Checklist Earthwork, Excavation and Backfilling
Checklist Earthwork, Excavation and Backfilling
INSPECTION REPORT
RC
IR-
CONTRACTOR
PROJECT
DC-
RFI NO.
EARTHWORKS, EXCAVATION
BACKFILLING
DATE
Location
Drawing No./Rev.No.
ITEM
NO.
ACCEPTANCE CRITERIA
SITE EXCAVATION
PASS
A1
Number and location of underground utilities are identified and properly marked.
A2
Vetical and horizontal controls are established as per approved drawing/ layout plan
A3
The surface is free from loose materials and free from water after excavation.
A4
Temporary support are provided for the existing structures/utilities to prevent damages
during excavation.
A5
Excavated material suitable for fill has been placed in fill areas, unsuitable material has
been hauled away & dumped in spoil area.
A6
FAIL
N/A
B1
B2
All backfill materials are free of debris, waste, organic material, and
other deleterious matter
Backfill has been placed in layers not to exceed
150 mm in compacted thickness.
B3
Each layer has been compacted to 90% for general fill and 95% for structural fill of
optimum dry density as per ASTM D1557.
B4
Level tolerance, Gen. Fill :100 mm, Fill to be covered with concrete in foundations or
linings: 0 mm
COMPANY
SIGNATURE
NAME
DATE
Contractor Const.Dep't
Contractor QC
Customer
AL JALHAMI
AL JALHAMI
RC/BECHTEL
REMARK
IR-
DC-
REMARK
Customer
RC/BECHTEL