Carbozinc 11
Selection & Specification Data
Generic Type
Solvent Based Inorganic Zinc
Description
Time-tested corrosion resistant primer that protects
steel galvanically in the harshest environments. For
over five decades, Carbozinc 11 (CZ 11) has been the
industry standard for high-performance inorganic zinc
protection on steel structures worldwide.
Features
Carbozinc 11 meets Class B slip co-efficient and
creep testing criteria for use on faying surfaces.
Rapid cure. Dry to handle in 45 minutes at 60F
(16C) and 50% relative humidity.
Low temperature cure down to 0F (-18C).
High zinc loading.
Meets FDA requirements in gray color.
Very good resistance to salting.
May be applied with standard airless or conventional
spray equipment.
VOC compliant in certain areas
Color
Green (0300); Gray (0700)
Finish
Flat
Primer
Self Priming
Topcoat
Can be topcoated with Epoxies, Polyurethanes,
Acrylics, High-Heat Silicones and others as
recommended by your Carboline sales representative.
Dry Film
Thickness
Surfaces must be clean and dry. Employ adequate
methods to remove dirt, dust, oil and all other
contaminants that could interfere with adhesion of the
coating.
Steel
Non-Immersion: SSPC-SP6 and obtain a 1.0-3.0 mil
(25-75 micron) angular blast profile (Reference ASTM
D4417)
Performance Data
Test Method
AASHTO M300 Bullet
Hole Immersion
Paragraph 4.6.9
System
1 ct. CZ11 over
Abrasive blasted steel
ASTM A-325
Slip Co-efficient
Blasted Steel 1
ct. CZ 11 @6 mils
(150 microns)
1 ct CZ11 at 2 mils
dry film thickness
over blasted steel.
ASTM B117 Salt Spray
Not required for certain exposures. Under certain conditions, a mist coat
is required to minimize topcoat bubbling.
Service
Temperature
Substrates & Surface Preparation
General
Untopcoated
Continuous: 750F (400C)
Non-Continuous: 800F (427C)
With recommended high heat topcoats:
Continuous: 1000F (538C)
Non-Continuous: 1200F (649C)
ASTM D3363
Pencil Hardness
Mixing & Thinning
Mixing
Power mix base, then combine and power mix as
follows. Pour zinc filler very slowly into premixed base
with continuous agitation. Mix until free of lumps. Pour
mixture through a 30 mesh screen. Sifting zinc through
a screen will aid in the mixing process by breaking up
or catching dry zinc lumps. DO NOT MIX PARTIAL
KITS.
Thinning
May be thinned up to 5 oz/gal (4%) with Thinner 26
or 33 for ambient and warm surfaces. For extremely
warm or windy conditions (above 85F/29C)may
be thinned up to 8 oz/gal (6%) with Thinner 254. In
cool weather (below 40F (4C)), thin up to 7 oz/gal
(6%) with Thinner 21. Use of thinners other than those
supplied or recommended by Carboline may adversely
affect product performance and void product warranty,
whether expressed or implied.
Ratio
1 Gal. Kit - Part A - .75 gal
1 Gal Kit - Zinc Filler - 14.6lbs
5 Gal Kit - Part A - 3.75 gal
5 Gal Kit - Zinc Filler - 73 lbs.
Pot Life
8 Hours at 75F (24C) and less at higher
temperatures. Pot life ends when coating becomes too
viscous to use.
2.0 - 3.0 mils (51 - 76 microns) per coat
By Volume 62.3% +/- 2%
Measured in accordance with ASTM D 2697.
Zinc Content in DryBy Weight 85% +/- 2%
Film
Coverage Rate
1000 ft /gal at 1 mil (24.5 m /l at 25 microns) DFT
2
333 ft /gal at 3 mils (8.2 m /l at 75 microns) DFT
Measured in accordance with ASTM D 2697. Allow for loss in mixing and
application.
VOC Values
As Supplied
EPA Method 24: 4.0 lbs./gal (479 g/l)
Thinned:
7 oz/gal w/ Thinner 21: 4.1 lbs./gal (492 g/l)
5 oz/gal w/ Thinner 26: 4.1 lbs./gal (492 g/l)
5 oz/gal w/ Thinner 33: 4.1 lbs./gal (492 g/l)
8 oz/gal w/ Thinner 254: 4.0 lbs./gal (507 g/l)
These are nominal values.
July 2015
No rusting blistering
cracking delamination
after 43000 hrs.
Moderate salting
of the surface only.
Pencil Hardness "2H"
Test reports and additional data available upon written request.
Dry film thickness up to 6.0 mils (150 microns) is acceptable
Solid(s) Content
1 ct. CZ11
Results
No blistering or
rusting of coating or
rusting of bare steel
area after 650 hrs.
Immersion in 5% sod
0.68; meets requirement
for Class B rating
0250
To the best of our knowledge the technical data contained herein is true and accurate on the date of publication and is subject to change without prior notice. User must contact Carboline Company
to verify correctness before specifying or ordering. No guarantee of accuracy is given or implied. We guarantee our products to conform to Carboline quality control. We assume no responsibility for
coverage, performance or injuries resulting from use. Liability, if any, is limited to replacement of products. NO OTHER WARRANTY OR GUARANTEE OF ANY KIND IS MADE BY CARBOLINE,
EXPRESS OR IMPLIED, STATUTORY, BY OPERATION OF LAW, OR OTHERWISE, INCLUDING MERCHANTABILITY AND FITNESS FOR A PARTICULAR PURPOSE. Carboline and Carboguard
are registered trademarks of Carboline Company.
Page 1 of 2
Carbozinc 11
Application Equipment Guidelines
Cleanup & Safety
Listed below are general equipment guidelines for the application of this product. Job site conditions
may require modifications to these guidelines to achieve the desired results.
Spray Application The following spray equipment has been
(General)
found suitable and is available from equipment
manufacturers. Keep material under mild agitation
during application. If spraying stops for more than
10 minutes, recirculate the material remaining in the
spray line. Do not leave mixed primer in the hoses
during work stoppages.
Conventional
Spray
Agitated pressure pot equipped with dual regulators,
3/8 I.D. minimum material hose, with a maximum
length of 50 feet; 0.070 I.D. fluid tip and appropriate
air cap.
Airless Spray
Pump Ratio: 30:1 (min.)
GPM Output: 3.0 (min.)
Material Hose: 3/8 I.D. (min.)
Tip Size: 0.019-0.023
Output PSI: 1500-2000 Filter Size: 60 mesh
PTFE packings are recommended and available from
the pump manufacturer.
Brush
For touch-up of areas less than one square foot only.
Use medium bristle brush and avoid rebrushing.
Roller
Not recommended.
Application Conditions
Condition
Minimum
Maximum
Material
Surface
Ambient
0 F (-18 C) 0 F (-18 C) 0 F (-18 C)
130 F (54 C) 200 F (93 C) 130 F (54 C)
Humidity
30%
95%
This product simply requires the substrate temperature to be above the dew point. Condensation
due to substrate temperatures below the dew point can cause flash rusting on prepared steel and
interfere with proper adhesion to the substrate. Special application techniques may be required
above or below normal application conditions.
Cleanup
Use Thinner 21 or Isopropyl Alcohol. In case of
spillage, absorb and dispose of in accordance with
local applicable regulations.
Safety
Read and follow all caution statements on this product
data sheet and on the MSDS for this product. Employ
normal workmanlike safety precautions.
Ventilation
When used as a tank lining or in enclosed areas,
thorough air circulation must be used during and after
application until the coating is cured. The ventilation
system should be capable of preventing the solvent
vapor concentration from reaching the lower explosion
limit for the solvents used. In addition to ensuring
proper ventilation, appropriate respirators must be
used by all application personnel.
Packaging, Handling & Storage
Shelf Life
Part A: 12 months at 75F (24C)
Part B: 24 months at 75F (24C)
*Shelf Life: (actual stated shelf life) when kept at recommended storage
conditions and in original unopened containers.
Shipping Weight
(Approximate)
1 Gallon Kit - 23 lbs (10 kg)
5 Gallon Kit - 113 lbs (51 kg)
Storage
Temperature &
Humidity
40 -100F (4-38C).
0-90% Relative Humidity
Flash Point
(Setaflash)
Part A: 55F (13C)
Zinc Filler: NA
Storage
Store Indoors.
This product is solvent based and not affected by excursions below
these published storage temperatures, down to 10F, for a duration of no
more than 14 days. Always inspect the product prior to use to make sure
it is smooth and homogeneous when properly mixed.
Curing Schedule
Surface Temp. & 50%
Relative Humidity
Dry to Handle
0 F (-18 C)
40 F (4 C)
60 F (16 C)
80 F (27 C)
100 F (38 C)
4 Hours
1 Hours
45.0 Minutes
45.0 Minutes
15.0 Minutes
Dry to Recoat
& Topcoat w/
other finishes
7 Days
48 Hours
24 Hours
18 Hours
16 Hours
These times are based on a 3.0-4.0 mil (75-100 micron) dry film thickness. Higher film thickness,
insufficient ventilation or cooler temperatures will require longer cure times and could result in
solvent entrapment and premature failure. Humidity levels below 50% will require longer cure times.
Notes: Maximum recoat time is unlimited. Must have a clean, dry surface free of chalk, zinc salts,
etc per typical good painting practices. Consult Carboline Technical Service for specific information.
Also, loose zinc must be removed from the cured film by rubbing with fiberglass screen wire if: 1)
The Carbozinc 11 is to be used without a topcoat in immersion service and "zinc pick up" could
be detrimental, or 2) When "dry spray/overspray" is evident on the cured film and a topcoat will be
applied. For accelerated curing or where the relative humidity is below 40%, allow an initial 2hour ambient cure. Follow 2 hour cure with water misting or steam to keep the coated surface wet
for a minimum of 8 hours and until the coated surface achieves a "2H" pencil hardness per ASTM
D3363.
July 2015
0250
To the best of our knowledge the technical data contained herein is true and accurate on the date of publication and is subject to change without prior notice. User must contact Carboline Company
to verify correctness before specifying or ordering. No guarantee of accuracy is given or implied. We guarantee our products to conform to Carboline quality control. We assume no responsibility for
coverage, performance or injuries resulting from use. Liability, if any, is limited to replacement of products. NO OTHER WARRANTY OR GUARANTEE OF ANY KIND IS MADE BY CARBOLINE,
EXPRESS OR IMPLIED, STATUTORY, BY OPERATION OF LAW, OR OTHERWISE, INCLUDING MERCHANTABILITY AND FITNESS FOR A PARTICULAR PURPOSE. Carboline and Carboguard
are registered trademarks of Carboline Company.
Page 2 of 2