Network Guide
Document Revision History:
1.
2.
3.
4.
Version 0.1 - Beta Release - March 2010
Version 1.0 Release to Market June 2010
Version 1.1 October 2010
Version 1.2 Added LONWORKS Network information June 2011
Network Guide
05DI-UGBACNG-12
Copyright Distech Controls Inc.
First printing June 2010. Printed in Canada.
While all efforts have been made to verify the accuracy of information in this manual, Distech
Controls is not responsible for damages or claims arising from the use of this manual.
Persons using this manual are assumed to be trained HVAC professionals and are
responsible for using the correct wiring procedures, correct override methods for equipment
control and maintaining safe working conditions in fail-safe environments. Distech Controls
reserves the right to change, delete or add to the information in this manual at any time
without notice.
Distech Controls and the Distech Controls logo are trademarks of Distech Controls Inc.
LONWORKS is a registered trademark of Echelon Corporation. BACnet is a registered
trademark of ASHRAE. Windows, Windows XP, Windows Vista, and Visual Basic.Net are
registered trademarks of Microsoft Corporation. NiagaraAX is a registered trademark of
Tridium, Inc.
TABLE OF CONTENTS
CHAPTER 1 ........................................................................................................................................... 5
Introduction ........................................................................................................................................ 5
Introduction .................................................................................................................................... 6
About BACnet .............................................................................................................................. 6
About LonWorks .......................................................................................................................... 6
About Subnetworks ..................................................................................................................... 6
About This User Guide .................................................................................................................. 7
Purpose of the User Guide .......................................................................................................... 7
Intended Audience....................................................................................................................... 7
Conventions Used in this Document ........................................................................................... 8
Notes ........................................................................................................................................... 8
Cautions and Warnings ............................................................................................................... 8
Related Documentation ............................................................................................................... 8
Acronyms and Abbreviations Used in this Document ................................................................... 9
CHAPTER 2 ......................................................................................................................................... 10
BACnet MS/TP Communication Bus Fundamentals .................................................................... 10
BACnet MS/TP Data Transmission Essentials............................................................................ 11
Data Bus Devices and Baud Rate ............................................................................................... 13
Data Bus Physical Specifications and Cable Requirements ....................................................... 15
Bus Topology and EOL Terminations.......................................................................................... 16
Data Bus Shield Grounding Requirements ................................................................................. 19
Using Repeaters to Extend the Data Bus .................................................................................... 20
Device Addressing ....................................................................................................................... 23
Inter-Building BACnet Connection ............................................................................................... 30
Power Supply Requirements ....................................................................................................... 31
Typical Device BACnet MS/TP LAN and Power Wiring Diagram ............................................... 35
CHAPTER 3 ......................................................................................................................................... 36
LonWorks Communication Bus Fundamentals ............................................................................ 36
Network Architecture ................................................................................................................... 37
EC-NetAX Network Architecture ................................................................................................. 37
TP/FT-10 Network Topologies..................................................................................................... 38
Bus Topology............................................................................................................................. 38
Free Topology ........................................................................................................................... 38
Network Cables ......................................................................................................................... 40
TP/FT-10 Cable specifications .................................................................................................. 40
Extending the Network ................................................................................................................ 42
Grounding a Network ................................................................................................................... 43
Grounding Shielded Twisted Pair Cable ................................................................................... 43
Building Entrance Protection ..................................................................................................... 43
Power Supply Requirements ....................................................................................................... 44
CHAPTER 4 ......................................................................................................................................... 46
Subnetwork Installation Guidelines ............................................................................................... 46
About the Subnetwork Bus .......................................................................................................... 47
ECx-4XX Subnetwork Bus........................................................................................................... 48
ECx-4XX Subnetwork Bus Physical Specifications and Cable Requirements ......................... 48
ECx-4XX Subnetwork Bus Topology and End-of-Line Terminations ........................................ 48
ECx-4XX Subnetwork Bus Shield Grounding Requirements .................................................... 50
ECx-4XX I/O Extension Module Addressing ............................................................................. 50
Power Supply Requirements ..................................................................................................... 51
EC-Smart-Vue Subnetwork Bus .................................................................................................. 52
Network Guide
EC-Smart-Vue Subnetwork Bus Cable Requirements.............................................................. 52
EC-Smart-Vue Subnetwork Bus Topology and End-of-Line Terminations ............................... 54
Commissioning with an EC-Smart-Vue ..................................................................................... 55
Connecting to the LAN through an EC-Smart-Vue ................................................................... 57
CHAPTER 5 ......................................................................................................................................... 60
BACnet Troubleshooting ................................................................................................................ 60
CHAPTER 6 ......................................................................................................................................... 66
LonWorks Troubleshooting ............................................................................................................ 66
CHAPTER 7 ......................................................................................................................................... 70
ECx-400 Series I/O Extension Module Specific Troubleshooting ............................................... 70
CHAPTER 8 ......................................................................................................................................... 71
EC-Smart-Vue Troubleshooting ..................................................................................................... 71
APPENDIX A ....................................................................................................................................... 73
Typical BACnet EIA-485 Data Bus Transmission Example ......................................................... 73
APPENDIX B ....................................................................................................................................... 75
How to Set a DIP Switch .................................................................................................................. 75
APPENDIX C ....................................................................................................................................... 76
Metric Conversions for Wire Gauge ............................................................................................... 76
APPENDIX D ....................................................................................................................................... 77
Documentation Improvement Form ............................................................................................... 77
Network Guide
CHAPTER 1
INTRODUCTION
This section provides an overview of the user guide.
In This Chapter
Topic
Page
Introduction
About This User Guide
Acronyms and Abbreviations Used in this Document
Network Guide
Introduction
Introduction
This document describes best practices, specifications, wiring rules, device termination, and
application information to implement robust and reliable communications networks.
About BACnet
The BACnet ANSI/ASHRAE Standard 135-2008 specifies a number of Local Area
Network (LAN) transport types. Distech Controls controllers use both BACnet IP and
BACnet Master-Slave/Token-Passing (MS/TP) communications bus (based on EIA-485) as
a local network for internetworking of supervisory controllers and field controllers.
About LonWorks
The LONWORKS standard ANSI/CEA-709.1-B specifies a number of Local Area Network
(LAN) transport types. Distech Controls controllers use a twisted pair "free topology"
communications bus operating at 78 kbit/s as a local network for internetworking of
supervisory controllers and field controllers.
LONWORKS is one of several network types of the BACnet ANSI/ASHRAE Standard;
however, no Distech Controls controllers are compatible with this network type except for an
EC-NetAX.
About Subnetworks
Distech Controls controllers also support the following types of subnetworks:
ECx-4XX subnetwork bus that is used to connect ECx-4XX Series I/O Extension
Modules to an ECB-600 or ECL-600 controller.
EC-Smart-Vue Subnetwork bus is used to connect EC-Smart-Vue sensors to any
Distech Controls ECB series controller or ECL series controller.
Network Guide
Introduction
About This User Guide
Purpose of the User Guide
This user guide does not provide and does not intend to provide instructions for
safe wiring practices. It is the users responsibility to adhere to the safety codes,
safe wiring guidelines, and safe working practices to conform to the rules and
regulations in effect in the job site jurisdiction. This user guide does not intend to
provide all the information and knowledge of an experienced HVAC technician or
engineer.
For BACnet
This User Guide describes the best practices for installing a BACnet MS/TP LAN
and reviews the specifications, device limits, BACNET MS/TP LAN cable
requirements, best wiring practices, the importance of rigorous grounding practices,
24 volt power supply wiring requirements, BACnet MS/TP bus termination, setting
the MAC address and Device Instance for devices on a BACnet MS/TP LAN, and
finally LAN troubleshooting.
This user guide is intended to provide BACnet LAN information to instruct a user to
install and configure a BACnet MS/TP LAN. However, this guide is not intended to
instruct the user on how configure the devices connected to the LAN, to use network
management tool software, to program a device to share points on the network, or
the procedure to install a given device. For this information, refer to the devices
hardware installation guide and its related programming user guide.
For LONWORKS
This User Guide describes the best practices for installing a LONWORKS LAN and
reviews the specifications, device limits, LAN cable requirements, best wiring
practices, grounding practices, 24 volt power supply wiring requirements,
LONWORKS network termination, and finally LAN troubleshooting.
This user guide is intended to provide LONWORKS LAN information to instruct a user
to install and configure a LONWORKS LAN. However, this guide is not intended to
instruct the user on how configure the devices connected to the LAN, to use network
management tool software, to program a device to share points on the network, or
the procedure to install a given device. For this information, refer to the devices
hardware installation guide and its related programming user guide.
For Subnetworks
This user guide also describes the best practices for installing the subnetwork used
for Distech Controls I/O Extension Modules and EC-Smart-Vue; cable requirements,
best wiring practices, bus termination, and device addressing.
Intended Audience
This user guide is intended for system designers, integrators, electricians, and field
technicians who have experience with control systems, and who want to learn about how to
make a successful BACnet MS/TP LAN installation. It is recommended that anyone installing
and configuring the devices specified in this user guide have prior training in the usage of
these devices.
Network Guide
Introduction
Conventions Used in this Document
Notes
This is an example of Note text. Wherever the note-paper icon appears, it means
the associated text is giving a time-saving tip or a reference to associated
information of interest.
Cautions and Warnings
This is an example of Caution or Warning text. Wherever the exclamation icon
appears, it means that there may be an important safety concern or that an action
taken may have a drastic effect on the device, equipment, and/or network if it is
improperly carried out.
Related Documentation
Refer to the Hardware Installation Guide for the devices you are installing.
Network Guide
Introduction
Acronyms and Abbreviations Used in this
Document
Table 1-1: Acronyms and Abbreviations
Acronym
Definition
ANSI
American National Standards Institute
ASHRAE
American Society of Heating, Refrigeration, and Air-Conditioning
Engineers
BACnet
Building Automation and Control Networking Protocol
B-AAC
BACnet Advanced Application Controller
B-ASC
BACnet Application Specific Controller
B-BC
BACnet Building Controller
BBMD
BACnet/IP Broadcast Management Device
DI
Device Instance Number
EIA
Electronic Industries Alliance
EOL
End Of Line
ID
Identifier
LAN
Local Area Network
MAC
Media Access Control
MS/TP
Master-Slave/Token-Passing
Network Guide
CHAPTER 2
BACNET MS/TP COMMUNICATION BUS
FUNDAMENTALS
This chapter describes the BACnet MS/TP Communications Bus operating principals.
In This Chapter
Topic
Page
BACnet MS/TP Data Transmission Essentials
11
Bus Topology and EOL Terminations
16
Using Repeaters to Extend the Data Bus
20
Data Bus Devices and Baud Rate
13
Data Bus Physical Specifications and Cable Requirements
15
Data Bus Shield Grounding Requirements
19
Device Addressing
23
Inter-Building BACnet Connection
30
Power Supply Requirements
31
Typical Device BACnet MS/TP LAN and Power Wiring
Diagram
35
Network Guide
10
BACnet MS/TP Communication Bus Fundamentals
BACnet MS/TP Data Transmission Essentials
Introduction
The BACnet MS/TP bus protocol is part of the BACnet ANSI/ASHRAE Standard 1352008 that uses the EIA-485 (RS-485) physical layer standard for data transmission (herein
called the data bus). Multiple data buses can be logically tied together as each BACnet
MS/TP bus is assigned a unique Network Instance that distinguishes it from other data
buses in the BACnet MS/TP Local Area Network (LAN). An example of an interconnected
BACnet MS/TP bus is shown in Figure 2-16.
EIA-485 is a standard that defines the electrical characteristics of the receivers and drivers
to be used to transmit data in a differential (balanced) multipoint data bus that provides high
noise immunity with relatively long cable lengths which makes it ideal for use in industrial
environments. The transmission medium is inexpensive and readily-available twisted pair
shielded cable.
While there are many possible LAN topologies for an EIA-485 data bus, only devices that
are daisy-chained together are allowed with BACnet MS/TP (see Figure 2-4). A spur is only
permitted when it is connected to the bus through a repeater (see Using Repeaters to
Extend the Data Bus on page 20).
End-of-line (EOL) terminations are critical to error-free EIA-485 data bus operation. The
impedance of the cable used for the data bus should be equal in value to the EOL
termination resistors (typically 120 ohms). Cable impedance is usually specified by the cable
manufacturer.
BACnet MS/TP Data Bus is Polarity Sensitive
The polarity of all devices that are connected to the two-wire BACnet MS/TP data bus must
be respected. The markings to identify the polarity can vary by manufacturer. The following
table summarizes the most common identification labels for BACnet MS/TP data bus
polarity.
Network Guide
11
BACnet MS/TP Communication Bus Fundamentals
Table 2-1: Common Identification Labels for BACnet MS/TP Data Bus Polarity
Device Manufacturer
Data Bus Connections
Inverting
Non-inverting
Reference
Controllers
NET
NET +
24V COM
EC-BOS
Thermostat
Ref
Repeater
Data
Data1
Data+
Data1+
(B)GND
BACnet/IP
to MS/TP
Adapter
RT
RT+
COM
BACnet/IP
to MS/TP
Router
SC
Common identification labels for
BACnet MS/TP data bus polarity
by other Manufacturers
SC
TxD/RxD
TxD+/RxD+
GND
U+
COM
RT
RT+
REF
Sig
Sig+
Data
Data+
Distech Controls
Except for an EC-BOS, never connect the shield of the BACnet MS/TP data bus to
the Reference terminal. See Data Bus Shield Grounding Requirements on page 19
for more information.
When interfacing with BACnet MS/TP devices from other manufacturers, refer to the
documentation for the device to correctly wire the device.
12
Network Guide
BACnet MS/TP Communication Bus Fundamentals
Data Bus Devices and Baud Rate
Maximum Number of BACnet MS/TP Devices on a Data Bus Segment
The BACnet MS/TP data bus supports up 255 devices:
Up to 128 (0 to 127) devices that are Masters (that can initiate communication).
Up to 128 (128 to 255) devices that are Slaves (cannot initiate communication).
However, it is recommended that any given data bus segment have no more than 50
devices. A repeater counts as a device on each data bus segment to which it is connected.
At 9600 Baud, the maximum number of devices is reduced to 25 due to increased
token loop times.
All Distech Controls devices are categorized as BACnet MS/TP Masters and are rated as
follows.
Table 2-2: Device Loading
Manufacturer
Device load on the attached BACnet MS/TP Data Bus
Distech Controls ECB
controllers
load devices
Distech Controls BACnet
MS/TP Thermostats
load devices
Other manufacturers
Refer to their documentation
However, if a data bus segment with Distech Controls Devices are interoperating with one or
more devices from another manufacturer that support fewer devices on a data bus segment,
then the device that supports the fewest devices on the same data bus is the one that sets
the limit for the maximum number of devices for that data bus segment. For example, you
plan to put on one data bus the following devices:
Table 2-3: Device Loading Example
Manufacturer
Quantity of
devices
(example)
Equivalent
full-load
devices
Maximum devices
supported by the
manufacturer
Distech Controls devices
( load devices)
1281 (50
recommended)
Distech Controls BACnet
MS/TP Thermostats (
load devices)
14
64 (50
recommended)
Manufacturer Y (full load
devices)
26
26
32
34
There are too many
devices on the data
bus. It is limited to a
maximum of 32
devices by
Manufacturer Y.
Total Full-Load Devices
This is limited by the maximum number of master devices allowed on a BACnet
MS/TP Data Bus.
The solution for the above example is to create two data bus segments connected together
by a repeater and then split up the devices between the data bus segments, ensuring again
Network Guide
13
BACnet MS/TP Communication Bus Fundamentals
that the maximum number of devices on each separate data bus is not exceeded. See Using
Repeaters to Extend the Data Bus on page 20.
Baud Rate
Most devices will have a range of baud rate settings and possibly an AUTO setting that
detects the baud rate of other devices transmitting on the data bus and adjusts the baud rate
of the device accordingly. Typical baud rates are 9600, 19 200, 38 400, and 76 800. The
baud rate setting determines the rate at which data is sent on the data bus. All devices on
the data bus must be set to the same baud rate. Therefore, the chosen baud rate must be
supported by all devices connected to the data bus.
Distech Controls devices must be power cycled after changing a baud rate setting for it to
take effect.
The recommended baud rate for Distech Controls devices is 38 400.
To set the baud rate, see Setting the BAUD Rate for ECB-Series Controllers (optional) on
page 56.
14
Network Guide
BACnet MS/TP Communication Bus Fundamentals
Data Bus Physical Specifications and Cable
Requirements
Cables composed of stranded conductors are preferred over solid conductors as stranded
conductor cable better resist breakage during pulling operations. Distech Controls highly
recommends the following data bus segment cable specifications be respected.
Table 2-4: BACnet MS/TP Data Bus Segment Physical Specifications and Cable
Requirements
Parameter
Details
Media
Twisted pair, 24 AWG
Shielding
Foil or braided shield
Shield grounding
The shield on each segment is connected to
electrical system ground at one point only; see Data
Bus Shield Grounding Requirements on page 19.
Characteristic impedance
100-130 Ohms. The ideal is 100-120 Ohms.
Distributed capacitance
between conductors
Less than 100 pF per meter (30 pF per foot) The
ideal is less than 60 pF per meter (18pF per foot).
Distributed capacitance
between conductors and shield
Less than 200 pF per meter (60 pF per foot).
Maximum length per segment
1220 meters (4000 feet)
Data Rate
9600, 19 200, 38 400, and 76 800 Baud
Polarity
Polarity sensitive
Multi-drop
Daisy-chain (no T-connections)
EOL terminations
120 ohms at each end of each segment
Data bus bias resistors
510 ohms per wire (max. of two sets per segment)
Shielded cable offers better overall electrical noise immunity than non-shielded cable.
Unshielded cable or cable of a different gauge may provide acceptable performance for
shorter data bus segments in environments with low ambient noise.
Table 2-5: Distech Controls Recommended Cable Types for BACnet MS/TP Data
Buses
Bus and Cable Type
Part Number
O.D. ()
300 meters (1000 feet), 24 AWG Stranded, Twisted
Pair Shielded Cable FT6, Rated for Plenum
Applications
07CBL-BACNET
3.75mm
(0.148 in.)
1. Distech Controls BACnet cable offers the best performance over the full range of baud
rates, cable lengths, and number of connected devices. This is primarily due to lower
conductor-to-conductor capacitance of this cable.
Network Guide
15
BACnet MS/TP Communication Bus Fundamentals
Bus Topology and EOL Terminations
Function of EOL Terminations
The first and last device on the data bus must have End-of-Line (EOL) termination resistors
connected across the two data lines/wires of the twisted pair. These resistors serve the
following purposes:
EOL terminations dampen reflections on the bus that result from fast-switching (highspeed rising and falling data edges) that otherwise would cause multiple data edges to
be seen on the bus with the ensuing data corruption that may result. The higher the
baud rate a data bus is operating at, the more important that EOL terminations be
properly implemented. Electrically, EOL terminations dampen these reflections by
matching the impedance to that of a typical twisted pair cable.
EIA-485 data bus transmitters are tri-state devices. That is they can electrically transmit
1, 0, and an idle state. When the transmitter is in the idle state, it is effectively offline or
disconnected from the data bus. EOL terminations serve to bias (pull-down and pull-up)
each data line/wire when the lines are not being driven by any device. When an undriven data bus is properly biased by the EOL terminations to known voltages, this
provides increased noise immunity on the data bus by reducing the likelihood that
induced electrical noise on the data bus is interpreted as actual data.
When to use EOL Terminations
EOL terminations should only be enabled / installed on the two devices located at either end
of the data bus. All other devices must not have the EOL terminations enabled/installed.
Typical BACnet Device
EOL OFF
EOL OFF
Typical EC-BOS Device
NET+
EOL ENABLED: For the
EC-BOS as a first or last
daisy-chained device:
NET-
NET+
Typical BACnet Device
EOL OFF
NET-
Typical BACnet Device
NET+
NET+
NET-
EOL ON
NET-
Typical BACnet Device
- OPTIONALLY set the
EOL jumper internally
- AND add a 120 Ohm
resistor as shown here
12
Data Bus: Shielded Twisted Pair Cable
First and last daisy-chained device:
- EOL Jumpers are ENABLED
OR EOL resistor is installed
All other Devices:
- EOL Jumpers are DISABLED
Electrical
System
Ground
Figure 2-1: EOL Terminations Must be Enabled at Both the First and Last Device on
the Data Bus
Devices are factory-set with the EOL termination disabled by default.
The BACnet/IP to MS/TP Adapter does not have EOL Termination (and BACnet
MS/TP Data Bus biasing) capabilities to be used at the end of a BACnet MS/TP
data bus. Instead, use the BACnet/IP to MS/TP Router for this application.
When to use EOL Terminations with BACnet MS/TP Thermostats
BACnet MS/TP thermostats support external EOL termination resistors only. When a
BACnet MS/TP thermostat is the first or last daisy-chained device, add a 120 Ohm resistor
across the and + BACnet MS/TP data bus connections.
The BACnet MS/TP data bus must be biased. This bias can only be provided by built-in EOL
termination resistors (ones set with a jumper). If a BACnet MS/TP data bus has a BACnet
MS/TP thermostat at one end of the BACnet MS/TP data bus and an EC-BOS at the other
end, you must set the internal EOL jumper in the EC-BOS so that proper biasing is provided
to the BACnet MS/TP data bus.
16
Network Guide
BACnet MS/TP Communication Bus Fundamentals
No Built-in EOL
Jumper
No Built-in EOL
Jumper
No Built-in EOL
Jumper
12
NET-
NET-
NET-
EOL ENABLED: Use the
EC-BOS as a first or last
daisy-chained device:
The internal EOL jumper
MUST be set to ON to
provide bias to BACnet
MS/TP Data Bus AND
add a 120 Ohm resistor
as shown here
NET+
No Built-in EOL
Jumper
NET+
Typical
BACnet
Device
NET+
Typical
BACnet
Device
NET+
Typical
BACnet
Device
NET-
Typical
BACnet
Device
Typical EC-BOS Device
EOL ON
12
Electrical
System
Ground
Data Bus: Shielded Twisted Pair Cable
EOL: Add a 120
Ohm resistor as
shown here
First and last daisy-chained device:
- EOL Jumpers are ENABLED
at one end, and EOL resistor is
installed at other end.
All other Devices:
- EOL Jumpers are DISABLED.
Figure 2-2: Typical EOL Terminations with BACnet MS/TP Thermostats with Biasing
Provided by the EC-BOS Internal EOL Jumper set to ON
When a BACnet MS/TP data bus has a BACnet MS/TP thermostat at one end of the BACnet
MS/TP data bus and an EC-BOS at the other end without its internal EOL jumper enabled,
fish-tail the BACnet MS/TP data bus back to a controller in which the built-in EOL termination
can be set. This will provide the necessary biasing to the BACnet MS/TP data bus.
No Built-in EOL
Jumper
No Built-in EOL
Jumper
NET+
Typical
BACnet
Device
NET-
NET+
NET-
NET+
NET-
No Built-in EOL
Jumper
Typical
BACnet
Device
NET+
With Built-in EOL Jumper
EOL ON
NET-
Typical BACnet Device
Typical
BACnet
Device
Typical EC-BOS Device
EOL ENABLED: For the
EC-BOS as a first or last
daisy-chained device:
- OPTIONALLY set the
EOL jumper internally
- AND add a 120 Ohm
resistor as shown here
12
Data Bus: Shielded Twisted Pair Cable
Fish-tail the Data Bus back to a controller
that has a built-in EOL Jumper making it
the last device on the Data Bus
Electrical
System
Ground
First and last daisy-chained device:
- EOL Jumpers are ENABLED
OR EOL resistor is installed
All other Devices:
- EOL Jumpers are DISABLED
Figure 2-3: Fish-tailing the BACnet MS/TP Data Bus to use a Controller with Built-in
EOL Termination that will Provide Biasing to the BACnet MS/TP Data Bus
Only a Daisy-Chained Data Bus Topology is Acceptable
Use a daisy-chained BACnet MS/TP data bus topology only. No other data bus topology is
allowed.
Network Guide
17
BACnet MS/TP Communication Bus Fundamentals
- Data Bus Management
- Data Bus Integration
- Device Configuration and
programming
- Graphical Interface
Configuration
- Alarm
- Trend Log
- Schedule
EC-NetAX Supervisor
- User Interface
- Remote Access
- Embedded EC-NetAX Pro
EC-NetAX Pro
Web Browser
Ethernet, TCP/IP, BACnet/IP, LONWORKS IP, XML, HTTP, oBIX
EC-BOSAX
EOL Terminator
MS/TP
Data Bus Segment
Maximum of 32 nodes and 1200 meters.
Maximum is 50 nodes when using
Distech Controls devices exclusively
Segment 1
EOL
ON
EOL Internally Set
Central Plant
Air Handling Controllers
Figure 2-4: Typical BACnet MS/TP LAN Topology Showing How Devices are DaisyChained Together with One Data Bus Segment
Only linear, daisy-chained devices provide predictable data bus impedances
required for reliable data bus operation.
Only a daisy-chained data bus topology should be specified during the planning
stages of a project and implemented in the installation phase of the project.
A spur is only permitted when it is connected to the bus through a repeater (refer
to Using Repeaters to Extend the Data Bus on page 20).
Star and ring topologies are not supported because signal reflections on the data bus may
not be sufficiently dampened by the standard EOL termination resistors supplied by device
manufacturers, as these resistors may present excessively high or low termination
impedance. These topologies have more complex electrical characteristics that require
advanced analysis to determine the appropriate termination resistances to ensure error-free
data transmission on the data bus.
EC-BOSAX
EC-BOSAX
Spur / Backbone
Topologies are
Unsupported
Star Topologies are
Unsupported
Figure 2-5: Unsupported BACnet MS/TP LAN Topologies
18
Network Guide
BACnet MS/TP Communication Bus Fundamentals
Data Bus Shield Grounding Requirements
The EIA-485 data bus standard requires that the data bus must be shielded against
interference. A BACnet MS/TP data bus must be properly grounded. For this, the devices on
each data bus segment must be daisy-chained together with the cable shield twisted
together and isolated with electrical tape at each device. The shield on each segment must
be connected to electrical system ground at one point only, at the Bus Master (Building
Controller) if there is one, as shown below. On data bus segments without a Bus Master
(Building Controller), the ideal point to ground the shield is in the middle of the data bus
segment.
Grounding the shield of a data bus segment in more than one place will more than likely
reduce shielding effectiveness.
Bus Master (Building Controller)
Typical BACnet Device
Typical BACnet Device
Typical BACnet Device
Typical BACnet Device
Data Bus Shields: Twist
together and Isolate
with electrical tape
Electrical
System
Ground
Data Bus Shields: Twist
together and Isolate
with electrical tape
NET-
NET+
NET-
NET+
NET-
NET+
NET-
The shield of the data bus
must be connected to the
electrical system ground at
one point only usually at
the Building Controller,
when present
NET+
Typical EC-BOS Device
Data Bus Shields: Twist
together and Isolate
with electrical tape
Data Bus Shield:
Isolate with
electrical tape
Data Bus: Shielded Twisted Pair Cable
Data Bus Shield:
Connect to the S
terminal
Figure 2-6: Typical Cable-Shield Grounding Requirements for a BACnet MS/TP Data
Bus Segment with a Building Controller located in the End of the Data Bus
Data Bus Shield:
Isolate with
electrical tape
Bus Master (Building Controller)
The shield of the data bus
must be connected to the
electrical system ground
at one point only usually
at the Building Controller,
when present
Data Bus Shields: Twist
together and Isolate
with electrical tape
Typical BACnet Device
Typical BACnet Device
Data Bus Shields: Twist
together and Isolate
with electrical tape
Electrical
System
Ground
NET-
NET+
Typical EC-BOS Device
NET-
NET-
NET+
Typical BACnet Device
NET-
NET+
Typical BACnet Device
NET+
Data Bus Shield:
Connect to the S
terminal
Data Bus Shield:
Isolate with
electrical tape
Data Bus: Shielded Twisted Pair Cable
Figure 2-7: Typical Cable-Shield Grounding Requirements for a BACnet MS/TP Data
Bus Segment with a Building Controller located in the Middle of the Data Bus
Data Bus Shield:
Isolate with
electrical tape
Data Bus Shields: Twist
together and Isolate
with electrical tape
Data Bus: Shielded Twisted Pair Cable
Electrical
System
Ground
Data Bus Shields: Twist
together and Isolate
with electrical tape
Data Bus Shields: Twist
together and Isolate
with electrical tape
NET-
NET+
Typical BACnet Device
NET-
NET+
Typical BACnet Device
NET-
NET+
Typical BACnet Device
NET-
NET+
Typical BACnet Device
NET-
NET+
Typical BACnet Device
Data Bus Shield:
Isolate with
electrical tape
The shield of the data bus must be
connected to the electrical system
ground at one point only, ideally in
the middle of the data bus as shown
Figure 2-8: Typical Cable-Shield Grounding Requirements for a BACnet MS/TP Data
Bus Segment without Building Controller
Network Guide
19
BACnet MS/TP Communication Bus Fundamentals
Using Repeaters to Extend the Data Bus
A BACnet MS/TP data bus segment can be up to 1220 meters (4000 feet) long with up to 50
devices maximum. When a greater length is required, a solution is to use a repeater. A
repeater increases the maximum length of the data bus.
Using an EC-BOS to Increase the Number of Connected Devices
If your BACnet MS/TP network has an EC-BOS, it may be more cost effective to add one or
two MS/TP network cards to the EC-BOS in place of an MS/TP Repeater. A standard
EC-BOS can support up to four MS/TP networks when equipped with two optional MS/TP
network cards. Furthermore, network performance is increased as each MS/TP network will
have lower communication latency due to each MS/TP network having its own token to pass
between devices. See BACnet MS/TP Data Bus Token-Passing Overview on page 24.
With up to 50 devices per MS/TP network, this allows up to a total of 200 devices to be
connected to an EC-BOS. See Figure 2-16.
Using a Repeater to Extend the Length of the BACnet MS/TP Data Bus
Repeaters can be used to extend a BACnet MS/TP data bus up to 3660 meters maximum
total length. Do not use more than two repeaters on a BACnet MS/TP LAN.
A BACnet MS/TP repeater is a bi-directional device that regenerates and strengthens the
electrical signals that pass through it. It creates two electrically-isolated BACnet MS/TP data
bus segments that transparently enable devices on one side of the repeater to communicate
with any device on the other side. The two BACnet MS/TP data bus segments have the
same requirements of an ordinary BACnet MS/TP data bus segment; that is each BACnet
MS/TP data bus segment:
Can be up to 1220 meters (4000 feet) long.
Will have the same network number as they remain part of the same network or LAN.
Do not use more than two repeaters on a BACnet MS/TP data bus.
A repeater can only connect two BACnet MS/TP data bus segments even if it has
ports to support more than two BACnet MS/TP data bus segments.
A repeater can be added anywhere to a data bus segment including the end of the segment
as shown below.
MS/TP Data Bus:
- 3660 m (12 000 ft) Maximum Total
- 50 Connected Devices Maximum Total
MS/TP Data Bus Segment:
- 1220 m (4 000 ft) Maximum
MS/TP Data Bus Segment:
- 1220 m (4 000 ft) Maximum
MS/TP Data Bus Segment:
- 1220 m (4 000 ft) Maximum
EOL Terminators
EOL Terminator
MS/TP
Repeater
EOL
ON
EC-BOSAX
MS/TP
Repeater
EOL
ON
EOL Internally Set
EOL Internally Set
< 7.6 m
< 25 ft
EOL
ON
EOL Internally Set
< 7.6 m
< 25 ft
Figure 2-9: Using a Repeater to Extend the Range of the LAN
A repeater can be used to create a spur as shown below.
20
Network Guide
BACnet MS/TP Communication Bus Fundamentals
MS/TP Data Bus Segment:
- 1220 m (4 000 ft) Maximum
- 50 Connected Devices Maximum Total
EOL Terminator
EOL
ON
EC-BOSAX
MS/TP
Repeater
EOL Terminator
EOL Internally Set
MS/TP Data Bus Segment:
- 1220 m (4 000 ft) Maximum
- 50 Connected Devices Maximum Total
EOL
ON
EOL Internally Set
Figure 2-10: Adding a Spur by Using a Repeater
A repeater is counted as a device on each data bus to which it is connected.
When third party devices are connected to a data bus segment, the number of devices that
can be connected to that data bus segment may be reduced. Refer to Maximum Number of
BACnet MS/TP Devices on a Data Bus Segment on page 13.
Data Bus Shields: Twist
together and Isolate with
electrical tape
Data Bus: Shielded
Twisted Pair Cable
Data + (1)
Data + (20)
Data (2)
Data (19)
2
12
< 7.6 m
< 25 ft
EOL ON
Data Bus Shields: Twist
together and Isolate
with electrical tape
Repeater
Typical BACnet Device
NET-
No Built-in EOL
Jumper
BACnet MS/TP data bus
Bias and EOL termination is
provided by this controllers
internal EOL Jumper being
set to ON
NET+
Typical
BACnet
Device
NET+
NET-
NET-
NET+
EOL ON
BACnet MS/TP data bus
Bias and EOL termination is
provided by this controllers
internal EOL Jumper being
set to ON
NET+
NET-
Typical BACnet Device
The data bus shield must be connected to the electrical system ground at
one point only usually at the Building Controller, when present
Figure 2-11: Repeater Connections when it is the First or Last Device on its
Respective Data Bus Segment
The BACnet MS/TP Data Bus must be biased. This bias can only be provided by built-in
EOL termination resistors (ones set with a jumper). When a repeater is the first or last device
on its respective data bus segment, use the following methods to provide MS/TP Data Bus
biasing and EOL termination as applicable to your situation:
1. On the BACnet MS/TP data bus segment shown in Figure 2-11, bias and EOL
termination is provided by a controllers internal EOL jumper being set to ON. In this
case the connection to the repeater cannot be more than 7.6 meters (25 feet) from this
controller.
2. On the BACnet MS/TP data bus segment shown in Figure 2-11, a 120 EOL
Termination resistor is added to the repeaters terminals. Biasing for this BACnet MS/TP
Network Guide
21
BACnet MS/TP Communication Bus Fundamentals
data bus segment is provided by the internal EOL Jumper being set to ON at the last
controller at the other end of this data bus.
See When to use EOL Terminations on page 16 for more information. Follow shielding and
grounding recommendations: See Data Bus Shield Grounding Requirements on page 19.
22
Network Guide
BACnet MS/TP Communication Bus Fundamentals
Device Addressing
Device addressing allows the coordinated transfer of messages between the intended
devices on the BACnet MS/TP data bus and with devices connected to the internetwork. For
this, each device connected to the BACnet MS/TP data bus is identified by a MAC address,
a Device Instance number, and a Network Number:
The MAC Address uniquely identifies a device on a Network (identified by a Network
Number). Devices on another Network can have the same MAC Address as messages
are not passed at the internetwork level using the MAC Address. The MAC Address also
defines the devices on the data bus that are Masters and Slaves, among other
categories (see Table 2-6). The MAC Address is also used to share data bus bandwidth
between devices through token passing between Master devices.
The Device Instance uniquely identifies a device across the BACnet internetwork. The
Device Instance is any number between 0 and 4 194 303. It is with the Device Instance
that messages are exchanged between BACnet devices. The Device Instance is also
used by routers to forward messages to devices located elsewhere in the internetwork.
Unlike a MAC Address, a Device Instance cannot be reused elsewhere in the BACnet
internetwork (it must be unique).
The Network Number is any number between 1 and 65 534. A network number identifies
a LAN for routing purposes.
Both the MAC Address and the Device Instance must be set for each device and are
essential for proper BACnet LAN operation.
For an example of how MAC address, Device Instance number, and Network Number apply
to a typical BACnet network, see Figure 2-16.
About the MAC Address
The MAC Address is a number from 0 to 255; however we recommend reserving some MAC
Addresses for common commissioning and maintenance tasks. For example, when a
portable adaptor is set to use one of these reserved MAC Addresses, it can be temporarily
connected with certainty to any data bus of any site without conflicting with other devices
already connected to the data bus.
MAC Addresses should be used as shown in the following table.
Network Guide
23
BACnet MS/TP Communication Bus Fundamentals
Table 2-6: Recommended BACnet MS/TP Bus MAC Address Values / Ranges for
BACnet MS/TP Bus Devices
MAC Address
Value / Range
Usage
Devices
Bus Master
(Building Controller)
EC-BOS
This address is invalid for Distech Controls
ECB devices
Temporary
commissioning
connection
Portable adaptor MAC Address for a
temporary commissioning and maintenance
connection
Reserved
Other
3-127
Master Range
Master devices: All Distech Controls
devices are master devices and should be in
this MAC Address range
128-254
Slave Range
Slave devices and network sensors
255
Broadcast
Do not apply address 255 to any device.
BACnet MS/TP Data Bus Token-Passing Overview
The BACnet MS/TP data bus protocol is a peer-to-peer, multiple-master protocol that shares
data bus bandwidth by passing a token between Master devices on the data bus that
authorizes the device that is holding the token to initiate communications on the data bus.
Once the device has completed its request(s), it closes the communications channel, passes
the token to the next Master device (making it the current Master), and liberates the data
bus.
The token is passed through a short message from device to device on the BACnet MS/TP
data bus in consecutive order starting from the lowest MAC address (MAC Address = 0) to
the next MAC Address.
Gaps or pockets of unassigned device MAC Addresses should be avoided as this reduces
bus performance. Every 50 requests, each master must poll for the next master that may
exist on the Data Bus. It is the timeout for each unassigned MAC Address that slows down
the data bus.
The way MAC Addresses are assigned is not a physical requirement: Devices can be daisychained on the data bus in any physical order regardless of their MAC Address sequence.
The goal is to avoid gaps in the device MAC Address range.
Slave devices cannot accept the token, and therefore can never initiate communications. A
Slave can only communicate on the data bus to respond to a data request addressed to it
from a Master device. Gaps in slave device MAC Addressing have no impact on BACnet
MS/TP data bus performance.
24
Network Guide
BACnet MS/TP Communication Bus Fundamentals
No MAC Address Gaps
EOL Terminator
MS/TP
Network # 10
EOL Internally Set
EOL
ON
EC-BOSAX
MAC: 0
DI: 10 000
MAC Address Gaps
MAC: 3
DI: 10 003
MAC: 4
MAC: 5
MAC: 6
DI: 10 004 DI: 10 005 DI: 10 006
MAC Address 1 & 2 are Reserved
for Maintenance Purposes
EOL Terminator
MS/TP
Network # 10
MS/TP
Network # 10
EOL Internally Set
EOL
ON
EC-BOSAX
MAC: 0
DI: 10 000
MAC: 3
DI: 10 003
MAC: 4
MAC: 25
MAC: 26
DI: 10 004 DI: 10 025 DI: 10 026
Avoid MAC Address Gap
EOL Internally Set
EOL
ON
EC-BOSAX
MAC: 0
DI: 10 000
EOL Terminator
MAC: 6
DI: 10 006
MAC Address 1 & 2
are Reserved for
Maintenance Purposes
MAC: 5
MAC: 3
MAC: 4
DI: 10 005 DI: 10 003 DI: 10 004
The Physical Order
of MAC Addresses
is Unimportant
Figure 2-12: Setting the Max Master on the Bus Master (Building Controller) to the
Highest MAC Address Used on the BACnet MS/TP Data Bus
About Tuning the Max Info Frames Parameter
Once a device has the token, it can make a number of information requests to other devices
on the BACnet intranetwork. The maximum number of requests is limited by the
Max Info Frames parameter. Ordinary BACnet MS/TP devices should have the
Max Info Frames parameter set to between 2 and 4. The Bus Master (Building Controller)
should have the Max Info Frames parameter set to 20.
About Tuning the Max Master Parameter
To prevent the passing of the token to unused MAC Addresses situated after the final Master
device, the Max Master must be set. By default, the Max Master for the Bus Master (Building
Controller) is set to 127 which allows for the theoretical maximum of 127 devices besides the
Bus Master to be connected to the data bus.
In practice, the actual number of devices connected to a data bus is far less, resulting in a
gap between the highest MAC Address of any device connected to the data bus and the
value set for Max Master. This gap unnecessarily slows-down the data bus with Poll for
Master requests.
When commissioning a BACnet MS/TP Data Bus, it is useful to start with the Max Master set
to 127 so as to be able to discover all devices connected to the data bus. Then, once all
devices have been discovered and the MAC Addressing is finalized by eliminating any gaps
in the address range, set the Max Master (maximum MAC Address) in the EC-BOS
(Building Controller) to the highest Master devices MAC Address number to optimize the
efficiency of the data bus.
Network Guide
25
BACnet MS/TP Communication Bus Fundamentals
Setting the Max Master and Max Info Frames
The Max Master and Max Info Frames are parameters used to optimize a BACnet MS/TP
Data Bus. This is set in the Bus Master (EC-BOS Building Controller) for the MS/TP port of
the Bus Master and for each BACnet MS/TP device connected on that port.
A Configure MS/TP Devices tool is available to automate this task. This tool:
Can only be used with a live database during commissioning. If you add more devices to
the data bus, you must run this tool again.
Automatically calculates the value for the Max Master by finding the highest Master
device MAC Address on the connected BACnet MS/TP data bus plus 1.
Sets the Max Master for all master devices including the Bus Master (EC-BOS).
Sets the Max Info Frames for all master devices excluding the Bus Master (EC-BOS).
For the Bus Master (EC-BOS), set the Max Info Frames to 20 in the screen shown in Figure
2-15 as this is a device that will make more requests for service from other devices on the
network. In general, according to the way a device is programmed, the Max Info Frames
may have to be set to a higher value than for other devices. For example, when Roof Top
Unit Controllers are used with VAV controllers that use gfxApplications code, they should
also have their Max Info Frames set to a higher value such as 5, as Roof Top Unit
Controllers poll VAV controllers for information.
Set the Max Master and Max Info Frames as follows.
1. Right-click the Link node in the Nav tree and select Ms/Tp Configuration.
Figure 2-13: Launching the Configure MS/TP Devices tool
2. The network must be live; the Status shown in Configure Ms/Tp devices window must
be {ok}.
26
Network Guide
BACnet MS/TP Communication Bus Fundamentals
Figure 2-14: Setting the Max Master on the Bus Master (EC-BOS) to the Highest MAC
Address Used on the BACnet MS/TP Data Bus
3. A confirmation message is shown.
4. Set the Max Info Frames to 20 for the Bus Master (EC-BOS) as shown in the screen
below.
Figure 2-15: Setting the Max Info Frames on the Bus Master (EC-BOS)
Default Device Instance Number Numbering System for Distech Controls controllers
By default, controllers from Distech Controls automatically self assign a Device Instance
number generated from the unique MAC Address assigned to the controller during
installation. The Device Instance number is calculated as follows:
Device Instance number = 364 X 1000 + MAC Address
Where 364 is Distech Controls unique BACnet Manufacturer ID.
This Numbering system is sufficient for a BACnet network that has only one Building
Controller. For larger BACnet networks that have more than one Building Controller (to form
a BACnet intranetwork), set the MAC Addresses, Device Instance Numbers and Network
Numbers according to the numbering scheme below.
Adopting a Numbering System for MAC Addresses, Device Instance Numbers, and
Network Numbers
Good network planning requires a well thought-out numbering scheme for device MAC
Addresses, Device Instance Numbers (DI), and Network Numbers. We recommend the
Network Guide
27
BACnet MS/TP Communication Bus Fundamentals
following scheme, as it reuses the MAC Address and Network Number in the Device
Instance number to make it easier for a network administrator to know where a device is
located in the network. This is shown below.
Table 2-7: Recommended Numbering Scheme for MAC Addresses, Instance Numbers,
and Network Numbers
Description
Range
Example
BACnet/IP Network Number
0 to 65 534
Building Controller BACnet/IP Device Instance
Numbers: Multiples of 10 000
10 000 to
4 190 000
10 000
20 000
BACnet MS/TP Network Number: Building Controller
BACnet/IP Device Instance Number/1000 + 0,1,2,3,4
(for each LAN)
10 to 4190
10
11
20
BACnet MS/TP Device Instance Number =
EC-BOS BACnet MS/TP Network Number * 1000 +
MAC Address
10 000 to
4 190 256
10 007 where
MAC = 7
An example of this numbering system is shown below.
- Data Bus Management
- Data Bus Integration
- Device Configuration and
programming
- Graphical Interface
Configuration
- Alarm
- Trend Log
- Schedule
EC-NetAX Supervisor
IP Network # 1
- User Interface
- Remote Access
- Embedded EC-NetAX Pro
EC-NetAX Pro
Web Browser
Ethernet, TCP/IP, BACnet/IP, LONWORKS IP, XML, HTTP, oBIX
IP Network # 1
EC-BOSAX
EC-BOS MAC on Network # 10 = 0
EOL Terminator
IP Network # 1
DI: 10 000
EC-BOS MAC on Network # 11 = 0
EOL Terminator
BACnet
Router
DI: 20 000
EC-BOS MAC on Network # 20 = 0
EOL Terminator
MAC: 3
DI: 10 003
MS/TP
Network # 10
MAC: 4
DI: 10 004
MAC: 3
DI: 11 003
MS/TP
Network # 11
MAC: 4
DI: 11 004
MAC: 5
DI: 10 005
EOL Internally Set
MS/TP
Network # 20
MAC: 4
DI: 20 004
MAC: 5
DI: 11 005
MAC: 6
DI: 10 006
EOL
ON
MAC: 3
DI: 20 003
EOL
ON
EOL Internally Set
MAC: 5
DI: 20 005
MAC: 6
DI: 11 006
EOL
ON
MAC: 6
DI: 20 006
EOL Internally Set
KEY:
DI: Device Instance
EOL: End of Line
MAC: Media Access Control
Figure 2-16: BACnet MS/TP Numbering System for MAC Addresses, Device Instance
Numbers, and Network Numbers
When discovering devices with an EC-BOS which has the routing option
configured, it will discover all BACnet devices connected to all EC-BOSes. Make
sure to add only the devices connected to the MS/TP port of the specific EC-BOS
being configured. Using this numbering system will greatly help to identify those
devices that should be added to a given EC-BOS.
Setting the MAC Address
The MAC Address on most devices can be set through a DIP switch located on its faceplate,
or though the software interface of a handheld device for example.
An example of how to set the devices MAC Address DIP switch is shown below for a
Distech Controls ECB-203 (and higher) controllers.
28
Network Guide
BACnet MS/TP Communication Bus Fundamentals
ON
Must be set to the
OFF (0) position
Figure 2-17: Typical Device MAC Address DIP Switch Set to 82
The address is the sum of the numbers set to ON. For example, if the second (2), fifth (16),
and seventh (64) DIP switches are set to ON, the device MAC address is 82 (2 + 16 + 64).
Addresses from 3 to 127 are recommended to be used (see Table 2-6). See also How to Set
a DIP Switch on page 75.
Once the MAC Address has been changed, the power to the device must be power cycled
for it to take effect.
For Distech Controls ECB-VAVS and ECB-VAV Series or ECB-103, the MAC Address is set
with an EC-Smart-Vue. See Commissioning with an EC-Smart-Vue on page 55.
For more information about how to set the devices MAC Address, refer to the devices
hardware installation guide.
Network Guide
29
BACnet MS/TP Communication Bus Fundamentals
Inter-Building BACnet Connection
BACnet network connections between buildings must be made using BACnet/IP or FOX as
shown below.
- Data Bus Management
- Data Bus Integration
- Device Configuration and
programming
- Graphical Interface
Configuration
- Alarm
- Trend Log
- Schedule
EC-NetAX Supervisor
IP Network # 2
IP
Router
IP Network # 3
- User Interface
- Remote Access
- Embedded EC-NetAX Pro
EC-NetAX Pro
Web Browser
BACnet/IP, Fox
IP Network # 3
IP Network # 1
BBMD
EC-BOSAX
EC-BOS MAC on Network # 10 = 0
EOL Terminator
DI: 10 000
EC-BOS MAC on Network # 11 = 0
EOL Terminator
BBMD
EC-BOSAX
DI: 20 000
EC-BOS MAC on Network # 20 = 0
EOL Terminator
MAC: 3
DI: 10 003
MS/TP
Network # 10
MAC: 4
DI: 10 004
MAC: 3
DI: 11 003
MS/TP
Network # 11
MAC: 4
DI: 11 004
MAC: 5
DI: 10 005
EOL
ON
EOL Internally Set
MAC: 3
DI: 20 003
MS/TP
Network # 20
MAC: 4
DI: 20 004
MAC: 5
DI: 11 005
MAC: 6
DI: 10 006
EOL
ON
MAC: 6
DI: 11 006
EOL Internally Set
Building #1
MAC: 5
DI: 20 005
EOL
ON
MAC: 6
DI: 20 006
EOL Internally Set
Building #2
KEY:
DI: Device Instance
EOL: End of Line
MAC: Media Access Control
Figure 2-18: Typical Inter-Building Connection Using BACnet/IP or FOX
BACnet/IP Broadcast Management Device Service
Though BACnet/IP or FOX uses IP protocol to communicate, a standard IP router does not
forward broadcast messages which are important in BACnet to identify services that are
available within the BACnet internetwork.
When two Building Controllers communicate to each other over a standard IP connection
that is separated by an IP router, both Building Controllers need the BACnet/IP Broadcast
Management Device (BBMD) service to be configured and operational.
The BBMD service identifies BACnet messages on the BACnet MS/TP network that are
intended for a device located on another BACnet network. The BBMD service encapsulates
these messages into an IP message to the appropriate BBMD service of the other BACnet
MS/TP network(s). The BBMD service on these networks strips out the encapsulation and
sends the BACnet message on to the appropriate devices.
When sending BACnet messages across a standard IP connection that has an IP router,
there must be one BBMD service running on each BACnet MS/TP network.
30
Network Guide
BACnet MS/TP Communication Bus Fundamentals
Power Supply Requirements
BACnet MS/TP is a Three Wire Bus
Even though data is transmitted over a 2-wire twisted pair, all EIA-485 transceivers interpret
the voltage levels of the differential signals with respect to a third voltage reference common
to all devices connected to the data bus (signal reference). In practice, this common signal
reference is provided by the buildings electrical system grounding wires that are required by
electrical safety codes worldwide. Without this signal reference, transceivers may interpret
the voltage levels of the differential data signals incorrectly, and this may result in data
transmission errors.
All Distech Controls devices use the 24V COM terminal as the signal reference point for the
data bus (see Table 2-1 for common device terminal labels). As a consequence, you must
wire the power supply (for any given number of devices) as shown in Figure 2-19, such that
the power bus that is connected to the 24V COM / C terminals are also connected at the
power supply to the buildings ground. This ensures that the 24V COM terminals of all
devices connected to any BACnet MS/TP bus in the building are at the same potential.
As specified by electrical safety codes worldwide, the buildings protective ground
network must not be used to conduct electrical current under normal conditions.
Such current can lift the reference voltage sensed at a controllers 24V COM
terminal, thus resulting in data transmission errors.
A mechanical ground is unacceptable: Do not use a pipe, conduit, or duct work for
a ground. The power supply must have a dedicated ground wire that comes from
the main electrical supply panel.
Any connection between buildings cannot be made with BACnet MS/TP. For
inter-building connections, it is recommended to use a BACnet/IP or FOX network
connection. Refer to Inter-Building BACnet Connection on page 30.
Power Supply
AC Power
Source
24 / 120 / 208 /
240 / 277 / 347 /
480 VAC, 1
BACnet Device
Fuse: 4A Max.
Fast Acting
24V AC/DC
24 VAC
24V COM
Electrical
System
Ground at
transformer
only
Maintain consistent
polarity when
connecting controllers
and devices to the
transformer.
The 24V COM / C
terminals of all devices
must be connected to
the power supply bus
that is grounded.
BACnet Thermostat
RC
C
Figure 2-19: The 24V COM / C Terminal of all Devices must be Connected to the
Grounded Power Supply Bus
The table below lists Distech Controls recommended power cable.
Network Guide
31
BACnet MS/TP Communication Bus Fundamentals
Table 2-8: Distech Controls Recommended Power Cable
Cable Type
AWG
Number of
Conductors
Non-Plenum Applications
(FT4)
Plenum Applications
(FT6)
Part Number
O.D. ()
Part Number
O.D. ()
18-2
07CBL-W181P-1002
5.0mm
0.20in.
07CBL-W181P-2051
5.0mm
0.20in.
16-2
07CBL-W161P-1031
4.8mm /
0.19in.
07CBL-W161P-2062
4.8mm /
0.19in.
14-2
07CBL-W141P-1081
7.2mm /
0.29in.
07CBL-W141P-2013
7.2mm /
0.29in.
Avoid Ground Lift
Power wiring runs should not be too long, nor have too many devices connected to it. Wiring
used to supply power to devices has a resistance that is proportional to the length of the
wiring run (see Table 2-9).
Table 2-9: Resistance of Common Copper Wire Sizes
AWG
Diameter ()
Area
Copper wire resistance
(inch)
(mm)
(kcmil)
(mm)
(/km)
(/1000 ft)
14
0.0641
1.628
4.11
2.08
8.286
2.525
16
0.0508
1.291
2.58
1.31
13.17
4.016
18
0.0403
1.024
1.62
0.823
20.95
6.385
If the power run from the power supply is relatively long and it supplies power to many
devices, a voltage will develop over the length of wire. For example, a 1000 ft of 18 AWG
copper wire has a resistance of 6.4 Ohms. If this wire is supplying 1 Ampere of current to
connected devices (as shown in Figure 2-20), the voltage developed across it will be 6.4
volts. This effect is called ground lift.
Electrical Power Run Length
Power Supply
AC Power
Source
24 / 120 / 208 /
240 / 277 / 347 /
480 VAC, 1
BACnet Device
Fuse: 4A Max.
Fast Acting
24V AC/DC
24 VAC
Reqv
Electrical
System
Ground
I=1A
24V COM
The equivalent resistance of a run of wire. For
example, a 1000 ft of 18 AWG copper wire
has a resistance of 6.4 Ohms. With 1 Ampere
of current, the voltage developed along the
length of the electrical power run for one
conductor will be 6.4 volts.
Figure 2-20: Ground Lift from a Long Power Run
Because the 24V COM terminal is the signal reference point for the data bus, ground lift
offsets the data bus voltage reference that is used to interpret valid data levels sent on the
data bus. If the ground lift is more than 7 volts peak, there is a risk of data corruption and
offline events due to the device being incapable of correctly reading data signals from the
data bus.
Techniques to Reduce Ground Lift
Reduce the impact of ground lift as follows:
32
Network Guide
BACnet MS/TP Communication Bus Fundamentals
Use a heavier gauge wire.
Add more wire runs. Connect these wire runs to the power supply in a star pattern.
For controllers that accept DC power (without triac outputs): Specify a 24 DC power
supply. The continuous and even voltage of a DC power supply makes more efficient
use of the power handling capabilities of a power run. A 24 DC power supply eliminates
the 2.5 multiplication factor associated with the peak AC current being 2.5 times the
average RMS AC current. See below.
Peak Current
Particular attention should be paid to the peak current absorbed by devices that are powered
by an AC circuit. All Distech Controls devices use half-wave rectifiers to supply their onboard
electronics (this is common with most controls manufacturers). With this configuration, the
peak AC current is approximately 2.5 times the average RMS AC current.
Transformer Selection and Determining the Maximum Power Run Length
Distech Controls devices are Class 2 Products. To conform to Class 2 installation
requirements, only use transformers of 100VA or less to power the device(s).
For VAV devices, determine the maximum number of VAVs that can be supplied by a single
power run cable supplied by a 100 VA transformer, according to the cables wire gauge and
the total cable length from the following table.
Table 2-10: Maximum Number of VAV Devices on a Power Run
AWG
Power Run Total
Cable Length
Maximum
Number of
Devices @ 7
VA per device1
Maximum
Number of
Devices @ 10
VA per device2
Maximum
Number of
Devices@ 15
VA per device3
144
75M (250 feet)
14
60M (200 feet)
14
45M (150 feet)
14
30M (100 feet)
16
60M (200 feet)
16
45M (150 feet)
16
30M (100 feet)
18
45M (150 feet)
18
30M (100 feet)
1.
2.
3.
4.
Typical VAV with 1 EC-Smart-Vue and actuator activated. No external loads.
Typical VAV with 1 EC-Smart-Vue, 2 triac loads (1.6 VA each), 1 analog output (20 mA), and actuator
activated.
Typical VAV with 1 EC-Smart-Vue, 4 triac loads (1.6 VA each), 2 analog outputs (20 mA each), and
actuator activated.
Device terminals are not capable of accepting two 14 AWG wires (when daisy-chaining devices). Use a
wire nut with a pig tail to make such a connection.
Any installation condition that is outside of the parameters of Table 2-10 should be avoided.
For non-VAV devices, determine the appropriate size transformer for the job as follows:
1. Add up the power requirements of all devices plus all connected output loads. Multiply
the total power needed by a multiplier of 1.3, as a security margin. For example, to
power five devices (15 VA each), the total load is 75 VA multiplied by 1.3 is 98 VA.
Choose a size of transformer just over this amount: For example, a 100 VA model.
2. When the total load of a number of devices requires a transformer with a rating greater
than 100 VA, use two or more transformers. Ensure that the load to be connected to
each transformer follows the guideline of Step 1 above.
Network Guide
33
BACnet MS/TP Communication Bus Fundamentals
Always use a separate transformer for each ECB-600 series controller and its
associated I/O Extension Modules.
Use an external fuse on the 24VAC side (secondary side) of the transformer, as shown in
Figure 2-19, to protect all controllers against power line spikes.
Maintain consistent polarity when connecting controllers and devices to the transformer, as
shown in Typical Device BACnet MS/TP LAN and Power Wiring Diagram on page 35. That
is, the 24V COM terminal of each controller and each peripheral must be connected to the
same terminal on the secondary side of the transformer. This transformer terminal must be
connected to the buildings ground. This ensures that the 24V COM terminals of all devices
connected to any BACnet MS/TP bus in the building are at the same potential.
34
Network Guide
Network Guide
24 VAC
Fuse: 4A Max.
Fast Acting
24V AC/DC
24V COM
Data Bus Shield:
Isolate with
electrical tape
24V COM
Electrical
System
Ground
24V AC/DC
Data Bus Shields: Twist
together and Isolate
with electrical tape
EOL OFF
EOL OFF
EOL OFF
Typical BACnet Device
NET+
NET-
First and last daisy-chained device:
- EOL Jumpers are ENABLED
All other Devices:
- EOL Jumpers are DISABLED
Data Bus: Shielded Twisted Pair Cable
Data Bus Shields: Twist
together and Isolate
with electrical tape
Typical BACnet Device
Data Bus Shields: Twist
together and Isolate
with electrical tape
Typical BACnet Device
24V COM
EOL ON
24V AC/DC
Typical BACnet Device
24V COM
Beware of Ground Lift. Too much current
over long wire runs can raise the ground
reference at the 24V COM terminals,
causing data bus transmission errors.
24V AC/DC
DC Power
Source
Equivalent
Fuse: 4A Max.
Fast Acting
24 VDC
AC Power
Source
(Mains)
When two or more devices share a single
power source, maintain polarity between
devices. For example, the 24V AC/DC
terminal of all devices must be connected
to the same power supply bus.
24VAC
OR
The shield of the data bus
must also be connected to
the electrical system
ground at only one point
usually at one end of the
bus as shown
Dedicated 24VAC Transformer
Neither side of secondary
connected to Electrical System
Ground
AC Power
Source
(Mains)
Data Bus Shield: Connect
to the S terminal
Electrical
System Ground
RS-485
Typical EC-BOS Device
12
24VDC
24VDC Power Supply, Polarity
is Not Critical No side should be connected
to Electrical System Ground
OPTIONALLY set the
EOL jumper internally
AND add a 120 Ohm
resistor as shown here
EOL ENABLED: For the
EC-BOS as a first or last
daisy-chained device:
Power
Input
EC-NPB-PWR
EC-NPB-PWRUN
Power
Module
BACnet MS/TP Communication Bus Fundamentals
Typical Device BACnet MS/TP LAN and Power
Wiring Diagram
An overview of the BACnet MS/TP LAN and power wiring is shown below.
NET+
NET-
NET+
NET-
NET+
NET-
35
LonWorks Communication Bus Fundamentals
CHAPTER 3
LONWORKS COMMUNICATION BUS
FUNDAMENTALS
This chapter describes the LONWORKS Communications Bus operating principals.
In This Chapter
Topic
36
Page
Network Architecture
37
TP/FT-10 Network Topologies
38
Network Cables
40
Extending the Network
42
Grounding a Network
43
Power Supply Requirements
44
Network Guide
LonWorks Communication Bus Fundamentals
Network Architecture
EC-NetAX Network Architecture
Single-Segment EC-NetAX Network
A single-segment EC-NetAX Network shown with EC-NetAX Supervisor and EC-NetAX Pro.
- Data Bus Management
- Data Bus Integration
- Device Configuration and
programming
- Graphical Interface
Configuration
- Alarm
- Trend Log
- Schedule
EC-NetAX Supervisor
- User Interface
- Remote Access
- Embedded EC-NetAX Pro
EC-NetAX Pro
Web Browser
Ethernet, TCP/IP, BACnet/IP, LONWORKS IP, XML, HTTP, oBIX
EC-BOSAX
LONWORKS Data Bus Segment
Segment 1
Central Plant
Air Handling Controllers
Figure 3-1: Single-Segment EC-NetAX Network
Inter-Building LONWORKS Connection
LONWORKS network connections between buildings must be made using TCP/IP with FOX
as shown below.
- Data Bus Management
- Data Bus Integration
- Device Configuration and
programming
- Graphical Interface
Configuration
- Alarm
- Trend Log
- Schedule
EC-NetAX Supervisor
IP Network # 2
IP
Router
IP Network # 3
- User Interface
- Remote Access
- Embedded EC-NetAX Pro
EC-NetAX Pro
Web Browser
TCP/IP with FOX
IP Network # 3
IP Network # 1
EC-BOS
AX
EC-BOSAX
Building #1
Building #2
Figure 3-2: Typical Inter-Building Connection Using IP/FOX
Network Guide
37
LonWorks Communication Bus Fundamentals
TP/FT-10 Network Topologies
The physical routing of the communication channel defines the network topology. The
channel and transceiver types define the requirements and limitations of each wiring
topology.
TP/FT-10 network segments require termination for proper data transmission performance.
Free topology and bus network topology differ in their termination requirements. The
following sections describe the various network topologies, their terminator types and
termination procedures.
Bus Topology
A bus topology is a physical routing of the communication channel that includes a distinct
beginning and end. It is also known as a daisy-chain topology.
...
Figure 3-3: Bus Topology
TP/FT-10 Bus Topology Network Termination
For bus topology type networks, use the following terminators at each end of the bus
topology channel (2 terminators per channel in total):
+
C1
R1
C2
R1 = 105, 1%, W
C1 = 100F, 50V
C2 = 100F, 50V
Distech Controls Part Number:
PDIDI-BT-TP10XX
It is recommended to use a bus topology when designing a network. Bus
topologies are the easiest to troubleshoot and the maximum wiring length in a
bus topology is greater than that for a free topology. See the section for
detailed information about wiring lengths and network cable considerations.
Free Topology
Free topology is a flexible wiring structure for communication channels that include ring, star,
loop and/or combination wiring structures. A free topology does not have restrictions such as
branching restrictions, stub length limits, device separation requirements or strict termination
guidelines. The free topology transmission specification only has two requirements that must
be met for proper system operation. The distance from each transceiver to all other
transceivers and to the termination must not exceed the maximum node-to node distance. If
multiple paths exist (i.e. a loop topology) then the longest path should be used for
calculations. The maximum total wire length is the total length of wire within a segment. See
the section for detailed information about wiring lengths and network cable considerations.
38
Network Guide
LonWorks Communication Bus Fundamentals
Figure 3-4: Free Topology
TP/FT-10 Free Topology Network Termination
For free topology type networks (TP/FT-10 only), use the terminator shown below for each
free topology channel. It is recommended to always place the terminator near the router for
consistency.
+
C1
R1
C2
Network Guide
R1 = 52.3, 1%, W
C1 = 100F, 50V
C2 = 100F, 50V
Distech Controls Part Number:
PDIDI-FT-TP10XX
39
LonWorks Communication Bus Fundamentals
Network Cables
The following section identifies the type of cabling that may be used in a TP/FT-10 twisted
pair LONWORKS network. The recommendations presented herein are intended to assist
network integrators and OEMs and are provided for informational purpose only.
For more information and detailed explanations on network topology and wire length
restrictions refer to the Junction Box and Wiring Guideline for Twisted Pair LonWorks
Networks. These guides can be downloaded from Echelons web site at www.echelon.com.
As a general rule, the TP/FT-10 channel communication cables should not
be run close to high voltage power cables.
All wiring must comply with applicable national, state and local wiring
electrical codes, ordinances, and regulations.
Parameter
Details
Nickname
Free Topology
Raw Bit rate
78kbps
Packets per second
144/168
Peak traffic
180/210
Topology
Free, Bus
Termination
Maximum number of
devices per segment
64
One per segment in free topology
Two per segment in bus topology
A maximum of 128 devices per channel can be
installed on a TP/FT-10 when a router or
repeater is used. See Extending the Network on
page 42 for more information.
Table 3-1 TP/FT-10 Channel Attributes
TP/FT-10 Cable specifications
Two types of cable are recommended for TP/FT-10 channel installations.
Type 1:
22 AWG (0.65mm), 1 twisted pair (1P), stranded conductor (STR), tinned copper (TNC),
PVC insulation, PVC jacket, unshielded, plenum FT6, CSA 600V, UL 300V.
Parameter
Details
Conductor Gauge (AWG)
22 AWG
Conductor Count
2 Conductors (twisted pair)
Conductor Type
Stranded conductor
Material
Tinned copper
Plenu:
Plenum rated
NEC Rating
UL listed art 800 plenum
CSA
Flame rated
Table 3-2 TP/FT-10 Type 1 Cable Attributes
40
Network Guide
LonWorks Communication Bus Fundamentals
Untwisted wires or cables containing flat or parallel untwisted conductors must not
be used on an LONWORKS twisted pair channel. The use of theses wires/cables may
result in improper network operation and could, in certain circumstances, result in
damage to nodes connected to such a channel.
In a bus topology, the maximum wire length is 1400 meters (4593 feet). The maximum stub
length on a TP/FT-10 channel is 3 meters (10 feet). A stub is a section of unterminated
transmission line that branches off the main transmission line of interest. The branch line is
terminated as an open circuit.
In a free topology, the maximum length is 400 meters (1312 feet) node-to-node and 500
meters (1640 feet) total wire length.
In the event that the limits on the number of transceivers or total wire distance are
exceeded, then one FTT physical layer repeater can be added to interconnect two
segments and double the overall system capability.
Type 2:
16 AWG (1.3mm), 1 twisted pair (1P), stranded conductor (STR), tinned copper (TNC),
PVC insulation, PVC jacket, unshielded, plenum FT6, CSA 600V or UL 300V.
Parameter
Details
Conductor Gauge (AWG)
16 AWG
Conductor Count
2 Conductors (twisted pair)
Conductor Type
Stranded conductor
Material
Tinned copper
Plenu:
Plenum rated
NEC Rating
UL listed art 800 plenum
CSA
Flame rated
Table 3-3: TP/FT-10 Type 2 Cable Attributes
In bus topology, the maximum wire length is 2700 meters (8858 feet). The maximum stub
length on a TP/FT-10 channel is 3 meters (10 feet).
In free topology, the maximum length is 500 meters (1640 feet) node-to-node and 500
meters (1640 feet) total wire length.
For more information about extending the network to a sensor, see Connecting to
the LAN through an EC-Smart-Vue on page 57.
Network Guide
41
LonWorks Communication Bus Fundamentals
Extending the Network
In the event that the limits on the number of transceivers or total wire distance are exceeded,
then one repeater or a router can be added to interconnect two segments and double the
overall system capability.
A maximum of 128 devices per channel can be installed on a TP/FT-10. However, after 64
devices you must add a repeater in order to add more devices up to the 128 device limit.
Alternately, once you have 64 devices on an FT-10 channel you can add a router instead of
a repeater. However the router will create a new channel for your new devices. A router
recommended for optimal performance.
Bus Toplogy
Repeater
or
Router
...
T
T
Bus Toplogy
...
Figure 3-5: Repeater or Router
42
Network Guide
LonWorks Communication Bus Fundamentals
Grounding a Network
Grounding Shielded Twisted Pair Cable
When using Shielded Twisted Pair, terminate the twisted pair and ground the cable shield,
as shown in Figure 3-6.
Figure 3-6: Grounding Shielded Twisted Pair Cable
It is recommended to use shielded cable only when the network cable is outside of
the building since it will be subjected to electromagnetic interference (EMI).
The twisted pair is terminated according to the guidelines listed in the previous sections. The
cable shield should be grounded using a capacitor to tie the shield to earth ground and a
large value resistor should be used to bleed off any static charge on the shield.
Tie the shield to earth ground through a capacitor, instead of with a direct connection. This
prevents DC and 50/60 Hz ground paths from forming through the shield. Typical values for
Cc and Rb are as follows:
Cc = 0.1 F, 10%, Metalized Polyester, 100V
Rb = 470k, 1/4W, 5%
The cable shield should be grounded at least once per segment, and preferably at each
node. Grounding the shield at every node (using the shield grounding circuit shown in Figure
3-6) will assist in suppressing 50/60Hz standing waves.
Building Entrance Protection
Use shielded twisted pair wire for networks, or portions of networks, that are run outside of
buildings. The shield should be connected to earth at each building entry point via a data-line
lightning/surge arrester, to conduct lightning strike energy or power surges directly to ground
and prevent their entry into the building via the control systems network. Data-line
lightning/surge arresters should also be used at each building entrance and should be
connected to the network data lines. Refer to the LonWorks FTT-10A Free Topology
Transceiver Users Guide available from Echelon, for more information about building
entrance protection.
Network Guide
43
LonWorks Communication Bus Fundamentals
Power Supply Requirements
For any given number of devices, wire the power supply as shown in Figure 3-7 and Figure
3-8, such that the power bus that is connected to the 24V COM terminals are also connected
at the power supply to the buildings ground.
As specified by electrical safety codes worldwide, the buildings protective ground
network must not be used to conduct electrical current under normal conditions.
A mechanical ground is unacceptable: Do not use a pipe, conduit, or duct work for
a ground. The power supply must have a dedicated ground wire that comes from
the main electrical supply panel.
Controller 1
24V AC
24V COM
Controller 2
24V AC
24V COM
Fuse: 4 A Max.
Fast Acting
24 VAC
AC
Transformer
Electrical System Ground
- At Transformer Only
Figure 3-7:
Power wiring AC: The 24V COM Terminal of all Devices must be
Connected to the Grounded Power Supply Bus
Controller 1
24V AC/DC
24V COM
Controller 2
24V AC/DC
24V COM
Fuse: 4 A Max.
Fast Acting
24 VDC
Electrical System Ground
- At Power Supply Only
Figure 3-8:
Power wiring DC: The 24V COM Terminal of all Devices must be
Connected to the Grounded Power Supply Bus
The table below lists Distech Controls recommended power cable.
Table 3-4: Distech Controls Recommended Power Cable
Cable Type
AWG
Number of
Conductors
Non-Plenum Applications
(FT4)
Plenum Applications
(FT6)
Part Number
O.D. ()
Part Number
O.D. ()
18-2
07CBL-W181P-1002
5.0mm
0.20in.
07CBL-W181P-2051
5.0mm
0.20in.
16-2
07CBL-W161P-1031
4.8mm /
0.19in.
07CBL-W161P-2062
4.8mm /
0.19in.
14-2
07CBL-W141P-1081
7.2mm /
0.29in.
07CBL-W141P-2013
7.2mm /
0.29in.
Transformer Selection and Determining the Maximum Power Run Length
Distech Controls devices are Class 2 Products. To conform to Class 2 installation
requirements, only use transformers of 100VA or less to power the device(s).
For VAV devices, determine the maximum number of VAVs that can be supplied by a single
power run cable supplied by a 100 VA transformer, according to the cables wire gauge and
the total cable length from the following table.
44
Network Guide
LonWorks Communication Bus Fundamentals
Table 3-5: Maximum Number of VAV Devices on a Power Run
AWG
Power Run Total
Cable Length
Maximum
Number of
Devices @ 7
VA per device1
Maximum
Number of
Devices @ 10
VA per device2
Maximum
Number of
Devices@ 15
VA per device3
144
75M (250 feet)
14
60M (200 feet)
14
45M (150 feet)
14
30M (100 feet)
16
60M (200 feet)
16
45M (150 feet)
16
30M (100 feet)
18
45M (150 feet)
18
30M (100 feet)
1.
2.
3.
4.
Typical VAV with 1 EC-Smart-Vue and actuator activated. No external loads.
Typical VAV with 1 EC-Smart-Vue, 2 triac loads (1.6 VA each), 1 analog output (20 mA), and actuator
activated.
Typical VAV with 1 EC-Smart-Vue, 4 triac loads (1.6 VA each), 2 analog outputs (20 mA each), and
actuator activated.
Device terminals are not capable of accepting two 14 AWG wires (when daisy-chaining devices). Use a
wire nut with a pig tail to make such a connection.
Any installation condition that is outside of the parameters of Table 3-5 should be avoided.
For non-VAV devices, determine the appropriate size transformer for the job as follows:
1. Add up the power requirements of all devices plus all connected output loads. Multiply
the total power needed by a multiplier of 1.3, as a security margin. For example, to
power five devices (15 VA each), the total load is 75 VA multiplied by 1.3 is 98 VA.
Choose a size of transformer just over this amount: For example, a 100 VA model.
2. When the total load of a number of devices requires a transformer with a rating greater
than 100 VA, use two or more transformers. Ensure that the load to be connected to
each transformer follows the guideline of Step 1 above.
Always use a separate transformer for each ECL-600 series controller and its
associated I/O Extension Modules.
Use an external fuse on the 24VAC side (secondary side) of the transformer, as shown in
Figure 3-7 and Figure 3-8, to protect all controllers against power line spikes.
Maintain consistent polarity when connecting controllers and devices to the transformer.
That is, the 24V COM terminal of each controller and each peripheral must be connected to
the same terminal on the secondary side of the transformer. This transformer terminal must
be connected to the buildings ground.
Network Guide
45
Subnetwork Installation Guidelines
CHAPTER 4
SUBNETWORK INSTALLATION GUIDELINES
This chapter describes the Extension and Room Sensor Bus Installation Guidelines.
In This Chapter
Topic
46
Page
About the Subnetwork Bus
47
ECx-4XX Subnetwork Bus
48
EC-Smart-Vue Subnetwork Bus
52
Network Guide
Subnetwork Installation Guidelines
About the Subnetwork Bus
Introduction
The subnetwork bus uses the EIA-485 standard for data transmission. The ECB-600 and
ECL-600 controllers use this bus to support the ECx-4XX Series I/O Extension Modules
through a 2-wire shielded cable.
All Distech Controls ECB-600 and ECL-600 series controllers also use the subnetwork bus
to support one or more EC-Smart-Vue(s) using standard structural cabling. For the
EC-Smart-Vue, the subnetwork bus also extends the LAN to the EC-Smart-Vue room sensor
to provide convenient network access for maintenance and troubleshooting purposes (see
Connecting to the LAN through an EC-Smart-Vue on page 57).
Sub-Network Bus Total Length: 300 m (1 000 ft) Maximum
EC-Smart-Vue Sub-Network Bus: 200 m (650 ft)
Maximum
ECx-4XX Sub-Network Bus: 300 m (1 000 ft)
Maximum
Typical ECx-4XX Series Extension I/O Modules For use
with an ECB-600 / ECL-600 Series Controller Only
Typical ECB-600 /
ECL-600 Controller
EC-Smart-Vue Sub-Network Bus Cat 5e Cable with RJ-45 Connectors
ECx-4XX Sub-Network Bus
LAN Access
Connector
2-Wire Shielded
Typical Adaptor /
Network Interface
- Temporary
Commissioning and
Maintenance
Connection
- No EOL Resistors are
Necessary
EC-Net Pro
Figure 4-1: Subnetwork Bus Overview Showing the EC-Smart-Vue Subnetwork Bus
and the ECx-4XX Subnetwork Bus
Subnetwork Bus Total Length
The total maximum length of all subnetwork buses, including both the length of the
EC-Smart-Vue subnetwork bus and the ECx-4XX subnetwork bus is 300 m (1 000 ft). The
maximum length of the EC-Smart-Vue subnetwork bus is 200 m (650 ft). The maximum
length of the ECx-4XX subnetwork bus is 300 m (1 000 ft).
Network Guide
47
Subnetwork Installation Guidelines
ECx-4XX Subnetwork Bus
Introduction
The ECx-4XX subnetwork bus is used to connect ECx-4XX Series I/O Extension Modules to
an ECB-600 or ECL-600 controller.
ECx-4XX Subnetwork Bus is Polarity Sensitive
The polarity of the ECx-4XX subnetwork bus must be respected as shown in Figure 4-4. All
terminals identified as SUBNET+ must be connected to the same conductor. Likewise, all
terminals identified as SUBNET- must be connected to the same conductor.
ECx-4XX Subnetwork Bus Physical Specifications and Cable
Requirements
Cables composed of stranded conductors are preferred over solid conductors as stranded
conductor cable better resist breakage during pulling operations. Distech Controls highly
recommends the following ECx-4XX subnetwork bus cable specifications be respected.
Table 4-1: ECx-4XX Subnetwork Bus Physical Specifications and Cable Requirements
Parameter
Details
Maximum number of ECx-4XX Series I/O
Extension Modules
Media
Shielded, twisted pair
Characteristic impedance
100-130 Ohms
Distributed capacitance
Less than 100 pF per meter (30 pF per
foot)
Maximum length of the EC-Smart-Vue
subnetwork bus and the ECx-4XX
subnetwork bus (total length)
300 m (1 000 ft) Maximum
Polarity
Polarity sensitive
Multi-drop
Daisy-chain (no T-connections, no
routers)
EOL terminations
Built-in. Must be set / enabled on the last
I/O Extension Module only.
Shield grounding
See ECx-4XX Subnetwork Bus Shield
Grounding Requirements on page 50
Distech Controls recommended cable is shown below.
Table 4-2: Distech Controls Recommended Cable Types for the ECx-4XX Subnetwork
Bus
Bus Cable Type
Part Number
O.D. ()
300 meters (1000 feet), 24 AWG Stranded, Twisted
Pair Shielded Cable FT6, Rated for Plenum
Applications
07CBL-BACNET
3.75mm
(0.148 in.)
ECx-4XX Subnetwork Bus Topology and End-of-Line
Terminations
Only a daisy-chain topology is acceptable for the ECx-4XX subnetwork bus. T-connections
and routers are not allowed.
48
Network Guide
Subnetwork Installation Guidelines
When ECx-4XX I/O Extension Modules are installed with an ECB-600 / ECL-600, only the
EOL terminations of the ECB-600 / ECL-600 and the last ECx-4XX are set to ON. All other
ECx-4XX I/O Extension Modules must have their EOL terminations set to OFF. This is
shown below.
Typical ECx-4XX Series Extension I/O Modules For use
with an ECB-600 / ECL-600 Series Controller Only
Typical ECB-600 /
ECL-600 Controller
ECx-4XX Sub-Network Bus
2-Wire Shielded
Inside
ECx-4XX
Inside
ECx-4XX
EOL OFF
EOL OFF
EOL ON
EOL ON
For ECx-4XX:
For ECB-600 / ECL-600, the
Sub-Network EOL is set to ON
Last daisy-chained ECx-4XX:
EOL Jumper is ON
All other ECx-4XX:
EOL Jumpers are OFF
Figure 4-2: Setting the EOL Terminations on the ECx-4XX Subnetwork Bus
When ECx-4XX I/O Extension Modules are installed with an ECB-600 / ECL-600 and with
EC-Smart-Vue sensor(s), only the EOL terminations the last ECx-4XX and the last EC Smart
Vue are set to ON. All other ECx-4XX I/O Extension Modules and EC-Smart-Vues must
have their EOL terminations set to OFF. This is shown below.
Typical ECB-600 /
ECL-600 Controller
EC-Smart-Vue Sub-Network Bus Cat 5e
Cable with RJ-45 Connectors
Typical ECx-4XX Series Extension I/O Modules For use
with an ECB-600 / ECL-600 Series Controller Only
ECx-4XX Sub-Network Bus
2-Wire Shielded
Inside
ECx-4XX
Back of
EC-Smart-Vue
OFF
EOL
ON
EOL OFF
For EC-Smart-Vue:
- Last daisy-chained EC-Smart-Vue:
EOL Jumper is ON
- All other EC-Smart-Vue:
EOL Jumpers are OFF
EOL ON
For ECx-4XX:
-
Last daisy-chained ECx-4XX:
EOL Jumper is ON
All other ECx-4XX:
EOL Jumpers are OFF
Figure 4-3: Setting the EOL Terminations on the ECx-4XX Subnetwork Bus when
EC-Smart-Vue Sensors are used
ECx-4XX devices and EC-Smart-Vue sensors are factory-set with the EOL set to OFF by
default.
Network Guide
49
Subnetwork Installation Guidelines
ECx-4XX Subnetwork Bus Shield Grounding Requirements
The best protection against interference is to use properly grounded shielded cable for the
ECx-4XX subnetwork bus. For this, the I/O Extension Modules on the ECx-4XX subnetwork
bus must be daisy-chained together with the cable shield twisted together and isolated with
electrical at each I/O Extension Module.
When using an ECB-600 / ECL-600, the shielding of the ECx-4XX subnetwork bus cable
must be connected to the electrical system ground at one point only.
ECx-4XX SubNetwork Bus
SUBNET -
Data Bus: Shielded
Twisted Pair Cable
ECx-4XX Sub-Network Bus
Shields: Twist together and
Isolate with electrical tape
Electrical
System
Ground
SUBNET +
ECx-4XX
SUBNET +
SUBNET -
ECx-4XX
SUBNET+
SUBNET -
ECB-600
ECL-600
ECx-4XX SubNetwork Bus
Shield: Isolate
with electrical
tape
Figure 4-4: ECB-600 / ECL-600: ECx-4XX Subnetwork Bus Shielding
ECx-4XX I/O Extension Module Addressing
Each I/O Extension Module on an ECx-4XX subnetwork bus needs to be set to a unique
address. The range of valid addresses is 1 to 7.
Table 4-3: I/O Extension Module Address DIP Switch Settings
Switch Position
Value
OFF
OFF
OFF
Invalid
ON
OFF
OFF
OFF
ON
OFF
ON
ON
OFF
OFF
OFF
ON
ON
OFF
ON
OFF
ON
ON
ON
ON
ON
An example of how to set an I/O Extension Module address DIP switch is shown below.
50
Network Guide
Subnetwork Installation Guidelines
ON
Must be set to the
OFF (0) position
Figure 4-5: Typical I/O Extension Module Address DIP Switch Set to 2
Power Supply Requirements
The ECB-600 / ECL-600 and the associated I/O Extension Modules must have their own
dedicated power supply. To size the power supply transformer, see Transformer Selection
and Determining the Maximum Power Run Length on page 33.
The ECx-4XX subnetwork bus is a three-wire bus that has specific installation requirements:
Follow all requirements described in Power Supply Requirements on page 31 for the ECB600 / ECL-600 and the associated I/O Extension Modules.
Network Guide
51
Subnetwork Installation Guidelines
EC-Smart-Vue Subnetwork Bus
Introduction
The EC-Smart-Vue subnetwork bus is used to connect EC-Smart-Vue sensors to any
Distech Controls ECB controller or ECL-600 controller.
Never connect an IP network to the SUBNET PORT connector of a controller or to
an EC-Smart-Vue. Equipment damage may result.
EC-Smart-Vue Subnetwork Bus Cable Requirements
The EC-Smart-Vue subnetwork bus uses common Cat5e structural cabling fitted with RJ-45
connectors. If you make your own patch cable, use Category 5e cable and crimp the RJ-45
connectors at both ends of the cable either as T568A or T568B.
Table 4-4: EC-Smart-Vue Subnetwork Bus Physical Specifications and Cable
Requirements
Parameter
Details
Maximum number of EC-Smart-Vue
Room Sensors
See Controller Data Sheet
Media
Cat 5e Patch Cable with RJ-45
Connectors
RJ-45 Pin Configuration
Four (4) pairs required. Straight-through
wiring. Crimp connectors as per T568A or
T568B (both cable ends must be crimped
the same way).
See Table 4-5 and Figure 4-6.
Characteristic impedance
100-130 Ohms
Distributed capacitance
Less than 100 pF per meter (30 pF per
foot)
Maximum length of the EC-Smart-Vue
subnetwork bus and the ECx-4XX
subnetwork bus
300 m (1 000 ft) Maximum
Maximum EC-Smart-Vue subnetwork bus
Length
200 m (650 ft) Maximum
Polarity
Polarity sensitive
Multi-drop
Daisy-chain (no T-connections)
EC-Smart-Vue room sensors have two
RJ-45 female pass-through connectors to
facilitate daisy-chain connections
EOL terminations
Must be set / enabled on the last room
sensor only
Shield grounding
Not applicable
Crimp both ends of the cable either as T568A or T568B as shown below.
52
Network Guide
Subnetwork Installation Guidelines
Table 4-5: T568A and T568B Terminations for an RJ-45 Connector
Pin
1
T568A (at both cable ends)
T568B (at both cable ends)
Pair
Pair
Color
2
white/green stripe
white/orange stripe
2
green solid
orange solid
3
white/orange stripe
white/green stripe
1
blue solid
5
blue solid
1
white/blue stripe
white/blue stripe
3
orange solid
green solid
4
white/brown stripe
Color
white/brown stripe
4
brown solid
brown solid
The final result of a crimped RJ-45 connector is shown graphically below.
T568A
T568B
1 2 3 4 5 6 7 8
Key:
1 2 3 4 5 6 7 8
Stripe Solid
Pair 3 Pair 1 Pair 2 Pair 4
Pair 2 Pair 1 Pair 3 Pair 4
Figure 4-6: Pins on RJ-45 Jack Face
Distech Controls recommends the cables shown below. Cables fitted with connectors are
wired as T568B.
Table 4-6: Distech Controls Recommended Cable Types for the EC-Smart-Vue
Subnetwork Bus
Bus and Cable
Type
Non-Plenum Applications (Use in
Conduit - FT4)
Part Number
9m (30 ft), Cat 5e Cable 07CBL-PATCHCORD30-FT4
fitted with RJ-45
Connectors
15m (50 ft), Cat 5e Cable 07CBL-PATCHCORD50-FT4
fitted with RJ-45
Connectors
22m (75 ft), Cat 5e Cable 07CBL-PATCHCORD75-FT4
fitted with RJ-45
Connectors
30m (100 ft), Cat 5e
07CBL-PATCHCORD100-FT4
Cable fitted with RJ-45
Connectors
Network Guide
O.D. ()1
Plenum Applications (FT6)
Part Number
O.D. ()1
4.6mm (0.18in.)
07CBL-PATCHCORD30-FT6
4.6mm (0.18in.)
4.6mm (0.18in.)
07CBL-PATCHCORD50-FT6
4.6mm (0.18in.)
4.6mm (0.18in.)
07CBL-PATCHCORD75-FT6
4.6mm (0.18in.)
4.6mm (0.18in.) 07CBL-PATCHCORD100-FT6 4.6mm (0.18in.)
53
Subnetwork Installation Guidelines
Bus and Cable
Type
Non-Plenum Applications (Use in
Conduit - FT4)
O.D. ()1
Part Number
300 meters (1000 feet),
Cat 5e Cable Without
Connectors
100 Crimp RJ-45
Connectors
Plenum Applications (FT6)
O.D. ()1
Part Number
07CBL-W244P-1446WHTB
4.6mm (0.18in.)
07CBL-W224P-2176WHTB
4.6mm (0.18in.)
07CBL-PATCHCONNECTOR
N/A
07CBL-PATCHCONNECTOR
N/A
Outer Cable diameter This does not factor the RJ-45 connector.
EC-Smart-Vue Subnetwork Bus Topology and End-of-Line
Terminations
Only a daisy-chain topology is acceptable for the EC-Smart-Vue subnetwork bus. Tconnections are not allowed. EC-Smart-Vue sensors are factory-set with the EOL
termination set to OFF by default.
When one or more EC-Smart-Vues are installed with an ECB-VAVS / ECB-VAV, ECB-103,
ECB-203, ECB-400 Controller Series, only the EOL terminations of the last EC-Smart-Vue
are set to ON. All other EC-Smart-Vues must have their EOL terminations set to OFF. The
ECB-VAVS / ECB-VAV, ECB-103, ECB-203, ECB-400 Controller Series must be the first
devices on the bus as the EOL termination in these devices are permanently enabled. This
is shown below.
EC-Smart-Vue Sub-Network Bus Cat 5e Cable with RJ-45 Connectors
Back of
EC-Smart-Vue
EOL set to ON
at the last
sensor at the
end of the Bus
ON
OFF
EOL
Controller Series:
ECL-VAVS / ECL-VAV
ECL-103
ECL-203
ECL-300
ECL-400
ECB-VAVS / ECB-VAV
ECB-103
ECB-203
ECB-300
ECB-400
Figure 4-7: Setting the EOL Terminations on the EC-Smart-Vue Subnetwork Bus for
the ECB-VAVS / ECB-VAV, ECB-103, ECB-203, ECB-400 Controller Series
When one or more EC-Smart-Vues are installed with an ECB-600 / ECL-600, only the EOL
terminations the ECB-600 / ECL-600 and the last EC Smart Vue are set to ON. All other
EC-Smart-Vues must have their EOL terminations set to OFF. This is shown below.
54
Network Guide
Subnetwork Installation Guidelines
EC-Smart-Vue Sub-Network Bus Cat 5e Cable with RJ-45 Connectors
Controller Series:
ECB-600
ECL-600
Inside
ECB/ECL-600
Back of
EC-Smart-Vue
EOL OFF
EOL ON
ON
OFF
EOL
For ECB-600 / ECL-600, set the
Sub-Network EOL to ON
EOL set to ON
at the last
sensor at the
end of the Bus
Figure 4-8: Setting the EOL Terminations on the EC-Smart-Vue Subnetwork Bus
Commissioning with an EC-Smart-Vue
Setting the EC-Smart-Vue Subnet ID
ECB and ECL Series controllers can be commissioned with an EC-Smart-Vue. The default
Subnet ID for an EC-Smart-Vue is 1. To commission an ECB / ECL Series controller, the
EC-Smart-Vues Subnet ID must be set to 1. If the EC-Smart-Vues Subnet ID has been set
to another value (for example, the display flashes error code 1 with the Bell icon when the
EC-Smart-Vue is connected to a controller for commissioning), change the Subnet ID to 1 as
follows:
1. Connect an EC-Smart-Vue to the controller with a Cat 5e patch cable. Wait for the Bell
icon and the number 1 to flash on the display.
2. Press and hold the Menu button
for 5 seconds to enter the password menu. 10000 is
shown on the display.
3. Use the down button
4. Use the Menu button
to set the number to 9995 (this is the default password).
to select SUBNET ID. The current controllers Subnet ID is
shown.
to set the controllers Subnet ID. Tip: Hold down
either the up or down button to fast-advance the display value.
5. Use the up and down buttons
6. Press the Menu button once to apply the value.
7. Press and hold the Menu button for 5 seconds to exit the configuration menu.
The EC-Smart-Vue can now be used to go from one ECB / ECL Series controller to the next
for commissioning purposes.
Commissioning ECB-Series Controllers
To commission a controller with a DIP switch located on the faceplate, first set the DIP
switch to 0 (all off). When using an EC-Smart-Vue for commissioning ECB Series controllers
(before code is downloaded to the controller from EC-gfxProgram), connect an
EC-Smart-Vue to the controller with its Subnet ID set to 1. During commissioning, the
EC-Smart-Vue is used to set the controllers BACnet MAC Address and Baud rate. For
ECB-VAV controllers, commissioning can be used to perform application selection if needed.
Applications are pre-loaded programs that enable the ECB-VAV to control a typical VAV box.
Set the EC-Smart-Vues Subnet ID and the connected controllers MAC Address as follows:
1. Connect an EC-Smart-Vue to the controller with a Cat 5e patch cable. Wait for the
display to show the room temperature.
Network Guide
55
Subnetwork Installation Guidelines
2. Press and hold the Menu button
for 5 seconds to enter the password menu. 10000 is
shown on the display.
3. Use the down button
to set the number to 9995 (this is the default password).
4. Use the Menu button to select GEN CFG.
5. Press the down button
once to enter the GEN CFG submenu. The MAC ADDRESS
menu is shown with the current controllers BACnet MAC Address.
to set the controllers MAC Address. Only
addresses from 1 to 127 are recommended to be used.
6. Use the up and down buttons
7. Press the Menu button once to apply the value.
8. Press and hold the Menu button for 5 seconds to exit the configuration menu.
Once the BACnet MS/TP network is operational, the controller can be programmed with
EC-gfxProgram. For each EC-Smart-Vue, set its Subnet ID number to the block number of
its associated CommSensor block in EC-gfxProgram. This is done in the EC-Smart-Vues
GEN CFG menu under SUBNET ID.
Setting the BAUD Rate for ECB-Series Controllers (optional)
For information about what the BACnet MS/TP network baud rate should be set to, see Data
Bus Devices and Baud Rate on page 13.
By default, the BAUD rate for the controller is set to automatically detect the current
communication BAUD rate of the connected BACnet MS/TP network (AUTO). This is the
preferred setting for a controller. However, at least one controller on the BACnet MS/TP
network data bus must have its BAUD rate set. The preference is to set the building
controllers BAUD rate (if present). Otherwise, set the BAUD rate on one controller that will
set the BAUD rate for all other controllers (to act as the master for setting the BAUD rate).
When the Baud rate is set to AUTO, the controller cannot initiate any
communication until it has detected the baud rate of the BACnet MS/TP network.
If all controllers on the BACnet MS/TP network are set to AUTO, then all
controllers will not communicate.
Set the connected controllers BAUD rate as follows:
1. Connect an EC-Smart-Vue to the controller with a Cat 5e patch cable. Wait for the
display to show the room temperature.
2. Press and hold the Menu button
for 5 seconds to enter the password menu. 10000 is
shown on the display.
3. Use the down button
4. Use the Menu button
5. Press the down button
to set the number to 9995 (this is the default password).
to select GEN CFG.
once to enter the GEN CFG submenu. The MAC ADDRESS
menu is shown.
6. Use the Menu button
to select BAUD RATE. The current controllers BAUD rate is
shown.
to set the controllers Baud rate. AUTO detects and
uses the Baud rate currently being used by the BACnet MS/TP network.
7. Use the up and down buttons
8. Press the Menu button once to apply the value.
9. Press and hold the Menu button for 5 seconds to exit the configuration menu.
56
Network Guide
Subnetwork Installation Guidelines
Connecting to the LAN through an EC-Smart-Vue
For a LONWORKS Network
Set the two Net to Subnet Port Settings jumpers inside the ECL series controller to
Enable to connect the main LONWORKS network to the EC-Smart-Vue subnetwork
Cat5e cable.
Net to Subnet
Port Settings
Enable
Disable
Enable
Disable
Figure 4-9: ECL-Series controllers: Set Net to Subnet Port Settings
Jumpers to Enable
This will create a free-topology LONWORKS network Comply with the maximum
cable lengths for a free-topology LONWORKS shown in Network Cables on page 40.
This must include the cable length between the controller and the EC-Smart-Vue.
The length of the EC-Smart-Vue subnetwork bus must also comply with the
restrictions shown in Subnetwork Bus Total Length on page 47.
22AWG (0.65mm) Unshielded Twisted Pair Network Cable
Controller
EC-Smart-Vue
Free-Topology
Network
Cat5e network cable:
EC-Smart-Vue Sub-Network
Bus and LONWORKS Network
Figure 4-10: LonWorks Network Free Topology
To temporarily access the LAN for commissioning and maintenance purposes,
connect a LON USB Network Interface to the stereo audio plug located on the lower
edge of the EC-Smart-Vue.
Wire a standard three-conductor 3.5 mm () stereo jack as shown below.
Network Guide
57
Subnetwork Installation Guidelines
LAN Access
Connector
LON1
LON2
Shield
To Portable Router
EC-Net Pro
- Temporary
Commissioning and
Maintenance
Connection
LON USB Network
Interface
Figure 4-11: 3.5mm Stereo Jack Connection for a LONWORKS Network
Interface
Ensure the BAC/LON jumper in the EC-Smart-Vue is set to the LON position.
BAC
LON
3.5 mm (1/8) Network
Access Jack
Network Type
Jumper
Figure 4-12: BAC/LON Jumper Set to the LON (LONWORKS) Position
For a BACnet Network
To temporarily access the LAN for commissioning and maintenance purposes,
connect a portable adaptor to the stereo audio plug located on the lower edge of the
EC-Smart-Vue.
The BACnet MS/TP adaptor must have an electrically-isolated RS-485 port.
Otherwise a ground path from the BACnet network will be made through the
computer that will disrupt BACnet network communications.
Wire a standard three-conductor 3.5 mm () stereo jack as shown below.
LAN Access
Connector
BACnet MS/TP Adaptor
with Isolated RS-485 Port
NET+
NETShield
To Portable Router
- Temporary
Commissioning and
Maintenance
Connection
- No EOL Resistors are
Necessary
EC-Net Pro
Figure 4-13: 3.5mm Stereo Jack Connection for a Portable Adaptor
58
Network Guide
Subnetwork Installation Guidelines
Ensure the BAC/LON jumper in the EC-Smart-Vue is set to the BAC position (this is
the factory-set default jumper position).
BAC
LON
Network Type
Jumper
3.5 mm (1/8) Network
Access Jack
Figure 4-14: BAC/LON Jumper Set to the BAC (BACnet) Position
Network Guide
59
BACnet Troubleshooting
CHAPTER 5
BACNET TROUBLESHOOTING
Table 5-1: Troubleshooting ECB Device Symptoms
Symptom
Possible Cause
Solution
Device does not
communicate on
the BACnet
MS/TP network
The device does not have
power / poor-quality power.
See Power Supply Requirements on page 31.
BACnet data bus polarity
reversed.
Ensure the polarity of the BACnet data bus is
always the same on all devices. See BACnet
MS/TP Data Bus is Polarity Sensitive on page
11.
Cut or broken wire.
Isolate the location of the break and pull a
new cable.
The BACnet data bus has
one or more devices with
the same MAC Address.
See Adopting a Numbering System for MAC
Addresses, Device Instance Numbers, and
Network Numbers on page 27.
The BAUD rate for all
devices are set to AUTO
At least one device must be set to a baud
rate, usually the bus master.
The device is set to a MAC
Address in the range of 128
to 255.
See if the STATUS led on the device is
showing a fault condition. See Table 5-2 for a
list of fault codes.
This range is for slave devices that cannot
initiate communication. All Distech Controls
devices are master devices and must their
MAC Address set accordingly. See Device
Addressing on page 23.
The maximum number of
devices on a data bus
segment has been
exceeded.
Use a repeater to extend the BACnet data
bus. See Data Bus Devices and Baud Rate on
page 13.
Max Master parameter
Configure the Max Master to the highest MAC
Address of any device on the MS/TP data
bus. See Setting the Max Master and Max
Info Frames on page 26.
Absent or incorrect supply
voltage
1. Check if the device is showing the PoorQuality Power status code. See Table 5-4 for
a list of fault codes.
2. Check power supply voltage between
24VAC 15% and COM pins and ensure that
it is within acceptable limits.
3. Check for tripped fuse or circuit breaker.
Overloaded power
transformer
1. Check if the device is showing the PoorQuality Power status code. See Table 5-4 for
a list of fault codes.
2. Verify that the transformer used is powerful
enough to supply all controllers. See
Transformer Selection and Determining the
Maximum Power Run Length on page 33.
60
Network Guide
BACnet Troubleshooting
Symptom
Possible Cause
Solution
Network not wired properly
Double check that the wire connections are
correct.
Absent or incorrect network
termination
Check the network termination(s).
There is another controller
with the same MAC
Address on the BACnet
MS/TP data bus
Each controller on a BACnet MS/TP data bus
must have a unique MAC Address. Use an
EC-Smart-Vue to check the MAC Address of
each controller. See Adopting a Numbering
System for MAC Addresses, Device Instance
Numbers, and Network Numbers on page 27.
There is another controller
with the same Device ID on
the BACnet intranetwork
Each controller on a BACnet intranetwork (the
entire BACnet BAS network) must have a
unique Device ID. Use an EC-Smart-Vue to
check the Device ID of each controller. See
Adopting a Numbering System for MAC
Addresses, Device Instance Numbers, and
Network Numbers on page 27.
The STATUS
led is blinking
The device has autodiagnosed a fault condition
See Table 5-2 for a list of fault codes.
Controller is
powered but
does not turn on
Fuse has blown
Disconnect the power. Check the fuse
integrity. Reconnect the power.
Power supply polarity
Verify that consistent polarity is maintained
between all controllers and the transformer.
Ensure that the COM terminal of each
controller is connected to the same terminal
on the secondary side of the transformer. See
Figure 6-1.
Controller
communicates
well over a short
network, but
does not
communicate on
large network
Network length
Check that the total wire length does not
exceed the specifications of the Network
Guide: Data Bus Physical Specifications and
Cable Requirements on page 15.
Wire type
Check that the wire type agrees with the
specification of the Network Guide: Data Bus
Physical Specifications and Cable
Requirements on page 15.
Network wiring problem
Double check that the wire connections are
correct.
Absent or incorrect network
termination
Check the network termination(s). Incorrect or
broken termination(s) will make the
communication integrity dependent upon a
controllers position on the network.
Number of controllers on
network segment exceeded
The number of controllers on a channel
should never exceed 50. Use a router or a
repeater: See Maximum Number of BACnet
MS/TP Devices on a Data Bus Segment on
page 13.
Max Master parameter
Configure the maximum number of master
device on the MS/TP network in all devices to
the controllers highest MAC address used on
the MS/TP trunk. See BACnet MS/TP Data
Bus Token-Passing Overview on page 24.
Network Guide
61
BACnet Troubleshooting
Symptom
Possible Cause
Solution
Hardware input
is not reading
the correct
value
Input wiring problem
Check that the wiring is correct according to
this manual and according to the peripheral
devices manufacturer.
Open circuit or short circuit
Using a voltmeter, check the voltage on the
input terminal. For example, for a digital input,
a short circuit shows approximately 0V and an
open circuit shows approximately 5V. Correct
wiring if at fault.
Configuration problem
Using the controller configuration wizard,
check the configuration of the input. Refer to
the controllers user guide for more
information.
Over-voltage or overcurrent at an input
An over-voltage or over-current at one input
can affect the reading of other inputs. Respect
the allowed voltage / current range limits of all
inputs. Consult the appropriate datasheet for
controller input range limits.
Fuse has blown (Auto reset
fuse)
Disconnect the power and outputs terminals.
Then wait a few seconds to allow the autoreset fuse to cool down. Check the power
supply and the output wiring. Reconnect the
power.
Output wiring problem
Check that the wiring is correct according to
this manual and according to the peripheral
devices manufacturer.
Configuration problem
Using the controller configuration wizard,
check the configuration of the output. Refer to
the controllers user guide for more
information.
0-10V output, 24VAC
powered actuator is not
moving.
Check the polarity of the 24VAC power supply
connected to the actuator while connected to
the controller. Reverse the 24VAC wire if
necessary.
Device not associated to
controller
Using the device configuration wizard, check
the configuration of the input. Refer to the
devices user guide for more information.
Power discharge
1. Recharge device with light (if solarpowered) or replace battery (if batterypowered).
2. Ensure sufficient light intensity (200lx for 4
hours/day).
Device too far from the
Wireless Receiver
Reposition the device to be within the range of
the Wireless Receiver. For information on
typical transmission ranges, refer to the Opento-Wireless Solution Guide.
Configuration problem
Using the device configuration plug-in or
wizard, check the configuration of the input.
Refer to the Wireless Battery-less Sensors
and Switches Solutions Guide for more
information.
Hardware
output is not
operating
correctly
Wireless
devices not
working
correctly
62
Network Guide
BACnet Troubleshooting
Table 5-2: Led Fault Condition Interpretation for ECB Devices
ECB Device Led
Interpretation
Description
Solution
RX LED not blinking
Data is not being received from the BACnet
MS/TP data bus.
TX LED not blinking
Data is not being transmitted onto the
BACnet MS/TP data bus.
If there is no
communication, see
Table 5-1.
POWER constant on
Power is available at the device. However
this does not mean that the quality of
supplied power is good. Verify the STATUS
led. See also Power Supply Requirements
on page 31.
If not lit, see Power
Supply Requirements
on page 31 for the
power requirements.
STATUS blinking
See below.
Table 5-3: STATUS Led Interpretation for Normal Operation with ECB Devices
Device STATUS Led blink
patterns
Status
Description
Fast blink continuous:
Initialization
The device is starting up.
Solid ON
Firmware upgrade
in progress
Controller operation is temporarily
unavailable. The new firmware is being
loaded into memory. This takes a few
seconds. Do not interrupt power to the
device during this time.
STATUS led is always OFF
No anomaly
Normal operation.
(150ms On, 150ms Off, continuous)
Network Guide
63
BACnet Troubleshooting
Table 5-4: STATUS Led Fault Condition Interpretation for ECB Devices
Device STATUS Led blink
patterns every 2 seconds
(highest priority shown first)
Possible Cause
Corrective action
Long Long Long blink
Offline
The device has not received a BACnet
token, and therefore cannot
communicate on the network.
Poor-quality
power.
The device has
browned-out.
The voltage at the 24VAC and 24VCOM
terminals was not at an acceptable level
during power up.
Invalid MAC
address
The devices MAC address is set to zero
(0) or is set to an address higher than
the Max Master. See BACnet MS/TP
Data Bus Token-Passing Overview on
page 24.
Backup and
Restore.
The controller is being backed-up or
restored.
(800ms On, 300ms Off, 800ms On,
300ms Off, 800ms On)
Short Short Long blink
(150ms On, 300ms Off, 150ms On,
300ms Off, 800 ms On)
Short Long blink
(150ms On, 300ms Off)
Long Short Short Short Short
Long Short:
(800ms On, 300ms Off, 150ms On,
300ms Off, 150ms On, 300ms Off,
150ms On, 300ms Off, 150ms On,
300ms Off, 800ms On, 300ms Off,
150ms On)
64
Network Guide
BACnet Troubleshooting
Table 5-5: Verify that the Following Recommendations have been Carried Out Before
Calling Technical Support
Recommendation
Description
Properly terminate the BACnet MS/TP
data bus
EOL terminations must be enabled / installed at either
end of the data bus only. See Figure 2-1.
Avoid duplicate MAC Addresses
Verify that no device has a duplicate MAC Address by
checking the MAC Address DIP switch settings on all
devices on the data bus, including segments
connected by a repeater.
If necessary, isolate devices from the data bus to
narrow-down the number of devices that may be at
fault.
All devices must be set to the same
baud rate
When all devices are set to AUTO BAUD rate, at least
one device must be set to a baud rate, usually the bus
master.
The bus is polarity sensitive
Ensure that the polarity of all data bus wiring is
consistent throughout the network. See BACnet MS/TP
Data Bus is Polarity Sensitive on page 11.
Do not overload the data bus with
Change of Value (COV) reporting
COV reports create the most traffic on the BACnet
MS/TP data bus. Set the COV report rate to the largest
value that provides acceptable performance. Only map
COV reports for values that are necessary. For
mapped analog points that are continuously changing,
try increasing the COV increment on these points or
set the COV minimum send time flag to true to send
the value at a regular frequency.
Do not leave address holes in the
devices MAC Address range
Assign MAC Address to device starting at 3, up to 127.
Do not skip addresses. Set the maximum MAC
Address in the Bus Master (Building Controller) to the
final MAC Address number actually installed.
NOTE: The physical sequence of the MAC Address of
the devices on the data bus is unimportant: For
example, the MAC Address of devices on the data bus
can be 5, 7, 3, 4, 6, and 8.
Only daisy-chained devices are
acceptable
Eliminate T-taps and star configurations. Use a router
to connect a data bus spur.
Connect no more than five devices to a
power supply transformer
BACnet MS/TP devices require good power quality.
See Power Supply Requirements on page 31.
Network Guide
65
LonWorks Troubleshooting
CHAPTER 6
LONWORKS TROUBLESHOOTING
Table 6-1: Troubleshooting ECL Device Symptoms
Symptom
Possible Cause
Solution
Device does not
communicate on
the LONWORKS
network
The device does not have
power / poor-quality power.
See Power Supply Requirements on page 44.
Cut or broken wire.
Isolate the location of the break and pull a
new cable.
The maximum number of
devices on a segment has
been exceeded.
Use a repeater to extend the LONWORKS data
bus. See Network Cables on page 40 and
also Extending the Network on page 42.
Absent or incorrect supply
voltage
1. Check if the device is showing the Poor
Power Quality status code. See Table 6-4 for
a list of fault codes.
2. Check power supply voltage between
24VAC 15% and COM pins and ensure that
it is within acceptable limits.
3. Check for tripped fuse or circuit breaker.
Overloaded power
transformer
1. Check if the device is showing the Poor
Power Quality status code. See Table 6-4 for
a list of fault codes.
2. Verify that the transformer used is powerful
enough to supply all controllers. See
Transformer Selection and Determining the
Maximum Power Run Length on page 44.
Network not wired properly
Double check that the wire connections are
correct.
Absent or incorrect network
termination
Check the network termination(s). See TP/FT10 Free Topology Network Termination on
page 39.
The STATUS
led is blinking
The device has autodiagnosed a fault condition
See Table 6-2 for a list of fault codes.
Controller is
powered but
does not turn on
Fuse has blown
Disconnect the power. Check the fuse
integrity. Reconnect the power.
Power supply polarity
Verify that consistent polarity is maintained
between all controllers and the transformer.
Ensure that the COM terminal of each
controller is connected to the same terminal
on the secondary side of the transformer. See
Power Supply Requirements on page 44.
Controller
communicates
well over a short
network, but
does not
communicate on
large network
Network length
Check that the total wire length does not
exceed the specifications of the Network
Guide. See Network Cables on page 40.
Wire type
Check that the wire type - see Network Cables
on page 40.
Network wiring problem
Double check that the wire connections are
correct.
66
Network Guide
LonWorks Troubleshooting
Symptom
Hardware input
is not reading
the correct
value
Hardware
output is not
operating
correctly
Network Guide
Possible Cause
Solution
Absent or incorrect network
termination
Check the network termination(s). Incorrect or
broken termination(s) will make the
communication integrity dependent upon a
controllers position on the network. See
TP/FT-10 Network Topologies on page 38.
Extra capacitance
Make sure that no extra capacitance is being
connected to the network other than the
standard FTT circuit, and a maximum of a 3
meter stub (in bus topology).
Number of controllers on
network segment exceeded
Too many controllers on a channel. See
Network Cables on page 40. Use a repeater
in accordance to the Network Guide. See
Extending the Network on page 42.
Network traffic
Query node statistic to check errors.
Use a LON protocol analyzer to check
network traffic.
Input wiring problem
Check that the wiring is correct according to
this manual and according to the peripheral
devices manufacturer.
Open circuit or short circuit
Using a voltmeter, check the voltage on the
input terminal. For example, for a digital input,
a short circuit shows approximately 0V and an
open circuit shows approximately 5V. Correct
wiring if at fault.
Configuration problem
Using the controller configuration wizard,
check the configuration of the input. Refer to
the controllers user guide for more
information.
Over-voltage or overcurrent at an input
An over-voltage or over-current at one input
can affect the reading of other inputs. Respect
the allowed voltage / current range limits of all
inputs. Consult the appropriate datasheet for
controller input range limits.
Fuse has blown (Auto reset
fuse)
Disconnect the power and outputs terminals.
Then wait a few seconds to allow the autoreset fuse to cool down. Check the power
supply and the output wiring. Reconnect the
power.
Output wiring problem
Check that the wiring is correct according to
this manual and according to the peripheral
devices manufacturer.
Configuration problem
Using the controller configuration wizard,
check the configuration of the output. Refer to
the controllers user guide for more
information.
0-10V output, 24VAC
powered actuator is not
moving.
Check the polarity of the 24VAC power supply
connected to the actuator while connected to
the controller. Reverse the 24VAC wire if
necessary.
67
LonWorks Troubleshooting
Symptom
Possible Cause
Solution
Wireless
devices not
working
correctly
Device not associated to
controller
Using the device configuration wizard, check
the configuration of the input. Refer to the
devices user guide for more information.
Power discharge
1. Recharge device with light (if solarpowered) or replace battery (if batterypowered),
2. Ensure sufficient light intensity (200lx for 4
hours/day).
Device too far from the
Wireless Receiver
Reposition the device to be within the range of
the Wireless Receiver. For information on
typical transmission ranges, refer to the Opento-Wireless Solution Guide.
Configuration problem
Using the device configuration plug-in or
wizard, check the configuration of the input.
Refer to the Wireless Battery-less Sensors
and Switches Solutions Guide for more
information.
Table 6-2: Led Fault Condition Interpretation for ECL Devices
ECL Device Led
Interpretation
Description
Solution
RX LED not blinking
Data is not being received from the
LONWORKS MS/TP data bus.
TX LED not blinking
Data is not being transmitted onto the
LONWORKS MS/TP data bus.
If there is no
communication, see
Table 5-1.
POWER constant on
Power is available at the device. However
this does not mean that the quality of
supplied power is good. Verify the STATUS
led. See also Power Supply Requirements
on page 44.
If not lit, see Power
Supply Requirements
on page 44 for the
power requirements.
STATUS blinking
See below.
Table 6-3: STATUS Led Interpretation for Normal Operation with ECL Devices
Device STATUS Led blink
patterns
Status
Description
Fast blink continuous:
Initialization
- Initialization: The device is starting up.
- Firmware upgrade in progress. Controller
operation is temporarily unavailable. The
new firmware is being loaded into memory.
This takes a few seconds. Do not interrupt
power to the device during this time.
No anomaly
Normal operation.
(150ms On, 150ms Off, continuous)
STATUS led is always OFF
68
Network Guide
LonWorks Troubleshooting
Table 6-4: STATUS Led Fault Condition Interpretation for ECL Devices
Device STATUS Led blink
patterns every 2 seconds
(highest priority shown first)
Possible Cause
Corrective action
Long blink continuous:
The controller is
unconfigured
Commission the controller
The controller is
offline
Set the controller Online
The controller is in
bypass mode
Set the controller Online
(150ms On, 300ms Off, 150ms On, 300ms Off, 800 ms On)
Poor-quality
power; The device
has browned-out
The voltage at the 24VAC and 24VCOM
terminals has gone below the devices
acceptable limit during power up.
Fast blink 12x:
Wink
The wink function is used to identify a
device.
(1s On, 1s Off, continuous)
Long Long Long blink
(800ms On, 300ms Off, 800ms On, 300ms Off,
800ms On)
Long Short Short Short blink
(800ms On, 300ms Off, 150ms On, 300ms Off, 150ms On,
300ms Off, 150ms On)
Short Short Long blink
(80ms On, 80ms Off, 12x)
Table 6-5: Verify that the Following Recommendations have been Carried Out Before
Calling Technical Support
Recommendation
Description
Properly terminate the LONWORKS data
bus
EOL terminations must be enabled / installed at either
end of the data bus only. See TP/FT-10 Free Topology
Network Termination on page 39.
Connect no more than five devices to a
power supply transformer
LONWORKS devices require good power quality. See
TP/FT-10 Free Topology Network Termination on page
39.
Network Guide
69
ECx-400 Series I/O Extension Module Specific Troubleshooting
CHAPTER 7
ECX-400 SERIES I/O EXTENSION MODULE
SPECIFIC TROUBLESHOOTING
For general troubleshooting of an ECx-400 Series I/O Extension Module, first follow the
troubleshooting for a controller see BACnet Troubleshooting on page 60 and LonWorks
Troubleshooting on page 66. Then follow the troubleshooting tips shown below.
Table 7-1: Troubleshooting ECx-400 Series I/O Extension Module Device Specific
Symptoms
Symptom
Possible Cause
Solution
Device does not
communicate on
the subnetwork
Cut or broken wire.
Isolate the location of the break and pull a
new cable.
Network not wired properly
Double check that the wire connections are
correct.
Absent or incorrect network
termination
Check the network termination(s). See
ECx-4XX Subnetwork Bus Topology and Endof-Line Terminations on page 48.
There is another controller
with the same Subnet ID on
the subnetwork
Each I/O Extension Module on the
subnetwork must have a unique Subnet ID.
Look at the Subnet ID DIP switch on the
faceplate of each I/O Extension Module. See
ECx-4XX I/O Extension Module Addressing
on page 50.
Network length
Check that the total wire length does not
exceed specification shown in About the
Subnetwork Bus on page 47.
Wire type
Check that the wire type agrees with the
specification shown in ECx-4XX Subnetwork
Bus Physical Specifications and Cable
Requirements on page 48.
70
Network Guide
EC-Smart-Vue Troubleshooting
CHAPTER 8
EC-SMART-VUE TROUBLESHOOTING
Table 8-1: EC-Smart-Vue Normal Operation
Symptom
Status
Description
When the
EC-Smart-Vue is
connected to a
Controller, the LCD
display on the
EC-Smart-Vue is
blank with the
backlight ON for
about 30 to 45
seconds
Firmware upgrade in
progress
Wait for the upgrade to complete. Do not
disconnect the EC-Smart-Vue from the controller
as the upgrade will only restart once it is
reconnected.
Table 8-2: Troubleshooting EC-Smart-Vue Symptoms
Symptom
Possible Cause
Solution
EC-Smart-Vue
screen is blank &
back light is off
Is the EC-Smart-Vue
connected to the
controller?
Verify that the EC-Smart-Vue is connected to the
controller and that the patch cables are pluggedin to the connectors. Refer to EC-Smart-Vue
Subnetwork Bus on page 52 for more information.
Is power being
supplied to the
controller?
There may be no power being supplied from the
controller. Check if the controller has power or if
the controllers internal fuses have blown or
tripped.
Is the cable
connected to the
controller and
EC-Smart-Vue?
Verify wiring.
Is the address
correctly set to a
unique address?
Each EC-Smart-Vue must be set to a unique
address for each controller. See Commissioning
with an EC-Smart-Vue on page 55.
Was the patch cable
was made onsite?
Verify that the RJ-45 crimp connectors were
installed on the cable correctly. See
EC-Smart-Vue Subnetwork Bus Cable
Requirements on page 52.
Is the device too far
from controller?
Verify the distance between the device and the
controller. See Subnetwork Bus Total Length on
page 47.
Is there a
configuration
problem?
With EC-gfxProgram, check the configuration of
the sensor, for example, is it enabled? Refer to
the EC-gfxProgram User Guide for more
information.
Device is not
communicating
with controller
Network Guide
71
EC-Smart-Vue Troubleshooting
Table 8-3: Error code Interpretation for EC-Smart-Vue Symptoms
Symptom
Possible Cause
Corrective action
Clock icon flashing for 15
seconds
Cannot
communicate with
controller.
Verify power at controller
Verify wiring to controller
Error code 2 with Bell icon
Invalid
configuration.
In EC-gfxProgram, resynchronize the
code with the controller.
Contact Distech Controls Customer
Support.
Error code 3 with Bell icon
EC-Smart-Vue is
not configured in
the controller
With EC-gfxProgram, check the
configuration of the sensor, for example,
is it enabled? Refer to the
EC-gfxProgram User Guide for more
information.
After 15 seconds: Error code 1
with Bell icon
72
Network Guide
Typical BACnet EIA-485 Data Bus Transmission Example
Appendix A
TYPICAL BACNET EIA-485 DATA BUS
TRANSMISSION EXAMPLE
The graph below shows electrical signals for the transmission of one byte of data
(hexadecimal D3, least significant bit first). Note that when idle, the BACnet MS/TP bus is
biased such that the Net + connection is positive with respect to the Net connection.
Net -
Idle
Space
Mark
Mark
Mark
Space
Space
Net +
Mark
Mark
Idle
Stop
Start
Figure 8-1: Example of a Typical EIA-485 Data Bus Transmission
The permitted voltage levels of an EIA-485 transmitter and receiver are shown below.
EIA-485 Receiver Differential Input
EIA-485 Transmitter Signal Voltage
+12 Volts
+12 Volts
Permissible
Range
+2 Volts
+0.2 Volts
Voltage VNet-,Net+
-0.2 Volts
Voltage VNet-,Net+
-2 Volts
Transition
Region
Maximum
Operating
Range
Permissible
Range
-7 Volts
-7 Volts
Figure 8-2: Typical EIA-485 Data Bus Operating Signal Levels
Table 8-1: EIA-485 Signal Specifications
Parameter
Conditions
Min
Max
Units
1.5
-1.5
-5
Differential Driver Output Voltage Open Circuit
Driver Output Voltage - Loaded
RLOAD = 27
Driver Common Mode (CM) Voltage
RLOAD = 54
-1
Receiver Sensitivity
-7 Vcm +12
0.2
Receiver Common-Mode Voltage
Range
-7
Receiver Input Resistance
96K
V
+12
The receiver is also protected against the temporary application of 24VAC and against
transients. However, such events will interrupt data reception.
Network Guide
73
Typical BACnet EIA-485 Data Bus Transmission Example
Common Mode Noise Rejection
Noise induced onto the conductors of the data bus cable will be common to both Net + and
Net - data bus wires that is to say, the noise will be of the same amplitude and polarity as
the conductors in the cable are so close together. For this reason the EIA-485 data bus is
differential bus. The receiver nulls out common mode induced noise picked up on the data
bus wire by subtracting the negative input from the positive input. This greatly reduces the
impact that induced noise has on the bus.
Induced common-mode noise transient
Noise transient
attenuation
Typical EIA-485 line
receiver with inverting
input shown
Figure 8-3: Common-Mode Noise is Significantly Attenuated by a Differential EIA-485
Line Receiver
74
Network Guide
How to Set a DIP Switch
Appendix B
HOW TO SET A DIP SWITCH
DIP switches are used to set the address of a device. In the following table, A & B represent
the binary ON / OFF setting for the DIP switch required for a given decimal value shown in
the table.
B
000
001
010
011
100
101
110
111
0000
0001
10
11
12
13
14
15
0010
16
17
18
19
20
21
22
23
0011
24
25
26
27
28
29
30
31
0100
32
33
34
35
36
37
38
39
0101
40
41
42
43
44
45
46
47
0110
48
49
50
51
52
53
54
55
0111
56
57
58
59
60
61
62
63
1000
64
65
66
67
68
69
70
71
1001
72
73
74
75
76
77
78
79
1010
80
81
82
83
84
85
86
87
1011
88
89
90
91
92
93
94
95
1100
96
97
98
99
100
101
102
103
1101
104
105
106
107
108
109
110
111
1110
112
113
114
115
116
117
118
119
1111
120
121
122
123
124
125
126
127
ON
For example
82 = A: 1010 & B: 010
Figure 8-1: Example of How to Set a DIP Switch to 82
Network Guide
75
Metric Conversions for Wire Gauge
Appendix C
METRIC CONVERSIONS FOR WIRE GAUGE
The following table provides information about metric wire equivalents for wire gauge.
AWG
76
Approximate stranded
metric equivalents
Diameter ()
Area
(inch)
(mm)
(kcmil)
(mm)
10
0.1019
2.588
10.4
5.26
12
0.0808
2.053
6.53
3.31
14
0.0641
1.628
4.11
2.08
16
0.0508
1.291
2.58
1.31
18
0.0403
1.024
1.62
0.823
24/0.2
20
0.0320
0.812
1.02
0.518
16/0.2
22
0.0253
0.644
0.642
0.326
7/0.25
24
0.0201
0.511
0.404
0.205
1/0.5, 7/0.2, 30/0.1
Network Guide
Documentation Improvement Form
Appendix D
DOCUMENTATION IMPROVEMENT FORM
Is any part of this document not clear enough? Are there any comments about the content of
this document? Do not hesitate to use this form to send us comments and
recommendations, as there is always a drive to improve documentation to further satisfy
clients.
Please mail or fax this form to:
Distech Controls Inc.
4005-B Boul. Matte
Brossard, QC
J4Y 2P4
Fax: 1-450-444-0770
Email:
[email protected]Distech Controls Documentation Improvement Form
Document Title and Version: Network Guide Network Guide
Page #
Network Guide
Suggestions or Comments
77
Distech Controls Inc
4005-B Boul. Matte
Brossard, QC J4Y 2P4
Tel.: 1-800-404-0043
Tel.: 1-450-444-9898
www.distech-controls.com
*05DI-UGBACNG-12*
05DI-UGBACNG-12