CH 08
CH 08
Excerpts from this work may be reproduced by instructors for distribution on a not-for-profit basis for testing or
instructional purposes only to students enrolled in courses for which the textbook Fair, Greyer, and Okuns Water
and Wastewater Engineering: Water Supply and Wastewater Removal by Nazih K. Shammas and Lawrence K. Wang,
has been adopted. Any other reproduction or translation of this work beyond that permitted by Sections 107 or 108
of the 1976 United States Copyright Act without the permission of the copyright owner is unlawful. Page 1
Chapter 8
Pumping, Storage and Dual Water
Systems
Problem 8.1
Determine the water horsepower, break horsepower and motor horsepower for a pump operating under the following
conditions: water flow of 490 gpm is to be pumped against a total head of 110 ft; the pump efficiency is 75%; and
the motor driving the pump has an efficiency is 85%
Solution:
Water horsepower = Q H/3957
= (490) (110)/3957
= 13.6 hp
Break horsepower = Water horsepower/Epump
= 13.6/0.75
= 18.1 hp
Motor horsepower = break horsepower/Emotor)
= 18.1/0.85
Excerpts from this work may be reproduced by instructors for distribution on a not-for-profit basis for testing or
instructional purposes only to students enrolled in courses for which the textbook Fair, Greyer, and Okuns Water
and Wastewater Engineering: Water Supply and Wastewater Removal by Nazih K. Shammas and Lawrence K. Wang,
has been adopted. Any other reproduction or translation of this work beyond that permitted by Sections 107 or 108
of the 1976 United States Copyright Act without the permission of the copyright owner is unlawful. Page 2
Solution:
Hs = Hsuction + Hd
TDH = Hs + Hf = Hsuction + Hd + Hf
Where
Hs = static head, ft
Hsuction = suction lift head, ft
Hd = discharge head, ft
TDH = total dynamic head, ft
Hf = friction loss head, ft
Hs = Hsuction + Hd
= 6 ft + 52 ft
= 58 ft
From Appendix 17 Equivalent length of pipe to headloss in fittings:
Equivalent 6-in pipe length for 2 globe valves (open) = 2 x 150 ft = 300 ft
Equivalent 6-in pipe length for 2 medium sweep elbows = 2 x 14 ft = 28 ft.
Total equivalent length of 6-in pipe = 1250 + 300 + 28 = 1,578 ft
From Nomogram (C= 110) in Appendix 14 at Q = 600 gpm
Hf = 40 ft of water per 1000 ft of 6-in DIP pipe
= (40/1000) (1,578)
= 63.12 ft
TDH = Hs + Hf
= 58 + 63.12 = 121.12 ft
Excerpts from this work may be reproduced by instructors for distribution on a not-for-profit basis for testing or
instructional purposes only to students enrolled in courses for which the textbook Fair, Greyer, and Okuns Water
and Wastewater Engineering: Water Supply and Wastewater Removal by Nazih K. Shammas and Lawrence K. Wang,
has been adopted. Any other reproduction or translation of this work beyond that permitted by Sections 107 or 108
of the 1976 United States Copyright Act without the permission of the copyright owner is unlawful. Page 3
Problem 8.3
Using the data given from Problem 8.2 assume the following additional data: efficiency of pump = 80 %, efficiency
of motor = 85 %. Determine (a) the motor horsepower in hp and kWh/day; and (b) the daily power cost if the unit
power cost is $0.1/kWh
Solution:
From Problem 8.2,
TDH = 121.12 ft
hp = (Q) (H)/3,957
= 600 x 121.12/3,957
= 18.4
Excerpts from this work may be reproduced by instructors for distribution on a not-for-profit basis for testing or
instructional purposes only to students enrolled in courses for which the textbook Fair, Greyer, and Okuns Water
and Wastewater Engineering: Water Supply and Wastewater Removal by Nazih K. Shammas and Lawrence K. Wang,
has been adopted. Any other reproduction or translation of this work beyond that permitted by Sections 107 or 108
of the 1976 United States Copyright Act without the permission of the copyright owner is unlawful. Page 4
Problem 8.4
Determine the total power input if the electrical input to a motor-pump system is 220 volts and 36 amps.
Solution:
Input power = (V) ( A )/746
= (220) (36)/746
= 10.6 hp
Excerpts from this work may be reproduced by instructors for distribution on a not-for-profit basis for testing or
instructional purposes only to students enrolled in courses for which the textbook Fair, Greyer, and Okuns Water
and Wastewater Engineering: Water Supply and Wastewater Removal by Nazih K. Shammas and Lawrence K. Wang,
has been adopted. Any other reproduction or translation of this work beyond that permitted by Sections 107 or 108
of the 1976 United States Copyright Act without the permission of the copyright owner is unlawful. Page 5
Problem 8.5
Determine the wire-to-water efficiency (%) if Q = 510 gpm, TDH = 53.65 ft, V = 220 volts, A = 36 amps.
Solution:
Eww = Water horsepower/Input horsepower
Water horsepower = (Q) (H)/3,957
= 510 x 53.65/3,957
= 6.9 hp
Input power = VA/746
= 220x36/746
= 10.6 hp
Eww = (6.9/10.6) x 100
= 65 %
Excerpts from this work may be reproduced by instructors for distribution on a not-for-profit basis for testing or
instructional purposes only to students enrolled in courses for which the textbook Fair, Greyer, and Okuns Water
and Wastewater Engineering: Water Supply and Wastewater Removal by Nazih K. Shammas and Lawrence K. Wang,
has been adopted. Any other reproduction or translation of this work beyond that permitted by Sections 107 or 108
of the 1976 United States Copyright Act without the permission of the copyright owner is unlawful. Page 6
Problem 8.6
Changing the speed of a centrifugal pump will change its operating characteristics including the water flow.
Determine the new flow rate or capacity, Q2 if
Q1 = rated water flow = 620 gpm
N2 = pump speed now = 1320 rpm
N1= rated pump speed = 1650 rpm
Solution:
Q2 = (Q1) (N2/N1)
= (620) (1320/1650)
= 496 gpm
Excerpts from this work may be reproduced by instructors for distribution on a not-for-profit basis for testing or
instructional purposes only to students enrolled in courses for which the textbook Fair, Greyer, and Okuns Water
and Wastewater Engineering: Water Supply and Wastewater Removal by Nazih K. Shammas and Lawrence K. Wang,
has been adopted. Any other reproduction or translation of this work beyond that permitted by Sections 107 or 108
of the 1976 United States Copyright Act without the permission of the copyright owner is unlawful. Page 7
Problem 8.7
Changing the speed of a centrifugal pump will change its operating characteristics, including the head. Determine
the new head, if
H1 = rated head = 120 ft
N2 = pump speed now = 1320 rpm
N1 = rated pump speed = 1650 rpm
Solution:
H2 = (H1) (N2/N1)2
H2 = (120) (1320/1650)2
= 76.8 ft
Excerpts from this work may be reproduced by instructors for distribution on a not-for-profit basis for testing or
instructional purposes only to students enrolled in courses for which the textbook Fair, Greyer, and Okuns Water
and Wastewater Engineering: Water Supply and Wastewater Removal by Nazih K. Shammas and Lawrence K. Wang,
has been adopted. Any other reproduction or translation of this work beyond that permitted by Sections 107 or 108
of the 1976 United States Copyright Act without the permission of the copyright owner is unlawful. Page 8
Problem 8.8
Changing the speed of a centrifugal pump will change its operating characteristics, including the power requirement.
Determine the new power requirement, if
P1 = rated head = 16 hp
N2 = pump speed now = 1320 rpm
N1 = rated pump speed = 1650 rpm
Solution:
P2 = (P1) (N2/N1)3
= (16) (1320/1650)3
= 8.2 hp
Excerpts from this work may be reproduced by instructors for distribution on a not-for-profit basis for testing or
instructional purposes only to students enrolled in courses for which the textbook Fair, Greyer, and Okuns Water
and Wastewater Engineering: Water Supply and Wastewater Removal by Nazih K. Shammas and Lawrence K. Wang,
has been adopted. Any other reproduction or translation of this work beyond that permitted by Sections 107 or 108
of the 1976 United States Copyright Act without the permission of the copyright owner is unlawful. Page 9
Problem 8.9
A water pumping station is designed to raise water from a lake at an elevation of 50 ft to a reservoir located at an
elevation of 140 ft. Water is pumped through a 16 in cast iron pipe that develops a headloss of 19 ft of water at a
discharge of 1000 gpm. The pumping station has two pumps, each of which possesses the following characteristics:
Flow, gpm
Head, ft
500
195
1,000
180
1,500
150
2,000
110
2,500
50
Shot of head = 200 ft.
What will be the discharge of the two pumps when operating in parallel?
Solution:
Plot the characteristic curves for one pump and 2 pumps in parallel and the system dynamic head. From the
intersection points of the dynamic head and the characteristic curves for the two pumps in parallel we get the
discharge of the two pumps (see the plot below)
hf = KQn
19 = K (1000)n
K = 19/(1000)n
H = hf + z = hf + 90
Flow
Q
gpm
n = 1.85
hf = KQ1.85
ft
H = hf + z
ft
n=2
hf = KQ2
ft
H = hf + z
ft
Excerpts from this work may be reproduced by instructors for distribution on a not-for-profit basis for testing or
instructional purposes only to students enrolled in courses for which the textbook Fair, Greyer, and Okuns Water
and Wastewater Engineering: Water Supply and Wastewater Removal by Nazih K. Shammas and Lawrence K. Wang,
has been adopted. Any other reproduction or translation of this work beyond that permitted by Sections 107 or 108
of the 1976 United States Copyright Act without the permission of the copyright owner is unlawful. Page 10
500
1000
1500
2000
2500
3000
5
19
40
68
104
145
95
109
130
158
194
235
5
19
43
76
119
171
95
109
133
166
209
261
Excerpts from this work may be reproduced by instructors for distribution on a not-for-profit basis for testing or
instructional purposes only to students enrolled in courses for which the textbook Fair, Greyer, and Okuns Water
and Wastewater Engineering: Water Supply and Wastewater Removal by Nazih K. Shammas and Lawrence K. Wang,
has been adopted. Any other reproduction or translation of this work beyond that permitted by Sections 107 or 108
of the 1976 United States Copyright Act without the permission of the copyright owner is unlawful. Page 11
Problem 8.10
The water supply system shown in Fig. 8.14 is designed to serve city ABCDEFA. Water is treated and collected in a
water tank in the treatment plant (WTP). A pump delivers the water through the 24-in main PR 1 to an elevated
reservoir (water level 2,700 ft) at the top of a hill. Pumping is done at a constant rate and only for a period of 16
hours per day from 4 AM to 8 PM. Water flows from the elevated reservoir into the distribution main network
ABCDEF through a 24-in main R2A.
The water consumption during the maximum day demand in the city is as follows:
Period
Midnight to 4 AM
4 AM to 8 AM
8 AM to Noon
Noon to 4 PM
4 PM to 8 PM
8 PM to Midnight
Flowrate, gpm
2,000
4,000
6,000
5,000
4,000
3,000
Excerpts from this work may be reproduced by instructors for distribution on a not-for-profit basis for testing or
instructional purposes only to students enrolled in courses for which the textbook Fair, Greyer, and Okuns Water
and Wastewater Engineering: Water Supply and Wastewater Removal by Nazih K. Shammas and Lawrence K. Wang,
has been adopted. Any other reproduction or translation of this work beyond that permitted by Sections 107 or 108
of the 1976 United States Copyright Act without the permission of the copyright owner is unlawful. Page 12
Assume that the water withdrawal from the network is equally distributed among the points A, B, C, D, E
and F, which are at the same elevation of 2,300 ft and that all pipes are ductile iron with C = 100. Also consider
that the pump possesses the following characteristics:
Head, ft
Flow, gpm
400
390
370
345
310
225
2,000
4,000
6,000
8,000
12,000
(a) Calculate the volume of the elevated reservoir needed to balance supply and demand.
(b) Compute the maximum flow in each pipe of the network.
(c) Determine the elevation of the water tank at the treatment plant
(d) At what rate of flow can you pump the water to the elevated reservoir if another identical pump is
installed in parallel with the existing pump?
Solution:
(a) Calculate the volume of the elevated reservoir needed to balance supply and demand.
Calculate the accumulative volume as follows (see following table):
Volume in MG = 4 h x rate gpm x 60 min/h/106
Volume MN to 4 AM = 4 x 2000 x 60/106 = 0.48 MG
Accumulative volume 4 AM to AM = 0.48 + 0.96 = 1.44 MG
Period
Flow rate
gpm
Volume
MG
Accumulative
volume
MG
Excerpts from this work may be reproduced by instructors for distribution on a not-for-profit basis for testing or
instructional purposes only to students enrolled in courses for which the textbook Fair, Greyer, and Okuns Water
and Wastewater Engineering: Water Supply and Wastewater Removal by Nazih K. Shammas and Lawrence K. Wang,
has been adopted. Any other reproduction or translation of this work beyond that permitted by Sections 107 or 108
of the 1976 United States Copyright Act without the permission of the copyright owner is unlawful. Page 13
Midnight to 4 AM
4 AM to 8 AM
8 AM to Noon
Noon to 4 PM
4 PM to 8 PM
8 PM to Midnight
2000
4000
6000
5000
4000
3000
0.48
0.96
1.44
1.20
0.96
0.72
0.48
1.44
2.88
4.08
5.04
5.76
Plot the accumulative volume vs. time of day for both consumption and pumping as shown in the following
figure:
(c) Determine the elevation of the water tank at the treatment plant
sPR1 at Q = 6000 gpm, d = 24 and C =100 is 3.75
(hf)PR1 = sL = 3.75 x 35,000/1000 = 131.25 ft
z = 345 131.25 = 213.75 ft
Elevation of water tank = 2700 213.75 = 2486.25 ft
(d) At what rate of flow can you pump the water to the elevated reservoir if another identical pump is installed in
parallel with the existing pump?
Excerpts from this work may be reproduced by instructors for distribution on a not-for-profit basis for testing or
instructional purposes only to students enrolled in courses for which the textbook Fair, Greyer, and Okuns Water
and Wastewater Engineering: Water Supply and Wastewater Removal by Nazih K. Shammas and Lawrence K. Wang,
has been adopted. Any other reproduction or translation of this work beyond that permitted by Sections 107 or 108
of the 1976 United States Copyright Act without the permission of the copyright owner is unlawful. Page 15
To draw the system curve we need to calculate the total dynamic head for the system as shown in the following
table:
Q
gpm
2000
4000
6000
7000
8000
s
(d = 24 in, C = 100)
0.55
1.80
3.75
5.80
6.40
hf = sL = 35s
ft
19
63
131
182
224
Plot system dynamic head and pump characteristics (one pump and two pumps in parallel) as a function of
water flow rate, Q:
Excerpts from this work may be reproduced by instructors for distribution on a not-for-profit basis for testing or
instructional purposes only to students enrolled in courses for which the textbook Fair, Greyer, and Okuns Water
and Wastewater Engineering: Water Supply and Wastewater Removal by Nazih K. Shammas and Lawrence K. Wang,
has been adopted. Any other reproduction or translation of this work beyond that permitted by Sections 107 or 108
of the 1976 United States Copyright Act without the permission of the copyright owner is unlawful. Page 16
From the figure it can be seen that the flow using two pumps in parallel is 6,800 gpm. However since in
this case the water cant reach the reservoir, then Qmax = 6000 gpm.
Excerpts from this work may be reproduced by instructors for distribution on a not-for-profit basis for testing or
instructional purposes only to students enrolled in courses for which the textbook Fair, Greyer, and Okuns Water
and Wastewater Engineering: Water Supply and Wastewater Removal by Nazih K. Shammas and Lawrence K. Wang,
has been adopted. Any other reproduction or translation of this work beyond that permitted by Sections 107 or 108
of the 1976 United States Copyright Act without the permission of the copyright owner is unlawful. Page 17
Problem 8.11
The water supply system shown in Fig. 8.15 is planned to serve a small village. Treated water from the treatment
plant (WTP) flowing at a uniform rate throughout the day is collected in a ground tank. Water is then pumped to an
elevated reservoir at the top of a hill through the main AB. Water flows from the elevated reservoir into the
distribution network through the main CD.
60 L/s
240 L/s
Noon to 6 PM
6 PM to Midnight
120 L/s
90 L/s
The pumping station has three pumps, two of which operate in parallel and the third pump is a standby.
Pumping is done at a constant rate and only for a period of 12 hours from 6 AM to 6 PM. Each pump possesses
the following characteristics:
Excerpts from this work may be reproduced by instructors for distribution on a not-for-profit basis for testing or
instructional purposes only to students enrolled in courses for which the textbook Fair, Greyer, and Okuns Water
and Wastewater Engineering: Water Supply and Wastewater Removal by Nazih K. Shammas and Lawrence K. Wang,
has been adopted. Any other reproduction or translation of this work beyond that permitted by Sections 107 or 108
of the 1976 United States Copyright Act without the permission of the copyright owner is unlawful. Page 18
Flow, L/s
60
90
120
150
180
Head, m
180
165
153
135
105
63
The Hazen-Williams Coefficient C for all mains is 100. The total equivalent length of main AB is 2,500 m and
main CD is 9,000 m.
(a) Determine the volumes of ground tank and elevated reservoir (each separately) needed to balance supply
and demand. (Storage for fire fighting and emergency are not required).
(b) Determine the minimum standard size of the water main AB needed so that the two operating pumps can
deliver the required flow from the ground tank to the elevated reservoir.
Solution:
(a) Determine the volumes of ground tank and elevated reservoir (each separately) needed to balance supply and
demand. (Storage for fire fighting and emergency are not required).
Plot accumulative supply and draft vs. time of day for ground tank:
Period
Midnight to 6AM
6 AM to 8 Noon
Noon to 6 PM
6 PM to Midnight
Flow rate
L/s
Volume
m3
60
240
120
90
1296
5184
2592
1944
Accumulative
volume
m3
1296
6480
9072
11,016
Excerpts from this work may be reproduced by instructors for distribution on a not-for-profit basis for testing or
instructional purposes only to students enrolled in courses for which the textbook Fair, Greyer, and Okuns Water
and Wastewater Engineering: Water Supply and Wastewater Removal by Nazih K. Shammas and Lawrence K. Wang,
has been adopted. Any other reproduction or translation of this work beyond that permitted by Sections 107 or 108
of the 1976 United States Copyright Act without the permission of the copyright owner is unlawful. Page 19
Excerpts from this work may be reproduced by instructors for distribution on a not-for-profit basis for testing or
instructional purposes only to students enrolled in courses for which the textbook Fair, Greyer, and Okuns Water
and Wastewater Engineering: Water Supply and Wastewater Removal by Nazih K. Shammas and Lawrence K. Wang,
has been adopted. Any other reproduction or translation of this work beyond that permitted by Sections 107 or 108
of the 1976 United States Copyright Act without the permission of the copyright owner is unlawful. Page 20
(b) Determine the minimum standard size of the water main AB needed so that the two operating pumps can deliver
the required flow from the ground tank to the elevated reservoir.
Plot the Characteristic curve for the two pumps in parallel.
Q = 11,016 m3/(12 h x 60 min x 60 s) = 0.255 m3/s = 255 L/s
hf = 127.5 120 = 7.5 m (see plot)
The required pipe diameter at Q = 255 L/s, s = 7.5/2.5 = 3 and C =100 is 540 mm.
Excerpts from this work may be reproduced by instructors for distribution on a not-for-profit basis for testing or
instructional purposes only to students enrolled in courses for which the textbook Fair, Greyer, and Okuns Water
and Wastewater Engineering: Water Supply and Wastewater Removal by Nazih K. Shammas and Lawrence K. Wang,
has been adopted. Any other reproduction or translation of this work beyond that permitted by Sections 107 or 108
of the 1976 United States Copyright Act without the permission of the copyright owner is unlawful. Page 21
Excerpts from this work may be reproduced by instructors for distribution on a not-for-profit basis for testing or
instructional purposes only to students enrolled in courses for which the textbook Fair, Greyer, and Okuns Water
and Wastewater Engineering: Water Supply and Wastewater Removal by Nazih K. Shammas and Lawrence K. Wang,
has been adopted. Any other reproduction or translation of this work beyond that permitted by Sections 107 or 108
of the 1976 United States Copyright Act without the permission of the copyright owner is unlawful. Page 22
Problem 8.12
A water pumping station is designed to raise water from a treatment plant ground reservoir at an elevation of 600 m
to an elevated reservoir located on the opposite side of town at an elevation of 660 m. The trunk line and the water
distribution network connecting the two reservoirs is equivalent to a pipe line (C = 100) 400 mm in diameter and
25,000 m long.
The pumping station has three pumps, two of which operate in series and the third pump is a standby. Each pump
possesses the following characteristics:
Flow, L/s
Head, m
40
80
120
160
200
240
100
98
94
87
79
70
60
During night hours, when consumption is low, the pumped water is greater than demand and excess water is stored
in the elevated reservoir. Considering this mode of operation, determine the flow rate that can be delivered through
the system under the following pumping conditions:
(a) Two pumps are operational.
(b) One pump is operational i.e. one pump failed and the standby is under maintenance.
Solution:
Plot the characteristics curve for one pump using the given data (Head vs. Flow)
Plot the characteristics curve for the two pumps in series by doubling the one pump head for each flow rate.
Plot the total dynamic head for the system using the total head vs. flow rate as calculated in the following
table:
Excerpts from this work may be reproduced by instructors for distribution on a not-for-profit basis for testing or
instructional purposes only to students enrolled in courses for which the textbook Fair, Greyer, and Okuns Water
and Wastewater Engineering: Water Supply and Wastewater Removal by Nazih K. Shammas and Lawrence K. Wang,
has been adopted. Any other reproduction or translation of this work beyond that permitted by Sections 107 or 108
of the 1976 United States Copyright Act without the permission of the copyright owner is unlawful. Page 23
Q
L/S
0
40
80
100
120
140
s
(d = 400 mm, C = 100)
0
0.47
1.75
2.7
3.7
5.2
hf = sL = 25s
m
0
12
44
68
93
130
H = hf + z = hf + 60
m
60
72
104
128
153
190
(a) The intersection of the two pumps characteristic curve with the total dynamic head curve yields Q = 128
L/s
(b) The intersection of the one pump characteristic curve with the total dynamic head curve yields Q = 74 L/s
Excerpts from this work may be reproduced by instructors for distribution on a not-for-profit basis for testing or
instructional purposes only to students enrolled in courses for which the textbook Fair, Greyer, and Okuns Water
and Wastewater Engineering: Water Supply and Wastewater Removal by Nazih K. Shammas and Lawrence K. Wang,
has been adopted. Any other reproduction or translation of this work beyond that permitted by Sections 107 or 108
of the 1976 United States Copyright Act without the permission of the copyright owner is unlawful. Page 24
Problem 8.13
A water pumping station is designed to raise water from a treatment plant ground reservoir at an elevation of 190 ft
to a downtown elevated reservoir located at an elevation of 415 ft. Water is pumped through a 20-in pipe (C = 100),
which is 30,000 ft long. The pumping station has two pumps, each of which possesses the following characteristics:
Flow, L/s
Head, m
1,000
2,000
3,000
4,000
5,000
6,000
7,000
290
270
245
210
170
125
65
Plot the characteristics curve for one pump using the given data (Head vs. Flow)
Plot the characteristics curve for the two pumps in series by doubling the one pump head for each flow rate.
Plot the total dynamic head for the system using the total head vs. flow rate as calculated in the following
table:
hf = sL = 30s
H =hf + 225
gpm
ft
ft
1000
0.35
10
235
2000
1.20
36
261
3000
2.40
72
297
4000
4.50
135
360
5000
6.40
192
417
6000
9.30
279
504
Excerpts from this work may be reproduced by instructors for distribution on a not-for-profit basis for testing or
instructional purposes only to students enrolled in courses for which the textbook Fair, Greyer, and Okuns Water
and Wastewater Engineering: Water Supply and Wastewater Removal by Nazih K. Shammas and Lawrence K. Wang,
has been adopted. Any other reproduction or translation of this work beyond that permitted by Sections 107 or 108
of the 1976 United States Copyright Act without the permission of the copyright owner is unlawful. Page 25
The intersection of the two pumps characteristic curve with the total dynamic head curve yields:
Q = 4500 GPM
H = 338 ft
Excerpts from this work may be reproduced by instructors for distribution on a not-for-profit basis for testing or
instructional purposes only to students enrolled in courses for which the textbook Fair, Greyer, and Okuns Water
and Wastewater Engineering: Water Supply and Wastewater Removal by Nazih K. Shammas and Lawrence K. Wang,
has been adopted. Any other reproduction or translation of this work beyond that permitted by Sections 107 or 108
of the 1976 United States Copyright Act without the permission of the copyright owner is unlawful. Page 26
Problem 8.14
An Industrial Complex utilizes water at a uniform rate of 5,400 gpm during its working hours from 8 AM to 12
Noon and from 4 PM to 8 pm. This water demand is withdrawn from an elevated water tank located at an elevation
of 40 ft above ground level.
Water is pumped, at a uniform rate continuously throughout the day to the tank using two pumps connected in series
from a well whose water level is 460 ft below ground level. The water pipe from the well to the tank is 3000 ft long
(C = 100).
1,000
2,000
3,000
4,000
350
325
275
175
50
(a) Calculate the water tank volume required to equalize supply and demand.
(b) Determine the size of the pipe delivering water from the well to the water tank.
Solution:
(a) Calculate the water tank volume required to equalize supply and demand.
Total flow = 5400 gpm 60 min x 8 h/106
= 2.592 MGD
Pumping rate = 2.592/24 =0.108 MG/h
=1800 gpm
Plot the supply and demand curves as shown in the figure
Total storage Volume = 0.432 + 0.864
S = 1.3 MG (see the plot)
Excerpts from this work may be reproduced by instructors for distribution on a not-for-profit basis for testing or
instructional purposes only to students enrolled in courses for which the textbook Fair, Greyer, and Okuns Water
and Wastewater Engineering: Water Supply and Wastewater Removal by Nazih K. Shammas and Lawrence K. Wang,
has been adopted. Any other reproduction or translation of this work beyond that permitted by Sections 107 or 108
of the 1976 United States Copyright Act without the permission of the copyright owner is unlawful. Page 27
(b) Determine the size of the pipe delivering water from the well to the water tank.
Static head = 460 + 40 = 500 ft
Plot the characteristic curves for 1
Plot the characteristic curves for 2 pumps in series by doubling the head for each given Q
Since the pumping rate Q =1800 gpm, then the 2 pumps in series should be able to deliver this flow.
From the plot of the two pumps characteristics as shown in the following figure, at 1800 gpm the total head
is 575 ft.
Hence the maximum hf shall not be more than 575 500 = 75 ft.
Then the required size of pipe should not be less than the following:
Excerpts from this work may be reproduced by instructors for distribution on a not-for-profit basis for testing or
instructional purposes only to students enrolled in courses for which the textbook Fair, Greyer, and Okuns Water
and Wastewater Engineering: Water Supply and Wastewater Removal by Nazih K. Shammas and Lawrence K. Wang,
has been adopted. Any other reproduction or translation of this work beyond that permitted by Sections 107 or 108
of the 1976 United States Copyright Act without the permission of the copyright owner is unlawful. Page 28
Excerpts from this work may be reproduced by instructors for distribution on a not-for-profit basis for testing or
instructional purposes only to students enrolled in courses for which the textbook Fair, Greyer, and Okuns Water
and Wastewater Engineering: Water Supply and Wastewater Removal by Nazih K. Shammas and Lawrence K. Wang,
has been adopted. Any other reproduction or translation of this work beyond that permitted by Sections 107 or 108
of the 1976 United States Copyright Act without the permission of the copyright owner is unlawful. Page 29
Problem 8.15
A summer resort complex consumes water at the following uniform rates during the indicated periods:
Period
Midnight to 8 a.m.
8 a.m. to 4 p.m.
4 p.m. to midnight
How large a storage tank would be required to equalize supply and demand for each of the following
conditions?
(a) Water is obtained from a nearby city at a uniform rate from 8 a.m. to 4 p.m.
(b) Water is obtained from the same city at a uniform rate over the 24-hr. period.
Solution:
Plot the accumulative consumption and supply curves over 24 h (see figure)
Excerpts from this work may be reproduced by instructors for distribution on a not-for-profit basis for testing or
instructional purposes only to students enrolled in courses for which the textbook Fair, Greyer, and Okuns Water
and Wastewater Engineering: Water Supply and Wastewater Removal by Nazih K. Shammas and Lawrence K. Wang,
has been adopted. Any other reproduction or translation of this work beyond that permitted by Sections 107 or 108
of the 1976 United States Copyright Act without the permission of the copyright owner is unlawful. Page 30
Excerpts from this work may be reproduced by instructors for distribution on a not-for-profit basis for testing or
instructional purposes only to students enrolled in courses for which the textbook Fair, Greyer, and Okuns Water
and Wastewater Engineering: Water Supply and Wastewater Removal by Nazih K. Shammas and Lawrence K. Wang,
has been adopted. Any other reproduction or translation of this work beyond that permitted by Sections 107 or 108
of the 1976 United States Copyright Act without the permission of the copyright owner is unlawful. Page 31
Problem 8.16
For the water supply of a small town with daily water requirement of 2,250 m 3, it is proposed to construct a water
reservoir. The pattern of draw off is as below:
Period
% of dail y demand
7 a.m. to 8 a.m.
30
8 a.m. to 5 p.m.
5 p.m. to 6.30 p.m.
8 . 3 0 p.m. to 7 a . m .
35
30
5
m3/period
7 AM 8 AM
30
675
Accumulative
volume
m3
675
8 A M 5 PM
35
787.5
1462.5
5 P M 6.30 PM
30
675
2137.5
8 . 3 0 PM 7AM
112.5
2250
Period
Excerpts from this work may be reproduced by instructors for distribution on a not-for-profit basis for testing or
instructional purposes only to students enrolled in courses for which the textbook Fair, Greyer, and Okuns Water
and Wastewater Engineering: Water Supply and Wastewater Removal by Nazih K. Shammas and Lawrence K. Wang,
has been adopted. Any other reproduction or translation of this work beyond that permitted by Sections 107 or 108
of the 1976 United States Copyright Act without the permission of the copyright owner is unlawful. Page 32
Excerpts from this work may be reproduced by instructors for distribution on a not-for-profit basis for testing or
instructional purposes only to students enrolled in courses for which the textbook Fair, Greyer, and Okuns Water
and Wastewater Engineering: Water Supply and Wastewater Removal by Nazih K. Shammas and Lawrence K. Wang,
has been adopted. Any other reproduction or translation of this work beyond that permitted by Sections 107 or 108
of the 1976 United States Copyright Act without the permission of the copyright owner is unlawful. Page 33
Problem 8.17
An industrial plant requires 5000 gpm of water during its onshift hours from 6 a.m. to 10 p.m. How large (in
gallons) a storage tank would be required to equalize the pumping rate for each of the following conditions:
(a) Water is obtained from a well at a uniform rate over the 214-h period.
(b) Water is obtained from a well during the period 10 p.m. to 6 a.m., which is the off peak period in electricity
consumption.
Solution:
Plot the accumulative demand and the two supply alternative curves over 24 h period (see figure)
Excerpts from this work may be reproduced by instructors for distribution on a not-for-profit basis for testing or
instructional purposes only to students enrolled in courses for which the textbook Fair, Greyer, and Okuns Water
and Wastewater Engineering: Water Supply and Wastewater Removal by Nazih K. Shammas and Lawrence K. Wang,
has been adopted. Any other reproduction or translation of this work beyond that permitted by Sections 107 or 108
of the 1976 United States Copyright Act without the permission of the copyright owner is unlawful. Page 34
Problem 8.18
A factory requires 50 L/s of water during its working hours from 8 AM to 4 PM How large a storage reservoir would
be required, to equalize supply and demand for each of the following water supply conditions?
(a) Water is supplied from a well at a uniform rate over the 24-h period.
(b) Water is supplied at a uniform rate from the city network during the off peak period from 4 p.m. to 8 a.m
Solution:
Plot the accumulative demand and the two supply alternative curves over 24 h period (see figure)
(a) For 24-h pumping, storage capacity of tank should be = V1a + V1b = 480 + 480 = 960 m3
(b) For 4 p.m. to 8 a.m. pumping, storage capacity of tank should be = V2 = 1440 m3
Excerpts from this work may be reproduced by instructors for distribution on a not-for-profit basis for testing or
instructional purposes only to students enrolled in courses for which the textbook Fair, Greyer, and Okuns Water
and Wastewater Engineering: Water Supply and Wastewater Removal by Nazih K. Shammas and Lawrence K. Wang,
has been adopted. Any other reproduction or translation of this work beyond that permitted by Sections 107 or 108
of the 1976 United States Copyright Act without the permission of the copyright owner is unlawful. Page 35
Problem 8.19
A residential neighborhood, population 20,000, is supplied with water from an elevated reservoir. The daily water
consumption is as follows:
Period of day
% of daily demand
Midnight to 3 a.m.
5
3 a.m. to 6 a.m.
7
6 a.m. to 9 a.m.
13
9 a.m. to noon
20
Noon to 3 p.m.
20
3 p.m.to 6 p.m.
15
6 p.m.to 9 p.m.
10
9 p.m.to midnight
10
The average daily water consumption is 400 L/capita and the maximum daily consumption is 125% of the daily
average. Determine the storage volume (in m 3) necessary to balance supply and demand in each of the
following cases:
(a) If water is supplied into the reservoir at a constant rate over the 24-h period.
(b) If water is supplied into the reservoir at a constant rate, but only for a period of 12 h from 6 a.m. to 6 p.m.
Solution:
Total max daily demand = 20,000 persons x 400 L/capita x 1.25 for max day/ (1000 L/m 3 ) = 10,000 m3
Calculate the accumulative volume (see table)
Plot the accumulative consumption and supply curves over 24 h period (see figure)
Period
% of
Daily demand
m3/period
MN 3
500
Accumulative
volume
m3
500
3-6
700
1200
6-9
13
1300
2500
9-N
20
2000
4500
N-3
20
2000
6500
36
15
1500
8000
79
10
1000
9000
9 - MN
10
1000
10,000
Excerpts from this work may be reproduced by instructors for distribution on a not-for-profit basis for testing or
instructional purposes only to students enrolled in courses for which the textbook Fair, Greyer, and Okuns Water
and Wastewater Engineering: Water Supply and Wastewater Removal by Nazih K. Shammas and Lawrence K. Wang,
has been adopted. Any other reproduction or translation of this work beyond that permitted by Sections 107 or 108
of the 1976 United States Copyright Act without the permission of the copyright owner is unlawful. Page 36
(a) For 24 h pumping, storage capacity of tank should be = S1a + S1b = 1300 + 500 = 1800 m3
(b) For 4 PM to 8 AM pumping, storage capacity of tank should be = S2a + S2b = 1200 + 2000 = 3200 m3
Excerpts from this work may be reproduced by instructors for distribution on a not-for-profit basis for testing or
instructional purposes only to students enrolled in courses for which the textbook Fair, Greyer, and Okuns Water
and Wastewater Engineering: Water Supply and Wastewater Removal by Nazih K. Shammas and Lawrence K. Wang,
has been adopted. Any other reproduction or translation of this work beyond that permitted by Sections 107 or 108
of the 1976 United States Copyright Act without the permission of the copyright owner is unlawful. Page 37
Problem 8.20
A residential complex consists of 60 duplex villas (two housing units in each). Each housing unit can accommodate
a maximum of 10 persons. The expected maximum daily water consumption is 400 L/capita. Water is supplied from
the municipal network at a uniform rate throughout the day and is collected in a ground storage reservoir. Water is
then pumped to an elevated reservoir at a constant rate but only for a period of 9 hours from 6 a.m. to 3 p.m. Water
then flows from the elevated reservoir to the various villas by gravity to satisfy the following daily demands:
Period of day
Midnight to 3 a.m.
3 a.m. to 6 a.m.
6 a.m. to 9 a.m.
9 a.m. to noon
Noon to 3 p.m.
3 p.m. to 6 p.m.
6 p.m. to 9 p.m.
9 p.m. to midnight
% of daily demand
5
5
25
15
15
10
15
10
Total max daily demand = 60x2x10 persons x 400 L/capita x (1000 L/m3 ) = 480 m3
Calculate the accumulative volume (see table)
Plot the accumulative consumption and the two supply curves over 24 h period (see figure)
Period
% of
Daily demand
m3/period
MN 3
3-6
6-9
9-N
N-3
36
79
9 - MN
5
5
25
15
15
10
15
10
24
24
120
72
72
48
72
48
Accumulative
volume
m3
24
48
168
240
312
360
432
480
Excerpts from this work may be reproduced by instructors for distribution on a not-for-profit basis for testing or
instructional purposes only to students enrolled in courses for which the textbook Fair, Greyer, and Okuns Water
and Wastewater Engineering: Water Supply and Wastewater Removal by Nazih K. Shammas and Lawrence K. Wang,
has been adopted. Any other reproduction or translation of this work beyond that permitted by Sections 107 or 108
of the 1976 United States Copyright Act without the permission of the copyright owner is unlawful. Page 38
(a) Volume of ground reservoir should be = S1a + S2a = 120 + 180 = 300 m3
(b) Volume of elevated reservoir should be = S1b + S2b = 48 + 168 = 216 m3
Excerpts from this work may be reproduced by instructors for distribution on a not-for-profit basis for testing or
instructional purposes only to students enrolled in courses for which the textbook Fair, Greyer, and Okuns Water
and Wastewater Engineering: Water Supply and Wastewater Removal by Nazih K. Shammas and Lawrence K. Wang,
has been adopted. Any other reproduction or translation of this work beyond that permitted by Sections 107 or 108
of the 1976 United States Copyright Act without the permission of the copyright owner is unlawful. Page 39
Problem 8.21
A small water system in the rural area has a population of 800 persons, and its daily per capita usage is estimated to
be 100 gpcd. The required fire flow determined by the village engineer is 500 gpm for a duration of 2 hours. There is
no particular hazard to the water supply works. Determine the required water storage to be provided for the village
using the Recommended Standards for Water Works, 2007 Edition. Visit the website or contact the local health
department for the latest edition of these Ten- State Standards for water works.
Solution:
Storage volume for domestic consumption = Average daily consumption (Ten States Standards)
= 800 x 100 = 80,000 gpd average daily demand
= 0.08 MGD
The fire reserve is 500 gpm for 2 hours
= (500 gal/min x 2 h x 60 min/h)/106
= 0.06 MG
Total storage = Domestic storage + Fire storage = 0.08 + 0.06 = 0.14 MG
Excerpts from this work may be reproduced by instructors for distribution on a not-for-profit basis for testing or
instructional purposes only to students enrolled in courses for which the textbook Fair, Greyer, and Okuns Water
and Wastewater Engineering: Water Supply and Wastewater Removal by Nazih K. Shammas and Lawrence K. Wang,
has been adopted. Any other reproduction or translation of this work beyond that permitted by Sections 107 or 108
of the 1976 United States Copyright Act without the permission of the copyright owner is unlawful. Page 40
Problem 8.22
A city is planning to improve its water supply system (Fig. 8.16). At present the city has a surface water supply
reservoir at elevation 100 ft (Point A), a pumping station at elevation 80 ft (Point B), water storage tank at elevation
200 ft (Point C), a 500 ft o suction transmission line between the reservoir and the pumping station, and a 10,000 ft
of 10-in pressure transmission line between the pumping station and the water storage tank. The water at the water
storage tank site is treated by UV for disinfection and then discharged to the water distribution system.
Solution:
It should be noted that the head loss is the same for the existing 10-in pipe and the new 16-in pipe in parallel. Two
new pumps are necessary, each of the same capacity, in order to meet the maximum daily demand of 5 MGD (i.e.
3470 gpm), with one pump operating and the other idle for repairs or in reserve as a standby for emergency.
(b) Assuming the combined efficiency (Epump)(Emotor) = 0.75, the input power to the motor can then be
determined.
= (142 hp) / 0.75
= 189 hp
(c) When pumps operate in series the total flow is limited to the capacity of the smallest pump. Therefore, the
two new pumps should operate in parallel.
Excerpts from this work may be reproduced by instructors for distribution on a not-for-profit basis for testing or
instructional purposes only to students enrolled in courses for which the textbook Fair, Greyer, and Okuns Water
and Wastewater Engineering: Water Supply and Wastewater Removal by Nazih K. Shammas and Lawrence K. Wang,
has been adopted. Any other reproduction or translation of this work beyond that permitted by Sections 107 or 108
of the 1976 United States Copyright Act without the permission of the copyright owner is unlawful. Page 42
Problem 8.23
Using the same given data in Problem 8.22, explain why the pipe line is designed based on the maximum daily
water demand, and determine the total storage capacity of a new water storage tank.
Solution:
Water supply conduits leading to water storage tanks are generally so proportioned that they can deliver water at a
rate sufficient to meet the maximum daily demand. Hour peak water demands in excess of this rate are supplied
from the water storage tanks. The three major components of water storage are: (a) equalizing or operating storage;
(b) fire reserve; and (c) emergency reserve.
1.
2.
3.
4.
The capacity of a new water storage tank can also be determined in accordance with the 10 State Standards (2007
edition):
1.
2.
3.
Excerpts from this work may be reproduced by instructors for distribution on a not-for-profit basis for testing or
instructional purposes only to students enrolled in courses for which the textbook Fair, Greyer, and Okuns Water
and Wastewater Engineering: Water Supply and Wastewater Removal by Nazih K. Shammas and Lawrence K. Wang,
has been adopted. Any other reproduction or translation of this work beyond that permitted by Sections 107 or 108
of the 1976 United States Copyright Act without the permission of the copyright owner is unlawful. Page 43