WEEKLY PROJECT PROGRESS REPORT
FROM : 09/05/2016 - 16/05/2016
PROJECT TITLE :
CADANGAN MEMBINA RUMAH SESEBUAH 3 TINGKAT BERSERTA KOLAM RENANG DI ATAS LOT
46016 (PT 32614), NO. 40, JALAN PJU 3/12 MUKIM PEKAN BARU SUNGAI BULOH, DAERAH
PETALING NEGERI SELANGOR DARUL EHSAN UNTUK TETUAN DATO TING YEW TONG
SUMMARY PHYSICAL PROGRESS REPORT
Previous
09/05/2016
Description
Schedule Progress
30.78%
19.66%
-11.13%
-45
12/18/2016
2/1/2017
Actual Progress
Ahead / Delay ( % )
Ahead / Delay ( Day )
Date of Completion ( Contract )
Estimated Date of Completion
MANPOWER AT SITE
17
17
SITE ACTIVIT
17
Activities
13
5/9/2016
5/10/2016
5/11/2016
5/12/2016
5/13/2016
5/14/2016
5/16/2016
WEATHER REPORT
1ST FLOOR
15 Staircase
ROOF
19 Roof Beam
20 RC Flat Roof Slab
21 Roof Column
22 Upper Roof Beam
23 Roof Truss
Building Work
25 Brickwall
26 Metal Beam
27 Timber Door Frame & Alumn. Frame
M & E Services
29 Electrical Wiring Work
30 Photovoltaic System
31 Security Alarm & CCTV System
Heavy Rain; 36%
Clear; 36%
Slight Rain; 7%
Cloudy; 21%
32
33
34
35
Smarthome System
Air Cond & Mech. Ventilation
Central Vacuum System
Lift System Installation
FINISHING WORK
49 Plumbing/Sanitary Fittings
50 Sewerage piping, manhole and Rain Water Sy
56 Koi pond / Swimming Pool System Installation
Slight Rain; 7%
Cloudy; 21%
NOTE :
- 1st floor brickworks started at Guest Room, Guest Bath, Bedroom 3, Bath 3, wet kitchen, pantry, Dry Kit
- All concreting works for structure are completed. The final concreting works done on the 11/05/2016
- External fencing work has started.
PREPARED BY :
VERIFIED BY :
ABDUL BASIT BIN ABD NASIR
S REPORT
FINANCIAL STATEMENT
RM3,578,347.29
Contract Sum
DI ATAS LOT
, DAERAH
ONG
Piling
Variation Order
PC Sum
Revised Contract Sum
S REPORT
Current
16/05/2016
33.25%
20.04%
-13.21%
-54
12/18/2016
2/10/2017
SITE ACTIVITY
Progress
Actual %
Scheduled
%
Remarks
Last Week This Week
100%
0%
0%
No progress
100%
100%
100%
100%
100%
100%
100%
100%
50%
0%
100%
100%
100%
100%
0%
100%
100%
33%
55%
0%
0%
55%
0%
0%
1st floor on progress
No progress
No progress
48%
50%
14%
22%
29%
0%
17%
40%
0%
0%
0%
0%
0%
0%
40%
0%
0%
0%
0%
0%
0%
Ducting & conduit
No progress
No progress
No progress
No progress
No progress
No progress
68%
71%
33%
5%
50%
0%
5%
50%
0%
No new progress
No new progress
No progress
removing sides fwk
removing sides fwk
removing sides fwk
removing sides fwk
No progress
, pantry, Dry Kitchen, Dining Room
e 11/05/2016
BY :
WEEKLY PROJECT PROGRESS REPORT
FROM : 09/05/2016 - 16/05/2016
PROJECT TITLE :
CADANGAN MEMBINA RUMAH SESEBUAH 3 TINGKAT BERSERTA KOLAM RENANG DI
ATAS LOT 46016 (PT 32614), NO. 40, JALAN PJU 3/12 MUKIM PEKAN BARU SUNGAI
BULOH, DAERAH PETALING NEGERI SELANGOR DARUL EHSAN UNTUK TETUAN DATO
TING YEW TONG
Front Elevation
Side Elevation
Side Elevation
Side Elevation
External Fencing: Cantilever
beams construction
WEEKLY PROJECT PROGRESS REPORT
FROM : 09/05/2016 - 16/05/2016
PROJECT TITLE :
CADANGAN MEMBINA RUMAH SESEBUAH 3 TINGKAT BERSERTA KOLAM RENANG DI
ATAS LOT 46016 (PT 32614), NO. 40, JALAN PJU 3/12 MUKIM PEKAN BARU SUNGAI
BULOH, DAERAH PETALING NEGERI SELANGOR DARUL EHSAN UNTUK TETUAN DATO
TING YEW TONG
1st Flr : Rumpus Room
1st Flr : Guest Room
2nd Flr : Pool Side View
2nd Flr : Bedroom 2 View
1st Flr : Dry Kitchen Area
1st Flr : External Garden View
2nd Flr : Study Room
Roof Level : Roof Beam & Upper Roof
Beam
WEEKLY PROJECT PROGRESS REPORT
FROM : 09/05/2016 - 16/05/2016
PROJECT TITLE :
CADANGAN MEMBINA RUMAH SESEBUAH 3 TINGKAT BERSERTA KOLAM RENANG DI
ATAS LOT 46016 (PT 32614), NO. 40, JALAN PJU 3/12 MUKIM PEKAN BARU SUNGAI
BULOH, DAERAH PETALING NEGERI SELANGOR DARUL EHSAN UNTUK TETUAN DATO
TING YEW TONG
M RENANG DI
ARU SUNGAI
TETUAN DATO
M RENANG DI
ARU SUNGAI
TETUAN DATO
en Area
rden View
Room
& Upper Roof
M RENANG DI
ARU SUNGAI
TETUAN DATO
Weather
Description
5/9/2016
Clear
5/9/2016
5/10/2016
5/10/2016
5/11/2016
Cloudy
Slight Rain
Heavy Rain
5/9/2016
5/10/2016
5/11/2016
5/12/2016
5/13/2016
Date
5/11/2016
5/12/2016
5/12/2016
5/13/2016
5/13/2016
5/14/2016
1
1
5/14/2016
5/15/2016
Heavy Rain; 36%
Clear; 36%
Slight Rain; 7%
Cloudy; 21%
5/14/2016
5/16/2016
5/16/2016
1
1
Rain; 36%
Clear; 36%
ght Rain; 7%
Cloudy; 21%
Total
5
3
1
5
CADANGAN MEMBINA RUMAH SESEBUAH 3 TINGKAT BERSERTA KOLAM RENANG DI ATAS
46016 (PT 32614), NO. 40, JALAN PJU 3/12 MUKIM PEKAN BARU SUNGAI BULOH, DAER
PETALING NEGERI SELANGOR DARUL EHSAN UNTUK TETUAN DATO TING YEW TONG
Manpower
Project Coordinator
Clerk of Work
Site Engineer
Safety Supervisor
Supervisor
Surveyor
Operator
Piler
Carpenter
Concretor
Barbender
General Worker
Door & Window Frame Inst.
Brick Layer
Roofer
Roof covering
Pre-Caster
Ceiling Work Inst.
Aluminium Inst.
Electrician
Plumber
Plasterer
Skim coating
G.I.Work Inst.
M.S.Work Inst.
Floor Screeder
Tiler
Drain Layer
Painter
Fume Cupboard Installer
Gas installer
Sprinkler System Installer
Airconditioning Workers
Emergency Shower Installer
Total Manpower
5/9/2016
5/10/2016
5/11/2016
5/12/2016
5/13/2016
1
3
1
3
1
3
17
17
17
13
OLAM RENANG DI ATAS LOT
SUNGAI BULOH, DAERAH
DATO TING YEW TONG
5/14/2016
5/16/2016
Scheduled Progress
Actual Progress
3/30/2016 4/13/2016 4/18/2016
17.16%
18.14%
15.45%
16.39%
Project Performance From January 2012
50.00%
45.00%
40.00%
35.00%
30.00%
% Progress 25.00%
17.16%
20.00%
18.14%
15.00%
15.45%
10.00%
16.39%
5.00%
0.00%
3/30/2016
4/6/2016
4/13/2016
Scheduled Progress
Actual Progress
2012
Scheduled Progress
Actual Progress
PROPOSED WORK
CADANGAN MEMBINA RUMAH SESEBUAH 3 TINGKAT BERSERTA KOLAM RENANG DI ATAS LOT 46016
COMMENCEMENT DATE
Description
Preliminaries
Site Mobilization
Site Clearing
Site Survey
Site Office/Store
Signboard & Hoading
Piling & Earthwork
Setting Out
Piling Work
Site Mobilization / Building Material Order
Earthwork
Ground Floor
Footing/Stump
Ground Beam
* Delayed due to Changes Work
Alteration to Existing Ground Beam, Lift Pit
and underground sewerage pipe
Anti Termite
Ground Floor Slab
Ground Floor Column / Lift Shaft Structure / RC wall
Sub-basement Compartment for Genset and Bal. tank
Koi Pond, Balancing Tank & Pump Room
1 st Floor
1sr Floor Beam
1st Floor Slab
1st Floor Column / Lift Shaft Structure
Staircase
Second Floor
Second Floor Beam / Swimming Pool Structure
Second Floor Slab
Second Floor Column / Lift Shaft Structure
Roof
Roof Beam
RC Flat Roof Slab
Roof Column
May-15
8
18
25
Jun-15
15
22
Upper Roof Beam
Roof Truss
Roof Covering / Sky Light Cover
Building Work
Brickwall
Metal I-beam
Timber Door Frame & Alumn. Frame
Plastering
M&E Services
Electrical Wiring Work
Photovoltaic System
Security Alarm & CCTV System
Smarthome System
Air Cond & Mech. Ventilation
Central Vacuum System
Lift System Installation
Finishing Work
Install Alum. Door, Window Panel and Fix Glass
Internal Wall and Swimming Pool Finishes/Tiles/Stone/Mosaic
Internal Floor Finishes
Internal ceiling Finishes/Roof EaveTimber Ceiling
Internal Skim coat, External and Internal Painting Work
Metal Grille & Screen
Metal Handrail / Glass Handrail Railing
Metal Spiral Staircase
Timber Door Leaf
Timber Skirting and Architrave
External Wall Timber Cladding
Timber Varnishing Work and R.C Feature Coating
Timber Flooring and Staircase Finishes
Plumbing/Sanitary Fittings Installation
Sewage Piping, Manhole and Rain Water System
R.C Ramp, Dry Yard, Fencing Wall, Main and Side Gate
External Wall Finishes
External Floor Finishes and Koi Pond Finishes
Timber Decking Koi Pond and Pump Room
Lighting and Electrical Work Installation
Koi pond / Swimming Pool System Installation
Built-in Furniture and ID Works
Turfing / Lanscape Work
Touch-up and Cleaning
Testing, Commissioning and Hand Over
Note: Otherwise indicated, this revised program is based on the amended Architectural Drawing
dated 2 Nov 15. Any amendment to the above drawings or additional items in future not sho
consideration in this program.
PROPOSED WORK PROGRAMME (Revision # 5) - 4th May 2016
G DI ATAS LOT 46016 ( PT 32614 ), NO. 15, JALAN PJU 3/12, MUKIM PEKAN BARU SUNGAI BULOH, DAERAH PETAL
COMMENCEMENT DATE : 16/01/2015
Jun-15
29
Jul-15
13
20
27
COMPLETION DATE : 15/04/2016
10
Aug-15
17
24
31
Sep-15
14
21
28
Oct-15
12
19
26
Nov-15
16
CHANGES ON DES
chitectural Drawings dated 23 Sept 15, Engineer Drawings dated 16 Oct 15 and Interior Design Drawings
ms in future not shows on the drawings are not taking
ULOH, DAERAH PETALING, NEGERI SELANGOR DARUL EHSAN UNTUK TETUAN DATO TING YEW TONG
REVISED COMMENCEMENT DATE: 18/05/15
Nov-15
23
30
Dec-15
14
21
Jan-16
28
11
18
25
Feb-16
15
22
16.67%
33.33%
CHANGES ON DESIGN (FROM RC TO STEEL STRUCTURE)
29
50.0%
20.00%
40.0%
60.0%
80.0%
33.33%
RE
Change of skirting design and construction method
or Design Drawings
TING YEW TONG
TE: 18/05/15
REVISED COMPLETION DATE: 10/12/16
Mar-16
Apr-16
14
21
66.67%
83.33%
100.00%
28
11
100.0%
66.7%
100.0%
50.00%
100.0%
50.00%
100.0%
50.00%
100.0%
50.00%
100.0%
18
25
May-16
16
50.00%
100.0%
25.00%
11.11%
22.2%
design and construction method
33.3%
44.4%
55.6%
66.7%
50.0%
75.0%
100.0%
11.11%
22.2%
33.3%
80.0%
100.0%
16.67%
33.3%
77.8%
88.9%
100.0%
20.00%
40.0%
60.0%
May-16
23
30
Schedule
Actual
Ahead/(Behind)
Overall week
Week Lapsed
Over All %
Schedule
(Overall)
100%
100%
0%
0.49%
0.49%
100%
100%
0%
0.74%
0.74%
100%
100%
0%
0.74%
0.74%
100%
100%
0%
0.99%
0.99%
100%
100%
0%
0.74%
0.74%
100%
100%
0%
0.25%
0.25%
100%
100%
0%
0.49%
0.49%
100%
100%
0%
0.74%
0.74%
100%
100%
0%
1.23%
1.23%
100%
100%
0%
0.74%
0.74%
100%
100%
0%
0.99%
0.99%
100%
100%
0%
0.49%
0.49%
100%
100%
0%
0.74%
0.74%
0%
0%
0%
1.48%
0.00%
100%
100%
0%
1.23%
1.23%
100%
100%
0%
0.74%
0.74%
100%
100%
0%
0.49%
0.49%
100%
90%
-10%
0.49%
0.49%
100%
90%
-10%
0.49%
0.49%
100%
50%
-50%
0.49%
0.49%
44.4%
50.0%
55.6%
66.7%
100%
50%
-50%
0.49%
0.49%
25%
0%
-25%
0.99%
0.25%
0%
0%
0%
2.22%
0.00%
70%
30%
-40%
2.22%
1.55%
0%
0%
0%
1.23%
0.00%
0%
0%
0%
1.48%
0.00%
0%
0%
0%
10
2.46%
0.00%
38%
38%
0%
27
11
6.65%
2.53%
0%
0%
0%
1.48%
0.00%
0%
0%
0%
14
3.45%
0.00%
0%
0%
0%
2.22%
0.00%
0%
0%
0%
1.72%
0.00%
0%
0%
0%
0.99%
0.00%
0%
0%
0%
1.48%
0.00%
0%
0%
0%
1.97%
0.00%
0%
0%
0%
11
2.71%
0.00%
0%
0%
0%
10
2.46%
0.00%
0%
0%
0%
11
2.71%
0.00%
0%
0%
0%
17
4.19%
0.00%
0%
0%
0%
1.97%
0.00%
0%
0%
0%
16
3.94%
0.00%
0%
0%
0%
1.23%
0.00%
0%
0%
0%
0.99%
0.00%
0%
0%
0%
0.74%
0.00%
0%
0%
0%
1.48%
0.00%
0%
0%
0%
11
2.71%
0.00%
0%
0%
0%
2.22%
0.00%
45%
5%
-40%
22
5.42%
2.44%
60%
50%
-10%
17
4.19%
2.51%
0%
0%
0%
11
2.71%
0.00%
Proposed
Actual
Ahead / Behi
0%
0%
0%
10
2.46%
0.00%
0%
0%
0%
1.48%
0.00%
0%
0%
0%
1.23%
0.00%
0%
0%
0%
1.23%
0.00%
0%
0%
0%
2.22%
0.00%
0%
0%
0%
15
3.69%
0.00%
0%
0%
0%
0.99%
0.00%
0%
0%
0%
0.74%
0.00%
0%
0%
0%
0.49%
0.00%
406
89
100.00%
23.07%
Actual W/Done
0.49%
0.74%
0.74%
0.99%
0.74%
0.25%
0.49%
0.74%
1.23%
0.74%
0.99%
0.49%
0.74%
0.00%
1.23%
0.74%
0.49%
0.44%
0.44%
0.25%
0.25%
0.00%
0.00%
0.67%
0.00%
0.00%
0.00%
2.53%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.27%
2.09%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
18.76%
Description
No.
Preliminaries
A
B
C
D
E
Site Mobilization
Site Clearing
Site Survey
Site Office/Store
Signboard & Hoading
Piling & Earthwork
Setting Out
G Piling Work
1 Site Mobilization / Building Material Order
F
Earthwork
Footing/Stump
Ground Floor
Ground Beam
* Delayed due to Changes Work
5 Alteration to Existing Ground Beam, Lift Pit
and underground sewerage pipe
6 Anti Termite
4
Ground Floor Slab
Ground Floor Column / Lift Shaft Structure / RC wall
10 Sub-basement Compartment for Genset and Bal. tank
11 Koi Pond, Balancing Tank & Pump Room
1 st Floor
12 1sr Floor Beam
13 1st Floor Slab
14 1st Floor Column / Lift Shaft Structure
15 Staircase
Second Floor
16 Second Floor Beam / Swimming Pool Structure
17 Second Floor Slab
18 Second Floor Column / Lift Shaft Structure
Roof
19 Roof Beam
20 RC Flat Roof Slab
21 Roof Column
22 Upper Roof Beam
May-15
8
18
Jun-15
25
15
Description
No.
23 Roof Truss
24 Roof Covering / Sky Light Cover
Building Work
25 Brickwall
26 Metal I-beam
27 Timber Door Frame & Alumn. Frame
28 Plastering
M&E Services
29 Electrical Wiring Work
30 Photovoltaic System
31 Security Alarm & CCTV System
32 Smarthome System
33 Air Cond & Mech. Ventilation
34 Central Vacuum System
35 Lift System Installation
Finishing Work
36 Install Alum. Door, Window Panel and Fix Glass
37 Internal Wall and Swimming Pool Finishes/Tiles/Stone/Mosaic
38 Internal Floor Finishes
39 Internal ceiling Finishes/Roof EaveTimber Ceiling
40 Internal Skim coat, External and Internal Painting Work
41 Metal Grille & Screen
42 Metal Handrail / Glass Handrail Railing
43 Metal Spiral Staircase
44 Timber Door Leaf
45 Timber Skirting and Architrave
46 External Wall Timber Cladding
47 Timber Varnishing Work and R.C Feature Coating
48 Timber Flooring and Staircase Finishes
49 Plumbing/Sanitary Fittings Installation
May-15
8
18
Jun-15
25
15
No.
Description
50 Sewage Piping, Manhole and Rain Water System
51 R.C Ramp, Dry Yard, Fencing Wall, Main and Side Gate
52 External Wall Finishes
53 External Floor Finishes and Koi Pond Finishes
54 Timber Decking Koi Pond and Pump Room
55 Lighting and Electrical Work Installation
56 Koi pond / Swimming Pool System Installation
57 Built-in Furniture and ID Works
58 Turfing / Lanscape Work
59 Touch-up and Cleaning
60 Testing, Commissioning and Hand Over
May-15
8
18
Jun-15
25
15
Jun-15
22
Jul-15
29
13
Aug-15
20
27
10
17
Sep-15
24
31
Jun-15
Jul-15
22
29
3.7%
7.4%
13
Aug-15
20
27
10
17
Sep-15
24
31
Jun-15
22
Jul-15
29
13
Aug-15
20
27
10
17
Sep-15
24
31
Sep-15
14
Oct-15
21
28
12
Nov-15
19
26
16
23
30
Sep-15
14
Oct-15
21
28
12
Nov-15
19
26
16
23
4.5%
9.1%
13.6%
18.2%
30
Sep-15
14
Oct-15
21
28
12
Nov-15
19
26
16
23
30
5.9%
11.8%
CADANGAN MEMBINA RUMAH SESEBUA
Dec-15
7
14
Jan-16
21
28
Feb-16
11
18
16.7%
33.3%
25
15
22
40.0%
60.0%
CHANGES ON DESIGN (FROM RC TO STEEL STRUCTURE)
20.0%
Dec-15
7
14
Jan-16
21
28
11.1%
14.8%
11
Feb-16
18
25
15
22
18.5%
22.2%
Change of skirting design and construction me
22.7%
27.3%
Dec-15
Jan-16
Feb-16
14
21
28
11
18
17.6%
23.5%
29.4%
35.3%
41.2%
47.1%
52.9%
25
15
22
11.1%
22.2%
NGAN MEMBINA RUMAH SESEBUAH 3 TINGKAT BERSERTA KOLAM RENANG DI ATAS LOT 46016 (PT 32614), NO. 40, JALAN PJU 3/12 MUKIM PEKAN BARU SUNGAI BULOH, DAER
WORK PROGRAM AS PER REVISED ON 18 APRIL 2016
Mar-16
Apr-16
29
14
21
50.0%
66.7%
83.3%
100.0%
80.0%
100.0%
33.3%
66.7%
28
11
May-16
18
100.0%
50.0%
100.0%
50.0%
100.0%
50.0%
100.0%
50.0%
100.0%
50.0%
100.0%
25
16
Mar-16
29
11.1%
25.9%
29.6%
14
22.2%
33.3%
Apr-16
21
33.3%
37.0%
28
44.4%
40.7%
55.6%
11
66.7%
44.4%
48.1%
16.7%
33.3%
May-16
18
25
25.0%
50.0%
75.0%
100.0%
11.1%
22.2%
33.3%
80.0%
100.0%
16.7%
33.3%
7.1%
14.3%
11.1%
22.2%
14.3%
28.6%
77.8%
88.9%
100.0%
20.0%
40.0%
60.0%
16
50.0%
25.0%
50.0%
16.7%
of skirting design and construction method
31.8%
36.4%
40.9%
45.5%
50.0%
54.5%
59.1%
63.6%
68.2%
Mar-16
29
33.3%
14
Apr-16
21
28
58.8%
64.7%
70.6%
11
May-16
18
25
16
KAN BARU SUNGAI BULOH, DAERAH PETALING NEGERI SELANGOR DARUL EHSAN UNTUK TETUAN DATO TING YEW TONG
18 APRIL 2016
May-16
Jun-16
23
30
13
Jul-16
20
27
11
Aug-16
18
25
May-16
Jun-16
23
30
44.4%
55.6%
50.0%
10.0%
20.0%
21.4%
28.6%
33.3%
44.4%
42.9%
57.1%
33.3%
50.0%
30.0%
13
Jul-16
20
27
11
18
25
66.7%
77.8%
88.9%
100.0%
100.0%
Timber Door Frame confirmed on 14/4/16, 3 weeks required for manufacture, Alumn n
40.0%
50.0%
60.0%
70.0%
80.0%
90.0%
100.0%
51.9%
55.6%
59.3%
63.0%
66.7%
70.4%
74.1%
77.8%
35.7%
42.9%
50.0%
Plastering cannot proceed due to
No confirmation
No confirmation
18.2%
5.9%
6.3%
9.1%
81.8%
12.5%
25.0%
37.5%
50.0%
62.5%
27.3%
36.4%
45.5%
54.5%
63.6%
10.0%
20.0%
30.0%
9.1%
18.2%
11.8%
12.5%
20.0%
77.3%
83.3%
No confirmation
55.6%
66.7%
9.1%
72.7%
Aug-16
40.0%
18.2%
60.0%
27.3%
17.6%
23.5%
29.4%
35.3%
18.8%
25.0%
31.3%
37.5%
50.0%
66.7%
83.3%
80.0%
100.0%
16.7%
33.3%
36.4%
45.5%
May-16
Jun-16
23
30
13
Jul-16
20
27
11
10.0%
Aug-16
18
25
76.5%
82.4%
88.2%
20.0%
30.0%
44.4%
Aug-16
15
Sep-16
22
29
12
Oct-16
19
26
10
17
24
31
Aug-16
15
Sep-16
22
29
12
Oct-16
19
26
10
17
24
31
85.2%
88.9%
92.6%
96.3%
100.0%
57.1%
64.3%
71.4%
75.00%
100.0%
88.2%
eks required for manufacture, Alumn no confirmation yet
Plastering cannot proceed due to concealed smarthome/alarm wiring not confirmed
81.5%
75.0%
87.5%
100.0%
72.7%
81.8%
90.9%
100.0%
40.0%
50.0%
60.0%
70.0%
80.0%
90.0%
100.0%
27.3%
36.4%
45.5%
54.5%
63.6%
72.7%
81.8%
90.9%
100.0%
47.1%
52.9%
58.8%
64.7%
70.6%
76.5%
82.4%
75.0%
87.5%
100.0%
75.0%
81.3%
87.5%
41.2%
12.5%
25.0%
37.5%
50.0%
62.5%
43.8%
50.0%
56.3%
62.5%
68.8%
25.0%
50.0%
75.0%
44.4%
55.6%
66.7%
100.0%
54.5%
63.6%
72.7%
11.1%
22.2%
33.3%
100.0%
Aug-16
Sep-16
Oct-16
15
22
29
12
19
26
9.1%
18.2%
27.3%
36.4%
45.5%
54.5%
63.6%
10
17
24
31
40.0%
50.0%
60.0%
70.0%
80.0%
16.7%
20.0%
55.6%
40.0%
60.0%
80.0%
20.0%
40.0%
60.0%
60.0%
66.7%
73.3%
66.7%
6.7%
13.3%
20.0%
26.7%
33.3%
40.0%
46.7%
53.3%
Nov-16
7
14
Dec-16
21
28
12
Jan-17
19
26
16
23
Nov-16
7
Dec-16
21
28
66.7%
83.3%
100.0%
85.7%
92.9%
100.0%
66.7%
77.8%
88.9%
100.0%
71.4%
85.7%
100.0%
66.67%
83.3%
100.0%
94.1%
100.0%
93.8%
100.0%
90.9%
100.0%
95.5%
100.0%
78.6%
14
81.8%
77.8%
88.9%
100.0%
86.4%
90.9%
12
Jan-17
19
26
16
23
Nov-16
7
14
Dec-16
21
28
94.1%
100.0%
90.9%
100.0%
66.7%
83.3%
77.8%
88.9%
100.0%
86.7%
93.3%
100.0%
25.0%
50.0%
75.0%
100.0%
33.3%
66.7%
100.0%
50.0%
100.0%
72.7%
81.8%
90.0%
100.0%
33.3%
50.0%
100.0%
100.0%
80.0%
80.0%
100.0%
12
Jan-17
19
26
16
23
Schedule
Actual
Ahead/(Behind)
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
100%
Overall week
Week Lapsed
Over All %
0%
0%
0%
0%
0%
0
0
0
0
0
0.00%
0.00%
0.00%
0.00%
0.00%
0%
0%
100%
0%
0%
0%
0
0
2
0.00%
0.00%
0.66%
100%
100%
0%
0.99%
100%
100%
0%
0.99%
100%
95%
-5%
2.98%
0%
0%
0%
0.33%
0%
0%
0%
0.66%
0%
0%
0%
0.66%
0%
0%
0%
2.65%
0%
0%
0%
1.32%
0%
0%
0%
0.66%
0%
0%
0%
0.66%
0%
0%
0%
0.33%
0%
0%
0%
1.66%
0%
0%
0%
0.99%
0%
0%
0%
0.66%
0%
0%
0%
0.66%
0%
0%
0%
0.66%
0%
0%
0%
0.66%
0%
0%
0%
0.66%
30
Schedule
Actual
Ahead/(Behind)
Overall week
Week Lapsed
Over All %
0%
0%
0%
1.32%
0%
0%
0%
1.99%
0%
0%
0%
0.66%
0%
0%
0%
1.66%
0%
0%
0%
1.99%
0%
0%
0%
1.99%
0%
0%
0%
29
9.60%
0%
0%
0%
1.99%
0%
0%
0%
1.99%
0%
0%
0%
1.99%
0%
0%
0%
1.99%
0%
0%
0%
1.32%
0%
0%
0%
1.32%
0%
0%
0%
1.66%
0%
0%
0%
12
3.97%
0%
0%
0%
2.32%
0%
0%
0%
11
3.64%
0%
0%
0%
1.66%
0%
0%
0%
1.99%
0%
0%
0%
10
3.31%
0%
0%
0%
24
7.95%
0%
0%
0%
1.66%
0%
0%
0%
0.99%
0%
0%
0%
15
4.97%
30
Schedule
Actual
Ahead/(Behind)
Overall week
Week Lapsed
Over All %
0%
0%
0%
1.99%
0%
0%
0%
1.99%
0%
0%
0%
1.99%
0%
0%
0%
11
3.64%
0%
0%
0%
0.99%
0%
0%
0%
11
3.64%
0%
0%
0%
1.66%
0%
0%
0%
1.32%
302
13
100.00%
30
A
c
t
u
a
l
Propose
0.00%
0.00%
0.00%
0.00%
0.00%
Schedule
Actual
Ahead/Behin
d
Schedule
(Overall)
Actual
W/Done
W
/
D
o
###
n
###
e
###
###
###
0.00%
0.00%
0.66%
###
###
### 100%
100%
0%
0.49%
0.49%
0.99%
### 100%
100%
0%
0.74%
0.74%
0.99%
### 100%
100%
0%
0.74%
0.74%
1.66%
### 100%
100%
0%
0.99%
0.99%
100%
100%
0%
0.74%
0.74%
0.00%
### 100%
100%
0%
0.25%
0.25%
0.00%
### 100%
100%
0%
0.49%
0.49%
0.00%
### 100%
100%
0%
0.74%
0.74%
100%
100%
0%
1.23%
1.23%
0.00%
### 100%
100%
0%
0.74%
0.74%
0.00%
### 100%
100%
0%
0.99%
0.99%
0.00%
### 100%
100%
0%
0.49%
0.49%
0.00%
### 100%
100%
0%
0.74%
0.74%
0.00%
### 100%
0%
-100%
1.48%
0.00%
0.00%
### 100%
100%
0%
1.23%
1.23%
0.00%
### 100%
100%
0%
0.74%
0.74%
0.00%
### 100%
100%
0%
0.49%
0.49%
0.00%
### 100%
100%
0%
0.49%
0.49%
0.00%
### 100%
100%
0%
0.49%
0.49%
0.00%
### 100%
100%
0%
0.49%
0.49%
0.00%
### 100%
50%
-50%
0.49%
0.25%
Propose
0.00%
A
c
t
u
a
l
W
/
D
o
###
n
e
Schedule
Actual
Ahead/Behin
d
Schedule
(Overall)
Actual
W/Done
75%
0%
-75%
0.74%
0.00%
11%
0%
-11%
0.25%
0.00%
0.00%
###
0.00%
### 100%
55%
-45%
2.22%
1.22%
0.00%
###
60%
0%
-60%
0.74%
0.00%
0.00%
###
0%
0%
0%
0.00%
0.00%
0.00%
###
0%
0%
0%
0.00%
0.00%
0.00%
###
48%
38%
-10%
3.20%
2.53%
0.00%
###
50%
0%
-50%
0.74%
0.00%
0.00%
###
0%
0%
0%
0.00%
0.00%
0.00%
###
0%
0%
0%
0.00%
0.00%
0.00%
###
0%
0%
0%
0.00%
0.00%
0.00%
###
50%
0%
-50%
0.49%
0.00%
0.00%
###
0%
0%
0%
0.00%
0.00%
0.00%
###
0%
0%
0%
0.00%
0.00%
0.00%
###
0%
0%
0%
0.00%
0.00%
0.00%
###
0%
0%
0%
0.00%
0.00%
0.00%
###
0%
0%
0%
0.00%
0.00%
0.00%
###
0%
0%
0%
0.00%
0.00%
0.00%
###
0%
0%
0%
0.00%
0.00%
0.00%
###
0%
0%
0%
0.00%
0.00%
0.00%
###
0%
0%
0%
0.00%
0.00%
0.00%
###
0%
0%
0%
0.00%
0.00%
0%
0%
0%
0.00%
0.00%
0%
0%
0%
0.00%
0.00%
0%
0%
0%
0.00%
0.00%
0.00%
###
0%
0%
0%
0.00%
0.00%
0.00%
###
64%
5%
-59%
3.45%
0.27%
Propose
A
c
t
u
a
l
W
/
D
o
n
e
Schedule
Actual
Ahead/Behin
d
Schedule
(Overall)
Actual
W/Done
71%
50%
-21%
2.96%
2.09%
0%
0%
0%
0.00%
0.00%
0.00%
###
0%
0%
0%
0.00%
0.00%
0.00%
###
0%
0%
0%
0.00%
0.00%
0%
0%
0%
0.00%
0.00%
0.00%
###
0%
0%
0%
0.00%
0.00%
0.00%
###
33%
0%
-33%
0.74%
0.00%
0.00%
###
0%
0%
0%
0.00%
0.00%
0.00%
###
0%
0%
0%
0.00%
0.00%
0.00%
###
0%
0%
0%
0.00%
0.00%
0.00%
###
0%
0%
0%
0.00%
0.00%
4.30%
###
30.78%
19.66%
CADANGAN MEMBINA RUMAH SESEBUAH 3 TINGKAT BERSERTA KOLAM RENANG DI ATAS LOT 46016 ( PT 32614 ), NO
PJU 3/12, MUKIM PEKAN BARU SUNGAI BULOH, DAERAH PETALING, NEGERI SELANGOR DARUL EHSAN UNTUK TETUA
YEW TONG
No.
Description
Preliminaries
May-16
16
Schedule
Actual
Ahead/
(Behind)
A
B
C
D
E
Site Mobilization
Site Clearing
Site Survey
Site Office/Store
Signboard & Hoading
F
G
1
Piling & Earthwork
Setting Out
Piling Work
Site Mobilization / Building Material Order
100%
100%
0%
Earthwork
100%
100%
0%
Footing/Stump
100%
100%
0%
100%
100%
0%
100%
100%
0%
Ground Beam
* Delayed due to Changes Work
Alteration to Existing Ground Beam, Lift Pit
and underground sewerage pipe
Anti Termite
100%
100%
0%
Ground Floor Slab
100%
100%
0%
Ground Floor Column / Lift Shaft Structure / RC wall
100%
100%
0%
10
Sub-basement Compartment for Genset and Bal. tank
100%
100%
0%
11
Koi Pond, Balancing Tank & Pump Room
100%
100%
0%
12
1sr Floor Beam
100%
100%
0%
13
1st Floor Slab
100%
100%
0%
14
1st Floor Column / Lift Shaft Structure
100%
100%
0%
15
Staircase
100%
0%
-100%
16
Second Floor
Second Floor Beam / Swimming Pool Structure
100%
100%
0%
17
Second Floor Slab
100%
100%
0%
18
Second Floor Column / Lift Shaft Structure
100%
100%
0%
19
Roof Beam
100%
100%
0%
20
RC Flat Roof Slab
100%
100%
0%
21
Roof Column
100%
100%
0%
22
Upper Roof Beam
100%
100%
0%
Ground Floor
1 st Floor
Roof
CADANGAN MEMBINA RUMAH SESEBUAH 3 TINGKAT BERSERTA KOLAM RENANG DI ATAS LOT 46016 ( PT 32614 ), NO
PJU 3/12, MUKIM PEKAN BARU SUNGAI BULOH, DAERAH PETALING, NEGERI SELANGOR DARUL EHSAN UNTUK TETUA
YEW TONG
No.
23
Description
May-16
16
Roof Truss
33%
Schedule
Actual
Ahead/
(Behind)
100%
0%
-100%
33%
0%
-33%
100%
55%
-45%
24
Roof Covering / Sky Light Cover
25
Brickwall
26
Metal I-beam
100%
100%
0%
-100%
27
Timber Door Frame & Alumn. Frame
33%
33%
0%
-33%
28
Plastering
0%
0%
0%
29
Electrical Wiring Work
48%
40%
-8%
30
Photovoltaic System
0%
0%
0%
31
Security Alarm & CCTV System
14%
14%
0%
-14%
32
Smarthome System
22%
22%
0%
-22%
33
Air Cond & Mech. Ventilation
29%
29%
0%
-29%
34
Central Vacuum System
0%
0%
0%
35
Lift System Installation
17%
0%
-17%
36
Finishing Work
Install Alum. Door, Window Panel and Fix Glass
0%
0%
0%
37
Internal Wall and Swimming Pool Finishes/Tiles/Stone/Mosaic
0%
0%
0%
38
Internal Floor Finishes
0%
0%
0%
39
Internal ceiling Finishes/Roof EaveTimber Ceiling
0%
0%
0%
40
Internal Skim coat, External and Internal Painting Work
0%
0%
0%
41
Metal Grille & Screen
0%
0%
0%
42
Metal Handrail / Glass Handrail Railing
0%
0%
0%
43
Metal Spiral Staircase
0%
0%
0%
44
Timber Door Leaf
0%
0%
0%
45
Timber Skirting and Architrave
0%
0%
0%
46
External Wall Timber Cladding
0%
0%
0%
47
Timber Varnishing Work and R.C Feature Coating
0%
0%
0%
48
Timber Flooring and Staircase Finishes
0%
0%
0%
Building Work
M&E Services
17%
CADANGAN MEMBINA RUMAH SESEBUAH 3 TINGKAT BERSERTA KOLAM RENANG DI ATAS LOT 46016 ( PT 32614 ), NO
PJU 3/12, MUKIM PEKAN BARU SUNGAI BULOH, DAERAH PETALING, NEGERI SELANGOR DARUL EHSAN UNTUK TETUA
YEW TONG
No.
49
Description
Plumbing/Sanitary Fittings Installation
May-16
16
68%
Schedule
Actual
Ahead/
(Behind)
68%
5%
-63%
50
Sewage Piping, Manhole and Rain Water System
71%
50%
-21%
51
R.C Ramp, Dry Yard, Fencing Wall, Main and Side Gate
0%
0%
0%
52
External Wall Finishes
0%
0%
0%
53
External Floor Finishes and Koi Pond Finishes
0%
0%
0%
54
Timber Decking Koi Pond and Pump Room
0%
0%
0%
55
Lighting and Electrical Work Installation
0%
0%
0%
56
Koi pond / Swimming Pool System Installation
33%
0%
-33%
57
Built-in Furniture and ID Works
0%
0%
0%
58
Turfing / Lanscape Work
0%
0%
0%
59
Touch-up and Cleaning
0%
0%
0%
60
Testing, Commissioning and Hand Over
0%
0%
0%
: Delayed items
T 32614 ), NO. 15, JALAN
NTUK TETUAN DATO TING
Overall
Scheduled
Actual W/Done
0.49%
0.49%
0.74%
0.74%
0.74%
0.74%
0.99%
0.99%
0.74%
0.74%
0.25%
0.25%
0.49%
0.49%
0.74%
0.74%
1.23%
1.23%
0.74%
0.74%
0.99%
0.99%
0.49%
0.49%
0.74%
0.74%
1.48%
0.00%
1.23%
1.23%
0.74%
0.74%
0.49%
0.49%
0.49%
0.49%
0.49%
0.49%
0.49%
0.49%
0.49%
0.49%
T 32614 ), NO. 15, JALAN
NTUK TETUAN DATO TING
Overall
Scheduled
Actual W/Done
0.99%
0.00%
0.74%
0.00%
2.22%
1.22%
1.23%
0.00%
0.49%
0.00%
0.00%
0.00%
3.20%
2.66%
0.00%
0.00%
0.49%
0.00%
0.49%
0.00%
0.49%
0.00%
0.00%
0.00%
0.25%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
T 32614 ), NO. 15, JALAN
NTUK TETUAN DATO TING
Overall
Scheduled
Actual W/Done
3.69%
0.27%
2.96%
2.09%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.74%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
33.25%
20.04%