/CE/S/013

K. Product Specifications

Track

Electroslag Welded Vees for Part-Welded Crossings


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Jun 96
D
This specification gives the requirements for welded crossings manufactured using the electroslag welding process.
Mandatory upon: Network Rail
Further Information: Material specification. Responds to GC/RT5011
Standards Ownership: Track Engineering
RT/CE/S/015

Self-Shielding Flux-Cored Wires for the Weld Repair of BS11 Normal and A Grade Rails
Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Dec 95
C
This specification gives the requirements for the manufacture and acceptance of shelf-shielding flux-cored wires for
use on BS11 Normal and A Grade rail steels.
Mandatory upon: Network Rail
Further Information: Material Spec. Responds to GC/RT5021
Standards Ownership: Track Engineering
RT/CE/S/016

33C1 Check Rails


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Oct 97
B
This specification lays down the requirements for new check rails of the 33C1 profile (previously known as U69 or
UIC33) to be supplied to Network Rail or for use on Network Rail s infrastructure.
Mandatory upon: Network Rail
Further Information: Material spec. Responds to GC/RT5019
Standards Ownership: Track Engineering
RT/CE/S/019

Cast Chairs, Baseplates and Blocks


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Apr 95
B
This specification gives the requirements for the material and dimensions of cast chairs, baseplates and blocks for
use in Network Rail s permanent way.
Mandatory upon: Network Rail
Further Information: Material specification. Responds to GC/RT5015
Standards Ownership: Track Engineering
RT/CE/S/021

Steel Sleepers
Issue

Date

Status

Price

Colour

Compliance

Implementation

2
Feb 03
C
This specification gives the requirements for the performance of steel sleepers which are to be installed for use in
Network Rail s permanent way.
Mandatory upon: Network Rail
Further Information: Material/Performance specification. Responds to GC/RT5015
Standards Ownership: Track Engineering
RT/CE/S/023

Insulated Rail Joints


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Mar 96
C
This specification gives the requirements for the geometry and the mechanical and electrical performance of
insulated rail joints for use in Network Rail.
Mandatory upon: Network Rail
Further Information: Material/performance specification. Responds to GC/RT5020
Standards Ownership: Track Engineering

th

st

Issue 46: 7 August 1 October 2004

Catalogue of Company Standards

Page 139

2. Company Standards

RT/CE/S/024

K. Product Specifications

Track

Component Kits for BR MkI11 4- and 6-Hole Glued Insulated Joints


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Mar 96
A
This specification defines the items required (excluding rails, bolts, MGL pins and adhesive) to make up a
component kit for the production of glued insulated rail joints of the BR Mk111 4- or 6-hole design.
Mandatory upon: Network Rail
Further Information: Material specification. Responds to GC/RT5020
Standards Ownership: Track Engineering
RT/CE/S/025

Steel Keys for Bullhead Rail


Issue

Date

Status

Price

Colour

Compliance

Implementation

1A
Oct 97
A
This specification gives the requirements for the material and dimensions (by reference to drawings) of steel rail
keys for use in Network Rail s permanent way.
Mandatory upon: Network Rail
Further Information: Material specification. Responds to GC/RT5013
Standards Ownership: Track Engineering
RT/CE/S/026

Oak Keys for Bullhead Rail


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
May 95
A
This specification gives the requirements for the material and dimensions of oak rail keys for use in Network Rail s
permanent way.
Mandatory upon: Network Rail
Further Information: Material specification. Responds to GC/RT5013
Standards Ownership: Track Engineering
RT/CE/S/027

Plastic Ferrules
Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Apr 95
B
This specification gives the requirements for the materials and dimensions of plastic ferrules for use in Network
Rail s permanent way.
Mandatory upon: Network Rail
Further Information: Material specification. Responds to GC/RT5013
Standards Ownership: Track Engineering
RT/CE/S/028

Insulators for Concrete Sleepers with Pandrol Shoulders


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Apr 95
B
This specification gives the requirements for the material and dimensions of thermoplastic insulators for use with
concrete sleepers with Pandrol shoulders.
Mandatory upon: Network Rail
Further Information: Material specification. Responds to GC/RT5013
Standards Ownership: Track Engineering
RT/CE/S/029

Wood Sleepers, Bearers and Longitudinal Timbers


Issue

Date

Status

Price

Colour

Compliance

Implementation

3
Feb 00
C
This specification defines the requirements for the supply of wood sleepers and bearers, and longitudinal timbers,
for use in Network Rail s permanent way.
Mandatory upon: Network Rail
Further Information: Materials specification. Responds to GC/RT5015
Standards Ownership: Track Engineering

th

st

Issue 46: 7 August 1 October 2004

Catalogue of Company Standards

Page 140

2. Company Standards

RT/CE/S/030

K. Product Specifications

Track

Concrete Sleepers and Bearers


Issue

Date

Status

Price

Colour

Compliance

Implementation

2
Aug 03
C
This specification gives technical requirements to be met by newly-manufactured concrete sleepers, bearers and related
items procured for use in Network Rail s permanent way. The specification should be read in association with the
appropriate Network Rail standard drawings (RE/PW/XXX) for the particular sleeper or bearer design or with the
manufacturer s accepted alternative designs.
Mandatory upon: Network Rail & Contractors
Standards Ownership: Track Engineering
RT/CE/S/033

Track Blanketing Sand


Issue

Date

Status

Price

Colour

Compliance

Implementation

2
Feb 98
B
This specification gives the requirements for blanketing sand, including physical properties and tests, for use as filter
layers in track substructures.
Mandatory upon: Network Rail
Further Information: Material specification. Responds to GC/RT5014
Standards Ownership: Track Engineering
RT/CE/S/040

Level Crossing Surface Systems


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Dec 97
B
This specification provides the performance specification for manufactured level crossing surface systems and
contains approval procedures to be followed by manufacturers of level crossing surface systems proposed for use
on Network Rail s public vehicular level crossings.
Mandatory upon: Network Rail
Further Information: Performance specification & mandated process. Responds to GC/RT5208
Standards Ownership: Track Engineering
RT/CE/S/043

Rail Anchors
Issue

Date

Status

Price

Colour

Compliance

Implementation

Compliance

Implementation

1A
Oct 97
B
This specification gives the performance requirements for rail anchors.
Mandatory upon: Network Rail
Further Information: Performance specification. Responds to GC/RT5010, GC/RT5013.
Standards Ownership: Track Engineering
RT/CE/S/052

Rail and Baseplate Pads


Issue

Date

Status

Price

Colour

3
Oct 02
C
This specification gives the requirements for the resilient rail pads for use between either flat bottom rails and
concrete sleepers, flat bottom rails and cast iron baseplates; or flat bottom rails and steel sleepers.
Mandatory upon: Network Rail
Further Information: Performance specification. Responds to GC/RT5013
Standards Ownership: Track Engineering
RT/CE/S/130

Flash-welded Rails: Site-welded Strings


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Aug 03
D
To ensure the serviceability of flash welded strings installed in Network Rail's permanent way.
Mandatory upon: Network Rail & Contractors
Standards Ownership: Track Engineering
RT/CE/S/131

Flash-welded Rails: Crossings, Switch Rails and Transition Rails


Issue

Date

Status

Price

Colour

Compliance

Implementation

1
Aug 03
D
To ensure the serviceability of flash welded joints incorporated in cast austenitic manganese steel crossings, switch
rails and transition rails.
Mandatory upon: Network Rail & Contractors
Standards Ownership: Track Engineering

th

st

Issue 46: 7 August 1 October 2004

Catalogue of Company Standards

Page 141

2. Company Standards

L. Documents Archived in the Last 14 Months

2L. Documents Archived in the Last 14 Months


2L1. Historic 06/03
Reference

Title

Issue

Change Made

RT/D/P/093

TPWS interventions

Withdrawn

RT/E/C/11400

HPSS Equipment Handbook

Superseded by Issue 3

RT/E/C/45002

The Installation of Electrical Point Heating

Superseded by Issue 4

RT/E/G/00015

Signalling Power Supply Design

Superseded by Issue 2

RT/E/P/10175

Process for Management of TPWS Technical Instructions and Guidance


Notes

10

Superseded by Issue 11

RT/E/PS/00007

Uninterruptible Power Supply Units for Operational Infrastructure

Superseded by Issue 2

RT/E/PS/00014

Telecommunications Optical Fibre Cable

Superseded by Issue 3

RT/E/PS/00015

Unit Twin Copper Telecommunications Cable

Superseded by Issue 2

RT/E/S/40045

Electric point Heating

Superseded by Issue 4

RT/LS/CAT/005

Index of Network Rail Documents Relating to Signalling and


Communications Equipment: Part 3 - Typical Circuits

18

Superseded by Issue 19

RT/LS/P/001

Railtrack Policy on Standards

Superseded by Issue 10

RT/LS/P/013

System Review Panel and Technical Review Groups

Superseded by Issue 4

RT/LS/P/014

Safety Review Groups

Superseded by Issue 4

RT/LS/P/015

Rolling Stock Acceptance Board

Superseded by Issue 3

RT/LS/P/100

Company Fire Safety Handbook

Superseded by Issue 2

RT/LS/S/020

Track Visitor Permits

Superseded by Issue 2

RT/CE/PWSI/004

Instruction on Management of Rails to Control Rolling Contact Fatigue


(Gauge Corner Cracking and Head Checking)

Superseded by Issue 3

RT/CE/PWSI/008

Instruction on Hand or Single Stone Grinding to Control Rolling Contact


Fatigue

Superseded by
RT/CE/PWSI/004 Issue 3

2L2. Historic 08/03


Reference

Title

Issue

Change Made

RT/CE/S/001

Joining of Rails by Flash Welding

Superseded by Issue 3

RT/CE/S/030

Concrete sleepers and bearers

Superseded by Issue 2

RT/CE/S/054

Inspection of cast crossings and cast vees in the track

Superseded by Issue 2

RT/D/S/002

Driving Cab Passes

Superseded by Issue 2

RT/E/P/10024

Signaller's Operating Guide for the

Superseded by Issue 3

11

Superseded by Issue 12

Use of the IECC Signalling Workstation


RT/E/P/10175

Process for Management of TPWS Technical Instructions and Guidance


Notes

RT/E/S/10040

IECC Applications Manual Contents

Superseded by Issue 5

RT/E/S/10067

Requirements Specification for a VDU Based Signalling Control System

Superseded by Issue 2

RT/E/S/10131

Requirement Specification for Signals On Controls for SSI Schemes

Superseded by Issue 2

RT/E/S/30032

Positioning and Labelling of Lineside Telephones

Superseded by Issue 2

RT/LS/CAT005

Index of Network Rail Documents Relating to Signalling and


Communications Equipment: Part 3 Typical Circuits

19

Superseded by Issue 20

RT/LS/S/016

Contract Requirements - Quality

Superseded by Issue 4

Issue

Change Made

2L3. Historic 10/03


Reference

Title

RT/SIN/076

Adrantz Type B3 3000 Impedance Bonds used with TI 21 Track Circuits

Deleted

RT/CE/PWSI/005

Instruction on Management of Temporary Fishplated Joints

Incorporated in
RT/CE/S/102 Issue 5

th

st

Issue 46: 7 August 1 October 2004

Catalogue of Company Standards

Page 142

2. Company Standards

L. Documents Archived in the Last 14 Months


Issue

Change Made

RT/E/P/10175

Reference

Process for Management of TPWS Technical Instructions and Guidance


Notes

Title

12

Superseded by Issue 13

RT/E/P/11120

Process for Management of Signal Engineering Technical Instructions and


Notice Boards

Superseded by Issue 2

RT/E/S/10039

Operational Requirements for Miniature Stop Lights Level Crossings

Superseded by Issue 2

RT/E/S/11630

BR930 Series Pin Code Allocations and Contact Arrangements

Superseded by Issue 5

RT/LS/P/020

Safety Validation of Organisational and Safety Management System Change

Superseded by Issue 6

Issue

Change Made

2L4. Historic 12/03


Reference

Title

RT/CE/C/039

Track Substructure Treatments

1A

Superseded by Issue 2

RT/CE/S/064

Assembly of BR MkIII 4- and 6-Hole Glued Insulated Joints

Superseded by Issue 2

RT/D/P/010

Signals Passed at Danger

E5

Superseded by Emergency
Issue 6

RT/E/C/11004

Symbols for Plans and Sketches Used in Signalling Applications

Superseded by Issue 2

RT/E/C/11115

Correlation of Signalling Records before Signalling Design Alterations

Superseded by Issue 2

RT/E/C/11701

Signalling Design: Production Guidance

Superseded by Issue 3

RT/E/P/10175

Process for Management of TPWS Technical Instructions and Guidance


Notes

13

Superseded by Issue 14

RT/E/P/11120

Process for Management of Signal Engineering Technical Instructions and


Notice Boards

Superseded by Issue 3

RT/E/P/19251

Management of signalling equipment workshop notices


(SIGWEN 000)

Superseded by Issue 2

RT/E/S/10056

Management of Correlation of Signalling Infrastructure

Superseded by
RT/E/C/11115 Issue 2

RT/E/S/11201

Signalling Design: Production

Superseded by Issue 3

RT/E/S/11630

BR930 Series Pin Code Allocations December 2003 and Contact


Arrangements

Superseded by Issue 6

RT/E/S/17504

IECC Operating Specification for Signalling Control and Indications Purposes

Superseded by Issue 3

RT/E/S/29987

Working On Or About 25kV A.C. Electrified Lines

1C

Superseded by Issue 1D

RT/LS/C/101

Managed Stations Fire Safety

Superseded by Issue 3

RT/LS/C/102

Operational Estate Fire Safety

Superseded by Issue 3

RT/LS/P/001

Business Standards Managing Standards

10

Superseded by Issue 11

RT/LS/P/016

Identification of the requirement for and the Review, Acceptance and


Maintenance of an Assurance Case

Superseded by Issue 9

RT/LS/G/00005

Risk Assessment of Multiple SPAD Signals

Withdrawn

2L5. Historic 02/04


Reference

Title

Issue

Change Made

RT/E/C/27017

Competence Management Systems for Work On Electrification and Plant


Systems

Superseded by Issue 2

RT/E/C/27018

Training and Assessment of Persons Working On or Having Access To


Electrical Power Supply Equipment

Superseded by Issue 2

RT/E/P/10175

Process for Management of TPWS Technical Instructions and Guidance


Notes

14

Superseded by Issue 15

RT/E/P/11120

Process for Management of Signal Engineering Technical Instructions and


Notice Boards

Superseded by Issue 4

RT/E/P/24001

Appointment of Persons Working On or Having Access To Electrical Power


Supply Equipment

Superseded by Issue 2

RT/E/PS/00801

Requirement Specification for TDM Systems

Superseded by Issue 2

th

st

Issue 46: 7 August 1 October 2004

Catalogue of Company Standards

Page 143

2. Company Standards

L. Documents Archived in the Last 14 Months

Reference

Title

RT/E/S/10047

Issue

Management Of Safety Related Reports For Signalling Failures

Change Made
Superseded by Issue 9

RT/E/S/10661

Signalling Maintenance Task Intervals

Superseded by Issue 4

RT/E/S/11221

Signalling Works Testing

Superseded by Issue 3

RT/E/S/21070

Competence of Persons Working On or Having Access To Electrical Power


Supply Equipment

Superseded by Issue 2

RT/E/S/30033

Inspection and Surveillance of Telecommunications Engineering Activities

E2

Superseded by Issue 3

RT/E/WI/00102

TI21 Track Circuit Risk Based Maintenance

Superseded by Issue 2

RT/LS/CAT/005

Index of Network Rail Documents Relating to Signalling & communications


Equipment - Part 3 Typical Circuits

20

Superseded by Issue 21

RT/LS/P/029

Product Acceptance

Superseded by Issue 3

2L6. Historic 04/04


Please note: Network Rail deleted a number of standards in April 2004 which did not get entered correctly into this catalogue for issues
44 and 45. The corrected table is included below
Title

RT/CE/C/025

The Structural Assessment of Underbridges

Apr-04

Superseded by Issue 2 (published Feb


2004)

RT/CE/P/016

The Management of Assessment of Structures

Apr-04

Superseded by RT/CE/S/035 Issue 2


(published Feb 2004)

RT/CE/P/037

Managing the Risk Arising from Mineral Extraction and


Landfill

Apr-04

Superseded by Issue 2

RT/CE/P/038

Track Geometry : Management of Recording and of


Immediate and Urgent Actions

Apr-04

Superseded by Issue 4

RT/CE/P/050

GEOGIS for Railtrack Asset Management

Apr-04

Superseded by Issue 2

RT/CE/S/003

Technical Approval of Design, Construction and


Maintenance of Civil Engineering Infrastructure

Apr-04

Superseded by Issue 2

RT/CE/S/017

Examination Of Structures

Apr-04

Superseded by Issue 2

RT/CE/S/035

Assessment of Structures

Apr-04

Superseded by Issue 2
(published Feb 2004)

RT/D/P/003

Noise & Vibration Complaints

1A

Apr-04

Superseded by Issue 2

RT/D/P/010

Signals Passed at Danger

E6

Apr-04

Superseded by Issue E7

RT/D/P/012

Management of the Operator- Infrastructure


Controller/Railtrack Safety Interface

Apr-04

This Company Standard has been


removed from the catalogue and is
now circulated in equivalent form in
the Health & Systems Manual.

RT/D/P/053

Advice to Train Ops of Imposition- Variance &


Withdrawal of Emergency Speed Restrictions.

Apr-04

Withdrawn to be replaced by
instructions in the Control Manual

RT/D/P/061

Management of Risk at Level Crossings

Apr-04

Superseded bu Issue 2

RT/D/P/084

Permissive Platform Working

Apr-04

Superseded by Issue 2

RT/D/P/085

Management Of Track Faults Found By Track


Recording Vehicle

Apr-04

Superseded by Issue 4

RT/E/G/00007

Generic Environmental Management For Light


Maintenance Depots

Apr-04

Superseded by Issue 2

RT/E/G/00008

Guidance on Failure Rating of Safety Related Telecoms


Failures

Apr-04

Withdrawn - This guidance note gave


guidance on the telecoms content of
RT/E/S/10047. As this has been
superseded by RT/E/S/30047 and the
associated guidance note
RT/E/G/30065 the older guidance
note is to be cancelled.

RT/E/G/00027

Incorporating Ergonomics Within Engineering Design


Projects: Guidance Note

Apr-04

Superseded by Issue 2

th

st

Issue 46: 7 August 1 October 2004

Issue

Date
Deleted

Standard No

Catalogue of Company Standards

Change Made

Page 144

2. Company Standards

L. Documents Archived in the Last 14 Months

Issue

Date
Deleted

Standard No

Title

Change Made

RT/E/P/02010

Investment Interfaces between Directorates EE&CSCivil and Procurement

Apr-04

Issue 1 of this standard was published


in March 1996 it has not been
updated since. It is considered that
the Supply Chain processes
developed since then supersede it.

RT/E/P/02015

Railtrack Asset Register

Apr-04

Superseded by Issue 3

RT/E/P/02018

Specification of Records Held by Operations Asset


Information National Records Group

Apr-04

Superseded by Issue 2

RT/E/P/02020

MIMS for Railtrack Asset Management

Apr-04

Superseded by Issue 4

RT/E/P/10175

Process for Management of TPWS Technical


Instructions and Guidance Notes

15

Apr-04

The TPWS National Project is now


complete and the content of the
TPWS TIs and TGNs has been
transferred to Network Rail TPWS
Company Standards. Therefore,
RT/E/P/10175 and all TPWS TIs and
TGNs issued under it have now been
withdrawn.

RT/E/P/11120

Process for Management of Signal Engineering TIs and


NBs

Apr-04

Superseded by Issue 5

RT/E/P/19000

Management Of Signalling Equipment Technical Advice


Notices (SIGTAN000)

Apr-04

Superseded by Issue 2

RT/E/P/24020

Incorporating Ergonomics within Engineering, Design,


Projects Requirements and Guidance

Apr-04

Superseded by Issue 2

RT/E/P/30007

Communication Engineering Technical Safety Audits

Apr-04

Withdrawn - This procedure, written


in 1996, is not appropriate as we
move into Maintenance and MP&I
organisations that are to become
self-assuring.

RT/E/PS/00009

Message Handling & Data Transmission Requirements


Between Processor Based Systems

Apr-04

Superseded by Issue 2

RT/E/S/02019

Specification of Records Held by Operations Asset


Information National Records Group

Apr-04

Superseded by Issue 2

RT/E/S/10028

Inspection and Surveillance of Signal Engineering


Maintenance Activities

Apr-04

Superseded by Issue 3

RT/E/S/10133

TPWS - TPWS - Signalling Interface Design


Requirements

Apr-04

Superseded by Issue 3

RT/E/S/10134

TPWS - Track Sub-System Equipment

Apr-04

Superseded by Issue 3

RT/E/S/10135

TPWS - Track sub-System Work Testing

Apr-04

Superseded by Issue 3

RT/E/S/10137

TPWS - Train Protection & Warning System Selection of Signals and Other Locations for Provision
of Track Sub-System

Apr-04

Superseded by Issue 3

RT/E/S/10138

TPWS - Transmitter Loop Requirements and


Positioning

Apr-04

Superseded by Issue 3

RT/E/S/10173

TPWS - Track Sub-System Installation Requirements

Apr-04

Superseded by Issue 3

RT/E/S/24017

Control Room Design Specification, Process and


Guidance

Apr-04

Superseded by Issue 2

RT/LS/G/00022

Construction noise mitigation through Section 61


consent process

Apr-04

Superseded by Issue 2

RT/LS/G/00023

Best Practicable Means: Control of Noise and


Vibration from Construction Operations

Apr-04

Superseded by Issue 2

RT/LS/G/00030

Risk Assessment of Timetable Change

Apr-04

Superseded by Issue 2

RT/LS/G/001

The Management of Safety Risk: Guidance for


managers in RT Line

Apr-04

This Company Standard has been


removed from the catalogue and is
now circulated in equivalent form in
the Health & Systems Manual.

th

st

Issue 46: 7 August 1 October 2004

Catalogue of Company Standards

Page 145

2. Company Standards

L. Documents Archived in the Last 14 Months

Issue

Date
Deleted

Standard No

Title

Change Made

RT/LS/P/001

Business Standards Managing Standards

11

Apr-04

Superseded by Issue 12

RT/LS/P/002

Management of Inquiries & Investigations and their


Recommendations by Railtrack Plc

Apr-04

Superseded by Issue 7

RT/LS/P/006

Maintenance and Contents of a Zone Hazard


Directory

Apr-04

Superseded by Issue 2

RT/LS/P/007

Project Management and the Environment

Apr-04

Superseded by Issue 2

RT/LS/P/013

System Review Panel and Technical Review Groups

Apr-04

Superseded by Issue 5

RT/LS/P/016

Identification of the requirement for and the Review,


Acceptance and Maintenance of an Assurance Case

Apr-04

Superseded by RT/LS/P/052
(restricted document)

RT/LS/P/017

Competence and Management and Assurance

Apr-04

Superseded by Issue 2

RT/LS/P/020

Safety Validation of Organisation and Safety

Apr-04

Superseded by Issue 7

RT/LS/P/027

Competence Assessment of Signallers and Crossing


Keepers

Apr-04

Withdrawn, to be replaced by
instructions in the Operations
Manual

RT/LS/P/029

Product Acceptance

Apr-04

Superseded by Issue 4

RT/LS/P/031

Risk Assessment & Briefing of Timetable Change

Apr-04

Superseded by Issue 2

RT/LS/P/040

Managing Safety Walkabouts

E1

Apr-04

Superseded by Issue 2

RT/LS/P/041

The Operations Manual

E1

Apr-04

Superseded by Issue 2

RT/LS/P/044

Track Maintenance, Renewal or Alteration Used


Ballast Handling

Apr-04

Superseded by Issue 2

RT/LS/P/045

Business Standards Managing the Process for NonCompliance Authority

Apr-04

Superseded by Issue 2

RT/LS/P/046

The Train Operations Manual

E1

Apr-04

Superseded by Issue 2

RT/LS/P014

Safety Review Groups

Apr-04

Re-Org changes

RT/LS/P015

Network Rail Acceptance Board

Apr-04

Superseded by Issue 4

RT/LS/S/008

Network Rail Contract Requirements - Safety

Apr-04

Superseded by Issue 10

RT/LS/S/015

Railtrack Contract Requirements -Environment

Apr-04

Superseded by Issue 5

RT/LS/S/019

Protection of People Working On or Near the Line

Apr-04

Superseded by Issue 3

RT/LS/S/020

Track Visitor Permits

Apr-04

Superseded by Issue 3

RT/SIN/055

Clamplock Hydraulic Fluid Level Indicators

Apr-04

Superseded by Issue 2

TPWS/TGN/001

SSI Interface Method 3 timing features and their effects

Apr-04

The TPWS National Project is now


complete.

TPWS/TGN/003

TPWS Suppression & Complex Approaches

Apr-04

The TPWS National Project is now


complete.

TPWS/TGN/005

TPWS Signal Selection In Absolute Block, Electric


Token Block and Tokenless Block Areas

Apr-04

The TPWS National Project is now


complete.

TPWS/TGN/006

SSI application, complex approach data

Apr-04

The TPWS National Project is now


complete.

TPWS/TGN/007

TPWS Failure Indication Unit - Guidance On


Implementation

Apr-04

The TPWS National Project is now


complete.

TPWS/TGN/008

TPWS Loop Positioning Where Trains Start A Service

Apr-04

The TPWS National Project is now


complete.

TPWS/TGN/009

Power Supplies to TPWS at Signals Controlled from


Mechanical Signal Boxes

Apr-04

The TPWS National Project is now


complete.

TPWS/TGN/011

Use of Orange Pipe For TPWS Transmitter Loop Tail


Cables

Apr-04

The TPWS National Project is now


complete.

TPWS/TGN/012

TPWS UPS

Apr-04

The TPWS National Project is now


complete.

TPWS/TGN/013

Corus Steel Sleepers with Pandrol Fastclip Rail


Fastening

Apr-04

The TPWS National Project is now


complete.

TPWS/TGN/014

Transmitter Loop Packing Spacers

Apr-04

The TPWS National Project is now


complete.

th

st

Issue 46: 7 August 1 October 2004

Catalogue of Company Standards

Page 146

2. Company Standards

L. Documents Archived in the Last 14 Months

Title

TPWS/TGN/016

Procedure for Replacing Displaced Vortok Loop End


Caps

Apr-04

The TPWS National Project is now


complete.

TPWS/TGN/017

Provision of TPWS Transmitter Loops Where


Derailment Guard Rails Exist

Apr-04

The TPWS National Project is now


complete.

TPWS/TGN/018

Earthing & Bonding the TPWS Track Sub-System

Apr-04

The TPWS National Project is now


complete.

TPWS/TGN/019

TPWS in Radio Electronic Token Block (RETB) Areas:


Faulting Guidance

Apr-04

The TPWS National Project is now


complete.

TPWS/TGN/020

Interleaving of TPWS Transmitter Loops

Apr-04

The TPWS National Project is now


complete.

TPWS/TI/004

Requirements for Wetting Current Resistors

Apr-04

The TPWS National Project is now


complete.

TPWS/TI/006

TPWS Signal Selection - Layout Protection

Apr-04

The TPWS National Project is now


complete.

TPWS/TI/007

TPWS Tail Cables And Plug Couplers

Apr-04

The TPWS National Project is now


complete.

TPWS/TI/008

Managing Defective Thales TPWS Trackside


Equipment

Apr-04

The TPWS National Project is now


complete.

TPWS/TI/009

TPWS Testing and Commissioning Efficiencies

Apr-04

The TPWS National Project is now


complete.

TPWS/TI/011

TPWS Trackside Test Equipment

Apr-04

The TPWS National Project is now


complete.

TPWS/TI/012

Reliability Improvement of TPWS Control Modules

Apr-04

The TPWS National Project is now


complete.

TPWS/TI/013

Fault Reporting on Lines Operated by Absolute Block


or Single Lines with Token/Tokenless Block Working

Apr-04

The TPWS National Project is now


complete.

TPWS/TI/014

Permanent Speed Restrictions

Apr-04

The TPWS National Project is now


complete.

TPWS/TI/015

Instructions for Use and Disposal of Different Versions


of TPWS Modules

Apr-04

The TPWS National Project is now


complete.

TPWS/TI/016

TPWS Control Modules - Direct Connection to Relay


Interlockings

Apr-04

The TPWS National Project is now


complete.

TPWS/TI/018

TPWS Signal Selection - Sidings Secured Out Of Use

Apr-04

The TPWS National Project is now


complete.

TPWS/TI/019

TPWS SIM Part Number 604366-00 Replacement

Apr-04

The TPWS National Project is now


complete.

TPWS/TI/020

Buffer Stops Overspeed Sensor Tolerances

Apr-04

The TPWS National Project is now


complete.

TPWS/TI/021

Fault Reporting at PSRs and Buffer Stops

Apr-04

The TPWS National Project is now


complete.

TPWS/TI/022

Suppression of Overspeed Sensors Under Subsidiary


Signal Moves

Apr-04

The TPWS National Project is now


complete.

TPWS/TI/023

TPWS Symbols for VDU Operated Signalling Systems

Apr-04

The TPWS National Project is now


complete.

TPWS/TI/024

TPWS Signal Selection Signals Protecting Moves up


to Limit of Shunt Signals.

Apr-04

The TPWS National Project is now


complete.

TPWS/TI/025

Replacement of Phosphor Bronze Contact Modules


with Gold Contacts

Apr-04

The TPWS National Project is now


complete.

TPWS/TI/026

TPWS Configuration Reporting

Apr-04

The TPWS National Project is now


complete.

TPWS/TI/027

Application of Buffer Stop Mini-Loops

Apr-04

The TPWS National Project is now


complete.

TPWS/TI/028

Blanking of TPWS Functions Inside Thales Two and


Four Function Cabinets

Apr-04

The TPWS National Project is now


complete.

th

st

Issue 46: 7 August 1 October 2004

Issue

Date
Deleted

Standard No

Catalogue of Company Standards

Change Made

Page 147

2. Company Standards

L. Documents Archived in the Last 14 Months

Issue

Date
Deleted

Standard No

Title

Change Made

TPWS/TI/030

Installation of Standard TPWS Transmitter Loops on


Concrete Slab Track

Apr-04

The TPWS National Project is now


complete.

TPWS/TI/031

Application of TPWS to No Signaller Token Remote


(NSTR) Operated Signalling

Apr-04

The TPWS National Project is now


complete.

TPWS/TI/032

Application of TPWS to Computer Based Interlockings


(CBI)

Apr-04

The TPWS National Project is now


complete.

TPWS/TI/033

Self-powered OSS for Remote PSRs

Apr-04

The TPWS National Project is now


complete.

TPWS/TI/034

Scheme Design Requirements

Apr-04

The TPWS National Project is now


complete.

TPWS/TI/036

TPWS Fitment at Plain Line Signals

Apr-04

The TPWS National Project is now


complete.

TPWS/TI/037

Overlay of TPWS in Radio Electronic Token Block


(RETB) Areas

Apr-04

The TPWS National Project is now


complete.

TPWS/TI/038

TPWS Overlay in Radio Electronic Token Block


(RETB) Areas: Interface Design Requirements

Apr-04

The TPWS National Project is now


complete.

TPWS/TI/039

TPWS Overlay in Radio Electronic Token Block


(RETB) Areas: Site Configuration Information

Apr-04

The TPWS National Project is now


complete.

TPWS/TI/040

TPWS Overlay in Radio Electronic Token Block


(RETB) Areas: Installation Requirements

Apr-04

The TPWS National Project is now


complete.

TPWS/TI/042

TPWS in Radio Electronic Token Block (RETB) Areas:


Maintenance Requirements

Apr-04

The TPWS National Project is now


complete.

TPWS/TI/046

Application of TPWS at Temporary Speed Restrictions

Apr-04

The TPWS National Project is now


complete.

TPWS/TI/047

TPWS SSI Method 1a Fitments: Requirements for


Loading of Dummy Outputs

Apr-04

The TPWS National Project is now


complete.

2L7. Historic 06/04


Reference

Title

RT/LS/P/014

Safety Review Groups

Issue
4

Change Made
Withdrawn

2L8. Historic 08/04


Issue
Deleted

Reference

Title

Change Made

RT/CE/C/041

Structures Condition Marking Index Handbook

Issue 2

RT/CE/S/044

Undertrack Crossings

Issue 1

Superseded by Issue 2

RT/CE/S/048

Standards of Competence for Examination of a Bridge following a Bridge Strike

Issue 3

Superseded by Issue 4

Superseded by Issue 3

RT/CE/S/049

Track Design Handbook

Issue 7

Superseded by Issue 8

RT/CE/S/071

Design of Earthworks and Earthworks Remediations

Issue 1

Superseded by Issue 2

RT/D/P/021

Acceptance- Audit & Review of the Contractor's Safety Case

Issue 2

Superseded by RT/LS/P/052

RT/D/P/022

Management of the Monitoring of Contracts and Corrective Actions

Issue 7

Withdrawn

RT/D/S/002

Driving Cab Passes

Issue 2

Superseded by Issue 3

RT/D/S/004

Railtrack Specification for Determining High Risk Sites for Wrong Side Track
Circuit Failures in Leaf Fall Areas

Issue 2

Superseded by RT/D/P/095

RT/D/S/005

Railtrack Specification for Determining High Risk Sites for Low Rail Adhesion
as Defined in Group Standard GO/RT3356

Issue 2

Superseded by RT/D/P/096

RT/E/C/10048

Signalling Relay and Searchlight Mechanism Servicing

Issue 1

Superseded by RT/E/S/11129
Issue 3

RT/E/C/10094

Signal Light Beam Alignment (SG21)

Issue 2

Superseded by RT/E/S/10660

RT/E/C/10095

Signal Lamp Maintenance Addendum to Signal Maintenance Specification


(SMS) SG31

Issue 2

Superseded by RT/E/S/10660

RT/E/C/11115

Correlation of Signalling Records

Issue 2

Superseded by Issue 3

th

st

Issue 46: 7 August 1 October 2004

Catalogue of Company Standards

Page 148

2. Company Standards

L. Documents Archived in the Last 14 Months


Issue
Deleted

Reference

Title

RT/E/C/19004

SIGTAN 004 Replacing relays - type sj 8211 relay units gec geographical units

Issue 1

Superseded by
RT/E/C/19020 Issue 3

RT/E/C/19011

SIGTAN 001 Silver to Silver Contacts - DC Polarised Moving Iron Relays

Issue 1

Superseded by
RT/E/C/19020 Issue 3

RT/E/C/19020

Signalling Equipment Technical Advice Notice (SIGTAN020) AEI - GRS Type M

Issue 2

Superseded by Issue 3

RT/E/C/19031

Signalling Equipment Technical Advice Notice (SIGTAN031) Full-Size Plug-In


Relays

Issue 1

Superseded by
RT/E/C/19020 Issue 3

RT/E/C/19034

(SIGTAN034) Thermal Timer Relays

Issue 1

Superseded by
RT/E/C/19020 Issue 3

RT/E/C/19255

Signalling Equipment Workshop Engineering Notice (SIGWEN004) GEC - GS


Geographical Units

Issue 1

Superseded by
RT/E/C/19272

RT/E/C/19256

SIGWEN 005 - Westinghouse Signals style 'P' relays

Issue 2

Superseded by
RT/E/C/19272

RT/E/C/19260

SIGWEN 009 - Westinghouse Signals style 'B' relays

Issue 2

Superseded by
RT/E/C/19272

RT/E/C/19261

SIGWEN 009 - Westinghouse Signals style 'B' relays

Issue 1

Superseded by
RT/E/C/19272

RT/E/C/19264

Signalling Equipment Workshop Engineering Notice (SIGWEN013) GEC-GS


Style Z Relays

Issue 1

Superseded by
RT/E/C/19272

RT/E/C/19267

Signalling Equipment Workshop Engineering Notice (SIGWEN016) Setting


Thermal Timer Relays

Issue 1

Superseded by
RT/E/C/19272

RT/E/P/10024

Signallers Operating Guide for the use of IECC Signalling Workstation

Issue 3

Superseded by Issue 4

RT/E/P/11120

Process for Management of Signal Engineering Technical Instructions and


Notice Boards

Issue 5

Superseded by Issue 6

RT/E/S/10040

IECC Applications Manual Contents

Issue 5

Superseded by Issue 6

RT/E/S/10662

Process for the Introduction of New or Revised Maintenance Regimes for


Signalling Assets

Issue 1

Superseded by Issue 2

RT/E/S/11129

Life Management of Signalling Relays

Issue 2

Superseded by Issue 3

RT/E/S/11630

BR930 Series Pin Code Allocations December 2003 and Contact


Arrangements

Issue 6

Superseded by Issue 7

th

st

Issue 46: 7 August 1 October 2004

Catalogue of Company Standards

Change Made

Page 149

3. Reference Guide to Group Standards

3. Reference Guide to Group Standards


Reference
BR 13422
BR 1654
GE/GN8501
GE/GN8502
GE/GN8507
GE/RT8064
GE/RT8067
GE/RT8070
GE/RT8217
GE/RT8250
GK/RT0206
GK/RT0207
GK/RT0208
GK/RT0209
GO/RT3251
GO/RT3252
GO/RT3253
GO/RT3255
GA/GN6508
GA/GN6509
GA/GN6510
GA/RT6001

GA/RT6002

GA/RT6004

GA/RT6005

GA/RT6006

GC/GN5523
GC/GN5533
GC/RC5510
GC/RC5511
GC/RC5521
GC/RC5603
GC/RT5011
GC/RT5014
GC/RT5021
GC/RT5021/1
GC/RT5022
GC/RT5023
GC/RT5024
GC/RT5033
GC/RT5060
GC/RT5100
GC/RT5101
GC/RT5110
GC/RT5112
th

Title
Issue Issue Date Directorate Ownership
50HZ Single Phase AC Electrification- Immunisation of Sig. & Telecomms Systems 1
01-Feb-79 Engineering
Telecommunications
Engineering
Radio Electronic Token Block
2
01-Dec-86 Engineering
Signal Engineering
Platform Stepping Distances
1
01-Jul-98
Engineering
Rail Vehicle
Engineering
Operations of Trams and Light Rail or Metro Vehicles over Railtrack
1
01-Feb-99 Safety &
Interoperability &
Compliance Acceptance
Managing the Risks from Contaminated Land
1
01-Oct-99 Engineering
Civil Engineering
European Train Control System: The Management of Packet 44
1
05-Apr-03 Safety &
Signal Engineering
Compliance
Personal Track Safety
1
05-Oct-02 Safety &
Occupational Health
Compliance & Safety Policy
Drugs and Alcohol
1
04-Oct-03 Safety &
Occupational Health
Compliance & Safety Policy
Introduction and use of Axle Counters - Managing the Risk
2
01-Feb-03 Engineering
Signal Engineering
Safety Performance Monitoring and Defect Reporting of Rail Vehicles- Plant and 1
02-Jun-01 Engineering
Rail Vehicle
Machinery
Engineering
Signalling and Operational Telecommunications Design: Safety Requirements
2
06-Apr-02 Engineering
Signal Engineering
Signalling Design Production
1
05-Aug-00 Engineering
Signal Engineering
Installation of Signalling and Operational Telecommunications Equipment
1
05-Aug-00 Engineering
Signal Engineering
Testing and Commissioning of Signalling and Operational Telecommunications
1
02-Dec-00 Engineering
Signal Engineering
Systems
Train Driving
4
05-Oct-02 Safety &
Operational Safety
Compliance Policy
Signals Passed at Danger (SPADs)
5
04-Oct-03 Safety &
Operational Safety
Compliance Policy
Checking the Speed of Trains
1
01-Mar-95 Safety &
Operational Safety
Compliance Policy
Train Working: Competence and Fitness
2
07-Oct-00 Safety &
Operational Safety
Compliance Policy
Criteria for the Assessment by Railway Safety of Railtrack s Railway Safety Case 1
01-Aug-01 Safety &
Safety Case
Compliance Management
Guidance on Train and Station Operators Railway Safety Cases for Assessment 2
02-Jun-01 Safety &
Safety Case
by Railway Safety
Compliance Management
Guidance on Submitting Material Revisions to Railway Safety Cases
2
02-Jun-01 Safety &
Safety Case
Compliance Management
Railway Group Standards Change Procedures
3
01-Aug-98 Safety &
Standards
Compliance Development
Process
Translation of roles and terminology for Group Standards authorised before
1
01-Mar-94 Safety &
Standards
1/4/94
Compliance Development
Process
Temporary non-compliance with Railway Group Standards
2
01-Aug-98 Safety &
Standards
Compliance Development
Process
Subject Committees
1
01-Aug-98 Safety &
Standards
Compliance Development
Process
Derogations from Railway Group Standards
1
01-Aug-98 Safety &
Standards
Compliance Development
Process
Changes to Track Standards - A Response to the Hatfield Derailment
1
02-Dec-00 Engineering
Track Engineering
Assessment of Risks from Train Overruns at Terminal or Bay Platforms
1
01-Dec-01 Engineering
Track Engineering
Recommendations for the Design of Bridges
2
05-Aug-00 Engineering
Civil Engineering
Recommendations for the safe Management of structures
3
03-Apr-04 Engineering
Civil Engineering
Calculation of Enhanced Permissible Speeds for Tilting Trains
1
02-Jun-01 Engineering
Track Engineering
Standard Definitions of Civil Engineering Terms
1
01-Nov-96 Engineering
Track Engineering
Switches and Crossings
2
02-Dec-00 Engineering
Track Engineering
Track Standards Manual: Section 6 - Formation and Ballast
1
01-Sep-95 Engineering
Track Engineering
Track System Requirements
2
04-Oct-03 Engineering
Track Engineering
Track System Requirements
1
01-Apr-00 Engineering
Track Engineering
Rails and Rail Joints
2
05-Oct-02 Engineering
Track Engineering
Categorisation of Track
2
01-Oct-99 Engineering
Track Engineering
Rail Fastenings & Supports
1
07-Apr-01 Engineering
Track Engineering
Terminal Track - Managing the Risk
1
01-Oct-99 Engineering
Track Engineering
Equipment for the Signing of Temporary and Emergency Speed Restrictions
2
01-Dec-96 Engineering
Track Engineering
Safe Management of Structures
3
03-Apr-04 Engineering
Civil Engineering
Technical Approval Requirements for Changes to the Infrastructure
1
01-Jul-96
Engineering
Civil Engineering
Design Requirements for Structures
2
05-Aug-00 Engineering
Civil Engineering
Loading Requirements for the Design of Bridges
1
01-May-97 Engineering
Civil Engineering
st

Issue 46: 7 August 1 October 2004

Catalogue of Company Standards

TSI's
TRUE
TRUE
TRUE
FALSE
FALSE
FALSE
FALSE
TRUE
FALSE
FALSE
TRUE
TRUE
TRUE
TRUE
FALSE
TRUE
TRUE
TRUE
TRUE
FALSE
TRUE
TRUE

TRUE

TRUE

TRUE

TRUE

FALSE
FALSE
TRUE
TRUE
TRUE
FALSE
TRUE
TRUE
TRUE
TRUE
FALSE
TRUE
TRUE
TRUE
FALSE
TRUE
TRUE
TRUE
TRUE

Page 150

3. Reference Guide to Group Standards

Reference
GC/RT5122
GC/RT5143
GC/RT5151
GC/RT5152
GC/RT5153

Title
Bridge Strikes from Road Vehicles or Waterborne Vessels
Scour and Flooding - Managing the Risk
Safe Asset Management - Embankments and Cuttings
Mineral Extraction - Controlling the Risk
Subterranean Fires - Managing the Risk

Issue
4
2
2
2
1

GC/RT5161
GC/RT5164
GC/RT5180
GC/RT5201
GC/RT5202
GC/RT5203

Station Platform Design Requirements


Design Requirements for Roofs and Glazing
Safe Asset Management of Infrastructure - Tunnels
Lineside Security
Vegetation - Managing the risks
Infrastructure Requirements for Personal Safety in respect of Clearance & Access

2
1
2
2
1
3

GC/RT5212
GE/GN8510

Requirements for Defining and Maintaining Clearances


Railway Group Safety Performance Monitoring - Definitions and Guidance

1
2

GE/GN8518

Identification of Responsibilities at Stations

GE/GN8521

Facilities for Emergency Voice Communications with Control Rooms

Directorate
Engineering
Engineering
Engineering
Engineering
Safety &
Compliance
05-Aug-00 Engineering
01-Nov-95 Engineering
03-Jun-00 Engineering
01-Dec-99 Engineering
05-Dec-98 Engineering
03-Feb-01 Safety &
Compliance
01-Feb-03 Engineering
01-Feb-03 Safety &
Compliance
02-Feb-02 Railway
Estates
06-Apr-02 Engineering

GE/GN8522

RIDDOR 1995 - Supplementary Guidance on Statutory Reporting

01-Oct-99

GE/GN8526
GE/GN8532

Guidance on Safety Requirements for Cab Signalling Systems


Guidance Note: Railway Fog Signals

1
1

GE/GN8547

Guidance on the Reporting of Safety Related Information

GE/GN8549

Guidance Note: The Creation and Management of System Authorities

GE/GN8550

Guidance on Issues between Railway Group Standards and TSIs for High Speed
Operation
Guidance on the Preparation of Risk Assessments Within Railway Safety Cases

GE/GN8566

Changes to the Management of RGS resulting from the Implementation of


Directives on Interoperability

GE/GN8658

Guidance on the Safety Validation of Change

05-Oct-02

GE/RC8505

Recommendations for the Fire Safety of Materials at Operational Premises

07-Apr-01

GE/RC8514

Approved Code of Practice Hot Axle Bearing Detection

02-Jun-01

GE/RC8517

02-Jun-01

GE/RC8546

Recommendations for Systems for the Supervision of Enhanced Permissible Speeds 1


and Tilt Enable
Safety Communications
1

GE/RC8554

Management of Shared Information Systems

01-Jun-02

GE/RT8000 -M4

Floods and Snow

01-Jun-03

GE/RT8000-AC1

07-Jun-03

GE/RT8000-AC2

AC electrified lines - Part A Dangers of the system, description of equipment,


personal safety and communications Part B Emergency procedures
AC electrified lines - Working on or near to the OLE

07-Jun-03

GE/RT8000-AC3

AC electrified lines - Working of trains

07-Jun-03

GE/RT8000-G1

General Safety Responsibilities

07-Jun-03

GE/RT8000-G2

Personal Safety when walking on or near the line, or when on the lineside

07-Jun-03

GE/RT8000-M1

Train stopped by accident, fire or accidental division

07-Jun-03

GE/RT8000-M2

Train stopped by train failure

07-Jun-03

GE/RT8000-M4

Floods and snow

07-Jun-03

GE/RT8000-M5

Managing accidents

07-Jun-03

GE/RT8000-OTM Working of on-track machines (OTM) outside a possession

07-Jun-03

GE/RT8000-OTP

On-track plant

03-Apr-04

GE/RT8000-P1

Single line working

07-Jun-03

GE/GN8561

th

st

Issue 46: 7 August 1 October 2004

Catalogue of Company Standards

Issue Date
05-Oct-02
01-Nov-95
01-Dec-99
01-Dec-99
01-Nov-95

Safety &
Compliance
02-Dec-00 Engineering
07-Apr-01 Safety &
Compliance
01-Feb-03 Safety &
Compliance
01-Dec-01 Railway
Systems
04-Oct-03 Safety &
Compliance
01-Jun-02 Safety &
Compliance
01-Jun-02 Safety &
Compliance

05-Oct-02

Safety &
Compliance
Safety &
Compliance
Railway
Systems
Engineering
Safety &
Compliance
Safety &
Compliance
Safety &
Compliance
Safety &
Compliance
Safety &
Compliance
Safety &
Compliance
Safety &
Compliance
Safety &
Compliance
Safety &
Compliance
Safety &
Compliance
Safety &
Compliance
Safety &
Compliance
Safety &
Compliance
Safety &
Compliance
Safety &
Compliance

Ownership
Civil Engineering
Civil Engineering
Civil Engineering
Civil Engineering
Fire Safety Policy

TSI's
FALSE
FALSE
FALSE
FALSE
FALSE

Civil Engineering
Civil Engineering
Civil Engineering
Track Engineering
Track Engineering
Occupational Health
& Safety Policy
Track Engineering
Safety Support

TRUE
TRUE
FALSE
TRUE
FALSE
TRUE

Maintenance

TRUE

FALSE
FALSE

Electrification & Plant TRUE


Engineering
Occupational Health FALSE
& Safety Policy
Signal Engineering
TRUE
Operational Safety TRUE
Policy
Occupational Health FALSE
& Safety Policy
Rail Vehicle
TRUE
Engineering
Interoperability &
TRUE
Acceptance
Risk
FALSE
Standards
Development
Process
Safety Case
Management
Fire Safety Policy
Rail Vehicle
Engineering
Signal Engineering
Operational Safety
Policy
Operational Safety
Policy
Operational Safety
Policy
Operational Safety
Policy
Operational Safety
Policy
Operational Safety
Policy
Operational Safety
Policy
Operational Safety
Policy
Operational Safety
Policy
Operational Safety
Policy
Operational Safety
Policy
Operational Safety
Policy
Operational Safety
Policy
Operational Safety
Policy
Operational Safety
Policy

FALSE

FALSE
TRUE
TRUE
TRUE
FALSE
FALSE
FALSE
FALSE
FALSE
FALSE
FALSE
FALSE
FALSE
FALSE
FALSE
FALSE
FALSE
FALSE
FALSE

Page 151

3. Reference Guide to Group Standards

Reference
GE/RT8000-P2
GE/RT8000-S1
GE/RT8000-S2
GE/RT8000-S3
GE/RT8000-S4
GE/RT8000-S5
GE/RT8000-SP
GE/RT8000-SS1
GE/RT8000-SS2
GE/RT8000-T10
GE/RT8000-T11
GE/RT8000-T12
GE/RT8000-T1A
GE/RT8000-T1B
GE/RT8000-T2
GE/RT8000-T3
GE/RT8000-T4
GE/RT8000-T5
GE/RT8000-T6
GE/RT8000-T7
GE/RT8000-T8
GE/RT8000-T9
GE/RT8000-TS1
GE/RT8000-TS2
GE/RT8000-TS3
GE/RT8000-TS4
GE/RT8000-TS5
GE/RT8000-TS6
GE/RT8000-TS7
GE/RT8000-TS8
GE/RT8000-TW1
GE/RT8000-TW2
GE/RT8000-TW3
GE/RT8000-TW5
GE/RT8000-TW6
GE/RT8000-TW7
GE/RT8000-TW8

th

Title
Working single and bi-directional lines by pilotman

Issue Issue Date Directorate Ownership


1
07-Jun-03 Safety &
Operational Safety
Compliance Policy
Signals and indicators controlling train movements
1
07-Jun-03 Safety &
Operational Safety
Compliance Policy
Observing and obeying fixed signals
1
07-Jun-03 Safety &
Operational Safety
Compliance Policy
Train warning systems (AWS and TPWS) and reporting signalling failures and
1
07-Jun-03 Safety &
Operational Safety
irregularities
Compliance Policy
Trains or shunting movements detained, or vehicles left, on running lines
1
07-Jun-03 Safety &
Operational Safety
Compliance Policy
Passing a signal at danger
1
07-Jun-03 Safety &
Operational Safety
Compliance Policy
Speeds
1
07-Jun-03 Safety &
Operational Safety
Compliance Policy
Station duties and train dispatch
1
07-Jun-03 Safety &
Operational Safety
Compliance Policy
Shunting
1
07-Jun-03 Safety &
Operational Safety
Compliance Policy
Protecting personnel when working on rail vehicles and in sidings
1
07-Jun-03 Safety &
Operational Safety
Compliance Policy
Movements of engineering trains under T3 arrangements
1
07-Jun-03 Safety &
Operational Safety
Compliance Policy
Protecting personnel carrying out activities on the line that do not affect the safety 2
03-Apr-04 Safety &
Operational Safety
of the line.
Compliance Policy
Failure, renewal and maintenance of signalling equipment
1
07-Jun-03 Safety &
Operational Safety
Compliance Policy
Working of trains during failure, maintenance and renewal of signalling equipment 1
07-Jun-03 Safety &
Operational Safety
Compliance Policy
Protecting engineering work or a hand trolley on a line not under possession
1
07-Jun-03 Safety &
Operational Safety
Compliance Policy
Possession of the line for engineering work
1
07-Jun-03 Safety &
Operational Safety
Compliance Policy
Possession of a siding for engineering work
1
07-Jun-03 Safety &
Operational Safety
Compliance Policy
operating power-operated points by hand
1
07-Jun-03 Safety &
Operational Safety
Compliance Policy
Walking as a group and working on or near the line
1
07-Jun-03 Safety &
Operational Safety
Compliance Policy
Safe systems of work when walking or working on or near the line
1
07-Jun-03 Safety &
Operational Safety
Compliance Policy
Handsignalling duties
1
07-Jun-03 Safety &
Operational Safety
Compliance Policy
Loading and unloading rail vehicles during engineering work
1
07-Jun-03 Safety &
Operational Safety
Compliance Policy
Signalling General Instructions
1
07-Jun-03 Safety &
Operational Safety
Compliance Policy
Track Circuit Block Regulations
1
07-Jun-03 Safety &
Operational Safety
Compliance Policy
Absolute Block Regulations
1
07-Jun-03 Safety &
Operational Safety
Compliance Policy
Electric Token Block Regulations
1
07-Jun-03 Safety &
Operational Safety
Compliance Policy
Tokenless Block Regulations
1
07-Jun-03 Safety &
Operational Safety
Compliance Policy
Instructions for Out-of-Gauge Loads
1
07-Jun-03 Safety &
Operational Safety
Compliance Policy
No Signaller Token Regulations
1
07-Jun-03 Safety &
Operational Safety
Compliance Policy
One-Train Working Regulations
1
07-Jun-03 Safety &
Operational Safety
Compliance Policy
Preparation and movement of trains - General
1
07-Jun-03 Safety &
Operational Safety
Compliance Policy
Preparation and movement of multiple-unit passenger trains
1
07-Jun-03 Safety &
Operational Safety
Compliance Policy
Preparation and movement of locomotive-hauled trains (including HSTs, push-pull, 1
07-Jun-03 Safety &
Operational Safety
postal, parcels)
Compliance Policy
Preparation and movement of trains - Defective or isolated vehicles and on-train 1
07-Jun-03 Safety &
Operational Safety
equipment
Compliance Policy
Working single lines with or without a train staff or token
1
07-Jun-03 Safety &
Operational Safety
Compliance Policy
Wrong-direction movements
1
07-Jun-03 Safety &
Operational Safety
Compliance Policy
Level crossings
1
07-Jun-03 Safety &
Operational Safety
Compliance Policy

st

Issue 46: 7 August 1 October 2004

Catalogue of Company Standards

TSI's
FALSE
FALSE
FALSE
FALSE
FALSE
FALSE
FALSE
FALSE
FALSE
FALSE
FALSE
FALSE
FALSE
FALSE
FALSE
FALSE
FALSE
FALSE
FALSE
FALSE
FALSE
FALSE
FALSE
FALSE
FALSE
FALSE
FALSE
FALSE
FALSE
FALSE
FALSE
FALSE
FALSE
FALSE
FALSE
FALSE
FALSE

Page 152

3. Reference Guide to Group Standards

Reference
GE/RT8004

Title
Local Operations Instructions

Issue Issue Date Directorate Ownership


TSI's
1
06-Apr-02 Safety &
Operational Safety FALSE
Compliance Policy
Fire Safety of Materials at Operational Premises
1
07-Apr-01 Safety &
Fire Safety Policy
TRUE
Compliance
Interface between Rail Vehicle Weights and Underline Bridges
1
02-Dec-00 Engineering
Civil Engineering
TRUE
Controlling the speed of tilting trains through curves
1
01-Dec-99 Engineering
Signal Engineering
TRUE
Hot Axle Bearing Detection
1
02-Jun-01 Railway
Rail Vehicle
TRUE
Systems
Engineering
Electromagnetic Compatibility between Railway Infrastructure and Trains
1
05-Oct-02 Engineering
Rail Vehicle
FALSE
Engineering
Verification of Electrification Systems & Interactions with other Systems
1
03-Jun-00 Engineering
Electrification & Plant TRUE
Engineering
Mechanical trainstops
1
01-Feb-00 Engineering
Signal Engineering
TRUE
Tilting Trains: Controlling Tilt Systems to Maintain Clearances
1
01-Apr-00 Engineering
Rail Vehicle
TRUE
Engineering
Facilities for Emergency Voice Communications with Control Rooms
1
06-Apr-02 Engineering
Telecommunications TRUE
Engineering
Compatibility Between Electric Trains and Electrification Systems
1
07-Oct-00 Engineering
Electrification & Plant TRUE
Engineering
Persons Working On or Near to AC Electrified Lines
1
07-Oct-00 Engineering
Electrification & Plant TRUE
Engineering
Electrical Protective Provisions for Electrified Lines
1
06-Oct-01 Engineering
Electrification & Plant TRUE
Engineering
Safety Requirements for Cab Signalling System
1
02-Dec-00 Engineering
Signal Engineering
TRUE
Requirements for a Train Protection Warning System (TPWS)
1
05-Aug-00 Engineering
Signal Engineering
TRUE
National Confidential Safety Reporting System
1
01-Aug-01 Safety &
Occupational Health TRUE
Compliance & Safety Policy
Maintenance of Signal Visibility
1
01-Dec-01 Engineering
Signal Engineering
TRUE
Automatic Warning System (AWS)
1
06-Oct-01 Engineering
Signal Engineering
TRUE
Low Adhesion between the Wheel and the Rail - Managing the Risk
1
03-Aug-02 Safety &
Operational Safety FALSE
Compliance Policy
Safety Communications
1
05-Oct-02 Safety &
Operational Safety FALSE
Compliance Policy
Reporting of Safety Related Information
2
01-Feb-03 Safety &
Occupational Health FALSE
Compliance & Safety Policy
Positioning and Labelling of Lineside Telephones
1
02-Feb-02 Engineering
Telecommunications TRUE
Engineering
The Creation and Management of System Authorities
1
01-Dec-01 Railway
Rail Vehicle
TRUE
Systems
Engineering
Process for dealing with Issues between Railway Group Standards and TSIs for
1
05-Oct-02 Safety &
Standards
FALSE
High-Speed Operation
Compliance Development
Process
Rule Book Module Selection
2
05-Apr-03 Safety &
Operational Safety FALSE
Compliance Policy
Management of Shared Information Systems
1
01-Jun-02 Safety &
Operational Safety FALSE
Compliance Policy
Technical Requirements for Dispatch of Trains from Platforms
1
07-Jun-03 Engineering
Telecommunications FALSE
Engineering
Deterring Unauthorised Access and Vandalism
1
07-Feb-04 Engineering
Track Engineering
FALSE
Route Acceptance of Railway Vehicles including changes in Operation or
1
01-Feb-03 Safety &
Interoperability &
FALSE
Infrastructure
Compliance Acceptance
Drugs and Alcohol
1
01-Aug-96 Safety &
Occupational Health TRUE
Compliance & Safety Policy
Safety Validation of Organisational Change
1
01-Jan-96 Safety &
Safety Case
TRUE
Compliance Management
Changes in Working Hours - Safety Critical Work
1
01-Aug-96 Safety &
Occupational Health TRUE
Compliance & Safety Policy
Guidance on Automatic Ticket Gates at Stations
1
01-Feb-03 Engineering
Electrification & Plant FALSE
Engineering
Guidance Note: Prevention and Mitigation of Overruns - Risk Assessment
1
02-Dec-00 Engineering
Signal Engineering
TRUE
Low Voltage Electrical Installations
1
01-Jun-02 Engineering
Electrification & Plant FALSE
Engineering
Provision, Risk Assessment and Review of Level Crossings
1
05-Oct-02 Engineering
Signal Engineering
FALSE
Recommendations for the Management of Construction Work in the Operational 1
01-Aug-01 Engineering
Major Projects &
FALSE
Railway Environment
Investments
Product Acceptance of systems- equipment and materials
1
01-Apr-99 Safety &
Interoperability &
FALSE
Compliance Acceptance
The Management of Construction Work in the Operational Railway Environment 1
01-Aug-01 Engineering
Major Projects &
FALSE
Investments
Requirements for the Design- Operation and Maintenance of Points
1
02-Dec-00 Engineering
Track Engineering
TRUE
Prevention and Mitigation of Overruns - Risk Assessment
1
01-Dec-00 Engineering
Signal Engineering
TRUE
Low Voltage Electrical Installations
1
01-Jun-02 Engineering
Electrification & Plant FALSE
Engineering
Pipelines, Buried Services and Undertack Crossings
1
01-Jun-02 Safety &
Occupational Health FALSE
Compliance & Safety Policy

GE/RT8005
GE/RT8006
GE/RT8012
GE/RT8014
GE/RT8015
GE/RT8016
GE/RT8018
GE/RT8019
GE/RT8021
GE/RT8023
GE/RT8024
GE/RT8025
GE/RT8026
GE/RT8030
GE/RT8033
GE/RT8034
GE/RT8035
GE/RT8040
GE/RT8046
GE/RT8047
GE/RT8048
GE/RT8049
GE/RT8050

GE/RT8051
GE/RT8054
GE/RT8060
GE/RT8063
GE/RT8270
GH/RT4000
GH/RT4003
GH/RT4004
GI/GN7515
GI/GN7606
GI/GN7607
GI/GN7611
GI/RC7503
GI/RT7002
GI/RT7003
GI/RT7004
GI/RT7006
GI/RT7007
GI/RT7008

th

st

Issue 46: 7 August 1 October 2004

Catalogue of Company Standards

Page 153

3. Reference Guide to Group Standards

Reference
GI/RT7010

Title
Lighting of Railway Premises

GI/RT7011
GI/RT7014
GI/RT7015

Provision, Risk Assessment and Review of Level Crossings


Infrastructure Requirements at Stations
Automatic Ticket Gates at Stations

GI/RT7016
GI/RT7033

Interface Between Station Platforms, Track and Trains


Lineside Operational Safety Signs

GK/GN0525
GK/GN0611
GK/GN0802
GK/GN0806
GK/RC0606

22
21
2
1
2
1
3
2
1
2
2
1
1
4
2
E3
4
1

04-Oct-03
07-Jun-03
01-Oct-99
01-Oct-95
04-Oct-03
01-Jan-97
05-Aug-00
04-Oct-03
01-Sep-97
01-Apr-99
01-Jun-98
01-Dec-95
01-Dec-95
02-Feb-02
02-Feb-02
01-Jul-96
02-Dec-00
01-Nov-96

Engineering
Engineering
Engineering
Engineering
Engineering
Engineering
Engineering
Engineering
Engineering
Engineering
Engineering
Engineering
Engineering
Engineering
Engineering
Engineering
Engineering
Engineering

Signal Engineering
Signal Engineering
Signal Engineering
Signal Engineering
Signal Engineering
Signal Engineering
Signal Engineering
Signal Engineering
Signal Engineering
Signal Engineering
Signal Engineering
Signal Engineering
Signal Engineering
Signal Engineering
Signal Engineering
Signal Engineering
Signal Engineering
Signal Engineering

FALSE
FALSE
TRUE
TRUE
TRUE
TRUE
TRUE
TRUE
TRUE
TRUE
TRUE
TRUE
FALSE
TRUE
TRUE
TRUE
TRUE
FALSE

GK/RT0037
GK/RT0038
GK/RT0039
GK/RT0041
GK/RT0042
GK/RT0044
GK/RT0051
GK/RT0054
GK/RT0061
GK/RT0063
GK/RT0064
GK/RT0091

Signalling Control Centres


Guidance on Train Direction
Glossary of Signalling Terms
Signalling and Operational Telecommunications Systems: Safety Requirements
Reporting- Investigation and Safety Performance Monitoring of Trainborne
Signalling and Operational Telecommunications Systems
Manual of Signalling Principles Standards
Manual of Signalling Principles Standards
Use of Colours for Safety related Signalling applications
Alterations to permissible speeds
Identification of Signalling and Related Equipment
Identification of Signalling & Related Equipment
Train Detection
Signalling Control Centres
Signalling Control and Display Systems
Signallers' route lists
Resetting and Restoration to Service of Signalling Systems
Train activated warning systems
Signalling lockout systems for protection of Personnel On or Near the Line
Lineside signals and indicators
Provision of Lineside Signals
Lineside Signs
Lineside Signal Spacing
Transition between Lineside Signalling Systems and Other Systems of Train
Control
Signal Positioning and Visibility
Signing of Permissible Speeds and Speed Restrictions
Semaphore and Mechanical Signalling
Track Circuit Block
Absolute Block
Controls for Signalling a Train onto an occupied line
Single Line Control
Radio Electronic Token Block
Shunters Releases- Ground Frames- Switch Panels and Gate Boxes
Approach Locking & Train Operated Route Release
Provision of Overlaps- Flank Protection and Trapping
Driver s Reminder Appliance

4
2
1
1
1
1
1
1
2
1
1
2

06-Oct-01
02-Dec-00
01-Jul-97
01-Jul-97
01-Jul-97
01-Feb-00
01-Apr-99
01-Mar-98
01-Mar-98
01-Nov-96
02-Dec-00
02-Dec-00

Engineering
Engineering
Engineering
Engineering
Engineering
Engineering
Engineering
Engineering
Engineering
Engineering
Engineering
Engineering

TRUE
TRUE
TRUE
TRUE
TRUE
TRUE
TRUE
TRUE
FALSE
TRUE
TRUE
TRUE

GK/RT0101
GK/RT0105
GK/RT0106
GK/RT0114
GK/RT0186

Competence standards for S&T staff


The Transmission of Safety Related Information
Safety management of signalling failures
Special Inspection Notices (SINs)
Safety Requirements of Signal Post Telephone Systems

1
2
2
2
1

01-May-94
01-Oct-96
01-Aug-99
01-Nov-96
01-Oct-96

Engineering
Engineering
Engineering
Engineering
Engineering

GK/RT0193

Communications Links for Electrification Supervisory Systems

01-Jun-96

Engineering

GK/RT0210
GK/RT0217
GK/RT0300
GK/RT0330
GL/RT1252

Asset Management for the Safety of Signalling and Operational Telecommunication 1


Systems and Equipment
Technical Requirements for Axle Counters
1
Level Crossing Audio Warnings
1
Plug in and Interchangeable Signalling Equipment
1
Production and Management of Electrification Isolation
1

Signal Engineering
Signal Engineering
Signal Engineering
Signal Engineering
Signal Engineering
Signal Engineering
Signal Engineering
Signal Engineering
Signal Engineering
Signal Engineering
Signal Engineering
Rail Vehicle
Engineering
Signal Engineering
Signal Engineering
Signal Engineering
Signal Engineering
Telecommunications
Engineering
Telecommunications
Engineering
Signal Engineering

01-Feb-03
01-Aug-98
01-Oct-98
01-Apr-00

Engineering
Engineering
Engineering
Engineering

GL/RT1253

Mitigation of DC Stray Current Effects

01-Apr-00

Engineering

GL/RT1254

Electrified Lines Traction Bonding

01-Apr-00

Engineering

GM/GN2560

Guidance on Structural Requirements for Railway Vehicles

07-Oct-00

Engineering

GM/GN2561

Guidance Note: Compliance with RGSs - New Vehicles

03-Aug-02

Engineering

GM/GN2571

Guidance on the Storage and Recommissioning of Traction and Rolling Stock

01-Jun-02

Engineering

GM/GN2572

Guidance on the Provision of Automatic Train Protection Space Envelopes on Rail 1


Vehicles

02-Jun-01

Engineering

GK/RM0501
GK/RM0501/21
GK/RT0005
GK/RT0007
GK/RT0009
GK/RT0009/1
GK/RT0011
GK/RT0025
GK/RT0025/1
GK/RT0026
GK/RT0027
GK/RT0029
GK/RT0030
GK/RT0031
GK/RT0032
GK/RT0033
GK/RT0034
GK/RT0036

th

st

Issue 46: 7 August 1 October 2004

Catalogue of Company Standards

Issue Issue Date Directorate Ownership


TSI's
1
05-Oct-02 Engineering
Electrification & Plant FALSE
Engineering
1
05-Oct-02 Engineering
Signal Engineering
FALSE
1
07-Feb-04
Unresolved
FALSE
1
01-Feb-03 Engineering
Electrification & Plant FALSE
Engineering
1
07-Feb-04 Engineering
Civil Engineering
FALSE
1
07-Jun-03 Safety &
Signal Engineering
FALSE
Compliance
1
04-Oct-03 Engineering
Signal Engineering
FALSE
1
05-Aug-00 Engineering
Signal Engineering
TRUE
1
03-Apr-04 Engineering
Signal Engineering
FALSE
1
06-Apr-02 Engineering
Signal Engineering
TRUE
1
01-Aug-99 Engineering
Signal Engineering
TRUE

02-Dec-00 Engineering

TRUE
TRUE
TRUE
FALSE
TRUE
FALSE
FALSE

Signal Engineering
TRUE
Signal Engineering
FALSE
Signal Engineering
TRUE
Electrification & Plant TRUE
Engineering
Electrification & Plant FALSE
Engineering
Electrification & Plant TRUE
Engineering
Rail Vehicle
TRUE
Engineering
Rail Vehicle
FALSE
Engineering
Rail Vehicle
FALSE
Engineering
Rail Vehicle
TRUE
Engineering
Page 154

3. Reference Guide to Group Standards

Reference
GM/GN2575
GM/GN2575
GM/GN2576
GM/GN2590
GM/GN2690
GM/RC1500
GM/RC1501
GM/RC1503
GM/RC2509
GM/RC2510
GM/RC2513
GM/RC2514
GM/RC2515
GM/RC2516
GM/RC2516
GM/RC2518
GM/RC2519
GM/RC2559
GM/RC2566
GM/RC2680
GM/RM2525
GM/RM2525
GM/RT1040
GM/RT1041
GM/RT1042
GM/RT1201
GM/RT1251
GM/RT1310
GM/RT1403
GM/RT2000
GM/RT2001
GM/RT2003
GM/RT2004
GM/RT2020
GM/RT2023
GM/RT2025
GM/RT2026
GM/RT2027

th

Title
Guidance on Engineering Acceptance of On-Track Machines

Issue Issue Date Directorate Ownership


TSI's
1
05-Oct-02 Engineering
Rail Vehicle
FALSE
Engineering
Guidance on the Engineering Acceptance of On-Track Machines
2
05-Jun-04 Engineering
Rail Vehicle
FALSE
Engineering
Guidance on Vehicle Requirements for Reliable Track Circuit Operation
1
02-Aug-03 Engineering
Rail Vehicle
FALSE
Engineering
Traction and Rolling Stock - Vehicle Electrical Inter-connectors
1
05-Oct-02 Engineering
Rail Vehicle
FALSE
Engineering
Guidance Note on Traction and Rolling Stock Mechanical Coupling Systems
1
Engineering
Rail Vehicle
FALSE
Engineering
Code of practice for EMC between the railway and its neighbourhood
1
01-Dec-94 Engineering
Electrification & Plant TRUE
Engineering
Code of Practice - Maintenance of Jardine & Smith Warning Device
1
01-Jan-96 Engineering
Electrification & Plant FALSE
Engineering
Code of Practice - Use of Rail Mounted Cranes
1
01-Aug-98 Engineering
Rail Vehicle
TRUE
Engineering
Code of Practice for Traction and Rolling Stock Mechanical Coupling Systems
1
01-Jan-96 Engineering
Rail Vehicle
TRUE
Engineering
Code of Practice -Acceptance testing of rail vehicles
1
01-Jan-95 Engineering
Rail Vehicle
TRUE
Engineering
Commentary on Permissible Track Forces for Railway Vehicles
1
01-Feb-95 Engineering
Track Engineering
TRUE
Rail Vehicles Equipotential Bonding
3
03-Apr-04 Engineering
Rail Vehicle
TRUE
Engineering
Code of Practice - Engineering Development of Rail Vehicles
1
01-Jan-96 Engineering
Rail Vehicle
TRUE
Engineering
Code of Practice for the Training Requirements for Personnel who Undertake
1
01-Dec-95 Engineering
Rail Vehicle
FALSE
Maintenance
Engineering
Code of Practice for the Training Requirements for Training Personnel who
2
05-Oct-02 Engineering
Rail Vehicle
FALSE
Influence, Maintain or Overhaul Axle Bearings
Engineering
Code of Practice - Welding- Cutting and Repair of Railborne Plant
1
01-Dec-95 Engineering
Rail Vehicle
FALSE
Engineering
Code of Practice - Design and Construction of Freight Wagons
1
01-Dec-96 Engineering
Rail Vehicle
TRUE
Engineering
Railtrack Approved Code of Practice: Safe Testing of Rail Vehicles on Railtrack
1
07-Oct-00 Engineering
Rail Vehicle
TRUE
Controlled Infrastructure
Engineering
Recommendations for Railway Wheelsets associated with GM/RT2466
1
02-Aug-03 Engineering
Rail Vehicle
FALSE
Engineering
Visibility & Audibility Requirements for Trains
2
01-Feb-00 Engineering
Rail Vehicle
TRUE
Engineering
Wheelsets Manual
5
07-Jun-03 Engineering
Rail Vehicle
FALSE
Engineering
Wheelsets Manual
6
02-Aug-03 Engineering
Rail Vehicle
FALSE
Engineering
Safe Working on or Near Electrical Equipment
1
01-Aug-96 Engineering
Electrification & Plant TRUE
Engineering
Warning Signs and Notices for Electrified Lines
1
01-Aug-97 Engineering
Electrification & Plant TRUE
Engineering
Protection of 25kv AC Overhead Line Equip from the Effects of Op of Steam Loco 2
01-Jun-95 Engineering
Electrification & Plant TRUE
Engineering
Escalators and Passenger Conveyors on Railway Stations
1
01-Sep-96 Engineering
Electrification & Plant TRUE
Engineering
Escalators & Passenger Conveyors - Registration & Periodic Exam Details &
1
01-Dec-94 Engineering
Electrification & Plant TRUE
Records
Engineering
Design Requirements & Acceptance of Portable/Transportable Infra Plant & Equip 2
01-Dec-98 Engineering
Electrification & Plant TRUE
Engineering
Use of Plant & Work Equipment
1
01-Aug-98 Engineering
Electrification & Plant TRUE
Engineering
Engineering acceptance of rail vehicles
2
07-Oct-00 Engineering
Rail Vehicle
TRUE
Engineering
Design Scrutiny for the Engineering Acceptance of Rail Vehicles
1
01-Dec-97 Engineering
Rail Vehicle
TRUE
Engineering
Certification Requirements for Registration of Steam Locomotives
1
01-Dec-96 Engineering
Rail Vehicle
TRUE
Engineering
Rail vehicle maintenance and overhaul policy
2
01-Oct-99 Engineering
Rail Vehicle
FALSE
Engineering
Policy for the Eng of Wheelsets Used on Railtrack Lines (held in GM/RM2525)
1
01-May-94 Engineering
Rail Vehicle
TRUE
Engineering
Wheelset Manufacture
1
01-Sep-95 Engineering
Rail Vehicle
TRUE
Engineering
Branding of Wheels- Tyres and Axles
2
01-Oct-96 Engineering
Rail Vehicle
TRUE
Engineering
Wheelsets : In Service Safety and Maintenance Attention
2
01-Jul-96
Engineering
Rail Vehicle
TRUE
Engineering
Wheelsets: Off Vehicle Repair and Overhaul (held in GM/RM2525)
1
01-Jun-94 Engineering
Rail Vehicle
TRUE
Engineering
st

Issue 46: 7 August 1 October 2004

Catalogue of Company Standards

Page 155

3. Reference Guide to Group Standards

Reference
GM/RT2028

Title
Wheelset Design

GM/RT2030

Axle Bearing Maintenance and Overhaul

GM/RT2040

Calculation of Brake Force Data for Rolling Stock Library

GM/RT2041

Braking System and Performance for Trailer Coaching Stock

GM/RT2042

Braking System and Performance for Traction Units

GM/RT2043

Braking System & Performance for Freight Trains

GM/RT2044

Braking System Requirements and Performance for Multiple Units

GM/RT2045

Braking Principles for Rail Vehicles

GM/RT2046

Braking System Requirements and Performance for Trains which Operate above
125 mile/h
Structural Requirements for Railway Vehicles

GM/RT2100
GM/RT2101
GM/RT2102

Requirements for the Design- Construction- Test & Use of Tanks of Rail Tank
Wagons
Structural Requirements for Drawgear and Buffers on Railway Vehicles

GM/RT2120

Requirement for the Control of Risks Arising from Fire on Railway Vehicles

GM/RT2141

Resistance of Railway Vehicles to Derailment and Roll-over

GM/RT2142

Resistance of Railway Vehicles to Overturning in Gales

GM/RT2149

Requirements for Defining and Maintaining the Size of Railway Vehicles

GM/RT2160

Ride Vibration and Noise Environment Inside Railway Vehicles

GM/RT2161

Requirements for Driving Cabs of Railway Vehicles

GM/RT2162

Traincrew Access to and Egress from Railway Vehicles

GM/RT2176

Air Quality and Lighting Environment for Traincrew Inside Railway Vehicles

GM/RT2177

Emergency and Safety Equipment and Signs on Rail Vehicles

GM/RT2180

Visibility & Audibility Requirements for Trains

GM/RT2181

Overhead Line Equipment (OLE) Warning Line on Traction and Rolling Stock

GM/RT2185

Train Safety Systems

GM/RT2190

Mechanical & Electrical Inter Vehicle Coupling Systems

GM/RT2190

Requirements for Rail Vehicle Mechanical and Electrical Coupling Systems

GM/RT2210

Identification of Railway Vehicles

GM/RT2260

Design for Recovery of Rail Vehicles After Accidents

GM/RT2273

Post Incident & Post Accident Testing of Vehicles

GM/RT2300

Warning signs & Labels fittes to Electrical Equipment on Rail Mounted Vehicles

GM/RT2304

Equipotential Bonding of Rail Vehicles to Running Rail Potential

GM/RT2307
GM/RT2400

Self contained electrical power supply systems fitted to infrastructure support


vehicles
Design of On-Track Machines

GM/RT2450

Supplier qualification-Safety critical services

GM/RT2451

Magnetic Particle Inspection

GM/RT2452

Accept of Trams/Light Rail or Metro Vehicles for shared Running on RT


Controlled Infra
Registration and Mandatory Data for Rail Vehicles

GM/RT2453

th

st

Issue 46: 7 August 1 October 2004

Catalogue of Company Standards

Issue Issue Date Directorate Ownership


1
01-Oct-98 Engineering
Rail Vehicle
Engineering
2
05-Oct-02 Engineering
Rail Vehicle
Engineering
1
01-May-95 Engineering
Rail Vehicle
Engineering
2
01-Apr-00 Engineering
Rail Vehicle
Engineering
2
01-Apr-00 Engineering
Rail Vehicle
Engineering
1
01-Apr-98 Engineering
Rail Vehicle
Engineering
4
02-Jun-01 Engineering
Rail Vehicle
Engineering
2
01-Apr-00 Engineering
Rail Vehicle
Engineering
1
01-Apr-00 Engineering
Rail Vehicle
Engineering
3
07-Oct-00 Engineering
Rail Vehicle
Engineering
1
01-May-96 Engineering
Rail Vehicle
Engineering
1
01-Aug-94 Engineering
Rail Vehicle
Engineering
2
03-Apr-04 Safety &
Rail Vehicle
Compliance Engineering
2
07-Oct-00 Engineering
Rail Vehicle
Engineering
2
07-Oct-00 Engineering
Rail Vehicle
Engineering
3
01-Feb-03 Engineering
Rail Vehicle
Engineering
2
07-Oct-00 Engineering
Rail Vehicle
Engineering
1
01-Aug-95 Engineering
Rail Vehicle
Engineering
1
01-Nov-95 Engineering
Rail Vehicle
Engineering
1
01-Dec-95 Engineering
Rail Vehicle
Engineering
1
01-Jan-95 Engineering
Rail Vehicle
Engineering
3
01-Feb-00 Engineering
Rail Vehicle
Engineering
3
01-Apr-98 Engineering
Rail Vehicle
Engineering
2
01-Dec-01 Engineering
Rail Vehicle
Engineering
1
01-May-98 Engineering
Rail Vehicle
Engineering
2
07-Feb-04 Engineering
Rail Vehicle
Engineering
2
01-Mar-96 Engineering
Rail Vehicle
Engineering
1
01-Jun-95 Engineering
Rail Vehicle
Engineering
1
01-Feb-99 Engineering
Rail Vehicle
Engineering
1
01-Aug-96 Engineering
Rail Vehicle
Engineering
3
03-Apr-04 Engineering
Rail Vehicle
Engineering
1
01-Apr-95 Engineering
Rail Vehicle
Engineering
2
07-Dec-02 Engineering
Rail Vehicle
Engineering
1
01-Dec-95 Engineering
Rail Vehicle
Engineering
1
01-May-99 Engineering
Rail Vehicle
Engineering
1
01-Feb-99 Safety &
Interoperability &
Compliance Acceptance
1
07-Oct-00 Engineering
Rail Vehicle
Engineering

TSI's
TRUE
TRUE
TRUE
TRUE
TRUE
TRUE
TRUE
TRUE
TRUE
TRUE
TRUE
TRUE
TRUE
TRUE
TRUE
FALSE
TRUE
TRUE
TRUE
TRUE
TRUE
TRUE
TRUE
TRUE
TRUE
FALSE
TRUE
TRUE
TRUE
TRUE
TRUE
TRUE
TRUE
TRUE
FALSE
FALSE
TRUE

Page 156

3. Reference Guide to Group Standards

Reference
GM/RT2455

Title
Freight Vehicle In-Service Inspections

Issue Issue Date Directorate Ownership


TSI's
1
01-Oct-99 Engineering
Rail Vehicle
TRUE
Engineering
GM/RT2456
Structural Requirements for Windscreens and Windows on Railway vehicles
2
06-Apr-02 Engineering
Rail Vehicle
TRUE
Engineering
GM/RT2457
Structural Requirements for Doors and Gangways on Railway vehicles
1
01-Apr-00 Engineering
Rail Vehicle
TRUE
Engineering
GM/RT2459
Data to be Displayed on Rail Vehicles
1
02-Dec-00 Engineering
Rail Vehicle
TRUE
Engineering
GM/RT2461
Sanding Equipment Fitted to Multiple Units and On- Track Machines
1
01-Aug-01 Engineering
Rail Vehicle
TRUE
Engineering
GM/RT2462
Internal Combustion Engines in Rail Vehicles
1
07-Apr-01 Engineering
Rail Vehicle
TRUE
Engineering
GM/RT2463
Design and Operation of Wheelskates
1
01-Feb-03 Engineering
Rail Vehicle
FALSE
Engineering
GM/RT2468
Rail Vehicles Overall Design- Risk Assessment and Certification
1
02-Jun-01 Engineering
Rail Vehicle
TRUE
Engineering
GM/RT2470
Wheel Supplier Qualification
1
03-May-02 Engineering
Rail Vehicle
FALSE
Engineering
GM/RT2472
Data Recorders on Trains - Design Requirements
1
01-Jun-02 Engineering
Rail Vehicle
FALSE
Engineering
GM/RT2473
Power Operated External Doors on Passenger Carrying Rail Vehicles
1
01-Feb-03 Engineering
Rail Vehicle
FALSE
Engineering
GM/RT2476
On-Track Machine Requirements for Demonstrating the Reliable Operation of
1
02-Aug-03 Engineering
Rail Vehicle
TRUE
Track Circuits
Engineering
GM/RT2477
TCA Configuration for Rail Vehicles
1
02-Aug-03 Engineering
Rail Vehicle
TRUE
Engineering
GM/TT0083
Wheelset Records (held in GM/RM2525)
1
01-May-93 Engineering
Rail Vehicle
TRUE
Engineering
GM/TT0088
Permissible Track Forces for Railway Vehicles
1
01-Oct-93 Engineering
Rail Vehicle
TRUE
Engineering
GM/TT0089
Geometric Interfaces Between Railway Wheelsets and Track (held in
1
01-Feb-94 Engineering
Rail Vehicle
TRUE
GM/RM2525)
Engineering
GM/TT0101
Clearance requirements for electrified lines and TR&S
1
01-Feb-94 Engineering
Electrification & Plant FALSE
Engineering
GM/TT0120
Wheelset Training (held in GM/RM2525)
1
01-May-93 Engineering
Rail Vehicle
TRUE
Engineering
GM/TT0136
Plant and Machine Room Management
1
01-Mar-93 Engineering
Electrification & Plant TRUE
Engineering
GM/TT0146
Lighting of Railway Premises
1A 01-Oct-93 Engineering
Electrification & Plant FALSE
Engineering
GO/GN3552/A/MF Signal Passed At Danger (SPAD) Data Collection Form (Infrustructure Controller) 2
01-Oct-02 Engineering
Signal Engineering
FALSE
GO/GN3552/B-MF Signal Passed At Danger (SPAD) Data Collection Form (Train Operators and
3
Engineering
Signal Engineering
FALSE
others)
GO/GN3552A
Guidance and Instructions for Completing (SPAD) Data collection form
3
05-Oct-02 Safety &
Operational Safety FALSE
(Infrastructure controller)
Compliance Policy
GO/GN3552B
Guidance and Instructions for Completing Signal Passed at Danger (SPAD) Data 4
05-Oct-02 Safety &
Operational Safety FALSE
Collection Form (Train Operator and Others)
Compliance Policy
GO/GN3575
Guidance Note: Operational Requirements for the Dispatching of Trains from
1
07-Feb-04 Safety &
Operational Safety FALSE
Platforms
Compliance Policy
GO/GN3626
Guidance on Dangerous Goods - Rail Carriage Arrangements and Risk
1
07-Dec-02 Safety &
Operational Safety FALSE
Management
Compliance Policy
GO/GN3652
Guidance on Category 'A' SPAD Investigations
1
04-Oct-03 Safety &
Operational Safety FALSE
Compliance Policy
GO/GN3671
Incident Response Planning
1
06-Apr-02 Safety &
Security Specialist
TRUE
Compliance
GO/GN3672
Incident Management and Evidence Gathering
1
06-Apr-02 Safety &
Security Specialist
TRUE
Compliance
GO/GN3673
Guidance Note: Formal Inquiries, Formal Investigations and Local Investigations 2
03-Aug-02 Safety &
Accident
FALSE
Compliance Investigation
GO/GN3674
Guidance on Dangerous Goods - Rail Served Facilities
1
07-Dec-02 Safety &
Operational Safety FALSE
Compliance Policy
GO/OT0011
Protection at Footpath and Bridleway Level Crossings
1
01-Oct-93 Safety &
Operational Safety FALSE
Compliance Policy
GO/OTS300
Power Operated External Doors on Passenger Carrying Rail Vehicles
1
01-Dec-93 Engineering
Rail Vehicle
TRUE
Engineering
GO/OTS303
Secondary Door Locking Operational Requirements
1
01-Jan-93 Engineering
Rail Vehicle
FALSE
Engineering
GO/RC3500
Pre-planned temporary block working
1
01-Jun-95 Safety &
Operational Safety FALSE
Compliance Policy
GO/RC3501
Temporary Block Working in Emergency Situations
1
01-Jun-95 Safety &
Operational Safety FALSE
Compliance Policy
GO/RC3537
Defective On-Train Equipment
1
05-Aug-00 Safety &
Operational Safety TRUE
Compliance Policy
GO/RC3551
Approved Code of Practice - Train Driving
3
01-Oct-02 Safety &
Operational Safety FALSE
Compliance Policy
th

st

Issue 46: 7 August 1 October 2004

Catalogue of Company Standards

Page 157

3. Reference Guide to Group Standards

Reference
GO/RC3555

Title
Railtrack Approved Code of Practice - Train Working

GO/RC3558
GO/RC3560
GO/RC3571
GO/RC3900
GO/RM3053
GO/RM3056
GO/RM3420
GO/RT3053/1
GO/RT3053/2
GO/RT3053/A
GO/RT3053/C
GO/RT3053/D
GO/RT3053/E
GO/RT3053/F
GO/RT3053/G
GO/RT3053/H
GO/RT3090
GO/RT3091
GO/RT3093
GO/RT3100
GO/RT3100/11
GO/RT3201
GO/RT3204
GO/RT3208
GO/RT3209
GO/RT3210
GO/RT3259
GO/RT3260
GO/RT3261
GO/RT3263
GO/RT3271
GO/RT3272
GO/RT3279
GO/RT3350
GO/RT3352
GO/RT3355

th

Issue Issue Date Directorate Ownership


TSI's
1
07-Oct-00 Safety &
Operational Safety TRUE
Compliance Policy
Persons responsible for protecting work on or near the line.
1
01-Jun-99 Safety &
Occupational Health FALSE
Compliance & Safety Policy
Code of Practice - Competence Assessment
1
01-Aug-98 Safety &
Occupational Health TRUE
Compliance & Safety Policy
Driver Only Operation (Passenger)
1
01-Apr-99 Safety &
Operational Safety TRUE
Compliance Policy
Recommendations for Safe Freight Train Operation and Loading
1
01-Dec-03 Safety &
Operational Safety FALSE
Compliance Policy
Working Manual for Rail Staff (Pink Pages) - Handling/carriage of dangerous goods 1
01-Apr-98 Safety &
Operational Safety TRUE
Compliance Policy
Working Manual for Rail Staff-Freight Train Operations (White Pages)
1
01-Apr-98 Safety &
Operational Safety TRUE
Compliance Policy
Dangerous Goods- Rail Acceptance and Carriage Manual
3
07-Dec-02 Safety &
Operational Safety FALSE
Compliance Policy
List of Dangerous Goods with their United Nation Number, Dangerous Goods
1
01-Apr-98 Safety &
Operational Safety FALSE
Class and TOPS Commodity Code.
Compliance Policy
Bulk Traffic Dangerous Goods Wagon And Container Seperation Distance
1
01-Apr-98 Safety &
Operational Safety FALSE
Requirements/ Prohibitions
Compliance Policy
Classification, Acceptance and Identification
1
01-Apr-98 Safety &
Operational Safety FALSE
Compliance Policy
Marshalling, Movement and Loading
1
01-Apr-98 Safety &
Operational Safety FALSE
Compliance Policy
Dangerous Goods Facility Intructions
1
01-Apr-98 Safety &
Operational Safety FALSE
Compliance Policy
Hazard Identification
1
01-Apr-98 Safety &
Operational Safety FALSE
Compliance Policy
Fires and Incidents involving Dangerous Goods
1
01-Apr-98 Safety &
Operational Safety FALSE
Compliance Policy
Emergency Transhipment of Dangerous Goods
1
01-Apr-98 Safety &
Operational Safety FALSE
Compliance Policy
Carriage of Dangerous Goods by Parcel Services
1
01-Apr-98 Safety &
Operational Safety FALSE
Compliance Policy
The Approval Process for Propelled Movements within Absolute Possessions
3
01-Mar-96 Safety &
Operational Safety TRUE
Compliance Policy
DC Electrified Lines Instructions
2
01-Aug-98 Engineering
Electrification & Plant TRUE
Engineering
The Planning Requirements for Operational Safety of Engineering Work
2
01-Dec-99 Safety &
Operational Safety FALSE
Compliance Policy
Changes to Specified Operations Publications for June 2004
14
05-Jun-04 Engineering
Rail Vehicle
FALSE
Engineering
Changes to Specified Operations Publications for August 2003
11
02-Aug-03 Safety &
Operational Safety TRUE
Compliance Policy
Working of Passenger Trains over Non-Passenger Lines
2
07-Oct-00 Safety &
Operational Safety TRUE
Compliance Policy
Protection of Temporary Vehicular Level Crossings
1
01-Feb-95 Safety &
Operational Safety FALSE
Compliance Policy
Special arrangements for dealing with non operation of track circuits during leaf 2
01-Aug-98 Safety &
Operational Safety FALSE
fall
Compliance Policy
Format and Content of the Weekly Operating Notice
4
01-Aug-01 Safety &
Operational Safety TRUE
Compliance Policy
Format and Content of the Periodical Operating Notice
3
01-Aug-01 Safety &
Operational Safety TRUE
Compliance Policy
Competence and Fitness Requirements for Signallers and Crossing Keepers
2
02-Jun-01 Safety &
Operational Safety FALSE
Compliance Policy
Competence Management for Safety Critical Work
2
01-Aug-98 Safety &
Occupational Health TRUE
Compliance & Safety Policy
Persons in Charge of Possession (PICOP) & Engineering Supervisors (ES) Standard 2
01-Dec-99 Safety &
Occupational Health FALSE
Compliance & Safety Policy
Auxiliary Operating Duties
1
01-Sep-97 Safety &
Operational Safety FALSE
Compliance Policy
Driver Only Operation
1
01-Apr-99 Safety &
Operational Safety TRUE
Compliance Policy
Data Recorders on Trains - Operating Requirements
3
01-Jun-02 Safety &
Operational Safety FALSE
Compliance Policy
High Visibility Warning Clothing
5
01-Dec-99 Safety &
Occupational Health TRUE
Compliance & Safety Policy
Communication of Urgent Operating Advice
1
07-Oct-00 Safety &
Operational Safety FALSE
Compliance Policy
Lookouts and Site Wardens
1
01-Apr-95 Safety &
Occupational Health FALSE
Compliance & Safety Policy
Portable Warning Equipment
1
01-Oct-95 Safety &
Occupational Health FALSE
Compliance & Safety Policy

st

Issue 46: 7 August 1 October 2004

Catalogue of Company Standards

Page 158

3. Reference Guide to Group Standards

Reference
GO/RT3358

Title
Persons Responsible for Protecting Work On or Near the Line

GO/RT3400
GO/RT3406
GO/RT3407
GO/RT3410
GO/RT3411
GO/RT3421
GO/RT3422
GO/RT3423
GO/RT3425
GO/RT3434/10
GO/RT3436
GO/RT3437
GO/RT3471
GO/RT3472
GO/RT3473
GO/RT3475
GO/RT3607
GO/RT3612
GO/RT4100
GO/RT4100/1
GT/EHH802
GT/TDCAB091
GT/TDINT100
JDPC006
RS/102
RS/210

RS/601
RT3181/1
RT3199/1
SSP050
TD CAB018
TD GEN096
TD INT 023
TD RAD054
TMI TGEN0073

th

Issue Issue Date Directorate Ownership


TSI's
2
05-Aug-00 Safety &
Occupational Health FALSE
Compliance & Safety Policy
Requirements for Safe Freight Train Operation
1
01-Dec-03 Safety &
Operational Safety FALSE
Compliance Policy
Competence Requirements for Safe Loading of Rail Vehicles
1
01-Apr-96 Safety &
Operational Safety TRUE
Compliance Policy
Train Operation-Exceptional Load Documentation
1
01-Oct-98 Safety &
Operational Safety TRUE
Compliance Policy
Train Radio Communication
1
01-Jun-97 Engineering
Telecommunications TRUE
Engineering
Exceptional Weather Conditions - Managing the Risks
1
01-Mar-96 Safety &
Operational Safety FALSE
Compliance Policy
Dangerous Goods - Rail Conditions of Acceptance
1
07-Dec-02 Safety &
Operational Safety FALSE
Compliance Policy
Explosives - Rail Conditions of Acceptance and Carriage
1
07-Dec-02 Safety &
Operational Safety FALSE
Compliance Policy
Radioactive materials - Rail Conditions of Acceptance and Carriage
1
07-Dec-02 Safety &
Operational Safety FALSE
Compliance Policy
Management of Dangerous Goods Incident and Irregularity Information.
1
07-Dec-02 Safety &
Operational Safety FALSE
Compliance Policy
Instructions to Staff Seeking Evidence of Cause of serious Accident Plastic Card
2
05-Apr-03 Safety &
Security Specialist
FALSE
Compliance
Information for Safe Train Operation
1
01-Oct-98 Safety &
Operational Safety TRUE
Compliance Policy
Defective On-Train Equipment
3
05-Aug-00 Safety &
Operational Safety TRUE
Compliance Policy
Incident Response Planning
1
06-Apr-02 Safety &
Security Specialist
TRUE
Compliance
Incident Management and Evidence Gathering
1
06-Apr-02 Safety &
Security Specialist
TRUE
Compliance
Formal Inquiries, Formal Investigations and Local Investigations
2
03-Aug-02 Safety &
Accident
TRUE
Compliance Investigation
Operational Requirements for the Dispatching of Trains from Platforms
1
07-Feb-04 Safety &
Operational Safety FALSE
Compliance Policy
Operational Security-Accidents/Emergencies MOD-NTL
2
Safety &
Security Specialist
FALSE
Compliance
Operational Security - Military Passenger Movements
1
Safety &
Security Specialist
FALSE
Compliance
Rule Book Section Z (part I) - AC Electrified Lines
3
01-Dec-00 Engineering
Electrification & Plant TRUE
Engineering
Rule Book Section Z (Part 1) - AC Electrified Lines
1
05-Dec-98 Engineering
Electrification & Plant FALSE
Engineering
Standard for Telecomms Wiring and Terminations
1
01-Mar-94 Engineering
Telecommunications TRUE
Engineering
Telecommunications Jumper Wire
2
01-Jun-93 Engineering
Telecommunications FALSE
Engineering
Earthing and Equipotential Bonding of Telecommunications Equipment
1
01-Sep-93 Engineering
Telecommunications TRUE
Engineering
Class 140 - 165 Trains Not Fitted with Track Circuit Actuators
2
01-Oct-92 Engineering
Signal Engineering
FALSE
Safety Tours - A Good Practice Note
2
03-Feb-01 Safety &
Occupational Health FALSE
Compliance & Safety Policy
Railway Safety: Strategy for Railway Group Standards
1
01-Oct-00 Safety &
Standards
FALSE
Compliance Development
Process
Company Safety Plans- A Guidance Note
2
03-Aug-02 Safety &
Safety Case
FALSE
Compliance Management
Record of Arrangements for Protection of the line or of a Hand Trolley
1
01-Aug-99 Safety &
Occupational Health FALSE
Compliance & Safety Policy
Engineering Supervisors Certificate
0
Safety &
Occupational Health FALSE
Compliance & Safety Policy
Remote control standby arrangements
1
01-Jun-88 Engineering
Signal Engineering
TRUE
Applied Voltage and Transmission Level Maxima for Balanced-Pair Telecomm
2
01-Sep-91 Engineering
Telecommunications TRUE
Cables
Engineering
Telecomm Requirements for General and Emergency Use at Sub Surface Stations 1
01-Jan-92 Engineering
Telecommunications TRUE
Engineering
Protection of 2Mbits/s PCM on Physical Pairs from High Induced Voltages
1
01-Dec-87 Engineering
Telecommunications TRUE
Engineering
Procedures for the Use of Band 111/NRN Base Stations for Eng/Emergency Work 1
01-May-92 Engineering
Telecommunications FALSE
Engineering
Wiring and Termination Procedures
1
01-Feb-92 Engineering
Telecommunications TRUE
Engineering

st

Issue 46: 7 August 1 October 2004

Catalogue of Company Standards

Page 159

3. Reference Guide to Group Standards


For Railway Group Standard Information, a helpline is provided by RSSB:
External

Internal

Tel: 020 7904 7518


Fax: 020 7904 7791

085-77518
085-77791

The Enquiry Desk is available between the hours of 09:00 and 17:00.

th

st

Issue 46: 7 August 1 October 2004

Catalogue of Company Standards

Page 160

4. Railway Group Standards and Catalogue Index

4. Railway Group Standards and Catalogue Index


4.1. Railway Group Standards retained by Network Rail
The following documents which have been deleted from the Railway Group Standards catalogue have been retained by
Network Rail Company and hard copies are available from Ian Bolt; Document Control Manager, Network Rail (020 7557
8474). These documents are to be applied only as specified in Company Standards and/or the terms and conditions of contracts
or lease agreements with Network Rail Infrastructure Ltd (Part of the Network Rail Group of Companies).
Reference No.

Title

EH H202

Electricity at work regulations

EHQ/SP/S/030

Specification for the preparation of isolation diagrams and


instructions for a.c. Electrified lines

GK/EHV609

Safe working procedures for d.c. Electrified lines

GK/RC0689

Code of practice for the testing of level crossing telephone


systems

GK/RT0108

Policy for commissioning & handover of telecomms projects

GK/RT0187

Testing of signal post telephone concentrator systems

GK/RT0188

Testing of microprocessor controlled spt concentrator systems

GK/RT0191

Cable laying from rail wagons/mole plough

GK/RT0320

Specification for uhf local radio schemes

GS/DH2E30

Configuration control of solid state interlocking design


workstations (ssidws)

GS/ES1937

Engineering specification - ssi trackside data link surge protection


module

2A

SSI-ELS-DOC-3733

Design workstation graphics character set

SSI-ELS-DOC-4057

Setting up of design office simulation system (mk 1 hardware)

SSI-ELS-DOC-4254

Setting up of design office simulation system (mk 1 hardware)

SSI-9503

Solid state interlocking maintenance policy

SSI-MI303

Mk ii signalling system. Technical manuals

TII BRAD9049

Testing of radio systems for driver only operation

TI/TTEL 9071

Whiteley public emergency telephone system for use at railway


crossings

th

st

Issue 46: 7 August 1 October 2004

Health Warning

Catalogue of Company Standards

Mandatory from 3rd April


1999

Date

Nov 93

Jan 1996

Page 161

4. Railway Group Standards and Catalogue Index

4.2. Catalogue Index


Standard

Page

GS/SIN/055...............................78
GS/SIN/061...............................78
GS/SIN/062...............................78
RT/CE/C/001............................88
RT/CE/C/002............................88
RT/CE/C/003......................... 103
RT/CE/C/004......................... 103
RT/CE/C/006......................... 103
RT/CE/C/007......................... 103
RT/CE/C/008............................88
RT/CE/C/015............................89
RT/CE/C/016......................... 103
RT/CE/C/017......................... 103
RT/CE/C/018............................89
RT/CE/C/019............................89
RT/CE/C/025............................90
RT/CE/C/026............................90
RT/CE/C/030......................... 104
RT/CE/C/033......................... 104
RT/CE/C/039......................... 104
RT/CE/C/041............................90
RT/CE/C/045............................90
RT/CE/P/008.............................87
RT/CE/P/015.......................... 102
RT/CE/P/018.......................... 102
RT/CE/P/020.............................87
RT/CE/P/022.............................87
RT/CE/P/027.......................... 102
RT/CE/P/030.......................... 116
RT/CE/P/032.............................87
RT/CE/P/034.......................... 102
RT/CE/P/037.............................87
RT/CE/P/038.......................... 102
RT/CE/P/042.............................87
RT/CE/P/044.............................88
RT/CE/P/050.......................... 107
RT/CE/PWSI/004.................. 105
RT/CE/PWSI/006.................. 105
RT/CE/PWSI/007.................. 105
RT/CE/PWSI/009.................. 105
RT/CE/PWSI/010.................. 105
RT/CE/PWSI/011.................. 105
RT/CE/S/001.......................... 138
RT/CE/S/002.............................96
RT/CE/S/003.............................83
RT/CE/S/004.......................... 138
RT/CE/S/005.......................... 138
RT/CE/S/006.......................... 138
RT/CE/S/007.............................83
RT/CE/S/008.............................96
RT/CE/S/009.............................96
RT/CE/S/010.......................... 138
RT/CE/S/011.............................96
RT/CE/S/012.......................... 138
RT/CE/S/013.......................... 139
th

st

Issue 46: 7 August 1 October 2004

Standard

Page

RT/CE/S/014 ............................ 96
RT/CE/S/015 .......................... 139
RT/CE/S/016 .......................... 139
RT/CE/S/017 ............................ 83
RT/CE/S/019 .......................... 139
RT/CE/S/021 .......................... 139
RT/CE/S/023 .......................... 139
RT/CE/S/024 .......................... 140
RT/CE/S/025 .......................... 140
RT/CE/S/026 .......................... 140
RT/CE/S/027 .......................... 140
RT/CE/S/028 .......................... 140
RT/CE/S/029 .......................... 140
RT/CE/S/030 .......................... 141
RT/CE/S/032 ............................ 97
RT/CE/S/033 .......................... 141
RT/CE/S/034 ............................ 97
RT/CE/S/035 ............................ 83
RT/CE/S/036 ............................ 97
RT/CE/S/037 ............................ 97
RT/CE/S/038 ............................ 97
RT/CE/S/039 .......................... 136
RT/CE/S/040 .......................... 141
RT/CE/S/041 .......................... 136
RT/CE/S/042 ............................ 98
RT/CE/S/043 .......................... 141
RT/CE/S/044 ............................ 83
RT/CE/S/047 ............................ 84
RT/CE/S/048 ............................ 84
RT/CE/S/049 ............................ 98
RT/CE/S/050 ............................ 98
RT/CE/S/051 ............................ 98
RT/CE/S/052 .......................... 141
RT/CE/S/053 ............................ 98
RT/CE/S/054 ............................ 99
RT/CE/S/055 ............................ 99
RT/CE/S/056 ............................ 99
RT/CE/S/057 ............................ 99
RT/CE/S/061 ............................ 99
RT/CE/S/062 ............................ 99
RT/CE/S/063 .......................... 100
RT/CE/S/064 .......................... 100
RT/CE/S/069 .......................... 125
RT/CE/S/071 ............................ 84
RT/CE/S/072 .......................... 100
RT/CE/S/073 .......................... 100
RT/CE/S/076 ............................ 84
RT/CE/S/077 .......................... 100
RT/CE/S/080 ............................ 84
RT/CE/S/082 ............................ 85
RT/CE/S/083 ............................ 85
RT/CE/S/084 ............................ 85
RT/CE/S/085 ............................ 85
RT/CE/S/087 ............................ 85
RT/CE/S/088 ............................ 85
Catalogue of Company Standards

Standard

Page

RT/CE/S/089 ............................ 86
RT/CE/S/090 ............................ 86
RT/CE/S/091 ............................ 86
RT/CE/S/092 ............................ 86
RT/CE/S/096 ..........................100
RT/CE/S/097 ..........................100
RT/CE/S/101 ..........................101
RT/CE/S/102 ..........................101
RT/CE/S/103 ..........................101
RT/CE/S/104 ..........................101
RT/CE/S/130 ..........................141
RT/CE/S/131 ..........................141
RT/CE/S/132 ..........................101
RT/CE/S/140 ............................ 86
RT/CE/S/142 ............................ 86
RT/D/C/004 ...........................128
RT/D/C/087 ...........................122
RT/D/C/089 ...........................111
RT/D/G/091 ...........................111
RT/D/P/003 ............................116
RT/D/P/010 ............................120
RT/D/P/011 ............................120
RT/D/P/015 ............................114
RT/D/P/020 ............................109
RT/D/P/026 .............................. 17
RT/D/P/027 ............................109
RT/D/P/030 ............................109
RT/D/P/034 ............................110
RT/D/P/036 ............................110
RT/D/P/044 ............................110
RT/D/P/045 .............................. 17
RT/D/P/047 ............................110
RT/D/P/049 ............................110
RT/D/P/061 ............................120
RT/D/P/064 .............................. 17
RT/D/P/084 ............................120
RT/D/P/085 ............................102
RT/D/P/088 ............................108
RT/D/P/090 ............................111
RT/D/P/095 ............................120
RT/D/P/096 ............................120
RT/D/S/002 ............................119
RT/D/S/006 .............................. 51
RT/D/S/009 ............................119
RT/D/S/010 ............................119
RT/D/S/011 ............................109
RT/D/S/012 .............................. 41
RT/D/S/020 ............................109
RT/E/C/001 .............................. 62
RT/E/C/02012........................104
RT/E/C/02022.......................... 62
RT/E/C/02104.......................... 62
RT/E/C/10026.......................... 62
RT/E/C/10049.......................... 62
RT/E/C/10050.......................... 62
Page 162

4. Railway Group Standards and Catalogue Index


RT/E/C/10051 ..........................63
RT/E/C/10099 ..........................63
RT/E/C/10117 ..........................94
RT/E/C/10179 ..........................63
RT/E/C/11004 ..........................63
RT/E/C/11110 ..........................63
RT/E/C/11115 ..........................63
RT/E/C/11116 ..........................63
RT/E/C/11191 ..........................64
RT/E/C/11202 ..........................64
RT/E/C/11205 ..........................64
RT/E/C/11210 ..........................64
RT/E/C/11213 ..........................64
RT/E/C/11400 ..........................64
RT/E/C/11600 ..........................65
RT/E/C/11653 ..........................65
RT/E/C/11701 ..........................65
RT/E/C/11711 ..........................65
RT/E/C/11721 ..........................65
RT/E/C/11722 ..........................65
RT/E/C/11723 ..........................65
RT/E/C/11724 ..........................65
RT/E/C/11729 ..........................66
RT/E/C/11731 ..........................66
RT/E/C/11772 ..........................66
RT/E/C/11774 ..........................66
RT/E/C/11821 ..........................66
RT/E/C/17901 ..........................66
RT/E/C/17902 ..........................67
RT/E/C/17903 ..........................67
RT/E/C/17904 ..........................67
RT/E/C/18301 ..........................67
RT/E/C/18302 ..........................67
RT/E/C/19002 ..........................67
RT/E/C/19008 ..........................67
RT/E/C/19010 ..........................68
RT/E/C/19012 ..........................68
RT/E/C/19014 ..........................68
RT/E/C/19015 ..........................68
RT/E/C/19016 ..........................68
RT/E/C/19019 ..........................68
RT/E/C/19020 ..........................69
RT/E/C/19023 ..........................69
RT/E/C/19024 ..........................69
RT/E/C/19025 ..........................69
RT/E/C/19026 ..........................69
RT/E/C/19030 ..........................69
RT/E/C/19032 ..........................69
RT/E/C/19036 ..........................70
RT/E/C/19039 ..........................70
RT/E/C/19040 ..........................70
RT/E/C/19041 ..........................70
RT/E/C/19042 ..........................70
RT/E/C/19043 ..........................70
RT/E/C/19044 ..........................70
RT/E/C/19045 ..........................71
RT/E/C/19046 ..........................71
RT/E/C/19047 ..........................71
RT/E/C/19048 ..........................71
th

st

Issue 46: 7 August 1 October 2004

RT/E/C/19050.......................... 71
RT/E/C/19051.......................... 71
RT/E/C/19052.......................... 72
RT/E/C/19253.......................... 72
RT/E/C/19254.......................... 72
RT/E/C/19257.......................... 72
RT/E/C/19258.......................... 72
RT/E/C/19259.......................... 72
RT/E/C/19262.......................... 73
RT/E/C/19265.......................... 73
RT/E/C/19269.......................... 73
RT/E/C/19272.......................... 73
RT/E/C/27003.......................... 37
RT/E/C/27004.......................... 37
RT/E/C/27006.......................... 37
RT/E/C/27009.......................... 37
RT/E/C/27010.......................... 37
RT/E/C/27017.......................... 37
RT/E/C/27018.......................... 38
RT/E/C/27019.......................... 38
RT/E/C/27020.......................... 38
RT/E/C/27021.......................... 38
RT/E/C/27022.......................... 38
RT/E/C/30037.......................... 94
RT/E/C/31100.......................... 94
RT/E/C/31101.......................... 95
RT/E/C/31200.......................... 95
RT/E/C/31201.......................... 95
RT/E/C/45002.......................... 50
RT/E/C/50001.......................... 73
RT/E/C/50002.......................... 73
RT/E/C/50004.......................... 74
RT/E/C/50005.......................... 74
RT/E/C/50007.......................... 74
RT/E/C/50008.......................... 74
RT/E/C/50009.......................... 74
RT/E/C/50012.......................... 74
RT/E/C/50013.......................... 75
RT/E/C/50015.......................... 75
RT/E/C/50018.......................... 75
RT/E/C/65000........................ 106
RT/E/G/00003 ......................... 39
RT/E/G/00004 ......................... 39
RT/E/G/00007 ....................... 117
RT/E/G/00011 ......................... 39
RT/E/G/00013 ......................... 76
RT/E/G/00015 ......................... 39
RT/E/G/00018 ....................... 128
RT/E/G/00027 ......................... 42
RT/E/G/00028 ......................... 76
RT/E/G/02025 ......................... 76
RT/E/G/11710 ......................... 76
RT/E/G/11720 ......................... 76
RT/E/G/11730 ......................... 77
RT/E/G/11740 ......................... 77
RT/E/G/14202 ......................... 77
RT/E/G/24015 ......................... 39
RT/E/G/30065 ......................... 95
RT/E/G/50003 ......................... 77
Catalogue of Company Standards

RT/E/G/50014.......................... 77
RT/E/G/50016.......................... 95
RT/E/P/02009........................... 41
RT/E/P/02015.........................107
RT/E/P/02017........................... 41
RT/E/P/02018.........................107
RT/E/P/02020.........................107
RT/E/P/02106........................... 41
RT/E/P/02200.........................111
RT/E/P/02201........................... 41
RT/E/P/10013........................... 59
RT/E/P/10016........................... 59
RT/E/P/10024........................... 60
RT/E/P/10025........................... 60
RT/E/P/10072........................... 60
RT/E/P/10160........................... 60
RT/E/P/11120........................... 60
RT/E/P/11305........................... 60
RT/E/P/11654........................... 60
RT/E/P/13251........................... 61
RT/E/P/14000........................... 61
RT/E/P/14001........................... 61
RT/E/P/14004........................... 61
RT/E/P/14201........................... 61
RT/E/P/19000........................... 61
RT/E/P/19251........................... 61
RT/E/P/19607........................... 62
RT/E/P/24000........................... 35
RT/E/P/24001........................... 36
RT/E/P/24003........................... 36
RT/E/P/24009........................... 36
RT/E/P/24010........................... 36
RT/E/P/24011........................... 36
RT/E/P/24013........................... 36
RT/E/P/24020........................... 42
RT/E/P/30022........................... 93
RT/E/P/30026........................... 93
RT/E/P/30027........................... 93
RT/E/P/30029........................... 94
RT/E/P/30030........................... 94
RT/E/P/30066........................... 94
RT/E/P/40042........................... 49
RT/E/P/40064........................... 49
RT/E/PS/00002.......................132
RT/E/PS/00003.......................129
RT/E/PS/00005.......................132
RT/E/PS/00006.......................129
RT/E/PS/00007.......................129
RT/E/PS/00008.......................129
RT/E/PS/00009.......................132
RT/E/PS/00011.......................132
RT/E/PS/00012.......................132
RT/E/PS/00013.......................137
RT/E/PS/00014.......................137
RT/E/PS/00015.......................137
RT/E/PS/00016.......................131
RT/E/PS/00018.......................129
RT/E/PS/00021.......................129
RT/E/PS/00022.......................130
Page 163

4. Railway Group Standards and Catalogue Index


RT/E/PS/00025 ...................... 137
RT/E/PS/00026 ...................... 137
RT/E/PS/00027 ...................... 137
RT/E/PS/00028 ...................... 137
RT/E/PS/00030 ...................... 136
RT/E/PS/00032 ...................... 132
RT/E/PS/00801 ...................... 132
RT/E/PS/11755 ...................... 133
RT/E/PS/11756 ...................... 133
RT/E/PS/11757 ...................... 133
RT/E/PS/11760 ...................... 133
RT/E/PS/11761 ...................... 133
RT/E/PS/11762 ...................... 133
RT/E/PS/11763 ...................... 133
RT/E/PS/11764 ...................... 134
RT/E/PS/11765 ...................... 134
RT/E/S/02019 ........................ 107
RT/E/S/02023 ...........................51
RT/E/S/02024 ...........................51
RT/E/S/10015 ........................ 134
RT/E/S/10028 ...........................51
RT/E/S/10029 ...........................51
RT/E/S/10031 ........................ 134
RT/E/S/10039 ...........................51
RT/E/S/10040 ...........................52
RT/E/S/10041 ........................ 134
RT/E/S/10047 ...........................52
RT/E/S/10059 ........................ 134
RT/E/S/10060 ...........................52
RT/E/S/10062 ...........................52
RT/E/S/10064 ...........................52
RT/E/S/10065 ........................ 135
RT/E/S/10067 ...........................52
RT/E/S/10071 ...........................52
RT/E/S/10073 ...........................53
RT/E/S/10075 ...........................53
RT/E/S/10081 ...........................53
RT/E/S/10083 ...........................53
RT/E/S/10110 ...........................53
RT/E/S/10127 ...........................53
RT/E/S/10129 ...........................53
RT/E/S/10131 ...........................54
RT/E/S/10133 ...........................54
RT/E/S/10134 ...........................54
RT/E/S/10135 ...........................54
RT/E/S/10137 ...........................54
RT/E/S/10138 ...........................54
RT/E/S/10157 ...........................55
RT/E/S/10161 ...........................55
RT/E/S/10172 ...........................55
RT/E/S/10173 ...........................55
RT/E/S/10178 ...........................55
RT/E/S/10660 ...........................55
RT/E/S/10661 ...........................55
RT/E/S/10662 ...........................56
RT/E/S/11010 ...........................56
RT/E/S/11107 ...........................56
RT/E/S/11129 ...........................56
RT/E/S/11130 ...........................56
th

st

Issue 46: 7 August 1 October 2004

RT/E/S/11171........................... 56
RT/E/S/11189........................... 91
RT/E/S/11201........................... 56
RT/E/S/11221........................... 57
RT/E/S/11231........................... 57
RT/E/S/11303........................... 57
RT/E/S/11304........................... 57
RT/E/S/11630........................... 57
RT/E/S/11652........................... 57
RT/E/S/11655........................... 57
RT/E/S/11752........................... 58
RT/E/S/14002........................... 58
RT/E/S/14003........................... 58
RT/E/S/14200........................... 58
RT/E/S/17002........................... 58
RT/E/S/17004........................... 58
RT/E/S/17005........................... 58
RT/E/S/17503........................... 59
RT/E/S/17504........................... 59
RT/E/S/19551........................... 59
RT/E/S/19608........................... 59
RT/E/S/20000........................... 19
RT/E/S/21000........................... 25
RT/E/S/21001........................... 25
RT/E/S/21002........................... 25
RT/E/S/21003........................... 25
RT/E/S/21004........................... 25
RT/E/S/21005........................... 26
RT/E/S/21006........................... 26
RT/E/S/21007........................... 26
RT/E/S/21008........................... 26
RT/E/S/21009........................... 26
RT/E/S/21010........................... 27
RT/E/S/21011........................... 27
RT/E/S/21012........................... 27
RT/E/S/21014........................... 27
RT/E/S/21015........................... 27
RT/E/S/21016........................... 27
RT/E/S/21018........................... 28
RT/E/S/21019........................... 28
RT/E/S/21020........................... 28
RT/E/S/21021........................... 28
RT/E/S/21023........................... 28
RT/E/S/21024........................... 29
RT/E/S/21025........................... 29
RT/E/S/21026........................... 29
RT/E/S/21028........................... 29
RT/E/S/21030........................... 29
RT/E/S/21032........................... 30
RT/E/S/21033........................... 30
RT/E/S/21035........................... 30
RT/E/S/21036......................... 130
RT/E/S/21041......................... 130
RT/E/S/21046........................... 30
RT/E/S/21051........................... 30
RT/E/S/21053........................... 30
RT/E/S/21054........................... 31
RT/E/S/21055........................... 31
RT/E/S/21056........................... 31
Catalogue of Company Standards

RT/E/S/21057........................... 31
RT/E/S/21060........................... 31
RT/E/S/21063........................... 31
RT/E/S/21064........................... 31
RT/E/S/21066........................... 32
RT/E/S/21067........................... 32
RT/E/S/21068........................... 32
RT/E/S/21070........................... 32
RT/E/S/21071........................... 32
RT/E/S/21072........................... 43
RT/E/S/21073........................... 43
RT/E/S/21074........................... 32
RT/E/S/21075........................... 33
RT/E/S/21078........................... 33
RT/E/S/21081........................... 33
RT/E/S/21082.........................130
RT/E/S/21085........................... 33
RT/E/S/21087........................... 33
RT/E/S/21088........................... 33
RT/E/S/21094........................... 34
RT/E/S/21096........................... 34
RT/E/S/21101.........................130
RT/E/S/21104........................... 34
RT/E/S/21106........................... 34
RT/E/S/21107........................... 34
RT/E/S/21111........................... 34
RT/E/S/21112........................... 34
RT/E/S/21130........................... 35
RT/E/S/21131........................... 35
RT/E/S/21136.........................135
RT/E/S/21140........................... 35
RT/E/S/24017........................... 42
RT/E/S/29987........................... 35
RT/E/S/30002........................... 91
RT/E/S/30003........................... 91
RT/E/S/30023........................... 91
RT/E/S/30024........................... 91
RT/E/S/30025........................... 91
RT/E/S/30028........................... 92
RT/E/S/30031........................... 92
RT/E/S/30032........................... 92
RT/E/S/30033........................... 92
RT/E/S/30034........................... 92
RT/E/S/30035........................... 92
RT/E/S/30036........................... 93
RT/E/S/30047........................... 93
RT/E/S/31001........................... 93
RT/E/S/40001........................... 43
RT/E/S/40002.........................106
RT/E/S/40003........................... 43
RT/E/S/40004........................... 43
RT/E/S/40005........................... 43
RT/E/S/40006........................... 44
RT/E/S/40007........................... 44
RT/E/S/40008........................... 44
RT/E/S/40010........................... 44
RT/E/S/40011........................... 44
RT/E/S/40013........................... 44
RT/E/S/40015........................... 44
Page 164

4. Railway Group Standards and Catalogue Index


RT/E/S/40016............................45
RT/E/S/40017............................45
RT/E/S/40018......................... 106
RT/E/S/40019............................45
RT/E/S/40020......................... 106
RT/E/S/40021......................... 106
RT/E/S/40022............................45
RT/E/S/40023............................45
RT/E/S/40025............................45
RT/E/S/40026............................45
RT/E/S/40027............................45
RT/E/S/40028............................46
RT/E/S/40029............................46
RT/E/S/40030............................46
RT/E/S/40031............................46
RT/E/S/40032............................46
RT/E/S/40033............................46
RT/E/S/40034............................46
RT/E/S/40035............................46
RT/E/S/40036............................47
RT/E/S/40039............................47
RT/E/S/40040............................47
RT/E/S/40041............................47
RT/E/S/40043............................47
RT/E/S/40044............................47
RT/E/S/40045............................47
RT/E/S/40047............................48
RT/E/S/40049............................48
RT/E/S/40050............................48
RT/E/S/40051............................48
RT/E/S/40052............................48
RT/E/S/40053............................48
RT/E/S/40054............................48
RT/E/S/40055............................49
RT/E/S/40056............................49
RT/E/S/40063......................... 106
RT/E/S/40065............................49
RT/E/S/40067............................49
RT/E/WI/00100........................82
RT/E/WI/00101........................82
RT/E/WI/00102........................82
RT/E/WI/00103........................82
RT/E/WI/00104........................82
RT/E/WI/00105........................82
RT/E/WI/00108........................82
RT/E/WI/00109........................40
RT/E/WI/00110........................40

th

st

Issue 46: 7 August 1 October 2004

RT/ETE/INDEX ....................... 16
RT/K/P/013 .............................. 17
RT/LS/C/004 .......................... 114
RT/LS/C/005 .......................... 122
RT/LS/C/101 .......................... 118
RT/LS/C/102 .......................... 118
RT/LS/C/103 .......................... 118
RT/LS/C/105 .......................... 118
RT/LS/CAT001........................ 15
RT/LS/CAT003........................ 15
RT/LS/CAT004........................ 15
RT/LS/CAT005........................ 15
RT/LS/CAT006........................ 16
RT/LS/CAT007........................ 16
RT/LS/G/00002 ..................... 112
RT/LS/G/00009 ..................... 108
RT/LS/G/00012 ..................... 128
RT/LS/G/00014 ....................... 18
RT/LS/G/00022 ..................... 117
RT/LS/G/00023 ..................... 117
RT/LS/G/00030 ..................... 122
RT/LS/G/00032 ..................... 124
RT/LS/P/001 ........................... 115
RT/LS/P/002 ........................... 124
RT/LS/P/003 ........................... 126
RT/LS/P/005 ........................... 126
RT/LS/P/006 ........................... 126
RT/LS/P/007 ........................... 116
RT/LS/P/009 ........................... 121
RT/LS/P/013 ........................... 113
RT/LS/P/015 ........................... 113
RT/LS/P/017 ........................... 127
RT/LS/P/020 ........................... 123
RT/LS/P/026 ........................... 121
RT/LS/P/028 ........................... 127
RT/LS/P/029 ........................... 113
RT/LS/P/030 ........................... 103
RT/LS/P/031 ........................... 121
RT/LS/P/032 ........................... 114
RT/LS/P/034 ........................... 123
RT/LS/P/035 ........................... 121
RT/LS/P/036 ........................... 114
RT/LS/P/037 ........................... 121
RT/LS/P/039 ........................... 121
RT/LS/P/040 ........................... 127
RT/LS/P/041 ........................... 122
RT/LS/P/043 ........................... 127

Catalogue of Company Standards

RT/LS/P/044 ...........................116
RT/LS/P/045 ...........................115
RT/LS/P/046 ...........................122
RT/LS/P/050 ...........................127
RT/LS/P/051 ...........................127
RT/LS/P/052 ............................. 18
RT/LS/P/100 ...........................118
RT/LS/S/004............................125
RT/LS/S/008............................125
RT/LS/S/011............................125
RT/LS/S/012............................119
RT/LS/S/013............................125
RT/LS/S/014............................126
RT/LS/S/015............................116
RT/LS/S/016............................114
RT/LS/S/018............................126
RT/LS/S/019............................126
RT/LS/S/020............................126
RT/LS/S/021............................119
RT/S/P/200..............................128
RT/S/P/250..............................128
RT/SEL/2004 ..........................130
RT/SIN/055 .............................. 78
RT/SIN/063 .............................. 78
RT/SIN/064 .............................. 78
RT/SIN/065 .............................. 79
RT/SIN/067 .............................. 79
RT/SIN/068 .............................. 79
RT/SIN/069 .............................. 79
RT/SIN/070 .............................. 79
RT/SIN/071 .............................. 79
RT/SIN/072 .............................. 80
RT/SIN/073 .............................. 80
RT/SIN/074 .............................. 80
RT/SIN/077 .............................. 80
RT/SIN/078 .............................. 80
RT/SIN/079 .............................. 80
RT/SIN/080 .............................. 81
RT/SIN/081 .............................. 81
RT/SIN/083 .............................. 81
RT/SIN/084 .............................. 81
RT/SIN/085 .............................. 81
RT/SIN/300 .............................. 95
RT/SRS/2001 ..........................135
SIN/039 ..................................... 78
SIN/040 ..................................... 78

Page 165

You might also like