Grade of Concrete
a)cementrequired:
No of Bags of Cement
3
4.44
221.90
b)VolumeofSandrequired:
Volume of sand required m3
c)VolumeofCoarseAggregateRequired
Volume of Coarse Aggregate m3
0.46
0.92
PCC
A. MATERIALS:
Cement
Coarse aggregate 40mm
Coarse aggregate 20mm
Coarse aggregate 10mm
Fine aggregate (Sand)
Water (including for curing)
B. MACHINERY
Kg
cum
cum
cum
cum
kl
221.90
Concrete Mixer 10 / 7 cft (0.2 / 0.8 cum) capacity
hour
C. LABOUR:
Mason 1st class
Mazdoor (unskilled)
Grand Total
day
day
0.1
1.39
Formwork @ 3.5% on cost of material, labour and
machinery
OverHeads and Contractor Profits
Cost per 1 Cum
0.92
0.46
1.2
Wet Mix 1.54
Bags
Kgs
m3
170.69
m3
RCC
6.4
1489.25
2009.25
1579.25
256.49
103
471.1
623
490
3.00%
1420.17
0.00
1856.55
0.00
118.50
123.60
471.10
62.30
681.10
4733.32
142.00
A. MATERIALS:
Cement
Coarse aggregate 40mm
Coarse aggregate 20mm
Coarse aggregate 10mm
Fine aggregate (Sand)
Water (including for curing)
B. MACHINERY
Concrete Mixer 10 / 7 cft (0.2 / 0.8 cum)
capacity
C. LABOUR:
Mason 1st class
Mason 2nd class
Mazdoor (unskilled)
Grand Total
Formwork @ 3.5% on cost of material, labour
and machinery
4875.32
663.77
5539.09
OverHeads and Contractor Profits
Cost per 1 Cum
Grade
M5
M7.5
M10
M15
M20
M25
Propostion
1:05:10
1:04:08
1:03:06
1:02:04
1:1.5:3
1:01:02
Cement
136 kgs
168 kgs
218 kgs
312 kgs
397 kgs
547.20 kgs
Kg
cum
cum
cum
cum
kl
221.90
0.65
0.28
0.46
1.2
6.4
1489.25
2009.25
1579.25
256.49
103
hour
471.1
day
day
day
0.13
0.27
3.6
623
560
490
4.00%
Sand
0.47 m3
0.46 m3
0.45 m3
0.43 m3
0.41 m3
0.38 m3
1420.17
0.00
1299.58
437.77
118.50
123.60
471.10
80.99
151.20
1764.00
5866.91
234.68
6101.59
830.73
6932.32
Aggregate
0.95 m3
0.93 m3
0.91 m3
0.86 m3
0.82 m3
0.76 m3