Inspection & Test Plan for Khabat PP
132kV Switchyard Current And
Voltage Transformer Installation
Works
PROJECT NAME
: Khabat Thermal Power Plant Units 1&2
DOCUMENT NO.
: KP-00+++-CQ712-B7359
TITLE
: Inspection&Test Plan for Khabat PP
132kV Switchyard Current And Voltage
Transformer Installation Works
OWNER
TOTAL 3 PAGES
(Including Cover)
Purpose
For Information
For Review
For Approval
For Construction
: Ministry of Electricity (MOE) of
Kurdistan Regional Government
As-Built
23.02.2015
For Construction
DE
AY
13.02.2015
First Issue
DE
AY
PREPARED
CHECKED
REVIEWED
APPROVED
Rev.
No.
DATE
DESCRIPTION
GAMA POWER SYSTEMS ENG &CONTRACTING,INC.
Owner
Ministry of Electricity (MOE)
of Kurdistan Regional Government
Contractor
POSCO ENGINEERING
& CONSTRUCTION CO., LTD.
Main Subcontractor
GAMA POWER SYSTEMS
ENGINEERING & CONTRACTING,INC.
ITP No.
Inspection & Test Plan
for CURRENT AND VOLTAGE TRANSFORMER INSTALLATION WORKS
Item Name
CTs & VTs
No.
Inspection & Test
Activity
Inspection & Test
Description
Application
Document/Code/Spec.
Supplier/
No.
KP-00+++-CQ712-B7359
Rev. No.
Page
1/1
Document Submittal
Remarks
Inspection Status
Subcontractor
GAMA
3rd Party POSCO
/ AI
E&C
Owner
1
1.1
Receiving
Inspection
Visually checking of the
busbar for and physical
damage.
Drawings and Technical
Specifications
Check List for Current & Voltage Transformers Erection
Item 1
1.2
Release of Steel
Structure
Checking release of steel
structure for equipment
erection
Drawings and Technical
Specifications
Check List for Current & Voltage Transformers Erection
Item 2
1.3
Package List
Checking of package list
Assembly Catalog
Check List for Current & Voltage Transformers Erection
Item 3
1.4
Assembly and
fixing
Checking assembly and
fixing of equipment
Drawings and Technical
Specifications
Check List for Current & Voltage Transformers Erection
Item 4
1.5
Screw Torques
Checking of Screw toques
Drawings and Technical
Specifications
Check List for Current & Voltage Transformers Erection
Item 5
1.6
Oil Level
Checking of oil level
Assembly Catalog
Check List for Current & Voltage Transformers Erection
Item 6
1.7
Erection of
Connectors
Checking connector erection
Drawings and Technical
Specifications
Check List for Current & Voltage Transformers Erection
Item 7
1.8
Site Construction
Dossier
Document preparation and
review
Drawings and Technical
Specifications
Site Construction Dossier
Notes) #1 CL (Check List) form of Current & Voltage Transformers Erection is submitted as attachment of this ITP.
Legend
SIEMENS
P
H
W
S
V
R
Perform
Hold Point
Witness Point
Spot Witness
Surveillance
Report Review
CHECK LIST of Current &
Voltage Transformers Erection
Num
.
Identification
Visual check of the equipment
Checking Erection release of steel support
Checking of Package list
Assembly and fixing
a.
Reviewing and checking of lifting plan
b.
Controlling of oil leakage
Checking of Screw torques
Checking of Oil level
Checking of connector erection
Accept
Reject
KHABAT THERMAL POWER PLANT UNITS
1 & 2 PROJECT 132kV AIR INSULATED
SWITCHGEAR
Rev: 0
Page No:1 of 1
Job No:
N/A
Signature
Comments
Subcontractor
SIGN OFF AS ACCEPTED
SIEMENS
GAMA
POSCO
Employer
Name:
Date:
Sign:
Name:
Date:
Sign:
Name:
Date:
Sign:
Name:
Date:
Sign:
GAMA
Employer