Work Center in SAP PP: Scheduling
Work Center in SAP PP: Scheduling
Scheduling
When a production order is created, the duration of an operation can be
calculated based on operating times in routing and formulas which are
entered in the Work Center.
2.
Costing
The costs of an operation can be calculated in the production Order
based on the formulas which are entered in the Work Center. Work
Center is also linked to a cost center.
3.
Capacity Planning
The available capacity and formulas for calculating capacity
requirements are stored in the Work Center.
2.
3.
Step 2) In this Screen, Work Center basic data would be entered as given
below.
1.
2.
3.
4.
Enter usage as "009" which means Work Center is valid for all task list
types such as production routing, maintenance task list, etc.
5.
Enter standard Value key which contains different activity types used
for standard cost calculation.
3.
Enter factory calendar ID, which has public holidays listed for your
plant. So, on holidays, capacity for that Work Center would be zero.
4.
5.
Enter the time period (start and finish time) for which Work Center
would be available for operation.
6.
7.
Check "relevant for finite scheduling and "long term planning" flags
which indicate if there is a capacity constraint, then the operation is
moved to a certain date where it can be processed without capacity
constraints.
Then click on the tab "Scheduling" tab from the menu, the system will show
the following screen:
Step 5) In Scheduling Tab,
1.
2.
2.
3.
Enter Start and Finish date which represents validity date of the cost
center.
Input cost center to which operational costs would be booked.
Input all activity types along with the formulae, which would be used
for calculating the activity costs.
Click button
message
2.
2.
After filling in all the fields, press enter from the keyboard to go to the
overview screen of the Work Center. You can also directly go to the
preferred tab by using the
buttons.
Troubleshooting
There might be the case where in Cost Center does not exist. For this,
you need to create the cost center and maintain activity type cost
center relationships.