Correctness, completeness, and quality
Actual results match the expected results
7 TESTING PRINCIPLES
Principle 1
Testing shows presence of defects
Principle 2
Exhaustive testing is impossible
Principle 3
Early Testing
Principle 4
Defect Clustering
Principle 5
Pesticide Paradox
Principle 6
Testing is context dependent
Principle 7
Absence of errors - fallacy
STLC
STLC Stage
Entry Criteria
Requirement Requirements
Analysis
Document available
(both functional and
non functional)
Acceptance criteria
defined.
Activity
Analyse business functionality to
know the business modules and
module specific functionalities.
Identify all transactions in the
modules.
Identify all the user profiles.
Application
Gather user interface/authentication,
architectural document geographic spread requirements.
available.
Identify types of tests to be
performed.
Gather details about testing priorities
and focus.
Prepare Requirement Traceability
Matrix (RTM).
Identify test environment details
where testing is supposed to be
carried out.
Automation feasibility analysis (if
Exit Criteria
Deliverables
Signed off RTM
RTM
Test automation
feasibility report
signed off by the
client
Automation
feasibility report
(if applicable)
required).
Test Planning Requirements
Documents
Requirement
Traceability matrix.
Test automation
feasibility document.
Analyze various testing approaches Approved test
available
plan/strategy
document.
Finalize on the best suited approach
Effort estimation
document signed
Preparation of test plan/strategy
document for various types of testing off.
Test
plan/strategy
document.
Effort estimation
document.
Test tool selection
Test effort estimation
Resource planning and determining
roles and responsibilities.
Test case
Requirements
development Documents
RTM and test plan
Automation analysis
report
Create test cases, automation scripts Reviewed and
(where applicable)
signed test
Cases/scripts
Review and baseline test cases and
scripts
Reviewed and
signed test data
Create test data
Test cases/scripts
Test data
Test
System Design and
Understand the required architecture, Environment setup Environment
Environment architecture documents environment set-up
is working as per ready with test
setup
are available
the plan and
data set up
checklist
Prepare hardware and software
Environment set-up
requirement list
Smoke Test
plan is available
Test data setup is Results.
Finalize connectivity requirements complete
Prepare environment setup checklist Smoke test is
successful
Setup test Environment and test data
Perform smoke test on the build
Accept/reject the build depending on
smoke test result
Test
Execution
Baselined RTM, Test Execute tests as per plan
Plan , Test case/scripts
are available
Document test results, and log
defects for failed cases
Test environment is
ready
Update test plans/test cases, if
necessary
Test data set up is done
Map defects to test cases in RTM
Unit/Integration test
report for the build to Retest the defect fixes
be tested is available
Regression testing of application
All tests planned
are executed
Defects logged and
tracked to closure Test cases
updated with
results
Track the defects to closure
Test Cycle
closure
Testing has been
completed
Test results are
available
Defect logs are
available
Evaluate cycle completion criteria Test Closure report
based on - Time, Test coverage , Cost signed off by client
, Software Quality , Critical Business
Objectives
Prepare test metrics based on the
above parameters.
Document the learning out of the
project
Prepare Test closure report
Qualitative and quantitative
reporting of quality of the work
product to the customer.
Test result analysis to find out the
defect distribution by type and
severity
Completed RTM
with execution
status
Defect reports