Project:
Pile Structural Capacity
Mott MacDonald Singapore
Dvn/Dept:
Structural Job No./File No.
258520
Calculated by:
KKL
Date:
16 Aug 2010
Sheet No.
Checked by:
Date:
16 Aug 2010
AW
1
Dwg Reference:
OUTPUT
Calculations for:
Rochor Station
Pile Design
CPD-01
REF
Diameter of Pile
Concrete Grade
D
fcu
=
=
800
40
Rebar provided
9 T 20
Dia of link
13 mm
Cover to link
75 mm
Max Com Force
Max Ten Force
Fc
Ft
=
=
mm
N/mm2
3100
0
kN
kN
Design Status:
OK
211 mm
Spacing of Rebar
Percentage Rebar 0.57 %
Max Crack width
0.25
Percentage of reinforcement provided ( 0.5% minimum, 4.0% maximum)
= As/Ac*100
= 0.57 %
OK !
Structural Capacity
** Compression
(CP 4- 7.4.5.3)
Allowable compression capacity for rock socketed reinforced bored cast-in-place
pile with full length of reinforcement is given by;
Fc = [0.4fcuAc + 0.75fyAs]/Fs
Where Fs >= 2 CP4 7.4.5.3
Fs = [0.4fcuAc + 0.75fyAs]/Fc
2.9
Fs =
** Tension
Ultimate Ten Capacity
Tension Crack width
Crack width Location
Spacing of bar
Where
As =
Ac =
> 2, OK !
= 0.57*fy*As
= 741.651 kN
(LTA DC - 6.2.3.9)
> Ft, OK !
(CP 73 - Annex B7)
Co =
S =
53 mm
211 mm
The equation for the crack width under direct tension only is given by,
Wcr
= 3*acr*m
\where,
acr
= 113 mm
m
= 1 - 2*Ac / (3*Es*As)
1
= Ft / (As*Es)
=
0
m
Wcr
=
=
-0.00059
-0.2 mm
< 0.25, OK !
2828.57 mm2
500029 mm2
Project:
Pile Structural Capacity
Mott MacDonald Singapore
Structural Job No./File No.
Dvn/Dept:
258520
Calculated by:
KKL
Date:
16 Aug 2010
Sheet No.
Checked by:
AW
Date:
16 Aug 2010
2
Dwg Reference:
OUTPUT
Calculations for:
Rochor Station
Pile Design
REF
CPD-02
Diameter of Pile
Concrete Grade
D
fcu
=
=
800
40
Rebar provided
9 T 20
Dia of link
13 mm
Cover to link
75 mm
Max Com Force
Max Ten Force
Fc
Ft
=
=
mm
N/mm2
2850
500
kN
kN
Design Status:
OK
Spacing of Rebar
211 mm
Percentage Rebar 0.57 %
Max Crack width
0.25
Percentage of reinforcement provided ( 0.5% minimum, 4.0% maximum)
= As/Ac*100
= 0.57 %
OK !
Structural Capacity
** Compression
(CP 4- 7.4.5.3)
Allowable compression capacity for rock socketed reinforced bored cast-in-place
pile with full length of reinforcement is given by;
Fc = [0.4fcuAc + 0.75fyAs]/Fs
Where Fs >= 2 CP4 7.4.5.3
Fs = [0.4fcuAc + 0.75fyAs]/Fc
Fs =
3.15
** Tension
Ultimate Ten Capacity
Tension Crack width
Crack width Location
Spacing of bar
Where
As =
Ac =
> 2, OK !
= 0.57*fy*As
= 741.651 kN
(LTA DC - 6.2.3.9)
> Ft, OK !
(CP 73 - Annex B7)
Co =
S =
53 mm
211 mm
The equation for the crack width under direct tension only is given by,
Wcr
= 3*acr*m
\where,
acr
= 113 mm
m
= 1 - 2*Ac / (3*Es*As)
1
= Ft / (As*Es)
= 0.00088
m
Wcr
=
=
0.00029
0.1 mm
< 0.25, OK !
2828.57 mm2
500029 mm2
Project:
Pile Structural Capacity
Mott MacDonald Singapore
Dvn/Dept:
Structural Job No./File No.
258520
Calculated by:
KKL
Date:
16 Aug 2010
Sheet No.
Checked by:
AW
16 Aug 2010
Date:
3
Dwg Reference:
OUTPUT
Calculations for:
Rochor Station
Pile Design
CPD-03
REF
Diameter of Pile
Concrete Grade
D
fcu
=
=
1000
40
mm
N/mm2
Rebar provided
= 13 T 20
Dia of link
13 mm
Cover to link
75 mm
Max Com Force
Max Ten Force
Fc
Ft
=
=
5500
250
kN
kN
Design Status:
OK
Spacing of Rebar
194 mm
Percentage Rebar 0.52 %
Max Crack width
0.25
Percentage of reinforcement provided ( 0.5% minimum, 4.0% maximum)
= As/Ac*100
= 0.52 %
OK !
Structural Capacity
** Compression
(CP 4- 7.4.5.3)
Allowable compression capacity for rock socketed reinforced bored cast-in-place
pile with full length of reinforcement is given by;
Fc = [0.4fcuAc + 0.75fyAs]/Fs
Where Fs >= 2 CP4 7.4.5.3
Fs = [0.4fcuAc + 0.75fyAs]/Fc
2.53
Fs =
** Tension
Ultimate Ten Capacity
Tension Crack width
Crack width Location
Spacing of bar
Where
As =
Ac =
> 2, OK !
= 0.57*fy*As
= 1071.27 kN
(LTA DC - 6.2.3.9)
> Ft, OK !
(CP 73 - Annex B7)
Co =
S =
53 mm
194 mm
The equation for the crack width under direct tension only is given by,
Wcr
= 3*acr*m
\where,
acr
= 106 mm
m
= 1 - 2*Ac / (3*Es*As)
1
= Ft / (As*Es)
= 0.00031
m
Wcr
=
=
-0.00033
-0.11 mm
< 0.25, OK !
4085.71 mm2
781629 mm2
Project:
Pile Structural Capacity
Mott MacDonald Singapore
Dvn/Dept:
Structural Job No./File No.
258520
Calculated by:
KKL
Date:
16 Aug 2010
Sheet No.
Checked by:
AW
Date:
16 Aug 2010
4
Dwg Reference:
OUTPUT
Calculations for:
Rochor Station
Pile Design
REF
CPD-04
Diameter of Pile
Concrete Grade
D
fcu
=
=
800
40
Rebar provided
9 T 20
Dia of link
13 mm
Cover to link
75 mm
Max Com Force
Max Ten Force
Fc
Ft
=
=
mm
N/mm2
2750
500
kN
kN
Design Status:
OK
Spacing of Rebar
211 mm
Percentage Rebar 0.57 %
Max Crack width
0.25
Percentage of reinforcement provided ( 0.5% minimum, 4.0% maximum)
= As/Ac*100
= 0.57 %
OK !
Structural Capacity
** Compression
(CP 4- 7.4.5.3)
Allowable compression capacity for rock socketed reinforced bored cast-in-place
pile with full length of reinforcement is given by;
Fc = [0.4fcuAc + 0.75fyAs]/Fs
Where Fs >= 2 CP4 7.4.5.3
Fs = [0.4fcuAc + 0.75fyAs]/Fc
Fs =
3.26
** Tension
Ultimate Ten Capacity
Tension Crack width
Crack width Location
Spacing of bar
Where
As =
Ac =
> 2, OK !
= 0.57*fy*As
= 741.651 kN
(LTA DC - 6.2.3.9)
> Ft, OK !
(CP 73 - Annex B7)
Co =
S =
53 mm
211 mm
The equation for the crack width under direct tension only is given by,
Wcr
= 3*acr*m
\where,
acr
= 113 mm
m
= 1 - 2*Ac / (3*Es*As)
1
= Ft / (As*Es)
= 0.00088
m
Wcr
=
=
0.00029
0.100 mm
< 0.25, OK !
2828.57 mm2
500029 mm2
Project:
Pile Structural Capacity
Mott MacDonald Singapore
Dvn/Dept:
Structural Job No./File No.
258520
Calculated by:
KKL
Date:
16 Aug 2010
Sheet No.
Checked by:
AW
Date:
16 Aug 2010
5
Dwg Reference:
OUTPUT
Calculations for:
Rochor Station
Pile Design
REF
CPD-05
Diameter of Pile
Concrete Grade
D
fcu
=
=
800
40
Rebar provided
9 T 20
Dia of link
13 mm
Cover to link
75 mm
Max Com Force
Max Ten Force
Fc
Ft
=
=
mm
N/mm2
3400
0
kN
kN
Design Status:
OK
Spacing of Rebar
211 mm
Percentage Rebar 0.57 %
Max Crack width
0.25
Percentage of reinforcement provided ( 0.5% minimum, 4.0% maximum)
= As/Ac*100
= 0.57 %
OK !
Structural Capacity
** Compression
(CP 4- 7.4.5.3)
Allowable compression capacity for rock socketed reinforced bored cast-in-place
pile with full length of reinforcement is given by;
Fc = [0.4fcuAc + 0.75fyAs]/Fs
Where Fs >= 2 CP4 7.4.5.3
Fs = [0.4fcuAc + 0.75fyAs]/Fc
Fs =
2.64
** Tension
Ultimate Ten Capacity
Tension Crack width
Crack width Location
Spacing of bar
Where
As =
Ac =
> 2, OK !
= 0.57*fy*As
= 741.651 kN
(LTA DC - 6.2.3.9)
> Ft, OK !
(CP 73 - Annex B7)
Co =
S =
53 mm
211 mm
The equation for the crack width under direct tension only is given by,
Wcr
= 3*acr*m
\where,
acr
= 113 mm
m
= 1 - 2*Ac / (3*Es*As)
1
= Ft / (As*Es)
=
0
m
Wcr
=
=
-0.00059
-0.2 mm
< 0.25, OK !
2828.57 mm2
500029 mm2
Project:
Pile Structural Capacity
Mott MacDonald Singapore
Dvn/Dept:
Structural Job No./File No.
258520
Calculated by:
KKL
Date:
16 Aug 2010
Sheet No.
Checked by:
AW
Date:
16 Aug 2010
6
Dwg Reference:
OUTPUT
Calculations for:
Rochor Station
Pile Design
REF
CPD-06
Diameter of Pile
Concrete Grade
D
fcu
=
=
800
40
Rebar provided
9 T 20
Dia of link
13 mm
Cover to link
75 mm
Max Com Force
Max Ten Force
Fc
Ft
=
=
mm
N/mm2
4400
0
kN
kN
Design Status:
OK
Spacing of Rebar
211 mm
Percentage Rebar 0.57 %
Max Crack width
0.25
Percentage of reinforcement provided ( 0.5% minimum, 4.0% maximum)
= As/Ac*100
= 0.57 %
OK !
Structural Capacity
** Compression
(CP 4- 7.4.5.3)
Allowable compression capacity for rock socketed reinforced bored cast-in-place
pile with full length of reinforcement is given by;
Fc = [0.4fcuAc + 0.75fyAs]/Fs
Where Fs >= 2 CP4 7.4.5.3
Fs = [0.4fcuAc + 0.75fyAs]/Fc
Fs =
2.04
** Tension
Ultimate Ten Capacity
Tension Crack width
Crack width Location
Spacing of bar
Where
As =
Ac =
> 2, OK !
= 0.57*fy*As
= 741.651 kN
(LTA DC - 6.2.3.9)
> Ft, OK !
(CP 73 - Annex B7)
Co =
S =
53 mm
211 mm
The equation for the crack width under direct tension only is given by,
Wcr
= 3*acr*m
\where,
acr
= 113 mm
m
= 1 - 2*Ac / (3*Es*As)
1
= Ft / (As*Es)
=
0
m
Wcr
=
=
-0.00059
-0.2 mm
< 0.25, OK !
2828.57 mm2
500029 mm2
Project:
Pile Structural Capacity
Mott MacDonald Singapore
Dvn/Dept:
Structural Job No./File No.
258520
Calculated by:
KKL
Date:
16 Aug 2010
Sheet No.
Checked by:
AW
Date:
16 Aug 2010
7
Dwg Reference:
OUTPUT
Calculations for:
Rochor Station
Pile Design
REF
CPD-07
Diameter of Pile
Concrete Grade
D
fcu
=
=
mm
N/mm2
800
40
Rebar provided
= 10 T 20
Dia of link
13 mm
Cover to link
75 mm
Max Com Force
Max Ten Force
Fc
Ft
=
=
4250
750
kN
kN
Design Status:
OK
Spacing of Rebar
190 mm
Percentage Rebar 0.63 %
Max Crack width
0.25
Percentage of reinforcement provided ( 0.5% minimum, 4.0% maximum)
= As/Ac*100
= 0.63 %
OK !
Structural Capacity
** Compression
(CP 4- 7.4.5.3)
Allowable compression capacity for rock socketed reinforced bored cast-in-place
pile with full length of reinforcement is given by;
Fc = [0.4fcuAc + 0.75fyAs]/Fs
Where Fs >= 2 CP4 7.4.5.3
Fs = [0.4fcuAc + 0.75fyAs]/Fc
Fs =
2.14
** Tension
Ultimate Ten Capacity
Tension Crack width
Crack width Location
Spacing of bar
Where
As =
Ac =
> 2, OK !
= 0.57*fy*As
= 824.057 kN
(LTA DC - 6.2.3.9)
> Ft, OK !
(CP 73 - Annex B7)
Co =
S =
53 mm
190 mm
The equation for the crack width under direct tension only is given by,
Wcr
= 3*acr*m
\where,
acr
= 104 mm
m
= 1 - 2*Ac / (3*Es*As)
1
= Ft / (As*Es)
= 0.00119
m
Wcr
=
=
0.00066
0.21 mm
< 0.25, OK !
3142.86 mm2
499714 mm2
Project:
Pile Structural Capacity
Mott MacDonald Singapore
Dvn/Dept:
Structural Job No./File No.
258520
Calculated by:
KKL
Date:
16 Aug 2010
Sheet No.
Checked by:
AW
Date:
16 Aug 2010
8
Dwg Reference:
OUTPUT
Calculations for:
Rochor Station
Pile Design
REF
CPD-08
Diameter of Pile
Concrete Grade
D
fcu
=
=
1000
40
mm
N/mm2
Rebar provided
= 12 T 32
Dia of link
13 mm
Cover to link
75 mm
Max Com Force
Max Ten Force
Fc
Ft
=
=
7850
300
kN
kN
Design Status:
OK
Spacing of Rebar
207 mm
Percentage Rebar 1.24 %
Max Crack width
0.25
Percentage of reinforcement provided ( 0.5% minimum, 4.0% maximum)
= As/Ac*100
= 1.24 %
OK !
Structural Capacity
** Compression
(CP 4- 7.4.5.3)
Allowable compression capacity for rock socketed reinforced bored cast-in-place
pile with full length of reinforcement is given by;
Fc = [0.4fcuAc + 0.75fyAs]/Fs
Where Fs >= 2 CP4 7.4.5.3
Fs = [0.4fcuAc + 0.75fyAs]/Fc
Fs =
2.01
** Tension
Ultimate Ten Capacity
Tension Crack width
Crack width Location
Spacing of bar
Where
As =
Ac =
> 2, OK !
= 0.57*fy*As
2531.5 kN
=
(LTA DC - 6.2.3.9)
> Ft, OK !
(CP 73 - Annex B7)
Co =
S =
53 mm
207 mm
The equation for the crack width under direct tension only is given by,
Wcr
= 3*acr*m
\where,
acr
= 109 mm
m
= 1 - 2*Ac / (3*Es*As)
1
= Ft / (As*Es)
= 0.00016
m
Wcr
=
=
-0.00011
-0.04 mm
< 0.25, OK !
9654.86 mm2
776059 mm2
Project:
Pile Structural Capacity
Mott MacDonald Singapore
Dvn/Dept:
Structural Job No./File No.
258520
Calculated by:
KKL
Date:
16 Aug 2010
Sheet No.
Checked by:
AW
Date:
16 Aug 2010
9
Dwg Reference:
OUTPUT
Calculations for:
Rochor Station
Pile Design
REF
CPD-09
Diameter of Pile
Concrete Grade
D
fcu
=
=
800
40
Rebar provided
9 T 20
Dia of link
13 mm
Cover to link
75 mm
Max Com Force
Max Ten Force
Fc
Ft
=
=
mm
N/mm2
3300
600
kN
kN
Design Status:
OK
Spacing of Rebar
211 mm
Percentage Rebar 0.57 %
Max Crack width
0.25
Percentage of reinforcement provided ( 0.5% minimum, 4.0% maximum)
= As/Ac*100
= 0.57 %
OK !
Structural Capacity
** Compression
(CP 4- 7.4.5.3)
Allowable compression capacity for rock socketed reinforced bored cast-in-place
pile with full length of reinforcement is given by;
Fc = [0.4fcuAc + 0.75fyAs]/Fs
Where Fs >= 2 CP4 7.4.5.3
Fs = [0.4fcuAc + 0.75fyAs]/Fc
Fs =
2.72
** Tension
Ultimate Ten Capacity
Tension Crack width
Crack width Location
Spacing of bar
Where
As =
Ac =
> 2, OK !
= 0.57*fy*As
= 741.651 kN
(LTA DC - 6.2.3.9)
> Ft, OK !
(CP 73 - Annex B7)
Co =
S =
53 mm
211 mm
The equation for the crack width under direct tension only is given by,
Wcr
= 3*acr*m
\where,
acr
= 113 mm
m
= 1 - 2*Ac / (3*Es*As)
1
= Ft / (As*Es)
= 0.00106
m
Wcr
=
=
0.00047
0.16 mm
< 0.25, OK !
2828.57 mm2
500029 mm2
Project:
Pile Structural Capacity
Mott MacDonald Singapore
Dvn/Dept:
Structural Job No./File No.
258520
Calculated by:
KKL
Date:
16 Aug 2010
Sheet No.
Checked by:
AW
Date:
16 Aug 2010
10
Dwg Reference:
OUTPUT
Calculations for:
Rochor Station
Pile Design
REF
CPD-10
Diameter of Pile
Concrete Grade
D
fcu
=
=
1000
40
mm
N/mm2
Rebar provided
= 13 T 20
Dia of link
13 mm
Cover to link
75 mm
Max Com Force
Max Ten Force
Fc
Ft
=
=
6050
0
kN
kN
Design Status:
OK
Spacing of Rebar
194 mm
Percentage Rebar 0.52 %
Max Crack width
0.25
Percentage of reinforcement provided ( 0.5% minimum, 4.0% maximum)
= As/Ac*100
= 0.52 %
OK !
Structural Capacity
** Compression
(CP 4- 7.4.5.3)
Allowable compression capacity for rock socketed reinforced bored cast-in-place
pile with full length of reinforcement is given by;
Fc = [0.4fcuAc + 0.75fyAs]/Fs
Where Fs >= 2 CP4 7.4.5.3
Fs = [0.4fcuAc + 0.75fyAs]/Fc
Fs =
2.30
** Tension
Ultimate Ten Capacity
Tension Crack width
Crack width Location
Spacing of bar
Where
As =
Ac =
> 2, OK !
= 0.57*fy*As
= 1071.27 kN
(LTA DC - 6.2.3.9)
> Ft, OK !
(CP 73 - Annex B7)
Co =
S =
53 mm
194 mm
The equation for the crack width under direct tension only is given by,
Wcr
= 3*acr*m
\where,
acr
= 106 mm
m
= 1 - 2*Ac / (3*Es*As)
1
= Ft / (As*Es)
=
0
m
Wcr
=
=
-0.00064
-0.2 mm
< 0.25, OK !
4085.71 mm2
781629 mm2
Project:
Pile Structural Capacity
Mott MacDonald Singapore
Dvn/Dept:
Structural Job No./File No.
258520
Calculated by:
KKL
Date:
16 Aug 2010
Sheet No.
Checked by:
AW
Date:
16 Aug 2010
11
Dwg Reference:
OUTPUT
Calculations for:
Rochor Station
Pile Design
REF
CPD-11
Diameter of Pile
Concrete Grade
D
fcu
=
=
800
40
Rebar provided
9 T 20
Dia of link
13 mm
Cover to link
75 mm
Max Com Force
Max Ten Force
Fc
Ft
=
=
mm
N/mm2
3000
0
kN
kN
Design Status:
OK
Spacing of Rebar
211 mm
Percentage Rebar 0.57 %
Max Crack width
0.25
Percentage of reinforcement provided ( 0.5% minimum, 4.0% maximum)
= As/Ac*100
= 0.57 %
OK !
Structural Capacity
** Compression
(CP 4- 7.4.5.3)
Allowable compression capacity for rock socketed reinforced bored cast-in-place
pile with full length of reinforcement is given by;
Fc = [0.4fcuAc + 0.75fyAs]/Fs
Where Fs >= 2 CP4 7.4.5.3
Fs = [0.4fcuAc + 0.75fyAs]/Fc
Fs =
2.99
** Tension
Ultimate Ten Capacity
Tension Crack width
Crack width Location
Spacing of bar
Where
As =
Ac =
> 2, OK !
= 0.57*fy*As
= 741.651 kN
(LTA DC - 6.2.3.9)
> Ft, OK !
(CP 73 - Annex B7)
Co =
S =
53 mm
211 mm
The equation for the crack width under direct tension only is given by,
Wcr
= 3*acr*m
\where,
acr
= 113 mm
m
= 1 - 2*Ac / (3*Es*As)
1
= Ft / (As*Es)
=
0
m
Wcr
=
=
-0.00059
-0.2 mm
< 0.25, OK !
2828.57 mm2
500029 mm2
Project:
Pile Structural Capacity
Mott MacDonald Singapore
Dvn/Dept:
Structural Job No./File No.
258520
Calculated by:
KKL
Date:
16 Aug 2010
Sheet No.
Checked by:
AW
Date:
16 Aug 2010
12
Dwg Reference:
OUTPUT
Calculations for:
Rochor Station
Pile Design
REF
CPD-12
Diameter of Pile
Concrete Grade
D
fcu
=
=
800
40
Rebar provided
9 T 20
Dia of link
13 mm
Cover to link
75 mm
Max Com Force
Max Ten Force
Fc
Ft
=
=
mm
N/mm2
2850
500
kN
kN
Design Status:
OK
Spacing of Rebar
211 mm
Percentage Rebar 0.57 %
Max Crack width
0.25
Percentage of reinforcement provided ( 0.5% minimum, 4.0% maximum)
= As/Ac*100
= 0.57 %
OK !
Structural Capacity
** Compression
(CP 4- 7.4.5.3)
Allowable compression capacity for rock socketed reinforced bored cast-in-place
pile with full length of reinforcement is given by;
Fc = [0.4fcuAc + 0.75fyAs]/Fs
Where Fs >= 2 CP4 7.4.5.3
Fs = [0.4fcuAc + 0.75fyAs]/Fc
Fs =
3.15
** Tension
Ultimate Ten Capacity
Tension Crack width
Crack width Location
Spacing of bar
Where
As =
Ac =
> 2, OK !
= 0.57*fy*As
= 741.651 kN
(LTA DC - 6.2.3.9)
> Ft, OK !
(CP 73 - Annex B7)
Co =
S =
53 mm
211 mm
The equation for the crack width under direct tension only is given by,
Wcr
= 3*acr*m
\where,
acr
= 113 mm
m
= 1 - 2*Ac / (3*Es*As)
1
= Ft / (As*Es)
= 0.00088
m
Wcr
=
=
0.00029
0.1 mm
< 0.25, OK !
2828.57 mm2
500029 mm2
Project:
Pile Structural Capacity
Mott MacDonald Singapore
Dvn/Dept:
Structural Job No./File No.
258520
Calculated by:
KKL
Date:
16 Aug 2010
Sheet No.
Checked by:
AW
Date:
16 Aug 2010
13
Dwg Reference:
OUTPUT
Calculations for:
Rochor Station
Pile Design
REF
CPD-13
Diameter of Pile
Concrete Grade
D
fcu
=
=
1000
40
mm
N/mm2
Rebar provided
= 13 T 20
Dia of link
13 mm
Cover to link
75 mm
Max Com Force
Max Ten Force
Fc
Ft
=
=
5450
200
kN
kN
Design Status:
OK
Spacing of Rebar
194 mm
Percentage Rebar 0.52 %
Max Crack width
0.25
Percentage of reinforcement provided ( 0.5% minimum, 4.0% maximum)
= As/Ac*100
= 0.52 %
OK !
Structural Capacity
** Compression
(CP 4- 7.4.5.3)
Allowable compression capacity for rock socketed reinforced bored cast-in-place
pile with full length of reinforcement is given by;
Fc = [0.4fcuAc + 0.75fyAs]/Fs
Where Fs >= 2 CP4 7.4.5.3
Fs = [0.4fcuAc + 0.75fyAs]/Fc
2.55
Fs =
** Tension
Ultimate Ten Capacity
Tension Crack width
Crack width Location
Spacing of bar
Where
As =
Ac =
> 2, OK !
= 0.57*fy*As
= 1071.27 kN
(LTA DC - 6.2.3.9)
> Ft, OK !
(CP 73 - Annex B7)
Co =
S =
53 mm
194 mm
The equation for the crack width under direct tension only is given by,
Wcr
= 3*acr*m
\where,
acr
= 106 mm
m
= 1 - 2*Ac / (3*Es*As)
1
= Ft / (As*Es)
= 0.00024
m
Wcr
=
=
-0.00039
-0.12 mm
< 0.25, OK !
4085.71 mm2
781629 mm2
Project:
Pile Structural Capacity
Mott MacDonald Singapore
Dvn/Dept:
Structural Job No./File No.
258520
Calculated by:
KKL
Date:
16 Aug 2010
Sheet No.
Checked by:
AW
Date:
16 Aug 2010
14
Dwg Reference:
OUTPUT
Calculations for:
Rochor Station
Pile Design
REF
CPD-14
Diameter of Pile
Concrete Grade
D
fcu
=
=
800
40
Rebar provided
9 T 20
Dia of link
13 mm
Cover to link
75 mm
Max Com Force
Max Ten Force
Fc
Ft
=
=
mm
N/mm2
2700
450
kN
kN
Design Status:
OK
Spacing of Rebar
211 mm
Percentage Rebar 0.57 %
Max Crack width
0.25
Percentage of reinforcement provided ( 0.5% minimum, 4.0% maximum)
= As/Ac*100
= 0.57 %
OK !
Structural Capacity
** Compression
(CP 4- 7.4.5.3)
Allowable compression capacity for rock socketed reinforced bored cast-in-place
pile with full length of reinforcement is given by;
Fc = [0.4fcuAc + 0.75fyAs]/Fs
Where Fs >= 2 CP4 7.4.5.3
Fs = [0.4fcuAc + 0.75fyAs]/Fc
Fs =
3.32
** Tension
Ultimate Ten Capacity
Tension Crack width
Crack width Location
Spacing of bar
Where
As =
Ac =
> 2, OK !
= 0.57*fy*As
= 741.651 kN
(LTA DC - 6.2.3.9)
> Ft, OK !
(CP 73 - Annex B7)
Co =
S =
53 mm
211 mm
The equation for the crack width under direct tension only is given by,
Wcr
= 3*acr*m
\where,
acr
= 113 mm
m
= 1 - 2*Ac / (3*Es*As)
1
= Ft / (As*Es)
0.0008
=
m
Wcr
=
=
0.00021
0.07 mm
< 0.25, OK !
2828.57 mm2
500029 mm2
Project:
Pile Structural Capacity
Mott MacDonald Singapore
Dvn/Dept:
Structural Job No./File No.
258520
Calculated by:
KKL
Date:
16 Aug 2010
Sheet No.
Checked by:
AW
Date:
16 Aug 2010
15
Dwg Reference:
OUTPUT
Calculations for:
Rochor Station
Pile Design
REF
CPD-15
Diameter of Pile
Concrete Grade
D
fcu
=
=
800
40
Rebar provided
9 T 20
Dia of link
13 mm
Cover to link
75 mm
Max Com Force
Max Ten Force
Fc
Ft
=
=
mm
N/mm2
3500
0
kN
kN
Design Status:
OK
Spacing of Rebar
211 mm
Percentage Rebar 0.57 %
Max Crack width
0.25
Percentage of reinforcement provided ( 0.5% minimum, 4.0% maximum)
= As/Ac*100
= 0.57 %
OK !
Structural Capacity
** Compression
(CP 4- 7.4.5.3)
Allowable compression capacity for rock socketed reinforced bored cast-in-place
pile with full length of reinforcement is given by;
Fc = [0.4fcuAc + 0.75fyAs]/Fs
Where Fs >= 2 CP4 7.4.5.3
Fs = [0.4fcuAc + 0.75fyAs]/Fc
2.56
Fs =
** Tension
Ultimate Ten Capacity
Tension Crack width
Crack width Location
Spacing of bar
Where
As =
Ac =
> 2, OK !
= 0.57*fy*As
= 741.651 kN
(LTA DC - 6.2.3.9)
> Ft, OK !
(CP 73 - Annex B7)
Co =
S =
53 mm
211 mm
The equation for the crack width under direct tension only is given by,
Wcr
= 3*acr*m
\where,
acr
= 113 mm
m
= 1 - 2*Ac / (3*Es*As)
1
= Ft / (As*Es)
0
=
m
Wcr
=
=
-0.00059
-0.2 mm
< 0.25, OK !
2828.57 mm2
500029 mm2