Second Quarter Report

1) Physical and financial progress under the components of Regular Watercourses and High Efficiency Irrigation System in Punjab was reviewed for the quarter ending December 2015. 2) Under Regular Watercourses, physical verification of ICR-I, ICR-II and FCR was below the Time Bound Action Plan targets in most regions except D.G. Khan. 3) Financial utilization under both components was also below expected levels for all regions, ranging from 13-97% utilization. Further funds need to be released to improve progress.

Uploaded by

Rocking Sheikh
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
42 views22 pages

Second Quarter Report

1) Physical and financial progress under the components of Regular Watercourses and High Efficiency Irrigation System in Punjab was reviewed for the quarter ending December 2015. 2) Under Regular Watercourses, physical verification of ICR-I, ICR-II and FCR was below the Time Bound Action Plan targets in most regions except D.G. Khan. 3) Financial utilization under both components was also below expected levels for all regions, ranging from 13-97% utilization. Further funds need to be released to improve progress.

Uploaded by

Rocking Sheikh
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 22

PUNJAB SUMMARY

i.

A. Regular Watercourses

Physical Progress

Region-wise physical progress of Punjab Irrigated Agriculture Productivity Improvement


Project under the component of Regular Watercourses for the quarter ending December, 2015 is
tabulated as under: Name of
Region
Bahawalpur
D.G Khan
Faisalabad
Gujranwala
Lahore
Multan
Sargodha
Rawalpindi
Total: -

Target
150
191
73
112
218
308
148
0
1200

ICR-I

ICR-II

FCR

TBAP (70%)

Achieved

TBAP (25%)

Achieved

105
134
51
78
153
216
104
0
840

91
134
34
79
107
199
97
0
741

38
48
18
28
55
77
37
0
300

22
34
5
45
9
30
26
0
171

TBAP (10%) Achieved

15
19
7
11
22
31
15
0
120

2
6
1
2
4
1
3
0
19

Above table reveals that as per Time Bound Action Plan (TBAP)
840 (70% of the target) ICR-I were required to be verified while, 741 ICR-I have been
verified.
300 (25% of the target) ICR-II were required to be verified while, 171 ICR-II have been
verified.
120 (10% of the target) FCR were required to be verified while, 19 FCR have been
verified.

ii.

Financial Utilization
Financial utilization for the quarter ending December, 2015 is given in the following table,
which shows that Rs. 481.933 million (78% of expected utilization) have been utilized at the end
of 2nd quarter. In regions Gujranwala and Multan utilization remained low but the same was a bit
better in Bahawalpur, D.G Khan, Faisalabad, Lahore and Sargodha regions.
(Rs. in million)
Name of
Region

Funds Utilized upto 31-12-2015


Expected Utilization
upto 31-12-2015
1st Release 2nd Release 3rd Release
Total

Bahawalpur

76.743

51.324

16.000

0.504

D.G Khan

66.398

51.218

6.523

0.242

Faisalabad

31.500

22.080

7.319

1.080

Gujranwala

54.772

22.777

10.001

7.428

Lahore

56.675

19.183

3.818

30.214

Page 1

67.82
7
57.98
3
30.47
9
40.20
6
53.21

%age

88
87
97
73
94

Multan

230.512

111.317

14.446

26.860

Sargodha

104.222

64.043

15.558

0.000

0.000

0.000
341.94
2

0.000

0.000

73.664

66.327

Rawalpindi
Total: -

i.

620.822

5
152.6
23
79.60
0
0.000
481.9
33

66
76
0
78

B. High Efficiency Irrigation System (HEIS)

Physical Progress

Physical progress under component High Efficiency Irrigation System (HEIS) for the
quarter ending December, 2015 is tabulated as under: Name of
District
Bahawalpur
D.G Khan
Faisalabad
Gujranwala
Lahore
Multan
Sargodha
Rawalpindi
Total: -

Target
(Acres)
1150
1050
900
1200
1000
1200
1400
2100
10000

As per TBAP
upto 31-12-2015
(50%)
575
525
450
600
500
600
700
1050
5000

Achievement upto 31-12-2015 (Acres)


Work Orders
Material
Commissioning
Issued
Verified
Verified
323
223
144
306
151
83
181
67
41
193
67
23
242
126
84
170
40
11
248
112
62
355
167
43
2018
953
491

Above table shows that situation under component HEIS does not reflect a rosy picture.
Work Order at only 2018 acres has been verified at the end of 2 nd quarter, while as per TBAP it
should be 5000 acres upto 31-12-2015. Out of 2018 acres where work order has been issued
material on 953 acres has been verified and commissioning verification is only at 491 acres.

ii.

Financial Utilization
Financial utilization for the quarter ending December, 2015 is given in the following table
which reveals that only Rs. 108.694 million (27% of the expected utilization) have been utilized at
the end of 2nd quarter.
(Rs. in million)
Name of Region
Bahawalpur
D.G Khan
Faisalabad
Gujranwala
Lahore
Multan
Sargodha
Rawalpindi
Total: -

Expected Utilization
upto 31-12-2015
45.713
41.738
35.775
47.700
39.750
47.700
55.650
83.475
397.500

Funds Utilized upto 31-12-2015


1st Release 2nd Release 3rd Release
Total
1.790
9.932
2.275
13.997
1.741
8.245
2.200
12.186
2.368
9.384
1.143
12.895
2.607
14.384
0.664
17.655
1.774
8.669
0.116
10.559
2.048
3.876
0.479
6.403
1.643
6.812
0.875
9.330
3.409
20.332
1.928
25.669
17.379
81.634
9.681
108.694

C. Status of Unspent Recovery (Rs.)

Page 2

%age
31
29
36
37
27
13
17
31
27

Name of
District
Bahawalpur
D.G Khan
Faisalabad
Gujranwala
Lahore
Multan
Sargodha
Total: -

Amount
Recoverable
41,464,850
46,423,523
17,950,000
14,166,761
41,565,944
28,520,613
9,598,260
199,689,951

Amount
Recovered
36,793,459
44,884,097
17,026,000
11,535,970
34,686,369
27,189,954
8,970,377
181,086,226

Balance
4,671,391
1,539,426
924,000
2,630,791
6,879,575
1,330,659
627,883
18,603,725

%
age
89
97
95
81
83
95
93
91

100%
75%
50%

97
Balance
89

95

95
Recovered
81 83

25%
0%
BW P DGK FSD GRW LHR MLN SGD

Bahawalpur Region
i.

A. Regular Watercourses
Physical Progress

In Bahawalpur region district-wise physical progress of Punjab Irrigated Agriculture


Productivity Improvement Project under the component of Regular Watercourses for the quarter
ending December, 2015 is tabulated as under: Name of District Target

ICR-I

ICR-II

FCR

TBAP (70%) Achieved TBAP (25%) Achieved TBAP (10%) Achieved

Bahawalpur

50

35

23

13

Rahim Yar Khan

75

53

44

19

10

Bahawalnagar

25

18

24

150

105

91

38

22

15

Total: -

Above table reveals that as per Time Bound Action Plan (TBAP)
105 (70% of the target) ICR-I were required to be verified while, 91 ICR-I have been
verified.
38 (25% of the target) ICR-II were required to be verified while, 22 ICR-II have been
verified.
15 (10% of the target) FCR were required to be verified while, 19 FCR have been
verified.

ii.

Financial Utilization
Financial utilization for the quarter ending December, 2015 is given in the following table,

which reveals that Rs. 67.827 millions (88% of the expected utilization) have been utilized in the
region at the end of first quarter.
(Rs. in million)
Name of
District

Expected Utilization
upto 31-12-2015

Funds Utilized upto 31-12-2015


First
Release

Page 3

93

Second
Release

Third
Release

Total

%age

Bahawalpur

24.140

14.418

2.281

0.504

17.202

71

Rahim Yar Khan

28.336

18.894

7.463

0.000

26.357

93

Bahawalnagar

24.267

18.012

6.256

0.000

24.267

100

76.743

51.324

16.000

0.504

67.82
7

88

Total: -

Page 4

i.

B. High Efficiency Irrigation System (HEIS)


Physical Progress

Physical progress under component High Efficiency Irrigation System (HEIS) for the
quarter ending December, 2015 is tabulated as under: Name of District
Bahawalpur
Rahim Yar Khan
Bahawalnagar
Total: -

Achievement upto 31-12-2015 (Acres)


Work Orders
Material
Commissioning
Issued
Verified
Verified
110
110
61
121
82
78
92
31
5
323
223
144

As per TBAP
upto 31-12-2015
(50%)
175
200
200
575

Target
(Acres)
350
400
400
1150

Above table shows that situation in the region under component HEIS is very poor. As per
TBAP against the target of 1150 acres, work orders on 575 acres were required to be issued upto
31-12-2015, while it was on 323 acres at the end of 2 nd quarter. Out of 323 acres where work
orders have been issued, material on 223 acres and commissioning on 144 acres have been
verified.
ii.

Financial Utilization
Financial utilization for the quarter ending December, 2015 is given in the following table

which reveals that only Rs. 13.997 million (31% of the expected utilization) have been utilized at
the end of 2nd quarter.

(Rs. in million)
Name of District

Expected Utilization
upto 31-12-2015

Bahawalpur
Rahim Yar Khan
Bahawalnagar
Total: -

13.913
15.900
15.900
45.713

Funds Utilized upto 31-12-2015


First
Release

Second
Release

Third
Release

Total

0.943
0.628
0.218
1.790

3.533
4.039
2.359
9.932

0.830
0.913
0.532
2.275

5.307
5.581
3.110
13.997

%age
38
35
20
31

C. Status of Unspent Recovery (Rs.)


Name of
District
Bahawalpur
R. Y Khan
Bahawalnagar
Total: -

Amount
Recoverable

12,937,7
27
16,430,4
74
12,096,6
49
41,464,
850

Amount
Recovered

Balance

%
age

12,670,0
267,665 98
62
12,821,4 3,609,06
78
11
3
11,301,9
794,663 93
86
36,793,4 4,671,3
89
59
91

Page 5

100%
75%
50%
98
Balance

93
Recovered
78

25%
0%

BWP

RYK

BNG

Page 6

Dera Ghazi Khan Region


i.

A. Regular Watercourses

Physical Progress

Physical progress under component Regular Watercourses for the quarter ending
December, 2015 is tabulated as under: Name of
District

Target

D.G Khan
Muzaffar Garrh
Rajanpur
Layyah
Total: -

60
75
52
4
191

ICR-I
TBAP (70%) Achieved

42
53
36
3
134

ICR-II
FCR
TBAP (25%) Achieved TBAP (10%) Achieved

52
47
33
2
134

15
19
13
1
48

8
16
8
2
34

6
8
5
0
19

4
1
1
0
6

Above table reveals that as per Time Bound Action Plan (TBAP)
134 (70% of the target) ICR-I were required to be verified and the same have
been verified which is indicative of good efforts made by OFWM staff in this
regard.
48 (25% of the target) ICR-II were required to be verified while, 34 ICR-II have
been verified. Districts D.G Khan and Rajanpur need some improvement in
this regard.
19 (10% of the target) FCR were required to be verified while, 6 FCR have been
verified. In this regard districts Muzaffar Garrh, Rajanpur and Layyah need
more efforts to bring the progress at par with TBAP.
ii.

Financial Utilization
Financial utilization for the quarter ending December, 2015 is given in the
following table which reveals that Rs. 57.983 million (87% of expected utilization) have
been utilized in the region at the end of 2 nd quarter. Funds should be released on the
watercourses where ICR-I, ICR-II and FCRs have been been verified to enhance
utilization.
(Rs. in million)
Name of
District

Expected
Utilization upto
31-12-2015

D.G Khan

21.000

Muzaffar Garrh

23.376

Rajanpur

18.367

Funds Utilized upto 31-12-2015


First
Release

16.25
5
18.17
8
14.69
4

Page 7

%age

Second
Release

Third
Release

Total

1.277

0.242

17.774

85

1.820

0.000

19.998

86

2.826

0.000

17.520

95

Layyah

3.655

Total: -

i.

2.091
51.21
8

66.398

0.600

0.000

2.691

74

6.523

0.242

57.983

87

B. High Efficiency Irrigation System (HEIS)

Physical Progress

Physical progress under component High Efficiency Irrigation System (HEIS) for the
quarter ending December, 2015 is tabulated as under: Achievement upto 31-12-2015 (Acres)

Name of
District

Target
(Acres)

As per TBAP
upto 31-12-2015
(50%)

Work Orders
Issued

Material
Verified

Commissioning
Verified

D.G Khan
Muzaffar Garrh
Rajanpur
Layyah
Total: -

250
250
200
350
1050

125
125
100
175
525

35
217
11
43
306

21
86
6
38
151

6
60
0
17
83

Above table shows that situation in the region under component HEIS is very poor. As per
TBAP against the target of 1050 acres, work orders on 525 acres were required to be issued upto
31-12-2015, while it was on 306 acres at the end of 2 nd quarter. Out of 306 acres where work
orders have been issued, material on 151 acres and commissioning on 83 acres have been verified.
A. Financial Utilization
Financial utilization for the quarter ending December, 2015 is given in the following table
which reveals that only Rs. 12.186 million (29% of the expected utilization) have been utilized at
the end of 2nd quarter. In district Muzaffargarrh Rs. 7.709 million (78% of the expected

utilization) have been utilized while in districts D.G Khan, Rajanpur and Layyah it was
only 14%, 6% and 19% respectively.
(Rs. in million)
Name of District

Funds Utilized upto 31-12-2015

Expected
Utilization upto 3112-2015

First
Release

Second
Release

Third
Release

Total

9.938
9.938
7.950
13.913
41.738

0.158
1.307
0.000
0.275
1.741

0.999
5.031
0.313
1.903
8.245

0.220
1.371
0.178
0.431
2.200

1.377
7.709
0.491
2.609
12.186

D.G Khan
Muzaffar Garrh
Rajanpur
Layyah
Total: -

C. Status of Unspent Recovery (Rs.)


Name of
District
D.G Khan

Amount
Recoverable
16,753,184

Amount
Recovered
16,730,379

Balance
22,805

Page 8

%
age
99.9

%age
14
78
6
19
29

Muzaffar Garrh
Rajanpur
Layyah

28,060,983
1,111,579
497,777

26,961,091
694,850
497,777

1,099,892
416,729
-

96.1
62.5
100

Total: -

46,423,523

44,884,097

1,539,426

97

100%
75%
50%
99.9
Balance
25%
0%
DGK

Page 9

100.0
96.1 Recovered
62.5
MGR

RPR

LYH

Faisalabad Region
i.

A. Regular Watercourses

Physical Progress

Physical progress under component Regular Watercourses for the quarter ending
December, 2015 is tabulated as under: Name of
District
Faisalabad
Jhang
T.T Singh
Chiniot
Total: -

Target
10
45
1
17
73

ICR-I
TBAP (70%) Achieved

7
32
1
12
51

ICR-II
FCR
TBAP (25%) Achieved TBAP (10%) Achieved

8
15
0
11
34

3
11
0
4
18

4
0
0
1
5

1
5
0
2
7

1
0
0
0
1

Above table reveals that as per Time Bound Action Plan (TBAP)
51 (70% of the target) ICR-I were required to be verified, while 34 ICR-I have
been verified.
18 (25% of the target) ICR-II were required to be verified, while only 5 ICR-II
have been verified.
8 (10% of the target) FCR were required to be verified, while only 1 FCR has
been verified.
ii.

Financial Utilization
Financial utilization for the quarter ending December, 2015 is given in the
following table which reveals that Rs. 30.479 million (87% of expected utilization) have
been utilized in the region at the end of first quarter.
(Rs. in million)
Name of
District

Expected
Utilization upto
31-12-2015

Faisalabad

20.000

Jhang
T.T Singh
Chiniot

4.450
0.050
7.000

Total: -

31.500

Funds Utilized upto 31-12-2015


First
Release

11.83
1
4.397
0.000
5.852
22.08
0

%age

Second
Release

Third
Release

Total

6.620

1.080

19.531

98

0.000
0.000
0.699

0.000
0.000
0.000

4.397
0.000
6.551

99
0
94

7.319

1.080

30.479

97

Page 10

i.

B. High Efficiency Irrigation System (HEIS)

Physical Progress

Physical progress under component High Efficiency Irrigation System (HEIS) for the
quarter ending December, 2015 is tabulated as under: Name of
District

Achievement upto 31-12-2015 (Acres)

Target
(Acres)

As per TBAP
upto 31-12-2015
(50%)

Work Orders
Issued

Material
Verified

Commissioning
Verified

250
250
250
150
900

125
125
125
75
450

37
39
83
22
181

16
5
30
16
67

0
0
25
16
41

Faisalabad
Jhang
T.T Singh
Chiniot
Total: -

Above table shows that situation in the region under component HEIS is very poor. As per
TBAP against the target of 900 acres, work orders on 425 acres were required to be issued upto
31-12-2015, while it was on only 181 acres at the end of 2 nd quarter. Out of 181 acres where work
orders have been issued, material on 67 acres and commissioning on 41 acres have been verified.
ii.

Financial Utilization
Financial utilization for the quarter ending December, 2015 is given in the following table
which reveals that Rs. 12.895 million (36% of the expected utilization) have been utilized at the
end of 2nd quarter. In district Chiniot, utilization is only 9% of the expected utilization.

(Rs. in million)
Name of District

Funds Utilized upto 31-12-2015

Expected Utilization
upto 31-12-2015

Faisalabad
Jhang
T.T Singh
Chiniot
Total: -

9.938
9.938
9.938
5.963
35.775

First
Release

Second
Release

Third
Release

Total

1.098
0.023
1.155
0.092
2.368

3.795
2.763
2.464
0.362
9.384

0.084
0.762
0.205
0.091
1.143

4.977
3.549
3.824
0.545
12.895

%age
50
36
38
9
36

C. Status of Unspent Recovery (Rs.)


Name of
District

Jhang

Amount
Recoverable
10,141,00
0
2,106,000

T.T Singh

Faisalabad

Chiniot
Total: -

Amount
Recovered

Balance

%
age

2,055,000

842,00
0
51,000

5,226,000

5,226,000

100

477,000

446,000

31,000

94

17,950,00
0

17,026,
000

924,0
00

95

9,299,000

100%

92

75%

98

50%
25%

Page 11

92
Balance

98

FSD

JNG

100

Recovered 94

0%
TTS

C HT

Gujranwala Region
i.

A. Regular Watercourses

Physical Progress

Physical progress under component Regular Watercourses for the quarter ending
December, 2015 is tabulated as under: Name of
District
Gujranwala
Hafizabad
Narowal
Sialkot
M.B Din
Gujrat
Total: -

Target
50
25
1
15
20
1
112

ICR-I
TBAP (70%) Achieved

35
18
1
11
14
1
78

ICR-II
FCR
TBAP (25%) Achieved TBAP (10%) Achieved

34
11
1
10
19
4
79

13
6
0
4
5
0
28

20
5
1
4
12
3
45

5
3
0
2
2
0
11

0
0
0
0
2
0
2

Above table reveals that as per Time Bound Action Plan (TBAP)
78 (70% of the target) ICR-I were required to be verified, while 79, ICR-I have
been verified, which is evident of excellent performance by OFWM staff.
28 (25% of the target) ICR-II were required to be verified, while 45, ICR-II have
been verified, good efforts made in this regard by OFWM staff.
12 (10% of the target) FCR were required to be verified, while only 2, FCR have
been verified. Except M.B Din, all districts in region.
ii.

Financial Utilization
Financial utilization for the quarter ending December, 2015 is given in the
following table which reveals that Rs. 40.206 million (73% of expected utilization) have
been utilized in the region at the end of 2nd quarter.
(Rs. in million)
Funds Utilized upto 31-12-2015

%age

Expected
Utilization upto
31-12-2015

First
Release

Second
Release

Third
Release

Total

Gujranwala

15.947

4.592

3.976

2.883

11.451

72

Hafizabad

19.541

0.000

1.166

13.666

70

0.000

0.000

0.300

100

Name of
District

Narowal

0.300

12.50
0
0.300

Sialkot

2.786

1.450

0.592

0.000

2.041

73

15.716

3.453

5.434

3.379

12.266

78

0.482

0.482

0.000

0.000

0.482

100

54.772

22.77

10.001

7.428

40.206

73

M.B Din
Gujrat
Total: -

Page 12

i.

B. High Efficiency Irrigation System (HEIS)

Physical Progress

Physical progress under component High Efficiency Irrigation System (HEIS) for the
quarter ending December, 2015 is tabulated as under: Name of District
Gujranwala
Hafizabad
Narowal
Sialkot
M.B Din
Gujrat
Total: -

Target
(Acres)

As per TBAP upto


31-12-2015 (50%)

175
150
175
200
250
250
1200

88
75
88
100
125
125
600

Achievement upto 31-12-2015 (Acres)


Work Orders
Material
Commissioning
Issued
Verified
Verified
25
0
0
0
0
0
33
0
0
33
15
0
26
26
23
76
26
0
193
67
23

Above table shows that situation in the region under component HEIS is very poor. As per
TBAP against the target of 1200 acres, work orders on 600 acres were required to be issued upto
31-12-2015, while it was on only 193 acres at the end of 2 nd quarter. Out of 193 acres where work
orders have been issued, material on 67 acres and commissioning on 23 acres have been verified.
ii.

Financial Utilization
Financial utilization for the quarter ending December, 2015 is given in the following table
which reveals that only Rs. 17.655 million (37% of the expected utilization) have been utilized at
the end of 2nd quarter. Among distrits it ranged from 13% to 66%.

(Rs. in million)
Name of District

Expected Utilization
upto 31-12-2015

Gujranwala
Hafizabad
Narowal
Sialkot
M.B Din
Gujrat
Total: -

6.956
5.963
6.956
7.950
9.938
9.938
47.700

Funds Utilized upto 31-12-2015


First
Second
Third
Total
Release
Release
Release
0.094
0.627
0.197
0.918
0.190
0.739
0.000
0.930
0.428
2.382
0.000
2.810
0.119
1.776
0.137
2.032
0.782
3.307
0.330
4.420
0.994
5.552
0.000
6.546
2.607
14.384
0.664
17.655

%age
13
16
40
26
44
66
37

C. Status of Unspent Recovery (Rs.)


Name of
District
Gujranwala
Hafizabad
Narowal
Sialkot
M.B Din
Gujrat
Total: -

Amount
Recoverable

Amount
Recovered

Balance

%
age

4,896,095
1,370,352
1,753,322
2,709,523
3,045,150
392,319
14,166,761

2,982,018
1,200,187
1,434,894
2,540,682
3,026,976
351,213
11,535,970

1,914,077
170,165
318,428
168,841
18,174
41,106
2,630,791

61
88
82
94
99
90
81

Page 13

100%
75%
50%
25%

88
Balance
61

82

99

94
Recovered

90

0%
GRW HZD NRL SKT MBD GJT

Lahore Region
A. Regular Watercourses
i. Physical Progress

Physical progress under component Regular Watercourses for the quarter ending
December, 2015 is tabulated as under: Name of
District

Target

Lahore
Sheikhupura
Nankana Sahib
Kasur
Okara
Total: -

10
48
10
75
75
218

ICR-I
TBAP (70%) Achieved

7
34
7
53
53
153

ICR-II
FCR
TBAP (25%) Achieved TBAP (10%) Achieved

3
17
4
47
36
107

3
12
3
19
19
55

2
4
0
3
0
9

1
5
1
8
8
22

0
0
0
0
4
4

Above table reveals that as per Time Bound Action Plan (TBAP)
153 (70% of the target) ICR-I were required to be verified against which 107
ICR-I have been verified.
55 (25% of the target) ICR-II were required to be verified against which only 9
ICR-II have been verified.
22 (10% of the target) FCR were required to be verified against which only 4 FCR
have been verified.
Region needs strenious efforts to bring the progress at par with TBAP as the
progress in all the districts is far behind the Time Bound Action Plan.
Financial Utilization
Financial utilization for the quarter ending December, 2015 is given in the
following table which reveals that Rs. 53.215 million (94% of expected utilization) have
been utilized in the region at the end of 2nd quarter.
(Rs. in million)
Name of
District
Lahore
Sheikhupura
Nankana Sahib

Funds Utilized upto 31-12-2015

%age

Expected
Utilization upto
31-12-2015

First
Release

Second
Release

Third
Release

Total

1.400

0.000

0.000

0.000

0.000

17.592

5.141

0.726

16.592

94

2.035

1.414
12.62
9

0.000

1.935

95

25.005

97

0.000

1.702

9.683

99

Kasur

25.905

Okara

9.743

1.390

Page 14

10.72
5
0.521
10.98
6
7.981

Total: -

i.

19.18
3

56.675

3.818

30.21
4

53.215

94

B. High Efficiency Irrigation System (HEIS)


Physical Progress

Physical progress under component High Efficiency Irrigation System (HEIS) for the
quarter ending December, 2015 is tabulated as under: Name of
District
Lahore
Sheikhupura
Nankana Sahib
Kasur
Okara
Total: -

Target
(Acres)

As per TBAP
upto 31-12-2015
(50%)

150
200
150
250
250
1000

75
100
75
125
125
500

Achievement upto 31-12-2015 (Acres)


Work Orders
Material
Commissioning
Issued
Verified
Verified

24
64
20
49
85
242

3
42
0
30
51
126

0
14
0
30
40
84

Above table shows that situation in the region under component HEIS is very poor. As per
TBAP against the target of 1000 acres, work orders on 500 acres were required to be issued upto
31-12-2015, while it was on 242 acres at the end of 2 nd quarter. Out of 242 acres where work
orders have been issued, material on 126 acres and commissioning on 84 acres have been verified.
In districts Lahore and Nankana Sahib material verification is 3 acres and nil respectively while
commissioning verification is nill in both districts.
ii.
Financial Utilization
Financial utilization for the quarter ending December, 2015 is given in the following table
which reveals that only Rs. 10.559 million (27% of the expected utilization) have been utilized at
the end of 2nd quarter. In districts Lahore and Nankana Sahib, it is 1% and 9% respectively.

(Rs. in million)
Name of District

Expected Utilization
upto 31-12-2015

Funds Utilized upto 31-12-2015


First
Second
Third
Total
Release
Release
Release

Lahore

5.963

0.030

0.000

0.000

Sheikhupura

7.950

0.052

3.645

0.000

Nankana Sahib

5.963

0.043

0.499

0.000

Kasur

9.938

0.495

1.346

0.116

Okara

9.938

1.155

3.178

0.000

39.750

1.774

8.669

0.116

Total: -

D. Status of Unspent Recovery (Rs.)

Page 15

0.03
0
3.69
7
0.54
2
1.95
7
4.33
3
10.5
59

%age

1
46
9
20
44
27

Name of
District

Amount
Amount
Recoverable Recovered

Lahore

5,652,152

5396132

Sheikhupura

4,477,215

3081177

Nankana Sahib

4,242,474
18,438,82
0
8,755,283
41,565,9
44

Kasur
Okara
Total: -

3359134
1413551
2
8714414
34,686,
369

Balance
256,020
1,396,0
38
883,340
4,303,3
08
40,869
6,879,5
75

%
age

100%

95

75%

69

50%

79

95
Balance

25%

77

79Recovered
77

69

0%

99.5

LHR

SKP

NSB

83

Multan Region
A.

Regular Watercourses
i.

Physical Progress

Physical progress under component Regular Watercourses for the quarter ending
December, 2015 is tabulated as under: Name of
District
Multan
Khanewal
Vehari
Lodhran
Sahiwal
Pakpattan
Total: -

Target
75
65
65
48
25
30
308

ICR-I
TBAP (70%) Achieved

53
46
46
34
18
21
216

ICR-II
FCR
TBAP (25%) Achieved TBAP (10%) Achieved

54
27
36
37
20
25
199

19
16
16
12
6
8
77

10
2
7
8
3
0
30

8
7
7
5
3
3
31

1
0
0
0
0
0
1

Above table reveals that as per Time Bound Action Plan (TBAP)
216 (70% of the target) ICR-I were required to be verified while 77, ICR-I have
been verified. Districts Khanewal and Vehari are behind the schedule.
77 (25% of the target) ICR-II were required to be verified while 30, ICR-II have
been verified. All the districts in region are behind the schedule.
31 (10% of the target) FCR were required to be verified while only 1, FCR has
been verified. Progress of all districts in the region is miserable.
ii.

Financial Utilization
Financial utilization for the quarter ending December, 2015 is given in the

following table which reveals that Rs. 164.855 million (85% of expected utilization) have
been utilized in the region at the end of 2nd quarter.
(Rs. in million)
Name of
District

Expected
Utilization upto
31-12-2015

Funds Utilized upto 31-12-2015


First
Release

Second
Release

Page 16

100

Third
Release

Total

%age

KSR

OKR

Multan

46.500

Khanewal

44.199

Vehari

30.280

Lodhran

32.576

Sahiwal

19.458

Pakpattan

21.500

Total: -

i.

11.50
0
25.48
2
22.18
7
20.89
3
11.53
4
19.72
2
111.3
17

194.512

12.231
2.638

10.01
2
16.07
9

33.743

73

44.199

100

1.770

0.000

23.956

79

6.083

0.000

26.976

83

3.429

0.769

15.732

81

0.527

0.000

20.249

94

26.678

26.86
0

164.85
5

85

B. High Efficiency Irrigation System (HEIS)


Physical Progress

Physical progress under component High Efficiency Irrigation System (HEIS) for the
quarter ending December, 2015 is tabulated as under: Name of District
Multan
Khanewal
Vehari
Lodhran
Sahiwal
Pakpattan
Total: -

Target
(Acres)

As per TBAP upto


31-12-2015 (50%)

200
200
200
200
250
150
1200

100
100
100
100
125
75
600

Achievement upto 31-12-2015 (Acres)


Work Orders
Material
Commissioning
Issued
Verified
Verified
58
0
0
21
21
6
50
5
5
14
4
0
17
10
0
10
0
0
170
40
11

Above table shows that situation in the region under component HEIS is very poor. As per
TBAP against the target of 1200 acres, work orders on 600 acres were required to be issued upto
31-12-2015, while it was on 170 acres at the end of 2 nd quarter. Out of 170 acres where work
orders have been issued, material on 40 acres and commissioning on 11 acres have been verified.
In districts Multan and Pakpattan material verification is nil while commissioning verification is
nill in districts Multan Lodhran, Sahiwal and Pakpattn.
ii.
Financial Utilization
Financial utilization for the quarter ending December, 2015 is given in the following table
which reveals that only Rs. 6.403 million (13% of the expected utilization) have been utilized at
the end of 2nd quarter. In districts Multan and Lodhran, it is 6% and 3% respectively.

(Rs. in million)
Name of District
Multan
Khanewal
Vehari
Lodhran

Expected Utilization
upto 31-12-2015
7.950
7.950
7.950
7.950

Funds Utilized upto 31-12-2015


First
Release
0.075
0.326
0.717
0.102

Page 17

Second
Release
0.302
1.002
0.000
0.105

Third
Release
0.136
0.235
0.107
0.000

Total
0.513
1.563
0.825
0.207

%age
6
20
10
3

Sahiwal
Pakpattan
Total: -

9.938
5.963
47.700

0.303
0.525
2.048

0.730
1.738
3.876

0.000
0.000
0.479

1.033
2.263
6.403

10
38
13

C. Status of Unspent Recovery (Rs.)


Name of
District

Amount
Recoverable

Amount
Recovered

Balance

%
age

Multan
Khanewal
Vehari
Lodhran
Sahiwal
Pakpattan

5,486,151
7,650,686
4,664,921
1,800,058
7,246,119
1,672,678

5,410,874
7,650,686
4,664,921
1,761,145
6,442,649
1,259,679

75,277
38,913
803,470
412,999

99
100
100
98
89
75

Total: -

28,520,613

27,189,954

1,330,659

95

Page 18

100%
75%
50%

99

100 100

98

Balance

Recovered
89

MLN KW L VHR

LRN SW L PKP

75

25%
0%

Sargodha Region
A.

Regular Watercourses
i.

Physical Progress

Physical progress under component Regular Watercourses for the quarter ending
December, 2015 is tabulated as under: Name of
District
Sargodha
Khushab
Bhakkar
Mianwali
Total: -

Target
55
27
46
20
148

ICR-I
TBAP (70%) Achieved

39
19
32
14
104

ICR-II
FCR
TBAP (25%) Achieved TBAP (10%) Achieved

38
18
29
12
97

14
7
11
5
37

14
2
4
6
26

6
3
5
2
15

3
0
0
0
3

Above table reveals that as per Time Bound Action Plan (TBAP)
104 (70% of the target) ICR-I were required to be verified while 97, ICR-I have
been verified.
37 (25% of the target) ICR-II were required to be verified while 26, ICR-II have
been verified. Districts Khushab and Bhakkar are behind the schedule.
15 (10% of the target) FCR were required to be verified while only 3, FCR have
been verified. All the districts in region are behind the schedule.
ii.

Financial Utilization
Financial utilization for the quarter ending December, 2015 is given in the

following table which reveals that Rs. 79.600 million (76% of expected utilization) have
been utilized in the region at the end of 2nd quarter.
(Rs. in million)
Name of
District

Expected
Utilization upto
31-12-2015

Funds Utilized upto 31-12-2015


First
Release

28.50
0
8.800
18.87
3

%age

Second
Release

Third
Release

Total

9.100

0.000

37.600

93

0.303

0.000

9.103

61

2.684

0.000

21.558

62

Sargodha

40.450

Khushab

14.924

Bhakkar

34.638

Mianwali

14.210

7.870

3.470

0.000

11.339

80

104.222

64.04
3

15.558

0.000

79.600

76

Total: -

Page 19

i.

B. High Efficiency Irrigation System (HEIS)


Physical Progress

Physical progress under component High Efficiency Irrigation System (HEIS) for the
quarter ending December, 2015 is tabulated as under: Name of
District

Target
(Acres)

As per TBAP
upto 31-12-2015
(50%)

350
300
500
250
1400

175
150
250
125
700

Sargodha
Khushab
Bhakkar
Mianwali
Total: -

Achievement upto 31-12-2015 (Acres)


Work Orders
Material
Commissioning
Issued
Verified
Verified
53
33
33
62
43
0
97
0
0
36
36
29
248
112
62

Above table shows that situation in the region under component HEIS is very poor. As per
TBAP against the target of 1400 acres, work orders on 700 acres were required to be issued upto
31-12-2015, while it was on 248 acres at the end of 2 nd quarter. Out of 248 acres where work
orders have been issued, material on 112 acres and commissioning on 62 acres have been verified.
In district Khushab verification of commissioning is nil while in Bhakkar verification of both
material and commissioning is nil.
ii.
Financial Utilization
Financial utilization for the quarter ending December, 2015 is given in the following table
which reveals that only Rs. 9.330 million (17% of the expected utilization) have been utilized at
the end of 2nd quarter.

(Rs. in million)
Name of District

Expected Utilization
upto 31-12-2015

Sargodha
Khushab
Bhakkar
Mianwali

13.913
11.925
19.875
9.938

Total: -

55.650

Funds Utilized upto 31-12-2015


First
Second
Third
Total
Release Release Release
0.295
2.926
0.622
3.843
0.401
1.712
0.053
2.165
0.101
1.767
0.099
1.967
0.846
0.407
0.102
1.355
1.643

6.812

C. Status of Unspent Recovery (Rs.)


Name of
District

Amount
Recoverable

Amount
Recovered

Balance

%
age

Sargodha

2,607,068

2,505,302

101,766

96

Khushab

2,333,991

2,287,253

46,738

98

Bhakkar

2,327,151

2,306,681

20,470

99

Mianwali

2,330,050

1,871,141

458,909

80

Total: -

9,598,260

8,970,377

627,883

93

Page 20

0.875

9.330

%age
28
18
10
14
17

100%
75%
50%

98

96
Balance

99

Recovered

80

25%
0%
SGD

KSB

BKR

Rawalpindi Region
High Efficiency Irrigation System (HEIS)
i.

Physical Progress

Physical progress under component High Efficiency Irrigation System (HEIS) for the
quarter ending December, 2015 is tabulated as under: Name of
District

Achievement upto 31-12-2015 (Acres)

Target
(Acres)

As per TBAP
upto 31-12-2015
(50%)

Work Orders
Issued

Material
Verified

Commissioning
Verified

450
700
550
400
2100

225
350
275
200
1050

89
120
94
52
355

56
36
72
3
167

16
6
18
3
43

Rawalpindi
Attock
Chakwal
Jhelum
Total: -

Above table shows that situation in the region under component HEIS is very poor. As per
TBAP against the target of 2100 acres, work orders on 1050 acres were required to be issued upto
31-12-2015, while it was on 355 acres at the end of 2 nd quarter. Out of 355 acres where work
orders have been issued, material on 167 acres and commissioning on 43 acres have been verified.
In district Attock verification of commissioning is 6 acres while in Jhelum verification of both
material and commissioning is 3 acres.
ii.

Financial Utilization
Financial utilization for the quarter ending December, 2015 is given in the following table

which reveals that only Rs. 25.669 million (31% of the expected utilization) have been utilized at
the end of 2nd quarter.

(Rs. in million)
Name of District
Rawalpindi
Attock

Expected Utilization
upto 31-12-2015
17.888
27.825

Funds Utilized upto 31-12-2015


First
Release

Second
Release

Third
Release

Total

1.086
1.264

5.393
8.654

0.244
0.763

6.722
10.681

Page 21

%age
38
38

MW L

Chakwal
Jhelum
Total: -

21.863
15.900
83.475

0.583
0.476
3.409

Page 22

5.048
1.238
20.332

0.575
0.346
1.928

6.206
2.060
25.669

28
13
31