A
REQUEST FOR INSPECTION
Project Title
Job No
Client
Main Contractor
Senoro Gas Development Project
9608/SU2573
JOB Pertamina Medco E & P Tomori Sulawesi
Tripatra-Samsung Consortium
(Client Name) :
Attn.
Sub-Contractor
Report No.
Date
Page
SNO-Q-BPK-RFI-907
07-Aug-15
of
Mr. Sri Adi. W
QC Manager
Gentlemen,
We would like to have your presence for inspection according to the following schedules.
Date and time
8-Aug-15
Place/Area
Inspection Item
CPP 2
Final Inspection
14.00 WITA
Remarks
F-2219
F-2217
F-2225
Piping
Civil
Instrument
Pipeline
Structural
Electrical
Mechanical
COMMENT :
Involvement
Party
Performed By
Signature
Name
Sign Date
Job Title
Form Code : SNO-Q-FM-0001 Rev.0
Crys Suryo Prayogo
07-Aug-15
QC
Approved By
TSC
Reviewed By
JOB PMTS
TPI
(If applicable)
FILTER INSPECTION CHEC
Project Title
Job No
Client
Main Contractor
Senoro Gas Development Project
9608/SU2573
JOB Pertamina Medco E & P Tomori Sulawesi
TRIPATRA-SAMSUNG CONSORTIUM
Equipment Tag Number
F-2219
Reference Dr
Equipment Name
Amine After Filter
Revision
Manufacturer
JFC
No.
ITEM TO CHECK
Equipment and parts are as specified in packing list, which
includes basic equipment, extras and materials of construction.
Nameplate detail comply with equipment.
Foundation bolts have been securely bolted.
The shell seal welded or otherwise treated to prevent corrosion
between the saddle and the shell.
Check sliding feet installed in a level position well guarded
and free to move in the correct direction.
Check shims are located on either side of each foundation bolt
and minimum amount has been used.
Check insulation and fireproofing are in line with the
requirements on the drawings.
Physically inspect for any damage to the shell during transport
or installation.
If a non- inspection vessel, particular attention shall be paid to
the quality of the welding.
10
The certificates supplied by the manufacturers should be clear
and unambiguous.
11
Check all pipe work adequately supported in such a manner
that no strain is placed on the vessel.
RESULT
ACC
REJ
FILTER INSPECTION CHEC
Project Title
Job No
Client
Main Contractor
Senoro Gas Development Project
9608/SU2573
JOB Pertamina Medco E & P Tomori Sulawesi
TRIPATRA-SAMSUNG CONSORTIUM
Equipment Tag Number
F-2219
Reference Dr
Equipment Name
Amine After Filter
Revision
Manufacturer
JFC
No.
RESULT
ACC
REJ
ITEM TO CHECK
12
Check internals are as per drawing. If any alterations are
required (temporary removal of weirs etc.) these should be fully
recorded.
13
Check insulation is intact and free from damages to ensure no
possibility of rain water ingress
14
Check for internal cleanliness.
15
Check gasket material as per drawing
16
Check platform and ladders are securely fastened, fitted with
permanent handrails.
17
Check Davits are straight and swing easily both with and
without load.
Remarks :
Involvement Party
Signature
Performed By
Approved By
TSC
FILTER INSPECTION CHEC
Project Title
Job No
Client
Main Contractor
Senoro Gas Development Project
9608/SU2573
JOB Pertamina Medco E & P Tomori Sulawesi
TRIPATRA-SAMSUNG CONSORTIUM
Equipment Tag Number
F-2219
Reference Dr
Equipment Name
Amine After Filter
Revision
Manufacturer
JFC
No.
Name
Sign Date
Job Title
Form Code : SNO-Q-FM-0158 Rev.0
ITEM TO CHECK
Crys Suryo Prayogo
07-Aug-15
QC
RESULT
ACC
REJ
ECTION CHECK LIST
Sub-Contractor
Report No.
Date
Page
SNO-Q-BPK-PVI-114
07-Aug-15
of
Reference Drawing
SNO-M-4500123425-GA-026
Revision
C2
DATE
ACCEPTED
SUBCON
TSC
REVIEWED
JOB PMTS
REMARKS
ECTION CHECK LIST
Sub-Contractor
Report No.
Date
Page
SNO-Q-BPK-PVI-114
07-Aug-15
of
Reference Drawing
SNO-M-4500123425-GA-026
Revision
C2
DATE
ACCEPTED
SUBCON
Reviewed By
JOB PMTS
TSC
REVIEWED
JOB PMTS
REMARKS
TPI (If applicable)
ECTION CHECK LIST
Sub-Contractor
Report No.
Date
Page
SNO-Q-BPK-PVI-114
07-Aug-15
of
Reference Drawing
SNO-M-4500123425-GA-026
Revision
C2
DATE
ACCEPTED
SUBCON
TSC
REVIEWED
JOB PMTS
REMARKS
FILTER INSPECTION CHEC
Project Title
Job No
Client
Main Contractor
Senoro Gas Development Project
9608/SU2573
JOB Pertamina Medco E & P Tomori Sulawesi
TRIPATRA-SAMSUNG CONSORTIUM
Equipment Tag Number
F-2217
Reference Dr
Equipment Name
Amine Pre Filter
Revision
Manufacturer
JFC
No.
ITEM TO CHECK
Equipment and parts are as specified in packing list, which
includes basic equipment, extras and materials of construction.
Nameplate detail comply with equipment.
Foundation bolts have been securely bolted.
The shell seal welded or otherwise treated to prevent corrosion
between the saddle and the shell.
Check sliding feet installed in a level position well guarded
and free to move in the correct direction.
Check shims are located on either side of each foundation bolt
and minimum amount has been used.
Check insulation and fireproofing are in line with the
requirements on the drawings.
Physically inspect for any damage to the shell during transport
or installation.
If a non- inspection vessel, particular attention shall be paid to
the quality of the welding.
10
The certificates supplied by the manufacturers should be clear
and unambiguous.
11
Check all pipe work adequately supported in such a manner
that no strain is placed on the vessel.
RESULT
ACC
REJ
FILTER INSPECTION CHEC
Project Title
Job No
Client
Main Contractor
Senoro Gas Development Project
9608/SU2573
JOB Pertamina Medco E & P Tomori Sulawesi
TRIPATRA-SAMSUNG CONSORTIUM
Equipment Tag Number
F-2217
Reference Dr
Equipment Name
Amine Pre Filter
Revision
Manufacturer
JFC
No.
RESULT
ACC
REJ
ITEM TO CHECK
12
Check internals are as per drawing. If any alterations are
required (temporary removal of weirs etc.) these should be fully
recorded.
13
Check insulation is intact and free from damages to ensure no
possibility of rain water ingress
14
Check for internal cleanliness.
15
Check gasket material as per drawing
16
Check platform and ladders are securely fastened, fitted with
permanent handrails.
17
Check Davits are straight and swing easily both with and
without load.
Remarks :
Involvement Party
Signature
Performed By
Approved By
TSC
FILTER INSPECTION CHEC
Project Title
Job No
Client
Main Contractor
Senoro Gas Development Project
9608/SU2573
JOB Pertamina Medco E & P Tomori Sulawesi
TRIPATRA-SAMSUNG CONSORTIUM
Equipment Tag Number
F-2217
Reference Dr
Equipment Name
Amine Pre Filter
Revision
Manufacturer
JFC
No.
Name
Sign Date
Job Title
Form Code : SNO-Q-FM-0158 Rev.0
ITEM TO CHECK
Crys Suryo Prayogo
07-Aug-15
QC
RESULT
ACC
REJ
ECTION CHECK LIST
Sub-Contractor
Report No.
Date
Page
SNO-Q-BPK-PVI-115
07-Aug-15
of
Reference Drawing
SNO-M-4500123425-GA-011
Revision
C2
DATE
ACCEPTED
SUBCON
TSC
REVIEWED
JOB PMTS
REMARKS
ECTION CHECK LIST
Sub-Contractor
Report No.
Date
Page
SNO-Q-BPK-PVI-115
07-Aug-15
of
Reference Drawing
SNO-M-4500123425-GA-011
Revision
C2
DATE
ACCEPTED
SUBCON
Reviewed By
JOB PMTS
TSC
REVIEWED
JOB PMTS
REMARKS
TPI (If applicable)
ECTION CHECK LIST
Sub-Contractor
Report No.
Date
Page
SNO-Q-BPK-PVI-115
07-Aug-15
of
Reference Drawing
SNO-M-4500123425-GA-011
Revision
C2
DATE
ACCEPTED
SUBCON
TSC
REVIEWED
JOB PMTS
REMARKS
FILTER INSPECTION CHEC
Project Title
Job No
Client
Main Contractor
Senoro Gas Development Project
9608/SU2573
JOB Pertamina Medco E & P Tomori Sulawesi
TRIPATRA-SAMSUNG CONSORTIUM
Equipment Tag Number
F-2225
Reference Dr
Equipment Name
Amine Sump Filter
Revision
Manufacturer
JFC
No.
ITEM TO CHECK
Equipment and parts are as specified in packing list, which
includes basic equipment, extras and materials of construction.
Nameplate detail comply with equipment.
Foundation bolts have been securely bolted.
The shell seal welded or otherwise treated to prevent corrosion
between the saddle and the shell.
Check sliding feet installed in a level position well guarded
and free to move in the correct direction.
Check shims are located on either side of each foundation bolt
and minimum amount has been used.
Check insulation and fireproofing are in line with the
requirements on the drawings.
Physically inspect for any damage to the shell during transport
or installation.
If a non- inspection vessel, particular attention shall be paid to
the quality of the welding.
10
The certificates supplied by the manufacturers should be clear
and unambiguous.
11
Check all pipe work adequately supported in such a manner
that no strain is placed on the vessel.
RESULT
ACC
REJ
FILTER INSPECTION CHEC
Project Title
Job No
Client
Main Contractor
Senoro Gas Development Project
9608/SU2573
JOB Pertamina Medco E & P Tomori Sulawesi
TRIPATRA-SAMSUNG CONSORTIUM
Equipment Tag Number
F-2225
Reference Dr
Equipment Name
Amine Sump Filter
Revision
Manufacturer
JFC
No.
RESULT
ACC
REJ
ITEM TO CHECK
12
Check internals are as per drawing. If any alterations are
required (temporary removal of weirs etc.) these should be fully
recorded.
13
Check insulation is intact and free from damages to ensure no
possibility of rain water ingress
14
Check for internal cleanliness.
15
Check gasket material as per drawing
16
Check platform and ladders are securely fastened, fitted with
permanent handrails.
17
Check Davits are straight and swing easily both with and
without load.
Remarks :
Involvement Party
Signature
Performed By
Approved By
TSC
FILTER INSPECTION CHEC
Project Title
Job No
Client
Main Contractor
Senoro Gas Development Project
9608/SU2573
JOB Pertamina Medco E & P Tomori Sulawesi
TRIPATRA-SAMSUNG CONSORTIUM
Equipment Tag Number
F-2225
Reference Dr
Equipment Name
Amine Sump Filter
Revision
Manufacturer
JFC
No.
Name
Sign Date
Job Title
Form Code : SNO-Q-FM-0158 Rev.0
ITEM TO CHECK
Crys Suryo Prayogo
07-Aug-15
QC
RESULT
ACC
REJ
ECTION CHECK LIST
Sub-Contractor
Report No.
Date
Page
SNO-Q-BPK-PVI-116
07-Aug-15
of
Reference Drawing
SNO-M-4500123425-GA-033
Revision
C2
DATE
ACCEPTED
SUBCON
TSC
REVIEWED
JOB PMTS
REMARKS
ECTION CHECK LIST
Sub-Contractor
Report No.
Date
Page
SNO-Q-BPK-PVI-116
07-Aug-15
of
Reference Drawing
SNO-M-4500123425-GA-033
Revision
C2
DATE
ACCEPTED
SUBCON
Reviewed By
JOB PMTS
TSC
REVIEWED
JOB PMTS
REMARKS
TPI (If applicable)
ECTION CHECK LIST
Sub-Contractor
Report No.
Date
Page
SNO-Q-BPK-PVI-116
07-Aug-15
of
Reference Drawing
SNO-M-4500123425-GA-033
Revision
C2
DATE
ACCEPTED
SUBCON
TSC
REVIEWED
JOB PMTS
REMARKS