002 Curtain Wall Calculations

This document is a site transmittal form transmitting structural design calculations for curtain walls of zone 3 buildings. The contractor is transmitting the calculations to KEO International Consultants for review in accordance with the contract drawings and specifications.

Uploaded by

Sharath
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
201 views1 page

002 Curtain Wall Calculations

This document is a site transmittal form transmitting structural design calculations for curtain walls of zone 3 buildings. The contractor is transmitting the calculations to KEO International Consultants for review in accordance with the contract drawings and specifications.

Uploaded by

Sharath
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 1

SITE TRANSMITTAL

TRANSMITTAL NO :

TCC-1188-SBJ-Z3-SDC-ST-002

REV :

To: KEO International Consultants


PROJECT

DIV/PACKAGE

PROJECT SUPERVISOR

CONTRACTOR

SARAYA BANAR JISSAH

ZONE - 3

KEO INTERNATIONAL

TOWELL CONSTR. CO.

WE ARE SENDING HEREWITH THE STRUCTURAL DESIGN CALCULATION FOR YOUR REVIEW.
ITEM

DRW., SPEC.

NO.

OR BOQ. REF

ARCH SPEC
REF H11

GENERAL DESCRIPTION AND REVISION DETAILS

REV NO

TYPE (i)

STRUCTURAL DESIGN CALCULATIOS FOR


CURTAIN WALLS OF ZONE 3 BUILDINGS BY
PROFILS SYSTEMS SAS FOR M/S PANORAMA
WINDOWS LLC

OT

ACTION
CODE (ii)

We certify that the items submitted herewith have been reviewed in detail and are in strict conformance with the
Contract Drawings and Specifications except as otherwise stated.
CONTRACTOR :

Mr. Haries Salim

DATE:

12.07.2015

RECEIVED BY KEO :
DATE:

KEO'S REMARKS :

Corrections or comments made relative to submittals during this review does not relieve the contractor from compliance
with the requirements of his Contract, drawings and specifications. This review is only in respect of general conformance
with the design intent of the project and general compliance with the information given in the Contract documents. The
contractor remains responsible, among other things, for the design of the project or such parts of the project he has
design responsibility for (if design forms part of the Contract), for confirming and correlating all quantities and
dimensions, selecting fabrication processes and techniques of construction, coordinating his work with that of other
trades, and performing his work in a safe and satisfactory manner, all in accordance with the Contract.

KEO CM / RE

RECEIVED BY CONTRACTOR :

DATE:

DATE:

(i) TYPE: SD:


SM:

Shop Drawings
Sample

GT: Guarantee
MD: Manufacturer's Data
CT:
OT:

(ii) ACTION CODE:


A: No objection
B: No objection subject to incorporation of all comments as noted
C: Rejected, to be resubmitted

Certificates
Others

KEO International Consultants W.L.L.

FORM: PPM-19.3-SITE TRANSMITTAL (June 09)

You might also like