User Manual Capex Ps
User Manual Capex Ps
V1.0
Sep 2007
English
End User
Documentation - PS
mySAPERP2004 (ECC 6.0)
SSTL
1,6th Floor, Crown Court
#128, Cathedral Road
Chennai 600 086
Page 1 of 183
mySAPERP2004
Content
1
Budget Distribution..................................................................................................66
10
11
12
13
14
15
16
17
18
19
20
21
Page 2 of 183
mySAPERP2004
22
Create Reservation..................................................................................................151
23
Goods Issue............................................................................................................154
24
25
26
27
28
29
30
Page 3 of 183
Page 4 of 183
Page 5 of 183
In Organizational Units
1. Requesting Company code
2. Requesting Business Area
3. Requesting Cost Center
4. Requesting Profit Center
5. Requesting Company
6. Object Class
7. Plant
8. Responsible Cost Center
9. Responsible Profit Center
10.Currency
In Variants Tab
General Data
1. Completion Date Approximate date of Project completion date.
Select Plan Values Tab
Click on Create Cost Estimate Button below the screen.
A new screen is opened where you need to click the button Show/Hide Item
View. It would show a table where we need to feed in the values. The values
to be fed are
Item Category
o M for Material
o V for other costs like manpower, QC etc. The cost element for V
should be 7100150
Resource is where we select the RM name. The master would be
entered by the Purchase person. This is not required for RM. Enter
Quantity & hit enter.
For V change the description to suit us.
After completion of the entry, click confirm to record those values by
SAP which would appear on the left hand side of the screen.
Rows can be added, inserted, deleted accordingly. Filled values are shown
below.
Go Back or press F3. The total budget for the year 2007 (as the
investment planned is for 2007) would appear as shown below. Save
the Appropriation request.
Page 6 of 183
Note: We would define the cost for 1 year and if the project spills over to the
next year the remaining budget would also spill over.
After mentioning all the required entries when the user saves the
appropriation request as per the configuration the Appropriation request will
go for approval process as SAP Workflow (predefined Process). The
documents are uploaded through Document Management system as well as it
can be uploaded in Change mode of Appropriation request by selecting the
Service for Object Create Attachment.
b) Approve Appropriation Request Transaction Code : IMA12/SBWP
When the approving authority opens their SAP Mail Box through the
transaction code SBWP the system will show all the Workflow process to be
executed by him. He has to select the required appropriation request and
Click on Approve button, if he wants to see the attachment. He can see the
same in display mode of Appropriation request by selecting the Service for
Object View Attachment or in the Document Tab. The authorized person in
SAP does this step.
c) Activate & Release Appropriation Request Transaction Code:
IMA12
After approval the Appropriation request needs to be activated and released.
This will be done by the authorized person in the Measures/Assets Tab of the
Appropriation request in change mode of Appropriation request transaction.
Page 7 of 183
Page 8 of 183
Page 9 of 183
Page 10 of 183
Page 11 of 183
Page 12 of 183
Page 13 of 183
Page 14 of 183
Page 15 of 183
Page 16 of 183
Page 17 of 183
Page 18 of 183
Create PR/Release PR
(By Projects/Approving
Authorities)(ME51/ME55)
Create PO/Release PO
(By Purchase/Approving
Authorities)ME21N/ME28
Goods Receipts
(By Stores )MIGO
Create Reservation
& Goods Issue
(By Projects / Stores)
MB21/MIGO
Create Service PR /
Release PR
(By Projects/App.Autho.)
Page 19 of 183
Create Confirmation
(By Projects)
CN25/CN27
Page 20 of 183
Title:
Document No.
Responsibility
Version
SAP/EUD/PS/01
Finance
001
Prepared by
Reviewed by
Supercedes
Issue
d on
Transaction Code
IM01
Effective
Review
Date
Date
NIL
Approved by
V.Ananthapadmanaban
10.03.2008
2.1
Trigger
Via Menus
Via Transaction Code
Some of the fields mentioned in the following may not be in your entry screen. This depends on the configuration of
your system.
Output Results
Creation of Investment Program
Comments
Page 21 of 183
Procedural Steps
Access Create Investment Program transaction by:
Via Menus
Accounting Investment Management Program Master Data
Investment Program Definition Create.
Via Transaction Code
IM01
1.2.
below:
On screen Create Inv. Program Definition: Header Screen, enter information in the fields in the table
Page 22 of 183
Field Name
Investment
Program
Description
Investment Program
R/O/C
User Action and Values
R
Type the Description of the Investment
Program e.g. Shasun Investment 07-08
Approval Year
Approval Year
Program Type
Program Type
Program
Description
FI Variant
Currency
Currency
Comments
Page 23 of 183
Title:
Document No.
Responsibility
Version
SAP/EUD/PS/01
Finance
001
Prepared by
Supercedes
Issue
d on
Transaction Code
IM11
Effective
Review
Date
Date
NIL
Reviewed by
Approved by
V.Ananthapadmanaban
10.03.2008
2.1
Trigger
Via Menus
Via Transaction Code
Position ID
Type the Top level Position ID. e.g. SHASUN Investment 2007-08
Approval Year
Some of the fields mentioned in the following may not be in your entry screen. This depends on the configuration of
your system..
Output Results
Creation of Investment Program Top
Position.
Comments
Page 24 of 183
Procedural Steps
Access Create Investment Program transaction by:
Via Menus
Page 25 of 183
Field Name
Investment
Program
Description
Investment Program
R/O/C
R
Position ID
Top Position ID
Approval Year
Approval Year
Position ID
Description
Controlling Area
Comments
Page 26 of 183
Title:
Document No.
Responsibility
Version
SAP/EUD/PS/01
Finance
001
Prepared by
Supercedes
Issue
d on
Transaction Code
IM22
Effective
Review
Date
Date
NIL
Reviewed by
Approved by
V.Ananthapadmanaban
10.03.2008
2.1
Trigger
Via Menus
Via Transaction Code
Position ID
Type the Top level Position ID. e.g. SHASUN INVESTMENT 2007-08
Approval Year
Some of the fields mentioned in the following may not be in your entry screen. This depends on the configuration of
your system..
Output Results
Creation of Investment Program
Structure.
Comments
Page 27 of 183
Procedural Steps
Access Change Inv. Program Structure transaction by:
Via Menus
Accounting Investment Management Program Master Data
Investment Program Structure Change.
Via Transaction Code
IM22
31
3.1. On screen Change Inv. Program Structure: , enter information in the fields as specified in the
table below:
Page 28 of 183
Click on Create
Page 29 of 183
Field Name
Investment
Program
Description
Investment Program
R/O/C
User Action and Values
R
Type the Description of the Investment
Program e.g. SHA0708
Position ID
Top Position ID
Approval Year
Approval Year
Comments
Page 30 of 183
Title:
Document No.
Responsibility
Version
SAP/EUD/PS/01
Finance
001
Prepared by
Supercedes
Issue
d on
Transaction Code
IM32
Effective
Review
Date
Date
NIL
Reviewed by
Approved by
V.Ananthapadmanaban
10.03.2008
2.1
Trigger
After creating the Investment Program Structure the company Level Budget needs to be
updated.
Via Menus
Via Transaction Code
Position ID
Type the Description of the Investment Program e.g. Shasun Investment 0708
Select the Position ID from the List.
Approval Year
Investment Program
Some of the fields mentioned in the following may not be in your entry screen. This depends on the configuration of
your system..
Output Results
Company level Budget is updated.
Comments
Page 31 of 183
Procedural Steps
Access Change Inv. Program Structure transaction by:
Via Menus
Accounting Investment Management Program Budgeting Edit
Original.
Via Transaction Code
IM32
31
3.1. On screen Change Inv. Program Structure: , enter information in the fields as specified in the
table below:
Page 32 of 183
Page 33 of 183
Page 34 of 183
Field Name
Investment
Program
Description
Investment Program
R/O/C
User Action and Values
R
Type the Description of the Investment
Program e.g. SHAN0708.
Position ID
Top Position ID
Approval Year
Approval Year
Comments
Page 35 of 183
Title:
Document No.
Responsibility
Version
SAP/EUD/PS/01
Projects
001
Prepared by
Reviewed by
Supercedes
Issue
d on
Transaction Code
IMA11
Effective
Review
Date
Date
NIL
Approved by
V.Ananthapadmanaban
10.03.2008
Trigger:
Receipt of Intimation from Management or the Basic User Specifications from User Department and QA
Specifications from QA Department.
Via Menus
Via Transaction Code
Some of the fields mentioned in the following may not be in your entry screen. This depends on the configuration of
your system.
Output Results
Creation of Appropriation Request for
the requested Project.
Comments
Page 36 of 183
Procedural Steps
Access Create Appropriation Request transaction by:
Via Menus
Accounting Investment Management Appropriation Requests
Edit Appropriation Requests Individual Processing.
Via Transaction Code
IMA11
31
3.1. On screen Create Appropriation Request: , enter information in the fields as specified in the table
below:
Page 37 of 183
Page 38 of 183
Field Name
Controlling Area
Description
Controlling Area
Appropriation Request
Type
Project Profile
R/O/C
R
R
Project Profile
General Data
Reason for Investment
Environment
Investment
Scale
Appropriation Request
Comments
Page 39 of 183
Priority
Approval Year
Planned Approval Date
Person Involved
IM : Proposed By :
(Partner field)
IM : Supported By :
(Partner field)
IM : Supported By :
IM : Approved Unit
Head :
IM : Approved
Finance
R
O
As per the
Approving
Authorities.
We have to
select the
approving
Authorities.
Page 40 of 183
Page 41 of 183
Field Name
Control Data :
Investment Program
Description
Position ID
R/O/C
Comments
Page 42 of 183
Page 43 of 183
Field Name
Org. Units :
Req. Cost Center
Description
R/O/C
R
Plant
R
O
Location
Resp.Company
User Defined Fields
Nature of Exp
R
Nature of Expenditure
Comments
Page 44 of 183
Field Name
Variants
General Data:
Completion Date
Description
R/O/C
R
Comments
Project
Page 45 of 183
Page 46 of 183
Page 47 of 183
Field Name
Variants
Plan Values:
Description
R/O/C
Item Cat M
Material
Item Cat N
Service
Comments
Only M, N
or V
should be
used.
Item Category
o M for Material
o V for other costs like manpower, QC etc. The cost element for V
should be 7100150
Resource is where we select the RM name. The master would be
entered by the Purchase person. This is not required for RM. Enter
Quantity & hit enter.
For V change the description to suit us.
Go Back or press F3. The total budget for the year 2007 (as the
investment planned is for 2007) would appear as shown below. Save
the Appropriation request.
Note: We would define the cost for 1 year and if the project spills over to the
next year the remaining budget would also spill over.
Page 48 of 183
Page 49 of 183
Select the project in the left side of the screen and go to Approp.
Request Menu and select the change option.
Go to Control data Tab and click Form approval. The Appropriation
Request needs to be sent for approval.
Save the Appropriation Request.
Page 50 of 183
Title:
Document No.
Responsibility
Version
SAP/EUD/PS/01
Projects
001
Prepared by
Reviewed by
Supercedes
Issue
d on
Transaction Code
IMA12/SBWP
Effective
Review
Date
Date
NIL
Approved by
V.Ananthapadmanaban
10.03.2008
Trigger:
After Creating of Project Appropriation Request and its sent for Approval.
Via Menus
Via Transaction Code
Some of the fields mentioned in the following may not be in your entry screen. This depends on the configuration of your system..
Output Results
Release Appropriation Request of the requested
Project.
Comments
Page 51 of 183
Procedural Steps
Access Appropriation Request Individual Processing transaction by:
Via Menus
Via Transaction Code
1.0
below:
On screen Change Appropriation Requests : Header Screen, enter information in the fields in the table
Page 52 of 183
Page 53 of 183
System Will show the Display Mode of the Appropriation Request sent for Approval.
In case of any further requirement on the same Appropriation Request press BACK.
Page 54 of 183
Page 55 of 183
Page 56 of 183
Click on APPROVE.
Page 57 of 183
Description
SAP Business
Work Bench
R/O/C
R
Comments
Field Name
Description
Worklist
Off / On
R/O/C
R
Assignment
Project
General Data
Status
Select Approve.
Comments
System gives
message that
the
Page 58 of 183
Assignment
WBS Element
Appropriation
Request is
approved.
System
automatically
copies the
Project Code.
e.g. : M-0011
Page 59 of 183
Title:
Document No.
Responsibility
Version
SAP/EUD/PS/01
Finance
001
Prepared by
Reviewed by
Supercedes
Issue
d on
Transaction Code
IMA11
Effective
Review
Date
Date
NIL
Approved by
V.Ananthapadmanaban
10.03.2008
Trigger:
After Approval of Project Appropriation Request & Activation of Project Definition.
Some of the fields mentioned in the following may not be in your entry screen. This depends on the configuration of your system..
Output Results
The Budget is Distributed for the Appropriation
Request of the requested Project.
Comments
Page 60 of 183
Procedural Steps
Access Appropriation Request Individual Processing transaction by:
Via Menus
On screen Change Appropriation Requests : Header Screen, enter information in the fields in the table
Field Name
Measure / Assets
Project
WBS Element
Description
R/O/C
Activate project
Work Break Down Structure
Element
R
R
Comments
Click on Project .
Click on WBS Element
Page 61 of 183
Page 62 of 183
Page 63 of 183
Page 64 of 183
Page 65 of 183
Title:
Budget Distribution
Document No.
Responsibility
Version
SAP/EUD/PS/01
Finance
001
Prepared by
Reviewed by
Supercedes
Issue
d on
Transaction Code
IM52
Effective
Review
Date
Date
NIL
Approved by
V.Ananthapadmanaban
10.03.2008
Trigger:
After Approval of Project Appropriation Request & Activation of Project Definition.
Some of the fields mentioned in the following may not be in your entry screen. This depends on the configuration of your system..
Output Results
The Budget is Distributed for the Appropriation
Request of the requested Project.
Comments
Page 66 of 183
Procedural Steps
Access Budget Distribution transaction by:
Via Menus
Via Transaction Code
1.1
On screen Budget Distribution : Header Screen, enter information in the fields in the table below:
Field Name
Investment Program
Original Budget
Description
The Investment Program
R/O/C
R
Annual Overview
Comments
Press Enter.
Select Execute option from the Menu or
Select the Clock Button in the Screen.
Enter the amount to be distributed for the
Project as Budget. e.g. CAP-2007-P02EXPAN.
Select Annual Overview from the
Screen and Enter the Original Budget
distributed for that Project.
Select Save Button from the Screen or
Save from the Menu.
Page 67 of 183
Enter the Overall / year Wise Budget for the Appropriation Request / Project Definition
Page 68 of 183
Page 69 of 183
Page 70 of 183
Check on
CHECK
Page 71 of 183
Click on check button and Save the system will generate the Budget document.
Page 72 of 183
Title:
Document No.
Responsibility
Version
SAP/EUD/PS/01
Finance
001
Prepared by
Reviewed by
Supercedes
Issue
d on
Transaction Code
IMA11
Effective
Review
Date
Date
NIL
Approved by
V.Ananthapadmanaban
10.03.2008
Trigger:
After Activation of Project Definition and Budget Updating for the Appropriation Request.
Some of the fields mentioned in the following may not be in your entry screen. This depends on the configuration of your system..
Output Results
Comments
Page 73 of 183
Procedural Steps
Access Appropriation Request Individual Processing transaction by:
Via Menus
Via Transaction Code
1.0
below:
On screen Change Appropriation Requests : Header Screen, enter information in the fields in the table
Page 74 of 183
Page 75 of 183
Title:
Document No.
Responsibility
Version
SAP/EUD/PS/01
Finance
001
Prepared by
Supercedes
Issue
d on
Transaction Code
CJ02/CJ20N
Effective
Review
Date
Date
NIL
Reviewed by
Approved by
V.Ananthapadmanaban
10.03.2008
Trigger:
After the Approved Budget Appropriation Request form.
Business Process Description Overview
The project Lower Level WBS Elements has to be created. (Up to Level 3)
Via Menus
Via Transaction Code
Logistics Project System Project Spl. Maintenance Function Work Break Down
Structure (WBS) Change
Logistics Project System Project Project Builder
CJ02 /CJ20 N
Some of the fields mentioned in the following may not be in your entry screen. This depends on the configuration of your system..
Output - Results
Comments
Page 76 of 183
Procedural Steps
1.0
On screen Change Project Definition : Header Screen, enter information in the fields in the
table below:
Field Name
Project Definition
Responsible Person
Applicant No.
Description
R/O/C
Start Date
End Date
Company Code
Company Code
Business Area
Business Area
Plant
Comments
Page 77 of 183
Profit Center
Profit Center
Location
Mask ID
Page 78 of 183
Field Name
Level
WBS Element
Description
Description
WBS Level Number
WBS Element
WBS Description
R/O/C
R
R
R
Comments
As required
by the Project
Engineers.
The Project
Structuring
needs to be
created.
Page 79 of 183
Title:
Document No.
Responsibility
Version
SAP/EUD/PS/01
Projects
001
Prepared by
Reviewed by
Supercedes
Issue
d on
Transaction Code
CJ40
Effective
Review
Date
Date
NIL
Approved by
V.Ananthapadmanaban
10.03.2008
2.1
Trigger
After creating the Lower Level (3) WBS elements under the Project Definition.
Via Menus
Via Transaction Code
Some of the fields mentioned in the following may not be in your entry screen. This depends on the configuration of
your system..
Output Results
Manual Cost Planning for the Project
Definition will be done.
Comments
Page 80 of 183
Procedural Steps
Access Change Cost Planning transaction by:
Via Menus
Via Transaction Code
1.2
On screen Change Cost Planning : Initial Screen, enter information in the fields in the table below:
Page 81 of 183
Page 82 of 183
Page 83 of 183
Description
R/O/C
Comments
Overall & Year
wise budget
needs to be
updated.
Click on Save.
After saving this the User needs to send an SAP Mail to Budgeting Department to
Update the Cost Planned to Budget.
Page 84 of 183
Title:
Document No.
Responsibility
Version
SAP/EUD/PS/01
Projects
001
Prepared by
Reviewed by
Supercedes
Issue
d on
Transaction Code
CJ30
Effective
Review
Date
Date
NIL
Approved by
V.Ananthapadmanaban
10.03.2008
2.1
Trigger
After creating the Manual Cost planning for the Lower Level (3) WBS elements under the
Project Definition.
Via Menus
Via Transaction Code
Some of the fields mentioned in the following may not be in your entry screen. This depends on the configuration of
your system..
Output Results
Budget for the Lower Level WBS
elements (level 3 ) for the Project
Definition will be done.
Comments
Page 85 of 183
Procedural Steps
Access Change Original Budget transaction by:
Via Menus
Field Name
Project Definition
Description
R/O/C
Comments
Overall &
Yearwise
budget needs
to be updated.
Page 86 of 183
Page 87 of 183
Page 88 of 183
Page 89 of 183
Page 90 of 183
Title:
Create Network
Document No.
Responsibility
Version
SAP/EUD/PS/01
Projects
001
Prepared by
Supercedes
Issue
d on
Transaction Code
CN21
Effective
Review
Date
Date
NIL
Reviewed by
Approved by
V.Ananthapadmanaban
10.03.2008
2.1
Trigger
After creating the Project definition for the activities this Network will be created.
Via Menus
Via Transaction Code
Network Profile
Select the network profile from the list. e.g. Network profile
w/Acct.asst(SCDL)
Network type
Plant
MRP Controller
Some of the fields mentioned in the following may not be in your entry screen. This depends on the configuration of
your system..
Output Results
Network will be created.
Comments
Page 91 of 183
Procedural Steps
Access Create Network transaction by:
Via Menus
Field Name
Network Profile
Description
Network Profile
R/O/C
R
Network Type
Network Type
Plant
Plant
MRP Controller
MRP Controller
Comments
The user has to
select only this
network Profile
The user has to
select only this
network type
Page 92 of 183
Page 93 of 183
Page 94 of 183
Field Name
Network
Description
Description of Network
Scheduling
Scheduling Type
Assignment
Project Def.
R/O/C
R
Project Definition
Comments
Page 95 of 183
Field Name
Network No.
Description
Network Number.
R/O/C
R
Description
Description of the
Activities
Normal Duration
Normal Required
Duration for the Activity
WBS Element
WBS element
R
Corresponding to the
Activities
(Note: On above table, in column R/O/C: R
Page 96 of 183
On screen Create Network Basic Data Overview (basic Dates ) Screen, enter information in
the fields in the table below:
Select the Activities for which the Milestones are Attached.
Select the Milestone Overview Button from the Screen or Activity option Milestone Overview
option from the Main menu.
Field Name
Usage
Description
The Person who is
responsible
for
confirming
this
Milestone
Description of the
Milestone
Description
R/O/C
R
Type
the
Description
Milestone to be confirmed
Group
Fixed Date
Fin. Off.
Offset
of
Finish to Offset
of
the
Comments
Milestone.
Unit of Offset of
R
Milestone
Date
(Note: On above table, in column R/O/C: R = Required, O = Optional, C = Conditional)
Offset Unit
Page 97 of 183
On screen Create Network Milestone Overview Screen, enter information in the fields in the
table below:
If you want to insert a Group of Milestones then select the Milestone Group from the given List
of Groups.
If you want to insert a Standard Milestone select the Standard Milestone from the given List.
Page 98 of 183
Page 99 of 183
On screen Create Network Basic Data Overview (basic dates ) Screen, enter information in
the fields in the table below:
Select the Activity Element Overview button from the Screen or Activity option Element
Overview option from the Main menu or Ctrl +Shift + F10 .
Field Name
Internal
Processing
Description
Work
Description
Description
of Work
Center Work
R/O/C
R
Work Center
Comments
Activity Type
On screen Create Network Basic Data Overview (basic dates ) Screen, enter information in
the fields in the table below:
Select the External processing button from the Screen.
Field Name
External
Processing
Service
Description
Indicator for External
Service requirement
Description
Description of the
Service
Name of the Purchase
Organization
Purchase org.
Cost Element
WBS Element
R/O/C
R
Comments
Outline-agreement
Contract Number.
Agreement item
Item number
Material Group
Select the an activity or group of activity by clicking the above said green colour button from the screen. The
system will display the following Screen.
1.6
On screen service Specifications : External Specs. F.Task List Maintain Screen, enter information in
the fields in the table below:
Field Name
Service Number
Description
Service Number
Quantity
No. of Quantity
Cost Element
Item
Overall Limit
Expected Value
No Limit
Contract Number
Other Limit
R/O/C
R
Comments
System will automatically
picks up the short text
from the service master.
Title:
Document No.
Responsibility
Version
SAP/EUD/PS/01
Projects
001
Prepared by
Reviewed by
Supercedes
Issue
d on
Transaction Code
CJ20/CJ20N
Effective
Review
Date
Date
NIL
Approved by
V.Ananthapadmanaban
10.03.2008
2.1
Trigger
The Asset wise WBS elements has to be created and Project definition has to be released.
Via Menus
Some of the fields mentioned in the following may not be in your entry screen. This depends on the configuration of
your system..
Output Results
The Assetwise WBS elements will be
created & Project is released.
Comments
Procedural Steps
Access Change Project definition transaction by:
Via Menus
Field Name
Project Definition
Description
R/O/C
Comments
Title:
Document No.
Responsibility
Version
SAP/EUD/PS/01
Projects
001
Prepared by
Supercedes
Issue
d on
Transaction Code
ME51/ME51N
Effective
Review
Date
Date
NIL
Reviewed by
Approved by
V.Ananthapadmanaban
10.03.2008
2.1
1.
Trigger
Direct requirements from a project, cost center , sales order or work order
Document Type
Delivery date
Plant
Purchasing Group
Account assignment
Output - Results
Approved requisitions
Comments
Authorization to Purchasing department to proceed with purchase
When you enter the item category, account assignment, delivery date, plant, storage location, Purchasing
group, material group on the initial overview screen, this information defaults to each item number on the item
screen eliminating duplication of typing effort. In the item screen any of these fields can be changed using a
requisition tracking number or entering a requisitioner allows grouping for easy monitoring. If you specify an
account assignment, do not reference a storage location, because the item is being charged off and will not go
into inventory.
Set up the user defaults for each user to force the system to plug in default data, i.e. plant, purchasing
organization.
Procedure Steps
31 1.1. Access transaction by:
Via Menus
Press Enter
Fields
Document
Type
Description
Defines whether a requisition or
agreement is to be created
R/O/C
R
Purchase
requisition
Source
determinatio
n
Item Category
O
R
Plant
Storage
location
Account
assignment
Delivery date
Fields
Item
I
A
Material
Short Text
Comments
Projects, orders
and cost centers
will have
assigned
numbers
Date format may
vary by
configuration
Description
Number that uniquely identifies
an item within a purchase
requisition
Denotes specific features of an
item (example - material is
consignment)
key specifying whether
accounting for an item is to be
effected via an auxiliary
Account
R/O/C
R
Enter name
Comments
Projects, orders
and cost
centers will
have assigned
numbers
Qty requested
Quantity to be ordered
UN
PGr
Matl Group
Material Group
Plant
Storage
location
SPlt
Supplying Plant
Delivery date
Do not enter a
location.
System will ask you the Valuation type. Enter the Valuation type or select the required valuation type from
the Drill Down Search method.
Press Ctrl + S from keyboard or Save button from the Screen. The system will prompt you the numbered
Purchase Requisition.
Title:
Document No.
Responsibility
Version
SAP/EUD/PS/01
Purchase
001
Prepared by
Supercedes
Issue
d on
Transaction Code
ME21N
Effective
Review
Date
Date
NIL
Reviewed by
Approved by
V.Ananthapadmanaban
10.03.2008
2.1
Trigger
Direct demand for Purchase order for stock material
Business Process Procedure Overview
A purchase order is a legal document used to record an individual purchase (negotiated terms, conditions and
pricing) with the vendor or arrange for a delivery based on prior agreement. It also provides the vendor with a
reference document to link to shipping (goods receipt) and invoicing (invoice verification) processes.
The purchase order is a commitment to a vendor for a given material, in a specified quantity at a predetermined
price and delivery date.
Vendor
Vendor number
Date
Purchasing Organization
Should default
Purchasing Group
Output - Results
Printed purchase order
Comments
Can be manually sent, faxed or EDI
31
Procedural Steps
1.1. Access Create Purchase Order: Initial screen by:
Via Menus
Field Name
Vendor
Description
Vendor number
R/O/C
R
Order type
Date
NA
Purchase Order
NA
Purchasing
Organization
Purchasing
Group
Item category
Type of purchase
Acct. assignment
category
Comments
Leave blank if
internally
assigned;
Delivery Date
category
Delivery date
Storage Location
Material Group
Req. tracking
number
Plant
Acknowledgment
required
32
R
O
being ordered.
Indicates whether the delivery
date is to be entered and
displayed as a calendar day,
week, or month.
Can default from material
master or be entered manually
Select plant number
Select storage location assigned
to above plant
Will default from material
master
Can be used in List display to list
all POs created by a certain
buyer
Turn on button if
acknowledgment is required .
Potential entry
is employee
number
Press enter.
1.3.
On screen Create Purchase Order: Item Overview: enter information as specified in the fields in the table
below:
Field Name
Item
R/O/C
R
Material
Description
Item number of purchase order
item
Material number
Quantity
Net Price
R
R
Date
Comments
Note: if
material is on
agreement use
agreement price
not current
price
Plant
33
Plant code
1.4. On screen Create Purchase Order: Item Details, enter information as specified in the fields in the table
below:
Field Name
Info record
update
Reminder 1, 2,
3
Confirmation
control key
Underdelivery
tolerance
Overdelivery
tolerance
Unlimited
Tax code
Shipping
instructions
IR
GR-based IV
34
Description
Used to specify how vendors
info record will be updated in
the system
Reminder (in days)
R/O/C
O
Comments
1.5. On screen Create Purchase Order: Header Details, enter information as specified in the fields in the table
below:
Field Name
Terms of
delivery and
payment
Incoterms 1&2
Description
Vendor terms
R/O/C
R
Currency
Exchange rate
References
Text Overview
References documents
Additional information
O
O
Salesperson
Telephone
Invoicing Party
Comments
Title:
Document No.
Responsibility
Version
SAP/EUD/PS/01
Purchase
001
Prepared by
Supercedes
Issue
d on
Transaction Code
F-47
Effective
Review
Date
Date
NIL
Reviewed by
Approved by
V.Ananthapadmanaban
10.03.2008
2.1
Trigger
Request from the Vendor for Advance. Request raised by Purchase against the purchase order.
Document Date
Company Code
Currency
Spl.GL indicator
Output - Results
Vendor advance request is created.
Comments
Procedural Steps
31 1.1. Access Down Payment Request : Initial screen by:
Via Menus
Field Name
Document date
Description
Document Date
R/O/C
R
Posting Date
Posting Date
Document Type
Company Code
Currency
R
R
R
Amount to be posted
R
R
R
Reference &
Head.Text
Amount
Tax Code
Due Date
Purch. Doc.
Comments
Title:
Document No.
Responsibility
Version
SAP/EUD/PS/01
Finance
001
Prepared by
Supercedes
Issue
d on
Transaction Code
F-48/F-58
Effective
Review
Date
Date
NIL
Reviewed by
Approved by
V.Ananthapadmanaban
10.03.2008
2.1
Trigger
The Vendor Advance Request raised by Purchase against the purchase order.
Currency
Spl.GL indicator
Output - Results
Vendor down payment is posted.
Comments
Procedural Steps
31 1.1. Access Post Down Payment Request: Initial screen by:
Via Menus
Field Name
Document date
Description
Document Date
R/O/C
R
Title:
Document No.
Responsibility
Version
SAP/EUD/PS/01
Finance
001
Prepared by
Reviewed by
Supercedes
Transaction Code
MIGO_GR
Issue
d on
Effective
Date
Review
Date
NIL
Approved by
V.Ananthapadmanaban
10.03.2008
2.1
Trigger
Deliveries from vendors are most likely the result of purchase orders initiated by the purchasing department
Business Process Procedure Overview
Goods are received from the Vendor as a result of a Purchase Order at the receiving area. A goods movement is
entered into the system referencing this PO and a goods receipt material document is posted. Appropriate general
ledger accounts are also posted.
Field Values/Comments
Date that the document is entered
Movement Type
Purchase Order Number
Output - Results
The output is a material document,
which can contain accounting, profit
center, and other financial postings.
Comments
The output is the Goods Receipt Note with reference to a Purchase order.
All inventory and accounting entries are created upon posting of this
document in the system.
accurately.
To reverse by material document follow the menu path: Logistics > Material Management > Inventory
Management > Material Document > Cancel/Reverse. The material document is needed for this transaction.
If it is unknown, do a pull-down on the material document field and enter in search criteria relevant to the material
document. For example, enter a material number, plant, movement type, posting date, etc. Remember, the
system only displays the information that is entered. Therefore, do not be too specific especially if you are not
sure. A recommendation would be for the material, plant and movement type as a minimum. Then press the
execute button (the icon resembling a flower or stopwatch or press F8). Select the material document item and
press the Adopt document button. The material document number will be copied into the screen. Now press
enter. The heading of the screen should read, Cancel Material Document: Selection Screen. Select the line and
press the Copy button. Then SAVE. If the material for that document is displayed, there will be offsetting entries
to the previous receipt by quantity AND value.
Goods receipt tolerances for quantity are set at different levels material master, purchasing information record,
purchase order, and outline agreements. The order of precedence follows the same order from least specific
(lowest) to most specific (highest). For example, the over/under-delivery tolerances are set at the material master
level
Procedural Steps
31 1.1. Access Goods Receipts Purchase Order: Initial screen by:
Via Menus
Field Name
Document
Date
Posting
Date
Delivery
note
R
/
O
/
C
R
Bill of
lading
Doc.
Header text
Purchase
order
Plant
Plant number.
Storage
location
Storage location
Reason for
Movement
Movement
type
Suggest
Zero Lines
Description
Comments
Movement type
is 101 for
goods receipt
to storage
location.
32
33
Field Name
Item
indicator
Quantity
R
/O/
C
R
Quantity received
Eun
Sloc
Storage location
34
35
36
Description
Comments
May be
changed to alt.
UOM, if
specified on
Material master
record.
1.4. Select the relevant lines that have been received from the packing list and Press the Adopt + Details
radio button to copy the PO information to the document.
*** Please note that the system will display a message for deficit quantities receipts and over delivery
quantities. For example, if a PO line has an expected quantity of 100 pieces and only 80 pieces were
delivered, a deficit warning will appear. The same will happen with over delivery quantities. In this case an
error message will be displayed. Warning can be overridden by pressing enter. Errors, however, cannot be
overridden. Errors must be resolved.
1.5. On screen Goods Receipt for PO: New Item, the fields will be filled in with information from the Purchase
Order. You may change the following fields:
Field Name
Description
R
/
O
/
C
R
Unit of
entry
Batch
Quantity received
Batch number to which the
material is assigned.
Vendor
Batch
Prod Dt
Production/Expiry date
No of
containers
Eun
No of GR
slip
Unloading
point
Text
Additional text
37
Comments
Must be
entered if
batch required
field is set on
material
master.
Title:
Document No.
Responsibility
Version
SAP/EUD/PS/01
Finance
001
Prepared by
Reviewed by
Transaction Code
MIRO
Supercedes
Issue
d on
Effective
Date
Review
Date
NIL
Approved by
V.Ananthapadmanaban
10.03.2008
Trigger:
Invoice
Output - Results
Posted or Parked Invoice Document
Comments
Procedural Steps
31 1.1. Access transaction by:
Via Menus
Via Transaction Code
32
Field Name
Document Date
Description
R/O/C
R
Document Type
Posting Date
R
R
Document
number
Reference
Amount
Calculate Tax
Business Place
Purchase Order
R
R
R
User Action
Defaults to RE
Defaults to System Date
PO to be
reference
in Invoice
Delivery note
Input values
Vendor invoice
date
RE
Actual date of
posting in SAP
No entry - Internal
Comments
Vendor Invoice
reference
Vendor Invoice
amount (including
Tax and Duties)
Tick
1000
Purchase Order
reference
Delivery note
reference
Field Name
Payment Terms
Description
R/O/C
R
Baseline date
House Bank
Payment method
R
O
Default
master
Default
master
Default
Default
master
User Action
from Vendor
Input values
Default
from Vendor
Default
Default
Default
Comments
Change if
required
Change if
required
Change if required
Change if
required
For foreign currency transactions, the currency and rate should be entered here. In case no rate is mentioned, then
the system takes the latest rate as maintained in the exchange rate table (OB08). Enter any document header text
also here.
Check for the green traffic light and Balance = 0.
Click the SIMULATE pushbutton to review the transaction prior to posting.
1.7.
Press the SAVE icon or Document Save to save and post the document.
Note document number at the bottom of the screen.
1.8.
or Shift F3).
Steps :-
31 Press the
SAVE icon or
Document Save to save and
post the document.
NOTE :
The payment block can be removed through automatic release by amending the order or manually
through MRBR.
Procedural Steps
33
1.1.
Via Menus
Via Transaction Code
Select RELEASE
AUTOMATICALLY for price
variance acceptance by order
amendment
EXECUTE
Select item
and place
cursor on the
Log.Block
column.
SAVE
Press the
1.
Procedural Steps
Access transaction by: Printout of Debit Advice
Via Menus
34
On screen Output Messages in Logistics Invoice Verification: Initial Screen, enter information in the fields for
Basic Data as specified in the table below:
Out Type:
Invoice doc. Number if known
User Name:
Execute
Title:
Create Reservation
Document No.
Responsibility
Version
SAP/EUD/PS/01
Projects
001
Prepared by
Transaction Code
MB21
Supercedes
Issue
d on
Effective
Date
Review
Date
NIL
Reviewed by
Approved by
V.Ananthapadmanaban
10.03.2008
Trigger:
User wishes to reserve a material for a particular usage on a particular date.
Business Process Description Overview
This process describes the method to create a reservation manually within the R/3 system.
The exact process for creating a reservation will be slightly different depending upon which goods movement is
being designated.
For material planning through release of Process order or Maintenance order the system automatically creates a
reservation for the materials/components so attached in the respective orders.
Field Value/Comments
Date that you want to reserve the material
Plant
The goods movement that you are reserving the material for. Movement
type 261 for reservations against orders ( Process and Maintenance).
Movement type 201 for reservations for consumption.
Plant where the reservation will occur.
Material
Material to be reserved.
Quantity
Amount to be reserved.
Storage Location
Output - Results
Creation of a reservation
Comments
The system will generate a unique reservation number.
Movement Type
31
Field Name
Base Date
Description
Date for which the goods movement
is planned
R/O/C
R
Check against
calendar
Plant number
Movement
Type
Plant
Comments
Ref.
Reservation
32 Press <Enter>
33 1.3. On screen Create Reservation: New Items, enter the below information:
(Note: Some of the data on this screen depends upon the movement type that was specified on the
initial screen).
Field Name
WBS Element
Description
WBS Element
R/O/C
R
Material
Material number
Quantity
Material quantity
UnE
Plant
Sloc
Plant number
The storage location where the
material is currently stored.
The batch number to which the
material is assigned.
Indicator: Goods movement for
reservation allowed Indicator specifying that
movements are allowed in respect
of the reservation item.
If you want to prevent a goods
movement in respect of this
reservation item, you must
deselect the field.
If you want to allow a goods
movement in respect of this
reservation item, select the field.
C
R
Batch
M
O
O
Comments
Pull down table
access.
The quantity is
automatically
converted to stockkeeping units.
Pull down table
access. The system
will use the default
unit of
measure (entry) if
this field is left
blank.
Pull down table
access.
Transaction Code
Title:
Goods Issue
Document No.
Responsibility
Version
SAP/EUD/PS/01
Projects
001
Prepared by
MIGO_GI/MB1A
Reviewed by
Supercedes
Issue
d on
Effective
Date
Review
Date
NIL
Approved by
V.Ananthapadmanaban
10.03.2008
Trigger:
Stock needs to be removed from inventory and issued for any one of a variety of reasons.
Issue to order/Others
Select
Select
Comments
Output - Results
Material and Accounting documents
31
Via Menus
Field Name
Document
Date
Posting Date
Material slip
Description
Default is current system date
R/O/C
R
R
O
Movement
type
Plant
Plant number.
Reason for
mvt.
Storage
location
Special stock
Suggest zero
lines
Storage location
O
O
Doc. Header
text
GR/GI slip
no
O
O
Comments
Movement type
is 551 for
issuing goods to
scrap.
Print indicator
Individual
slip
Indiv.slip
w.inspect.te
xt
Collective
slip
32
Field Name
G/L account
Business
area
Cost center
Material
Quantity
Unit of Entry
Stor. Loc.
Description
The account number in a chart
of accounts. This is the account
to which the goods issue is
assigned.
An organizational entity for
which balance sheets as well as
P&L statements can be created.
A uniquely defined cost center
where the cost of scrap occurs.
Material Number of material that
is to be scrapped.
Material quantity
R/O/C
O
Comments
Pull down table
access.
O
O
Transaction Code
Title:
Service Entry
Document No.
Responsibility
Version
SAP/EUD/PS/01
Projects
001
Prepared by
ML81N
Supercedes
Issue
d on
Effective
Date
Review
Date
NIL
Reviewed by
Approved by
V.Ananthapadmanaban
10.03.2008
Trigger:
Requirement for recording services performed by service provider
Business Process Description Overview
This document describes the procedure for creating a service entry sheet. Within purchasing, this service entry
sheet document is designed for the recording of the services, which have been performed by the service provider.
The service entry sheet is a list of all planned services that have actually been performed. It can also be used to
list and specify unplanned services that have been performed and whose precise scope and nature were unknown
at time of planning phase.
Comments
Output - Results
Service Entry
31
Via Menus
Logistics > Material Management > Service Entry Maintain
Via Transaction Code
ML81N
1.2.
On screen Maintain Service Entry: Initial Screen, enter information in the fields as specified in the below
table:
Purchase Order
Number
Purchase Order
Item
Entry Sheet
Number
Selection
Criteria:
Person resp :
(ordering
party)
Person resp :
(contractor)
Reference Date
Only open
sheets
Location
service
performed
Short Text
Adoption of
Planned Services
Name of person
responsible for ordering
service
Name of person
responsible at contractors
office
Date when the price was
put on the service entry
sheet
Enter name
Enter name
Enter date
O
Location at which service
was performed.
O
O
Enter location
Percentage for
quantities
Model Service
Specifications
Sequential
Control
% of planned services
adopted from PO
Number of a set of model
service specifications
Overview
Details
Add
Choose one
Field Name
Short Text
Description
Key which uniquely defines
service
(service master number)
Description of Service
Quantity
Un of
Measure
Price
Service No.
R/O/C
R
Comments
1.4.1
The system determines whether the entry of the relevant service is allowed in each
case. It checks whether the service that has been performed:
Relates to PO Item
Relates to a contract
Is covered by a limit in a contract
Title:
Create Confirmations
Document No.
Responsibility
Version
SAP/EUD/PS/01
Projects
001
Prepared by
Reviewed by
Transaction Code
CN25/CN27
Supercedes
Issue
d on
Effective
Date
Review
Date
NIL
Approved by
V.Ananthapadmanaban
10.03.2008
Trigger:
Completion of the Activity by the person or Work center.
Business Process Description Overview
Confirming the Activity or the Activity element by the Person or Work Center.
The responsible person who is doing the work has to confirm the Activity / Activity element.
Via Menus
Via Transaction Code
Some of the fields mentioned in the following may not be in your entry screen. This depends on the configuration of your system..
Output Results
Comments
Field Name
Network
Description
Description of Network
R/O/C
R
Activity
Description of Activity
Activity Element
Capacity Cat.
Category
Split Number
Comments
1.4
Press Actual Data button from the screen or Goto option and select the actual data option from the Main menu.
Field Name
Comp.
Description
Completion
Final. Comp.
Final Completion
Work Center
Work
R/O/C
C
Comments
If there is no pending
work on this activity.
If you have selected the
Activity
element
for
confirmation
then
the
system will automatically
picks up the Work center
field.
Field Name
Network
Description
Description of Network
R/O/C
R
Activity
Description of Activity
Activity Element
Capacity Cat.
Category
Split Number
Comments
Title:
Document No.
Responsibility
Version
SAP/EUD/PS/01
Projects
001
Prepared by
Transaction Code
F-58
Supercedes
Reviewed by
Issue
d on
Effective
Date
Review
Date
NIL
Approved by
V.Ananthapadmanaban
10.03.2008
Trigger:
Need to print a check without running the payment program.
Business Process Description Overview
You can have the system print checks without running the payment program or the print program.
The process outlined below assumes you want to post the payment and print the associated check at the same
time. However, you may also just print the check for a payment which has already been posted. This may be
necessary, for example, if a check is damaged during printing with the print program.
Field Name
Description
R/
O/
C
R
R
Company Code
Payment Method
Company code ID
Payment method used to settle
open items, selection of Mode of
payment
House Bank
Bank name
Document Date
Document type
R
R
R
R
Customer
Vendor
Payment on
account
Adhoc payment
Pmt on account
Standard Ois
Posting Date
Currency
Amount
Business Area
Value Date
Text
R
R
O
O
R/
o
Comments
(BA/ BB/
BF/BH/BR)
INR
Amount to be paid
The Business Area pertaining to the
Bank Location
The field should be made as value date
Remarks of the document
Save icon.
NOTE:
The system will return a confirmation pop-up window with a document number and it will issue a
confirmation message that the print program has been initiated.
For printing the Check & Payment Advice select the line item & click the Print ICON
Title:
Project Settlement
Document No.
Responsibility
Version
SAP/EUD/PS/01
Projects
001
Prepared by
Reviewed by
Transaction Code
CJ88/CJ8G
Supercedes
Issue
d on
Effective
Date
Review
Date
NIL
Approved by
V.Ananthapadmanaban
10.03.2008
Trigger:
After Project Handing Over to the User Department with all the required documents.
Materials, which are not used in those Projects, can be moved from one project to another.
Projects Department should give the List of Materials, which are installed, in that requesting Cost center with the
date of Installation. This information is required for Finance for Asset Capitalization.
Business Process Description Overview
Settlement of Asset Under Construction to Fixed Assets.
The authorized Person will do this transaction.
Via Menus
Via Transaction Code
Some of the fields mentioned in the following may not be in your entry screen. This depends on the configuration of
your system.
Output Results
Settlement of Asset from WBS Elements
for the Project.
Comments
1.0
On screen Actual Settlement : Project / WBS Element / Network Initial Screen, enter information in the
fields in the table below:
Field Name
Project Definition
or WBS element or
Network
Settlement Period
Description
Key identifying the
Project
Network Number
Settlement Month.
R/O/C
R
Fiscal year
With Hierarchy
With Orders
Test Run
Financial Year
Indicator
Indicator
Indicator
Detail List
Indicator
Check Trans.Data
Indicator
R
R
R
R&C
Comments
Network Activities have Settlement Rule; Manpower WBS Level 2 shall have settlement Rule from Level
3 Manpower .
At month end, man-hours to be recorded by engineers to date.
Title:
Document No.
Responsibility
Version
SAP/EUD/PS/01
Projects
001
Prepared by
Reviewed by
Transaction Code
CJ02/CJ20N
Supercedes
Issue
d on
Effective
Date
Review
Date
NIL
Approved by
V.Ananthapadmanaban
10.03.2008
Trigger:
After Project Handing Over to the User Department with all the required documents.
Materials, which are not used in those Projects, can be moved from one project to another.
Projects Department should give the List of Materials, which are installed, in that requesting Cost center with the
date of Installation. This information is required for Finance for Asset Capitalization.
Business Process Description Overview
Settlement of Asset Under Construction to Fixed Assets.
The authorized Person will do this transaction.
Via Menus
Via Transaction Code
Some of the fields mentioned in the following may not be in your entry screen. This depends on the configuration of
your system.
Output Results
Asset will be created
Comments
On screen Change Project Definition: Initial Screen, enter information in the fields in the table below:
Field Name
Project Definition or
WBS element or
Network
Asset Class
Description
Key identifying the
Project
Network Number
Asset Class
R/O/C
R
R
Comments
Partial Capitalization :-
Settlement of AuC from WBS Elements done; Create Fixed Assets from WBS Elements; Assign Settlement
Rules from Manpower WBS Level 2 to Fixed Assets with equivalence numbers.
Field Name
Project Definition or
WBS element or
Network
Settlement Period
Description
Key identifying the
Project
Network Number
Settlement Month.
R/O/C
R
Posting Period
Asset Value Date
Fiscal year
With Hierarchy
With Orders
Test Run
Detail List
Indicator
Check Trans.Data
Indicator
R
R
R
R
R
R
R&C
Press
Execute
Button
from
the
Comments
Partial Capitalization should have been completed; TECO status for WBS Elements and Network
Activities, At Project end, this is done. Project Should be closed in Financial / Material Management
Point of view.
Final Captalization :-
Field Name
Project Definition or
WBS element or
Network
Settlement Period
Description
Key identifying the
Project
Network Number
Settlement Month.
R/O/C
R
Posting Period
Asset Value Date
Fiscal year
With Hierarchy
With Orders
Test Run
Detail List
Indicator
Check Trans.Data
Indicator
R
R
R
R
R
R
R&C
Press Execute
Screen.
Button
from
the
Comments
NOTE :
PLEASE NOTE THAT FINAL SETTLEMENT CAN BE DONE ONLY AFTER CLEARING THE DOWN PAYMENTS
AGAINST PROJECTS PURCHASE ORDERS.
Title:
Document No.
Responsibility
Version
SAP/EUD/PS/01
Projects
001
Prepared by
Reviewed by
Supercedes
Transaction Code
CN22
Issue
d on
Effective
Date
Review
Date
NIL
Approved by
V.Ananthapadmanaban
10.03.2008
Trigger:
After Project Handing Over to the User Department with all the required documents.
Materials, which are not used in those Projects, can be moved from one project to another.
Projects Department should give the List of Materials, which are installed, in that requesting Cost center with the
date of Installation. This information is required for Finance for Asset Capitalization.
Setting the System status as CLOSED
Business Process Description Overview
Setting the User Status as CLOSED
The authorized Person will do this transaction.
Via Menus
Via Transaction Code
Some of the fields mentioned in the following may not be in your entry screen. This depends on the configuration of
your system.
On screen Change Network: Initial Screen, enter information in the fields in the table below:
Title:
Document No.
Responsibility
Version
SAP/EUD/PS/01
Projects
001
Prepared by
Supercedes
Transaction Code
CJ02/CJ20N
Issue
d on
Effective
Date
Review
Date
NIL
Reviewed by
Approved by
V.Ananthapadmanaban
10.03.2008
Trigger:
After Project Handing Over to the User Department with all the required documents.
Materials, which are not used in those Projects, can be moved from one project to another.
Projects Department should give the List of Materials, which are installed, in that requesting Cost center with the
date of Installation. This information is required for Finance for Asset Capitalization.
Setting the System Status as CLOSED
Business Process Description Overview
Setting the System Status as CLOSED
The authorized Person will do this transaction.
Via Menus
Via Transaction Code
Some of the fields mentioned in the following may not be in your entry screen. This depends on the configuration of
your system.
Output Results
System Status for the Project Definition
will be set as CLSD Closed
Comments
On screen Change Project Definition: Initial Screen, enter information in the fields in the table below:
Select all the WBS elements and set the User Status as Closed