Task Name
Duration
Start
Finish
INFRASTRUCTURE WORKS
Milestones
Drainage
Drainage Start
Drainage Finish
Gravel Verge
Gravel Verge Start
Gravel Verge Finish
Road Work
Road Start
Road Finish
Pavement
Pavement Start
Pavement Finish
Premix
Premix Start
Premix Finish
Perimeter Drainage
Perimeter Drain Deaerator East
20 days
20 days
15 days
0 days
0 days
15 days
0 days
0 days
16 days
0 days
0 days
13 days
0 days
0 days
5 days
0 days
0 days
15 days
4 days
11/2/14
11/2/14
11/2/14
11/2/14
25/2/14
14/2/14
14/2/14
28/2/14
14/2/14
14/2/14
1/3/14
15/2/14
15/2/14
28/2/14
26/2/14
26/2/14
2/3/14
11/2/14
11/2/14
2/3/14
2/3/14
25/2/14
11/2/14
25/2/14
28/2/14
14/2/14
28/2/14
1/3/14
14/2/14
1/3/14
28/2/14
15/2/14
28/2/14
2/3/14
26/2/14
2/3/14
25/2/14
14/2/14
1 day
1 day
1 day
1 day
11/2/14
11/2/14
12/2/14
13/2/14
11/2/14
11/2/14
12/2/14
13/2/14
Concreting Drain Wall
1 day
Perimeter Drain Deaerator North 4 days
East
Excavation
1 day
Casting Lean Concrete
1 day
Concrete base
1 day
Drain Wall Formwork Erection 1 day
(with curve wall)
Concreting Drain Wall
1 day
Perimeter Drain Boiler
4 days
(Right/North side)
Excavation
1 day
Casting Lean Concrete
1 day
Concrete base
1 day
Drain Wall Formwork Erection 1 day
14/2/14
15/2/14
14/2/14
18/2/14
15/2/14
15/2/14
16/2/14
17/2/14
15/2/14
15/2/14
16/2/14
17/2/14
18/2/14
14/2/14
18/2/14
17/2/14
14/2/14
14/2/14
15/2/14
16/2/14
14/2/14
14/2/14
15/2/14
16/2/14
Concreting Drain Wall
Perimeter DrainBoiler
(Right/North side Exit)
Excavation
Casting Lean Concrete
Concrete base
Drain Wall Formwork Erection
1 day
4 days
17/2/14
18/2/14
17/2/14
21/2/14
1 day
1 day
1 day
1 day
18/2/14
18/2/14
19/2/14
20/2/14
18/2/14
18/2/14
19/2/14
20/2/14
Concreting Drain Wall
Perimeter Drain Boiler
(Left/South side)
Excavation
Casting Lean Concrete
Concrete base
Drain Wall Formwork Erection
1 day
4 days
21/2/14
22/2/14
21/2/14
25/2/14
1 day
1 day
1 day
1 day
22/2/14
22/2/14
23/2/14
24/2/14
22/2/14
22/2/14
23/2/14
24/2/14
Concreting Drain Wall
Close Drain C/W R.C Sump
WTU to Boiler (L=6.95M)
Excavation
Casting Lean Concrete
Concrete base
Drain Wall Formwork Erection
1 day
5 days
4 days
1 day
1 day
1 day
1 day
25/2/14
11/2/14
11/2/14
11/2/14
11/2/14
12/2/14
11/2/14
25/2/14
15/2/14
14/2/14
11/2/14
11/2/14
12/2/14
13/2/14
Concreting Drain Wall & Top
WTU to Boiler (L=15M)
Excavation
1 day
5 days
1 day
11/2/14
11/2/14
11/2/14
14/2/14
15/2/14
11/2/14
Excavation
Casting Lean Concrete
Concrete base
Drain Wall Formwork Erection
Project: Infra Schedule 17_02_1
Date: 17/2/14
Text1
11/2
25/2
14/2
28/2
14/2
1/3
15/2
28/2
26/2
2/3
Task
Summary
Manual Progress
Milestone
Progress
Critical
Page 1
February
March
19/1 26/1 2/2 9/2 16/2 23/2 2/3 9/3
ID
Task
Mode
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
Task Name
Duration
Start
Finish
1 day
1 day
2 days
11/2/14
12/2/14
11/2/14
11/2/14
12/2/14
14/2/14
1 day
12 days
11/2/14
15/2/14
15/2/14
26/2/14
1 day
15/2/14
15/2/14
Concreting Pavement
Remaining Pavement Boiler
North Side
Concreting Pavement
Remaining Pavement Boiler
South Side
Concreting Pavement
Pavement
Maintenance Track (Main)
Access Pickup Track WTU West
Side
Access Pickup Track Laku Tank
1 day
1 day
15/2/14
18/2/14
15/2/14
18/2/14
1 day
1 day
18/2/14
26/2/14
18/2/14
26/2/14
1 day
4 days
3 days
3 days
26/2/14
19/2/14
19/2/14
19/2/14
26/2/14
22/2/14
21/2/14
21/2/14
1 day
19/2/14
19/2/14
Access Pickup Track Demin
Tank
Access Pickup Track BFW
Access Pickup Track
Condensate
Gravel verge
Gravel verge at FG piperack
Leveling to finish level 9.8m
laying of crusher run
Gravel verge at WTU
Leveling to finish level 9.8m
laying of crusher run
Gravel verge at Boiler
(left/South side) yard
Leveling to finish level 9.8m
laying ofcrusher run
Road
FDT
Road work (WTU north side)
Excavation/Leveling
Laying of Crusher run
Road work (WTU tank South
Side)
Excavation/Leveling
Laying of Crusher run
Road work (Deaerator East Side)
1 day
20/2/14
20/2/14
1 day
1 day
21/2/14
22/2/14
21/2/14
22/2/14
15 days
5 days
2 days
2 days
5 days
2 days
2 days
8 days
14/2/14
14/2/14
14/2/14
17/2/14
18/2/14
18/2/14
20/2/14
21/2/14
28/2/14
18/2/14
15/2/14
18/2/14
22/2/14
20/2/14
22/2/14
28/2/14
3 days
3 days
16 days
1 day
3 days
1 day
1 day
4 days
21/2/14
24/2/14
14/2/14
14/2/14
14/2/14
14/2/14
16/2/14
17/2/14
25/2/14
28/2/14
1/3/14
14/2/14
16/2/14
15/2/14
16/2/14
20/2/14
1 day
1 day
4 days
17/2/14
18/2/14
19/2/14
19/2/14
20/2/14
22/2/14
Excavation/Leveling
1 day
Laying of Crusher run
1 day
Road work (Boiler North Side)
4 days
Excavation/Leveling
1 day
Laying of Crusher run
1 day
Road work (Boiler tank South
4 days
Side)
Excavation/leveling
1 day
Laying of Crusher run
1 day
Premix
5 days
Road work (WTU north side)
1 day
Road work (WTU tank South Side) 1 day
19/2/14
20/2/14
21/2/14
21/2/14
23/2/14
26/2/14
21/2/14
22/2/14
24/2/14
23/2/14
24/2/14
1/3/14
26/2/14
27/2/14
26/2/14
26/2/14
27/2/14
28/2/14
1/3/14
2/3/14
26/2/14
27/2/14
28/2/14
28/2/14
1 day
1 day
1/3/14
2/3/14
1/3/14
2/3/14
5 days
0 days
17/2/14
17/2/14
21/2/14
17/2/14
Casting Lean Concrete
Concrete base
Drain Wall & Culvert Formwork
Erection
Concreting Drain Wall & Top
Remaining Pavement (Around
perimeter drain)
Remaining Pavement Deaerator
Road work (Deaerator East Side) 1 day
Road work (Boiler North Side)
Road work (Boiler tank South
Side)
Micellenous
Start
Project: Infra Schedule 17_02_1
Date: 17/2/14
Text1
pending for FDT test
17/2
Task
Summary
Manual Progress
Milestone
Progress
Critical
Page 2
February
March
19/1 26/1 2/2 9/2 16/2 23/2 2/3 9/3
ID
Task
Mode
Task Name
Duration
Start
Finish
2 days
17/2/14
18/2/14
111
Pipe / structure Support stumps
112
113
Staircase stumps
1 day
Stumps for economiser platform 1 day
19/2/14
20/2/14
19/2/14
20/2/14
114
Light Pole installation
1 day
21/2/14
21/2/14
115
Finish
0 days
21/2/14
21/2/14
Project: Infra Schedule 17_02_1
Date: 17/2/14
Text1
Pending for MIE dwg position of pole
21/2
Task
Summary
Manual Progress
Milestone
Progress
Critical
Page 3
February
March
19/1 26/1 2/2 9/2 16/2 23/2 2/3 9/3