The document provides information on the materials, labor, and machinery required to produce 1 cubic meter of different grades of concrete. For PCC concrete, it lists the quantities of cement, coarse aggregate, fine aggregate, and water needed. It also gives the requirements for labor, machinery, formwork, and overhead costs. Similarly for RCC concrete, it specifies the material, labor, and machinery quantities and provides the mix proportions and cement quantities for various concrete grades from M5 to M25.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
59 views6 pages

Concrete

The document provides information on the materials, labor, and machinery required to produce 1 cubic meter of different grades of concrete. For PCC concrete, it lists the quantities of cement, coarse aggregate, fine aggregate, and water needed. It also gives the requirements for labor, machinery, formwork, and overhead costs. Similarly for RCC concrete, it specifies the material, labor, and machinery quantities and provides the mix proportions and cement quantities for various concrete grades from M5 to M25.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 6

Grade of Concrete

a)cementrequired:
No of Bags of Cement

3
4.44
221.90

b)VolumeofSandrequired:
Volume of sand required m3
c)VolumeofCoarseAggregateRequired
Volume of Coarse Aggregate m3

0.46
0.92

PCC
A. MATERIALS:
Cement
Coarse aggregate 40mm
Coarse aggregate 20mm
Coarse aggregate 10mm
Fine aggregate (Sand)
Water (including for curing)
B. MACHINERY

Kg
cum
cum
cum
cum
kl

221.90

Concrete Mixer 10 / 7 cft (0.2 / 0.8 cum) capacity

hour

C. LABOUR:
Mason 1st class
Mazdoor (unskilled)
Grand Total

day
day

0.1
1.39

Formwork @ 3.5% on cost of material, labour and


machinery
OverHeads and Contractor Profits
Cost per 1 Cum

0.92
0.46
1.2

Wet Mix 1.54

Bags
Kgs

m3

170.69

m3
RCC
6.4
1489.25
2009.25
1579.25
256.49
103
471.1
623
490

3.00%

1420.17
0.00
1856.55
0.00
118.50
123.60
471.10
62.30
681.10
4733.32
142.00

A. MATERIALS:
Cement
Coarse aggregate 40mm
Coarse aggregate 20mm
Coarse aggregate 10mm
Fine aggregate (Sand)
Water (including for curing)
B. MACHINERY
Concrete Mixer 10 / 7 cft (0.2 / 0.8 cum)
capacity
C. LABOUR:
Mason 1st class
Mason 2nd class
Mazdoor (unskilled)
Grand Total
Formwork @ 3.5% on cost of material, labour
and machinery

4875.32

663.77

5539.09

OverHeads and Contractor Profits


Cost per 1 Cum

Grade
M5
M7.5
M10
M15
M20
M25

Propostion
1:05:10
1:04:08
1:03:06
1:02:04
1:1.5:3
1:01:02

Cement
136 kgs
168 kgs
218 kgs
312 kgs
397 kgs
547.20 kgs

Kg
cum
cum
cum
cum
kl

221.90
0.65
0.28
0.46
1.2

6.4
1489.25
2009.25
1579.25
256.49
103

hour

471.1

day
day
day

0.13
0.27
3.6

623
560
490
4.00%

Sand
0.47 m3
0.46 m3
0.45 m3
0.43 m3
0.41 m3
0.38 m3

1420.17
0.00
1299.58
437.77
118.50
123.60
471.10
80.99
151.20
1764.00
5866.91
234.68
6101.59

830.73

6932.32

Aggregate
0.95 m3
0.93 m3
0.91 m3
0.86 m3
0.82 m3
0.76 m3