CLASS A
General Items
Item No.
Code No.
A100
Description
Unit
Qty.
Rate
CONTRACTUAL REQUIREMENTS
Bond
A111
Performance Bond.
sum
A112
Design Guarantee Bond [for roof structure (to be
designed by the Contractor) of (..)].
sum
Insurances
A121
Insurance of the Works.
sum
A122
Public Liability Insurance.
sum
A123
SOCSO/Workmen Compensation Insurance.
sum
Statutory Obligations
A131
CIDB Levy.
sum
A140
Stamp duty.
sum
A200
ENGINEER/SO/PD'S REQUIREMENTS
Facilities for the Engineer/SO/PD's representative.
Rate shall be deemed to include the provision of water
supply, electricity, and communication facilities.
A211
Establishment and removal of [transportable type cabin]
office [with a floor area of 70 m2].
sum
A212
Maintenance of office.
mth
A213
Establishment and removal of [purpose built]
laboratories [with a floor area of 60 m2 as shown in
Drawing Nos. (.) to (..)].
sum
A214
Maintenance of laboratories.
mth
Equipment for Use by the Engineer/SO/PD's
Representative
A221
Establishment and removal of office equipment [with
type and quantity as per Specification clause ().
Equipment to be reverted to the Contractor after
completion].
sum
A222
Maintenance of office equipment.
mth
file:///var/www/apps/conversion/tmp/scratch_7/340051828.xlsx
Class A: General Items
Page BQA1 of BQA32
CLASS A
General Items
Item No.
Code No.
Description
Unit
Qty.
Rate
Page Total carried to Summary of Class A
file:///var/www/apps/conversion/tmp/scratch_7/340051828.xlsx
Class A: General Items
Page BQA2 of BQA32
CLASS A
General Items
Item No.
Code No.
Description
Unit
A223
Establishment and removal of laboratory equipment
[with type and quantity as per Specification clause
(). Equipment to be reverted to the Contractor after
completion].
sum
A224
Maintenance of laboratory equipment.
mth
A225
Surveying equipment [with type and quantity as per the
Specification, Clause (). Equipment to be reverted
to the Contractor after completion].
sum
A226
Maintenance of survey equipment.
mth
Qty.
Rate
Services for the Engineer/SO/PD's Representative
A231.1
Provision of transport vehicle [Type A as per
Specification clause (..). Vehicle to be reverted to the
Contractor after completion].
sum
A231.2
Provision of transport vehicle [Type B as per
Specification clause (..). Vehicle to be reverted to the
Contractor after completion].
sum
A232.1
Maintenance of vehicle [Type A].
mth
A232.2
Maintenance of vehicle [Type B].
mth
A233
Provision of mobile phones [and to be reverted to the
Contractor after completion].
sum
A234
Maintenance of mobile phones.
mth
A235
Provision of camera [and to be reverted to the
Contractor after completion].
sum
Attendance for Engineer/SO/PD's Representative
A241
[2 Nos.] Drivers for [Type A and Type B vehicle].
man-mth
A242
[2 Nos.] Survey assistants.
man-mth
A243
[2 Nos.] Laboratory assistants.
man-mth
A244
[4 Nos.] General labours.
man-mth
A245
[2 Nos.] Security guards.
man-mth
file:///var/www/apps/conversion/tmp/scratch_7/340051828.xlsx
Class A: General Items
Page BQA3 of BQA32
CLASS A
General Items
Item No.
Code No.
Description
Unit
Qty.
Rate
Page Total carried to Summary of Class A
file:///var/www/apps/conversion/tmp/scratch_7/340051828.xlsx
Class A: General Items
Page BQA4 of BQA32
CLASS A
General Items
Item No.
Code No.
Description
Unit
Qty.
Rate
Submission of Documents
A251
Project execution plan [as per Specification clause
(..)].
sum
A252
Drawings [as per Specification clause (..)].
sum
A253
Method statement [as per Specification clause (..)].
sum
A254
Work programme [in Microsoft Project on a Gantt Chart
format].
sum
Miscellaneous
A261
Progress report [ in five sets]. Rate to include progress
photographs.
mth
A262
Project signboard.
nr
A263
As built drawings.
sum
A264
Video recording [as per Specification clause (....)].
sum
A265
Temporary fencing and hoarding.
sum
A300
PROJECT REQUIREMENTS
A310
Survey and setting out [by licensed surveyor].
sum
Quality Assurance/Quality Control (QA/QC)
QA/QC Plan [as per Specification clause (..)].
sum
Testing of materials; [concrete test cubes; samples and
method of testing as per Specification clause (..)].
sum
A323
Testing of work [for cold water plumbing system as per
Specification clause (.)].
sum
A324
Factory acceptance test [for hydrostatic testing of
butterfly valves] for three (3) person of the S.O.
representatives.
sum
Testing and commissioning [of plant for a duration of
three (3) months].
sum
A321
A322
A325
Operation and Maintenance of Plant
file:///var/www/apps/conversion/tmp/scratch_7/340051828.xlsx
Class A: General Items
Page BQA5 of BQA32
CLASS A
General Items
Item No.
Code No.
Description
Unit
A331
Operation and Maintenance Manual.
sum
A332
Training of operating personnel [for a period of 10
weeks].
sum
Qty.
Rate
Page Total carried to Summary of Class A
file:///var/www/apps/conversion/tmp/scratch_7/340051828.xlsx
Class A: General Items
Page BQA6 of BQA32
CLASS A
General Items
Item No.
Code No.
Description
Unit
A333
Provision of manpower [for a period of 12 months].
sum
A334
Provision of chemicals and consumable [for a period of
12 months].
sum
A335
Utility cost [for a period of 12 months].
sum
Qty.
Rate
Maintenance of Road
A341
Routine maintenance for existing road as per
Specification clause [..].
sum
A342
Periodic maintenanceas for existing road per
Specification clause [..].
sum
A343
Routine maintenance for temporary road diversion as
per Specification clause [..].
sum
A344
Periodic maintenance for temporary road diversion as
per Specification clause [..].
sum
A350
Clearance of site upon completion.
sum
A400
AUTHORITIES' REQUIREMENTS
Occupational Safety and Health Requirements
A411
Health and safety plan.
A412
Occupational safety and health officer [for duration of
the contract period].
A413
Personnel protective equipment as per Specification
clause [..].
sum
A414
Health and safety report [in five sets. Rate to include
tool box meeting].
mth
A415
Training of health and safety as per Specification clause
[..].
sum
A416
Safety signages.
sum
A420
Permits and fees [to KTMB for pipe jacking work
across railway tracks at (.)].
sum
A430
Deposit [to JKR for pipelaying work along road verge
from (..) to ()].
sum
file:///var/www/apps/conversion/tmp/scratch_7/340051828.xlsx
sum
man-mth
Class A: General Items
Page BQA7 of BQA32
CLASS A
General Items
Item No.
Code No.
Description
Unit
Qty.
Rate
Page Total carried to Summary of Class A
file:///var/www/apps/conversion/tmp/scratch_7/340051828.xlsx
Class A: General Items
Page BQA8 of BQA32
CLASS A
General Items
Item No.
Code No.
A500
Description
Unit
Qty.
Rate
CONTRACTOR'S REQUIREMENTS
Facilities
Item shall be deemed to include the provision of water
supply, electricity, and sanitary facilities and their
continuing operation and/or maintenance.
A511.1
Set up offices and remove upon completion; fixed
charge.
sum
A511.2
Maintain office for duration of contract period; timerelated charge.
sum
A512.1
Provision of office equipment and remove upon
completion; fixed charge.
sum
A512.2
Maintain office equipment for duration of contract
period; time-related charge.
sum
A513.1
Set up laboratories and remove upon completion; fixed
charge.
sum
A513.2
Maintain laboratories for duration of contract period;
time-related charge.
sum
A514.1
Provision of laboratories equipment and remove upon
completion [with type and quantity as per Specification
clause ()].
sum
A514.2
Maintain laboratories equipment for duration of contract
period; time-related charge.
sum
A515.1
Set up stores and remove upon completion; fixed
charge.
sum
A515.2
Maintain store for duration of contract period; timerelated charge.
sum
A516.1
Set up workshops and remove upon completion; fixed
charge.
sum
A516.2
Maintain workshop for duration of contract period;
time-related charge.
sum
A517.1
Set up workmen accomodation and remove upon
completion; fixed charge.
sum
A517.2
Maintain workmen accomodation for duration of
contract period; time-related charge.
sum
file:///var/www/apps/conversion/tmp/scratch_7/340051828.xlsx
Class A: General Items
Page BQA9 of BQA32
CLASS A
General Items
Item No.
Code No.
Description
A518.1 Provision of transport.
A518.2
Maintain transport for duration of contract period; timerelated charge.
Unit
sum
Qty.
Rate
sum
Page Total carried to Summary of Class A
file:///var/www/apps/conversion/tmp/scratch_7/340051828.xlsx
Class A: General Items
Page BQA10 of BQA32
CLASS A
General Items
Item No.
Code No.
Description
Unit
Qty.
Rate
Temporary Work
A521.1
Construct temporary access roads to site; fixed charge.
sum
A521.2
Maintain temporary access roads for duration of contract
period; time-related charge.
sum
A522.1
Construct temporary bridges and remove upon
completion [over Sg. ()]; fixed charge.
sum
A522.2
Maintain temporary bridges for duration of contract
period; time-related charge.
sum
A523.1
Construct cofferdams for [water intake] and remove
upon completion; fixed charge.
sum
A523.2
Maintain cofferdam for duration of construction; timerelated charge.
sum
A524.1
Install pumping and dewatering at [pumphouse] and
remove upon completion; fixed charge.
sum
A524.2
Operation and maintenance of pumping and dewatering
for duration of construction; time-related charge.
sum
A525.1
Construct river diversion for [water intake] and reinstate
to its original alignment upon completion; fixed charge.
sum
A525.2
Maintain river diversion for duration of construction;
time-related charge.
sum
A526.1
Construct temporary jetty [at Sg. ()] and remove
upon completion; fixed charge.
sum
A526.2
Maintain temporary jetty for duration of contract period;
time-related charge.
sum
A527.1
Construct temporary staging over [Sg. (.)] and
remove upon completion; fixed charge.
sum
A527.2
Maintain temporary staging for duration of construction;
time-related charge.
sum
Site Management
A531
Site agent for the duration of conract period; timerelated charge.
file:///var/www/apps/conversion/tmp/scratch_7/340051828.xlsx
sum
Class A: General Items
Page BQA11 of BQA32
CLASS A
General Items
Item No.
Code No.
Description
A532 QA/QC officer for the duration of contract period.
Unit
man-mth
Qty.
Rate
Page Total carried to Summary of Class A
file:///var/www/apps/conversion/tmp/scratch_7/340051828.xlsx
Class A: General Items
Page BQA12 of BQA32
CLASS A
General Items
Item No.
Code No.
Description
Unit
A540
Mobilisation and demobilisation. [Rate to include
remobilisation for testing and commissioning of the
plant after the completion of the pipelaying work under
Package (2)].
sum
A600
DESIGN AND BUILT ELEMENT
A610
Preliminary engineering studies.
sum
A620
Design survey.
sum
A630
Utilities survey.
sum
A640
Site investigation.
sum
A650
Design fees.
sum
Qty.
Rate
Independent Checkers
A661
Structural.
sum
A662
Geotechnical.
sum
A663
Road safety.
sum
A670
Supervision fees.
sum
A700
PROVISIONAL/PRIME COST SUMS
Provisional Sums
A711.1
Provisional Sum of [RM: Two hundred thousands only
for TNB contribution].
sum
A711.2
Provisional Sum of [RM: Five hundred thousands only
for piling work].
sum
A711.3
Provisional Sum of [RM: Three hundred thousands only
for staff quarters to be procured by the Employer].
sum
A711.4
Attendance [for Item A711.3].
sum
A711.5
Profit for [Item A711.3].
Prime Cost Items
A721
Prime Cost Sum of [RM: One million only for
reinforced soil wall].
file:///var/www/apps/conversion/tmp/scratch_7/340051828.xlsx
sum
Class A: General Items
Page BQA13 of BQA32
CLASS A
General Items
Item No.
Code No.
Description
A722
Attendance.
A723
Profit.
Unit
Qty.
Rate
sum
%
Page Total carried to Summary of Class A
file:///var/www/apps/conversion/tmp/scratch_7/340051828.xlsx
Class A: General Items
Page BQA14 of BQA32
CLASS A
General Items
Item No.
Code No.
Description
Unit
Qty.
Rate
Summary of Class A: General Items
Page BQA1
Page BQA2
Page BQA3
Page BQA4
Page BQA5
Page BQA6
Page BQA7
file:///var/www/apps/conversion/tmp/scratch_7/340051828.xlsx
Class A: General Items
Page BQA15 of BQA32
CLASS A
General Items
Item No.
Code No.
Description
Unit
Qty.
Rate
Total of Class A carried to Grand Summary
file:///var/www/apps/conversion/tmp/scratch_7/340051828.xlsx
Class A: General Items
Page BQA16 of BQA32
Amount (RM)
file:///var/www/apps/conversion/tmp/scratch_7/340051828.xlsx
Class A: General Items
Page BQA17 of BQA32
Amount (RM)
file:///var/www/apps/conversion/tmp/scratch_7/340051828.xlsx
Class A: General Items
Page BQA18 of BQA32
Amount (RM)
file:///var/www/apps/conversion/tmp/scratch_7/340051828.xlsx
Class A: General Items
Page BQA19 of BQA32
Amount (RM)
file:///var/www/apps/conversion/tmp/scratch_7/340051828.xlsx
Class A: General Items
Page BQA20 of BQA32
Amount (RM)
file:///var/www/apps/conversion/tmp/scratch_7/340051828.xlsx
Class A: General Items
Page BQA21 of BQA32
Amount (RM)
file:///var/www/apps/conversion/tmp/scratch_7/340051828.xlsx
Class A: General Items
Page BQA22 of BQA32
Amount (RM)
file:///var/www/apps/conversion/tmp/scratch_7/340051828.xlsx
Class A: General Items
Page BQA23 of BQA32
Amount (RM)
file:///var/www/apps/conversion/tmp/scratch_7/340051828.xlsx
Class A: General Items
Page BQA24 of BQA32
Amount (RM)
file:///var/www/apps/conversion/tmp/scratch_7/340051828.xlsx
Class A: General Items
Page BQA25 of BQA32
Amount (RM)
file:///var/www/apps/conversion/tmp/scratch_7/340051828.xlsx
Class A: General Items
Page BQA26 of BQA32
Amount (RM)
file:///var/www/apps/conversion/tmp/scratch_7/340051828.xlsx
Class A: General Items
Page BQA27 of BQA32
Amount (RM)
file:///var/www/apps/conversion/tmp/scratch_7/340051828.xlsx
Class A: General Items
Page BQA28 of BQA32
Amount (RM)
file:///var/www/apps/conversion/tmp/scratch_7/340051828.xlsx
Class A: General Items
Page BQA29 of BQA32
Amount (RM)
file:///var/www/apps/conversion/tmp/scratch_7/340051828.xlsx
Class A: General Items
Page BQA30 of BQA32
Amount (RM)
file:///var/www/apps/conversion/tmp/scratch_7/340051828.xlsx
Class A: General Items
Page BQA31 of BQA32
Amount (RM)
file:///var/www/apps/conversion/tmp/scratch_7/340051828.xlsx
Class A: General Items
Page BQA32 of BQA32