Design Calculation: Larsen & Toubro Limited ECC Division - EDRC

This document provides calculations for sizing a diesel generator set. It calculates the steady state capacity required as well as additional capacity needed during transient conditions like motor starting. Various design parameters like voltage drops, motor terminal voltage during starting, and bus voltage during starting are also calculated and checked against standards. The generator set size of 1750kVA is found to meet all requirements within specified limits.

Uploaded by

amit
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
100% found this document useful (2 votes)
1K views16 pages

Design Calculation: Larsen & Toubro Limited ECC Division - EDRC

This document provides calculations for sizing a diesel generator set. It calculates the steady state capacity required as well as additional capacity needed during transient conditions like motor starting. Various design parameters like voltage drops, motor terminal voltage during starting, and bus voltage during starting are also calculated and checked against standards. The generator set size of 1750kVA is found to meet all requirements within specified limits.

Uploaded by

amit
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 16

LARSEN & TOUBRO LIMITED

ECC Division - EDRC


PROJECT
TITLE

DOCUMENT NO

STANDARDIZATION OF DESIGN CALCULATION

DG SET SIZING CALCULATION

DATE

O12020-E-TP-GE-DC-3058

DESIGNED
MAG

CHECKED
MVMR

29/8/2012

APPROVED

SHEET

SKW

DESIGN CALCULATION
DIESEL GENERATOR SET SIZING CALCULATION

Page2 of 17

LARSEN & TOUBRO LIMITED


ECC Division - EDRC
PROJECT
TITLE

DOCUMENT NO

STANDARDIZATION OF DESIGN CALCULATION

DATE

O12020-E-TP-GE-DC-3058

DESIGNED

DG SET SIZING CALCULATION

MAG

CHECKED
MVMR

29/8/2012

APPROVED
SKW

INDEX
0.0.0

PURPOSE AND SCOPE

1.0.0

SYMBOLS AND UNITS

2.0.0

REFERENCE STANDARDS

3.0.0

ASSUMPTIONS

4.0.0

DESIGN INPUTS

5.0.0

ENVIRONMENTAL DETAILS

6.0.0

STEADY STATE CAPACITY CALCULATION

7.0.0

CHECKING OF CAPACITY FOR TRANSIENT CONDITION

8.0.0
9.0.0
10.0.0

CHECKING OF VOLTAGE DROP DURING TRANSIENT CONDITION


CHECKING OF VOLTAGE DROP DURING TRANSIENT CONDITION
RESULT

6
6
7

SHEET
Page3 of 17

LARSEN & TOUBRO LIMITED


ECC Division - EDRC
PROJECT
TITLE

DOCUMENT NO

STANDARDIZATION OF DESIGN CALCULATION

DG SET SIZING CALCULATION

DATE

O12020-E-TP-GE-DC-3058

DESIGNED

CHECKED

MAG

MVMR

29/8/2012

APPROVED
SKW

0.0.0 PURPOSE AND SCOPE


The purpose of the document is to select proper sizing of Diesel Generator (DG) set.
1.0.0 SYMBOLS AND UNITS
Base Load
BL

kVA

Cm

Motor cable detail

Cos

Full load power Factor of largest rating motor

Cosqs

Starting power Factor of largest rating motor

Cos

System power factor

DM

Design Margin

Supply Frequency

Hz

IFL

Full load current of highest rating motor

Im1

Base load current

Im2

Increased Base load current due to motor starting

IS

Starting current of motor in terms of voltage

Ist

Starting current of largest rating motor

Ratio of starting current to full load current

Lm

Length of motor cable

kM

MD

Total Maximum demand

kVA

Rating of largest rating motor

kW

Rm

Motor cable resistance

Sinqs

Reactive power factor of motor during starting

STLM

Starting kVA of largest rating motor

kVA

Design ambient temperature

TCL

Total connected load

kVA

System Voltage

Volts

Vb

Bus voltage during motor starting

Volts

Vm

Motor terminal voltage during starting

Volts

Vph

Phase voltage at low voltage side

Volts

Xm

Motor cable reactance

XS

DG reactance

Full load Efficiency of largest rated motor

2.0.0 REFERENCE STANDARDS


IS 325 (1996) (Specifications for three phase Induction Motors)
3.0.0 ASSUMPTIONS
The DG set is having Automatic Voltage regulator which compensates the voltage drop due to source during steady state condition.

SHEET
Page4 of 17

LARSEN & TOUBRO LIMITED


ECC Division - EDRC
PROJECT
TITLE

DOCUMENT NO

STANDARDIZATION OF DESIGN CALCULATION

DATE

O12020-E-TP-GE-DC-3058

DESIGNED

DG SET SIZING CALCULATION

MAG

CHECKED

29/8/2012

APPROVED

MVMR

SHEET
Page5 of 17

SKW

4.0.0 DESIGN INPUTS


4.1.1 System Voltage

4.1.2 Frequency

50 Hz

4.1.3 Total maximum demand for emergency load

MD

1477 kVA 2

4.1.4 Total maximum demand for emergency load

TCL

2183 kVA

4.1.5 Design margin

DM

15%

4.1.6 System power factor

Cos

0.85

4.1.7 Phase Voltage at low voltage side

Vph

415 V

239.61 V

4.1.8 Largest rating motor data


4.1.8.1 Rating of largest rating motor
4.1.8.2 Type of motor and starter

(Refer MD calculation)

55 kW
Sq cage / DOL

4.1.8.3 Full load power factor

Cos

0.8

(Refer Motor data sheet)

4.1.8.4 Full load Efficiency

93%

(Refer Motor data sheet)

4.1.8.5 Starting power factor

Cosqs

0.2

Sinqs

0.98

4.1.8.6 Multiplication factor for starting current

4.1.8.7 Motor Cable detail

Cm

Lm

0.18 kM

0.16 / kM

(Refer Motor data sheet)

1# 3Cx240 Sqmm, XLPE, Al.

1
Length of the Cable
Resistance of the Cable @ 90C / kM
Resistance of the Cable @ 90C

Rm

Reactance of the Cable / kM


Reactance of the Cable
4.2.0. Tie feeder rating

:
:

Xm

PTie

0.0288
0.07 / kM
0.01278
350.00 kVA 1

5.0.0 ENVIRONMENTAL DETAILS


5.1.1 Design Ambient Temperature

50

6.0.0 STEADY STATE CAPACITY CALCULATION


6.1.1 DG capacity required

((MD-PTie) x 1+DM) + PTie

((1477.27103099304-350) x 1.15) + 350

1646.361686 kVA

-----(1)

LARSEN & TOUBRO LIMITED


ECC Division - EDRC
PROJECT
TITLE

DOCUMENT NO

STANDARDIZATION OF DESIGN CALCULATION

DATE

O12020-E-TP-GE-DC-3058

DESIGNED

DG SET SIZING CALCULATION

CHECKED

MAG

29/8/2012

APPROVED

MVMR

SHEET
Page6 of 17

SKW

7.0.0 CHECKING OF CAPACITY FOR TRANSIENT CONDITION


7.1.1 Base load

BL

MD - P / (Cos x 1)

1477.27103099304 - 55 / ( 0.8 x 0.93)

:
7.1.2 Base load current

Im1

1404 kVA
BL*1000
3 * V

1404 * 1000
3 * 415

:
7.1.3 Full load current of motor

IFL

1953.31 A
P * 1000
3*V*Cos * 1

55 * 1000
3*415*0.8 * 0.93

:
7.1.4 Starting Current of motor

Ist

102.85 A

1.2 * K*IFL

1.2 *6*102.85

:
7.1.5 Starting kVA of motor

STLM

20% tolerance on starting


current as per IS 325
Table-1

740.52 A
3*V*Ist
1000

3*415*740.52
1000

:
7.1.6 Total starting kVA required

532.28 kVA

(STLM + BL)

532.28 + 1404

1936 kVA

DG set required for this starting requirement

1291 kVA

From Equation (1) and (2) above, the DG rating required

Maximum of (1) and (2)

1646

1750

7.1.7 The DG set is capable of withstanding 150% overloading

kVA or

---- (2)

1.75 MVA

LARSEN & TOUBRO LIMITED


ECC Division - EDRC
PROJECT
TITLE

DOCUMENT NO

STANDARDIZATION OF DESIGN CALCULATION

DATE

O12020-E-TP-GE-DC-3058

DESIGNED

DG SET SIZING CALCULATION

CHECKED

MAG

29/8/2012

APPROVED

MVMR

SKW

8.0.0 CHECKING OF STEADY STATE VOLTAGE DROP 1


Vph
IX
IR CosQ

IX Sin (90-Q)

Neglecting phase angle difference between Vm and Vph

Vm

IR

IX Cos (90-Q)

from the above phasor diagram,


Vph

Vm + IR CosQ + IX Cos (90-Q)

Vm + IR CosQ + IX SinQ

Therefore, Steady state voltage drop

Vd

I (R CosQ + X SinQ)

Steady state voltage drop

Vd

102.85( 0.0288*0.8+0.01278*0.6)

3.1583

Percentage Voltage drop for this length

%Vd

Vd * 100 * 3
V

3.1583* 100 *3
415

1.32 %

Percentage Voltage Drop at MCC feeding this load

Total Voltage Drop upto this level

1.32+0

%
%

1.32 %

9.0.0 CHECKING OF VOLTAGE DROP DURING LARGEST MOTOR STARTING


9.1.1 Base parameters
Base impedance at 1 MVA and 0.415kV

0.172225

9.1.3 DG set parameters


Transient reactance (PU value)

Xd'

15.00%

XS

Xd' * Base impedance / DG Rating

1
Transient reactance (Actual value)

0.01500 Ohm

9.1.4 Phasor diagram


Vph
(Im2-Im1) Xs
Is Xs

2.53

9.65

8.22

203.97

Vb
Is Xm
Vm

IS Rm

Vm Sinqs
Vm Cosqs

IS

41.62589

204

SHEET
Page7 of 17

LARSEN & TOUBRO LIMITED


ECC Division - EDRC
PROJECT
TITLE

DOCUMENT NO

STANDARDIZATION OF DESIGN CALCULATION

DATE

O12020-E-TP-GE-DC-3058

DESIGNED

DG SET SIZING CALCULATION

MAG

CHECKED

29/8/2012

APPROVED

MVMR

SHEET
Page8 of 17

SKW

9.1.5 Calculation
From the above phasor diagram
Vph2 = (Vm Cosqs + IS Rm)2 + (Vm Sinqs +IS Xm +IS XS + XS (Im2-Im1))2

---------- (I)

Motor Starting Current

IS

Ist Vm/ Vph

----------(a)

For constant kVA modeling

Im2

Im1 Vph/ Vb

----------(b)

Also, bus voltage

Vb 2

(Vm cos qs+ IS Rm)2 + (Vm sin qs +IS Xm)2

Putting the Equations (a), (b) & (c) in Equation (I) we get)
2
+
Vm Sinqs + Ist Vm (Xm+ XS) + XS Im1 (Vph-Vb 2)
Vph2 = Vm Cosqs + Ist Rm Vm
Vph
Vph

----------(c)

2
Vb

Please press Ctrl+K to run the Macro


Voltage available at Motor Terminal during starting of largest Motor
Vm

208.13 V

86.87 %

220.55 V

92.05 %

Similarly, Voltage available at Bus during starting of largest Motor


Vb

Increased Base load current due to motor starting


Im2

Starting current of motor in terms of voltage

IS

1953.31*239.61
220.55
2122.12 A

740.52 * 208.13
239.61
643.23 A

10.0.0 RESULT

Description

Rating of DG (kVA)
Thermal loading on the DG during motor starting

Selected Value

1750
110.64%

Required

1646.36169
150.00%

Steady state voltage drop

1.32%

3.00%

Voltage available at motor terminal during motor starting

86.87%

85%

Voltage available at Bus during motor starting

92.05%

90%

As all the conditions are satisfied, the selected DG set size of 1.75 MVA is Safe

TO ESSENTIAL HVAC DB

BOILER AND AUXILIARIES - UNIT # 1

ACTRI

ACTRI

ACTRI

415
415

ACTRI

ACTRI

ACTRI

ACTRI

ACTRI

ACTRI

ACTRI

ACTRI

ACTRI

415

415

LOCALE CONTROL CABINET FOR LUBRICATION OIL4 POWER FOR LUBE OIL STATION MOTOR OF MILL-4

415

LOCALE CONTROL CABINET FOR LUBRICATION OIL3 POWER FOR LUBE OIL STATION MOTOR OF MILL-3

LOCALE CONTROL CABINET FOR LUBRICATION


OIL-5 POWER FOR LUBE OIL STATION MOTOR
OF MILL-5
LOCALE CONTROL CABINET FOR LUBRICATION
OIL-6 POWER FOR LUBE OIL STATION MOTOR
OF MILL-6
LOCALE CONTROL CABINET FOR LUBRICATION
OIL-7 POWER FOR LUBE OIL STATION MOTOR
OF MILL-7

415

LOCALE CONTROL CABINET FOR LUBRICATION OIL2 POWER FOR LUBE OIL STATION MOTOR OF MILL-2

415

POWER FOR LUBE OIL STATION MOTOR OF IDF (IDF1)-1

415

POWER FOR HYDRAULIC OIL STATION MOTOR OF


FDF (FDF-2)-1

415

415

POWER FOR HYDRAULIC OIL STATION MOTOR OF


FDF (FDF-1)-1

415

PAF MOTOR LUBE OIL PUMP (PAF-2)-1

415

ACTRI

415

PAF MOTOR LUBE OIL PUMP (PAF-1)-1

LOCALE CONTROL CABINET FOR LUBRICATION OIL1 POWER FOR LUBE OIL STATION MOTOR OF MILL1

ACTRI

415

OIL PUMP MOTOR OF PAF HYDRAULIC LUBE OIL


STATION (PAF-2)-1

POWER FOR LUBE OIL STATION MOTOR OF IDF (IDF2)-1

ACTRI

415

OIL PUMP MOTOR OF PAF HYDRAULIC LUBE OIL


STATION (PAF-1)-1

ACTRI

415

STEAM-DRIVEN FEEDWATER PUMP LUBE-OIL


STANDBY OIL PUMP MOTOR-1
BFP TURBINE LUBE OIL STANDBY PUMP MOTOR-1

ACTRI

415

Hydraulic coupling starting luboil pump motor

ACTRI

ACTRIN

415

415

ACTRIN

AUXILIARY ACTUATING MOTOR-1

PLANT COMMUNICATION EPABX CHARGER

UNIT-1 UPS CHARGER A

415

ACTRIN

415

ACTRIN

ACTRIN

415

415

ACTRIN

415

BUS COUPLER

220 V DC STATION BATTERY CHARGER-1

ACTRIN

415

INCOMER FROM EDG-1

220 V DC UNIT-1 BATTERY CHARGER-1

ACTRIN

NAT

415

(V)

Volt

Load Rating

INCOMER FROM UNIT-1 SWGR-1

415V ESSENTIAL SWGR-1A

Service Description

KKS No.
(Load
side)

Item
No.

Type

11.00

11.00

11.00

11.00

11.00

11.00

11.00

1.10

1.10

2.20

2.20

0.00

0.00

2.20

2.20

30.00

11.00

15.00

50.00

3.00

160.00

90.00

325.00

1500

2000

Power

kW

kW

kW

kW

kW

kW

kW

kW

kW

kW

kW

kW

kW

kW

kW

kW

kW

kW

kVA

kVA

kVA

kVA

kVA

kVA

kVA

kVA

Unit

1.00
0.80
0.80

0.0
452.2
125.2

0.80

0.0

22.5

22.5

22.5

22.5

22.5

22.5

22.5

2.9

2.9

5.9

0.80

0.80

0.80

0.80

0.80

0.80

0.80

0.80

0.80

0.80

0.80

0.80

0.0

5.9

0.80

0.80

5.9

5.9

0.80

0.80

22.5

56.1

0.80

0.80

0.80

30.7

69.6

4.2

0.80

1.00

2086.9

222.6

1.00

0.85

0.85

0.85

0.85

0.85

0.85

0.85

0.65

0.65

0.65

0.65

0.65

0.65

0.65

0.65

0.93

0.85

0.85

1.00

1.00

1.00

1.00

1.00

1.00

1.00

1.00

Factor Efficiency

Power

2782.5

(A)

Current

Rated

415V ESSENTIAL SWITCHGEAR UNIT - 1

UNI/
BI Ope

0.80

0.80

0.80

0.80

0.80

0.80

0.80

0.80

0.80

0.80

0.80

0.80

0.80

0.80

0.80

0.80

0.80

0.80

0.80

0.50

0.50

0.50

0.50

Factor

Load

Start-up

12.94

0.00

12.94

0.00

12.94

0.00

12.94

1.69

0.00

3.38

3.38

0.00

0.00

0.00

3.38

32.26

0.00

17.65

40.00

1.50

80.00

45.00

162.50

(kVA)

Capacity Ope

Normal

Factor

Load
(kVA)

Capacity Ope

Shutdown

Load Character

Factor

Load
(kVA)

Capacity

Ope

0.40

0.40

0.40

0.40

0.40

0.40

0.40

0.40

0.40

0.40

0.40

0.40

0.40

0.40

0.40

0.40

0.40

0.40

0.40

0.40

0.40

0.40

0.40

Factor

Load

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

(kVA)

(Mtrs.)

Capacity Length

Intermittent

of load

Location

Control

Incomer

FROM DEC Electrical Load list Dtd


24/02/11, REV.F

FROM DEC Electrical Load list Dtd


24/02/11, REV.F

FROM DEC Electrical Load list Dtd


24/02/11, REV.F

FROM DEC Electrical Load list Dtd


24/02/11, REV.F

FROM DEC Electrical Load list Dtd


24/02/11, REV.F

FROM DEC Electrical Load list Dtd


24/02/11, REV.F

FROM DEC Electrical Load list Dtd


24/02/11, REV.F

FROM DEC Electrical Load list Dtd


25/06/11

FROM DEC Electrical Load list Dtd


25/06/11

FROM DEC Electrical Load list Dtd


25/06/11

FROM DEC Electrical Load list Dtd


25/06/11

FROM DEC Electrical Load list Dtd


25/06/11

FROM DEC Electrical Load list Dtd


25/06/11

FROM DEC Electrical Load list Dtd


25/06/11

FROM DEC Electrical Load list Dtd


25/06/11

FROM DEC Electrical Load list Dtd


24/02/11, REV.F

FROM DEC Electrical Load list Dtd


24/02/11, REV.F

FROM DEC Electrical Load list Dtd


25/06/11

INPUT FROM MECHANICAL

BASED ON C&I LOADLIST

BASED ON DEC LATEST INPUT

ASSUMED & UNVERIFIED

ASSUMED & UNVERIFIED

STANDARD BREAKER RATING SHALL BE


SELECTED.

Incomer

STANDARD BREAKER RATING SHALL BE


SELECTED.

Module
Type

STANDARD BREAKER RATING SHALL BE


SELECTED.

Remarks

SPARE

RESERVED

11

12

ACTRIN

ACMONO
ACTRI

240
415

BOILER AND AUXILIARIES - UNIT # 1

FURNACE FLAME TV FOR A & B SIDE

AUXILIARY ACTUATING MOTOR-1

ACTRIN

415

UNIT-1 UPS BYPASS TRANSFOMER

415

ACTRIN

415

TIE TO ESSENTIAL SWGR-2

220 V DC UNIT-1 BATTERY CHARGER-2

ACTRIN

415

ACTRIN

ACTRIN

INCOMER FROM UNIT-1 SWGR-2

415V ESSENTIAL SWGR-1B

TOTAL LOAD ON BUS A


(NORMAL + INTERMITTENT)

415

415

ACTRI

ACTRI

ACMONO

ACTRIN

ACTRI

ACTRI

ACTRI

ACTRI

SPARE

SUB TOTAL

415

ESSENTIAL LIGHTING DB-1

10

415

240

240V SPARE AC POWER-1

415

415

FURNACE GAS TEMP. PROBE RIGHT SIDE


LOCAL CONTROLCABINET

415V SPARE AC POWER-1

415

SEALNG OIL RECIRCULATING AC MOTOR-1

415

of load

From
ANSAL
DO,
From
ANSAL
From
ANSAL
From
ANSAL

Control

FROM DEC Electrical Load list Dtd 25/06/11

FROM DEC Electrical Load list Dtd


25/06/11

FROM DEC Electrical Load list Dtd


25/06/11

FROM DEC Electrical Load list Dtd


24/02/11, REV.F

Remarks

15.00

160.00

325.00

350

2000

727

5.00

kW

kW

kVA

kVA

kVA

kVA

kVA

kW

kW

kW

kVA

kW

1.00
150.00

kW

kW

kW

kW

kW

kW

kW

kW

1.00

5.00

5.50

7.50

15.00

11.00

1.50

45.00

kW

0.80
0.80

30.7

1.00

1.00

0.80

1.00

0.80

0.80

0.80

1.00

0.80

0.80

0.80

0.80

0.80

0.80

0.80

0.80

0.80

0.80

16.0

222.6

452.2

486.9

2782.5

10.2

0.0

0.0

208.7

5.2

1.7

10.2

11.3

15.3

26.1

22.5

4.0

84.1

102.8

0.85

0.65

1.00

1.00

1.00

1.00

0.85

0.65

0.65

1.00

1.00

1.00

0.85

0.85

0.85

1.00

0.85

0.65

0.93

0.93

0.80

0.80

0.50

0.50

0.80

0.80

0.80

0.80

0.80

0.80

0.80

0.80

0.80

0.80

0.80

0.80

0.80

0.80

0.80

17.65

3.08

0.00

162.50

280.00

719.5

5.88

0.00

0.00

120.00

0.00

1.00

5.88

6.47

0.00

15.00

12.94

2.31

48.39

0.80

0.80

0.80

0.80

0.80

0.80

0.00

0.00

0.00

0.00

0.00

0.00

0.80

0.80

0.80

0.80

0.80

0.80

0.00

0.00

0.00

0.00

0.00

0.00

0.40

0.40

0.40

0.40

0.40

0.40

0.40

0.40

0.40

0.40

0.40

0.40

0.40

0.40

0.40

0.40

0.40

0.40

0.00

0.0

0.00

0.00

7.1

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Module
Type

FROM DEC Electrical Load list Dtd


25/06/11

Added as per ACPL/EIPL Comments


dated 17.7.2012

BASED ON DEC LATEST INPUT

ASSUMED & UNVERIFIED

STANDARD BREAKER RATING SHALL BE


Incomer
SELECTED.

STANDARD BREAKER RATING SHALL BE


Incomer
SELECTED.

ASSUMED & UNVERIFIED

FROM DEC Electrical Load list Dtd


25/06/11
FROM DEC Electrical Load list Dtd
25/06/11
FROM DEC Electrical Load list Dtd
25/06/11
FROM DEC Electrical Load list Dtd
25/06/11
From
FROM DEC Electrical Load list Dtd
ANSA
25/06/11
LDO,
From
FROM DEC Electrical Load list Dtd
ANSA
24/02/11, REV.F
LDO,
From
FROM DEC Electrical Load list Dtd
ANSA
24/02/11, REV.F
LDO,

FROM DEC Electrical Load list Dtd


25/06/11

FROM DEC Electrical Load list Dtd


25/06/11

415

0.00

4.705882

0.00

2.40

(Mtrs.)

Location

ACTRI

0.4

0.40

0.40

0.00

(kVA)

Capacity Length

415

0.40

Factor

Load

Intermittent

BYPASS SYSTEM OIL STATION (WITH LOCAL


CONTROL BOX)-1

0.80

(kVA)

Ope

BFP-TURBINE TURNING GEAR MOTOR-1

0.00

Factor

Capacity

ACTRI

0.80

(kVA)

Load

415

59.14

Shutdown
Capacity Ope

EH OIL CIRCULATIONL PUMP MOTOR

0.00

Factor

Load

ACTRI

0.8

0.80

0.00

0.00

(kVA)

Capacity Ope

415

0.80

0.80

Factor

Load

EH OIL MAIN OIL PUMP MOTOR-1

UNI/
BI Ope

FROM DEC Electrical Load list Dtd


25/06/11

55.00

0.85

1.00

1.00

0.85

Load Character

ACTRI
M

0.80

0.0
0.8

0.80

8.3

16.3676

0.80

Factor Efficiency

22.5

(A)

Current

Start-up

415

kW

kW

kW

kW

Unit

Normal

STEAM TURBINE JACKING OIL PUMP AC


MOTOR(NORMAL)

0.00

4.80

11.00

Power

Power

FROM DEC Electrical Load list Dtd


25/06/11

Type

Rated

TURBINE GENERATOR AND AUXILIARIES - UNIT # 1

ACTRI

ACMONO

240

FLAME SCANNER AMPLIFIER CABINET

415

ACTRIN

415

BOILER SOOT BLOWER POWER CABINET

AIR PREHEATER GAP ADJUST CONTROL CABINET


FOR A & B SIDE-1

ACTRI

NAT

415

(V)

Volt

LOCALE CONTROL CABINET FOR LUBRICATION


OIL-8 POWER FOR LUBE OIL STATION MOTOR
OF MILL-8

Service Description

SEALNG OIL AC MOTOR-1

KKS No.
(Load
side)

Load Rating

Item
No.

415V ESSENTIAL SWITCHGEAR UNIT - 1

ACTRI

ACTRI

ACTRIN
ACTRIN

415
415
415
415
415

415

415

415

415

415

415

415

415

415
415

PAF MOTOR LUBE OIL PUMP (PAF-2)-2

POWER FOR HYDRAULIC OIL STATION MOTOR


OF FDF (FDF-1)-2

POWER FOR HYDRAULIC OIL STATION MOTOR


OF FDF (FDF-2)-2

POWER FOR LUBE OIL STATION MOTOR OF IDF


(IDF-1)-2

POWER FOR LUBE OIL STATION MOTOR OF IDF


(IDF-2)-2

LOCALE CONTROL CABINET FOR LUBRICATION OIL1


POWER FOR LUBE OIL STATION MOTOR OF MILL-1

LOCALE CONTROL CABINET FOR LUBRICATION OIL2 POWER FOR LUBE OIL STATION MOTOR OF MILL-2

LOCALE CONTROL CABINET FOR LUBRICATION OIL3 POWER FOR LUBE OIL STATION MOTOR OF MILL-3

LOCALE CONTROL CABINET FOR LUBRICATION OIL4 POWER FOR LUBE OIL STATION MOTOR OF MILL-4

LOCALE CONTROL CABINET FOR LUBRICATION


OIL-5 POWER FOR LUBE OIL STATION MOTOR
OF MILL-5

LOCALE CONTROL CABINET FOR LUBRICATION


OIL-6 POWER FOR LUBE OIL STATION MOTOR
OF MILL-6

LOCALE CONTROL CABINET FOR LUBRICATION


OIL-7 POWER FOR LUBE OIL STATION MOTOR
OF MILL-7

LOCALE CONTROL CABINET FOR LUBRICATION


OIL-8 POWER FOR LUBE OIL STATION MOTOR
OF MILL-8

BOILER SOOT BLOWER POWER CABINET

FLAME SCANNER AMPLIFIER CABINET

ACTRI
ACTRI
ACTRI

415
415
415
415

STEAM TURBINE LUBE OIL AUXILIARY PUMP


MOTOR

EH OIL MAIN OIL PUMP MOTOR-2

EH OIL TRANSFER PUMP MOTOR

ACTRI

ACTRI

ACTRI

ACTRI

ACTRI

ACTRI

ACTRI

ACTRI

ACTRI

ACTRI

ACTRI

ACTRI

STEAM TURBINE TURNING GEAR MOTOR

TURBINE GENERATOR AND AUXILIARIES - UNIT


#1

ACTRI

415

PAF MOTOR LUBE OIL PUMP (PAF-1)-2

ACTRI
ACTRI

415

ACTRI

NAT

OIL PUMP MOTOR OF PAF HYDRAULIC LUBE OIL


STATION (PAF-2)-2

(V)

Volt

415

Service Description

OIL PUMP MOTOR OF PAF HYDRAULIC LUBE OIL


STATION (PAF-1)-2

KKS No.
(Load
side)

415

Item
No.

Load Rating

STEAM-DRIVEN FEEDWATER PUMP LUBE-OIL


STANDBY OIL PUMP MOTOR-2
BFP TURBINE LUBE OIL STANDBY PUMP
MOTOR-1

Type

1.50

45.00

55.00

15.00

0.00

4.80

11.00

11.00

11.00

11.00

11.00

11.00

11.00

11.00

1.10

1.10

2.20

2.20

0.00

0.00

2.20

2.20

30.00

Power

kW

kW

kW

kW

kW

kW

kW

kW

kW

kW

kW

kW

kW

kW

kW

kW

kW

kW

kW

kW

kW

kW

kW

Unit

0.80

0.0

4.0

84.1

102.8

0.80

0.80

0.80

0.80

0.80

8.3

30.7

0.80

0.80

0.80

0.80

0.80

0.80

0.80

0.80

0.80

0.80

0.80

0.80

0.80

0.80

0.80

0.80

0.80

0.65

0.93

0.93

0.85

1.00

1.00

0.85

0.85

0.85

0.85

0.85

0.85

0.85

0.85

0.65

0.65

0.65

0.65

0.65

0.65

0.65

0.65

0.93

Factor Efficiency

Power

22.5

22.5

22.5

22.5

22.5

22.5

22.5

22.5

2.9

2.9

5.9

5.9

0.0

0.0

5.9

5.9

56.1

(A)

Current

Rated

415V ESSENTIAL SWITCHGEAR UNIT - 1

UNI/
BI Ope

0.80

0.80

0.80

0.80

0.80

0.80

0.80

0.80

0.80

0.80

0.80

0.80

0.80

0.80

0.80

0.80

0.80

0.80

0.80

0.80

0.80

0.80

0.80

Factor

Load

Start-up

2.31

0.00

59.14

17.65

0.00

0.00

12.94

0.00

12.94

0.00

12.94

0.00

12.94

0.00

0.00

1.69

0.00

3.38

0.00

0.00

0.00

3.38

32.26

(kVA)

Capacity Ope

Normal

0.80

Factor

Load

0.00

(kVA)

Capacity Ope

Shutdown

Load Character

0.80

Factor

Load

0.00

(kVA)

Capacity

Ope

0.40

0.40

0.40

0.40

0.40

0.40

0.40

0.40

0.40

0.40

0.40

0.40

0.40

0.40

0.40

0.40

0.40

0.40

0.40

0.40

0.40

0.40

0.40

Factor

Load

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

(kVA)

(Mtrs.)

Capacity Length

Intermittent

of load

Location

FROM DEC Electrical Load list Dtd


25/06/11

FROM DEC Electrical Load list Dtd


25/06/11

FROM DEC Electrical Load list Dtd


25/06/11

FROM DEC Electrical Load list Dtd


24/02/11, REV.F

FROM DEC Electrical Load list Dtd


24/02/11, REV.F

FROM DEC Electrical Load list Dtd


24/02/11, REV.F

FROM DEC Electrical Load list Dtd


24/02/11, REV.F

FROM DEC Electrical Load list Dtd


24/02/11, REV.F

FROM DEC Electrical Load list Dtd


24/02/11, REV.F

FROM DEC Electrical Load list Dtd


24/02/11, REV.F

FROM DEC Electrical Load list Dtd


24/02/11, REV.F

FROM DEC Electrical Load list Dtd


25/06/11

FROM DEC Electrical Load list Dtd


25/06/11

FROM DEC Electrical Load list Dtd


25/06/11

FROM DEC Electrical Load list Dtd


25/06/11

FROM DEC Electrical Load list Dtd


25/06/11

FROM DEC Electrical Load list Dtd


25/06/11

FROM DEC Electrical Load list Dtd


25/06/11

FROM DEC Electrical Load list Dtd


25/06/11

FROM DEC Electrical Load list Dtd


24/02/11, REV.F

Remarks

FROM DEC Electrical Load list Dtd


25/06/11
FROM DEC Electrical Load list Dtd
25/06/11
FROM DEC Electrical Load list Dtd
25/06/11
From
FROM DEC Electrical Load list Dtd
ANSA
25/06/11
LDO,

Control

Module
Type

COMMUNICATION PANEL

AVIATION OBSTRUCTION LIGHTING FEEDER

ESSENTIAL LIGHTING DB-2

Chimney emergency load

switchyard emergency load

SPARE

SPARE

RESERVED

11

12

13

14

15

16

17

18

Total load on Bus-A & B with 10% margin

Total load on Bus-A & B

Total Load on Bus-B

Total Load on Bus-A

TOTAL LOAD ON BUS B


(NORMAL + INTERMITTENT)

SUB TOTAL

415

FLAME SCANNING COOLING FAN AC MOTOR


LOCAL CONTROL CABINET

10

ACTRIN

ACTRI

415
ACTRIN

ACTRI

415

415

ACTRI

415

415

ACTRI

ACTRI

ACTRI

ACTRI

ACTRI

ACMONO

ACTRI

ACTRI

ACTRI

415

415

415

415

AIR PREHEATER GAP ADJUST CONTROL


CABINET FOR A & B SIDE-2

240

415

415

415

240V SPARE AC POWER-2

FURNACE GAS TEMP. PROBE LEFT SIDE LOCAL


CONTROLCABINET
AIR PREHEATER FIRE DETECTION CABINET
FOR A & B SIDE
415V SPARE AC POWER -2

BOILER LOCAL IGNITION CABINET

ACTRI

415

ACTRI

415

BYPASS SYSTEM OIL STATION (WITH LOCAL


CONTROL BOX)-2

ACTRI

NAT

415

(V)

Volt

Load Rating

BFP-TURBINE TURNING GEAR MOTOR-2

Service Description

SEALNG OIL AC MOTOR-2

KKS No.
(Load
side)

Item
No.

Type

1621

1474

747

727

747

5.00

15.00

50.00

100.00

10.00

6.00

15.00

8.00

1.00

1.00

5.00

0.00

7.50

15.00

11.00

Power

kVA

kVA

kVA

kVA

kVA

kW

kW

kW

kVA

kVA

kVA

kW

kW

kW

kW

kW

kW

kW

kW

kW

kW

kW

Unit

10.2

0.0

0.0

20.9

69.6

139.1

17.4

10.4

26.1

16.4

5.2

1.7

10.2

0.0

15.3

30.7

22.5

(A)

Current

Rated

0.80

0.80

0.80

1.00

1.00

1.00

0.80

0.80

0.80

0.80

0.80

0.80

0.80

0.80

0.80

0.80

0.80

0.85

0.65

0.65

1.00

1.00

1.00

1.00

1.00

1.00

0.85

1.00

1.00

0.85

0.65

0.85

0.85

0.85

Factor Efficiency

Power

415V ESSENTIAL SWITCHGEAR UNIT - 1

UNI/
BI Ope

0.80

0.80

0.80

0.80

0.80

0.80

0.80

0.80

0.80

0.80

0.80

0.80

0.80

0.80

0.80

0.80

0.80

Factor

Load

Start-up

747.0

5.88

0.00

0.00

12.00

40.00

0.00

0.00

6.00

15.00

0.00

0.00

1.00

5.88

0.00

8.82

17.65

0.00

(kVA)

Capacity Ope

Normal

0.80

0.80

0.80

0.80

0.80

0.80

0.80

0.80

0.80

0.80

Factor

Load

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

(kVA)

Capacity Ope

Shutdown

Load Character

0.80

0.80

0.80

0.80

0.80

0.80

0.80

0.80

0.80

0.80

Factor

Load

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

(kVA)

Capacity

Ope

0.40

0.40

0.40

0.40

0.40

0.40

0.40

0.40

0.40

0.40

0.40

0.40

0.40

0.40

0.40

0.40

0.40

Factor

Load

0.0

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

(kVA)

(Mtrs.)

Capacity Length

Intermittent

of load

Location

FROM DEC Electrical Load list Dtd


24/02/11, REV.F
FROM DEC Electrical Load list Dtd
25/06/11
FROM DEC Electrical Load list Dtd
25/06/11
FROM DEC Electrical Load list Dtd
25/06/11

Remarks

Added as per ACPL/EIPL Comments


dated 17.7.2012
Added as per ACPL/EIPL Comments
dated 17.7.2012

Assumed & unverified

Assumed & unverified

Assumed & unverified

FROM DEC Electrical Load list Dtd


ANSA
25/06/11
LDO,
From
FROM DEC Electrical Load list Dtd
ANSA
24/02/11, REV.F
LDO,
From
ANSA FROM DEC Electrical Load list Dtd
LDO, 24/02/11, REV.F
Rev.0
From
FROM DEC Electrical Load list Dtd
ANSA
25/06/11
LDO,
From
FROM DEC Electrical Load list Dtd
ANSA
25/06/11
LDO,

From
ANSA
LDO,
From
ANSA
LDO,
From
ANSA
LDO,
From
ANSA
LDO,
From

Control

Module
Type

ACTRI
ACTRI
ACTRI

415

415
415
415
415
415
415
415
415

415

415

STEAM-DRIVEN FEEDWATER PUMP LUBE-OIL


STANDBY OIL PUMP MOTOR-1
BFP TURBINE LUBE OIL STANDBY PUMP
MOTOR-1

OIL PUMP MOTOR OF PAF HYDRAULIC LUBE


OIL STATION (PAF-1)-1

OIL PUMP MOTOR OF PAF HYDRAULIC LUBE


OIL STATION (PAF-2)-1

PAF MOTOR LUBE OIL PUMP (PAF-1)-1

PAF MOTOR LUBE OIL PUMP (PAF-2)-1

POWER FOR HYDRAULIC OIL STATION MOTOR


OF FDF (FDF-1)-1

POWER FOR HYDRAULIC OIL STATION MOTOR


OF FDF (FDF-2)-1

POWER FOR LUBE OIL STATION MOTOR OF


IDF (IDF-1)-1

POWER FOR LUBE OIL STATION MOTOR OF


IDF (IDF-2)-1

LOCALE CONTROL CABINET FOR


LUBRICATION OIL-1 POWER FOR LUBE OIL
STATION MOTOR OF MILL-1

LOCALE CONTROL CABINET FOR


LUBRICATION OIL-2 POWER FOR LUBE OIL
STATION MOTOR OF MILL-2

ACTRI

ACTRI

ACTRI

ACTRI

ACTRI

ACTRI

ACTRI

ACTRI

ACTRI

415

Hydraulic coupling starting luboil pump motor

ACTRIN

ACTRI

415

415

BOILER AND AUXILIARIES - UNIT # 2

ACTRIN

415

220 V DC STATION BATTERY CHARGER-2

UNIT-2 UPS CHARGER A

ACTRIN

415

220 V DC UNIT-2 BATTERY CHARGER-1

ACTRIN

415

BUS COUPLER

ACTRIN

415

INCOMER FROM EDG-2

NAT

ACTRIN

(V)

Volt

415

415V ESSENTIAL SWGR-2A

Service Description

INCOMER FROM UNIT-2 SWGR-1

Item
No. KKS No.
(Load
side)

AUXILIARY ACTUATING MOTOR-1

Load Rating

Type

11.00

11.00

1.10

1.10

2.20

2.20

0.00

0.00

2.20

2.20

30.00

11.00

15.00

160.00

105.00

325.00

1500

2000

Power

kW

kW

kW

kW

kW

kW

kW

kW

kW

kW

kW

kW

kW

kVA

kVA

kVA

kVA

kVA

kVA

Unit

22.5

22.5

2.9

2.9

5.9

5.9

0.0

0.0

5.9

5.9

56.1

22.5

30.7

222.6

146.1

452.2

0.0

2086.9

2782.5

(A)

Current

Rated

415V ESSENTIAL SWITCHGEAR UNIT - 2

0.80

0.80

0.80

0.80

0.80

0.80

0.80

0.80

0.80

0.80

0.80

0.80

0.80

0.80

0.80

0.80

1.00

1.00

1.00

0.85

0.85

0.65

0.65

0.65

0.65

0.65

0.65

0.65

0.65

0.93

0.85

0.85

1.00

1.00

1.00

1.00

1.00

1.00

Factor Efficiency

Power

UNI/
BI Ope

0.80

0.80

0.80

0.80

0.80

0.80

0.80

0.80

0.80

0.80

0.80

0.80

0.80

0.50

0.50

0.50

Factor

Load

0.00

12.94

1.69

0.00

3.38

3.38

0.00

0.00

0.00

3.38

32.26

0.00

17.65

80.00

52.50

162.50

(kVA)

0.40

0.40

0.40

0.40

0.40

0.40

0.40

0.40

0.40

0.40

0.40

0.40

0.40

0.40

0.40

0.40

Factor

Load

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

(kVA)

(Mtrs.)

Capacity Length

Intermittent

Load Character

Capacity Ope

Normal

of load

Location

Incomer

FROM DEC Electrical Load list Dtd


24/02/12, REV.F

FROM DEC Electrical Load list Dtd


24/02/12, REV.F

FROM DEC Electrical Load list Dtd


25/06/11

FROM DEC Electrical Load list Dtd


25/06/11

FROM DEC Electrical Load list Dtd


25/06/11

FROM DEC Electrical Load list Dtd


25/06/11

FROM DEC Electrical Load list Dtd


25/06/11

FROM DEC Electrical Load list Dtd


25/06/11

FROM DEC Electrical Load list Dtd


25/06/11

FROM DEC Electrical Load list Dtd


25/06/11

FROM DEC Electrical Load list Dtd


24/02/12, REV.F

FROM DEC Electrical Load list Dtd


24/02/12, REV.F

FROM DEC Electrical Load list Dtd


25/06/11

BASED ON DEC LATEST INPUT

ASSUMED & UNVERIFIED

ASSUMED & UNVERIFIED

STANDARD BREAKER RATING


SHALL BE SELECTED.

Incomer

STANDARD BREAKER RATING


SHALL BE SELECTED.

Module
Type

STANDARD BREAKER RATING


SHALL BE SELECTED.

Remarks

415
240

BOILER SOOT BLOWER POWER CABINET

ACTRI
ACTRI
ACTRI
ACTRI

415
415
415
415
415

BFP-TURBINE TURNING GEAR MOTOR-1

BYPASS SYSTEM OIL STATION (WITH LOCAL


CONTROL BOX)-1

SEALNG OIL AC MOTOR-1

SEALNG OIL RECIRCULATING AC MOTOR-1

FURNACE GAS TEMP. PROBE RIGHT SIDE


LOCAL CONTROLCABINET

ACMONO
ACTRI
ACTRI

240
415
415

240V SPARE AC POWER-1

ESSENTIAL LIGHTING DB-1

SPARE

10

ACTRIN

8
415

ACTRI

415

EH OIL CIRCULATIONL PUMP MOTOR

415V SPARE AC POWER-1

ACTRI

415

EH OIL MAIN OIL PUMP MOTOR-1

ACTRI

ACTRI

ACTRI

415

TURBINE GENERATOR AND AUXILIARIES UNIT # 2


STEAM TURBINE JACKING OIL PUMP AC
MOTOR(NORMAL)

AIR PREHEATER GAP ADJUST CONTROL CABINET


FOR A & B SIDE-1

ACTRI

ACTRI

ACTRI

415

LOCALE CONTROL CABINET FOR


LUBRICATION OIL-8 POWER FOR LUBE OIL
STATION MOTOR OF MILL-8

ACMONO

415

LOCALE CONTROL CABINET FOR


LUBRICATION OIL-7 POWER FOR LUBE OIL
STATION MOTOR OF MILL-7

415

ACTRIN

415

LOCALE CONTROL CABINET FOR


LUBRICATION OIL-6 POWER FOR LUBE OIL
STATION MOTOR OF MILL-6

FLAME SCANNER AMPLIFIER CABINET

ACTRI

415

LOCALE CONTROL CABINET FOR


LUBRICATION OIL-5 POWER FOR LUBE OIL
STATION MOTOR OF MILL-5

ACTRI

415

LOCALE CONTROL CABINET FOR


LUBRICATION OIL-4 POWER FOR LUBE OIL
STATION MOTOR OF MILL-4

ACTRI

NAT

(V)

Volt

415

Service Description

Item
No. KKS No.
(Load
side)

LOCALE CONTROL CABINET FOR


LUBRICATION OIL-3 POWER FOR LUBE OIL
STATION MOTOR OF MILL-3

Load Rating

Type

100.00

1.00

1.00

5.00

5.50

7.50

kW

kVA

kW

kW

kW

kW

kW

kW

kW

15.00

kW

1.50

kW

kW

kW

kW

kW

kW

kW

kW

kW

kW

kW

Unit

11.00

45.00

55.00

0.00

4.80

11.00

11.00

11.00

11.00

11.00

11.00

Power

0.0

139.1

5.2

1.7

10.2

11.3

15.3

26.1

22.5

4.0

84.1

102.8

0.80

1.00

0.80

0.80

0.80

0.80

0.80

0.80

0.80

0.80

0.80

0.80

0.8

0.80

0.0
16.36760328

0.80

0.80

0.80

0.80

0.80

0.80

0.80

0.65

1.00

1.00

1.00

0.85

0.85

0.85

1.00

0.85

0.65

0.93

0.93

0.85

1.00

1.00

0.85

0.85

0.85

0.85

0.85

0.85

Factor Efficiency

Power

8.3

22.5

22.5

22.5

22.5

22.5

22.5

(A)

Current

Rated

415V ESSENTIAL SWITCHGEAR UNIT - 2

UNI/
BI Ope

0.80

0.80

0.80

0.80

0.80

0.80

0.80

0.80

0.80

0.80

0.80

0.80

0.8

0.80

0.80

0.80

0.80

0.80

0.80

0.80

0.80

Factor

Load

0.00

80.00

0.00

1.00

5.88

6.47

0.00

15.00

12.94

2.31

48.39

59.14

0.00

0.00

0.00

12.94

0.00

12.94

0.00

12.94

(kVA)

0.40

0.40

0.40

0.40

0.40

0.40

0.40

0.40

0.40

0.40

0.40

0.40

0.4

0.40

0.40

0.40

0.40

0.40

0.40

0.40

0.40

Factor

Load

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

4.705882

0.00

2.40

0.00

0.00

0.00

0.00

0.00

0.00

(kVA)

(Mtrs.)

Capacity Length

Intermittent

Load Character

Capacity Ope

Normal

of load

Location

ASSUMED & UNVERIFIED

FROM DEC Electrical Load list Dtd


25/06/11
FROM DEC Electrical Load list Dtd
25/06/11
FROM DEC Electrical Load list Dtd
25/06/11
FROM DEC Electrical Load list Dtd
25/06/11
FROM DEC Electrical Load list Dtd
25/06/11
FROM DEC Electrical Load list Dtd
25/06/11
FROM DEC Electrical Load list Dtd
25/06/11
FROM DEC Electrical Load list Dtd
25/06/11
FROM DEC Electrical Load list Dtd
25/06/11
FROM DEC Electrical Load list Dtd
24/02/12, REV.F
FROM DEC Electrical Load list Dtd
24/02/12, REV.F

FROM DEC Electrical Load list Dtd


25/06/11

FROM DEC Electrical Load list Dtd


25/06/11
FROM DEC Electrical Load list Dtd
25/06/11

FROM DEC Electrical Load list Dtd


24/02/12, REV.F

FROM DEC Electrical Load list Dtd


24/02/12, REV.F

FROM DEC Electrical Load list Dtd


24/02/12, REV.F

FROM DEC Electrical Load list Dtd


24/02/12, REV.F

FROM DEC Electrical Load list Dtd


24/02/12, REV.F

FROM DEC Electrical Load list Dtd


24/02/12, REV.F

Remarks

Module
Type

ACTRI
ACTRI

ACTRI

ACTRI

415
415
415
415
415
415

PAF MOTOR LUBE OIL PUMP (PAF-1)-2

PAF MOTOR LUBE OIL PUMP (PAF-2)-2

POWER FOR HYDRAULIC OIL STATION MOTOR


OF FDF (FDF-1)-2

POWER FOR HYDRAULIC OIL STATION MOTOR


OF FDF (FDF-2)-2

POWER FOR LUBE OIL STATION MOTOR OF


IDF (IDF-1)-2

POWER FOR LUBE OIL STATION MOTOR OF


IDF (IDF-2)-2

LOCALE CONTROL CABINET FOR LUBRICATION OIL415


1
POWER FOR LUBE OIL STATION MOTOR OF MILL-1

ACTRI

ACTRI

ACTRI

ACTRI

415

ACTRI

415

OIL PUMP MOTOR OF PAF HYDRAULIC LUBE


OIL STATION (PAF-2)-2

ACTRI

AUXILIARY ACTUATING MOTOR-1

415

ACTRI

415

FURNACE FLAME TV FOR A & B SIDE

STEAM-DRIVEN FEEDWATER PUMP LUBE-OIL


STANDBY OIL PUMP MOTOR-2
BFP TURBINE LUBE OIL STANDBY PUMP
MOTOR-1
OIL PUMP MOTOR OF PAF HYDRAULIC LUBE
OIL STATION (PAF-1)-2

ACMONO

240

BOILER AND AUXILIARIES - UNIT # 2

ACTRIN

415

ACTRIN

415

UNIT-2 UPS BYPASS TRANSFOMER

220 V DC UNIT-2 BATTERY CHARGER-2

ACTRIN

415

TIE TO ESSENTIAL SWGR-1

ACTRIN

415

INCOMER FROM UNIT-2 SWGR-2

415V ESSENTIAL SWGR-2B

TOTAL LOAD ON BUS A


(NORMAL + INTERMITTENT)

SUB TOTAL

11.00

1.10

1.10

2.20

2.20

0.00

0.00

kW

kW

kW

kW

kW

kW

kW

kW

kW

2.20
2.20

kW

kW

kW

kVA

kVA

kVA

kVA

kVA

kW

30.00

15.00

160.00

325.00

250

2000

653

5.00

22.5

2.9

2.9

5.9

5.9

0.0

0.0

5.9

5.9

0.80

0.80

0.80

0.80

0.80

0.80

0.80

0.80

0.80

0.80

0.80

30.7

56.1

0.80

1.00

1.00

1.00

1.00

0.80

0.80

0.85

0.65

0.65

0.65

0.65

0.65

0.65

0.65

0.65

0.93

0.85

0.65

1.00

1.00

1.00

1.00

0.85

0.65

Factor Efficiency

Power

16.0

222.6

452.2

347.8

2782.5

10.2

ACTRIN

415

RESERVED

12

Current
(A)

kW

Unit

0.0

Power

ACTRIN

Type

(V)

NAT

415

Volt

SPARE

Service Description

Rated

11

Item
No. KKS No.
(Load
side)

Load Rating

415V ESSENTIAL SWITCHGEAR UNIT - 2

UNI/
BI Ope

0.80

0.80

0.80

0.80

0.80

0.80

0.80

0.80

0.80

0.80

0.80

0.80

0.50

0.50

1.00

0.80

0.80

Factor

Load

0.00

0.00

1.69

0.00

3.38

0.00

0.00

0.00

3.38

32.26

17.65

3.08

0.00

162.50

250.00

645.5

5.88

0.00

(kVA)

0.40

0.40

0.40

0.40

0.40

0.40

0.40

0.40

0.40

0.40

0.40

0.40

0.40

0.40

0.40

0.40

0.40

Factor

Load

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.0

0.00

0.00

0.00

7.1

0.00

0.00

(kVA)

(Mtrs.)

Capacity Length

Intermittent

Load Character

Capacity Ope

Normal

of load

Location

Incomer

STANDARD BREAKER RATING


SHALL BE SELECTED.

FROM DEC Electrical Load list Dtd


24/02/12, REV.F

FROM DEC Electrical Load list Dtd


25/06/11

FROM DEC Electrical Load list Dtd


25/06/11

FROM DEC Electrical Load list Dtd


25/06/11

FROM DEC Electrical Load list Dtd


25/06/11

FROM DEC Electrical Load list Dtd


25/06/11

FROM DEC Electrical Load list Dtd


25/06/11

FROM DEC Electrical Load list Dtd


25/06/11

FROM DEC Electrical Load list Dtd


25/06/11

FROM DEC Electrical Load list Dtd


24/02/12, REV.F

FROM DEC Electrical Load list Dtd


25/06/11

Added as per ACPL/EIPL Comments


dated 17.7.2012

BASED ON DEC LATEST INPUT

ASSUMED & UNVERIFIED

Incomer

Module
Type

STANDARD BREAKER RATING


SHALL BE SELECTED.

Remarks

415
415

BOILER SOOT BLOWER POWER CABINET

FLAME SCANNER AMPLIFIER CABINET

ACTRIN

415

LOCALE CONTROL CABINET FOR


LUBRICATION OIL-8 POWER FOR LUBE OIL
STATION MOTOR OF MILL-8

415

415

FURNACE GAS TEMP. PROBE LEFT SIDE


LOCAL CONTROLCABINET

AIR PREHEATER FIRE DETECTION CABINET


FOR A & B SIDE
415V SPARE AC POWER -2

415

BOILER LOCAL IGNITION CABINET

415

BYPASS SYSTEM OIL STATION (WITH LOCAL


CONTROL BOX)-2

415

BFP-TURBINE TURNING GEAR MOTOR-2

415

ACTRI

415

EH OIL TRANSFER PUMP MOTOR

SEALNG OIL AC MOTOR-2

ACTRI

415

EH OIL MAIN OIL PUMP MOTOR-2

ACTRI

415

ACTRI

ACTRI

ACTRI

ACTRI

ACTRI

ACTRI

415

STEAM TURBINE LUBE OIL AUXILIARY PUMP


MOTOR

ACTRI

ACTRI

STEAM TURBINE TURNING GEAR MOTOR

TURBINE GENERATOR AND AUXILIARIES UNIT # 2

ACTRIN

415

LOCALE CONTROL CABINET FOR


LUBRICATION OIL-7 POWER FOR LUBE OIL
STATION MOTOR OF MILL-7

ACTRI

415

LOCALE CONTROL CABINET FOR


LUBRICATION OIL-6 POWER FOR LUBE OIL
STATION MOTOR OF MILL-6

ACTRI

ACTRI

415

LOCALE CONTROL CABINET FOR


LUBRICATION OIL-5 POWER FOR LUBE OIL
STATION MOTOR OF MILL-5

1.00

5.00

0.00

7.50

15.00

11.00

1.50

45.00

55.00

15.00

0.00

4.80

11.00

11.00

11.00

11.00

11.00

kW

kW

kW

kW

kW

kW

kW

kW

kW

kW

kW

kW

kW

kW

kW

kW

kW

0.80

0.0

1.74

10.23

0.0

15.34

30.69

22.51

4.01

84.15

102.85

0.80

0.80

0.80

0.80

0.80

0.80

0.80

0.80

0.80

0.80

0.80

8.3

30.7

0.80

0.80

0.80

0.80

0.80

0.80

0.80

1.00

0.85

0.65

0.85

0.85

0.85

0.65

0.93

0.93

0.85

1.00

1.00

0.85

0.85

0.85

0.85

0.85

0.85

0.85

Factor Efficiency

Power

22.5

22.5

22.5

22.5

22.5

22.5

ACTRI

kW

LOCALE CONTROL CABINET FOR LUBRICATION OIL4 POWER FOR LUBE OIL STATION MOTOR OF MILL- 415
4

11.00

ACTRI

Current

LOCALE CONTROL CABINET FOR LUBRICATION OIL3 POWER FOR LUBE OIL STATION MOTOR OF MILL- 415
3

kW

Unit

11.00

Power

22.5

Type

ACTRI

NAT

Volt
(A)

Service Description
(V)

Item
No. KKS No.
(Load
side)

Rated

LOCALE CONTROL CABINET FOR LUBRICATION OIL2 POWER FOR LUBE OIL STATION MOTOR OF MILL- 415
2

Load Rating

415V ESSENTIAL SWITCHGEAR UNIT - 2

UNI/
BI Ope

0.80

0.80

0.80

0.80

0.80

0.80

0.80

0.80

0.80

0.80

0.80

0.80

0.80

0.80

0.80

0.80

0.80

0.80

0.80

Factor

Load

1.00

5.88

0.00

8.82

17.65

0.00

2.31

0.00

59.14

17.65

0.00

0.00

12.94

0.00

12.94

0.00

12.94

0.00

12.94

(kVA)

0.40

0.40

0.40

0.40

0.40

0.40

0.40

0.40

0.40

0.40

0.40

0.40

0.40

0.40

0.40

0.40

0.40

0.40

0.40

Factor

Load

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

(kVA)

(Mtrs.)

Capacity Length

Intermittent

Load Character

Capacity Ope

Normal

of load

Location

FROM DEC Electrical Load list Dtd


24/02/12, REV.F

FROM DEC Electrical Load list Dtd


25/06/11

FROM DEC Electrical Load list Dtd


25/06/11
FROM DEC Electrical Load list Dtd
25/06/11
FROM DEC Electrical Load list Dtd
25/06/11
FROM DEC Electrical Load list Dtd
25/06/11
FROM DEC Electrical Load list Dtd
25/06/11
FROM DEC Electrical Load list Dtd
25/06/11
FROM DEC Electrical Load list Dtd
24/02/12, REV.F
FROM DEC Electrical Load list Dtd
25/06/11
FROM DEC Electrical Load list Dtd
25/06/11
FROM DEC Electrical Load list Dtd
25/06/11

FROM DEC Electrical Load list Dtd


25/06/11

FROM DEC Electrical Load list Dtd


24/02/12, REV.F

FROM DEC Electrical Load list Dtd


24/02/12, REV.F

FROM DEC Electrical Load list Dtd


24/02/12, REV.F

FROM DEC Electrical Load list Dtd


24/02/12, REV.F

FROM DEC Electrical Load list Dtd


24/02/12, REV.F

FROM DEC Electrical Load list Dtd


24/02/12, REV.F

FROM DEC Electrical Load list Dtd


24/02/12, REV.F

Remarks

Module
Type

COMMUNICATION PANEL

AVIATION OBSTRUCTION LIGHTING FEEDER

ESSENTIAL LIGHTING DB-2

Chimney emergency load

switchyard emergency load

SPARE

SPARE

RESERVED

11

12

13

14

15

16

17

18

kVA
kVA

825
1477
1625

Total load on Bus-A & B

Total load on Bus-A & B with 10% margin

kVA

kVA

653

kVA

kW

kW

kW

kVA

kVA

kVA

kW

kW

kW

kW

kW

Unit

Total Load on Bus-B

5.00

15.00

50.00

100.00

10.00

6.00

15.00

8.00

1.00

Power

Total Load on Bus-A

Type

825

ACTRIN

ACTRIN

415
415

ACTRI

ACTRI

ACTRI

ACTRI

ACTRI

415

415

415

415

415

ACTRI

ACTRI

ACTRI

ACMONO

NAT

TOTAL LOAD ON BUS B


(NORMAL + INTERMITTENT)

SUB TOTAL

415

FLAME SCANNING COOLING FAN AC MOTOR


LOCAL CONTROL CABINET

10
415

415

AIR PREHEATER GAP ADJUST CONTROL


CABINET FOR A & B SIDE-2

(V)

Volt

240

Service Description

240V SPARE AC POWER-2

Item
No. KKS No.
(Load
side)

Load Rating

10.23

0.00

0.00

20.9

69.6

139.12

17.39

10.43

26.09

16.37

5.21

(A)

Current

Rated

415V ESSENTIAL SWITCHGEAR UNIT - 2

0.80

0.80

0.80

1.00

1.00

1.00

0.80

0.80

0.80

0.80

0.80

0.85

0.65

0.65

1.00

1.00

1.00

1.00

1.00

1.00

0.85

1.00

Factor Efficiency

Power

UNI/
BI Ope

0.80

0.80

0.80

0.80

0.80

0.80

0.80

0.80

0.80

0.80

0.80

Factor

Load

824.6

5.88

0.00

0.00

12.00

40.00

80.00

10.00

6.00

15.00

0.00

0.00

(kVA)

0.40

0.40

0.40

0.40

0.40

0.40

0.40

0.40

0.40

0.40

0.40

Factor

Load

0.0

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

(kVA)

(Mtrs.)

Capacity Length

Intermittent

Load Character

Capacity Ope

Normal

of load

Location

Added as per ACPL/EIPL Comments


dated 17.7.2012
Added as per ACPL/EIPL Comments
dated 17.7.2012

Assumed & unverified

Assumed & unverified

Assumed & unverified

FROM DEC Electrical Load list Dtd


25/06/11

FROM DEC Electrical Load list Dtd


24/02/12, REV.F

FROM DEC Electrical Load list Dtd


24/02/12, REV.F