Revised Final Estimate of Earth Mat - 220kV Yard

The document provides an abstract estimate for the modification of the earthing system at a 220kV substation in Poovanthuruthu, Kerala, India. This involves laying an earthmat in the 220kV switchyard and includes quantities, unit rates, and totals for various work items like excavation, laying rods, welding, and plastering. The total estimated cost is [AMOUNT] plus service tax and an allowance for unforeseen items.

Uploaded by

Midhun Varghese
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
365 views116 pages

Revised Final Estimate of Earth Mat - 220kV Yard

The document provides an abstract estimate for the modification of the earthing system at a 220kV substation in Poovanthuruthu, Kerala, India. This involves laying an earthmat in the 220kV switchyard and includes quantities, unit rates, and totals for various work items like excavation, laying rods, welding, and plastering. The total estimated cost is [AMOUNT] plus service tax and an allowance for unforeseen items.

Uploaded by

Midhun Varghese
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 116

KERALA STATE ELECTRICITY BOARD LIMITED

220kV SUB STATION SUB-DIVISION, POOVANTHURUTHU


ABSTRACT OF ESTIMATE
Name of Work:- Modification of Earthing System at 220kV Substation, Poovanthuruthu
Laying of Earthmat in the 220kV switchyard.
Sl.
No
.

Quantity

Details of Work

Rate

Per
Unit

Amount

280.000 m3

Picking, Collecting, Washing and Stacking


40mm broken stone from the existing 220kV
yard or suitable place (upto 100m) for
measurement
including
head
load 762.00
conveyance upto 100m including all labour
charges complete as per the direction of
departmental officers at site.

m3

213360.00

285.000 m3

Collecting and stacking the mixture of


broken stones comprising balance unusable
40mm broken stone, 20mm broken stone,
dirty sand etc in the existing 220kV yard or
627.35
suitable place (within 100m distance) for
measurement including all labour charges
complete as per the direction of
departmental officers at site.

m3

178794.75

100.000 m3

Additional head load conveyance required


for items 1 & 2 above 100m for every
additional 50m of 40mm broken stone,
Mixture of broken stones and dirty sand,
River sand / quarry dust etc as per the
direction of departmental officers at site.

m3

3995.00

m3

Demolishing concrete in cement mortar and


clearing away the debris within a distance of
150m at any convenient place as directed
by departmental officers at site without
causing any damage to the existing trench
1835.60
including
the cost of removing and
replacing
the
cover
slabs
for
the
convenience of work and plastering neatly
the sides of the demolished portion of
concrete.

m3

31205.20

m3

Brick work in cement mortar 1:6 with wire


cut bricks 22.9cm x 11.2cm x 7cm for the
sides of cable trench including all charges
6750.65
for labour, materials, curing etc complete as
per the direction of departmental officers at
site.

m3

27002.60

m2

Plastering with cement mortar 1:3, 12mm


thick one coat, floated hard and trowelled
smooth including cost and conveyance of all
265.40
materials, labour charges, watering, curing
etc complete as per the direction of
departmental officers at site.

m2

6635.00

17.000

4.000

25.000

39.95

Sl.
No
.

Quantity

###

Details of Work

Rate

Excavating trenches of required width in all


classes of soil for laying the 32mm MS rod
for earth mat
including excavation for
sockets and dressing of sides, ramming of
bottoms, depth upto 1.5m, including getting
out the excavated soil and charges include
R.
returning the soil as required in layers not 179.75
m
exceeding 20cm in depth, including
consolidating each deposited layer by
ramming, watering, etc and disposing of
surplus excavated soil as directed by
departmental officers at site, within a lead
of 50m.

Per
Unit

Amount

R. m

431400.00

Cutting the departmentally supplied 32mm


MS rod in required length etc complete as
per the direction of departmental officers at
950.000 No.
site. Charges include the lifting of 32mm MS
rod from the stockyard to the site, hire
charges for the cutting tool etc complete.

59.25

No.

56287.50

Bending the departmentally supplied 32mm


MS rod for crossing cable trench /
foundations / risers etc as per the direction
of departmental officers at site. Charges
No.
include the lifting of 32mm MS rod from the
stockyard to the site, hire charges for the
bending tool etc complete. (Heat bending of
MS rod is not allowed.)

84.65

No.

110045.00

Laying of earth mat of required size as


specified using 32mm MS rod to the
excavated trench, charges include levelling,
lowering and placing in trenches for lap
695.30
10 275.000 Qtl
joining, bending etc complete as per the
direction of departmental officers at site.
Charges include the lifting of 32mm MS rod
from the stockyard to the site.

Qtl

191207.50

Driving down the MS ground electrode upto


a depth of 3m from the already taken earth
pit as directed by departmental officers at
11 120.000 No. site. Charges include the lifting of ground 119.80
electrode from the stockyard to the site,
backfilling, placing and leveling the
electrode etc complete.

No.

14376.00

###

Sl.
No
.

Quantity

Details of Work

Rate

Per
Unit

Amount

Drilling holes and driving down MS ground


electrode from the bottom level of trench in
all classes of soil including rock etc
complete
as
per
the
direction
of
146.35
m
departmental officers at site. Charges
include the lifting of ground electrode from
the stockyard to the site, backfilling, placing
and leveling the electrode complete.

60.000

Drilling bore holes of size 150mm or nearest


with 3m in depth in all classes of soil
including hire charges of plant and
machinery, cost of oil, fuel, tool etc and
taking all necessary precautions for safety
1719.50
No.
to the substation equipments, personnel etc
and filling the drilled boreholes with
bentonite clay after placing the ground
electrode
as
per
the
direction
of
departmental officers at site.

No.

103170.00

###

Welding of overlapping joints for mat, riser


lap joints with 32mm MS rod placed in
trenches, having 150mm in length 6mm
thick on all sides(in round shape) of the rod
and both ends of overlapped MS rods with
6mm welding thickness after cleaning the
surfaces neatly. Charges include cost of low
No. hydrogen DC electrode (No. E7018), hire 535.75
charges of DC arc welding set, tools and
plants required, current charges including
labour charges for holding MS rod in position
and applying two coats of anti corrosive
paints at the welded joints etc complete as
per the direction of departmental officers at
site.

No.

776837.50

Welding the nodal points (cross joints) in the


trenches at all sides to a thickness of 6mm
after cleaning the surface neatly. Charges
include cost of low hydrogen DC electrodes
(No. E7018), hire charges of DC welding set,
15 520.000 No. tools and plants required, current charges, 250.85
labour charges for holding MS rod in position
and applying two coats of anti corrosive
paints at the welded joints etc complete as
per the direction of departmental officers at
site.

No.

130442.00

12 200.000

13

14

29270.00

Sl.
No
.

Quantity

Details of Work

Rate

Welding the ground electrode with the main


electrode after cleaning the surface neatly.
Charges include cost of low hydrogen
content DC electrodes (No. E7018), hire
charges of DC arc welding set, tools and
304.45
16 120.000 No.
plants, current charges, labour charges for
holding MS rod in position and applying two
coats of anti corrosive paints at the welded
joints etc complete as per the direction of
departmental officers at site.
Laying of departmentally supplied GI strip /
Copper strip of suitable size over the
equipment structure and the trenches,
including cleaning and neatly bending the
strips, cutting, removing of metal / earth in
m the yard and burying earth strip to the 116.40
required depth, re-doing the yard metalling
as per the direction of the departmental
officers at site. Charges include the lifting of
GI strip from the stockyard to the site
complete.

Per
Unit

No.

Amount

36534.00

197880.00

Welding one end of the bended GI strip of


size 50x6mm with the riser / GI angle
platform in front of the equipments of the
already laid earth mat, welding 150mm in
length, 6mm thick on both sides & end of
the strip & other end of the strip with yard
structure at 2 points 50mm apart each
welding points having 50mm length and
18 350.000 No. 6mm thick on both sides & end of the strip 449.90
including the charges for connecting the
strip with structure using bolted joints as
per the direction of the departmental
officers at site. Charges include hire charges
of DC arc welding set, current charges, cost
of low hydrogen content DC arc welding
electrodes (No.E7018) cost of anti corrosive
paint etc complete.

No.

157465.00

Welding overlapping joints of 50x6mm GI


strip with 50mm long, 6mm thick welding on
all three sides after doing 2 Nos. bolted
joints at the centre as specified after
cleaning the surface. Charges include hire
201.75
19 100.000 No.
charges of DC arc welding set, current
charges, cost of low hydrogen content DC
arc welding electrodes (No.E7018), cost of
anti corrosive paint etc complete as per the
direction of departmental officers at site.

Nos.

17

###

20175.00

Sl.
No
.

Quantity

Details of Work

Rate

Per
Unit

Amount

Welding one end of the bended GI strip of


size 50x6mm with the riser / GI platform of
the already laid earth mat, welding 150mm
in length, 6mm thick on both sides & end of
the strip welded on the stucture and
connect with nuts & bolts if required as per
416.05
20 200.000 No.
the direction of departmental officers at
site. Charges include hire charges of DC arc
welding set, current charges, cost of low
hydrogen content DC arc welding electrodes
(No.E7018), cost of anti corrosive paint etc
complete.

No.

83210.00

m3

Cement Concrete 1:2:4, ( M15) using 20mm


hard granite broken stone for fixing GI
7738.70
Platform support including all cost of
watering, curing etc complete as per the
direction of departmental officers at site.

m3

54170.90

22 150.000 m2

Centering and shuttering for the


GI
platform support as per the given
measurement including strutting, propping
in finished condition etc and removal of 276.90
form for foundations, footings, bases of
columns etc as per the direction of
departmental officers at site.

m2

41535.00

Cutting the departmentally supplied steel /


GI / MS angle for fabricating the platform
near the isolators for safe operation as per
23 180.000 No. the direction of departmental officers at 132.15
site. Charges include hire charges for the
cutting tool, levelling, placing, lifting the
angle etc complete.

No.

23787.00

Welding on iron parts using DC arc welding


as per standards as per the direction of
departmental officers at site. Charges
24 840.000 No.
include the current charge and hire charge
for the welding machine, filing, caning etc
complete.

No.

76398.00

21

7.000

90.95

Total
Service Tax @ 12.36%
Add for Unforeseen
Grand Total

( Rupees Thirty Five Lakh only)

###
###
###
###

KERALA STATE ELECTRICITY BOARD LIMITED


220kV SUB STATION SUB-DIVISION, POOVANTHURUTHU
DETAILS OF ESTIMATE
Name of Work:- Modification of Earthing System at 220kV Substation, Poovanthuruthu Laying of
Earthmat in the 220kV switchyard.
Sl.
No.

Particulars

No.

Length Breadth Height


(m)
(m)
(m)

Total

Unit

Picking, Collecting, Washing and Stacking 40mm


broken stone from the existing 220kV yard or
suitable place (upto 100m) for measurement
including head load conveyance upto 100m
including all labour charges complete as per the
direction of departmental officers at site.
1

220kV feeder's area

50.00

75.00

0.10

375.000

200MVA Transformer Back side

51.00

35.00

0.10

178.500
553.500

Take only 50% as Reusable material

276.750

Add extra

3.250

Total

280.000

m3

Collecting and stacking the mixture of broken


stones comprising balance unusable 40mm
broken stone, 20mm broken stone, dirty sand etc
in the existing 220kV yard or suitable place
(within 100m distance) for measurement
including all labour charges complete as per the
direction of departmental officers at site.
220kV feeder's area

50.00

75.00

0.05

200MVA Transformer Back side

51.00

35.00

0.05

187.500
89.250
276.750

Add extra

8.250

Total
Additional head load conveyance required for
items 1 & 2 above 100m for every additional
50m of 40mm broken stone, Mixture of broken
stones and dirty sand, River sand / quarry dust
etc as per the direction of departmental officers
at site.

285.000

m3

100.000

m3

Demolishing concrete in cement mortar and


clearing away the debris within a distance of
150m at any convenient place as directed by
departmental officers at site without causing any
damage to the existing trench including the cost
of removing and replacing the cover slabs for the
convenience of work and plastering neatly the
sides of the demolished portion of concrete.
Old CB Foundation Near to SB-PL 220kV
Old CB Foundation Near to PL-AM 220kV &
200MVA Transformer No. 2
Old unsusable trenches

3
3
4

1.00
1.00
0.25

1.00
1.00
0.25

2.00
2.00
1.00

6.000
6.000
0.250
12.250

Add extra

4.750

Total

Brick work in cement mortar 1:6 with wire cut


bricks 22.9cm x 11.2cm x 7cm for the sides of
cable trench including all charges for labour,
materials, curing etc complete as per the
direction of departmental officers at site.

2.00

2.00

1.00

17.000

m3

4.000

m3

Plastering with cement mortar 1:3, 12mm thick


one coat, floated hard and trowelled smooth
including cost and conveyance of all materials,
labour charges, watering, curing etc complete as
per the direction of departmental officers at site.

5.00

5.00

1.00

25.000

m2

Excavating trenches of required width in all


classes of soil for laying the 32mm MS rod for
earth mat including excavation for sockets and
dressing of sides, ramming of bottoms, depth
upto 1.5m, including getting out the excavated
soil and charges include returning the soil as
required in layers not exceeding 20cm in depth,
including consolidating each deposited layer by
ramming, watering, etc and disposing of surplus
excavated soil as directed by departmental
officers at site, within a lead of 50m.
Compressor room to 200MVA transformer CB
220kV PL-AM 220kV to SB-PL 220kV
220kV PL-AM 220kV to 220kV Compressor room
Transformer spare plinth to SB-PL 220kV

10
11

35.00
75.00

350.000
825.000

8
8

101.00
40.00

808.000
320.000
2303.000

Add Extra

97.000

Total

Cutting the departmentally supplied 32mm MS


rod in required length etc complete as per the
direction of departmental officers at site.
Charges include the lifting of 32mm MS rod from
the stockyard to the site, hire charges for the
cutting tool etc complete.
Main Mat
Auxiliary Mat
Diversion Grid
Driving Electrode
Risers
Additional straight joints at nodal points of 1m
length

2400.000 R. m

37
90

37.000
90.000

25
90
406
234

25.000
90.000
406.000
234.000
882.000

Add Extra

68.000

Total

950.000

No.

Bending the departmentally supplied 32mm MS


rod for crossing cable trench / foundations / risers
etc as per the direction of departmental officers
at site. Charges include the lifting of 32mm MS
rod from the stockyard to the site, hire charges
for the bending tool etc complete. (Heat bending
of MS rod is not allowed.)
Main Mat
Risers
Additional straight joints at nodal points.

500
466
256

500.000
466.000
256.000
1222.000

Add Extra

78.000

Total

1300.000 No.

Laying of earth mat of required size as specified


using 32mm MS rod to the excavated trench,
charges include levelling, lowering and placing in
trenches for lap joining, bending etc complete as
per the direction of departmental officers at site.
Charges include the lifting of 32mm MS rod from
the stockyard to the site.
Main Mat
10 Auxiliary Mat
Diversion
Driving Electrode
Risers
Lap joints
Additional straight joints at nodal points.
Total length

2400

2400.000

15

135.000

125
120
466
400
256

1.8
3
1.5
0.15
1

225.000
360.000
699.000
60.000
256.000

m
m
m
m
m

4135.000

Weight = 6.3kg/m

###

kg

Add Extra

1449.500

kg

Total

275.000

Qtl

11

Driving down the MS ground electrode upto a


depth of 3m from the already taken earth pit as
directed by departmental officers at site.
Charges include the lifting of ground electrode
from the stockyard to the site, backfilling, placing
and leveling the electrode etc complete.
Main Mat
LA
Transformer

71
21
12

Add Extra
Total

71.000
21.000
12.000
104.000
16.000
120.000

No.

Drilling holes and driving down MS ground


electrode from the bottom level of trench in all
classes of soil including rock etc complete as per
12 the direction of departmental officers at site.
Charges include the lifting of ground electrode
from the stockyard to the site, backfilling, placing
and leveling the electrode complete.

200

200.000

Drilling bore holes of size 150mm or nearest with


3m in depth in all classes of soil including hire
charges of plant and machinery, cost of oil, fuel,
tool etc and taking all necessary precautions for
13 safety to the substation equipments, personnel
etc and filling the drilled boreholes with
bentonite clay after placing the ground electrode
as per the direction of departmental officers at
site.

60

60.000

No.

400

400.000

18

18.000

466

466.000

512

512.000

Welding of overlapping joints for mat, riser lap


joints with 32mm MS rod placed in trenches,
having 150mm in length 6mm thick on all
sides(in round shape) of the rod and both ends of
overlapped MS rods with 6mm welding thickness
after cleaning the surfaces neatly. Charges
include cost of low hydrogen DC electrode (No.
E7018), hire charges of DC arc welding set, tools
and plants required, current charges including
labour charges for holding MS rod in position and
applying two coats of anti corrosive paints at the
14
welded joints etc complete as per the direction of
departmental officers at site.
Overlap joints for the main mat
Auxiliary Mat
Risers
Additional straight joints at nodal points.

1396.000

Add extra

54.000

Total

1450.000 No.

Welding the nodal points (cross joints) in the


trenches at all sides to a thickness of 6mm after
cleaning the surface neatly. Charges include cost
of low hydrogen DC electrodes (No. E7018), hire
charges of DC welding set, tools and plants
required, current charges, labour charges for
holding MS rod in position and applying two
coats of anti corrosive paints at the welded joints
15 etc complete as per the direction of
departmental officers at site.
Nodal points in the X-direction

11

88.000

Nodal points in the Y-direction

21

168.000

Auxiliary Mat

25

225.000
481.000

Add extra

39.000

Total

520.000

No.

Welding the ground electrode with the main


electrode after cleaning the surface neatly.
Charges include cost of low hydrogen content DC
electrodes (No. E7018), hire charges of DC arc
welding set, tools and plants, current charges,
labour charges for holding MS rod in position and
applying two coats of anti corrosive paints at the
welded joints etc complete as per the direction of
16 departmental officers at site.
Main Mat
LA

71

71.000

21

21.000

Transformer

12

12.000
104.000

Add Extra

16.000

Total

120.000

Laying of departmentally supplied GI strip /


Copper strip of suitable size over the equipment
structure and the trenches, including cleaning
and neatly bending the strips, cutting, removing
of metal / earth in the yard and burying earth
strip to the required depth, re-doing the yard
17 metalling as per the direction of the
departmental officers at site. Charges include the
lifting of GI strip from the stockyard to the site
complete.
GI strip for Equipment and all types of structure
1526
earthing
Add extra
Total

No.

1526.000
174.000
1700.000

Welding one end of the bended GI strip of size


50x6mm with the riser / GI angle platform in
front of the equipments of the already laid earth
mat, welding 150mm in length, 6mm thick on
both sides & end of the strip & other end of the
strip with yard structure at 2 points 50mm apart
each welding points having 50mm length and
6mm thick on both sides & end of the strip
including the charges for connecting the strip
18 with structure using bolted joints as per the
direction of the departmental officers at site.
Charges include hire charges of DC arc welding
set, current charges, cost of low hydrogen
content DC arc welding electrodes (No.E7018)
cost of anti corrosive paint etc complete.

No. of welding points (70% of No. of Risers)


Add extra

326

326.000
24.000

Total

350.000

No.

100.000

No.

Welding overlapping joints of 50x6mm GI strip


with 50mm long, 6mm thick welding on all three
sides after doing 2 Nos. bolted joints at the
centre as specified after cleaning the surface.
Charges include hire charges of DC arc welding
19 set, current charges, cost of low hydrogen
content DC arc welding electrodes (No.E7018),
cost of anti corrosive paint etc complete as per
the direction of departmental officers at site.
Total

100

Welding one end of the bended GI strip of size


50x6mm with the riser / GI platform of the
already laid earth mat, welding 150mm in length,
6mm thick on both sides & end of the strip
welded on the stucture and connect with nuts &
bolts if required as per the direction of
departmental officers at site. Charges include
hire charges of DC arc welding set, current
20
charges, cost of low hydrogen content DC arc
welding electrodes (No.E7018), cost of anti
corrosive paint etc complete.
No. of welding and bolted points (30% of No. of
Risers)
Add extra for joining to the existing earth plates
Total
Cement Concrete 1:2:4, ( M15) using 20mm
hard granite broken stone for fixing GI Platform
support including all cost of watering, curing etc
complete as per the direction of departmental
21 officers at site.
RCC required for the platform of operation

140

140.000
60.000
200.000

48

2.00

0.10

0.60

Add Extra for cable trench repair


Total

No.

5.760
1.240
7.000

m3

Centering and shuttering for the GI platform


support as per the given measurement including
strutting, propping in finished condition etc and
22
removal of form for foundations, footings, bases
of columns etc as per the direction of
departmental officers at site.
Outer side

48

2.4

0.6

69.120

Inner side

48

1.6

0.6

46.080
115.200

Add extra

34.800

Total

150.000

m2

Cutting the departmentally supplied steel / GI /


MS angle for fabricating the platform near the
isolators for safe operation as per the direction of
23
departmental officers at site. Charges include
hire charges for the cutting tool, levelling,
placing, lifting the angle etc complete.

12

15

180.000

No.

Welding on iron parts using DC arc welding as


per standards as per the direction of
24 departmental officers at site. Charges include the
current charge and hire charge for the welding
machine, filing, caning etc complete.

12

70

840.000

No.

KERALA STATE ELECTRICITY BOARD LIMITED


220kV SUB STATION SUB-DIVISION, POOVANTHURUTHU
DATA
Name of Work:- Modification of Earthing System at 220kV Substation, Poovanthuruthu Laying
of Earthmat in the 220kV switchyard.
0.4095

Cost Index of Kottayam (148-105)/105


Sl.
No.

Item
No. in
Data
Book /
Code

Particulars

Unit

Quantity

Rate

Amount

Day

1.00

329.00

329.00

cum

1.00

136.44

136.44

Picking, Collecting, Washing and


Stacking 40mm broken stone from
the existing 220kV yard or suitable
place (upto 100m) for measurement
including head load conveyance upto
100m including all labour charges
complete as per the direction of
departmental officers at site.
0114

Beldar
Conveyance by head load(50M to
100M)

1
1.2.6

Stone aggregate 40mm nominal size


and above
Add Water Charges @ 1%

465.44

Add CPOH @ 15%

470.09

Add Price Index 148 For Kottayam

465.44
4.65
470.09
70.51
540.60
221.38

540.60

Cost of 1cum
Say Rs.

761.98
762.00

/ 1m3

Day

0.75

329.00

246.75

cum

1.00

136.44

136.44

Collecting and stacking the mixture of


broken stones comprising balance
unusable 40mm broken stone, 20mm
broken stone, dirty sand etc in the
existing 220kV yard or suitable place
(within
100m
distance)
for
measurement including all labour
charges complete as per the direction
of departmental officers at site.
0114

Beldar
Conveyance by head load(50M to
100M)

2
1.2.6

Stone aggregate 40mm nominal size


and above
Add Water Charges @ 1%

383.19

Add CPOH @ 15%

387.02

Add Price Index 148 For Kottayam

445.07

383.19
3.83
387.02
58.05
445.07
182.26

Cost of 1cum
Say Rs.

627.33
627.35

/ 1m3

Sl.
No.

Item
No. in
Data
Book /
Code

Particulars

Unit

Quantity

Rate

cum

1.00

24.4

Amount

Additional head load conveyance


required for items 1 & 2 above 100m
for every additional 50m of 40mm
broken stone, Mixture of broken
stones and dirty sand, River sand /
quarry dust etc as per the direction of
departmental officers at site.
Conveyance by head load for
aditional 50m
3

1.2.6

Stone aggregate 40mm nominal size


and above
Add Water Charges @ 1%

24.40

Add CPOH @ 15%

24.64

Add Price Index 148 For Kottayam

28.34

24.40
0.24
24.64
3.70
28.34
11.61

Cost of 1cum
Say Rs.

39.95
39.95

Demolishing concrete in cement


mortar and clearing away the debris
within a distance of 150m at any
convenient place as directed by
15.3 of departmental officers at site without
CPWD causing any damage to the existing
2014 trench including the cost of removing
and replacing the cover slabs for the
convenience of work and plastering
neatly the sides of the demolished
portion of concrete.

/ 1m3

m3

0114
0115

Details of cost for 1 cum


LABOUR:
Beldar
Coolie

day
day

2.650
0.720

329.00
329.00

9999

Sundries

L.S.

7.020

1.78

1121.23

Add Water Charges @ 1%

Add Price Index 148 For Kottayam

1302.31

12.50
1121.23
11.21

533.30
1835.61

Cost of 1 cum
Say Rs.

871.85
236.88

1132.44
169.87
1302.31

1132.44

Add CPOH @ 15%

24.40

1835.60

/ 1m3

1000 Nos

494

4500.00

1000 Nos

494

283.96

Brick work in cement mortar 1:6 with


wire cut bricks 22.9cm x 11.2cm x
6.1.2 of 7cm for the sides of cable trench
CPWD including all charges for labour,
2014 materials, curing etc complete as per
the direction of departmental officers
at site.
2602

Bricks
(non
modular
22.9x11.4x7cm)

2201

Carriage of bricks
Cement mortar 1 :6

of

size

2223.00
140.28

Sl.
No.

Item
No. in
Data
Book /
Code

Particulars

Unit

Quantity

Rate

3.11

Rate as per Item Number 3.11 of SH:


Mortars ( Sub data no.1)

m3

0.25

5550.87

9999

Sundries

Amount

1387.72

LS

2.73

1.78

123
124
115

Mason (brick layer) 1 st class


Mason (brick layer) 2nd class
Coolie

day
day
day

0.36
0.36
1.37

435.00
399.00
329.00

156.60
143.64
450.73

101

Bhisti

day

0.2

363.00

72.60
4579.43
31.92

Add water charge @1% of Rs

3191.71

Add 15% CPOH of Rs

3223.63

Carriage of wire cut Bricks


remaining 20km by mechanical

for

1000 Nos

4.86

4611.35
483.54
5094.89
494

412.45

203.75

Cost of carriage, market rate and


their CPOH and water charges

1549.04

Add Price Index 148 For Kottayam


3545.85
Cost of 1 cu.m

1452.03
6750.67

Say Rs.

6750.65

/ 1m3

m3

0.144

8397.56

LABOUR:
Mason (average)
Coolie

day
day

0.67
0.75

417.00
329.00

279.39
246.75

Bhisti
Scaffolding and sundries.

day
LS

0.92
12.61

363.00
1.78

333.96
22.45
2091.80

Add Water Charges @ 1%

882.55

Add CPOH @ 15%

891.38

Plastering with cement mortar 1:3,


12mm thick one coat, floated hard
13.7.1
and trowelled smooth including cost
of
and conveyance of all materials,
CPWD
labour charges, watering, curing etc
2014
complete as per the direction of
departmental officers at site.
Details of cost for 10 sqm.
MATERIAL:

3.3

Cement mortar 1:3 (1 cement : 3 fine


sand)

3.3

Rate as per Item Number 3.3 of SH:


Mortars (sub data no.2)

155
115
101
9999

1209.25

8.83
2100.63
133.71
2234.34

Cost of carriage, market rate and


their CPOH and water charges
Add Price Index 148 For Kottayam

1209.25
1025.09

419.77

Cost of 10M2

2654.11

Cost of 1M2
Say Rs.

265.41
265.40

/ 1m2

Sl.
No.

Item
No. in
Data
Book /
Code

Particulars

Unit

Quantity

Rate

Amount

85.05

222.00

18881.10

Excavating trenches of required width


in all classes of soil for laying the
32mm MS rod for earth mat including
excavation for sockets and dressing
of sides, ramming of bottoms, depth
upto 1.5m, including getting out the
2.10.1 excavated soil and charges include
of
returning the soil as required in layers
CPWD not exceeding 20cm in depth,
2014 including
consolidating
each
deposited
layer
by
ramming,
watering, etc and disposing of surplus
excavated soil as directed by
departmental officers at site, within a
lead of 50m.
2.8.1

2.8.1

All kinds of soil


Details of cost for 180 R m.
Rate as per Item Number 2.8.1 of SH:
Earth work (sub data.3)

cum

7
Sl.
No.

Item
No. in
Data
Book /
Code
2.25

34(a) as
per
Transmi
ssion
Data for
substati
on
works

0116
0100
8

Particulars

Rate as per Item Number 2.25 of SH:


Earth work (sub data 4)

Unit

cum

Quantity

Rate

Amount

85.05

158.45

13476.17

TOTAL
Cost of 180 metre length of pipe

32357.27
32357.27

Cost of 1 metre
Say Rs.

179.76

Cutting the departmentally supplied


32mm MS rod in required length etc
complete as per
the direction of
departmental officers at site. Charges
include the lifting of 32mm MS rod
from the stockyard to the site, hire
charges for the cutting tool etc
complete.

179.75

/ 1 R. m

1 No.

Details for 10nos


Fitter

day

0.40

435.00

174.00

Bandhani
Hire Charges of T & P

day
LS

0.40

363.00

145.20
60.00
379.20

Add Water Charges @ 1%

379.20

Add CPOH @ 15%

382.99

3.79
382.99
57.45
440.44

Cost of carriage, market rate and


their CPOH and water charges

35(a) as
per
Transmi
ssion
Data for
substati
on
works

69.00

Add Price Index 148 For Kottayam


Cost of 10nos cut
Cost of 1no cut

371.44

Say Rs.

59.25

Bending the departmentally supplied


32mm MS rod for crossing cable
trench / foundations / risers etc as per
the direction of departmental officers
at site. Charges include the lifting of
32mm MS rod from the stockyard to
the site, hire charges for the bending
tool etc complete. (Heat bending of
MS rod is not allowed.)

1 No.

152.10
592.54
59.25
/ 1cut

Details for 4nos


9

0102

Blacksmith for levelling and bending


of rods

day

0.20

435.00

87.00

0100

Bandhani

day

0.33

363.00

119.79

Add Water Charges @ 1%

206.79

Add CPOH @ 15%

208.86

Add Price Index 148 For Kottayam

240.19

Cost of 4nos bend


Cost of 1no bend
Say Rs.

206.79
2.07
208.86
31.33
240.19
98.36
338.55
84.64

84.65

/ 1bend

Sl.
No.

10

Item
No. in
Data
Book /
Code

Particulars

Unit

36 as
per
Transmi
ssion
Data for
substati
on
works

Laying of earth mat of required size


as specified using 32mm MS rod to
the
excavated
trench,
charges
include
levelling,
lowering
and
placing in trenches for lap joining,
bending etc complete as per the
direction of departmental officers at
site. Charges include the lifting of
32mm MS rod from the stockyard to
the site.

1 Qtl

0102
0100

Blacksmith
Bandhani for assisting

0100
0114

Bandhani for conveying


Beldar for assisting

37 as
per
Transmi
ssion
Data for
substati
on
works

Quantity

Rate

day
day

0.40
0.40

435.00
363.00

174.00
145.20

day
day

0.20
0.10

363.00
329.00

72.60
32.90
424.70

Add Water Charges @ 1%

424.70

Add CPOH @ 15%

428.95

Add Price Index 148 For Kottayam


Cost of 1qtl

493.29

Say Rs.

695.30

Driving
down
the
MS
ground
electrode upto a depth of 3m from
the already taken earth pit
as
directed by departmental officers at
site. Charges include the lifting of
ground electrode from the stockyard
to the site, backfilling, placing and
leveling the electrode etc complete.

1 No.

Amount

4.25
428.95
64.34
493.29
202.00
695.29
/ 1Qtl

Data for 10 Nos.


0100
0114
11

Bandhani
Beldar
Cost of making scaffolding etc

day
day
LS

Add Water Charges @ 1%

803.60

Add CPOH @ 15%

811.64

0.80
0.80

121.75
933.39
287.50

645.89

264.49
1197.88

Cost of 1no
Say Rs.

290.40
263.20
250.00
803.60
8.04
811.64

Cost of carriage, market rate and


their CPOH and water charges
Add Price Index 148 For Kottayam
Cost of 10nos

363.00
329.00

119.79
119.80

/ 1no

Sl.
No.

Item
No. in
Data
Book /
Code

Particulars

Unit

38 as
per
Transmi
ssion
Data for
substati
on
works

Drilling holes and driving down MS


ground electrode from the bottom
level of trench in all classes of soil
including rock etc complete as per
the direction of departmental officers
at site. Charges include the lifting of
ground electrode from the stockyard
to the site, backfilling, placing and
leveling the electrode complete.

1m

Quantity

Rate

Amount

Rate for 30 M
0134
0100
12

Rock hole Driller


Mechanic Gr.II (pwd rate)
Bandhani

day
day
day

1.00
1.75
3.00

329.00
471.00
363.00

329.00
824.25
1089.00

Hire charges of drilling machine


Hire charges of T & P

Day
LS

1.00

500.00

500.00
125.00

Cost of consumable items, making


scaffolding etc. for driving electrodes
and current charges

LS

Add Water Charges @ 1%

3192.25

Add CPOH @ 15%

3224.17

325.00
3192.25
31.92
3224.17
483.63
3707.80

Cost of carriage, market rate and


their CPOH and water charges

2040.39

Add Price Index 148 For Kottayam


1667.41
Cost of 30m

682.80
4390.60

Cost of 1m

Arrived
Data
based
on 39 of
Transmi
ssion
Data for
substati
on
works

146.35

Say Rs.

146.35

/ 1m

Drilling bore holes of size 150mm or


nearest with 3m in depth
in all
classes of soil including hire charges
of plant and machinery, cost of oil,
fuel, tool etc and taking all necessary
precautions
for
safety
to
the
substation equipments, personnel etc
and filling the drilled boreholes with
bentonite clay after placing the
ground electrode as per the direction
of departmental officers at site.

1 No.

Ground water department - fees and


charges - enhancement - Revision of
rates
sanctioned
vide
G.O.(Rt)
No.1345/2004/WRD
dated
Thiruvananthapuram 16-11-2004

3.00

320.00

Bentonite Clay

kg

80.00

6.69

13

Add CPOH @ 15%

1495.20
1719.50

535.20
1495.20
224.28
1719.48

Cost of 1no
Say Rs.

960.00

/ 1no

Sl.
No.

14

Item
No. in
Data
Book /
Code

Particulars

Unit

40 as
per
Transmi
ssion
Data for
substati
n works

Welding of overlapping joints for mat,


riser lap joints with 32mm MS rod
placed in trenches, having 150mm in
length 6mm thick on all sides(in
round shape) of the rod and both
ends of overlapped MS rods with
6mm welding thickness after cleaning
the surfaces neatly. Charges include
cost of low hydrogen DC electrode
(No. E7018), hire charges of DC arc
welding
set,
tools
and
plants
required, current charges including
labour charges for holding MS rod in
position and applying two coats of
anti corrosive paints at the welded
joints etc complete as per the
direction of departmental officers at
site.

1 No.

Quantity

Rate

Amount

1087
0102
0100

Welder
Blacksmith
Bandhani

day
day
day

0.10
0.10
0.12

399.00
435.00
363.00

39.90
43.50
43.56

0114

Beldar

day

0.10

329.00

32.90

Charges for low hydrogen content DC


electrode( E 7018 )

LS

110.00

Hire charges of DC motor generator


Arc welding set, including current
charges.

LS

110.00

Hire charges of T & P.


Painting charges.

LS
LS

10.00
5.00
394.86

Add Water Charges @ 1%

394.86

Add CPOH @ 15%

398.81

3.95
398.81
59.82
458.63

Cost of carriage, market rate and


their CPOH and water charges
Add Price Index 148 For Kottayam
Cost of 1no
Say Rs.

41 as
per
Transmi
ssion
Data for
substati
n works

15

Welding the nodal points (cross


joints) in the trenches at all sides to a
thickness of 6mm after cleaning the
surface neatly. Charges include cost
of low hydrogen DC electrodes (No.
E7018), hire charges of DC welding
set, tools and plants required, current
charges, labour charges for holding
MS rod in position and applying two
coats of anti corrosive paints at the
welded joints etc complete as per the
direction of departmental officers at
site.

270.25
188.38
535.75

77.14
535.77
/ 1no

1 No.

1087
0102
0100

Welder
Blacksmith
Bandhani

day
day
day

0.07
0.05
0.05

399.00
435.00
363.00

27.93
21.75
18.15

0114

Beldar

day

0.03

329.00

9.87

Charges for low hydrogen content DC


electrode( E 7018 )

LS

50.00

Sl.
No.
15

Item
No. in
Data
Book /
Code

Particulars

Unit

Quantity

Rate

Amount

Hire charges of DC motor generator


arc welding set, including current
charges.

LS

50.00

Hire charges of T & P.


Painting charges.

LS
LS

4.00
2.00
183.70

Add Water Charges @ 1%

183.70

Add CPOH @ 15%

185.54

1.84
185.54
27.83
213.37

Cost of carriage, market rate and


their CPOH and water charges
Add Price Index 148 For Kottayam
Cost of 1no
Say Rs.

42 as
per
Transmi
ssion
Data for
substati
on
works

16

Welding the ground electrode with


the main electrode after cleaning the
surface neatly. Charges include cost
of
low
hydrogen
content
DC
electrodes (No. E7018), hire charges
of DC arc welding set, tools and
plants,
current
charges,
labour
charges for holding MS rod in position
and applying two coats of anti
corrosive paints at the welded joints
etc complete as per the direction of
departmental officers at site.

121.90
91.47
250.85

37.46
250.83
/ 1no

1 No.

1087
0102
0100

Welder
Blacksmith
Bandhani

day
day
day

0.08
0.05
0.08

399.00
435.00
363.00

31.92
21.75
29.04

0114

Beldar

day

0.08

329.00

26.32

Charges for low hydrogen content DC


electrode( E 7018 )

LS

50.00

Hire charges of DC motor generator


arc welding set, including current
charges.

LS

50.00

Hire charges of T & P.


Painting charges.

LS
LS

5.00
3.00
217.03

Add Water Charges @ 1%

217.03

Add CPOH @ 15%

219.20

2.17
219.20
32.88
252.08

Cost of carriage, market rate and


their CPOH and water charges
Add Price Index 148 For Kottayam
Cost of 1no
Say Rs.

124.20
127.88
304.45

52.37
304.45
/ 1no

Sl.
No.

17

Item
No. in
Data
Book /
Code

Particulars

Unit

43 as
per
Transmi
ssion
Data for
substati
on
works

Laying of departmentally supplied GI


strip / Copper strip of suitable size
over the equipment structure and the
trenches, including cleaning and
neatly bending the strips, cutting,
removing of metal / earth in the yard
and burying earth strip to the
required depth, re-doing the yard
metalling as per the direction of the
departmental officers at site. Charges
include the lifting of GI strip from the
stockyard to the site complete.

1m

0116
0114

Fitter
Beldar

0102

Blacksmith
Add Water Charges @ 1%

44 as
per
Transmi
ssion
Data for
substati
on
works

18

Quantity

Rate

day
day

0.40
1.50

435.00
329.00

174.00
493.50

day

0.10

435.00

43.50
711.00
7.11

711.00

Add CPOH @ 15%

718.11

Add Price Index 148 For Kottayam


Cost of 10m
Cost of 1m

825.83

Say Rs.

116.40

Welding one end of the bended GI


strip of size 50x6mm with the riser /
GI angle platform in front of the
equipments of the already laid earth
mat, welding 150mm in length, 6mm
thick on both sides & end of the strip
& other end of the strip with yard
structure at 2 points 50mm apart
each welding points having 50mm
length and 6mm thick on both sides
& end of the strip including the
charges for connecting the strip with
structure using bolted joints as per
the direction of the departmental
officers at site. Charges include hire
charges of DC arc welding set,
current charges, cost of low hydrogen
content DC arc welding electrodes
(No.E7018) cost of anti corrosive
paint etc complete.

1 No.

Amount

718.11
107.72
825.83
338.18
1164.01
116.40
/ 1m

1087
0102
0100

Welder
Blacksmith
Bandhani

day
day
day

0.12
0.08
0.08

399.00
435.00
363.00

47.88
34.80
29.04

0114

Beldar

day

0.08

329.00

26.32

Cost of low hydrogen content arc


welding electrode

LS

100.00

Hire charges of DC arc welding set &


current charges.

LS

80.00

Hire charges of T & P

LS

8.00

Cost of Paint

LS

4.00
330.04
3.30

Add Water Charges @ 1%

330.04

333.34

Sl.
No.

Item
No. in
Data
Book /
Code

Particulars

Add CPOH @ 15%

Unit

Quantity

Rate

333.34

50.00
383.34

Cost of carriage, market rate and


their CPOH and water charges

45 as
per
Transmi
ssion
Data for
substati
on
works

19

220.80

Add Price Index 148 For Kottayam


Cost of 1no

162.54

Say Rs.

449.90

Welding
overlapping
joints
of
50x6mm GI strip with 50mm long,
6mm thick welding on all three sides
after doing 2 Nos. bolted joints at the
centre as specified after cleaning the
surface. Charges include hire charges
of DC arc welding set, current
charges, cost of low hydrogen
content DC arc welding electrodes
(No.E7018), cost of anti corrosive
paint etc complete as per the
direction of departmental officers at
site.

1 No.

66.56
449.90
/ 1no

1087

Welder

day

0.08

399.00

31.92

0102
0100
0114

Blacksmith
Bandhani
Beldar

day
day
day

0.08
0.05
0.03

435.00
363.00
329.00

34.80
18.15
9.87

Cost of low hydrogen content arc


welding electrode & hire charges of
DC arc welding set , current charges
etc.

LS

Add Water Charges @ 1%

134.74

Add CPOH @ 15%

136.09

40.00
134.74
1.35
136.09
20.41
156.50

Cost of carriage, market rate and


their CPOH and water charges

46 as
per
Transmi
ssion
Data for
substati
on
works

20

Amount

46.00

Add Price Index 148 For Kottayam


Cost of 1no

110.50

Say Rs.

201.75

Welding one end of the bended GI


strip of size 50x6mm with the riser /
GI platform of the already laid earth
mat, welding 150mm in length, 6mm
thick on both sides & end of the strip
welded on the stucture and connect
with nuts & bolts if required as per
the direction of departmental officers
at site. Charges include hire charges
of DC arc welding set, current
charges, cost of low hydrogen
content DC arc welding electrodes
(No.E7018), cost of anti corrosive
paint etc complete.

1 No.

45.25
201.75
/ 1no

1087
0102

Welder
Blacksmith

day
day

0.08
0.08

399.00
435.00

31.92
34.80

0100
0114

Bandhani
Beldar

day
day

0.12
0.08

363.00
329.00

43.56
26.32

Sl.
No.
20

Item
No. in
Data
Book /
Code

Particulars

Unit

Cost of low hydrogen content arc


welding electrode.

LS

90.00

Hire charges of DC arc welding set &


current charges

LS

75.00

Add Water Charges @ 1%

301.60

Add CPOH @ 15%

304.62

Quantity

Rate

301.60
3.02
304.62
45.69
350.31

Cost of carriage, market rate and


their CPOH and water charges
Add Price Index 148 For Kottayam

189.75
160.56

65.75

Cost of 1no
Say Rs.

Amount

416.06
416.05

/ 1no

Cement Concrete 1:2:4, ( M15) using


4.1.3 of 20mm hard granite broken stone for
CPWD fixing GI Platform support including
watering, curing etc
2014 all cost of
complete as per the direction of
departmental officers at site.
Details of cost for 1 cum.
MATERIAL :-

21

0295

Stone Aggregate (Single size) : 20


mm nominal size.

m3

0.67

1175.00

787.25

0297

Stone Aggregate (Single size) : 10


mm nominal size.

m3

0.22

1175.00

258.50

2202

Carriage of stone aggregate below 40


mm nominal size for 5km

m3

0.89

106.49

Coarse Msand (MR)

m3

0.445

1750.00

2203

Carriage of coarse sand

m3

0.445

106.49

0367
2209

Portland Cement(0.2833 cum)


Carriage of cement

tonne
tonne

0.32
0.32

6300.00
94.65

1.63
0.70

329.00
363.00

536.27
254.10

0114
0101

LABOUR :Beldar

94.78
778.75
47.39
2016.00
30.29

Bhisti

day
day

0155

Mason average

day

0.10

417.00

41.70

0002

Hire charges of Concrete Mixer 0.25


to 0.40 cum with Hopper

day

0.07

800.00

56.00

0012
9999

Vibrator (Needle type 40 mm)


Sundries

day
LS

0.07
14.30

350.00
1.78

24.50
25.45
4950.98

Add Water Charges @ 1%


Add CPOH @ 15%

49.51
5000.49
750.07

5000.49

5750.56
Cost of carriage, market rate and
their CPOH and water charges

895.56

Add Price Index 134 For Kottayam


4855.00
Cost of 1 cum
Say Rs.

7738.70

1988.12
7738.68
/ 1m3

Sl.
No.

Item
No. in
Data
Book /
Code

Particulars

Unit

Centering and shuttering for the GI


platform support as per the given
measurement
including
strutting,
5.9.1 of propping in finished condition etc and
CPWD removal of form for foundations,
2014 footings, bases of columns etc as per
the direction of departmental officers
at site.

Quantity

Rate

Amount

Data for 1
sqm

Cost of 1 sqm
Details of cost for footing size
2.7mx2.7mx 1.00m Contact area =
10.8 sqm.
MATERIAL : Assuming shuttering material will
become unserviceable after use of
40 times, Adding for maintenance @
10% of cost, Taking salvage value
after full use of material @ 25% of
cost Wall form panel 1250x500 mm

7319

Wall from panel 1250x500mm Qty


taken for cost of using once =
16x0.85/40 =0.34

each

0.34

1050.00

7326

Corner angle 45x45x5mm, 1.50m


long Qty taken for cost of using once
= 4x0.85/40 = 0.085

each

0.085

300.00

7327

100 mm channel shoulder 2.5 m long


Qty taken for cost of using once =
8x0.85/40 = 0.17

each

0.17

1160.00

7328

Double clip ( bridge clip) Qty taken


for cost of using once =16x0.85/40 =
0.34

each

0.34

97.00

32.98

7329

Single clip Qty taken for cost of using


once =8x0.85/40 = 0.17

each

0.17

77.00

13.09

7330

M.S. tube 40 mm dia Qty taken for


cost of using once = 10.8x0.85/40 =
0.2295

0.2295

280.00

64.26

9999

Assembly nuts & bolts Qty taken for


cost of using once = 1040x0.85/40 =
22.10

LS

22.1

1.78

39.34

LS

78

1.78

138.84

day
day
LS

0.75
1.5
52

435.00
329.00
1.78

326.25
493.50
92.56

LS

26

1.78

22

9999
116
0114
9999
9999

Carriage
LABOUR : Fitter (grade 1)
Beldar
Shuttering oil
Sundries
Add Water Charges @ 1%

1826.80

Add CPOH @ 15%

1845.07

276.90

25.50

197.20

46.28
1826.80
18.27
1845.07
276.76
2121.83

Add Price Index 148 For Kottayam


2121.83
Cost of 10.8 sqm
Cost of 1sqm
Say Rs.

357.00

868.89
2990.72
276.92
/1m2

Sl.
No.

23

Item
No. in
Data
Book /
Code

0116
0100

Particulars

Unit

Cutting the departmentally supplied


steel / GI / MS angle for fabricating
the platform near the isolators for
safe operation as per the direction of
departmental officers at site. Charges
include hire charges for the cutting
tool, levelling, placing, lifting the
angle etc complete.

1 No.

Details for 8 Nos


Fitter
Bandhani

day
day

Add Water Charges @ 1%

645.69

Add CPOH @ 15%

652.15

Add Price Index 148 For Kottayam

Quantity

Rate

0.75
0.88

435.00
363.00

326.25
319.44
645.69
6.46
652.15
97.82
749.97
307.11

749.97

Cost of 8nos
Cost of 1cut

1087

Amount

1057.08
132.14

Say Rs.

132.15

Welding on iron parts using DC arc


welding as per standards as per the
direction of departmental officers at
site. Charges include the current
charge and hire charge for the
welding machine, filing, caning etc
complete.

1 No.

/ 1cut

Data for 30 Nos


Welding rods (MR)

No.

300.00

4.20

1260.00

Welder
Current charge and hire charges

day
LS

1.75

399.00

698.25
100.00
2058.25

24
Add Water Charges @ 1%

2058.25

Add CPOH @ 15%

2078.83

20.58
2078.83
311.82
2390.65

Cost of carriage, market rate and


their CPOH and water charges

1564.00

Add Price Index 148 For Kottayam


Cost of 30nos
Cost of 1no

826.65

Say Rs.

90.95

338.51
2729.16
90.97
/ 1no

KERALA STATE ELECTRICITY BOARD LIMITED


220kV SUB STATION SUB-DIVISION, POOVANTHURUTHU
SUB DATA
Name of Work:- Modification of Earthing System at 220kV Substation,
Poovanthuruthu Laying of Earthmat in the 220kV switchyard.

Sl. No.

Code

Description

Unit

Qty.

Rate

1750.00

Amount

3.11 of
Cement mortar 1:6 (1 cement : 6
CPWD
coarse sand)
2014
Details of cost for 1 cum
MATERIAL:(0.375 cum. of cement = 0.51
tonne)
Cement
required
for
cement mortar is 35.70%
0982

Coarse M sand (MR)

m3

1.070

2203

Carriage of sand

1.070

106.49

0367

Cement

MT

0.25

6300.00

2209

Carriage of cement

MT

0.25

94.65

day

0.75

329.00

246.75

day

0.07

363.00

25.41

day

26.91

1.78

47.90

L.S.

13.52

1.78

24.07
3929.23

1872.50
113.94
1575.00
23.66

LABOUR:-

For
measuring,
depositing and mixing.
114
101

carrying,

Beldar
Bhisthi

9999

Hire
running
mechanical mixer.

9999

Sundries

charges

of

Add water charge @1% of Rs


Add 15% CPOH of Rs

3929.23

39.29

3968.52

3968.52
595.28
4563.80

Cost of carriage, market rate and


their CPOH and water charges.
Add Price Index 148 for Kottayam

2153.38
2410.42

987.07

Cost of 1 cum

Say Rs.

5550.87

###

/ 1m3

Portland Cement

tonne

0.51

6300.00

Carriage of cement

tonne

0.51

94.65

Fine M sand (MR)

m3

1.07

1850.00

m3

1.07

106.49

113.94

Beldar
Bhisti

day
day

0.75
0.07

329.00
363.00

246.75
25.41

Hire and running charges of


mechanical mixer.

L.S.

26.91

1.78

L.S.

13.52

1.78

3.3 of
Cement mortar 1:3 (1 cement : 3
CPWD
fine sand)
2014
Details of cost for 1 cum.
MATERIAL:(0.375 cum. of cement = 0.51
tonne)
Cement
required
for
cement mortar is 35.70%
367
2209
2261

Carriage of fine sand

3213.00
48.27
1979.50

LABOUR:For
measuring,
depositing and mixing.
2

114
101
9999
9999

Sundries

carrying,

47.90
24.07
5698.84

Add Water Charges @ 1%

56.99

Sl. No.

Code

Description

Unit

Qty.

Rate

Amount

5755.83
Add CPOH @ 15%

5755.83

863.37
6619.20

Cost of carriage, market rate and


their CPOH and water charges.

2276.43

Add Price Index 148 For Kottayam 4342.77

1778.36

Cost of 1 cum

Say Rs.

8397.56

###

/ 1m3

Sl. No.

Code

Description

Unit

Qty.

Rate

Amount

Earth work in excavation in all


kinds of soil by mechanical means
(Hydraulic
excavator)/manual
means in foundation trenches of
LA structure (not exceeding 1.5m
2.8.1 in width or 10 sqm on plan) and
of
for laying of GI strip 50x6mm,
CPWD including
dressing
of
sides
2014 andramming of bottoms, lift up to
1.5m, including getting out the
excavated soil and disposal of
surplus
excavated
soil
as
directed, within a lead of 50m.
2.8.1

All kinds of soil


Details of cost for 10 cum.
MACHINERY:-

0020

Hydraulic Excavator (3D) with


driver and fuel.

day

###

8000.00

330.00

0018

Hire and running charges of loader.

day

###

5000.00

206.25

day
day

0.400
2.050

363.00
329.00

145.20
674.45

LABOUR:0128
0115

Mate
Beldar/Coolie
Add Water Charges @ 1%

1355.90

Add CPOH @ 15%

1369.46

1355.90
13.56
1369.46
205.42
1574.88

Add Price Index 148 For Kottayam 1574.88

644.91

Cost of 10 cum
Cost of 1 cum
Say Rs.

2.25

2219.79
221.98
222.00

/ 1m3

Filling available excavated earth


(excluding rock) in trenches,
plinth, sides of foundations etc in
layers not exceeding 20cm in
depth,
consolidating
each
deposited layer by ramming
andwatering, lead upto 50m and
lift upto 1.5m.
Details of cost for 10 cum
LABOUR:-

0128

Mate

day

0.200

363.00

72.60

0115
0101

Coolie

day

2.500

329.00

822.50

Bhisti

day

0.200

363.00

72.60

Add Water Charges @ 1%

967.70

967.70
9.68

Add CPOH @ 15%

977.38

977.38
146.61
1123.99

Add Price Index 148 for Kottayam

1123.99

460.27

Cost of 10 cum
Cost of 1 cum
Say Rs.

1584.26
158.43
158.45

/ 1m3

KERALA STATE ELECTRICITY BOARD LIMITED


220kV SUB STATION SUB-DIVISION, POOVANTHURUTHU
CONVEYANCE STATEMENT
Name of Work:- Modification of Earthing System at 220kV Substation,
Poovanthuruthu Laying of Earthmat in the 220kV switchyard.
Sl. No.

Description

Place

Road distance

Cement

Kottayam

5km

Coarse sand/M Sand

Kottayam

5km

Broken stone 40mm, 20mm and


10mm

Kottayam

5km

Bentonite clay

Kottayam

5km

Bricks

Kattachira

25 km

Certificate
The distance noted in the data for the conveyance from quarry or source have
been personally verified by me and found correct. These are the minimum leads required.

Assistant Executive Engineer

KERALA STATE ELECTRICITY BOARD


#REF!
Sl. No.
1

Particulars
Cutting of ms rod

DATA FOR FORM WORK


No
Length

Breadth

Height

cutting(x/12)
1
Total length of 32mm ms rod
3m
total number of earth electrode(main mat
electrodes periphery)
electrode for LA
electrode for NCT
200MVA Transformer
Total
total lenth of earth elctrode(90*3)
Auxiliary auxiliary mat size(1.5 x 1.5)
mat
1.5*5
1.5*5
total
we have 9no auxilary mat
Riser

2400

200.000

22.500

65
15
2
8
90
270
7.5
7.5
15
135

line isolator
bus isolator
ct
pt
tower footings
cb
LA
cc
NCT
Transformer
Fencing

total no
total length of riser
total cutting
Number of MS rod bend
Excavation
inside the feeder area
Behind area of transformer
No C bend in Excavted points
Number of C Bend in feeder area
Number of C Bend behind trasformer

3
6
15
9
19
15
15
2
2
6

144
32
88
20
17

total
Total number of bend

125
500

Laying of Earthmat
Excavation
Total length
length C bend
Number of C Bend in feeder area

2400
125
20

m
5
5
4
4
4
3
4
4
4
4

11.250
15
30
60
36
76
45
60
8
8
24
35.00
397.00
595.50

49.625

Number of C Bend behind trasformer


total
Total number of bend
3 Calculation of overlap Welding
total length
bending length
Riser's
Auxiliary mat
Total
no of overlap

17
162
648

2400
250
100
135
2885
240.417

200.00
20.83
8.33
11.25

7
75
101
65

Calculation of Excavation

35
14

2623.00

0.3

0.6

8
8
Total length
excavation in m3
Add Extra
Total
3 Calculation of nodal points
total length of mat periphery
nodal points in the periphery(5m spacing)
LA
200mva Transformer(6x2+2x2+2x1)
total
add extra

5 Calculation of cross joints


length of yard in horizontal
length of yard in vertical
total
6 Auxiliary mat
length
breadth

352
71
21
18
110
10
120

14
7

16
8

1.5
1.5

5
5

7.5
7.5
15

3
6
15
15
19
15
21
2

6
6
4
4
3
4
3
4

18
36
60
60
57
60
63
8

7 Calculation of riser
equipment
line isolator
bus isolator
ct
pt
tower footings
cb
LA
CC

2
2
2
2
2

NCT
Transformer
Supporting Stucture
Fencing
Kiosk
Lamp post
Handle

8 Calculation of GI strip
isolator
cb
ct
pt
la
nct
transformer
Column
Platform
Fencing
Supporting structure (Bus Post Insulator)
Coupling Capacitor
Marshalling Kiosk
Lamp post

2
6
8
1
12
10

no

4
3
2
36
1
1

m
9
15
15
15
21
2
6
19
9
36
16
4
12
10

8
18
16
36
12
10
4
466

bolt
30
12
11
11
11
11
20
6
3
3
3
5
3
2

2
4

weld
3
2
2
2
1
2
4
0
0
1

3
2
2
2
2
2
0
3
2
2
1

Quantity

10

10

16

12

4
8
8

3
1
1

8
10
10
1

3
1
2
3

28

283.38

10

189
57
42
135
40
12

10

475

245.00
1050.00
808.00
520.00
2623.00
472.14
27.86
500.00
6

6
8
5
10
138

equipment structure
0
15
0
30
30
30
30
30
0
76
30
0
42
42
4
4
4
4
24
0
5
0
20
5
164
251
2
2
4
0
2
2

224
56
280

structure

22

20

total in m
270
180
165
165
231
22
120
114
27
108
48
20
36
20
1526

no of weld no of bolt
27
27
30
30
30
30
30
30
42
21
4
4
0
24
57
0
18
0
72
0
16
16

326

182

Node

Cut

Bend

Lap

Ground Electrode

Node

Cut

Bend

Lap

Ground Electrode

A1
A2
A3
A4

2
2
2
2

1
1
1
1

2
2
2
2

1
1
1
1

B1
B2
B3
B4

2
1
1
1

1
1
1
1

2
2
2
2

1
0
0
0

Total

B5
B6
B7
B8
B9
B10
B11
B12
B13
B14
B15
B16

2
2
2
2
2
2
2
2
2
2
2
2

1
1
1
1
1
1
1
1
1
1
1
1

2
2
2
2
2
2
2
2
2
2
2
2

1
1
1
1
1
1
1
1
1
1
1
1

B17
B18
B19
B20
B21

3
3
2
2
2

2
2
1
1
1

4
4
2
2
2

1
1
1
1
1

Total

41

23

46

18

Node

Cut

Bend

Lap

Ground Electrode

Node

Cut

Bend

Lap

Ground Electrode

C1
C2
C3
C4
C5
C6
C7
C8
C9
C10
C11
C12
C13
C14
C15
C16
C17
C18
C19
C20
C21

2
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2

1
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

D1
D2
D3
D4
D5
D6
D7
D8
D9
D10
D11
D12
D13
D14
D15
D16
D17
D18
D19
D20
D21

2
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2

1
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total

22

21

42

Total

22

21

42

Node

Cut

Bend

Lap

Ground Electrode

Node

Cut

Bend

Lap

Ground Electrode

E1
E2
E3
E4
E5
E6
E7
E8
E9
E10
E11
E12
E13
E14
E15
E16
E17
E18
E19
E20
E21

2
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
2

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2

1
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
1

F1
F2
F3
F4
F5
F6
F7
F8
F9
F10
F11
F12
F13
F14
F15
F16
F17
F18
F19
F20
F21

2
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
2

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2

1
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
1

Total

23

21

42

Total

23

21

42

Node

Cut

Bend

Lap

Ground Electrode

Node

Cut

Bend

Lap

Ground Electrode

G1
G2
G3
G4
G5
G6
G7
G8
G9
G10
G11
G12
G13
G14
G15
G16
G17
G18
G19
G20
G21

2
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
2

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2

1
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
1

H1
H2
H3
H4
H5
H6
H7
H8
H9
H10
H11
H12
H13
H14
H15
H16
H17
H18
H19
H20
H21

2
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2

1
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total

23

21

42

Total

22

21

42

Node

Cut

Bend

Lap

Ground Electrode

Node

Cut

Bend

Lap

Ground Electrode

I1
I2
I3
I4
I5
I6
I7
I8
I9
I10
I11

2
1
1
1
1
1
1
1
1
1
2

1
1
1
1
1
1
1
1
1
1
1

2
2
2
2
2
2
2
2
2
2
2

1
0
0
0
0
0
0
0
0
0
1

J1
J2
J3
J4
J5
J6
J7
J8
J9
J10
J11

2
1
1
1
1
1
1
1
1
1
2

1
1
1
1
1
1
1
1
1
1
1

2
2
2
2
2
2
2
2
2
2
2

1
0
0
0
0
0
0
0
0
0
1

I12
I13
I14
I15
I16
I17
I18
I19
I20
I21

2
2
2
2
2
2
2
2
2
2

1
1
1
1
1
1
1
1
1
1

2
2
2
2
2
2
2
2
2
2

1
1
1
1
1
1
1
1
1
1

Total

13

11

22

Total

33

21

42

12

Node

Cut

Bend

Lap

Ground Electrode

Node

Cut

Bend

Lap

Ground Electrode

K1
K2
K3
K4
K5
K6
K7
K8
K9
K10
K11

2
1
1
1
1
1
1
1
1
1
2

1
1
1
1
1
1
1
1
1
1
1

2
2
2
2
2
2
2
2
2
2
2

1
0
0
0
0
0
0
0
0
0
1

L1
L2
L3
L4
L5
L6
L7
L8
L9
L10
L11

2
1
1
1
1
1
1
1
1
1
2

1
1
1
1
1
1
1
1
1
1
1

2
2
2
2
2
2
2
2
2
2
2

1
0
0
0
0
0
0
0
0
0
1

Total

13

11

22

Total

13

11

22

Node

Cut

Bend

Lap

Ground Electrode

Node

Cut

Bend

Lap

Ground Electrode

M2
M3
M4
M5
M6
M7
M8
M9
M10

2
1
1
1
1
1
1
1
1

1
1
1
1
1
1
1
1
1

2
2
2
2
2
2
2
2
2

1
0
0
0
0
0
0
0
0

N3
N4
N5
N6
N7
N8
N9
N10
N11

2
1
1
1
1
1
1
1
2

1
1
1
1
1
1
1
1
1

2
2
2
2
2
2
2
2
2

1
0
0
0
0
0
0
0
1

M11

Total

11

18

Total

12

10

20

Node

Cut

Bend

Lap

Ground Electrode

Node

Cut

Bend

Lap

Ground Electrode

O
P0
P5
P6
P7
P8
P9
P10

2
2
1
1
1
1
1
1

1
1
1
1
1
1
1
1

2
2
2
2
2
2
2
2

1
1
0
0
0
0
0
0

Q
R0
R6
R7
R8
R9
R10
R11

2
2
2
2
2
2
2
2

1
1
1
1
1
1
1
1

2
2
2
2
2
2
2
2

1
1
1
1
1
1
1
1

P11

Total

16

16

Total

12

18

Node (520) Cut (950) Bend (1300) Lap (1450) Ground Electrode (120)
A1 - A4
B1 - B21
C1 - C21
D1 - D21
E1 - E21
F1 - F21
G1 - G21
H1 - H21
I1 - 121
J1 - J11
K1 - K11
L1 - L11
M2 - M11
N3 - N11
O - P0 - P11
Q - R0 - R11

4
21
21
21
21
21
21
21
21
11
11
11
10
9
9
8

8
41
22
22
23
23
23
22
33
13
13
13
12
11
12
16

4
23
21
21
21
21
21
21
21
11
11
11
10
9
9
8

8
46
42
42
42
42
42
42
42
22
22
22
20
18
18
16

4
18
1
1
2
2
2
1
12
2
2
2
2
2
3
8

Total

241

307

243

486

64

KERALA STATE ELECTRICITY BOARD LIMITED


220kV SUB STATION SUB-DIVISION, POOVANTHURUTHU
MEASUREMENT
Name of Work:- Modification of Earthing System at 220kV Substation, Poovanthuruthu Laying
of Earthmat in the 220kV switchyard.
Sl.
No.

Particulars

10.00

8.00

2.00

160.00

Stack 2

8.00

6.00

2.00

96.00

Total

256.00

As per estimate

280.00

Stack 1

10.00

8.00

2.00

Stack 2

8.00

6.00

2.00

m3

160.00
96.00
256.00

285.00

m3

Additional head load conveyance required for items 1


& 2 above 100m for every additional 50m of 40mm
broken stone, Mixture of broken stones and dirty
sand, River sand / quarry dust etc as per the
direction of departmental officers at site.
NIL

100.00

m3

Demolishing concrete in cement mortar and clearing


away the debris within a distance of 150m at any
convenient place as directed by departmental
officers at site without causing any damage to the
existing trench including the cost of removing and
replacing the cover slabs for the convenience of
work and plastering neatly the sides of the
demolished portion of concrete.
NIL

17.00

m3

Brick work in cement mortar 1:6 with wire cut bricks


22.9cm x 11.2cm x 7cm for the sides of cable trench
including all charges for labour, materials, curing etc
complete as per the direction of departmental
officers at site.

Total
As per estimate

Unit

Collecting and stacking the mixture of broken stones


comprising balance unusable 40mm broken stone,
20mm broken stone, dirty sand etc in the existing
220kV yard or suitable place (within 100m distance)
for measurement including all labour charges
complete as per the direction of
departmental
officers at site.

Total
As per estimate

Total

Stack 1

Total
As per estimate

Lengt Breadt Heigh


h (m) h (m) t (m)

Picking, Collecting, Washing and Stacking 40mm


broken stone from the existing 220kV yard or
suitable place (upto 100m) for measurement
including head load conveyance upto 100m including
all labour charges complete as per the direction of
departmental officers at site.

Total
As per estimate

No.

NIL

4.00

m3

Plastering with cement mortar 1:3, 12mm thick one


coat, floated hard and trowelled smooth including
cost and conveyance of all materials, labour charges,
watering, curing etc complete as per the direction of
departmental officers at site.

Total
As per estimate

NIL

25.00

m2

Excavating trenches of required width in all classes


of soil for laying the 32mm MS rod for earth mat
including excavation for sockets and dressing of
sides, ramming of bottoms, depth upto 1.5m,
including getting out the excavated soil and charges
include returning the soil as required in layers not
exceeding 20cm in depth, including consolidating
each deposited layer by ramming, watering, etc and
disposing of surplus excavated soil as directed by
departmental officers at site, within a lead of 50m.
Along A-gridline

17.00

1
1

99.00
3.30

17.00
17.00
99.00
3.30

99.00
2.10

102.30
99.00
2.10

Total
Along B-gridline
Add for diversion
Deduct for cable trench crossing
Total
Along C-gridline
Add for diversion

0.00
1
1

Deduct for cable trench crossing


Total
Along D-gridline
Add for diversion

1
1

99.00
5.20

101.10
99.00
5.20

Deduct for cable trench crossing

0.70

2.10

1.20

2.40

0.00

Total
Along E-gridline
Add for diversion

1
1

99.00
1.80

99.70
99.00
1.80

Deduct for cable trench crossing

0.70

2.80

1.20

2.40

1.40

1.40

2.00

4.00

Total
Along F-gridline
Add for diversion

99.00

90.20
99.00

2.60

2.60

Deduct for cable trench crossing


Total
Along G-gridline
Add for diversion

1.40

2.80

1
1

99.00
3.10

98.80
99.00
3.10

Deduct for cable trench crossing

0.70

0.70

1.20

1.20

1.40

2.80

6.70

6.70

1
1

99.00
0.70

90.70
99.00
0.70

1.20

1.20

1.40

2.80

Deduct for sump tank crossing


Total
Along I-gridline
Add for diversion

6.70

6.70

1
1

99.00
1.55

87.60
99.00
1.55

Deduct for cable trench crossing

0.70

1.40

1.20

1.20

1.40

Deduct for sump tank crossing


Total
Along H-gridline
Deduct for cable trench crossing

Total

2.80
95.15

Along J-gridline
Deduct for cable trench crossing
Total
Along K-gridline
Add for diversion

1
2

47.00
1.40

47.00
2.80

1
1

47.00
1.55

44.20
47.00
1.55

Deduct for cable trench crossing


Total
Along L-gridline
Add for diversion

1.40

2.80

1
1

49.00
1.75

45.75
49.00
1.75

Deduct for cable trench crossing


Total
Along M-gridline
Add for diversion

1.40

2.80

1
1

44.00
0.60

47.95
44.00
0.60

Deduct for cable trench crossing

0.70

5.60

1.40

2.80

3.10

6.20

1
1

39.00
4.20

30.00
39.00
4.20

33.00

28.00

29.00

0.50

1.50

1
12

57.00
0.50

27.50
57.00
6.00

1
13

59.00
0.50

51.00
59.00
6.50

1
14

63.00
0.50

52.50
63.00
7.00

67.00

56.00
67.00

0.25

0.25

0.70

2.10

1.20

2.40

15

0.50

7.50

1
1

71.00
2.60

55.25
71.00
2.60

0.70

2.10

1.20

2.40

15

0.50

7.50

1
1

73.00
3.70

61.60
73.00
3.70

0.70

0.70

1.20

1.20

1.40

1.40

15

0.50

Total
Along N-gridline
Add for diversion
Total
Along P-gridline
Total
Along R-gridline
Total
Slanding trench b/w R & L gridlines along
periphery
Deduct for Earth mat node crossing
Total
Along 1-gridline
Deduct for Earth mat node crossing
Total
Along 2-gridline
Deduct for Earth mat node crossing
Total
Along 3-gridline
Deduct for Earth mat node crossing
Total
Along 4-gridline
Add for diversion
Deduct for cable trench crossing
Deduct for Earth mat node crossing
Total
Along 5-gridline
Add for diversion
Deduct for cable trench crossing
Deduct for Earth mat node crossing
Total
Along 6-gridline
Add for diversion
Deduct for cable trench crossing

Deduct for Earth mat node crossing


Total

43.20
33.00
33.00
28.00
28.00
29.00

7.50
65.90

Along 7-gridline
Add for diversion

1
1

73.00
0.50

73.00
0.50

Deduct for cable trench crossing

0.70

0.70

1.20

1.20

1.40

1.40

15

0.50

7.50

1
1

73.00
1.00

62.70
73.00
1.00

0.70

1.40

1.20

1.20

1.40

1.40

2.00

2.00

15

0.50

7.50

1
4

73.00
0.70

60.50
73.00
2.80

1.20

1.20

1.40

1.40

15

0.50

7.50

1
1

73.00
0.35

60.10
73.00
0.35

0.70

1.40

1.20

2.40

1.40

1.40

2.00

2.00

15

0.50

7.50

1
1

73.00
5.50

58.65
73.00
5.50

1.20

1.20

1.40

1.40

3.10

3.10

Deduct for Earth mat node crossing


Total
Along 12-gridline
Deduct for cable trench crossing

15

0.50

7.50

33.00

65.30
33.00

1.40

1.40

Deduct for Earth mat node crossing


Total
Along 13-gridline
Deduct for cable trench crossing

0.50

4.00

1
1

33.00
1.40

27.60
33.00
1.40

Deduct for Earth mat node crossing


Total
Along 14-gridline
Add for diversion

0.50

4.00

1
1

33.00
0.50

27.60
33.00
0.50

Deduct for cable trench crossing

1.40

1.40

Deduct for Earth mat node crossing


Total
Along 15-gridline
Deduct for cable trench crossing

0.50

4.00

1
1

33.00
1.40

28.10
33.00
1.40

Deduct for Earth mat node crossing


Total

0.50

Deduct for Earth mat node crossing


Total
Along 8-gridline
Add for diversion
Deduct for cable trench crossing

Deduct for Earth mat node crossing


Total
Along 9-gridline
Deduct for cable trench crossing

Deduct for Earth mat node crossing


Total
Along 10-gridline
Add for diversion
Deduct for cable trench crossing

Deduct for Earth mat node crossing


Total
Along 11-gridline
Add for diversion
Deduct for cable trench crossing

4.00
27.60

Along 16-gridline
Deduct for cable trench crossing

1
1

33.00
1.40

33.00
1.40

Deduct for sump tank crossing

4.50

4.50

Deduct for Earth mat node crossing


Total
Along 17-gridline
Deduct for cable trench crossing

0.50

4.00

1
1

33.00
1.40

23.10
33.00
1.40

Deduct for sump tank crossing

4.50

4.50

Deduct for Earth mat node crossing


Total
Along 18-gridline
Deduct for cable trench crossing

0.50

4.00

33.00

23.10
33.00

1.40

1.40

Deduct for Earth mat node crossing


Total
Along 19-gridline
Deduct for cable trench crossing

0.50

4.00

1
1

33.00
1.40

27.60
33.00
1.40

Deduct for Earth mat node crossing


Total
Along 20-gridline
Deduct for cable trench crossing

0.50

4.00

33.00

27.60
33.00

1.40

1.40

Deduct for Earth mat node crossing


Total
Along 21-gridline
Add for diversion

0.50

4.00

1
1

33.00
1.60

27.60
33.00
1.60

Deduct for cable trench crossing

1.40

1.40

Deduct for Earth mat node crossing


Total

0.50

4.00
29.20

Excavation of trench for Risers


SB-PL 220kV Feeder
R-phase L.A.

2.60

2.60

1.20

1.20

1.80

1.80

1.20

1.20

1.25

1.25

1.25

1.25

1.50

1.50

1.70

1.70

1.80

1.80

1.70

1.70

1.00

1.00

2.00

2.00

2.00

2.00

2.00

2.00

1.00

1.00

2.00

2.00

R-phase C.T.

1.20

1.20

Y-phase C.T.

1.20

1.20

B-phase C.T.

0.80

0.80

R-phase breaker pole

1.30

1.30

1.30

1.30

1.70

1.70

2.30

2.30

1.60

1.60

1.40

1.40

2.30

2.30

1.00

1.00

Breaker Control Cubicle

2.00

2.00

Bus Isolator

1.80

1.80

1.80

1.80

0.80

0.80

Y-phase L.A.
B-phase L.A.
Line Isolator

R-phase P.T.
Y-phase P.T.

B-phase P.T.

Y-phase breaker pole

B-phase breaker pole

NP-PL 220kV Feeder


R-phase L.A.
Y-phase L.A.
B-phase L.A.
Line Isolator

R-phase P.T.
Y-phase P.T.
B-phase P.T.
R-phase C.T.

Y-phase C.T.
B-phase C.T.
R-phase breaker pole

Y-phase breaker pole


B-phase breaker pole

1.50

1.50

1.50

1.50

1.30

1.30

1.20

1.20

1.20

1.20

1.80

1.80

2.20

2.20

2.00

2.00

1.00

1.00

1.20

1.20

1.40

1.40

1.40

1.40

1.00

1.00

1.40

1.40

1.70

1.70

1.20

1.20

1.40

1.40

2.30

2.30

2.30

2.30

2.30

2.30

2.30

2.30

1.60

1.60

1.00

1.00

1.20

1.20

1.20

1.20

1.20

1.20

1.20

1.20

1.20

1.20

1.50

1.50

1.00

1.00

Breaker Control Cubicle

1.20

1.20

Bus Isolator

2.00

2.00

1.50

1.50

2.50

2.50

1.00

1.00

1.80

1.80

1.00

1.00

1.40

1.40

1.80

1.80

1.80

1.80

1.00

1.00

Y-phase P.T.

1.20

1.20

B-phase P.T.

1.00

1.00

R-phase C.T.

1.60

1.60

1.50

1.50

1.50

1.50

1.50

1.50

1.50

1.50

1.50

1.50

Y-phase breaker pole

1.00

1.00

Breaker Control Cubicle

0.70

0.70

Bus Isolator

0.80

0.80

0.70

0.70

1.60

1.60

1.00

1.00

PL-AM 220kV Feeder


R-phase L.A.
Y-phase L.A.
B-phase L.A.
R-phase P.T.

Y-phase Coupling Capacitor


B-phase Coupling Capacitor

200MVA No.1 TRANSFORMER


R-phase C.T.

1.50

1.50

Bus Isolator

1.50

1.50

Neutral C.T.

1.50

1.50

Breaker Control Cubicle

1.50

1.50

Cooler Control Cubicle

1.50

1.50

R-phase L.A.

6.00

6.00

2.40

2.40

R-phase L.A.

1.00

1.00

Y-phase L.A.

2.00

2.00

200MVA No.2 TRANSFORMER

1.80

1.80

B-phase L.A.

2.30

2.30

R-phase C.T.

1.00

1.00

1.00

1.00

1.00

1.00

1.00

1.00

1.00

1.00

1.00

1.00

1.50

1.50

1.30

1.30

Neutral C.T.

1.50

1.50

Breaker Control Cubicle

1.00

1.00

1.00

1.00

Cooler Control Cubicle

1.50

1.50

200MVA No.2 R-phase 110kV L.A.

6.00

6.00

200MVA No.2 Y-phase 110kV L.A.

6.00

6.00

200MVA No.2 B-phase 110kV L.A.

5.00

5.00

Tertiary of 200MVA transformers

6.00

6.00

1.00

1.00

1.00

1.00

1.75

1.75

2.20

2.20

1.20

1.20

Tower Column near NP-PL feeder

1.00

1.00

Tower Column near SB-PL feeder

1.00

1.00

Tower Column near PL-AM feeder

1.00

1.00

Tower Column between NP-PL & SB-PL feeders

1.00

1.00

1.00

1.00

2.00

2.00

1.00

1.00

1.00

1.00

1.00

1.00

1.00

1.00

1.00

1.00

1.00

1.00

1.00

1.00

1.00

1.00

1.00

1.00

1.00

1.00

1.00

1.00

1.00

1.00

1.00

Y-phase C.T.
Bus Isolator

Bus Paralleling Isolator

Tower Column near 200MVA No.1 transformer


Tower Column near 200MVA No.2 transformer
Tower Column near 66kV yard compressor room
220kV bus R-phase Support insulator

220kV bus Y-phase Support insulator

220kV bus B-phase Support insulator

Grand Total of Trench Excavation


As per estimate

1.00

2215.00
2400.00 R. m

Cutting the departmentally supplied 32mm MS rod in


required length etc complete as per the direction of
departmental officers at site. Charges include the
lifting of 32mm MS rod from the stockyard to the
site, hire charges for the cutting tool etc complete.
Along A-gridline
Along Main grid

Total
Along B-gridline
Along Main grid

Along Bending points

Total
1

Along Bending points

Total

Along Bending points

Along Bending points

Along Bending points

Along Bending points

1.00

12.00
13.00

1.00

17

17.00
18.00

1.00

14

14.00
15.00

1.00

16

16.00

Total
Along H-gridline
Along Main grid
Along Bending points

17.00
1

1.00

13

13.00

Total
Along I-gridline
Along Main grid
Along Bending points

14.00
1

1.00

16

16.00

Total

17.00

Along J-gridline
Along Main grid

Along Bending points

Total
Along K-gridline
Along Main grid
Along Bending points

Along Bending points

Along Bending points

1.00

10.00
11.00

1.00

13

13.00
14.00

Along Bending points

Total

Along R-gridline

9.00

Total

1.00
8.00
9.00

Total

1.00

10

Along N-gridline
Along Main grid

Along P-gridline
Along Main grid

9.00

10.00

Total
Along M-gridline
Along Main grid

1.00
10.00

Total
Along L-gridline
Along Main grid

4.00

Total
Along G-gridline
Along Main grid

1.00

12

Total
Along F-gridline
Along Main grid

4.00

5.00

Total
Along E-gridline
Along Main grid

1.00
5.00

Along C-gridline
Along Main grid

Along D-gridline
Along Main grid

1.00
1.00

1.00
1.00

Along Main grid

1.00

Total
Along R & L-gridlines in the periphery
Cut for Ground Electrodes

6.00

Cut for L-Connectors

8.00

Along Main grid

Total

1.00

1.00
15.00

Along 1-gridline
Cut for Ground Electrodes
Cut for L-Connectors
Along Main grid

8.00

11

11.00

Total
Along 2-gridline
Cut for Ground Electrodes
Cut for L-Connectors
Along Main grid

1.00

12

12.00

Total
Along 3-gridline
Cut for Ground Electrodes
Cut for L-Connectors
Along Main grid

Cut for L-Connectors


Along Main grid
Along Bending points
Total
Along 5-gridline
Cut for Ground Electrodes
Cut for L-Connectors
Along Main grid
Along Bending points
Total
Along 6-gridline
Cut for Ground Electrodes
Cut for L-Connectors
Along Main grid
Along Bending points
Total
Along 7-gridline
Cut for Ground Electrodes
Cut for L-Connectors
Along Main grid
Along Bending points
Total
Along 8-gridline
Cut for Ground Electrodes
Cut for L-Connectors
Along Main grid
Along Bending points
Total
Along 9-gridline
Cut for Ground Electrodes
Cut for L-Connectors
Along Main grid
Along Bending points
Total
Along 10-gridline
Cut for Ground Electrodes
Cut for L-Connectors
Along Main grid
Along Bending points
Total
Along 11-gridline
Cut for Ground Electrodes
Cut for L-Connectors
Along Main grid
Along Bending points
Total

1.00
14.00

1.00

13

13.00

Total
Along 4-gridline
Cut for Ground Electrodes

1.00
20.00

1.00
15.00

1.00

14

14.00

1.00

14

14.00
30.00

1.00

15

15.00

1.00

14

14.00
31.00

2.00

15

15.00

1.00

11

11.00
29.00

2.00

15

15.00

1.00

11

11.00
29.00

2.00

15

15.00

1.00

13

13.00
31.00

2.00

15

15.00

1.00

13

13.00
31.00

2.00

15

15.00

1.00

17

17.00
35.00

7.00

15

15.00

1.00

15

15.00
38.00

Along 12-gridline
Cut for Ground Electrodes

2.00

Cut for L-Connectors

8.00

Along Main grid

1.00

Along Bending points

Total

3.00
14.00

Along 13-gridline
Cut for Ground Electrodes

2.00

Cut for L-Connectors

8.00

Along Main grid

1.00

Along Bending points

Total

3.00
14.00

Along 14-gridline
Cut for Ground Electrodes

2.00

Cut for L-Connectors

8.00

Along Main grid

1.00

Along Bending points

Total

3.00
14.00

Along 15-gridline
Cut for Ground Electrodes

2.00

Cut for L-Connectors

8.00

Along Main grid

1.00

Along Bending points

Total

3.00
14.00

Along 16-gridline
Cut for Ground Electrodes

2.00

Cut for L-Connectors

8.00

Along Main grid

1.00

Along Bending points

Total

7.00
18.00

Along 17-gridline
Cut for Ground Electrodes

2.00

Cut for L-Connectors

9.00

Along Main grid

1.00

Along Bending points

Total

3.00
15.00

Along 18-gridline
Cut for Ground Electrodes

2.00

Cut for L-Connectors

9.00

Along Main grid

1.00

Along Bending points

Total

3.00
15.00

Along 19-gridline
Cut for Ground Electrodes

2.00

Cut for L-Connectors

8.00

Along Main grid

1.00

Along Bending points

Total

3.00
14.00

Along 20-gridline
Cut for Ground Electrodes

2.00

Cut for L-Connectors

8.00

Along Main grid

1.00

Along Bending points

Total
Along 21-gridline
Cut for Ground Electrodes

4.00
15.00

6.00

10

10.00

Along Main grid

1.00

Along Bending points

Cut for L-Connectors

6.00

Total

23.00

Total No. of cut along the main grid

635.00

Cut for Risers


SB-PL 220kV Feeder
R-phase L.A.
Cut for Riser

4.00

Cut for Ground Electrode

2.00

Cut for L-Connector

Total

2.00
8.00

Y-phase L.A.
Cut for Riser

4.00

Cut for Ground Electrode

2.00

Cut for L-Connector

Total
B-phase L.A.
Cut for Riser

2.00
8.00

4.00

Cut for Ground Electrode

Cut for L-Connector

Total

2.00
2.00
8.00

Y-phase Coupling Capacitor


Cut for Riser
B-phase Coupling Capacitor
Cut for Riser
Line Isolator
Cut for Riser
R-phase P.T.
Cut for Riser
Y-phase P.T.
Cut for Riser
B-phase P.T.
Cut for Riser
R-phase C.T.
Cut for Riser
Y-phase C.T.
Cut for Riser
B-phase C.T.
Cut for Riser
SF6 Breaker (R-phase unit)
Cut for Riser
SF6 Breaker (Y-phase unit)
Cut for Riser
SF6 Breaker (B-phase unit)
Cut for Riser
Breaker Cubicle
Cut for Riser
Bus Isolator
Cut for Riser
Old Cubicle
Cut for Riser

3.00

3.00

6.00

4.00

4.00

4.00

4.00

4.00

4.00

4.00

4.00

4.00

3.00

6.00

2.00

Total no. of cuts for SB-PL feeder


NP-PL 220kV Feeder

83.00

R-phase L.A.
Cut for Riser

4.00

Cut for Ground Electrode

2.00

Cut for L-Connector

Total

2.00
8.00

Y-phase L.A.
Cut for Riser

4.00

Cut for Ground Electrode

2.00

Cut for L-Connector

Total

2.00
8.00

B-phase L.A.
Cut for Riser

4.00

Cut for Ground Electrode

2.00

Cut for L-Connector

Total
Line Isolator
Cut for Riser
R-phase P.T.
Cut for Riser
Y-phase P.T.
Cut for Riser
B-phase P.T.
Cut for Riser
R-phase C.T.
Cut for Riser
Y-phase C.T.
Cut for Riser
B-phase C.T.
Cut for Riser
SF6 Breaker (R-phase unit)
Cut for Riser

2.00
8.00

6.00

4.00

4.00

4.00

4.00

4.00

4.00

4.00

SF6 Breaker (Y-phase unit)


Cut for Riser
SF6 Breaker (B-phase unit)
Cut for Riser
Breaker Cubicle
Cut for Riser
Bus Isolator
Cut for Riser
Old Cubicles
Cut for Riser

Total no. of cuts for NP-PL feeder

4.00

4.00

3.00

6.00

2.00

77.00

PL-AM 220kV Feeder


R-phase L.A.
Cut for Riser

4.00

Cut for Ground Electrode

2.00

Cut for L-Connector

Total

2.00
8.00

Y-phase L.A.
Cut for Riser

4.00

Cut for Ground Electrode

2.00

Cut for L-Connector

Total

2.00
8.00

B-phase L.A.
Cut for Riser

4.00

Cut for Ground Electrode

2.00

Cut for L-Connector

Total
Y-phase Coupling Capacitor
Cut for Riser
B-phase Coupling Capacitor
Cut for Riser
Line Isolator
Cut for Riser
R-phase P.T.
Cut for Riser
Y-phase P.T.
Cut for Riser
B-phase P.T.
Cut for Riser
R-phase C.T.
Cut for Riser
Y-phase C.T.
Cut for Riser
B-phase C.T.
Cut for Riser
SF6 Breaker (R-phase unit)
Cut for Riser
SF6 Breaker (Y-phase unit)
Cut for Riser
SF6 Breaker (B-phase unit)
Cut for Riser
Breaker Cubicle
Cut for Riser
Bus Isolator
Cut for Riser
Old Cubicles
Cut for Riser

3.00

3.00

6.00

4.00

4.00

4.00

4.00

4.00

4.00

4.00

4.00

4.00

3.00

6.00

Total no. of cuts for PL-AM feeder


200MVA No.1 Transformer
Bus Isolator
Cut for Riser
R-phase C.T.
Cut for Riser
Y-phase C.T.
Cut for Riser
B-phase C.T.
Cut for Riser
SF6 Breaker R-phase pole
Cut for Riser
SF6 Breaker Y-phase pole
Cut for Riser
SF6 Breaker B-phase pole
Cut for Riser
Breaker Cubicle

2.00
8.00

1.00

82.00

6.00

4.00

4.00

4.00

4.00

4.00

4.00

Cut for Riser


R-phase 220kV L.A.

3.00

Cut for Riser

4.00

Cut for Ground Electrode

2.00

Cut for L-Connector

Total

2.00
8.00

Y-phase 220kV L.A.


Cut for Riser

4.00

Cut for Ground Electrode

2.00

Cut for L-Connector

Total

2.00
8.00

B-phase 220kV L.A.


Cut for Riser

4.00

Cut for Ground Electrode

2.00

Cut for L-Connector

Total

2.00
8.00

R-phase 110kV L.A.


Cut for Riser

4.00

Cut for Ground Electrode

2.00

Cut for L-Connector

Total

2.00
8.00

Y-phase 110kV L.A.


Cut for Riser

4.00

Cut for Ground Electrode

2.00

Cut for L-Connector

Total

2.00
8.00

B-phase 110kV L.A.


Cut for Riser

4.00

Cut for Ground Electrode

2.00

Cut for L-Connector

Total
Transformer Body (R-phase unit)
Cut for Riser
Transformer Body (Y-phase unit)
Cut for Riser
Transformer Body (B-phase unit)
Cut for Riser
Fan Control Cubicle (R-phase)
Cut for Riser
Fan Control Cubicle (Y-phase)
Cut for Riser
Fan Control Cubicle (B-phase)
Cut for Riser
Old Cubicles
Cut for Riser
Neutral C.T.
Cut for Riser

2.00
8.00

2.00

2.00

2.00

1.00

1.00

1.00

2.00

4.00

Cut for Ground Electrode

2.00

Cut for L-Connector

Total

2.00
8.00

Tertiary Connection
Cut for Riser

2.00

Cut for Ground Electrode

2.00

Cut for L-Connector

Total

Total no. of cuts for 200MVA No.1


200MVA No.2 Transformer
Bus Isolator
Cut for Riser
R-phase C.T.
Cut for Riser
Y-phase C.T.
Cut for Riser
B-phase C.T.
Cut for Riser

1.00
5.00

105.00

6.00

4.00

4.00

4.00

SF6 Breaker R-phase pole


Cut for Riser
SF6 Breaker Y-phase pole
Cut for Riser
SF6 Breaker B-phase pole
Cut for Riser
Breaker Cubicle
Cut for Riser
R-phase 220kV L.A.
Cut for Riser

4.00

4.00

4.00

3.00

4.00

Cut for Ground Electrode

2.00

Cut for L-Connector

Total

2.00
8.00

Y-phase 220kV L.A.


Cut for Riser

4.00

Cut for Ground Electrode

2.00

Cut for L-Connector

Total

2.00
8.00

B-phase 220kV L.A.


Cut for Riser

4.00

Cut for Ground Electrode

2.00

Cut for L-Connector

Total

2.00
8.00

R-phase 110kV L.A.


Cut for Riser

4.00

Cut for Ground Electrode

2.00

Cut for L-Connector

Total

2.00
8.00

Y-phase 110kV L.A.


Cut for Riser

4.00

Cut for Ground Electrode

2.00

Cut for L-Connector

Total

2.00
8.00

B-phase 110kV L.A.


Cut for Riser

4.00

Cut for Ground Electrode

2.00

Cut for L-Connector

Total
Transformer Body (R-phase unit)
Cut for Riser
Transformer Body (Y-phase unit)
Cut for Riser
Transformer Body (B-phase unit)
Cut for Riser
Fan Control Cubicle (R-phase)
Cut for Riser
Fan Control Cubicle (Y-phase)
Cut for Riser
Fan Control Cubicle (B-phase)
Cut for Riser
Old Cubicles
Cut for Riser
Neutral C.T.
Cut for Riser

2.00
8.00

2.00

2.00

2.00

1.00

1.00

1.00

1.00

4.00

Cut for Ground Electrode

2.00

Cut for L-Connector

Total

2.00
8.00

Tertiary Connection
Cut for Riser

2.00

Cut for Ground Electrode

2.00

Cut for L-Connector

Total

Total no. of cuts for 200MVA No.2


Bus Paralleling Isolator
Cut for Riser

1.00
5.00

104.00
6

6.00

4.00

15

30.00

220kV Bus P.T.


Cut for Riser

220kV Tower Structures (21 Nos)


Cut for Riser
Total

18.00
48.00

H-Structure near PL-AM feeder


Cut for Riser

1.00

18

18.00

220kV Support Structures (9 Nos)


Cut for Riser

Lamp Post (5 Nos)

Cut for Riser

5.00

1.00

1.00

36

36.00

30

30.00

5.00

Spare transformer
Cut for Riser

Yardlight Control box


Cut for Riser

Connection to yard fencing


Cut for Riser

Connection to old earthing


Cut for Riser

Cable trench earth strip


Cut for Riser

Total no. of cuts

574

155.00

Grand Total of Cuts

1241.00

As per estimate

950.00

No.

Bending the departmentally supplied 32mm MS rod


for crossing cable trench / foundations / risers etc as
per the direction of departmental officers at site.
Charges include the lifting of 32mm MS rod from the
stockyard to the site, hire charges for the bending
tool etc complete. (Heat bending of MS rod is not
allowed.)
Along A-gridline
NIL
Along B-gridline
Bend for diversion

Total
Along C-gridline
Bend for diversion

Total
Along D-gridline
Bend for diversion

10

14

14

12

10

12

12.00
12.00

Total
Along N-gridline
Bend for diversion

10.00
10.00

Total
Along M-gridline
Bend for diversion

8.00
8.00

Total
Along L-gridline
Bend for diversion

12.00
12.00

Total
Along K-gridline
Bend for diversion

8.00
8.00

Total
Along J-gridline
Bend for diversion

14.00
14.00

Total
Along I-gridline
Bend for diversion

14.00
14.00

Total
Along H-gridline
Bend for diversion

10.00
10.00

Total
Along G-gridline
Bend for diversion

8.00
8.00

Total
Along F-gridline
Bend for diversion

4.00
4.00

Total
Along E-gridline
Bend for diversion

6.00
6.00

8.00
8.00

Total

8.00
8.00

Along P-gridline
NIL
Along R-gridline
NIL
Along R & L-gridlines in the periphery
Bend for L-Connectors

Bend for diversion

Total
Along 1-gridline
Bend for L-Connectors

11

11.00
11.00

12

Total

1.00
9.00

Total
Along 2-gridline
Bend for L-Connectors

8.00

12.00
12.00

Along 3-gridline
Bend for L-Connectors

13

Total
Along 4-gridline
Bend for L-Connectors
Bend for diversion

14

Total
Along 5-gridline
Bend for L-Connectors
Bend for diversion
Total

13.00
13.00
14.00
6.00
20.00

15

15.00
6.00
21.00

Along 6-gridline
Bend for L-Connectors

15

Bend for diversion

14

Total
15

Bend for diversion

12

Total
15

Bend for diversion

10

Total
15

15

Bend for diversion

12

Total
15

Bend for diversion

16

Total
8

8.00

15.00
12.00

15.00
16.00

8.00
4.00
12.00

Along 13-gridline
Bend for L-Connectors

Bend for diversion

Total

8.00
4.00
12.00

Along 14-gridline
Bend for L-Connectors

Bend for diversion

Total

8.00
4.00
12.00

Along 15-gridline
Bend for L-Connectors

Bend for diversion

Total

8.00
4.00
12.00

Along 16-gridline
Bend for L-Connectors

Bend for diversion

Total

8.00
8.00
16.00

Along 17-gridline
Bend for L-Connectors

Bend for diversion

Total

9.00
4.00
13.00

Along 18-gridline
Bend for L-Connectors

Bend for diversion

Total

9.00
4.00
13.00

Along 19-gridline
Bend for L-Connectors

Bend for diversion

Total

8.00
4.00
12.00

Along 20-gridline
Bend for L-Connectors

Bend for diversion

Total

Total

15.00

31.00

Total

Bend for diversion

10.00

27.00

Along 11-gridline
Bend for L-Connectors

Along 21-gridline
Bend for L-Connectors

15.00

23.00

Along 10-gridline
Bend for L-Connectors

Bend for diversion

12.00

25.00

Total

Along 12-gridline
Bend for L-Connectors

15.00
27.00

Along 8-gridline
Bend for L-Connectors

Bend for diversion

14.00
29.00

Along 7-gridline
Bend for L-Connectors

Along 9-gridline
Bend for L-Connectors

15.00

8.00
4.00
12.00

10

10.00
6.00
16.00

Total No. of bend along main grid

500.00

Bend for Risers


SB-PL 220kV Feeder
R-phase L.A.
Bend for Riser
Bend for Ground Electrode L-Connector
Total
Y-phase L.A.
Bend for Riser
Bend for Ground Electrode L-Connector
Total
B-phase L.A.
Bend for Riser
Bend for Ground Electrode L-Connector
Total
Y-phase Coupling Capacitor
Bend for Riser
B-phase Coupling Capacitor
Bend for Riser
Line Isolator
Bend for Riser
R-phase P.T.
Bend for Riser
Y-phase P.T.
Bend for Riser
B-phase P.T.
Bend for Riser
R-phase C.T.
Bend for Riser
Y-phase C.T.
Bend for Riser
B-phase C.T.
Bend for Riser
SF6 Breaker R-phase pole
Bend for Riser
SF6 Breaker Y-phase pole
Bend for Riser
SF6 Breaker B-phase pole
Bend for Riser
Breaker Cubicle
Bend for Riser
Bus Isolator
Bend for Riser
Old Cubicle
Bend for Riser

4
2

2
1

8.00
2.00
10.00

4
2

2
1

8.00
2.00
10.00

4
2

2
1

8.00
2.00
10.00

6.00

6.00

12.00

8.00

8.00

8.00

8.00

8.00

8.00

8.00

8.00

8.00

6.00

12.00

Total no. of Bends for SB-PL feeder


NP-PL 220kV Feeder
R-phase L.A.
Bend for Riser
Bend for Ground Electrode L-Connector
Total
Y-phase L.A.
Bend for Riser
Bend for Ground Electrode L-Connector
Total
B-phase L.A.
Bend for Riser
Bend for Ground Electrode L-Connector
Total
Line Isolator
Bend for Riser
R-phase P.T.
Bend for Riser
Y-phase P.T.
Bend for Riser
B-phase P.T.
Bend for Riser
R-phase C.T.
Bend for Riser
Y-phase C.T.
9

4.00

148.00

4
2

2
1

8.00
2.00
10.00

4
2

2
1

8.00
2.00
10.00

4
2

2
1

8.00
2.00
10.00

12.00

8.00

3
1

2
1

6.00
1.00

8.00

8.00

Bend for Riser


B-phase C.T.
Bend for Riser
SF6 Breaker R-phase pole
Bend for Riser
SF6 Breaker Y-phase pole
Bend for Riser
SF6 Breaker B-phase pole
Bend for Riser

8.00

8.00

8.00

8.00

8.00

Breaker Cubicle
Bend for Riser
Bus Isolator
Bend for Riser
Old Cubicle
Bend for Riser

6.00

12.00

Total no. of Bend for NP-PL feeder


PL-AM 220kV Feeder
R-phase L.A.
Bend for Riser
Bend for Ground Electrode L-Connector
Total
Y-phase L.A.
Bend for Riser
Bend for Ground Electrode L-Connector
Total
B-phase L.A.
Bend for Riser
Bend for Ground Electrode L-Connector
Total
Y-phase Coupling Capacitor
Bend for Riser
B-phase Coupling Capacitor
Bend for Riser
Line Isolator
Bend for Riser
R-phase P.T.
Bend for Riser
Y-phase P.T.
Bend for Riser
B-phase P.T.
Bend for Riser
R-phase C.T.
Bend for Riser
Y-phase C.T.
Bend for Riser
B-phase C.T.
Bend for Riser
SF6 Breaker R-phase pole
Bend for Riser
SF6 Breaker Y-phase pole
Bend for Riser
SF6 Breaker B-phase pole
Bend for Riser
Breaker Cubicle
Bend for Riser
Bus Isolator
Bend for Riser
Old Cubicle
Bend for Riser

4
2

2
1

8.00
2.00
10.00

4
2

2
1

8.00
2.00
10.00

4
2

2
1

8.00
2.00
10.00

6.00

6.00

12.00

8.00

3
1

2
1

6.00
1.00

1.5

6.00

8.00

3
1

2
1

6.00
1.00

3
1

2
1

6.00
1.00

8.00

8.00

8.00

6.00

5
1

2
3

10.00
3.00

Total no. of Bends for PL-AM feeder


200MVA No.1 Transformer
Bus Isolator
Bend for Riser
R-phase C.T.
Bend for Riser
Y-phase C.T.
Bend for Riser
B-phase C.T.
Bend for Riser
SF6 Breaker R-phase pole
Bend for Riser
SF6 Breaker Y-phase pole
Bend for Riser
SF6 Breaker B-phase pole

4.00

135.00

1.00

141.00

12.00

8.00

8.00

8.00

8.00

8.00

Bend for Riser


Breaker Cubicle
Bend for Riser
R-phase 220kV L.A.
Bend for Riser
Bend for Ground Electrode L-Connector
Total
Y-phase 220kV L.A.
Bend for Riser
Bend for Ground Electrode L-Connector
Total

8.00

6.00

4
2

2
1

8.00
2.00
10.00

4
2

2
1

8.00
2.00
10.00

B-phase 220kV L.A.


Bend for Riser
Bend for Ground Electrode L-Connector
Total
R-phase 110kV L.A.
Bend for Riser
Bend for Ground Electrode L-Connector
Total
Y-phase 110kV L.A.
Bend for Riser
Bend for Ground Electrode L-Connector
Total
B-phase 110kV L.A.
Bend for Riser
Bend for Ground Electrode L-Connector
Total
Transformer Body (R-phase unit)
Bend for Riser
Transformer Body (Y-phase unit)
Bend for Riser
Transformer Body (B-phase unit)
Bend for Riser
Fan Control Cubicle (R-phase)
Bend for Riser
Fan Control Cubicle (Y-phase)
Bend for Riser
Fan Control Cubicle (B-phase)
Bend for Riser
Old Cubicles
Bend for Riser
Neutral C.T.
Bend for Riser
Bend for Ground Electrode L-Connector
Total
Tertiary Connection
Bend for Riser
Bend for Ground Electrode L-Connector
Total

4
2

2
1

8.00
2.00
10.00

4
2

2
1

8.00
2.00
10.00

4
2

2
1

8.00
2.00
10.00

4
2

2
1

8.00
2.00
10.00

1
1

2
1

2.00
1.00

2.00

2.00

1.00

1.00

1.00

2.00

4
2

2
1

8.00
2.00
10.00

1
1
1

2
1
1

2.00
1.00
1.00
4.00

Total no. of Bends for 200MVA No.1


200MVA No.2 Transformer
Bus Isolator
Bend for Riser
R-phase C.T.
Bend for Riser
Y-phase C.T.
Bend for Riser
B-phase C.T.
Bend for Riser
SF6 Breaker R-phase pole
Bend for Riser
SF6 Breaker Y-phase pole
Bend for Riser
SF6 Breaker B-phase pole
Bend for Riser
Breaker Cubicle
Bend for Riser
R-phase 220kV L.A.
Bend for Riser
Bend for Ground Electrode L-Connector
Total
Y-phase 220kV L.A.
Bend for Riser
Bend for Ground Electrode L-Connector
Total
B-phase 220kV L.A.
Bend for Riser
Bend for Ground Electrode L-Connector
Total

152.00

12.00

8.00

8.00

8.00

8.00

8.00

8.00

6.00

4
2

2
1

8.00
2.00
10.00

4
2

2
1

8.00
2.00
10.00

4
2

2
1

8.00
2.00
10.00

R-phase 110kV L.A.


Bend for Riser
Bend for Ground Electrode L-Connector
Total

4
2

2
1

8.00
2.00
10.00

Y-phase 110kV L.A.


Bend for Riser
Bend for Ground Electrode L-Connector
Total
B-phase 110kV L.A.
Bend for Riser
Bend for Ground Electrode L-Connector
Total
Transformer Body (R-phase unit)
Bend for Riser
Transformer Body (Y-phase unit)
Bend for Riser
Transformer Body (B-phase unit)
Bend for Riser
Fan Control Cubicle (R-phase)
Bend for Riser
Fan Control Cubicle (Y-phase)
Bend for Riser
Fan Control Cubicle (B-phase)
Bend for Riser
Old Cubicles
Bend for Riser
Neutral C.T.
Bend for Riser
Bend for Ground Electrode L-Connector
Total
Tertiary Connection
Bend for Riser
Bend for Ground Electrode L-Connector
Total

4
2

2
1

8.00
2.00
10.00

4
2

2
1

8.00
2.00
10.00

1
1

2
1

2.00
1.00

2.00

2.00

1.00

1.00

1.00

1.00

4
2

2
1

8.00
2.00
10.00

1
1
1

2
1
1

2.00
1.00
1.00
4.00

Total no. of Bends for 200MVA No.2

151.00

Bus Paralleling Isolator


Bend for Riser

12.00

8.00

15
6

4
6

60.00
36.00
96.00

18

36.00

10.00

2.00

1.00

36

36.00

30

30.00

4
1

2
1

8.00
1.00

220kV Bus P.T.


Bend for Riser

220kV Tower Columns (21 Nos)


Bend for Riser
Total

220kV Support Structure (9 Nos)


Bend for Riser

Lamp Post (5 Nos)


Bend for Riser

Spare transformer
Bend for Riser

Yardlight Control box


Bend for Riser

Connection to yard fencing


Bend for Riser

Connection to old earthing


Bend for Riser

Cable trench earth strip


Bend for Riser

H-Structure near PL-AM feeder


Bend for Riser

1.00

Total no. of Bend

241.00

Grand Total no. of Bends

1468.00

As per estimate

1300.00 No.

Laying of earth mat of required size as specified


using 32mm MS rod to the excavated trench,
charges include levelling, lowering and placing in
trenches for lap joining, bending etc complete as per
the direction of departmental officers at site.
Charges include the lifting of 32mm MS rod from the
stockyard to the site.
Along A-gridline
Main mat

17

Lap joint

0.18

Total

17.00
0.18
17.18

Along B-gridline
Main mat

99

99.00

Diversion

3.3

3.30

Lap joint

11

0.18

1.98

Total

104.28

Along C-gridline
Main mat

99

99.00

Diversion

2.1

2.10

Lap joint

10

0.18

Total
Along D-gridline
Main mat

99

99.00

Diversion

5.2

5.20

Lap joint

17

0.18

99

99.00

Diversion

1.8

1.80

Cable trench height

2.00

21

0.18

Total
1

99

99.00

Diversion

2.6

2.60

Cable trench height

2.00

17

0.18

Total
1

99

99.00

Diversion

3.1

3.10

Cable trench height

2.00

0.3

0.60

20

0.18

Total
1

99

99.00

Cable trench height

0.3

0.60

0.7

1.40

0.25

0.50

1.3

2.60

17

0.18

Total
1

99

99.00

Diversion

1.55

1.55

Cable trench height

0.25

0.50

0.7

1.40

0.3

0.60

20

0.18

Total
Along J-gridline

3.06
107.16

Along I-gridline
Main mat

Lap joint

3.60
108.30

Along H-gridline
Main mat

Lap joint

3.06
106.66

Along G-gridline
Main mat

Lap joint

3.78
106.58

Along F-gridline
Main mat

Lap joint

3.06
107.26

Along E-gridline
Main mat

Lap joint

1.80
102.90

Total

3.60
106.65

Main mat

47

47.00

Cable trench height

0.5

1.00

0.3

0.60

10

0.18

Lap joint
Total

1.80
50.40

Along K-gridline
Main mat

47

47.00

Diversion

1.55

1.55

Cable trench height

0.5

1.00

0.3

0.60

10

0.18

Lap joint
Total

1.80
51.95

Along L-gridline
Main mat

49

49.00

Diversion

1.75

1.75

Cable trench height

0.5

1.00

0.3

0.60

11

0.18

Lap joint
Total

44

44.00

Diversion

0.6

0.60

Cable trench height

0.5

1.00

0.3

0.60

13

0.18

Total
Along N-gridline
Main mat

39

39.00

Diversion

4.2

4.20

Lap joint

0.18

33

Lap joint

0.18

Total
1

28

Lap joint

0.18

0.36

0.36

29

29.00

Ground electrode

21.00

L-connectors

0.6

4.80

Lap joint

0.18

28.36

57

57.00

Ground electrode

11

33.00

L-connectors

11

0.6

6.60

0.18

Total
1

59

59.00

Ground electrode

3.00

12

0.6

7.20

0.18

Lap joint
Total

63

63.00

Ground electrode

3.00

13

0.6

7.80

0.18

0.90

Lap joint

0.72
69.92

Along 3-gridline
Main mat
L-connectors

0.72
97.32

Along 2-gridline
Main mat
L-connectors

0.54
55.34

Along 1-gridline
Main mat

Lap joint

28.00

Total
Along L & R-gridlines in the periphery
Main mat

Total

33.00
33.36

Along R-gridline
Main mat

1.44
44.64

Along P-gridline
Main mat

2.34
48.54

Total

1.98
54.33

Along M-gridline
Main mat

Lap joint

Total

74.70

Along 4-gridline
Main mat

67

67.00

Diversion

0.25

0.25

Cable trench height

0.5

1.00

Ground electrode

3.00

L-connectors

14

0.6

8.40

Lap joint

15

0.18

Total

2.70
82.35

Along 5-gridline
Main mat

71

71.00

Diversion

2.6

2.60

Cable trench height

0.5

1.00

Ground electrode

3.00

L-connectors

15

0.6

9.00

Lap joint

16

0.18

2.88

Total

89.48

Along 6-gridline
Main mat

73

73.00

Diversion

3.7

3.70

Cable trench height

0.5

1.00

0.25

0.50

6.00

L-connectors

15

0.6

9.00

Lap joint

14

0.18

Ground electrode

Total
1

73

73.00

Diversion

0.5

0.50

Cable trench height

0.3

1.20

0.5

1.00

6.00

L-connectors

15

0.6

9.00

Lap joint

14

0.18

Total
1

73

73.00

Diversion

1.00

Cable trench height

0.3

0.60

0.5

1.00

6.00

L-connectors

15

0.6

9.00

Lap joint

16

0.18

2.88

Total

93.48

Along 9-gridline
Main mat

73

73.00

Cable trench height

0.3

1.20

0.5

1.00

6.00

L-connectors

15

0.6

9.00

Lap joint

15

0.18

Ground electrode

Total
1

73

73.00

Diversion

0.35

0.35

Cable trench height

0.3

0.60

0.7

1.40

2.00

6.00

L-connectors

15

0.6

9.00

Lap joint

19

0.18

Total

2.70
92.90

Along 10-gridline
Main mat

Ground electrode

2.52
93.22

Along 8-gridline
Main mat

Ground electrode

2.52
95.72

Along 7-gridline
Main mat

Ground electrode

3.42
95.77

Along 11-gridline
Main mat

73

73.00

Diversion

5.5

5.50

Cable trench height

0.3

0.60

0.7

1.40

2.00

27.00
9.00

Ground electrode
L-connectors

15

0.6

Lap joint

17

0.18

Total

3.06
121.56

Along 12-gridline
Main mat

33

33.00

Cable trench height

0.8

1.60

Ground electrode

6.00

L-connectors

0.6

4.80

Lap joint

0.18

0.90

Total

46.30

Along 13-gridline
Main mat

33

33.00

Cable trench height

0.8

1.60

Ground electrode

6.00

L-connectors

0.6

4.80

Lap joint

0.18

Total
Along 14-gridline
Main mat

33

33.00

Diversion

0.5

0.50

Cable trench height

2.00

Ground electrode

6.00

L-connectors

0.6

4.80

Lap joint

0.18

Along 15-gridline
Main mat

33

33.00

Cable trench height

0.8

1.60

Ground electrode

6.00

L-connectors

0.6

4.80

Lap joint

0.18

Along 16-gridline
Main mat

33

33.00

Cable trench height

0.8

1.60

1.3

2.60

Ground electrode

6.00

L-connectors

0.6

4.80

Lap joint

0.18

1.44
49.44

Along 17-gridline
Main mat

33

33.00

Cable trench height

0.9

1.80

Ground electrode

6.00

L-connectors

0.6

5.40

Lap joint

0.18

Total
1

33

33.00

Cable trench height

0.9

1.80

Ground electrode

6.00

L-connectors

0.6

5.40

Lap joint

0.18

Along 19-gridline

0.90
47.10

Along 18-gridline
Main mat

Total

0.90
46.30

Total

0.90
47.20

Total

0.90
46.30

Total

0.90
47.10

Main mat

33

33.00

Cable trench height

0.8

1.60

Ground electrode

6.00

L-connectors

0.6

4.80

Lap joint

0.18

Total

0.90
46.30

Along 20-gridline
Main mat

33

33.00

Cable trench height

2.00

Ground electrode

6.00

L-connectors

0.6

4.80

Lap joint

0.18

Total

0.90
46.70

Along 21-gridline
Main mat

33

33.00

Diversion

1.6

1.60

Cable trench height

2.00

Ground electrode

24.00

10

0.6

6.00

0.18

L-connectors
Lap joint

67.68

Total Length of MS Rod along main grid

2730.73

Quantity of MS Rod for Risers


SB-PL 220kV Feeder
1

3.5

3.50

2.25

2.25

1.7

3.40

Ground electrode

6.00

L-connectors

0.6

Total
Y-phase L.A.
Riser

1.20
16.35

2.7

5.40

1.75

3.50

Ground electrode

6.00

L-connectors

0.6

Total
B-phase L.A.
Riser

1.20
16.10

4.00

2.5

2.50

1.7

1.70

Ground electrode

6.00

L-connectors

0.6

1.20

Total
Y-phase Coupling Capacitor
Riser
B-phase Coupling Capacitor
Riser
Line Isolator
Riser

R-phase P.T.
Riser
Y-phase P.T.
Riser

B-phase P.T.
Riser

1.08

Total

R-phase L.A.
Riser

15.40
3

1.2

3.60

1.9

3.80

1.3

1.30

4.00

2.7

5.40

6.00

2.7

5.40

1.9

3.80

6.00

2.3

2.30

2.9

2.90

2.9

5.80

m
m

17231

R-phase C.T.
Riser
Y-phase C.T.
Riser
B-phase C.T.
Riser
SF6 Breaker (R-phase pole)
Riser
SF6 Breaker (Y-phase pole)
Riser

SF6 Breaker (B-phase pole)


Riser
Breaker Cubicle
Riser
Bus Isolator
Riser

Old Cubicles
Riser

1.7

3.40

1.4

2.80

1.6

3.20

2.3

4.60

1.7

3.40

1.8

3.60

1.7

3.40

2.2

4.40

2.5

5.00

2.5

5.00

3.2

3.20

3.7

3.70

2.2

4.40

2.5

5.00

2.00

3.00

6.00

1.3

2.60

1.2

1.20

1.9

1.90

1.4

Total Quantity of MS Rod for SB-PL feeder


NP-PL 220kV Feeder
R-phase L.A.
Riser

2.6

7.80

1.6

1.60

Ground electrode

6.00

L-connectors

0.6

Total
Y-phase L.A.
Riser

1.20
16.60

2.4

7.20

1.6

1.60

Ground electrode

6.00

L-connectors

0.6

Total
B-phase L.A.
Riser
10

2.80

172.75

1.20
16.00

1.8

3.60

1.3

2.60

Ground electrode

6.00

L-connectors

0.6

Total
Line Isolator
Riser

R-phase P.T.
Riser
Y-phase P.T.
Riser
B-phase P.T.
Riser

1.20
13.40

3.2

6.40

2.2

4.40

1.5

3.00

1.1

2.20

2.5

5.00

1.4

4.20

1.8

1.80

1.7

3.40

m 1090.05

R-phase C.T.
Riser
Y-phase C.T.
Riser
B-phase C.T.
Riser
SF6 Breaker (R-phase pole)
Riser
SF6 Breaker (Y-phase pole)
Riser
SF6 Breaker (B-phase pole)
Riser

Breaker Cubicle
Riser
Bus Isolator
Riser

Old Cubicle
Riser

2.1

2.10

2.5

2.50

3.3

6.60

2.2

4.40

3.4

6.80

1.5

3.00

1.5

4.50

2.5

2.50

2.5

5.00

4.00

2.5

7.50

2.2

2.20

1.5

3.00

2.3

2.30

2.7

2.70

2.2

6.60

1.3

2.60

1.4

2.80

2.2

2.20

3.2

3.20

1.2

Total Quantity of MS Rod for NP-PL feeder


PL-AM 220kV Feeder
R-phase L.A.
Riser

2.40

155.30

1.4

2.80

2.3

2.30

3.2

3.20

Ground electrode

6.00

L-connectors

0.6

Total
Y-phase L.A.
Riser

1.20
15.50

3.2

6.40

1.5

3.00

Ground electrode

6.00

L-connectors

0.6

Total
B-phase L.A.
Riser

1.20
16.60

1.2

2.40

2.4

4.80

Ground electrode

6.00

L-connectors

0.6

Total
Y-phase Coupling Capacitor
Riser
B-phase Coupling Capacitor
Riser
Line Isolator
Riser

R-phase P.T.

1.20
14.40

2.6

5.20

2.00

2.6

5.20

1.3

1.30

1.8

3.60

1.5

3.00

1.3

2.60

979.943

Riser
Y-phase P.T.
Riser

B-phase P.T.
Riser

R-phase C.T.
Riser
Y-phase C.T.
Riser
B-phase C.T.
Riser
SF6 Breaker (R-phase pole)
Riser
SF6 Breaker (Y-phase pole)
Riser

SF6 Breaker (B-phase pole)


Riser
Breaker Cubicle
Riser
Bus Isolator
Riser

Old Cubicle
Riser

4.00

2.8

5.60

2.00

1.5

1.50

2.4

2.40

2.00

2.00

4.00

2.7

5.40

1.7

3.40

2.00

1.6

3.20

2.00

1.7

3.40

1.2

2.40

1.3

2.60

1.3

2.60

1.6

1.60

2.3

2.30

1.3

2.60

1.2

2.40

1.2

2.40

1.8

1.80

2.7

2.70

1.5

3.00

1.7

5.10

1.6

1.60

Total Quantity of MS Rod for PL-AM feeder


200MVA No.1 Transformer
Bus Isolator
Riser

R-phase C.T.
Riser

Y-phase C.T.
Riser
B-phase C.T.
Riser
SF6 Breaker (R-phase pole)
Riser
SF6 Breaker (Y-phase pole)
Riser
SF6 Breaker (B-phase pole)
Riser

145.40

1.9

3.80

2.5

5.00

4.00

1.7

3.40

1.5

1.50

2.00

4.00

1.7

3.40

1.6

3.20

1.4

2.80

1.7

3.40

1.5

3.00

1.8

3.60

1.4

2.80

1.4

2.80

m 917.474

1.7

1.70

1.00

1.2

2.40

1.9

1.90

2.2

4.40

1.5

3.00

Ground electrode

6.00

L-connectors

0.6

Breaker Cubicle
Riser
R-phase 220kV L.A.
Riser

Total
Y-phase 220kV L.A.
Riser

1.20
14.60

1.9

3.80

2.3

4.60

Ground electrode

6.00

L-connectors

0.6

Total
B-phase 220kV L.A.
Riser

1.20
15.60

2.5

5.00

1.3

2.60

Ground electrode

6.00

L-connectors

0.6

Total
R-phase 110kV L.A.
MS rod used for connecting the Risers

6.00

Riser

1.3

2.60

2.00

2.5

2.50

Ground electrode

6.00

L-connectors

0.6

Y-phase 110kV L.A.


Riser

4.00

Ground electrode

6.00

L-connectors

0.6

B-phase 110kV L.A.


Riser

0.9

1.80

1.2

2.40

Ground electrode

6.00

L-connectors

0.6

2.3

4.60

4.00

2.5

5.00

0.8

0.80

0.9

0.90

1.00

2.4

4.80

1.7

1.70

1.2

1.20

Ground electrode

6.00

L-connectors

0.6

Tertiary Connection

1.20
11.40

Total

1.20
11.20

Total
Transformer Body (R-phase unit)
Riser
Transformer Body (Y-phase unit)
Riser
Transformer Body (B-phase unit)
Riser
Fan Control Cubicle (R-phase unit)
Riser
Fan Control Cubicle (Y-phase unit)
Riser
Fan Control Cubicle (B-phase unit)
Riser
Neutral C.T.
Riser

1.20
20.30

Total

1.20
14.80

Total

1.20
14.90

Riser

1.7

1.70

1.00

Ground electrode

6.00

L-connectors

0.6

Total
Old Cubicles
Riser

1.6

Total Quantity of MS Rod for 200MVA No.1


200MVA No.2 TRANSFORMER
Bus Isolator
Riser

R-phase C.T.
Riser

Y-phase C.T.
Riser
B-phase C.T.
Riser
SF6 Breaker (R-phase pole)
Riser
SF6 Breaker (Y-phase pole)
Riser

SF6 Breaker (B-phase pole)


Riser
Breaker Cubicle
Riser
R-phase 220kV L.A.
Riser

Ground electrode
L-connectors

1.8

3.60

1.6

3.20

2.4

4.80

1.7

3.40

1.5

1.50

2.6

2.60

1.5

3.00

1.3

2.60

1.2

3.60

1.6

1.60

1.2

3.60

1.6

1.60

1.3

2.60

1.2

1.20

1.7

1.70

2.00

1.4

2.80

1.1

2.20

1.5

1.50

1.2

2.40

2.00

3.4

3.40

6.00

0.6

1.7

3.40

1.3

1.30

2.6

2.60

Ground electrode

6.00

L-connectors

0.6

B-phase 220kV L.A.


Riser

1.2

2.40

1.9

1.90

2.6

2.60

Ground electrode

6.00

L-connectors

0.6

1.20
14.10

R-phase 110kV L.A.


MS rod used for connecting the Risers

6.00

Riser

2.2

4.40

1.3

2.60

6.00

Ground electrode

1.20
14.50

Total

m 1181.86

1.20
15.00

Total

3.20

187.30

Total
Y-phase 220kV L.A.
Riser

0.60
9.30

L-connectors

0.6

Total

1.20
20.20

Y-phase 110kV L.A.


MS rod used for connecting the Risers

6.00

Riser

0.9

1.80

1.2

2.40

Ground electrode

6.00

L-connectors

0.6

Total

1.20
17.40

B-phase 110kV L.A.


MS rod used for connecting the Risers

5.00

Riser

0.9

1.80

1.2

2.40

Ground electrode

6.00

L-connectors

0.6

Total
Transformer Body (R-phase unit)
Riser
Transformer Body (Y-phase unit)
Riser
Transformer Body (B-phase unit)
Riser
Fan Control Cubicle (R-phase unit)
Riser
Fan Control Cubicle (Y-phase unit)
Riser
Fan Control Cubicle (B-phase unit)
Riser
Neutral C.T.
Riser

2.5

5.00

2.7

5.40

2.4

4.80

1.00

1.00

2.00

1.5

4.50

2.5

2.50

Ground electrode

6.00

L-connectors

0.6

Tertiary Connection
MS rod used for connecting the Tertiary

6.00

Riser

1.4

1.40

1.2

1.20

Ground electrode

6.00

L-connectors

0.6

Old Cubicles
Riser

1.5

Riser

0.60
15.20

Total Quantity of MS Rod for 200MVA No.2


Bus Paralleling Isolator

1.20
14.20

Total

1.20
16.40

Total

1.50

196.80

m 1241.81

1.3

3.90

4.00

3.3

3.30

1.5

3.00

2.5

5.00

220kV Bus P.T.


Riser

220 Tower Structures (21 Nos)


Riser

Total

1.2

6.00

10

1.4

14.00

1.6

8.00

10.00

2.2

11.00

2.4

19.20

2.6

10.40

12.00

3.2

6.40
97.00

220kV Support Structures (9 Nos)


Riser

1.2

4.80

1.5

9.00

1.8

7.20

Total

8.00
29.00

Lamp Post (5 Nos)


Riser

2.3

2.30

1.5

4.50

Total

1.00
7.80

Spare transformer
Riser

1.8

1.80

1.5

1.50

1.8

1.80

17

0.8

13.60

15

15.00

1.2

Yardlight Control box


Riser

H-Structure near PL-AM feeder


Riser

Connection to yard fencing


Riser

Total

4.80
33.40

Connection to old earthing


Riser

26

0.9

23.40

8.00

1.5

4.50

1.2

2.40

229.80

Connection to cable trench earth strip


Riser

Total Quantity of MS Rod

Grand Total Quantity of MS Rod in


meter
Grand Total Quantity of MS Rod in
kg
Grand Total Quantity
of MS Rod in
Qtl

3818.08
###
240.92

As per estimate

275.00

Driving down the MS ground electrode upto a depth


of 3m from the already taken earth pit as directed
by departmental officers at site. Charges include the
lifting of ground electrode from the stockyard to the
site, backfilling, placing and leveling the electrode
etc complete.
Along 1-gridline

11

11.00

Along 2-gridline

1.00

Along 3-gridline

1.00

Along 4-gridline

1.00

Along 5-gridline

1.00

Along 6-gridline

2.00

Along 7-gridline

2.00

Along 8-gridline

2.00

Along 9-gridline

2.00

Along 10-gridline

2.00

Along 11-gridline

9.00

Along 12-gridline

2.00

Along 13-gridline

2.00

Along 14-gridline

2.00

Along 15-gridline

2.00

11 Along 16-gridline
Along 17-gridline

2.00

2.00

Along 18-gridline

2.00

Along 19-gridline

2.00

Along 20-gridline

2.00

Qtl

1450

Along 21-gridline

8.00

For the 220kV L.A. of SB-PL feeder

6.00

For the 220kV L.A. of NP-PL feeder

6.00

For the 220kV L.A. of PL-AM feeder

6.00

For the 220kV L.A. of 200MVA No.1 transformer

6.00

For the 110kV L.A. of 200MVA No.1 transformer

6.00

For the Neutral C.T. of 200MVA No.1 transformer

2.00

For the Tertiary Connection of 200MVA No.1


transformer

2.00

For the 220kV L.A. of 200MVA No.2 transformer

6.00

For the 110kV L.A. of 200MVA No.2 transformer

6.00

For the Neutral C.T. of 200MVA No.2 transformer

2.00

For the Tertiary Connection of 200MVA No.2


transformer

2.00

Along R & L-gridlines in the periphery

7.00

Grand Total no. of Ground Electrodes

117.00

As per estimate

120.00

No.

Drilling holes and driving down MS ground electrode


from the bottom level of trench in all classes of soil
including rock etc complete as per the direction of
departmental officers at site. Charges include the
lifting of ground electrode from the stockyard to the
site, backfilling, placing and leveling the electrode
complete.
Along D-gridline

0.7

1.2

1.20

0.7

3.30
2.80

1.2

2.40

1.4

1.40

Total
Along E-gridline

Total

2.10

4.00

10.60

Along F-gridline

1.4

Along G-gridline

0.7

2.80
0.70

1.2

1.20

1.4

2.80

0.7

4.70
0.70

1.2

1.20

1.4

2.80

0.7

4.70
1.40

1.2

1.20

1.4

Total
Along H-gridline

Total
Along I-gridline

Total

2.80

5.40

Along J-gridline

1.4

2.80

Along K-gridline

1.4

2.80

Along L-gridline

1.4

Along M-gridline

0.7

2.80
5.60

1.4

2.80

3.1

6.20

0.7

14.60
2.10

1.2

2.40

0.7

4.50
2.10

1.2

2.40

0.7

4.50
0.70

1.2

1.20

1.4

1.40

0.7

3.30
0.70

Total
Along 4-gridline

Total
Along 5-gridline

12 Along 6-gridline

Total

Total
Along 7-gridline

1.2

1.4

1.40

0.7

3.30
1.40

1.2

1.20

1.4

1.40

2.00

0.7

6.00
2.80

1.2

1.20

1.4

1.40

0.7

5.40
1.40

1.2

2.40

1.4

1.40

2.00

1.2

7.20
1.20

1.4

1.40

3.1

Total
Along 8-gridline

Total
Along 9-gridline

Total
Along 10-gridline

Total
Along 11-gridline

Total

1.20

3.10

5.70

Along 12-gridline

1.4

1.40

Along 13-gridline

1.4

1.40

Along 14-gridline

1.4

1.40

Along 15-gridline

1.4

1.40

Along 16-gridline

1.4

1.40

Along 17-gridline

1.4

1.40

Along 18-gridline

1.4

1.40

Along 19-gridline

1.4

1.40

Along 20-gridline

1.4

1.40

Along 21-gridline

1.4

1.40

For Risers to the 200MVA transformers

1.2

4.80

Grand Total of Drilling

113.20

As per estimate

200.00

Drilling bore holes of size 150mm or nearest with 3m


in depth in all classes of soil including hire charges
of plant and machinery, cost of oil, fuel, tool etc and
taking all necessary precautions for safety to the
substation equipments, personnel etc and filling the
13 drilled boreholes with bentonite clay after placing
the ground electrode as per the direction of
departmental officers at site.

Total

NIL

As per estimate

60.00

Welding of overlapping joints for mat, riser lap joints


with 32mm MS rod placed in trenches, having
150mm in length 6mm thick on all sides(in round
shape) of the rod and both ends of overlapped MS
rods with 6mm welding thickness after cleaning the
surfaces neatly. Charges include cost of low
hydrogen DC electrode (No. E7018), hire charges of
DC arc welding set, tools and plants required, current
charges including labour charges for holding MS rod
in position and applying two coats of anti corrosive
paints at the welded joints etc complete as per the
direction of departmental officers at site.
Along A-gridline
Lap joint along main gridline
Total
Along B-gridline
Lap joint along main gridline

1.00
1.00

Lap joint along diversions


Total
Along C-gridline
Lap joint along main gridline

7.00

Lap joint along diversions


Total
Along D-gridline
Lap joint along main gridline

5.00

Lap joint along diversions


Total
Along E-gridline
Lap joint along main gridline

12

12.00

4.00

Lap joint along diversions


Total
Along F-gridline
Lap joint along main gridline

17

17.00

3.00

Lap joint along diversions


Total
Along G-gridline
Lap joint along main gridline

14

14.00

2.00

Lap joint along diversions


Total
Along H-gridline
Lap joint along main gridline

18

18.00

3.00

Lap joint along diversions


Total
Along I-gridline
Lap joint along main gridline

14

14.00

4.00

Lap joint along diversions


Total

16

16.00

4.00
11.00
6.00
4.00
10.00

17.00

21.00

17.00

20.00

17.00

20.00

Along J-gridline
Lap joint along main gridline

Lap joint along diversions


Total
Along K-gridline
Lap joint along main gridline

0.00

Lap joint along diversions


Total
Along L-gridline
Lap joint along main gridline

10

10.00

0.00

Lap joint along diversions


Total
Along M-gridline
Lap joint along main gridline

11

11.00

2.00

Lap joint along diversions


Total
Along N-gridline
Lap joint along main gridline

11

11.00

Lap joint along diversions


Total
Along P-gridline
Lap joint along main gridline

Lap joint along diversions


Total
Along R-gridline
Lap joint along main gridline

Lap joint along diversions


Total
Along L & R-gridlines in the periphery
Lap joint along main gridline

1.00

Lap joint for L-connectors

16.00

Lap joint along diversions


Total
Along 1-gridline
Lap joint along main gridline

Lap joint for L-connectors


Lap joint along diversions
Total
Along 2-gridline
Lap joint along main gridline
Lap joint for L-connectors
Lap joint along diversions
Total
Along 3-gridline
Lap joint along main gridline
Lap joint for L-connectors
Lap joint along diversions
Total
Along 4-gridline
Lap joint along main gridline

2.00
8.00
10.00

10.00

11.00

13.00
0.00
8.00
8.00
2.00
0.00
2.00
2.00
0.00
2.00

2.00
19.00

4.00

11

22.00

0.00
26.00

4.00

12

24.00

0.00
28.00

5.00

13

26.00

0.00
31.00

2.00

Lap joint for L-connectors

14

28.00

Lap joint along diversions


Total

13

13.00
43.00

Along 5-gridline
Lap joint along main gridline

1.00

Lap joint for L-connectors

15

30.00

Lap joint along diversions


Total
Along 6-gridline
Lap joint along main gridline

15

0.00

Lap joint for L-connectors

15

30.00

Lap joint along diversions


Total
Along 7-gridline
Lap joint along main gridline

14

0.00

Lap joint for L-connectors

15

30.00

Lap joint along diversions


Total
Along 8-gridline
Lap joint along main gridline

14

1.00

Lap joint for L-connectors

15

30.00

Lap joint along diversions


Total
Along 9-gridline
Lap joint along main gridline

15

1.00

Lap joint for L-connectors

15

30.00

Lap joint along diversions


Total
Along 10-gridline
Lap joint along main gridline

14

3.00

Lap joint for L-connectors

15

30.00

Lap joint along diversions


Total
Along 11-gridline
Lap joint along main gridline

16

1.00

Lap joint for L-connectors

15

30.00

Lap joint along diversions


Total
Along 12-gridline
Lap joint along main gridline

16

15.00
46.00

14.00
44.00

14.00
44.00

15.00
46.00

14.00
45.00

16.00
49.00

16.00
47.00

1.00

Lap joint for L-connectors

16.00

Lap joint along diversions


Total
Along 13-gridline
Lap joint along main gridline

1.00

Lap joint for L-connectors

16.00

Lap joint along diversions


Total
Along 14-gridline
Lap joint along main gridline

1.00

Lap joint for L-connectors

16.00

Lap joint along diversions


Total
Along 15-gridline
Lap joint along main gridline

1.00

Lap joint for L-connectors

16.00

Lap joint along diversions


Total
Along 16-gridline
Lap joint along main gridline

1.00

Lap joint for L-connectors

16.00

Lap joint along diversions


Total

4.00
21.00

4.00
21.00

4.00
21.00

4.00
21.00

7.00
24.00

Along 17-gridline
Lap joint along main gridline

1.00

Lap joint for L-connectors

18.00

Lap joint along diversions


Total
Along 18-gridline
Lap joint along main gridline

1.00

Lap joint for L-connectors

18.00

Lap joint along diversions


Total
Along 19-gridline
Lap joint along main gridline

1.00

Lap joint for L-connectors

16.00

Lap joint along diversions


Total
Along 20-gridline
Lap joint along main gridline

1.00

Lap joint for L-connectors

16.00

Lap joint along diversions


Total
Along 21-gridline
Lap joint along main gridline

Lap joint for L-connectors


Lap joint along diversions
Total

4.00
23.00

4.00
23.00

4.00
21.00

4.00
21.00

0.00

10

20.00

6.00
26.00

Total No. of Overlap along the main grid

880.00

Overlap for Risers


SB-PL 220kV Feeder
R-phase L.A.
Lap joint for Risers

Lap joint for Ground Electrode L-Connectors


Total
Y-phase L.A.
Lap joint for Risers

Lap joint for Ground Electrode L-Connectors


Total
B-phase L.A.
Lap joint for Risers

Lap joint for Ground Electrode L-Connectors


Total
Y-phase Coupling Capacitor
Lap joint for Riser
B-phase Coupling Capacitor
Lap joint for Riser
Line Isolator
Lap joint for Riser
R-phase P.T.
Lap joint for Riser
Y-phase P.T.
Lap joint for Riser
B-phase P.T.
Lap joint for Riser
R-phase C.T.
Lap joint for Riser
Y-phase C.T.
Lap joint for Riser
B-phase C.T.
Lap joint for Riser
SF6 Breaker (R-phase pole)
Lap joint for Riser
SF6 Breaker (Y-phase pole)

4.00
4.00
8.00
4.00
4.00
8.00
4.00
4.00
8.00

3.00

3.00

6.00

4.00

4.00

4.00

4.00

4.00

4.00

4.00

Lap joint for Riser


SF6 Breaker (B-phase pole)
Lap joint for Riser
Breaker Cubicle
Lap joint for Riser
Bus Isolator
Lap joint for Riser
Old cubicles
Lap joint for Riser

14

4.00

4.00

3.00

6.00

2.00

Total no. of overlap for SB-PL feeder


NP-PL 220kV Feeder
R-phase L.A.
Lap joint for Risers

83.00

14 Lap joint for Ground Electrode L-Connectors


Total
Y-phase L.A.
Lap joint for Risers

Lap joint for Ground Electrode L-Connectors


Total
B-phase L.A.
Lap joint for Risers

Lap joint for Ground Electrode L-Connectors


Total
Line Isolator
Lap joint for Riser
R-phase P.T.
Lap joint for Riser
Y-phase P.T.
Lap joint for Riser
B-phase P.T.
Lap joint for Riser
R-phase C.T.
Lap joint for Riser
Y-phase C.T.
Lap joint for Riser
B-phase C.T.
Lap joint for Riser
SF6 Breaker (R-phase pole)
Lap joint for Riser
SF6 Breaker (Y-phase pole)
Lap joint for Riser
SF6 Breaker (B-phase pole)
Lap joint for Riser
Breaker Cubicle
Lap joint for Riser
Bus Isolator
Lap joint for Riser
Old cubicles
Lap joint for Riser

4.00
8.00
4.00
4.00
8.00
4.00
4.00
8.00

6.00

4.00

4.00

4.00

4.00

4.00

4.00

4.00

4.00

4.00

3.00

6.00

Total no. of overlap for NP-PL feeder


PL-AM 220kV Feeder
R-phase L.A.
Lap joint for Risers

4.00

2.00

77.00

Lap joint for Ground Electrode L-Connectors


Total
Y-phase L.A.
Lap joint for Risers

Lap joint for Ground Electrode L-Connectors


Total
B-phase L.A.
Lap joint for Risers

Lap joint for Ground Electrode L-Connectors


Total
Y-phase Coupling Capacitor
Lap joint for Riser
B-phase Coupling Capacitor
Lap joint for Riser
Line Isolator
Lap joint for Riser
R-phase P.T.
Lap joint for Riser
Y-phase P.T.

4.00
4.00
8.00
4.00
4.00
8.00
4.00
4.00
8.00

3.00

3.00

6.00

4.00

Lap joint for Riser


B-phase P.T.
Lap joint for Riser
R-phase C.T.
Lap joint for Riser
Y-phase C.T.
Lap joint for Riser
B-phase C.T.
Lap joint for Riser
SF6 Breaker (R-phase pole)
Lap joint for Riser
SF6 Breaker (Y-phase pole)
Lap joint for Riser
SF6 Breaker (B-phase pole)
Lap joint for Riser

4.00

4.00

4.00

4.00

4.00

4.00

4.00

4.00

Breaker Cubicle
Lap joint for Riser
Bus Isolator
Lap joint for Riser
Old cubicle
Lap joint for Riser

3.00

6.00

Total no. of overlap for PL-AM feeder


200MVA No.1 Transformer
Bus Isolator
Lap joint for Riser
R-phase C.T.
Lap joint for Riser
Y-phase C.T.
Lap joint for Riser
B-phase C.T.
Lap joint for Riser
SF6 Breaker (R-phase pole)
Lap joint for Riser
SF6 Breaker (Y-phase pole)
Lap joint for Riser
SF6 Breaker (B-phase pole)
Lap joint for Riser
Breaker Cubicle
Lap joint for Riser
R-phase 220kV L.A.
Lap joint for Riser

1.00

82.00

6.00

4.00

4.00

4.00

4.00

4.00

4.00

3.00
4.00

Lap joint for Ground Electrode L-Connector


Total
Y-phase 220kV L.A.
Lap joint for Riser

Lap joint for Ground Electrode L-Connector


Total
B-phase 220kV L.A.
Lap joint for Riser

Lap joint for Ground Electrode L-Connector


Total
R-phase 110kV L.A.
Lap joint for Riser

Lap joint for Ground Electrode L-Connector


Total
Y-phase 110kV L.A.
Lap joint for Riser

Lap joint for Ground Electrode L-Connector


Total
B-phase 110kV L.A.
Lap joint for Riser

Lap joint for Ground Electrode L-Connector


Total
Transformer Body (R-phase unit)
Lap joint for Riser
Transformer Body (Y-phase unit)
Lap joint for Riser
Transformer Body (B-phase unit)
Lap joint for Riser
Fan Control Cubicle (R-phase unit)
Lap joint for Riser
Fan Control Cubicle (Y-phase unit)
Lap joint for Riser
Fan Control Cubicle (B-phase unit)
Lap joint for Riser
Neutral C.T.
Lap joint for Riser

Lap joint for Ground Electrode L-Connector

4.00
8.00
4.00
4.00
8.00
4.00
4.00
8.00
4.00
4.00
8.00
4.00
4.00
8.00
4.00
4.00
8.00

2.00

2.00

2.00

1.00

1.00

1.00

4.00

4.00

Total
Tertiary Connection
Lap joint for Riser
Lap joint for Ground Electrode L-Connector
Total
Old cubicles
Lap joint for Riser

Total no. of overlap for 200MVA No.1

8.00
2

2.00
2.00
4.00

2.00

104.00

200MVA No.2 Transformer


Bus Isolator
Lap joint for Riser
R-phase C.T.
Lap joint for Riser
Y-phase C.T.
Lap joint for Riser
B-phase C.T.
Lap joint for Riser
SF6 Breaker (R-phase pole)
Lap joint for Riser
SF6 Breaker (Y-phase pole)
Lap joint for Riser
SF6 Breaker (B-phase pole)
Lap joint for Riser
Breaker Cubicle
Lap joint for Riser
R-phase 220kV L.A.
Lap joint for Riser

6.00

4.00

4.00

4.00

4.00

4.00

4.00

3.00
4.00

Lap joint for Ground Electrode L-Connector


Total
Y-phase 220kV L.A.
Lap joint for Riser

Lap joint for Ground Electrode L-Connector


Total
B-phase 220kV L.A.
Lap joint for Riser

Lap joint for Ground Electrode L-Connector


Total
R-phase 110kV L.A.
Lap joint for Riser

Lap joint for Ground Electrode L-Connector


Total
Y-phase 110kV L.A.
Lap joint for Riser

Lap joint for Ground Electrode L-Connector


Total
B-phase 110kV L.A.
Lap joint for Riser

Lap joint for Ground Electrode L-Connector


Total
Transformer Body (R-phase unit)
Lap joint for Riser
Transformer Body (Y-phase unit)
Lap joint for Riser
Transformer Body (B-phase unit)
Lap joint for Riser
Fan Control Cubicle (R-phase unit)
Lap joint for Riser
Fan Control Cubicle (Y-phase unit)
Lap joint for Riser
Fan Control Cubicle (B-phase unit)
Lap joint for Riser
Neutral C.T.
Lap joint for Riser

Lap joint for Ground Electrode L-Connector


Total
Tertiary Connection
Lap joint for Riser

Lap joint for Ground Electrode L-Connector


Total
Old cubicle
Lap joint for Riser

4.00
8.00
4.00
4.00
8.00
4.00
4.00
8.00
4.00
4.00
8.00
4.00
4.00
8.00
4.00
4.00
8.00

2.00

2.00

2.00

1.00

1.00

1.00

4.00

4.00
8.00
2.00
2.00
4.00

1.00

Total no. of overlap for 200MVA No.2

103.00

220kV Bus Paralleling Isolator


Lap joint for Riser

6.00

4.00

15

30.00

18.00

220kV Bus P.T.


Lap joint for Riser

220kV Tower Columns (21 Nos)


Lap joint for Riser

220kV Support Structure (9 Nos)

Lap joint for Riser

18

18.00

5.00

1.00

1.00

36

36.00

30

30.00

5.00

Lamp Post (5 Nos)


Lap joint for Riser

Spare Transformer
Lap joint for Riser

Yardlight Control box


Lap joint for Riser

Connection to Yard fencing


Lap joint for Riser

Connection to old earthing


Lap joint for Riser

Connection to cable trench earth strip


Lap joint for Riser

H-Structure near PL-AM feeder


Lap joint for Riser

1.00

Total No. of overlap

155.00

Grand Total of Overlap

1484.00

As per estimate

1450.00 No.

Welding the nodal points (cross joints) in the


trenches at all sides to a thickness of 6mm after
cleaning the surface neatly. Charges include cost of
low hydrogen DC electrodes (No. E7018), hire
charges of DC welding set, tools and plants required,
current charges, labour charges for holding MS rod in
position and applying two coats of anti corrosive
paints at the welded joints etc complete as per the
direction of departmental officers at site.
Along 1-gridline

11

11.00

Along 2-gridline

12

12.00

Along 3-gridline

13

13.00

Along 4-gridline

14

14.00

Along 5-gridline

14

14.00

Along 6-gridline

15

15.00

Along 7-gridline

15

15.00

Along 8-gridline

15

15.00

Along 9-gridline

15

15.00

15

15.00

15

15.00

Along 12-gridline

8.00

Along 13-gridline

8.00

Along 14-gridline

8.00

Along 15-gridline

8.00

Along 16-gridline

8.00

Along 17-gridline

8.00

Along 18-gridline

8.00

Along 19-gridline

8.00

Along 20-gridline

8.00

Along 21-gridline

8.00

Along R & L-gridlines in the periphery

15 Along 10-gridline
Along 11-gridline

Total No. of Nodal points in the main mat


No. of Nodal points in an Auxiliary mat

No. of Nodal point in 12 Nos of Auxiliary


mat

7.00

241.00
5

25.00

12

25

300.00

Grand Total of Nodal points

541.00

As per estimate

520.00

Welding the ground electrode with the main


electrode after cleaning the surface neatly. Charges
include cost of low hydrogen content DC electrodes
(No. E7018), hire charges of DC arc welding set, tools
and plants, current charges, labour charges for
holding MS rod in position and applying two coats of
anti corrosive paints at the welded joints etc
complete as per the direction of departmental
officers at site.

No.

16

17

Along 1-gridline

11

11.00

Along 2-gridline

1.00

Along 3-gridline

1.00

Along 4-gridline

1.00

Along 5-gridline

1.00

Along 6-gridline

2.00

Along 7-gridline

2.00

Along 8-gridline

2.00

Along 9-gridline

2.00

Along 10-gridline

2.00

Along 11-gridline

9.00

Along 12-gridline

2.00

Along 13-gridline

2.00

Along 14-gridline

2.00

Along 15-gridline

2.00

Along 16-gridline

2.00

Along 17-gridline

2.00

Along 18-gridline

2.00

Along 19-gridline

2.00

Along 20-gridline

2.00

Along 21-gridline

8.00

For the 220kV L.A. of SB-PL 220kV feeder

6.00

For the 220kV L.A. of NP-PL 220kV feeder

6.00

For the 220kV L.A. of PL-AM 220kV feeder

6.00

For the 220kV L.A. of 200MVA No.1 transformer

6.00

For the 110kV L.A. of 200MVA No.1 transformer

6.00

For the Neutral C.T. of 200MVA No.1 transformer

2.00

For the Tertiary Connection of 200MVA No.1


transformer

2.00

For the 220kV L.A. of 200MVA No.2 transformer

6.00

For the 110kV L.A. of 200MVA No.2 transformer

6.00

For the Neutral C.T. of 200MVA No.2 transformer

2.00

For the Tertiary Connection of 200MVA No.2


transformer

2.00

Along R & L-gridlines in the periphery

7.00

Grand Total of Ground Electrode


welding

117.00

As per estimate

120.00

No.

Laying of departmentally supplied GI strip / Copper


strip of suitable size over the equipment structure
and the trenches, including cleaning and neatly
bending the strips, cutting, removing of metal / earth
in the yard and burying earth strip to the required
depth, re-doing the yard metalling as per the
direction of the departmental officers at site.
Charges include the lifting of GI strip from the
stockyard to the site complete.
Along the periphery in the main mat

0.00

220kV LA

0.00

110kV LA

0.00

Neutral of Transformers

0.00

Tertiary of Transformers

0.00

Grand Total of G.E. welding

0.00

As per estimate

1700.00

Welding one end of the bended GI strip of size


50x6mm with the riser / GI angle platform in front of
the equipments of the already laid earth mat,
welding 150mm in length, 6mm thick on both sides
& end of the strip & other end of the strip with yard
structure at 2 points 50mm apart each welding
points having 50mm length and 6mm thick on both
sides & end of the strip including the charges for
connecting the strip with structure using bolted
joints as per the direction of the departmental
officers at site. Charges include hire charges of DC
arc welding set, current charges, cost of low
hydrogen content DC arc welding electrodes
(No.E7018) cost of anti corrosive paint etc complete.

SB-PL 220kV Feeder


R-phase L.A.

1.00

Y-phase L.A.

1.00

B-phase L.A.

1.00

Y-phase Coupling Capacitor

1.00

B-phase Coupling Capacitor

1.00

Line Isolator

3.00

R-phase P.T.

2.00

Y-phase P.T.

2.00

B-phase P.T.

2.00

R-phase C.T.

2.00

Y-phase C.T.

2.00

B-phase C.T.

2.00

SF6 Breaker (R-phase pole)

4.00

SF6 Breaker (Y-phase pole)

4.00

SF6 Breaker (B-phase pole)

4.00

Breaker Cubicle

2.00

Bus Isolator

3.00

Old Cubicle

Total No. of Bolted GI strip for SB-PL feeder


NP-PL 220kV Feeder

2.00

39.00

R-phase L.A.

2.00

Y-phase L.A.

2.00

B-phase L.A.

2.00

Line Isolator

3.00

R-phase P.T.

2.00

Y-phase P.T.

2.00

B-phase P.T.

2.00

R-phase C.T.

2.00

Y-phase C.T.

2.00

B-phase C.T.

2.00

SF6 Breaker (R-phase pole)

2.00

SF6 Breaker (Y-phase pole)

2.00

SF6 Breaker (B-phase pole)

2.00

Breaker Cubicle

2.00

Bus Isolator

3.00

Old Cubicle

Total No. of Bolted GI strip for NP-PL feeder


PL-AM 220kV Feeder

2.00

34.00

R-phase L.A.

2.00

Y-phase L.A.

2.00

B-phase L.A.

2.00

Y-phase Coupling Capacitor

1.00

B-phase Coupling Capacitor

1.00

Line Isolator

3.00

R-phase P.T.

2.00

Y-phase P.T.

2.00

B-phase P.T.

2.00

R-phase C.T.

2.00

18

Y-phase C.T.

2.00

B-phase C.T.

2.00

SF6 Breaker (R-phase pole)

4.00

SF6 Breaker (Y-phase pole)

4.00

SF6 Breaker (B-phase pole)

4.00

Breaker Cubicle

2.00

Bus Isolator

3.00

Old Cubicle

Total No. of Bolted GI strip for PL-AM


feeder
200MVA No.1 TRANSFORMER

1.00

41.00

Bus Isolator

3.00

R-phase C.T.

2.00

Y-phase C.T.

2.00

B-phase C.T.

2.00

SF6 Breaker (R-phase pole)

2.00

SF6 Breaker (Y-phase pole)

2.00

SF6 Breaker (B-phase pole)

2.00

Breaker Cubicle

2.00

R-phase 220kV L.A.

2.00

Y-phase 220kV L.A.

2.00

B-phase 220kV L.A.

2.00

R-phase 110kV L.A.

2.00

Y-phase 110kV L.A.

2.00

B-phase 110kV L.A.

2.00

Transformer Body (R-phase unit)

2.00

Transformer Body (Y-phase unit)

2.00

Transformer Body (B-phase unit)

2.00

Fan Control Cubicle (R-phase unit)

1.00

Fan Control Cubicle (Y-phase unit)

1.00

Fan Control Cubicle (B-phase unit)

1.00

Neutral C.T.

3.00

Tertiary Connection

2.00

Old Cubicle

Total No. of Bolted GI strip for 200MVA


No.1
200MVA No.2 TRANSFORMER

2.00

45.00

Bus Isolator

3.00

R-phase C.T.

2.00

Y-phase C.T.

2.00

B-phase C.T.

2.00

SF6 Breaker (R-phase pole)

2.00

SF6 Breaker (Y-phase pole)

2.00

SF6 Breaker (B-phase pole)

2.00

Breaker Cubicle

2.00

R-phase 220kV L.A.

2.00

Y-phase 220kV L.A.

2.00

B-phase 220kV L.A.

2.00

R-phase 110kV L.A.

2.00

Y-phase 110kV L.A.

2.00

B-phase 110kV L.A.

2.00

Transformer Body (R-phase unit)

2.00

Transformer Body (Y-phase unit)

2.00

Transformer Body (B-phase unit)

2.00

Fan Control Cubicle (R-phase unit)

1.00

Fan Control Cubicle (Y-phase unit)

1.00

Fan Control Cubicle (B-phase unit)

1.00

Neutral C.T.

3.00

Tertiary Connection

2.00

Old Cubicle

Total No. of Bolted GI strip for 200MVA


No.2

1.00

44.00

Bus Paralleling Isolator

3.00

Bus P.T.

2.00

Tower Structure (21 Nos)

0.00

H-Structure

0.00

Support Structure (9 Nos)

0.00

Lamp Post (5 Nos)

0.00

Spare Transformer

1.00

Yardlight Control box

1.00

Fencing

0.00

30

30.00

5.00

Old earthing
Cable trench earth strip

Total No. of Bolted GI strip

42.00

Grand Total of Bolted G.I. Strips

245.00

As per estimate

350.00

No.

Welding overlapping joints of 50x6mm GI strip with


50mm long, 6mm thick welding on all three sides
after doing 2 Nos. bolted joints at the centre as
specified after cleaning the surface. Charges include
hire charges of DC arc welding set, current charges,
cost of low hydrogen content DC arc welding
electrodes (No.E7018), cost of anti corrosive paint
etc complete as per the direction of departmental
officers at site.

SB-PL 220kV Feeder


Bus Isolator

3.00

Line Isolator

3.00

3.00

Bus Isolator

3.00

Line Isolator

3.00

SF6 Breaker (B-phase pole)

1.00

Transformer Body (R-phase unit)

1.00

Bus Isolator

3.00

Neutral C.T.

1.00

110kV R-phase L.A.

1.00

110kV Y-phase L.A.

7.00

110kV B-phase L.A.

7.00

Bus Isolator

3.00

Neutral C.T.

1.00

110kV R-phase L.A.

1.00

220kV Support Structure near 200MVA No.1

1.00

Bus Paralleling Isolator

NP-PL 220kV Feeder


Line Isolator

PL-AM 220kV Feeder


19

200MVA No.1 TRANSFORMER

200MVA No.2 TRANSFORMER

3.00

Grand Total of Overlapping joints

45.00

As per estimate

100.00

Welding one end of the bended GI strip of size


50x6mm with the riser / GI platform of the already
laid earth mat, welding 150mm in length, 6mm thick
on both sides & end of the strip welded on the
stucture and connect with nuts & bolts if required as
per the direction of departmental officers at site.
Charges include hire charges of DC arc welding set,
current charges, cost of low hydrogen content DC arc
welding electrodes (No.E7018), cost of anti corrosive
paint etc complete.

SB-PL 220kV Feeder


R-phase L.A.

3.00

Y-phase L.A.

3.00

B-phase L.A.

3.00

Y-phase Coupling Capacitor

2.00

No.

B-phase Coupling Capacitor

2.00

Line Isolator

3.00

R-phase P.T.

2.00

Y-phase P.T.

2.00

B-phase P.T.

2.00

R-phase C.T.

2.00

Y-phase C.T.

2.00

B-phase C.T.

2.00

SF6 Breaker (R-phase pole)

0.00

SF6 Breaker (Y-phase pole)

0.00

SF6 Breaker (B-phase pole)

0.00

Breaker Cubicle

1.00

Bus Isolator

3.00

Old Cubicle

Total No. of Welded GI strip for SB-PL


feeder
NP-PL 220kV Feeder

0.00

32.00

R-phase L.A.

2.00

Y-phase L.A.

2.00

B-phase L.A.

2.00

Line Isolator

3.00

R-phase P.T.

2.00

Y-phase P.T.

2.00

B-phase P.T.

2.00

R-phase C.T.

2.00

Y-phase C.T.

2.00

B-phase C.T.

2.00

SF6 Breaker (R-phase pole)

2.00

SF6 Breaker (Y-phase pole)

2.00

SF6 Breaker (B-phase pole)

2.00

Breaker Cubicle

1.00

Bus Isolator

3.00

Old Cubicle

Total No. of Welded GI strip for NP-PL


feeder
PL-AM 220kV Feeder

0.00

31.00

R-phase L.A.

2.00

Y-phase L.A.

2.00

B-phase L.A.

2.00

Y-phase Coupling Capacitor

2.00

B-phase Coupling Capacitor

2.00

Line Isolator

3.00

R-phase P.T.

2.00

Y-phase P.T.

2.00

B-phase P.T.

2.00

R-phase C.T.

2.00

Y-phase C.T.

2.00

B-phase C.T.

2.00

SF6 Breaker (R-phase pole)

0.00

20 SF6 Breaker (Y-phase pole)


SF6 Breaker (B-phase pole)

0.00

0.00

Breaker Cubicle

1.00

Bus Isolator

3.00

Old Cubicle

Total No. of Welded GI strip for PL-AM


feeder
200MVA No.1 TRANSFORMER

0.00

29.00

Bus Isolator

3.00

R-phase C.T.

2.00

Y-phase C.T.

2.00

B-phase C.T.

2.00

SF6 Breaker (R-phase pole)

2.00

SF6 Breaker (Y-phase pole)

2.00

SF6 Breaker (B-phase pole)

2.00

Breaker Cubicle

1.00

R-phase 220kV L.A.

2.00

Y-phase 220kV L.A.

2.00

B-phase 220kV L.A.

2.00

R-phase 110kV L.A.

2.00

Y-phase 110kV L.A.

2.00

B-phase 110kV L.A.

2.00

Transformer Body

0.00

Fan Control Cubicle

0.00

Neutral C.T.

1.00

Tertiary Connection

0.00

Old Cubicle

Total No. of Welded GI strip for 200MVA


No.1
200MVA No.2 TRANSFORMER

0.00

29.00

Bus Isolator

3.00

R-phase C.T.

2.00

Y-phase C.T.

2.00

B-phase C.T.

2.00

SF6 Breaker (R-phase pole)

2.00

SF6 Breaker (Y-phase pole)

2.00

SF6 Breaker (B-phase pole)

2.00

Breaker Cubicle

1.00

R-phase 220kV L.A.

2.00

Y-phase 220kV L.A.

2.00

B-phase 220kV L.A.

2.00

R-phase 110kV L.A.

2.00

Y-phase 110kV L.A.

2.00

B-phase 110kV L.A.

2.00

Transformer Body

0.00

Fan Control Cubicle

0.00

Neutral C.T.

1.00

Tertiary Connection

0.00

Old Cubicle

Total No. of Welded GI strip for 200MVA


No.2

0.00

29.00

Bus Paralleling Isolator

Bus P.T.

2.00

15

30.00

Tower Structure (21 Nos)

3.00

18.00

H-Structure

1.00

Support Structure (9 Nos)

9.00

Lamp Post ( 5 Nos)

5.00

Spare Transformer

0.00

Yardlight Control box

0.00

36

36.00

Old earthing

0.00

Cable trench earth strip

Fencing

0.00

Total No. of Welded GI strip

104.00

Grand Total of Welded G.I. Strips

254.00

As per estimate

200.00

No.