0% found this document useful (0 votes)
350 views5 pages

ISO TC 67 Standards Update

This document provides a list of standards projects under the ISO TC 67 work programme. It includes information such as the project title, status, project leader, corresponding API and CEN/TC12 documents, ISO stage and timeline. There are over 40 ongoing projects related to petroleum, petrochemical and natural gas industries. The projects cover areas such as drilling fluids, well cementing, pipeline transportation systems, and materials selection. Most projects are revisions of existing standards and aim to provide specifications and testing methods for equipment and processes in the oil and gas industry.

Uploaded by

Marcelo Colombo
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
350 views5 pages

ISO TC 67 Standards Update

This document provides a list of standards projects under the ISO TC 67 work programme. It includes information such as the project title, status, project leader, corresponding API and CEN/TC12 documents, ISO stage and timeline. There are over 40 ongoing projects related to petroleum, petrochemical and natural gas industries. The projects cover areas such as drilling fluids, well cementing, pipeline transportation systems, and materials selection. Most projects are revisions of existing standards and aim to provide specifications and testing methods for equipment and processes in the oil and gas industry.

Uploaded by

Marcelo Colombo
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 5

STANDARDS ON ISO TC 67 WORK PROGRAMME LIST

TC SC WG

ISO

Title

Status Mid Feburary 2008


Project Leader

Corresponding API
Document

Corresponding
CEN/TC12 WI

ISO Stage
Target elapsed time in months
Cumulative Progress Percentage
67

13879

P&ngi - Content and drafting of a functional specification (reaffirmed till 2009)

Wright, M

67

13880

P&ngi - Content and drafting of a technical specification (reaffirmed till 2009)

Wright, M

67

13881

P&ngi - Classification and conformity assessment of products, processes and services


(technical report)(reaffirmed till 2006)

Wright, M

67

29001

Pp&ngi - Sector-specific quality management systems - Requirements for product and


service supply organisations (technical specification)(Rev. of ISO TS 29001:2003)

Durante, E

Spec Q1/ISO TS 29001

(UAP) ?

67

14224

Pp&ngi - Collection and exchange of reliability and maintenance data for equipment
(Rev. of ISO 14224:1999)

Kortner, H.

Std 689/
ISO 14224:2006

EN ISO 14224:2006

67

20815

Pp&ngi - Production assurance and reliability management

Kortner, H.

67

15546

P&ngi - Aluminium alloy drill pipe (Minor revision of ISO 15546:2002)

Polyachek, D.

EN ISO 15546:2007

67

20312

P&ngi - Recommended practice for design and operating limits of drill stem of
aluminium drill string

Polyachek, D.

prEN ISO 20312


(179)

67

27627

P&ngi - Alumimum alloy drill pipe thread connection gauging

Polyachek, D

221

67

15156-1

Milliams, D. / Tuttle, B.

(NACE MR 0175/ ISO


15156-1:2001)

EN ISO 15156-1:2001

67

15156-2

Milliams, D. / Tuttle, B.

(NACE MR 0175/
ISO 15156-2:2003)

EN ISO 15156-2:2003

67

15156-3

Milliams, D. / Tuttle, B.

(NACE MR 0175/
ISO 15156-3:2003)

EN ISO 15156-3:2003

67

23936-1

P&ngi - Materials for use in H2S-containing environments in oil and gas production Part 1: General principles for selection of cracking-resistant material (incl. Cor 1:2005)
(reaffirmed till 2011)
Pp&ngi - Materials for use in H2S-containing environments in oil and gas production Part 2: Cracking-resistant carbon and low alloy steels, and the use of cast irons (incl.
Cor 1:2005)
Pp&ngi - Materials for use in H2S-containing environments in oil and gas production Part 3: Cracking-resistant CRAs (corrosion-resistant alloys) and other alloys (incl. Cor
1 and 2:2005)
P&ngi - Non-metallic materials in contact with media related to oil and gas production Part 1: Thermoplastics

Schmitt, G

prEN ISO 23936-1


(184)

67

21457

Pp&ngi - Materials selection for upstream operations

Mollan, R

230

67

15663-1

P&ngi - Life cycle costing - Part 1: Methodology (reaffirmed till 2010)

Black, B.

EN ISO 15663-1:2006

67

15663-2

P&ngi - Life cycle costing - Part 2: Guidance on application of methodology and


calculation methods (reaffirmed till 2011)

Bang, K.E.

67

15663-3

P&ngi - Life cycle costing - Part 3: Implementation guidelines (reaffirmed till 2011)

Black, B.

67

10

P&ngi - Installation and equipment for liquefied natural gas - Ship to shore interface

prEN ISO 20815


(173)

?
(CEN/TC 282)

Registration
20.00
0
0

WD

CD

20.20 30.20
6
13
14
37

DIS

FDIS

ISO

40.20
25
60

50.20
39
84

60.60
43
100 Current %
Complete

Feb-98 Jun-99 Oct-99

100

Feb-98 Jun-99 Oct-99

100

Oct-98

Apr-00

100

Aug-97

Nov-07

100

Feb-02

Jun-05 Jun-05 Feb-07

Dec-03 Dec-04 Sep-06 Dec-06

100

Jan-04 Aug-04

Jul-05

Aug-06 Jan-08 May-08

84

Dec-06 May-07

100

Oct-07 Dec-08 Apr-09

60

Sep-06
Jan-04 Mar-05

Jul-06

Apr-06

Oct-95

Oct-98

Sep-01 Dec-01

100

Mar-97

Nov-99 Oct-01 Sep-03 Dec-03

100

Dec-99 Jan-00 Jun-00 Dec-01 Sep-03 Dec-03

100

Feb-05 Sep-05 May-06 May-07 Oct-08 Feb-09

60

May-07

Jul-99

May-08 May-09 Jul-10

Nov-10

Apr-98 Feb-99 Apr-00 Aug-00

100

Mar-99 Apr-00

Apr-01 Sep-01

100

Feb-99 Mar-00 Apr-01 Aug-01

100

Oct-06

0
Average completion 78

67

13

13623

P&ngi - Pipeline transportation systems (Rev. of ISO 13623:2000)

O'Grady, T (Gjertveit,
E.)

67

14313

P&ngi - Pipeline transportation systems - Pipeline valves (Rev. of ISO 14313:1999)

Faircloth, R

67

13847

P&ngi - Pipeline transportation systems - Welding of pipelines (incl. Cor 1:2001) (Rev.
of ISO 13847:2000)

Lillig, D

67

14723

P&ngi - Pipeline transportation systems - Subsea pipeline valves (Rev. of ISO


14723:2001)

Faircloth, R.

67

10

15590-1

P&ngi - Induction bends, fittings and flanges for pipeline transportation systems - Part
1: Induction bends (Rev. of ISO 15590-1:2001)

Schofield, B

67

10

15590-2

P&ngi - Induction bends, fittings and flanges for pipeline transportation systems - Part
2: Fittings

Schofield, B

67

10

15590-3

P&ngi - Induction bends, fittings and flanges for pipeline transportation systems - Part
3: Flanges

Henderson, M.

67

11

15589-1

P&ngi - Cathodic protection of pipeline transportation systems - Part 1: On land


pipelines

Eliassen, S.

67

11

15589-2

P&ngi - Cathodic protection of pipeline transportation systems - Part 2: Offshore


pipelines

Eliassen, S.

67

12

16708

P&ngi - Pipeline transportation systems - Reliability-based limit state methods

Sotberg, T.

EN ISO 16708:2006

67

14

21809-1

P&ngi - External coatings for buried and submerged pipelines used in pipeline
transportation systems Part 1: Polyolefin coatings (3- layer PE and 3- layer PP).

Gronsfeld, P.

ECISS/TC 29/SC 4
EC 029148

67

14

21809-2

P&ngi - External coatings for buried and submerged pipelines used in pipeline
transportation systems Part 2: Fusion-bonded epoxy coatings

Coulson, K.

EN ISO 21809-2:2007
(ECISS/TC 29/SC 4)

67

14

21809-3

P&ngi - External coatings for buried and submerged pipelines used in pipeline
transportation systems Part 3: Field joint coatings

Roche, M.

67

14

21809-4

P&ngi - External coatings for buried and submerged pipelines used in pipeline
transportation systems Part 4: Polyethylene coatings (2- layer PE)

Wong, D

67

14

21809-5

P&ngi - External coatings for buried and submerged pipelines used in pipeline
transportation systems Part 5: External concrete coatings

67

15

21329

67

16

3183

Spec 6D
/ISO 14313:1999 (mod)
Spec 1104

Spec 6DSS/
ISO 14723:2001 (mod)

EN 14161:2003
(ISO 13623:2000 mod)
(217 for revision)
EN 13942:2003
(ISO 14313:1999 mod)
(UAP (188) for revision)
EN 14163:2001
(ISO 13847:2000 mod)
(222 for revision)
EN ISO 14723:2001
(218 for revision)
EN 14870-1:2004
(ISO 15590-1:2001 mod)
(223 for revision)
EN 14870-2:2004
(ISO 15590-2:2003 mod)

NACE*

May-05

Aug-07 Aug-08 Dec-08

60

Aug-04

May-06 Sep-07 Dec-07

100

Aug-06

May-07 May-08 Jul-09

Oct-09

14

Sep-06

Jan-08 Mar-09

Jul-09

37

Aug-06

Oct-07 Dec-08 Apr-09

37

Jul-99

Feb-00 Oct-02 Aug-03 Dec-03

100

EN 14870-3:2006
(ISO 15590-3:2004 mod)

Jul-99

Apr-02 Sep-03

Nov-04

100

prEN 14919-1:2004
115 (UAP-mod)

Jun-99

Mar-00 Sep-01 Aug-03 Nov-03

100

Jun-95

Mar-00 Sep-01 Jan-04 May-04

100

Sep-98 Dec-98

Jul-01

100

prEN 14919-2:2006
183 (UAP-mod)

May-04 Dec-05 Apr-06

Dec-02 Apr-05 Sep-06 Jun-08 Oct-08

60

Jul-02 May-03 Apr-05 May-06 Sep-07 Dec-07

100

EN 10329:2006
ECISS/TC 29/SC 4

Jul-02 May-03 Apr-05

Jan-07 Aug-08 Dec-08

60

EN 10288:2002
ECISS/TC 29/SC 4

Dec-02 May-03

Jul-06

Oct-07 Dec-08 Apr-09

37

Friedman, B

ECISS/TC 29/SC 4
EC 029xxx

Jun-04

Feb-07 Feb-08 Apr-09 Aug-09

37

P&ngi - Pipeline transportation systems - Test procedures for mechanical connectors

Jee, T.

EN ISO 21329:2004

Jul-01

May-03 Jun-04 Oct-04

100

P&ngi - Steel pipe for pipeline transportation systems (Rev. of ISO 3183-1:1996; 31832:1996 and ISO 3183-3:1999)

Christensen, F
(Hammond J.)

Dec-01 Dec-02 Aug-04 May-05 Sep-06 Mar-07

100

Spec 5L/
ISO 3183:2007 (mod)

EN 10208-1:1997 EN 102082:1998
(for revision as prEN ISO 3183)
EC 029151

Jul-02

Jul-04

Average completion 73.1

Updated 19/02/2008

Page 1 of 5

TC SC WG

ISO

Title

Project Leader

Corresponding API
Document

Corresponding
CEN/TC12 WI

ISO Stage
Target elapsed time in months
Cumulative Progress Percentage
67

10414-1

P&ngi - Field testing of drilling fluids - Part 1: Water-based fluids (Rev. of ISO 104141:2001)

Stark, C.

RP 13B-1/
ISO 10414-1:2001 (mod)

189 (UAP)

67

10414-2

P&ngi - Field testing of drilling fluids - Part 2: Oil-based fluids (Rev. of ISO 104142:2002)

Stark, C.

RP 13B-2*

prEN ISO 10414-2


(180)

67

10416

P&ngi - Drilling fluids - Laboratory testing (Rev. of ISO 10416:2002)

van den Berg, H

RP 13l/
ISO 10416:2002 (mod)

(UAP) ?

67

13500

P&ngi - Drilling fluid materials - Specifications and tests (Rev. of ISO 13500:1998)
(Rev. of ISO 13500:2006)

van den Berg, H

Spec 13A/
ISO 13500:2006 (mod)

EN ISO 13500:2006
(204 for amend)

67

13501

P&ngi - Drilling fluids - Processing systems evaluation

Stark, C

RP 13C

EN ISO 13501:2006

67

10426-1

P&ngi - Cements and materials for well cementing - Part 1: Specification (rev of ISO
10426-1:2000 (incl. Amd 1:2000)) (Rev of ISO 10426-1:2005)

Bol, G.

Spec 10A/ISO 10426-1


ISO 10426-1:2001

EN ISO 10426-1:2006
(224 for revision)

67

10426-2

P&ngi - Cements and materials for well cementing - Part 2: Testing of well cements
(incl. Amd 1:2005) (incl. Corr 1:2006) (Rev of ISO 10426-2:2003)

Bol, G.

RP 10B-2/
ISO 10426-2:2003

EN ISO 10426-2:2004
(225 for revision)

67

10426-3

P&ngi - Cements and materials for well cementing - Part 3: Testing of deepwater well
cement formulations

Bol, G.

RP 10B-3/
ISO 10426-3:2003

EN ISO 10426-3:2004

67

10426-4

P&ngi - Cements and materials for well cementing - Part 4: Preparation and testing of
foamed cement slurries at atmosphere pressure (reaffirmed till 2009)

Benge, G.

RP 10B-4/
ISO 10426-4:2003

EN ISO 10426-4:2004

67

10426-5

P&ngi - Cements and materials for well cementing - Part 5: Determination of


shrinkage and expansion of well cement formulations at atmospheric pressure

Moroni, N

RP 10B-5/
ISO 10426-5:2004

EN ISO 10426-5:2005

67

10426-6

P&ngi - Cements and materials for well cementing - Part 6: Methods for determining
static gel strength of cement formulations

Mueller, D

RP 10B-6

prEN ISO 10426-6


(206)

67

10427-1

P&ngi - Equipment for well cementing - Part 1: Casing bow-spring centralizers (Rev. of
ISO 10427:1993) (reaffirmed till 2011)

De Lirette, B.

Spec 10D/
ISO 10427-1:2001

EN ISO 10427-1:2001

67

10427-2

P&ngi - Equipment for well cementing - Part 2: Centralizer placement and stop-collar
testing

De Lirette, B.

Spec 10D-2/
ISO 10427-2:2004

EN ISO 10427-2:2004

67

10427-3

P&ngi - Equipment for well cementing - Part 3: Performance testing of cementing float
equipment (Rev. of ISO 18165:2001)

Bol, G.

RP 10F/
ISO 10427-3:2003

EN ISO 10427-3:2004

67

13503-1

P&ngi - Completion fluids and materials - Part 1: Measurement of viscous properties of Penny, G.
completion fluids

RP 13M/
ISO 13503-1:2003

EN ISO 13503-1:2005

67

13503-2

P&ngi - Completion fluids and materials - Part 2: Measurement of properties of


proppants used in hydraulic fracturing and gravel packing operations

Penny, G.

RP 19 xx

prEN ISO 13503-2:2006


(216 for amend)

67

13503-3

P&ngi - Completion fluids and materials - Part 3: Testing of heavy brines

Penny, G.

RP 13J/
ISO 13503-3:2005

EN ISO 13503-3:2005

67

13503-4

P&ngi - Completion fluids and materials - Part 4: Procedure for measuring stimulation
and gravel pack fluid leak off under static conditions

Asadi, M

RP 13M-4/
ISO 13503-4:2004

EN ISO 13503-4:2006

67

13503-5

P&ngi - Completion fluids and materials - Part 5: Procedures for measuring the long
term conductivity of proppants

Kaufman, P

EN ISO 13503-5:2006

Registration
20.00
0
0

WD

CD

20.20 30.20
6
13
14
37

DIS

FDIS

ISO

40.20
25
60

50.20
39
84

60.60
43
100 Current %
Complete

Apr-05

Sep-05 Sep-06 Apr-08

84

Jan-05

Nov-05 Nov-08 Mar-09

60

Apr-05

Dec-05 Jan-08 May-08

84

Mar-07

Oct-08 Feb-09

60

Sep-96 Dec-04 Sep-05 Dec-05

100

Apr-07

Jan-08 Feb-09 Jun-09

60

Apr-07

Sep-08 Nov-09 Mar-10

37

Nov-04

Jul-07

Feb-01

Mar-02

Aug-03

100

Sep-01

Oct-02

Mar-04

100

Mar-03 Jun-03

Oct-03

Dec-04

100

Oct-05

Oct-06 Mar-08

Jul-08

60

Oct-97

Jul-99

Jun-01 Oct-01

100

Jun-99

Oct-02

Sep-02

Jan-04 May-04

100

Dec-02 Apr-03

100

Jan-96 Sep-99 May-01 Mar-02

Sep-03

100

Aug-04 Jun-06 Nov-06

100

Nov-03

Jul-04

Sep-05 Dec-05

100

May-04

Oct-04

Jun-06 Oct-06

100

Feb-02

Jul-04

Dec-04 Feb-06

Jul-06

100

Average completion 86.6

Updated 19/02/2008

Page 2 of 5

TC SC WG

ISO

Title

Project Leader

Corresponding API
Document

Corresponding
CEN/TC12 WI

ISO Stage
Target elapsed time in months
Cumulative Progress Percentage
67

Compact flanged connections

Eriksen, T.

67

10407-1

27509

P&ngi - Rotary drilling equipment - Part 1: Drill stem design and operating limits (Rev.
of ISO 10407:1993)

Chandler, B

67

10407-2

P&ngi - Rotary drilling equipment - Part 2: Inspection and classification of drill stem
elements (Rev. of ISO 10407:1993)

Mackin, J.

67

10424-1

P&ngi - Rotary drilling equipment - Part 1: Rotary drill stem elements

Brinegar, D.

67

10424-2

P&ngi - Rotary drilling equipment - Part 2: Threading and gauging of rotary shouldered
thread connections

67

13534

67

13535

67

67

67

241
RP 7G*

92

RP 7G*

93

Spec 7-1/
ISO 10424-1:2004 (mod)

EN ISO 10424-1:2004

Collins, T

Spec 7*

EN ISO 10424-2:2007

P&ngi - Drilling and production equipment - Inspection, maintenance, repair and


remanufacture of hoisting equipment (Rev. of ISO 13534:2000) (API/ISO Editing
Agreement Pilot)
P&ngi - Drilling and production equipment - Hoisting equipment (Rev. of ISO
13535:2000) (API/ISO Editing Agreement Pilot)

Aker, A.

RP 8B/
ISO 13534:2000

Aker, A.

13626

P&ngi - Drilling and production equipment - Drilling and well servicing structures

(McLeod, M)

14693

P&ngi - Drilling and well-servicing equipment

13533

67

67

67

Registration
20.00
0
0

WD

CD

20.20 30.20
6
13
14
37

DIS

FDIS

ISO

40.20
25
60

50.20
39
84

60.60
43
100 Current %
Complete

Oct-07
Jan-95

0
Apr-99

Jan-05 Oct-07 Dec-08 Apr-09

37

May-95 Apr-99

Oct-04

Jul-08

60

Mar-00 Apr-98

Jan-02 Feb-03 May-04 Sep-04

100

Jun-06 Mar-08

Mar-00 Apr-98 Dec-02 Apr-04

Apr-06 Nov-07

100

EN ISO 13534:2000
(186 for revision)

Apr-05

Jul-07

Sep-08 Jan-09

14

Spec 8C/
ISO 13535:2000 mod

EN ISO 13535:2000
(187 for revision)

Apr-05

Jul-07

Sep-08 Jan-09

14

Spec 4F**

EN ISO 13626:2004

Oct-00

Jan-98 Jun-98 Nov-00

Nov-03

100

(Sibille, M.)

Spec 7K/
ISO 14693:2003 (mod)

EN ISO 14693:2003

Oct-00

Jan-98 May-99 Jun-00 Sep-03 Dec-03

100

P&ngi - Drilling and production equipment - Drill through equipment (incl. Cor 1:2005)
(reaffirmed till 2011)

Young, K.

Spec 16A/
ISO 13533:2001 (mod)

EN ISO 13533:2001

13624-1

P&ngi - Drilling well control systems - Part 1: Design and operation of marine drilling
riser systems

Stanton, P.

RP 16Q

prEN ISO 13624-1


(49)

13624-2

P&ngi - Drilling well control systems - Part 2: Application of marine drilling riser system
analysis (Technical Report)

Stanton, P.

TR 16TR1

(UAP) ?

13625

P&ngi - Drilling and production equipment - Marine drilling riser couplings

Stanton, P.

Spec 16R*

EN ISO 13625:2002

67

22830

P&ngi - Drilling well control equipment - Control systems for drilling well control
equipment and diverter systems (to be deleted?)

Roche, J.

Spec 16D

203

67

10423

Langereis, R

Spec 6A/
ISO 10423:2003 (mod)

EN ISO 10423:2004
(193 for revision)

67

10417

P&ngi - Drilling and production equipment - Wellhead and christmas tree equipment
(Rev. of ISO 10423:1994)(Minor revision of ISO 10423:2001 in 2003)(Rev. of ISO
10423:2003)
P&ngi - Subsurface safety valve systems - Design, installation, repair, operation and
redress (Rev. of ISO 10417:1993)

Freeman, A.

RP 14B/
ISO 10417:2004

EN ISO 10417:2004

67

10428

P&ngi - Drilling and production equipment - Sucker rods (pony rods, polished rods,
couplings and sub-couplings) (Rev. of ISO 10428:1993)

Williams, B

Spec 11B

prEN ISO 10428


(15)

67

10431

P&ngi - Drilling and production equipment - Pumping units (Rev of ISO 10431:1993)

Dijkhuis, B.

Spec 11E

prEN ISO 10431


(16)

67

10432

P&ngi - Downhole equipment - Subsurface safety valve equipment ( Rev. of ISO


10432:1993) (Rev. of ISO 10432:1999)

Dijkhuis, B.

Spec 14A/
ISO 10432:2004

EN ISO 10432:2004

67

14310

P&ngi - Downhole equipment - Packers and bridge plugs (Rev. of ISO 14310:2001)

Ellis, G.

Spec 11D1/
ISO 14310:2004

67

15136-1

Downhole equipment for p&ngi - Progressive cavity pump systems for artificial lift Part 1: Pumps (Rev. of ISO 15136-2:2001)

Noonan, S

(Spec 11D2/
ISO 15136-1)*

67

15136-2

Downhole equipment for p&ngi - Progressive cavity pump systems for artificial lift Part 2: Surface drive systems

Stephenson, G.

67

16070

P&ngi - Downhole equipment - Lock mandrels and landing nipples (Rev. of ISO
16070:2001)

Yonker, J.

Spec 14L/ISO 16070:2005

EN ISO 16070:2005

67

17078-1

P&ngi - Drilling and production equipment - Part 1: Side-pocket mandrels

Mabry, W.

Spec 11V1

EN ISO 17078-1:2004

67

17078-2

P&ngi - Drilling and production equipment - Part 2: Flow control devices for sidepocket mandrels

Mabry, W.

Spec 11V2

EN ISO 17078-2:2007

67

17078-3

P&ngi - Drilling and production equipment - Part 3: Latches and related tools for sidepocket mandrels

Mabry, W.

prEN ISO 17078-3


(119)

67

17078-4

P&ngi - Drilling and production equipment - Part 4: Practices for side-pocket mandrels
and related equipment

Mabry, W.

205

67

17824

P&ngi - Downhole equipment - Sand control screens

Gillespie, G.

67

28781

P&ngi - Downhole equipment - Subsurface tubing mounted formation barrier valves


and related equipment

McCalvin, D.

67

11326

P&ngi - Specification for flexible pipe ancillary equipment

Doynov, K.

243

67

11355

P&ngi - Recommended practice for flexible pipe ancillary equipment

Doynov, K.

244

67

13628-1

Bakke, W. (to become


Dahl, P.R.)

67

13628-2

P&ngi - Design and operation of subsea production systems - Part 1: General


requirements and recommendations (Rev. of ISO 13628-1:1999) (Amd. 1 and Amd. 2
of ISO 13628-1:2005)
P&ngi - Design and operation of subsea production systems - Part 2: Unbonded
flexible pipe systems for subsea and marine applications (Rev. of ISO 13628-2:2000)

67

13628-3

P&ngi - Design and operation of subsea production systems - Part 3: Through flowline
(TFL) systems (reaffirmed till 2010)

67

13628-4

67

67

67
67

Jul-01

Dec-01

100

Nov-08

60

May-03 Sep-03 Apr-07

Dec-08

37

Jan-95 Mar-98 Feb-99 Jun-01 Aug-02 Dec-02

100

Nov-04

Feb-05 Dec-06 Feb-08 Jun-08

37

Sep-05

Nov-07 Jan-09 May-09

37

Jan-95 Mar-98 Nov-01 Jun-02 Mar-04

Jul-04

100

Jun-00 Feb-01

Oct-07 Dec-08 Apr-09

60

Jun-00 Feb-01

Oct-06 Aug-08 Dec-08

60

Jul-03

Sep-04 Dec-04

100

EN ISO 14310:2001
(209 for revision)

May-06

Mar-07 Aug-08 Dec-08

60

EN ISO 15136-1 :2001


(210 for revision)

Dec-06

x
220

RP 17A/
ISO 13628-1:2005

EN ISO 13628-1:2005
(215 and 238 for amend)

Doynov, K.

Spec 17J*

EN ISO 13628-2:2006

Yonker, J.

RP 17C/
ISO 13628-3:2000

EN ISO 13628-3:2000

P&ngi - Design and operation of subsea production systems - Part 4: Subsea wellhead
and tree equipment (Rev. of ISO 13628-4:1999)

Frazer, R

Spec 17D*

EN ISO 13628-4:1999
(160 for revision)

13628-5

P&ngi - Design and operation of subsea production systems - Part 5: Subsea control
umbilicals (Rev. of ISO 13628-5:2002)

Dee, R

Spec 17E/
ISO 13628-5:2002

202

13628-6

P&ngi - Design and operation of subsea production systems - Part 6: Subsea


production control systems (Rev. of ISO 13628-6:2000)

Neuenkirchen, J.H.

Spec 17F/
ISO 13628-6:2006

EN ISO 13628-6:2006

13628-7

P&ngi - Design and operation of subsea production systems - Part 7:


Completion/workover riser systems

13628-8

67

67

67

67

Muff, A.

RP 17G/
ISO 13628-7:2005

EN ISO 13628-7:2006

P&ngi - Design and operation of subsea production systems - Part 8: Remotely


Operated Vehicle (ROV) interfaces on subsea production systems (incl. Cor 1:2005)(to
be replaced by ISO 13628-13)
13628-9 P&ngi - Design and operation of subsea production systems - Part 9: Remotely
Operated Tool (ROT) intervention systems(reaffirmed till 2010)(to be replaced by ISO
13628-13)
13628-10 P&ngi - Design and operation of subsea production systems - Part 10: Specification for
bonded flexible pipe (API Pilot Project)

Marsh, T.

RP 17H/
ISO 13628-8:2006

EN ISO 13628-8:2006

Brun-Olsen, J.

RP 17M/
ISO 13628-9:2000

EN ISO 13628-9:2006

Doynov, K.

Spec 17K/
ISO 13628-10:2005

EN ISO 13628-10:2006

13628-11 P&ngi - Design and operation of subsea production systems - Part 11: Flexible pipe
systems for subsea and marine applications (Rev. of ISO 10420:1994)

Doynov, K.

RP17B*

166 (UAP)

13628-12 P&ngi - Design and operation of subsea production systems - Part 12: Dynamic
production risers

Stanton, P.

RP 2RD

214

67

Brun-Olsen, J.

RP 17H / ISO 13628-8


RP 17M / ISO 13628-9
to be RP 17R
?

208

67

13628-13 P&ngi - Design and operation of subsea production systems - Part 13: Remotely
operated tools and interfaces on subsea production systems (replacing ISO 13628-8
and ISO 13628-9)
13628-15 P&ngi - Design and operation of subsea production systems - Part 15: Subsea
structures and manifolds

Brubrek, B

Apr-99

May-07 Jul-08

Dec-01 Jan-03

EN ISO 15136-2:2006

Mar-01 Mar-98
May-03 Mar-98

240

Oct-99

Jan-02

Oct-03

Dec-07 Feb-09 Jun-09

37

Dec-04 Feb-06 Jun-06

100

Apr-04

Jun-05 Dec-05

100

Sep-99 Nov-98 Mar-02 Mar-03 Sep-04 Dec-04

100

Sep-99 Feb-01 Mar-05 Oct-05 Sep-07 Dec-07

100

May-03 Nov-01 May-06 Aug-07 Oct-08 Feb-09

60

May-05 Feb-06 Apr-07

Apr-08

Jun-09 Oct-09

37

May-03 Feb-02 Apr-07

Apr-08

Jun-09 Oct-09

37

Nov-06

Apr-09

Jun-10 Nov-10

Apr-08

Sep-07

Sep-07

Mar-07

Oct-07 Dec-08 Apr-09

37

Jun-03 Jun-03

Jan-04

Jul-06

100

Jan-98

Apr-98

Apr-06

Jan-99 Aug-00 Dec-00

100

Aug-04

Sep-06 Apr-09 Aug-09

60

Jan-05

Aug-07 Aug-08 Dec-08

60

Mar-01 Nov-02

Jan-04 Jan-06 May-06

100

Jan-95 Mar-98 Apr-00 Nov-01


Jan-95

Nov-05

100

Jul-99

Jul-00

Sep-02 Dec-02

100

Nov-95 Sep-97

Jul-98

Mar-00 Jun-00

100

Jul-03

Jun-05 Oct-05

100

Jul-96

Apr-03
Jun-03 Oct-03
Sep-06
Apr-06

Jun-07

Apr-06

Feb-04 May-07 Sep-07

100

Sep-07 Sep-08 Oct-09 Mar-10

14

Nov-07 Jan-09 May-09

14

0
Average completion 62.9

Updated 19/02/2008

Page 3 of 5

TC SC WG

ISO

Title

Project Leader

Corresponding API
Document

Corresponding
CEN/TC12 WI

ISO Stage
Target elapsed time in months
Cumulative Progress Percentage

Registration
20.00
0
0

WD

CD

20.20 30.20
6
13
14
37

67

10405

P&ngi - Care and use of casing and tubing (Rev. of ISO 10405:1993)(reaffirmed till
2010)

Bellinger, B

RP 5C1

EN ISO 10405:2006

67

11960

P&ngi - Steel pipes for use as casing or tubing for wells (Rev. of ISO 11960:1996)
(incl. Cor 1:11/2002)(Rev. of ISO 11960:2001) (in revision)

Fallouey, P.

Spec 5CT/
ISO 11960:2004

EN ISO 11960:2004
(232 for revision)

Dec-01 Jun-02

67

11961

P&ngi - Drill pipe with weld-on tool joints (Rev. of ISO 11961:1996)

Fallouey, P.

Spec 5D/
Spec 7

EN ISO 11961:1996
(66 for revision)

May-06

67

15463

P&ngi - Field inspection of new casing, tubing and plain-end drill pipe

Goodson, D.

RP 5A5/
ISO 15463:2004

EN ISO 15463:2003

67

15464

P&ngi - Gauging and inspection of casing, tubing and line pipe threads (technical
report)

Della Pina, G.

RP 5B1

31

67

2b

10400

P&ngi - Equations and calculation for the properties casing, tubing, drill pipe and line
pipe used as casing or tubing (Rev. of ISO 10400:1993)(technical report)

Patillo, P

Bul 5C3*

(UAP) ?

67

2a

13679

P&ngi - Procedures for testing casing and tubing connections (rev. of ISO 13679:2002)

Valigura, G.

RP 5C5/ISO 13679:2002

EN ISO 13679:2006
(219 for revision)

May-06

67

13680

P&ngi - Corrosion resistant alloy seamless tubes for use as casing, tubing and coupling Della Pina, G.
stock (Rev. of ISO 13680:2000) (incl. Cor 2:5/2004)

(RP 5CRA)**

EN ISO 13680:2001
(150 for revision)

67

13678

P&ngi - Evaluation and testing of thread compounds for use with casing, tubing and
line pipe (incl. Cor 1:2005) (Rev. of ISO 13678:2000 new title to add "and drill stem
elements")

Mulvihill, M

RP 5A3/
ISO 13678:2000

prEN ISO 13678


(197)

67

10418

P&ngi - Offshore production installations - Basic surface process safety systems (Rev.
of ISO 10418:1993)

Black, B.

RP 14C

EN ISO 10418:2003

67

13702

P&ngi - Control and mitigation of fires and explosions on offshore production


installations - Requirements and guidelines (reaffirmed till 2009)

Ellingsen, S.

RP 14G

EN ISO 13702:1999

67

15544

P&ngi - Offshore production installations - Requirements and guidelines for emergency


response (reaffirmed till 2010)(Amd. of ISO 15544:2000)

Savage, N.

67

17776

P&ngi - Offshore production installations - Guidelines on tools and techniques for


hazard identification and risk assessment (reaffirmed till 2010)

Vinnem, J.E., N.

RP 14J

EN ISO 17776:2002

67

10438-1

Pp&ngi - Lubrication, shaft sealing and control-oil systems and auxiliaries - Part 1:
General requirements (Rev. of ISO 10438-1:2003)

Fulton, L

Std 614

EN ISO 10438-1:2007

67

10438-2

Pp&ngi - Lubrication, shaft sealing and control-oil systems and auxiliaries - Part 2:
Special-purpose oil systems (Rev. of ISO 10438-2:2003)

Fulton, L

Std 614

EN ISO 10438-2:2007

67

10438-3

Pp&ngi - Lubrication, shaft sealing and control-oil systems and auxiliaries - Part 3:
Genera-purpose oil systems (Rev. of ISO 10438-3:2003)

Fulton, L

Std 614

EN ISO 10438-3:2007

67

10438-4

Pp&ngi - Lubrication, shaft sealing and control-oil systems and auxiliaries - Part 4: Self- Fulton, L
acting gas seal systems (Rev. of ISO 10438-4:2003)

Std 614

EN ISO 10438-4:2007

67

10437

P&ngi - Steam turbines - Special-purpose applications (Rev. of ISO 10437:1993)(Rev.


of ISO 10437:2003)

Wilkinson, V.

Std 612
/ISO 10437:2003

EN ISO 10437:2003
(231 for revision)

67

13703

P&ngi - Design and installation of piping systems on offshore production platforms


(incl. Cor 1:7/2002)(reaffirmed till 2010)

Milnes, J.

RP 14E

EN ISO 13703:2000

67

14692-1

P&ngi - Glass-reinforced plastics (GRP) piping - Part 1: Vocabulary, symbols,


applications and materials (Rev. of ISO 14692-1:2002)

Frost, S.

67

14692-2

P&ngi - Glass-reinforced plastics (GRP) piping - Part 2: Qualification and manufacture


(incl. Cor 1:2005) (Rev. of ISO 14692-2:2002)

67

14692-3

67

14692-4

67

67

67

DIS

FDIS

ISO

40.20
25
60

50.20
39
84

60.60
43
100 Current %
Complete

Sep-98 Oct-98

Mar-00

100

Aug-03 Sep-04 Dec-04

100

Mar-04 Aug-06 Mar-08

Jul-08

60

May-97 Jun-98 Dec-98 Dec-98 Sep-03 Dec-03

100

May-06

Dec-08

14

Jun-08

Jan-99 Jan-01 Aug-02 Feb-06

Nov-07

100

Mar-08 Mar-09 May-10 Sep-10

14

May-06

Dec-06 Jun-08 Oct-08

60

Jan-06

Sep-06 Aug-07 Oct-08 Feb-09

60

Jan-01

Aug-99 Feb-01 Jun-03 Sep-03

100

Feb-95 Jun-96 Nov-98 Mar-99

100

Sep-07

Nov-08 Jan-10 May-10

37

Jul-99

Oct-00

100

Jun-04

Sep-04 Apr-06 Sep-07 Dec-07

100

Jun-04

Sep-04 Apr-06 Sep-07 Dec-07

100

Jun-04

Sep-04 Apr-06 Sep-07 Dec-07

100

Average completion 67.6

201 (UAP)***

Jun-04

Sep-04 Apr-06 Sep-07 Dec-07

100

Sep-07

Sep-08 Mar-09 Mar-10 May-10

Jun-94 Sep-98 Aug-00 Dec-00

100

EN ISO 14692-1:2002
(234 for revision)

Sep-07

Sep-08 Mar-09 Mar-10 May-10

Frost, S.

EN ISO 14692-2:2002
(235 for revision)

Sep-07

Sep-08 Mar-09 Mar-10 May-10

P&ngi - Glass-reinforced plastics (GRP) piping - Part 3: System design (incl. Cor
1:2005) (Rev. of ISO 14692-3:2002)

Frost, S.

EN ISO 14692-3:2002
(236 for revision)

Sep-07

Sep-08 Mar-09 Mar-10 May-10

P&ngi - Glass-reinforced plastics (GRP) piping - Part 4: Fabrication, installation and


operation (Rev. of ISO 14692-4:2002)

Frost, S.

EN ISO 14692-4:2002
(237 for revision)

Sep-07

Sep-08 Mar-09 Mar-10 May-10

15649

P&ngi - Piping (reaffirmed till 2011)

Zezula, F.

24817

Pp&ngi - Composite repairs for pipework - Qualification and design, installation, testing
and inspection (technical specification)

Evans, G.

13704

Pp&ngi - Calculation of heater-tube thickness in petroleum refineries (incl. Cor 1:2004)


(Rev. of ISO 13704:2001)

Gelfand, D.

RP 530/ISO 13704:2001

EN ISO 13704:2007

67

13705

Pp&ngi - Fired heaters for general refinery service (Rev. of ISO 13705:2001)

Riddick, E.

Std 560*
ISO 13705:2006

EN ISO 13705:2006

67

13706

Pp&ngi - Air-cooled heat exchangers (Rev. of ISO 13706:2000) (Rev. of ISO


13706:2005)

Kluppel, G

Std 661/ISO 13706:2005

EN ISO 13706:2005
(226 for revision)

67

15547-1

Pp&ngi - Plate-type heat exchangers Part 1: Plate-and-frame heat exchangers (Rev.


of ISO 15547:2000)

Petigara, J.

Std 662 Part 1/ISO 155471:2005

EN ISO 15547-1:2005

67

15547-2

Pp&ngi - Plate-type heat exchangers Part 2: Brazed aluminium plate-fin heat


exchangers

Petigara, J.

Std 662 Part 2/ISO 155472:2005

EN ISO 15547-2:2005

67

16812

Pp&ngi - Shell-and-tube heat exchangers (Rev. of ISO 16812:2002)

Petigara, J.

Std 660/ISO 16812:2007

EN ISO 16812:2007

67

25457

Pp&ngi - Flares details for general refinery and petrochemical service

Wey, R

Std 537

prEN ISO 25457


(196)

67

10441

Pp&ngi - Flexible couplings for mechanical power transmission - Special purpose


applications (Rev. of ISO 10441:1999)

Gibbons, B

Std 671/ISO 10441:2007

EN ISO 10441:2007

67

14691

Pp&ngi - Flexible couplings for mechanical power transmission - General purpose


applications (Rev. of ISO 14691:1999)

Simmons, P

EN ISO 14691:2000
(128 for revision)

67

11

15138

P&ngi - Offshore production installations - Heating, ventilation and air-conditioning


(incl. Cor 1:2001) (Rev. of ISO 15138:2000)

Uldalen, S.

EN ISO 15138:2007

67

11

27469

Pp&ngi - Method of test for offshore fire dampers (technical specification)

Swinton, G.

(UAP) ?

67

12

23251

Pp&ngi - Pressure-relieving and depressuring systems (Rev. of ISO 23251:2006)

Otis, B.

67

12

28300

Pp&ngi - Venting of atmospheric and low-pressure storage tanks

Davies, M.

(ASME B31.3)

CEN/TR 14549:2004
(UAP) ?

Std 521/ISO 23251:2005

Std 2000

EN ISO 23251:2007
(227 for revision and 239 for
amend)
prEN ISO 28300
(213)

Oct-99

Apr-00 Feb-01 Jun-01

100

Aug-05 Feb-06 Jun-06

Dec-06

100

Mar-03 Apr-03

Apr-06 Aug-07 Dec-07

100

Mar-03 Apr-03

Jan-05 Aug-06 Nov-06

100

Apr-07

Oct-08

Oct-09 Feb-10

37

Nov-00 Apr-03

Jun-04

Jul-05

Nov-05

100

Nov-00 Apr-03

Jun-04

Jul-05

Nov-05

100

Mar-03 Apr-03

Jun-05 Nov-06 Feb-07

100

Oct-05

Oct-05

Feb-07 Aug-08 Dec-08

60

Nov-00 Jan-02

Sep-05 Nov-06 Mar-07

100

Mar-07

Oct-07 Dec-08 Apr-09

60

Oct-04

Oct-04 Dec-05 Sep-06 Sep-07 Dec-07

100

Jun-06
Mar-07

Sep-06 Oct-06

Apr-08

Dec-08

Jan-08 May-08

84

Nov-06 Jan-08 May-08

84

Average completion 71.1

Updated 19/02/2008

Page 4 of 5

TC SC WG

ISO

Title

Project Leader

Corresponding API
Document

Corresponding
CEN/TC12 WI

ISO Stage
Target elapsed time in months
Cumulative Progress Percentage
67

19900

P&ngi - General requirements for offshore structures (Rev. of ISO 13819-1:1995)

Snell, R.

EN ISO 19900:2002

67

19901-1

P&ngi - Specific requirements for offshore structures - Part 1: Metocean design and
operating considerations

Shaw, C.

EN ISO 19901-1:2005

67

19901-2

P&ngi - Specific requirements for offshore structures - Part 2: Seismic design


procedures and criteria

Banon, C.

EN ISO 19901-2:2004

67

19901-3

P&ngi - Specific requirements for offshore structures - Part 3: Topsides structure

Galbraith, D.N.

67

19901-4

P&ngi - Specific requirements for offshore structures - Part 4: Geotechnical and


foundation design considerations

Lacasse, S.

EN ISO 19901-4:2003

67

19901-5

P&ngi - Specific requirements for offshore structures - Part 5: Weight control during
engineering and construction

Worren, E.

EN ISO 19901-5:2003

67

19901-6

P&ngi - Specific requirements for offshore structures - Part 6: Marine operations

Wichers, J.

prEN ISO 19901-6


(137)

67

19901-7

P&ngi - Specific requirements for offshore structures - Part 7: Stationkeeping for


floating offshore structures and mobile offshore units (Replacing ISO TR 13637:1997)

Wolfram, R.

67

19902

P&ngi - Fixed steel offshore structures (Rev. of ISO 13819-2:1995)

Galbraith, D.N.

67

19903

P&ngi - Fixed concrete offshore structures

Leivestad, S.

EN ISO 19903:2006

67

19904-1

P&ngi - Floating offshore structures - Part 1: Monohulls, semi-submersibles and spars

Wolfram, R.

EN ISO 19904-1:2006

67

19904-2

P&ngi - Floating offshore structures - Part 2: Tension leg platforms

Wolfram, R.

67

19905-1

P&ngi - Site-specific assessment of mobile offshore units - Part 1: Jack-ups

Hoyle, M.J.R.

123

67

19905-2

P&ngi - Site specific assessment of mobile offshore units - Part 2: Jack-ups


commentary (Technical Report)

Hoyle, M.J.R.

124

67

19906

P&ngi - Arctic offshore structures

Blanchet, D

154

prEN ISO 19901-3


(136)

RP 2SK

EN ISO 19901-7:2005

RP 2A-LRFD

EN ISO 19902:2007

RP 2T

Registration
20.00
0
0

WD

CD

20.20 30.20
6
13
14
37

Jan-01

DIS

FDIS

ISO

40.20
25
60

50.20
39
84

60.60
43
100 Current %
Complete

Aug-01 Aug-02 Dec-02

100

May-01 Jan-00 Jan-01 Sep-03

Jul-05

Nov-05

100

Jan-01 Feb-00 Jan-01

Apr-03

Jul-04

Nov-04

100

Jun-07

Apr-09 Aug-09

60

Dec-00 Mar-03 Aug-03

100

Oct-01

Oct-00

Jul-00

Dec-99

Oct-02

Jul-00

Sep-97 Jan-00 Mar-01 Apr-03

Jul-03

100

Jul-00

Dec-01 Apr-05 Mar-06 Aug-08 Dec-08

60

Dec-05

100

May-96 Nov-95 May-99 Sep-04 Aug-07 Dec-07

Jun-03 Jun-03

Mar-04

Jul-05

100

Jan-95 Jun-01 Nov-02 Oct-04 Aug-06 Dec-06

100

Dec-00

100

Feb-02 Nov-04 Jun-06 Nov-06

0
Jun-00 Jan-02 Jun-05 Nov-07 Jan-09 May-09

37

Jun-00

May-09

14

Dec-01 Nov-01 Nov-07 Nov-08 Jan-10 May-10

37

Jul-01

Average completion 73.9


60

11

13691

P&ngi - High-speed special-purpose gear units (reaffirmed till 2011)

Dehner, E.

Std 613

EN ISO 13691:2002

115

13710

Pp&ngi Reciprocating positive displacement pumps

Saile, D

Std 674*

EN ISO 13710:2004

115

13709

Centrifugal pumps for petroleum, petrochemical and natural gas industries (Rev. of
ISO 13709:2003)

Jones, R

Std 610/
ISO 13709:2003

EN ISO 13709:2003
(182 for revision)

Mar-05

115

21049

Pumps - Shaft sealing systems for centrifugal and rotary pumps (Rev. of ISO
21049:2004)

Thorp, J.

Std 682/
ISO 21049:2004

EN ISO 21049:2004
(228 for revision)

Apr-07

Aug-08 Oct-09 Feb-10

37

118

10439

Petroleum, chemical and gas service industries - Centrifugal compressors

Savoie, K
(Noack, P.R.)

Std 617

EN ISO 10439:2002

118

10442

Petroleum, chemical and gas service industries - Packaged integrally geared


centrifugal air compressors

Noack, P.R.

Std 672

EN ISO 10442:2002

118

13631

P&ngi - Packaged reciprocating gas compressors

Autran, P.

Spec 11P

EN ISO 13631:2002

118

13707

P&ngi - Reciprocating compressors (Rev. of ISO 13707:2000)

Lea, F

Std 618*

44

118

10440-1

P&ngi - Rotary-type positive displacement compressors - Part 1: Process compressors


(oil-free) (Rev. of ISO 10440-1:2000)

Rohacek, M

Std 619

EN ISO 10440-1:2007
(142 for revision)

118

10440-2

P&ngi - Rotary-type positive displacement compressors - Part 2: Packaged air


compressors (oil-free)(reaffirmed till 2011)

Frost, F.

153

10434

Bolted bonnet steel gate valves for petroleum and natural gas industries (Rev. of ISO
10434:1998) (Rev. of ISO 10434:2004)

McLean, B.

Std 600/
ISO 10434:2001 (mod)

153

15761

Steel gate, globe and check valves for sizes DN 100 and smaller, for petroleum and
natural gas industries (Rev. of ISO 15761:2002)

McLean, B.

153

11

17292

Metal ball valves for petroleum, petrochemical and allied industries (reaffirmed till
2012)

McLean, B.

192

3977-5

Gas turbines - Procurement - Part 5: Applications for petroleum and natural gas
industries (reaffirmed till 2011)

Heseding, M.

Jul-93

Jan-98 Feb-00 Aug-01 Dec-01

100

Aug-01

Mar-97

Jul-04

100

Sep-07 Sep-08 Dec-08

60

Jul-99

Mar-04

Jan-00

Mar-94 Jun-96

Oct-02

100

Aug-01

Jun-94 Nov-96 Aug-02 Dec-02

100

Jun-00

May-97 Aug-00 Mar-02 Aug-02

100

May-08 Jul-09

Nov-10

14

Aug-01

Jun-02 May-04 Apr-07 Aug-07

100

Jul-93

Aug-94 Nov-95

Dec-01

100

EN ISO 10434:2004
(CEN/TC 69 WI 129)

Jan-06

Jun-07 Jun-08 Aug-09 Dec-09

37

Std 602/
ISO 15761:2002 (mod)

EN ISO 15761:2002
(207 for revision)

Jan-06

Jun-07 Jun-08 Aug-09 Dec-09

37

Std 608

EN ISO 17292:2004
(CEN/TC 69)

Sep-88

Apr-01 May-02 Apr-04 Aug-04

100

Std 616 & RP 11 PGT


(adopted as ASME B.133)

EN ISO 3977-5:2003

Nov-94

Jun-95 Aug-98 Aug-01 Dec-01

100

EN ISO 10440-2:2001

Mar-03 Apr-03

Jul-02

Jul-01

Average completion 77.5

Overall completion 72.2


Note: Future estimated dates are my personal "best estimates" and have not all been directly taken from the ISO/TC 67 database, available via http://www.tc67.net.
(They will need verifying with the responsible person).
Note : P&ngi = Petroleum and natural gas industries
Pp&ngi = Petroleum, petrochemical and natural gas industries
* = adopt back planned by API
** = adopt back approved by API, but not yet published
*** = approved for publication by CEN
- ISO/TC67 portfolio : 164
- ISOs published : 131 (of which 3 are still the fasttrack revision). i.e. 128 true ISOs.
The 3 fasttrack standards are: (SC4) 10407; 10428 and 10431
- Published ISOs in revision : 38
- CEN published adoptions : 108
- API published adoptions : 53
- Adoptions by both API and CEN : 47
- NACE published adoptions : 3
- ISO possibles for publication in 2008: 19
- This may bring number of true published ISOs, excluding the orignal fasttracks, to 135 end 2008
- Other API adoptions:
ISO/TC105, API Spec 9A/ISO 10425:2003 Wire rope
ISO/TC153, API Std 607/ISO 10497:2004 Testing of valves - Fire type-testing requirements
ISO/TC28, API MPMS 2.2C/ISO 7507-3:1993 Calibration of upright cylindrical tanks using the optical-triangulation method (no recognition in document)
ISO/TC28, API MPMS 2.2D/ISO 7507-4:1995 Calibration of upright cylindrical tanks using the internal electro-optical distance-ranging method (no recognition in document)
ISO/TC28, API MPMS 2.2E/ISO 12917-1 2002 Petroleumn and liquid petroleum products - Calibration of horizontal cylindrical tanks - Part 1: Manual methods
ISO/TC28, API MPMS 2.2F/ISO 12917-2 2002 Petroleumn and liquid petroleum products - Calibration of horizontal cylindrical tanks - Part 2: Internal electro-optical distance-ranging method
Drafted by Neil Reeve, Shell Standards Team, SGSI, The Hague, 12/02/2008

Updated 19/02/2008

Page 5 of 5

You might also like