Checklist Earthwork, Excavation and Backfilling

This inspection report summarizes the results of an inspection of earthworks, excavation, and backfilling for a corrosion repair and protection project. The excavation work passed inspection as the underground utilities were properly identified and marked, vertical and horizontal controls were established, and the excavated surface was clear of loose materials and water. Temporary supports were also provided as needed. Backfilling passed inspection, as the material was free of debris, properly layered in 150mm lifts, and each layer was compacted to at least 90% density for general fill and 95% for structural fill. The inspection was signed off by representatives of the contractor and customer.

Uploaded by

Karthik Kumar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
33% found this document useful (3 votes)
2K views2 pages

Checklist Earthwork, Excavation and Backfilling

This inspection report summarizes the results of an inspection of earthworks, excavation, and backfilling for a corrosion repair and protection project. The excavation work passed inspection as the underground utilities were properly identified and marked, vertical and horizontal controls were established, and the excavated surface was clear of loose materials and water. Temporary supports were also provided as needed. Backfilling passed inspection, as the material was free of debris, properly layered in 150mm lifts, and each layer was compacted to at least 90% density for general fill and 95% for structural fill. The inspection was signed off by representatives of the contractor and customer.

Uploaded by

Karthik Kumar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 2

CUSTOMER

INSPECTION REPORT

RC

IR-

CONTRACTOR
PROJECT

560-S29 : CORROSSION REPAIR AND


PROTECTION WORKS

DC-

RFI NO.

EARTHWORKS, EXCAVATION
BACKFILLING

DATE

Location
Drawing No./Rev.No.

ITEM
NO.

ACCEPTANCE CRITERIA

SITE EXCAVATION

PASS

A1

Number and location of underground utilities are identified and properly marked.

A2

Vetical and horizontal controls are established as per approved drawing/ layout plan

A3

The surface is free from loose materials and free from water after excavation.

A4

Temporary support are provided for the existing structures/utilities to prevent damages
during excavation.

A5

Excavated material suitable for fill has been placed in fill areas, unsuitable material has
been hauled away & dumped in spoil area.

A6

Gradation: Less than 12% passing No. 200 sieve.

FAIL

N/A

BACKFILLING AND COMPACTION

B1
B2

All backfill materials are free of debris, waste, organic material, and
other deleterious matter
Backfill has been placed in layers not to exceed
150 mm in compacted thickness.

B3

Each layer has been compacted to 90% for general fill and 95% for structural fill of
optimum dry density as per ASTM D1557.

B4

Level tolerance, Gen. Fill :100 mm, Fill to be covered with concrete in foundations or
linings: 0 mm

COMPANY
SIGNATURE
NAME
DATE

Contractor Const.Dep't

Contractor QC

Customer

AL JALHAMI

AL JALHAMI

RC/BECHTEL

REMARK

IR-

DC-

REMARK

Customer
RC/BECHTEL