B.O.Q For Supply & Erection

This document is a bill of quantities (BOQ) from UNICON CO. for the supply and erection of various piping items and pumps for a sugar company. It includes 34 line items for supplying and erecting pipes, valves, flanges, and other accessories for fire pumps, domestic pumps, a jockey pump, and a water booster. It provides the quantities required for each item and gives a total price of 145,000 LE for the supply and erection, excluding taxes. Payment will be made in three stages: 50% in advance, 30% after supplying materials, and 20% after testing.

Uploaded by

Janna Ahamed
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
35 views

B.O.Q For Supply & Erection

This document is a bill of quantities (BOQ) from UNICON CO. for the supply and erection of various piping items and pumps for a sugar company. It includes 34 line items for supplying and erecting pipes, valves, flanges, and other accessories for fire pumps, domestic pumps, a jockey pump, and a water booster. It provides the quantities required for each item and gives a total price of 145,000 LE for the supply and erection, excluding taxes. Payment will be made in three stages: 50% in advance, 30% after supplying materials, and 20% after testing.

Uploaded by

Janna Ahamed
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 6

Company

United company for sugar

Date

Nov23,2014

Attention

Eng. Mohiey

From

UNICON CO.

Our ref

erection

Your ref

Erection offer

B.O.Q FOR SUPPLY & ERECTION


Items
1

Supply&erection of wall connection piece 8" with required flanges,pipes / fire pumps

Supply&erection of wall connection piece 6" with required flanges,pipes / fire pumps

Supply&erection of wall connection piece 4" with required flanges,pipes / domestic pumps

Supply&erection bedplate beams

Supply&erection of simless concentric reducer

Supply&erection of simless ecentric increaser

Supply&erection of 8" simless elbow with bliend cover

Supply&erection of 6" simless elbow

Supply&erection of wall connection piece 2" with required flanges,pipes / jockey pump

10 Supply&erection of 8"OS&Y gate valve,UL listed & FM approved.


11 Supply&erection of 6"OS&Y gate valve,UL listed & FM approved.
12 Supply&erection of 6"non return valve,UL listed & FM approved.
13 Supply&erection of 2" valve/Jp
14 Supply of 2"non return valve/Jp
15 Supply&erection of 4"pressure relief valve,UL listed & FM approved.
16 Supply&erection of 6"alarm automatic valve.

17 Supply&erection of 6" gate valve/ over flow line


18 Supply&erection of simless elbows
19 Supply&erection of 6" simless pipe / over flow line
20 Supply&erection of 4" gate valve/ domestic suction pipe
21 Supply&erection of T simless /domestic suction pipe
22 Supply&erection of 4" simless pipe / domestic suction pipe
23 Supply&erection of 4" gate valve/drain pipe
24 Supply&erection of 4" simless pipe / drain pipe
25 Supply&erection of tamper switch
26 Supply&erection Nuts sets
27 Supply&erection Rubber rings sets
28 Supply&erection set of welding materials
29 Supply&erection Steel plate for JP
30 Supply&erection Glass wall for exhaust pipe isolation
Supply&erection set power and control cables from Fire pumps control panel to Diesel,Electrical and
31
Jockey pumps
Supply&erection set power and control cables from Water booster control panel to Booster pumps
32
33 Supply&erectionof 6" simless flange
34 Supply&erection of 4" simless flange
35 Supply&erection Simless 8" pipe table 40
36 Supply&erectionSimless 6" pipe table 40
37 Supply&erection Simless 2" pipe table 40
38 Transportaion
Erection for two submersible pumps,supply all necessary accessories for erection & control panel
39
40 Erection for water booster & control panel

Commercial offer :

Total price for supply & erection the a/m reguriments is 145000 L.E

above price is excluding sales taxes.


erection time : 2-3 weeks from dowpayment
payment : 50% in advance , 30% after supplying the materials , 20% with test.
our works will be inside the pump room only .

Thanks & Best Regards


Eng./ Shereen Thabet

umps

umps

estic pumps

y pump

QTY
____
____
____
____
____
____
____
____
____
4
4
2
2
1
1
1

3
____
____
5
____
____
____
____
10
____
____
____
____
____
Diesel,Electrical and

l to Booster pumps

on & control panel

____
____
____
____
____
____
____
____
____

____

with test.

You might also like