1) The document summarizes the structural design of a reinforced concrete box culvert with internal dimensions of 3600mm width and 1800mm height. 2) A finite element analysis was conducted to determine bending moments, shear forces, and moment distributions under different loading conditions. 3) Reinforcement requirements were calculated at critical sections and designed to resist hogging and sagging bending moments, as well as shear. The reinforcement drawings are also provided.

Uploaded by

coreteam
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
304 views8 pages

Single-box-culvert-structural-Design 3.6 M X 1.8M 01 Nov 2016

1) The document summarizes the structural design of a reinforced concrete box culvert with internal dimensions of 3600mm width and 1800mm height. 2) A finite element analysis was conducted to determine bending moments, shear forces, and moment distributions under different loading conditions. 3) Reinforcement requirements were calculated at critical sections and designed to resist hogging and sagging bending moments, as well as shear. The reinforcement drawings are also provided.

Uploaded by

coreteam
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 8

PROJECT :

PJE

JOB NO :
DESIGNED BY :
DATE
:

hanz
10-Nov-16

STRUCTURAL DESIGN OF BOX CULVERTS ( HB HIGHWAY LOAD )


CULVERT NO. :
INPUT DATA
DIMENSIONS OF R.C BOX
beban q
Internal width
Internal height
Wall thickness
Slab thickness
Effective width
Effective height

=
=
=
=
=
=

3600
1800
400
400
4000
2200

mm
mm
mm
mm
mm
mm

D
1800

C
3600

ASSUMPTIONS
Thickness of pavement =
Unit weight of soil
Unit weight of concrete
Unit weight of pavement
Soil cover

=
=
=
=

110 mm
20
24
24
100

kN/m3
kN/m3
kN/m3
mm

::
LOADING
HB wheel load =
Max.coefficient of lateral
earth pressure =
Min.coefficient of lateral
earth pressure =

62.5 kN/wheel

NORMALLY USE 25 UNIT HB = 45*2.5=112.5KN/WHEEL

0.6
0.2

PARTIAL FACTOR OF SAFETY


(BASED ON BS5400:PART 2)
Dead load (concrete)
Superimposed dead load
HB Highway load
Earth pressure
ULS for concrete

=
=
=
=
=

1.15
1.75
1.30
1.50
1.10

MATERIAL PROPERTIES
fcu =
fy =

20 N/mm2
320 N/mm2

::

336467119.xls

BOX CULVERT ANALYSIS


UNFACTORED LOAD
Self weight of top slab
Weight of walls
Weight of pavement
Weight of soil cover
HB Highway load

=
=
=
=
=

9.60
7.85
2.64
2.00
77.49

kN/m2
kN/m2
kN/m2
kN/m2
kN/m2

*Note:
Dispersion of wheel load is taken as 2:1 in soil (BS5400 :pt 2)
For depth of fill 6.0m > depth > 1.8m , consider 2 axles only
L=
B=

(A)

2.01 m (longitudinal dispersion)


3.21 m (transverse dispersion)

ANALYSIS OF BOX
CASE 1 : For max.BM and shear on wall & max. hogging
BM at corners, consider max. lateral earth
pressure acting on the wall in empty
condition.
P1 ------> ! A

where
P1, P2 = earth pressure

!
!
!
P2 ------> ! B

P1 =

26.15 kN/m2

P2 =

69.71 kN/m2
Top slab pressure =

130.57 kN/m2

Base pressure =

140.51 kN/m2

::
Loading is symmetrical about the vertical centreline
of the box.
-FEM(AD) =
FM(AD) =
FEM(AB) =
-FEM(BA) =
FM(AB) =
FEM(BC) =
FM(BC) =

174.10
261.15
17.57
21.09
29.00
187.34
281.02

kNm/m
kNm/m
kNm/m
kNm/m
kNm/m
kNm/m
kNm/m

Moment distribution (case 1):


distribution factor ,
DF(AD) = DF(BC) =
DF(AB) = DF(DC) =
Joints
DF
FEM

A
AD
0.22
-174.1
33.8

0.22
0.78

BC
0.22
187.3
-35.9

2.2

BA
0.78
-21.1
-130.4
61.4
-48.1
25.6
-20.1
9.4
-7.4

-118.9

118.9

-130.7

130.7

5.2

###
###

B
AB
0.78
17.6
122.8
-65.2
51.1
-24.1
18.9
-10.0
7.9

14.1

I(slab) =
I(wall) =

-13.2
-5.5
-2.0

::
(B)

CASE 2 : For max.sagging moment in the top & bottom


slab, consider min.lateral earth pressure
acting on the box.
P1 =

8.72 kN/m2

P2 =

23.24 kN/m2

FEM(AB) =
FM(AB) =
-FEM(BA) =
Moment distribution (case 2):
Joints
AD
DF
0.22
FEM
-174.1
36.3

2.3

A
AB
0.78
5.9
132.0
-70.7
55.5
-25.9
20.3
-10.9
8.5

BA
0.78
-7.0
-141.4
66.0
-51.7
27.7
-21.7
10.1
-8.0

-114.6

114.6

-126.1

15.3
5.6

336467119.xls

5.86 kNm/m
9.67 kNm/m
7.03 kNm/m
B
BC
0.22
187.3
-38.9
-14.2
-6.0
-2.2
126.1

DESIGN MOMENT ENVELOPE


Hogging
moment at bottom corners =

130.70 kNm/m

130.70

Hogging

moment at top corners =

118.92 kNm/m

118.92

Sagging

moment at top slab =

146.51 kNm/m

146.51

Sagging

moment at bottom slab =

154.96 kNm/m

154.96

95.81 kNm/m

-95.81

Hogging

moment of wall =

SHEAR
cover to rebar =
size of rebar =

50 mm
12 mm dia. for Slab.
12 mm dia.for Wall.
Critical shear section is at distance 2*d from the
face of support.
Shear in base slab :
Effective depth, d =
344 mm
Shear V =
156.25 kN/m
Shear in wall :
Effective depth, d =
344 mm
Shear V =

11.97 kN/m

REINFORCEMENT DESIGN
Hogging
Steel at Bottom Corners :
(i) Slab
K=
0.055
No comp.steel required.
Z=
321.41
As(req)=
1460.6
(ii) wall
K=
0.055
No comp.steel required.
Z=
321.41
As(req)=
1461
Hogging
(i) Slab

R1" =
P3' =
P3" =

<

0.156

<
mm2/m

326.8

<

0.156

<
mm2/m

326.8

K=
0.050 <
No comp.steel required.
Z=
323.58 <
As(req)=
1320 mm2/m

0.156

K=
0.050 <
No comp.steel required.
Z=
323.58 <
As(req)=
1320 mm2/m

0.156

14.91
52.13
17.38

Steel at Top Corners :

326.8

(ii) wall

::
Sagging

Sagging

326.8

Steel at Top Slab :


K=
0.062 <
No comp.steel required.
Z=
318.44 <
As(req)=
1653 mm2/m

0.156
326.8

Steel at Bottom Slab :


K=
0.065 <
No comp.steel required.
Z=
316.83 <
As(req)=
1757 mm2/m

Steel in Wall :
K=
0.040 <
No comp.steel required.
Z=
327.76 >
As(req)=
1053 mm2/m
Minimum Steel Ratio Required For Tension
& Distribution Steel = 0.15%
(i) Slab
As (min) =
(ii) Wall
As (min) =

0.156
326.8

Hogging

0.156
326.8

516 mm2/m
516 mm2/m

REINFORCEMENT PROVISION
(A) SUPPORT STEEL
(I) TOP SLAB
use Y
As (req) =
As (prov) =

16

spacing
1320 mm2/m
1340 mm2/m

150 c/c

use Y
As (req) =
As (prov) =

16

spacing
1461 mm2/m
1340 mm2/m

150 c/c

use Y
As (req) =
As (prov) =

16

spacing
1461 mm2/m
1340 mm2/m

150 c/c

(II) BOTTOM SLAB

Steel Area Not Surfficient!!

(III) WALL

336467119.xls

Steel Area Not Surfficient!!

(B) MIDSPAN STEEL


(I) TOP SLAB
use Y
As (req) =
As (prov) =

16

spacing
1653 mm2/m
1675 mm2/m

120 c/c

use Y
As (req) =
As (prov) =

16

spacing
1757 mm2/m
1675 mm2/m

120 c/c

use Y
As (req) =
As (prov) =

16

spacing
1053 .
1340 mm2/m

150 c/c

::
(II) BOTTOM SLAB

Steel Area Not Surfficient!!

(III) WALL

SHEAR CHECK
(i) Base
Shear
Shear stress v
ps
vc

=
=
=
=

156.25
0.45
0.39
0.45

kN
N/mm2
%
N/mm2

Shear failure.

Shear
Shear stress v
ps
vc

=
=
=
=

11.97
0.03
0.39
0.45

kN
N/mm2
%
N/mm2

Shear is OK.

(ii) Wall

::

(I) TOP SLAB


D 16 - 150 mm c/c

(I) TOP SLAB


D 16 - 120 mm c/c

D 16 - 150 mm c/c
(III) WALL

(III) WALL
D 16 - 150 mm c/c

(II) BOTTOM SLAB


D 16 - 120 mm c/c
GAMBAR PENULANGAN BOX CULVERT

336467119.xls

(II) BOTTOM SLAB


D 16 120 mm c/c

336467119.xls

mm4
mm4

336467119.xls

336467119.xls

336467119.xls

You might also like