This Quality Management and IV&V Plan outlines the testing, auditing, and verification activities for an unnamed project. It includes sections on product testing with an overview, schedule, team responsibilities, and resource requirements. Similarly, it outlines the project audit process with an overview, schedule, responsibilities, and resources. Finally, it addresses independent verification and validation with an overview, schedule, responsibilities, and resource needs. The document provides a framework but leaves key details like project name, dates and staff assignments to be populated.

Uploaded by

gridech
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
454 views5 pages

3-3-6 Plan Quality and IVV Plan

This Quality Management and IV&V Plan outlines the testing, auditing, and verification activities for an unnamed project. It includes sections on product testing with an overview, schedule, team responsibilities, and resource requirements. Similarly, it outlines the project audit process with an overview, schedule, responsibilities, and resources. Finally, it addresses independent verification and validation with an overview, schedule, responsibilities, and resource needs. The document provides a framework but leaves key details like project name, dates and staff assignments to be populated.

Uploaded by

gridech
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 5

<Type Project Name Here>

Quality Management and IV&V Plan


This document is to be used by projects with complexity:
Basic Low Medium High

1 General Information
Project Name:
Sponsoring Organization:
Project Sponsor:
Project Manager:
Project Start:
Project Reporting:
Prepared By:

Project Finish:
Project Complexity:
Prepared Date:

2 Product Testing
Describe the Product Testing activities for the project including Testing Overview, Testing Schedule, Team
Responsibilities, and Resource Requirements

2.1 Product Testing Overview


Provide a general description of the plans for testing the product(s) developed by the project

2.2 Product Testing Schedule


Define the specific schedule for testing activities and identify the person responsible for the activity. Integrate the
Product Test Schedule with the Project Schedule

Activity

Scheduled Date

Responsible
Person(s)

2.3 Project Team Responsibilities


Describe the Product Testing Responsibilities of the Project Team in general and the specific team member
assignments. Cross-reference this information with the organizational breakdown structure, resource plan, and
schedule

2.3.1 General Responsibilities

284678127.doc

Version Date:<Insert Version Date>

<Type Project Name Here>


Quality Management and IV&V Plan
This document is to be used by projects with complexity:
Basic Low Medium High

2.3.2 Specific Team Member Responsibilities


Team Member

Specific Task

2.4 Testing Resource Requirements


Describe the Resources needed to execute the scheduled testing activities. Cross-reference this information with
project resource plan and schedule

Activity

Scheduled Date

Resources Required

3 Project Audit
Describe the Project Audit activities for the project including Audit Overview, Audit Schedule, Team
Responsibilities, and Resource Requirements.

3.1 Project Audit Overview


Provide a general description of the plans for auditing the project. Identify what is audited, who conducts the audit
and when the audit is conducted.

3.2 Project Audit Schedule


Define the specific schedule for Project Audit and identify the person responsible for the activity. Integrate the
Project Audit Schedule with the Project Schedule

Activity

284678127.doc

Scheduled Date
or Phase

Responsible Person(s)

Version Date:<Insert Version Date>

<Type Project Name Here>


Quality Management and IV&V Plan
This document is to be used by projects with complexity:
Basic Low Medium High

Activity

Scheduled Date
or Phase

Responsible Person(s)

3.3 Project Team Responsibilities


Describe the Project Audit Responsibilities of the Project Team in general and the specific team member
assignments. Cross-reference this information with the organizational breakdown structure, resource plan, and
schedule

3.3.1 General Responsibilities

3.3.2 Specific Team Member Responsibilities


Team Member

Specific Task

3.4 Testing Resource Requirements


Describe the Resources needed to execute the scheduled audit activities. Cross-reference this information with
project resource plan and schedule

Activity

Scheduled Date

Resources Required

4 Independent Verification and Validation (IV&V)


Describe the Independent Verification and Validation activities for the project including Independent Verification
and Validation Overview, Schedule, Team Responsibilities and Resource Requirements

284678127.doc

Version Date:<Insert Version Date>

<Type Project Name Here>


Quality Management and IV&V Plan
This document is to be used by projects with complexity:
Basic Low Medium High

4.1 IV&V Overview


Provide a description of the plans for Independent Verification and Validation of the project

4.2 IV&V Schedule


Define the specific schedule for Independent Verification and Validation of the project and identify the person
responsible for the activity. Integrate the Independent Verification and Validation Schedule with the Project
Schedule.

Activity

Scheduled Date
or Phase

Responsible Person(s)

4.3 Project Team Responsibilities


Describe the Independent Verification and Validation Responsibilities of the Project Team in general and the
specific team member assignments such as acceptance test and audit. Cross-reference this information with the
organizational breakdown structure, resource plan, and schedule

4.3.1 General Responsibilities

4.3.2 Specific Team Member Responsibilities


Team Member

Specific Task

4.4 IV&V Resource Requirements


Describe the resources needed to execute the scheduled for Independent Verification and Validation activities of the
project. Cross-reference this information with project resource plan and schedule
284678127.doc

Version Date:<Insert Version Date>

<Type Project Name Here>


Quality Management and IV&V Plan
This document is to be used by projects with complexity:
Basic Low Medium High

Activity

284678127.doc

Scheduled Date

Resources Required

Version Date:<Insert Version Date>