Date of Assessment:
08.10.2015
Assessment Title:
PEECC MCC Module
Assessment Team:
Reference No:
AZN/EMD/SAP WO
Number of People doing the work or that may be affected:
RISK ASSESSMENT
20
30
40
50
60
Control Measures and Risk Evaluation
Before Control
Measures
N
u
m
b
e
r
10
Two
AZN HSE PROC 027 F1
T
a
s
k
Task Steps
Hazard Description
Take the permit
Check the suitability of fitment of Spare Bucket/Module if avialable
Else dismantling of Faulty MCCB & with identiifcation marking of R,Y, B
Fixing of Spare New MCCB with correct phase sequence
Check intactness of power and contrlol termination
Close the Permit
After Control Measures
Likely Consequences
None
None
Manual handling
Minor injuries
Manual handling
Minor injuries
Manual handling
Minor injuries
Manual handling
Minor injuries
None
None
Control Measures
1
4
4
4
4
1
None
PPE & Proper Test Instruments
PPE & Proper Test Instruments
PPE & Proper Test Instruments
PPE
PPE
Residual
Risk
Acceptable
YES/NO
Yes
Yes
Yes
Yes
Yes
Yes
70
80
90
100
110
120
None
None
None
Yes
0
0
WHO MAY BE HARMED AND HOW?
Can work continue?
PERSONNEL LIMITATIONS AND SPECIAL PRECAUTIONS
Persons at Risk:
Hard Hat:
Safety Glasses:
Coveralls:
COSHH Risk
Assessment
Designated
Persons Report
PERSONAL PROTECTIVE EQUIPMENT (if not covered on SAP)
Safety Boots:
Respirator:
Full Face Visor:
Ear Protection:
Chemical Suit:
Fall equipment:
Lifting
Plan
Hot Work
Assessment
Manual
Handling
Assesment
Please Specify Type:
Specify Type/Duration:
Gloves:
Noise
Assesment
DSE
Assesment
Date of Assessment:
08.10.2015
Assessment Title:
PEECC MCC Module
Assessment Team:
Reference No:
AZN/EMD/SAP WO
Number of People doing the work or that may be affected:
RISK ASSESSMENT
20
30
40
50
60
Control Measures and Risk Evaluation
Before Control
Measures
N
u
m
b
e
r
10
Two
AZN HSE PROC 027 F1
T
a
s
k
Task Steps
Hazard Description
Take the permit
Switch OFF the MCCB and open the feeder door
Make note of the settings and close the door
Connect the Power Analyser and make the settings
Normalize the Feeder MCCB
Close the permit
After Control Measures
Likely Consequences
None
None
Indirect contact of Electricity
Shock Hazard
None
None
Indirect contact of Electricity
Shock Hazard
None
None
None
None
Control Measures
1
4
1
9
1
1
None
Power Isolated
None
Shield protection from nearby feeders
None
None
Residual
Risk
Acceptable
YES/NO
Yes
Yes
Yes
Yes
Yes
Yes
70
80
90
100
110
120
None
None
None
Yes
0
0
WHO MAY BE HARMED AND HOW?
Can work continue?
PERSONNEL LIMITATIONS AND SPECIAL PRECAUTIONS
Persons at Risk:
Hard Hat:
Safety Glasses:
Coveralls:
COSHH Risk
Assessment
Designated
Persons Report
PERSONAL PROTECTIVE EQUIPMENT (if not covered on SAP)
Safety Boots:
Respirator:
Full Face Visor:
Ear Protection:
Chemical Suit:
Fall equipment:
Lifting
Plan
Hot Work
Assessment
Manual
Handling
Assesment
Please Specify Type:
Specify Type/Duration:
Gloves:
Noise
Assesment
DSE
Assesment