Transmission Corporation of A.P. Limited

The document summarizes the results of a substation and feeder testing, including: - Metering circuit testing results showing voltage, current, power, and VAR readings for each phase. - Verification of overload and earth fault relay make and input voltage/current settings. - DC circuit testing showing voltages and continuity to earth. - Functional checks showing remote close/trip operations and proper indications and alarms worked as expected.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
75 views2 pages

Transmission Corporation of A.P. Limited

The document summarizes the results of a substation and feeder testing, including: - Metering circuit testing results showing voltage, current, power, and VAR readings for each phase. - Verification of overload and earth fault relay make and input voltage/current settings. - DC circuit testing showing voltages and continuity to earth. - Functional checks showing remote close/trip operations and proper indications and alarms worked as expected.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 2

TRANSMISSION CORPORATION OF A.P.

LIMITED
SITE :

DATE :

Name of the Substation


Name of the Feeder
Date of testing
Metering Circuit Testing
Applied I
Ammeter
&V

:
:
:
:
Voltmeter

MW

PHASE

SETTING

O/L R

PS =

TL =

PS =

TL =

PS =

TL =

PS =

TL =

O/L B

E/L

Energy Meter
Currents

O/L &E/L Relay Make :


Inputs verification:
Input V& I
R phase
voltage
current

O/L Y

MVAR

PICK
UP

MW

MVAR

PF

Type
Y phase
voltage

PSM TIME(actual) TIME

B phase
current

voltage

REMARKS

Testing:

current

DC Incoming
1) At C&R panels DC wiring terminations checked for loose contacts if any.
DC Voltage: + to - =
; + to E =
; - to E =
At C & R panels CT wiring terminations checked for loose contacts if any
At C & R panels PT wiring terminations checked for loose contacts if any.
Earthing of control & Relay panel (continuity of panel earth bar with main earth mat)
Remarks

Functional checks:
1. Remote close
:
2. Remote trip
:
3. Protection trip
:
4. All Indications
:
5. All annunciations :
6. Breaker Trouble Alarms: