Open navigation menu
Close suggestions
Search
Search
en
Change Language
Upload
Sign in
Sign in
Download free for days
0 ratings
0% found this document useful (0 votes)
1K views
Weld Inspection Report - Sample
Documents
Uploaded by
Andis
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content,
claim it here
.
Available Formats
Download as PDF or read online on Scribd
Download now
Download
Save Weld Inspection Report - Sample For Later
Download
Save
Save Weld Inspection Report - Sample For Later
0%
0% found this document useful, undefined
0%
, undefined
Embed
Share
Print
Report
0 ratings
0% found this document useful (0 votes)
1K views
Weld Inspection Report - Sample
Documents
Uploaded by
Andis
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content,
claim it here
.
Available Formats
Download as PDF or read online on Scribd
Download now
Download
Save Weld Inspection Report - Sample For Later
Carousel Previous
Carousel Next
Download
Save
Save Weld Inspection Report - Sample For Later
0%
0% found this document useful, undefined
0%
, undefined
Embed
Share
Print
Report
Download now
Download
You are on page 1
/ 6
Search
Fullscreen
TWI training & Certineation WELD INSPECTION REPORT/SENTENCE SHEET WELD INSPECTION REPORT/SENTENCE SHEET PRINT FULLNAME guns _awweat uaa P SPECIMENNUMBER & & tom), EXTERNAL DEFECTS Defect Noted Code or Specification Reference | Defect Type Pipe/Plate | Accumulative ‘Maximum Section! Accept/Reject | Section Total Allowance | Table No | 1 2 3 4 5 Reinforcement (Height) | h-e Nu a = heeege Reinforcement (Appear) | A-¢ Ro trwot | Sawer | 14 ete Incomplete filled groove | a-c nw = eco Inadequate weld width = = = = detepe Slag Inclusions A-c Lz ac wel Lar wee lo Ryro Undercut Arc ba bet | og 2 Rage | Surface Porosity Te ge 8.0 a eter Crack/Cracklike Defects [a -C Ane = = hesspt | ‘Lack of Fusion kot 29 wee as & nelpe—| | Are strikes A-® te we NOt_pamurrrenl 4 epee Mechanical damage Ane AL = = freee Laps/Laminations Ace AN me = Keep | Misalignment ARC Boe ae “oe 5 Repecr | Longitudinal seams Ano pic — eal Aust: ROOT DEFECT: Misalignment Ae Bras ok co tarpet —| Excessive Penetration bee Bes 2 t eeopa— Lack of Root Penetration kee we = = heespe — Lack of Root Fusion hee Le 25 w Metre | | Root Concavity hee NL = = Keepy | Root Undereut Are Lz Déoc 24 & Keegy _| ‘Crack/Cracklike defects Toe ae = = Res Slag inclusions A-€ tz ws | tee wes \ beeegr Porosity hee ior 2 3 hey Laps/Laminations qe mL = = eg | ‘This “piped spexamined to the requirements of {code/specification} Bwlvt[eo and is accept cordingly. Date...... 24.46. 2. Sima. Ph gs *Delete which Is hot applicable oe Use the other side for any comments WIS 5 -PPR Issue 2 Date: 1301/02TWI training & certinestion * CSWIP VISUAL INSPECTION PLATE REPORT . Name (Block capitals) __Puvi_Auraentrn Q-_ Signature Mt Test piece identification _ © A Code/Specification used_ ew /Vt/ 60 Welding process__ MMA __Spint type__ S@qy Pant Welding position AG Length & thickness of plate 4S_® 5 Date 25 Avb__ Roose 5 | WELD FACE C § b z 8 THREE] gy WORKIN gel TS a z LF us wi airrin of fw 5 9 a ae, | = 2 7 / cod g _.| mo e [os = Mise nkege nse pL Umer He ue WIS $ -WIPPIZ issue 1. Date: 22/3/01, PeeSWI raining & Certification CSWIP VISUAL PLATE REPORT WELD ROOT Blo | a “3 Sener = 4 Tee CTT She pees 22) erat | | goqq WALVd SIHL Wows aansvaWw hoe + RL ihehion (eK = Wassdecome Waters gy uo lewon ote WIS 5 -WiPPI issue 1, Date: 22/301TWI araining & Certification WELD INSPECTION REPORT/SENTENCE SHEET PRINT FULL NAME Rup Noa 0 SPECIMEN NUMBER EK (men) EXTERNAL DEFECTS Defect Noted ‘Code or Specification Reference | | Defect Type ‘Accumulative Maximum Section/ | AcceptReject | ) ection Total Allowance | Table No } | 1 | 2 | 3 4 5 Reinforcement (Height) hon eae se 7.3e bactect Reinforcement (Appear) | 4 - 4 fox Sincox Sanoot 232 | Pepa | Incomplete filled groove | 4 — A tiga Be Hy wie | 7.3.2 eager 4 | Inadequate weld width AWA (ao. 52H pe toese] TBE eceey "Slag Inclusions sw taaswar | bo wie $230] kecepy Undereut hoa Lore Pug 08 | Ls Se & 300 ‘Surface Porosity Ae ga wes | (Crack/Cracklike Defects | q—a ie Sate FRC Lack of Fusion AoA AL cape ‘Are strikes A-k Liby we | Li age werge Mechanical damage R-A Lee = Laps/Laminations coe aa Misalignment Acs | Wed bes x | Longitudinal seams A-k fot = ee ‘ony Misalignment Ana Wel Excessive Penetration Ark tte a Lack of Root Penetration | 4-4 wile Lack of Root Fusion p-B Ls ay es Root Concavity A-A Nit pasty BM Root Undercut Anh Lie pcos] L:50 w 0 Crack/Cracklike defects ran WL re Chace Slag inclusions Ak 1 = Porosity a AL aa Laps/Laminations A-A aL a es Giri ac examined to the requirements of {code/specification)... ATT. and is fejectgPccordingly. Door - Signature. Anal eee Pe *Delete which ism Le Use the other side for any comments WIS 5-PPR tssue2 Date: 130102perenne WET Sere fer. Mat TE I training & Certification CSWIP Welding Inspection Practical Pipe | Pipe Weld Test Piece ID Number E14“ Diameter: \bo__ exe Wall Thickness mm Process: MMA Material _CA®®O6 Greet | Weld Preparation: Sq V__tart Inspection Carried out in Accordance With Specification: Art 04, 199g Face Side: Aw Burgos C tbs) Trae oT 2 nsf Ste ee Z, Sa 2 RET RTTEE] Liat bo rb C (ts) Diao) =f] GaADAL) ° =r] SES 2 a f oe eS SRS lace / / ae 7 once Lae y Date: 25 AG 2008 Signature: — KL bimeASomAL iN om ‘WIS 5 -WIPPI2 issue |. Date: 22/12/01 — BreesSiyg WELD Leal FUL Uae He — Pook FROFILg . “THR6UGH BUT CeNGTH +TWH training & certinieation CSWIP Welding Inspection Practical Pipe Root Side: > @ a | UNReCUT Fale OfTUM C-D «D> Woe > KL Dimes “Us ma genet ST HOTE THroost Cor qe welo edeTH Urey WermrTes Lanett Hoos! por tie wetr LesbtH oy WIS 5.WaPIa ie |. One 221201
You might also like
Aws D1.1 - WPS - Smaw-Fcaw PDF
PDF
No ratings yet
Aws D1.1 - WPS - Smaw-Fcaw PDF
1 page
Atf Wpqr-Blank v1
PDF
No ratings yet
Atf Wpqr-Blank v1
1 page
WPQ Format
PDF
100% (1)
WPQ Format
1 page
Welding Procedure Specifica Tion (WPS) : I I I I
PDF
No ratings yet
Welding Procedure Specifica Tion (WPS) : I I I I
5 pages
Pwps Jo Wps Asme 016 Rev.001
PDF
100% (1)
Pwps Jo Wps Asme 016 Rev.001
2 pages
Bend Test Result For Stud Welding
PDF
100% (2)
Bend Test Result For Stud Welding
1 page
3g Tar WPQTR Form Aws d1.1
PDF
100% (1)
3g Tar WPQTR Form Aws d1.1
2 pages
Welding Procedure Specification For GTAW
PDF
No ratings yet
Welding Procedure Specification For GTAW
9 pages
E WPQ Witness Format
PDF
No ratings yet
E WPQ Witness Format
1 page
NDT Map
PDF
100% (1)
NDT Map
1 page
WPS - P No. 8 To P No. 1 PDF
PDF
No ratings yet
WPS - P No. 8 To P No. 1 PDF
6 pages
PQR (GMAW) - Notes
PDF
No ratings yet
PQR (GMAW) - Notes
3 pages
Wps
PDF
No ratings yet
Wps
3 pages
Procedure Qualification Records (PQR) : in Accordance With ASME SECTION IX For Power Pipping
PDF
No ratings yet
Procedure Qualification Records (PQR) : in Accordance With ASME SECTION IX For Power Pipping
6 pages
Blank Sample WPS Form (SAW) Welding Procedure Specification (WPS)
PDF
No ratings yet
Blank Sample WPS Form (SAW) Welding Procedure Specification (WPS)
1 page
Welder List For WQT
PDF
0% (2)
Welder List For WQT
1 page
Welding Procedure Specification (WPS) : (Asme Sec. Ix)
PDF
No ratings yet
Welding Procedure Specification (WPS) : (Asme Sec. Ix)
1 page
ASME 9 Multi Process Welding Procedures QW200
PDF
No ratings yet
ASME 9 Multi Process Welding Procedures QW200
2 pages
WPQ Template (Asme Ix) No Logo
PDF
100% (1)
WPQ Template (Asme Ix) No Logo
4 pages
Welding Proposed Pwps For Our Jubail Work
PDF
100% (2)
Welding Proposed Pwps For Our Jubail Work
2 pages
Sample WPS 1
PDF
No ratings yet
Sample WPS 1
13 pages
Pre-Liminary WELDING PROCEDURE Specification (PWPS) : RDMP RU-V Balikpapan Project
PDF
No ratings yet
Pre-Liminary WELDING PROCEDURE Specification (PWPS) : RDMP RU-V Balikpapan Project
2 pages
WPS PQR-07
PDF
No ratings yet
WPS PQR-07
8 pages
Poposed Welding Procedure Specification (PWPS) : ASME Section IX, ASME Boiler and Pressure Code Ed.2015
PDF
No ratings yet
Poposed Welding Procedure Specification (PWPS) : ASME Section IX, ASME Boiler and Pressure Code Ed.2015
12 pages
Sample Forms AWS, ASME and API
PDF
No ratings yet
Sample Forms AWS, ASME and API
14 pages
WPS - 003 B
PDF
No ratings yet
WPS - 003 B
7 pages
WQT Parameter Recording Sheet
PDF
No ratings yet
WQT Parameter Recording Sheet
13 pages
IAETSD-PREPARATION OF W.P.S FOR STAINLESS STEEL (Ni, CR, Mo, Nu) WELDING PDF
PDF
100% (1)
IAETSD-PREPARATION OF W.P.S FOR STAINLESS STEEL (Ni, CR, Mo, Nu) WELDING PDF
3 pages
WPS Form - A - ENG
PDF
No ratings yet
WPS Form - A - ENG
1 page
Company Name Key Information Questions Answers File Reference Reviews & Approvals
PDF
No ratings yet
Company Name Key Information Questions Answers File Reference Reviews & Approvals
7 pages
Visual Inspection Report-Baitur
PDF
100% (1)
Visual Inspection Report-Baitur
5 pages
Sample PQR Form (GTAW & SMAW - Page 1) Procedure Qualification Record (PQR)
PDF
No ratings yet
Sample PQR Form (GTAW & SMAW - Page 1) Procedure Qualification Record (PQR)
2 pages
Filled WPS Single FCAW
PDF
No ratings yet
Filled WPS Single FCAW
3 pages
Welding Procedure Specification (WPS) : Page: 1/1
PDF
No ratings yet
Welding Procedure Specification (WPS) : Page: 1/1
5 pages
WPS Dissimilar 11.08 MM Max.
PDF
50% (2)
WPS Dissimilar 11.08 MM Max.
4 pages
WPS - 01 Structure PDF
PDF
No ratings yet
WPS - 01 Structure PDF
6 pages
AWS D1.1-D1.1M-2015 - Structural Welding Code-Steel Sample Form Report
PDF
100% (1)
AWS D1.1-D1.1M-2015 - Structural Welding Code-Steel Sample Form Report
36 pages
Fit-Up & Visual Report
PDF
No ratings yet
Fit-Up & Visual Report
1 page
WPS - 023
PDF
0% (1)
WPS - 023
10 pages
4 - PREPARATION OF WPS - Student
PDF
No ratings yet
4 - PREPARATION OF WPS - Student
22 pages
J 1 PQR GMAW FCAW D1.1 2020 Form
PDF
100% (1)
J 1 PQR GMAW FCAW D1.1 2020 Form
2 pages
Draf WPS
PDF
No ratings yet
Draf WPS
2 pages
WPS PQR PDF
PDF
100% (1)
WPS PQR PDF
23 pages
Wps Sa106 Grbeil Gtaw Smaw
PDF
No ratings yet
Wps Sa106 Grbeil Gtaw Smaw
5 pages
Welding Procedure Specification Sample
PDF
No ratings yet
Welding Procedure Specification Sample
5 pages
Witness Data Sheet For Welding Procedure Qualification Record
PDF
No ratings yet
Witness Data Sheet For Welding Procedure Qualification Record
1 page
BRE-Cathodic Protection Installation Procedure Rev. 1
PDF
No ratings yet
BRE-Cathodic Protection Installation Procedure Rev. 1
22 pages
Ultrasonic Testing Acceptance Criteria
PDF
100% (2)
Ultrasonic Testing Acceptance Criteria
4 pages
QAP For PQR'S - For Impact Testing
PDF
100% (1)
QAP For PQR'S - For Impact Testing
3 pages
RS 002 July 2014 (Welder Test Run Sheet Asep W)
PDF
No ratings yet
RS 002 July 2014 (Welder Test Run Sheet Asep W)
1 page
Wps For Ss 304
PDF
No ratings yet
Wps For Ss 304
3 pages
WPS & PQR 05 - 0001
PDF
No ratings yet
WPS & PQR 05 - 0001
15 pages
WQT Smaw
PDF
No ratings yet
WQT Smaw
1 page
WQT
PDF
100% (1)
WQT
1 page
PQR Run Sheet
PDF
No ratings yet
PQR Run Sheet
1 page
Fracture Test
PDF
100% (1)
Fracture Test
1 page
A36 WPS
PDF
No ratings yet
A36 WPS
1 page
Presentation FCAW
PDF
100% (1)
Presentation FCAW
27 pages
API Acceptance Criteria
PDF
No ratings yet
API Acceptance Criteria
1 page
Practical Plate - Pipe Inspection
PDF
No ratings yet
Practical Plate - Pipe Inspection
10 pages