GENERAL CONDITION
1. The Schedule of Rates (Volume I) is divided into two sections and each section into sub-sections. In
all cases of contracts in respect of Building Works, this entire volume of Schedule will be operative.
Though this entire volume of Schedule is divided for convenience into sections and sub-sections it is to
be taken as a whole. An item under one section will apply equally to work failing under the category of
another section unless a similar item appears in the later section. The same principle applies to items
under different sub-sections..
2. The Engineer-in-Charge shall mean the Executive Engineer of the Division concerned. The Sub-
divisional Officer concerned is authorized to carry out on behalf of the Engineer-in-Charge general
supervision, day to day instructions with approval of materials and workmanship. In case of dispute,
the decision of the Engineer-in-Charge shall be final and binding.
3. Except when specifically mentioned in the description of the item itself, the rate for any item of work
will apply equally to all floors, in any position and up to any height. In respect of concrete work etc.
where the rate is on the basis of volume, the item shall apply to all cases irrespective of the thickness
unless a specific item appear in the Schedule for the particular type of work. The work up to a
particular floor level means all work up to the roof of that floor. All works in basement shall be treated
as work in first floor for payment.
4. Renewal works include dismantling and taking out of old works with mending good damages after
renewal and removal of waste materials. The rate for any item of original nature not provided in this
Schedule may be deduced from the rate of similar item of renewal work by multiplying by a factor
100/105 and conversely the rate of any item of renewal nature not provided in this Schedule may be
deduced from the rate of similar item of original nature by multiplying by a factor 105/100.
5. White washing, painting etc. include preparation of surface (including plugging old nail holes etc.)
prior to the treatment and removal of all marks or stains from walls, floor, glass, panes, chowkats etc.
For repair works, this also includes shifting and/or covering furniture etc.
6. All works shall be carried out with due regard to the convenience of the occupants, if any, and the
arrangement and programme of work must be adjusted accordingly. In case of works within Jails,
Hospitals etc. the Rules & Regulations of Authorities concerned must be strictly obeyed. The rates
given in the Schedule are deemed to be inclusive of all such factors and contingencies.
7. All materials, tools and plants besides those to be supplied by government are to be arranged for the
work. All labours (Skilled & Unskilled) including their housing, sanitation, procurement of food stuff,
medical aids etc. are to be arranged by the contractor. Cost of transport of labour, materials and all
other relevant items shall have to be borne by the contractor.
PWD (W.B.), Schedule of Rates 2014
A-1
8. Arrangement of water for preparation of concrete & mortar as well as for soaking of bricks and other
materials are to be made by the contractor. Construction of platforms and vats including cost thereof
are to be borne by the contractor.
9. Rates of all items are inclusive of labour & material charges with all other relevant cost towards
Sales Tax, Royalty, Octroi, Toll Tax, Ferry Charges, VAT etc. as may have to be incurred by the
contractor for the respective items of works to be executed to proper and complete finish.
To arrive at complete rate of different items in this Schedule, 5% overhead, 10% contractors
profit and 1% labour welfare cess have been considered along with the aforesaid material cost,
labour cost and other cost etc.
Unless specifically mentioned otherwise in the description of the item itself, no extra charges will be
paid for scaffolding (including stage scaffolding), centering, shuttering, curing etc. and the rates are
deemed to be inclusive of the same and of the cost of sundries necessary for the satisfactory completion
of the work.
10. All materials brought to site must have approval of Engineer-in-Charge. Rejected materials must be
removed by the contractor from the site within 24 (twenty-four) hours of the issue of orders to that
effect. In case of non-compliance with such orders, the Engineer-in-Charge shall have the authority
for removal of those rejected materials at the cost and expenses of contractor and the contractor shall
not be entitled to any loss or damage on that account.
11. Departmental materials (i.e. materials are supposed to be issued by the department) shall be issued to
the contractor to the extent of requirements as assessed and in small installments as decided by the
Engineer-in-Charge. Issue of departmental materials may be of two categories :
(A) Materials for which value are to be recovered from the contractor.
(B) Materials which are issued directly to work (in respect of items the rates of which do not include
the cost of these materials).
For materials under Category (A) the value of materials issued to the contractor on usual hand receipt
shall be recovered from the bill of contractor in one installment or in successive installments as may be
decided by the Engineer-in-Charge.
For materials under Category (B) the contractor will act as custodian of the department, when he shall
take charge of the materials against appropriate receipts signed by him. The contractor shall remain
responsible for the proper storage and safe custody of such materials. The rates of relevant items of
work shall be deemed to be inclusive of reasonable consideration for such duties and responsibilities as
the custodian.
PWD (W.B.), Schedule of Rates 2014
A-2
All materials, whatever be the category thereof, shall be properly stored by the contractor in suitable
godowns within the site of work. Under no circumstances whatsoever shall any materials be removed
from the site of work without prior written permission from the Engineer-in-Charge. The contractor
shall be responsible for any damage or loss of such materials unless he can satisfy the Engineer-in-
Charge that the reasons for such damage or loss are due to circumstances beyond his control. The
contractor shall also have to satisfy the Engineer-in-Charge regarding the proper utilization of such
materials.
The value of any materials which cannot be satisfactorily accounted for, shall be revovered from the
contractors bill or other dues as specified in P. W. Departments Order No. 2809(3)-A Dated
27.04.1971 as mentioned in West Bengal Form No. 2911.
Any materials under Category (A) which may be surplus in few quantities on completion of the work
may at the sole discretion of the Superintending Engineer be taken back provided the same are found of
non-perishable nature and has not been damaged in any way. Surplus materials under Category (B)
shall be returned to the Engineer-in-Charge in good condition.
12. Subject to the aforesaid condition, the following materials under Category (A) shall be issued to the
contractor at issue rates reflected against each. The materials shall be issued from the departmental
godown or godowns and for this purpose a stack-yard shall also be deemed as goodown as may be
specified in the contract stipulations for any particular work. The contractor will have to carry the
materials at his own cost and his quoted rate will be deemed to be inclusive of all such costs including
costs for loading, unloading and stacking.
(i) Cement - Issue Rate and Basic Price of Cement are shown in Table 1-1 of
Annexure I. If cement is supplied by the Department, the cost of cement
will be recovered on Issue Rate, when in case of supply of the same by the
contractor, then rates of those cement related items are to be deduced as
per Format A of Annexure - I.
Except M35 & M40 Grade of design mix concrete, rates of all other
cement related items have been derived considering PSC/PPC Cement. For
M35 & M40 Grade of design mix concrete, OPC (Grade 43/53) cement
has been considered in deriving the item-rates.
(ii) Reinforcing Steel - Issue Rate and Basic Price of Reinforcing Steel are shown in
Table 1-1 of Annexure I. If Steel is supplied by the Department,
the cost of Steel will be recovered on Issue Rate, when in case of
supply of the same by the contractor, then rates of those Steel related
items are to be deduced as per Format B of Annexure - I.
Cut pieces of reinforcing steel materials left surplus on completion of
work shall not be taken back if the same be considered as unsuitable
for utilization in other works. Item-rates of structural steel and GCI
Sheet have been derived considering said materials to be supplied by
the contractor.
PWD (W.B.), Schedule of Rates 2014
A-3
(iii) Empty Bitumen Drum - Prevailing Schedule of Rates (Volume III) of PWD is to
be followed.
13. Materials obtained by dismantling Government structures or parts thereof shall remain the property of
Government. The contractor shall sort out and stack the serviceable materials within the premises and
also dispose of the unserviceable rubbish etc. as per instruction of the Engineer-in-Charge or his
representative.
The contractor shall remain the custodian of such dismantled materials till the charge of the same is
taken over by the Engineer-in-Charge or his representative.
14. The site must be cleared by the contractor from time to time by removing rubbish, debris etc. as
accumulated during the work and on completion the whole site must be left in a clean and tidy
condition to the satisfaction of Engineer-in-Charge or his representative.
15. Number of full bricks salvaged by dismantling all types of masonry part of the structure must
correspond to at least 20% of the volume dismantled.
16. Carriage of materials (unless specifically considered in the Rate Analysis) is the sole responsibility of
the contractor for which no extra payment should be made (unless in exigency a few of those seem to
be justified by the Engineer-in-Charge, when the same are to be approved by the concerned
Superintending Engineer).
A-4
PWD (W.B.), Schedule of Rates 2014
GENERAL SPECIFICATIONS
(INCLUDING MODES OF MEASUREMENT)
(A) MATERIALS
GENERAL:
All materials to be used in works shall conform to Indian Standards Specification as published by B.I.S from
time to time (and in the absence thereof as approved by the Engineer-in-Charge). Unless specifically mentioned
otherwise the following modes of measurements shall be adopted. In general the mode of measurement of the
civil engineering works shall be guided by I.S.I. Code No.: 1200-1964 (Revised) for Indian Standard Method of
measurement of Building work.
A-1 Bricks
All bricks shall be of approved quality of standard specifications, made of good brick earth, uniform deep red,
cherry or copper colour, thoroughly burnt in kiln (machine made) without being vitrified, regular in shape and
size, sound, hard, homogeneous in texture, true to shape and of standard dimension and shall be free form
cracks, chips, flaws, stones or humps of any kind and shall not show appreciable signs of efflorescence either
dry or subsequent to soaking in water. The size of bricks shall be 93/ x 43/ x 23/ (conventional). 190 x 90 x
4 4 4
90 mm (modular). The Bricks shall emit a clear ringing sound on being struck and have minimum crushing
strength of 105 kg./sq.cm. All the bricks which absorb water more than 20% of their own dry weight after 24
hours immersion in cold water shall be rejected.
B-1
PWD (W.B.), Schedule of Rates
TABLE - 1
IS. Seive Designation Percentage passing for graded aggregate of nominal size
40mm 20mm 16mm 12.5mm
1 2 3 4 5
80 mm 100
63 mm
40 mm 95-100 100
20 mm 30-70 95-100 100 100
16 mm 90-100
12.5 mm. 90-100
10 mm. 10-35 25-55 30-70 40-85
4.75 mm. 0-5 0-10 0-10 0-10
2.36 mm.
When coarse aggregates brought to the site is ungraded, single size coarse aggregates of different nominal
sizes, conforming to the requirements vide table II given below, shall be mixed at site with the other ingredients
of concrete either directly in the mixture or on the platform in the proportion indicated in Table III below :
TABLE II
IS. Seive Designation Percentage passing for single sized aggregate of nominal size
63mm 40mm 20mm 16mm 12.5mm 10 mm
1 2 3 4 5 6 7
80 mm 100
63 mm 85-100 100
40 mm 0-30 85- 100 100
20 mm 0-5 0-20 85-100 100
16 mm 85- 100 100
12.5 mm. 85-100 100
10 mm. 0-5 0-5 0-20 0-30 0-45 85-100
4.75 mm. 0-5 0-5 0-10 0-20
2.36 mm. 0-5
B-2
PWD (W.B.), Schedule of Rates
TABLE - III
SI. Cement Nominal Parts of Parts of Parts of Parts of Parts of
No. concrete mix size of aggregate of aggregate of aggregate of aggregate of aggregate of
aggregate size 50 mm. size 40 mm. size 20 mm size 12.5 mm size 10 mm.
1 2 3 4 5 6 7 8
1. C.C1:6: 12 63mm 9 3
2. C.C.1:6:12 40mm 9 3
1
3. C.C.1:5:10 63mm 7 2/ 212/
4. C.C. 1:5:10 40mm 712/ 212/
5. C.C.1:4:8 63mm 6 2
6. C.C.I:4:8 40mm 6 2
1
7. CC. 1:3:6 63mm 4 2/ 112/
8. CC. 1: 3 : 6 40mm 412/ 112/
9. CC. 1:3:6 20mm 412/ 121/
10. C.C.1:2:4 40mm 212/ 1 121/
11. C.C.1:2:4 20 mm 3 1
12. C.C.1:2:4 12.5mm 3 1
13. C.C. 1:1/2:3 20mm 2 1
Notes: The Proportions indicated in table III above are by volume. These proportions may be varied
somewhat by Engineer-in-Charge after making sieve analysis of the aggregates brought to the site, when
considered necessary for obtaining better density and strength of concrete, void ratio in the tune 0-25
All-in-aggregates: If combined aggregates are available, they need not be separated into fine and coarse.
But necessary adjustment may be made in the grading by the addition of single sized aggregates. The grading
of the all-in-aggregate when analysed as described in IS: 2386 (Part I) shall be in accordance with Table IV.
TABLE - IV
B-3
ii) Gravel, for use as coarse aggregates in cement concrete work must be hard, absolutely free from
surface coating and on being broken, the fractured surface must indicate a uniform and fine texture
free from laminations or planes or weakness. It shall be thoroughly washed and free from any
foreign elements.
(iii) Jhama chips for cement concrete work shall be obtained by breaking good quality Jhama bats,
must not be spongy or with any coating of foreign materials and should be homogeneous in texture.
The chips shall be more or less cubicle in shape.
All coarse aggregates for concrete works must be well graded. These shall be screened for removal
of dust and if so necessary in the opinion of the Engineer-in-Charge, shall he washed at the cost
and expenses of the contractor.
(i) Brick aggregates for lime concrete in foundation or flooring shall consist of approved, clean, hard
and well-burnt Jhama khoa. The khoa be well graded and unless otherwise specified shall pass
through 32 mm. ring.
(ii) Brick aggregates for Lime Terracing work on roof shall consist of khoa broken from 1st class brick
bats and unless otherwise specified shall pass through 25 mm ring and be suitably graded.
A4 Sand
All sand shall be clean sharp and free from clay, loam, organic or any other foreign matter, shall be obtained
from approved source. The contractor shall get the sample of sand to be used in different kinds of works
approved by the Engineer-in-Charge before using the same in work. Sand which in the opinion of the Engineer-
in-Charge or his representative is dirty, must be washed to his satisfaction at the cost and expenses of the
contractor.
(i) In Malda District only BANSLOI Sand should be used in all types of of cement works. In Nadia
and Murshidabad Districts, coarse sand from SAINTHIA only should be used in structural concrete
works.
(ii) Sand for all cement concrete work must be coarse. The sand shall pass through a mesh, 4.75 mm.
square measured in the clear. Sand shall not be used for concrete works if it contains more than
10% of fine grains passing through a 76 mesh sieve as used for cement test, nor should the fineness
modulus be less than 2.00 unless specific permission is obtained from the Engineer-in-Charge.
(iii) Medium sand may be used for cement mortar, for masonry, plaster etc. fineness modulus shall be
between 2 and 1.8.
(iv) Sand filling in plinth or foundation where specified may be done with fine sand or Silver sand.
B-4
A5 Surki :
Surki shall be made from well burnt 1st class brick bats, ground to pass through a mesh 2 mm, each way, and
shall be perfectly clean and free from any foreign matter.
A-6 Lime:
All lime shall be freshly burnt and slaked and screened before use, the slaking should be done at site of work.
Lime for works including roof terracing shall be Bisra, Satna or other approved stone lime.
The specification covers lime as used in construction of building and other structures as described below (refer
IS. 712-1973).
(a) Quick-lime shall mean a calcined material, the major part of which is calcium oxide in natural
association with a relatively small amount of magnesium oxide and capable of slaking with water.
(b) Fat lime shall mean the lime which has high calcium oxide content (between 95 and 100 percent)
and is dependent for setting and hardening on the absorption of carbon dioxide from the atmosphere.
This is defined as classC in I.S.: 712-1973 which is used for finishing coat in plastering, white
washing etc. and with addition of pozzolanic materials (surki) for masonry mortar.
(c) Hydraulic lime shall mean the lime which contains small quantities of silica and alumina and I or
iron oxide which are in chemical combination with some of the calcium oxide content, giving a
putty of mortar that has the property of setting and hardening under water.
(d) Hydrated lime shall mean a dry powder resulting from treatment of quick-lime with water enough
to satisfy its chemical affinity for water under the conditions of hydration.
Classification of Lime
Class A: Eminently hydraulic lime (containing 25% to 30% of clay) used for foundations and
other hydraulic structures, shall be supplied as hydrated lime only and should be used particularly
in any masonry work below G.L. It should be noted that no masonry work below G.L. should be
taken up with the use of any lime, other than specified hydraulic lime. In case of doubt if any in
respect of hydraulic lime being used in work below G.L., it is preferable not to use lime mortar at
all below G.L.
Class C: Fat lime is used mainly for lime punning, white washing and with suitable admixture,
such as surki or any other pozzolanic material to produce artificial hydraulic mortar.
A7 Cement :
No cement except those supplied by the department or approved by Engineer-in-Charge shall be used in work
or brought to site by contractor. Cement bags must be stored in a water-tight shed having wooden floor or
platforms raised at least 50 mm. from ground as approved by the Engineer-in-Charge. Cement which is partially
set or which is lumpy or caked is to be treated as damaged and shall be removed from the site immediately.
A8 Steel:
All steel shall be clean and free from loose mill scales, dust, loose rust and coats of paints, oil or other coatings.
Any scale or loose rust shall be removed before use, even though the same may have been supplied by the
Department without any claim for extra charge for the same. No steel excepting those supplied by the Department
or approved by the Engineer-in-Charge shall be used in work or brought to site by the contractor.
B-5
A-9 Timber:
All timber shall be of best quality well-seasoned and/or well-treated for preservation and protection against
decay etc. It shall be uniform in substance, straight in fibre, free from large or dead knots, sap, flaws, sun-
cracks, shakes or blemishes of any kind. Any insect damage or splits across the grain shall not be permissible.
The colour of the timber shall be uniform throughout, firm and shining with a silky luster when planed and shall
not emit dull sound when struck.
A-9 Glass:
All glasses shall be of the specified type, colour visibility and sound and shall be free from cracks, flaws. spick
bubbles and blemishes and shall not weigh less than 7.4 kg/sq.m. unless otherwise specified.
A-11 Timber Doors, Windows etc. and their Fittings:
(i) Door and window work shall be carried out as per detailed drawings or as direced by the Engineer-
in-Charge, Specified timber shall be used, and it shall be sawn in the direction of the grains and be
straight and square.
(ii) Fittings shall be of iron, brass, aluminium or as specified. These shall be well made, reasonably
smooth and free from sharp edges, corners, flaws and other defects. Screw holes shall be counter
sunk to suit the head of specified wood screws. Iron fittings shall be finished bright or black
enameled or copper oxidised. Brass fitting shall be finished bright or, (brass) oxidised chromium
plated (etc treated) & aluminium fittings shall be finished bright or anodised or as specified.
Fittings shall be got approved by the Engineer-in-Charge before fixing. In case of renewal works,
the new fitting shall, as far as possible, match with the existing ones. Screws shall be driven home
with screw driver and not hammered in.
A-12 Fibre Reinforced Polymer (FRP) door shutter/frame:
The Polymer shall be either thermoplastic or thermoset resin, such as polyster, Isopolyester, Vinyl ester, epoxy
or Phenolic base. The fibre moulded skins may be of glass or other synthetic (Carbon or aramid) or natural (jute
or Coir) or other reinforcing materials.
The sandwich core to impart monolithic composite strucutres approved by Department of Science & Technology
or similar competent Authority.
Testing : As per IS 4020 door testing performance criteria.
Frame without Core: Frames shall have intermittent stiffness for rigidity and will have provision for hinge
fixing, including anchors.
Frame with Core: Such Composite frames will be filled with inner Core in addition to all the features mentioned
for frame without Core.
A-13 Paint etc.:
All paints shall be delivered in strong containers, marked with the colour of the paint, brand, volume of paint
content in litres and of the best quality of approved make and brand as approved by the Engineer-in-Charge.
Under no circumstances shall the paint be diluted with Linseed oil or otherwise. Any paint or enamel although
of approved brand, which so hardens in the container that it cannot be readily broken up with a stirrer to a
smooth uniform painting consistency, shall be rejected. Any paint or enamel too thick for proper brush
application shall be rejected.
B-6
(B) EXECUTION
GENERAL: All works shall be carried out in proper manner. Items of works not covered by the following.
shall be carried out as per best practice according to directions of the Engineer-in-Charge and to his satisfaction.
Unless otherwise specified in this section or in the description of item, the cost of all stages of works men-
tioned hereunder shall be deemed to have been included in the rates of items provided in the Schedule.
B1 (a) Excavations of Foundation and Filling up Trenches:
(i) Foundation when excavated to the level shown in the drawing will be shown to the Engineer-in-Charge
and if on account of bad ground or for any reason whatsoever he decides to go deeper with the foundation,
the contractor shall excavate further to the depths required by the Engineer-in-Charge. In no case shall the
foundation soling or concrete be laid prior to receiving orders to that effect from the Engineer-in-Charge
or his authorised representative.
(ii) Excavating shall include throwing the excavated earth at least one metre or half the depth of excavation,
whichever is more, clear of the edge.
(iii) The excavated areas around the foundation of structures are to be filled up properly to the required levels
with earth obtained from excavation or other materials as directed, well rammed with water and consoli-
dated in layers not exceeding 150 mm. at a time. The quantity for this item of work will be measured on
the basis of quantity of excavation paid for less the volume occupied by the strucutre in foundation.
(b) Shoring:
(i) For loose earth and when the depth of excavation exceeds 3 metres, poling boards (vertical mem-
bers) of 50 to 75 mm. in thickness and 175 to 225 mm. in width preferably of sal-wood to be
placed close together and to be driven about 300 mm. in ground below the bottom of the trench
with intermediate sal-bullab piling of dia not less than 100 mm. at the rate of 900 to 1000 mm.
center to center to be placed in between the vertical surface of trench and the poling boards and
double struts of sal-bullah of not less than 100 mm. in dia between two wallings (horizontal
member) of 250 mm. in width and 75 mm. in thickness held horizontally between them.
(ii) For medium clay and when the depth of excavation exceeds 2 metres but not exceeds 3 metres
single struts will be provided and sal-bullah pilling may not be placed. Other requirements are to
be satisfied as (i) above.
(iii) For stiff clay or dry clay and when the excavation is within 2 metres, vertical poling boards will be
placed at the rate of 600 to 1000 mm. apart with or without walling pieces; but single or double
strutting will be provided. Other requirements are to be satisfied as per (i) above.
B-2 Lime Terracing:
Lime terracing on roof shall be composed of brick aggregate of 25 mm. (nominal) size unless otherwise speci-
fied, surki and Bisra or Satna lime in the specified proportion.
Lime concrete shall be laid (and not thrown) in a single layer and spread and rammed, with wooden rammers of
weight not exceeding 2 kg. to the specified average thickness, slopes and levels. The concrete shall be used
when it is quite fresh. Concrete left over from the previous days work shall in no circumstances be used.
During this preliminary ramming the surface shall be tested and kept perfectly true to slope, line and level and
even by means of a trowel, straight edge and spirit level. The concrete shall then be further consolidated by two
rows of labourers sitting close and beating the concrete in union with wooden thappies (weight 1 to 2 kg.) across
B-7
the entire width of the roof and thus slowly traversing the length of the roof. Special care shall be taken to
consolidate the concrete properly at its junction with the parapet wall. This beating shall be continued for three
to four days or more until the mortar is almost set and the wooden thappies rebound from the surface readily
when struck on it, causing a ringing sound to emit.
During the operation of mixing, Kunji water is to be sprinkled and allowed to soak well in. Lime water must
be continuously sprinkled on the terracing to keep it wet whilst being beaten. The mortar which comes to the
surface of the terracing during the beating shall be rendered smooth and finished off with lime rubbing and
afterwards with oil. Concrete shall be kept wet after each days work by spreading straw, and watering very
frequently, so as to ensure thorough setting of the concrete.
Mouths of rain water pipes shall be properly finished as per direction. The slope of the finished terrace shall not
be less than 1in 48. unless a flater slope is desired by the Engineer-in-Charge. The roof surface shall slope from
all sides towards the outlets. The minimum thickness of concrete at junction with parapet shall be 75 mm. and
shall be rounded. The concrete should be leak-proof and free from cracks.
Payment will be made on the basis of average finished thickness after consolidation.
(i) Shuttering and staging: Wherever necessary, shuttering and staging must be provided. Unless oth-
erwise stated no payment will be made for such shuttering or staging and the cost thereof will be
deemed to have been covered by the rate for relevant finished item of work. Where payment for
shuttering has been specified, the rate shall be deemed to cover the cost of the necessary staging as
well. Payment, if any, for shuttering will be on the basis of surtace area of shuttering in actual contact
with concrete.
Shuttering may be of approved dressed timber true to line, not less than 25 mm. thick. Surface to be
in contact with concrete are to be planed smooth except where otherwise stated. As an alternative,
sufficiently rigid steel shuttering may be used. In every case, joints of the shuttering are to be such as
to prevent the loss of liquid from concrete. In timber shuttering the joints must be perfectly closed
and the entire shuttering surface shall be covered with polythene sheets of approved quality. In case
of steel shuttering also the joints are to be similarly lined.
All shuttering and framing must adequately be stayed and braced to the satisfaction of the Engineer-
in-Charge for properly supporting the concrete during the period of hardening. It shall be so con-
structed that it may be removed without shock or vibration to the concrete.
Before the concrete is placed, the shuttering shall, if considered necessary be coated with and ap-
proved preparation for preventing the adhesion of the concrete to the moulds, and it is to be of such a
nature and so applied that the surface of the finished concrete is not stained. Care shall also be taken
that such approved preparation shall be kept out of contact with the reinforcement.
In no circumstances shall forms be struck until the concrete reaches strength of at least twice the
stress of which the concrete may be subjected at the time of striking.
B-8
Interior of all moulds and boxes must be thoroughly washed out with a hosepipe or otherwise so as to be
perfectly clean and free from all extraneous matter prior to the deposition of concrete.
All form works shall be removed without shock or vibration. Before the form work is stripped, the
concrete surface shall be exposed where necessary in order to ascertain that the concrete has hard- ened
sufficiently. In normal weather and with ordinary cement, vertical or side shuttering may be removed
after three days and the bottom shuttering of horizontal members after fourteen days in case of slabs and
twenty one days in case of beams and cantileves etc. from the date of placing the last portion of the
concrete in the structure. The above are the minimum and may be extended if found necessary. Before
stripping the shuttering of structural members the contractor shall take prior per mission of the Engineer-
in-Charge or his representative.
No plugs, bolts, ties, hold fasts or any other appliances whatsoever for the purpose of supporting the
shuttering are to be fixed in the structure or placed in such a way that damage might result to the work in
removing the same when the shuttering is struck.
(ii) Scaffolding: The scaffolding must be strong and rigid stiffened with necessary cross bracers and
always decked and boarded on the sills with close boarded veiling and swings to prevent any injury to
persons or materials. The contractor shall have to allow other traders to make reasonable use of his
scaffolding as and when directed by the Engineer-in-Charge.
If for the interest of the work contractors have to erect scaffolding in others properties including local
bodies or corporation, the arrangement for the same including the cost of licensing fees etc. shall have to
be borne by the contractor and the department should be kept free from any liability on this account.
(iii) Mixing, placing and compacting: The proportion specified is by volume in dry rodded condition of the
different constituents.
Boxes of suitable sizes shall be used for measuring sand and aggregate. The unit of measurement for
cement shall be bag of cement weighing 50 Kg. and this shall be taken as 0.035 cubic metre while
measuring the aggregate, shaking, ramming or hammering shall not be done. The proportioning of sand
shall be on the basis of its dry volume and in case of damp sand allowances for bulkage be made. The
aggregate in each batch of concrete are to be proportioned as to contain full bags of cement.
Normally all structural concrete shall be mixed in mixture machine in appropriate proportion, shall have
to be vibrated with suitable vibrator. Mixing shall be continued until there is uniform distribu- tion of the
materials and the mass is uniform in colour and consistency, but in no case mixing shall be be done for less
than two minutes. The rates appearing in the Schedule of Rates against such items are inclusive of hire
and operational charges of such appliances. For a particular job the Engineer-in- Charge may allow hand
mixing and or hand tapping of concrete In case of hand mixing concrete, extra cement up to 10% over the
standard requirement of cement for machine mix of particular mix shall have to be provided by the
contractor at his own cost.
B-9
As the bulking of sand may vary from day to day and at different parts of the day on account of
varying moisture content, frequent tests for bulking shall be carried out with the sand to be used and
amount of bulking allowed for in the field mix so as to keep the actual proportion constant through-
out.
Only such quantities as are required for immediate use are to be mixed at any one time. Sufficient water
is to be added to obtain proper workability so that the mixture may flow readily round the reinforcement
and into every part of the moulds. The workability shall be measured by the amount of slump.
The quantity of water to be used for each mix of 50 kg. cement to give the required consistency shall
not be more than 34 litres for 1:3:6 mix, 32 litres for 1:2:4 mix, 30 litres for 1:11/2:3 mix and 27 litres
for 1:1:2 mix. In the case of vibrated concrete, the limit specified may be suitably reduced to avoid
segregation.
Nominal Mix Concrete may be used for concrete of M20 or lower. The proportions of materials for
nominal mix concrete shall be in accordance with the following table.
Note: The proportion of the aggregates should be adjusted from upper limit to lower limit progressively as the
grading of the aggregates becomes finer and the maxirnum size of coarse aggregate become larger. Graded
coarse aggregate shall be used.
Example: For an average of fine aggregate (that is, Zone II). The proportions shall be 1:11/2 , I:.2 and 1:21/2
for maximum size of aggregates 10 mm, 20 mm and 40 mm respectively.
The total water content in each batch of concrete shall always be kept constant as the amount previously
determined by experiments. The quantity of water to be actually added may, therefore, vary depending on
moisture content in the aggregates. In actual job, if the quantities of the ingredients remain constant, the amount
of slump may be taken as a good guide indicating the total water content in the mixture. The consistency and
consequently the water content of the concrete shall therefore be kept constant and checked from time to time
as work proceeds, by means of standard slump test. The slump tests shall be carried out with concrete immedi-
ately after it has been mixed and before any initial set has commenced, the sample being taken preferably at the
point where the concrete is being delivered for placing in the moulds.
B-10
The mould shall then be removed by raising vertically immediately after filling. The moulded concrete shall
then be allowed to subside and the height of the specimen measured after coming to rest
The consistency shall be recorded in terms of millimetres of the subsidence of the specimen during the test,
which is known as slump.
I. S. : 456-2000 allows use of nominal mix of concrete upto grade M20 and may be allowed in works at the
discretion of Engineer-in-Charge and will be guided by the provision of IS 456-2000. For grade of concrete
above M20, design mix has to be adopted. For determination of mix proportion for design mix concrete, the
target strength should be higher than the specified characteristic strength to ensure that characteristic strength
is attained at 28 days at site. Accodring to Explanatory Hand Book on IS 456-1978 (S.P. 241983):
Standard deviation for different grades of concrete in absence of any test may be taken as per IS : 456 2000
as follows :
B-11
Once the target strength of cube moulds with specific mix design is obtained in the laboratory, it may be
inferred that the corresponding characteristic strength of concrete, prepared with the materials used in the test
mould (s) cured under identical condition as that of the test specimen, shall be obtained at site at 28 days.
The Explanatory Hand Book on IS. 4561978 (S.P.-24-1983) provides an approximate formula for
expressing the strength of concrete at aget (in days),
t
ft = a +bt
xf28 where f 28 is the strength at 28 days.
ACCEPTANCE CRITERIA:
The concrete shall be deemed to comply with the strength requirements when both the following
conditions are met:
(a) The mean strength determined from any group of four non overlapping consecutive test results com-
plies with the appropriate limits, in Col. 2 of following table.
(b) Any individual test result complies with the appropriate limits in Col. 3 of following table.
Characteristic Compressive Strength Compliance Requirement
B-12
Providing a proper construction joint; (iii) the reinforcement has been displaced beyond the tolerances specified
; or (iv) construction tolerances have not been met. However, the hardened concrete may be accepted after
carrying out suitable remedial measures to the satisfaction of the Engineer-in-Charge.
Frequency of sampling:
Sampling Procedurea random sampling procedure shall be adopted to ensure that each concrete batch shall
have a reasonable chance of being tested; that is, the sampling should be spread over the entire period of
concreting and cover all mixing units.
Frequency- The minimum frequency of sampling of concrete of each grade shall be in accordance with the
following:
1-5 1
6-15 2
16-30 3
31-50 4
51 and above 4 Plus one additional sample for
each additional 50m 3 or part
thereof
TEST SPECIFICATIONThe test specimens shall be made from each sample for testing at 28
days. Additional cubes may be required for various purposes such as to determine the strength of
concrete at 7 days or at the time of striking the form work, or to determine the duration of curing,
or to check the testing error. Additional cubes may also be required for testing cubes cured by
accelerated methods as described in IS: 90131978. The specimen shall be tested as described
in IS: 516-1959.
TEST STRENGTH OF SAMPLEThe test strength of the samples shall be the average of the
strength of three specimens. The individual variation should not be more than 15 percent of the
average.
Concrete shall be handled from the place of mixing to the place of final deposit as rapidly as
practicable by methods which will prevent the segregation or loss of the ingredients. It shall be
deposited as nearly as practicable in the final position to avoid re-handling or flowing. Unless
specially permitted by the Engineer-in-Charge, concrete shall not be dropped freely from a height
of more than 2 metres.
B-13
rubbish. When placing the concrete the finer materials must be carefully worked against the
moulds so that the faces of concrete shall be left perfectly smooth and free from honey-combing
upon withdrawal of the moulds. Any defect in this respect must be dealt with by the contractor as
directed by the Engineer-in-Charge without any extra charges thereof.
Depositing concrete under water shall not be allowed without specific permission from the
Engineer-in-Charge. The method of concreting to be adopted in such cases shall have to be
previously approved by him.
During placing and also immediately after deposition, the concrete shall be thoroughly compacted
by ramming, spearing etc. until it has been made to penetrate and fill all the spaces between and
around the steel rods, around embedded fixtures, and into the corners of formwork in such a
manner as to ensure a solid mass entirely free from voids. If so directed by the Engineer-in-
Charge, in addition to usual ramming, spearing etc. sufficient number and suitable type of vibrators
may have to be used on important jobs to enable working with homogeneity It is imperative that
the work should be done quickly as well as efficiently and adequate numb of hands must therefore
be employed to ensure this.
Concrete shall be placed and compacted in its final position before setting has commenced and
shall not subsequently be disturbed.
Concreting shall be carried out continuously up to construction joints, the position and arrangement
of which shall be predetermined by the Engineer-in-Charge or his representative. Any rest, pauses,
such as for meal, shall also be subject to his approval. All concreting work should be so
programmed as not to necessitate work at night. If for any reason this becomes imperative, the
contractor shall obtain previous permission of the Engineer-in-Charge or representative and make
proper lighting arrangements, at own cost, to his satisfaction.
(iv) Protection and curing: The contractor shall adequately protect freshly laid concrete, about 1 to
2 hours after its laying from too rapid drying due to sunshine, drying winds etc. and also from
rains or surface water and shocks. About 24 hours after laying of concrete, the surface shall be
cured by flooding with water of minimum 25 mm. depth or by covering with wet absorbent
materials. The curing shall be done for a minimum period of 7 days. Over the foundation concrete
the masonry work may be started after 48 hours of its laying, but the curing of cement concrete
shall be continued along with masonry work for a minimum period of 7 days.
In case of cement concrete used as sub-grade for flooring, the flooring may be commenced with
48 hours of the laying of sub-grade. In case it is not possible to do so due to exigencies of work.
the subgrade shall be roughened with steel wire brush without disturbing the concrete, wetted
with neat cement slurry at the rate of 1.75 kg of cement per square metre applied to the base
before laying floor, and full rate of artificial stone flooring/mosaic will be paid with the specific
orders of the Engineer-in-Charge. The curing to be continued along with top layer of flooring for
a minimum period of 7 days.
B-14
Joints may be made will be indicated by the Engineer-in-Charge or his representative.
In the case of horizontal joint any excess mortar or laitance shall be moved from the surface after the
concrete is deposited and before it has set.
When the work has to be commenced on a surface which has hardened, such surface shall be well
roughened and all laitance removed; the surface shall then be swept clean, thoroughly wetted and covered
with a thin layer of mortar composed of equal volumes of cement and sand. Such works shall be deemed
to be covered by the rates for concrete.
(vi) Minimum crushing strength: For major RCC work, (where concrete is specified by strength) the mix
should not be leaner than 1:11/2:3 so as to give ultimate crushing strength not less than 25 N/Sq. mm. at
28 days cured under field condition. The mix for the concrete is to be so adopted and the slump is to be
so allowed as to give specified strength and proper workability at the existing site conditions. Contractor
shall remain fully responsible for producing concrete of specified strength in the actual job and therefore
cast at his own cost test specimens of 15 cm. Cube as already specified during work and cure the same
in similar way as for laid concrete being tested for strength. Each set of test specimen shall be taken to
cover the quantity of concrete laid on the job during the period from the time of taking the previous set
of specimens and the quantity will be estimated by the Engineer-in-Charge from records maintained by
him.
The interior surface of the mould and base plate shall be lightly oiled before the concrete is placed in the
mould.
(a) CompactingThe test specimens shall be made as soon as practicable after mixing. and in such a way
as to produce full compaction of the concrete with neither segregation nor excessive laitance. The concrete
shall be filled into the mould in layers approximately 5 cm deep. In placing each scoopful of concrete,
the scoop shall be moved around the top edge of the mould as the concrete slides from it, in order to
ensure a symmetrical distribution of the concrete within the mould. Each layer shall be compacted either
by hand or by vibration. After the top layer has been compacted, the surface of the concrete shall be
finished level with the top of the mould, using a trowel, and covered with a glass or metal plate to
prevent evaporation.
Compacting by HandWhen compacting by hand, the standard tamping bar shall be used and the
strokes of the bar shall be distributed in a uniform manner over the crosssection of the mould. The
number of strokes per layer required to produce specified conditions will vary according to the type of
concrete. For cubical specimens, in no case shall the concrete be subjected to less than 35 strokes per
layer for 15 cm cubes or 25 strokes per layer for 10 cm cubes. For cylindrical specimens, the number of
strokes shall not be less than 30 per layer. The strokes shall penetrate into the underlying layer and the
bottom layer shall be rodded throughout its depth. Where voids are left by the tamping bar, the sides of
the mould shall be tapped close the voids.
B-15
(b) When the job concrete is placed by vibration and consistency of the concrete is such that the test specimens
cannot be properly moulded by hand rodding as described under (a) above, the specimens shall be
vibrated to give a compaction corresponding to that of the job concrete. The fresh concrete shall be
placed in the mould in two layers, each approximately half the volume of mould. In placing each scoopfull
of concrete, the scoop shall be moved around the top edge of the mould as the concrete there slides from
it, in order to ensure a symmetrical distribution of concrete within the mould. Either internal or external
vibrator may be used. The vibration of each layer shall not be continued longer than what is necessary to
secure the required density. Internal vibrators shall be of appropriate size and shall penetrate only the
layer to be compacted. In compacting the first layer, the vibrators shall not be allowed to rest on the
bottom of the mould. In placing the concrete for the top layer, the mould shall be filled to the extent that
there will be no mortar loss during vibration. After vibrating the second layer, enough concrete shall be
added to bring the level above the top of the mould. The surface of the concrete shall then be struck off
with a trowel and covered with a class or steel plate as specified under (a) above. The whole process of
moulding shall be carried out in such a manner as to preclude the alternation of water cement ratio of the
concrete by loss of water either by leakage from the bottom or overflow from the top of the mould.
Curing - The test specimens shall be stored on the site at a place free from vibration, under damp
matting, sacks or other similar material for 24 hours +/-1/2 hour from the time of adding the water to the
other ingredients. The temperature of the place of storage shall be within the range of 220 to 320C. After
the period of 24 hours, they shall be marked for later identification. removed from the moulds and,
o
unless required for testing within 24 hours, stored in clean water at a temperature of 24 C to 300C until
they are transported to the testing laboratory. They shall be sent to the testing laboratory well packed in
damp sand, damp sacks, or other suitable material so as to arrive there in a damp condition not less than
24 hours before the time of test. On arrival at the testing laboratory, the specimens shall be stored in
water at a temperature of 270 + /-20C until the time of rest,records of the daily maximum and minimum
temperarure shall be kept during the period of the specimens remain on the site and in the laboratory.
After curing, the specimen suitably marked and properly wrapped shall be made over to the Engineer-
in-Charge or his representative who will arrange to have them tested at 28 days from the date of casting.
If there be any delay for any reason whatsoever the result of the test shall nevertheless be valid and will
be applicable as per rules in each case for all test specimens ns whatsoever. The contractor shall be
responsible for proper packing of the specimens at his own cost, for safe and convenient transport of the
same from the site to the testing laboratory. The cost of testing the test moulds and other charges including
cost of carriage of the test moulds from the work site to the particular laboratory (both ways) and other
incidental charges in this connection will have to be borne by contractor.
In case of concrete showing, on the result of the cube tests, strength less than that specified in (a) and (b)
of the Acceptance Criteria but has a strength greater than (c) & (d) of the said Acceptance Criteria
concrete may, at the discretion of the Engineer-in-Charge, be accepted as being structurally adequate
without further testing.
If the concrete is deemed not to comply pursuant to (c) &. (d) of the Acceptance Criteria, the Structural
adequacy of the parts affected may be investigated as per provision of I.S. 456-latest revision i.e. core
test and / or load test, as the case may be before rejection on the application of the Contractor with the
undertaking to bear the cost of such tests.
B-16
or sub-clause 16.5.3 of I.S. 456-1978, concrete in the member represented by such tests shall be considered
acceptable but the Engineer-in-Charge shall have the full power to fix the rate of deduction @ Rs.200/-
per cubic metre.
In case the test results do not satisfy the relevant requirement of the preceding paragraph, the volume of
concrete so deficient shall be deemed to be un-acceptable and shall be removed from the structure and
replaced by fresh concrete to specified strength and the contractor shall, in that case, have to carry out
the instruction of the Engineer-in-Charge irrespective of the amount of loss, inconvenience and difficulties
involved.
The contractor shall remain liable to act/to carry out instructions under the provision of this clause,
notwithstanding issuing of any certificate or the passing of any bills or accounts by the Engineer-in-
Charge.
(vii) Rehabilitation of Concrete For rehabilitation of Concrete Structures the following essential steps are
to be followed
(a) To remove the loose concrete/plaster until hard and sound surface is exposed.
(c) To apply two coats of cement based Polymer modified anti corrosive protective coating to exposed
reinforcement (manufactures specification is to be strictly followed).
(d) If diameter of bar is reduced by more than 25%, additional bar equivalent to 50% area of existing bar
is to be added by lapping/welding as deemed fit by Design wing.
(e) (i) The exposed hard concrete surface is to be saturated with clean water and a bond coat of
Cement slurry duly admixed with water resistant bonding agent.
Or
(ii) For concrete beam /column if found necessary by Engineer-in-Charge the surface may be
treated by epoxy based reactive agent for jointing fresh concrete with old surface.
(f) (i) For Slab / Chhaja / Weatherboard: To fill up the removed part of Concrete / Plaster with
fresh Concrete / Plaster admixed with the water resistant bonding agent as per
Manufacturers specification within the time the bond coat remains fresh or tacky. The
admixed material shall have to be applied within 30 minutes of preparation or as
specified in literature.
B-17
(ii) For Beams / Columns: To fill up the removed part of concrete with fresh concrete with
water proofing plasticising admixture as per manufacturers specification.
Cement mortar shall be prepared by mixing sand and cement in specified proportion. Sand shall be
measured on the basis of its dry volume. In case of damp sand, its quantity shall be increased suitably
to allow for bulkage.
Brick shall be laid in English bond. The brick shall be laid by layering method. A layer of mortar shall
be spread on full width for suitable length of the lower courses. Each brick shall first be laid so as to
project over the one below. Both at the end and at the side, then pressed into the mortar and shoved
into final position so as to embed the brick and to fill its inside face fully with mortar. Cut bricks shall
not be used except where necessary.
The walls shall be taken up true to plumb with plumb bob. The thickness of brick courses shall be
kept uniform and for this purpose, wooden straight edge with graduations giving thickness of each
brick course including joint shall be used. All courses shall be laid truly horizontal and all vertical
joints shall be truly vertical. Vertical joints in alternate course shall come directly one over the other.
A set of tools comprising wooden straight edge, masons spirit level, square, half metre rule, line and
pins, string and plumb shall be kept for every 3 masons for frequent checking during progress of
work. Faces of walls found not in plumb shall be dismantled.
Both the faces of walls of thickness greater than 25 cm. shall be kept in proper plane. All the connected
brickwork shall be carried out nearly at one level and no portion of the work shall be left more than 1
metre below the rest of the work. Where this is not possible, the work shall he racked according to
bond (and not left toothed) at an angle not steeper than 45
Bricks shall be so laid that all joints are quite full of mortar. The thickness of joints shall not exceed
10 mm. Bricks shall be laid with frogs upward except in the top course where frog shall be placed
downward. The face joints shall be racked to a minimum depth of 15 mm. by racking tools daily
during the progress of work when the mortar is still green, so as to provide key for plaster or pointing
to be done. Where plastering or pointing is not required to be done, the joints shall he struck flush and
finished at the time of laying.
The face of brickwork shall be cleaned the very day that brickwork is laid daily and all mortar droppings
removed.
Green work shall be protected from rain by suitable covering. The brickwork shall be kept wet for a
period of at least 7 days. The top of masonry work shall be left flooded at the close of the day.
Scaffolding shall be sound and strong and holes left in masonry work for supporting the scaffolding
shall be filled and made good, before plastering.
B-18
B5 Damp Proof Courses:
This shall be laid to specified thickness over walls for the full thickness of the super structure walls.
The surface shall be leveled and prepared before laying the cement concrete. Edges of damp proof
course shall be straight, even and vertical. Side shuttering shall consist of wooden form and shall be
strong and properly fixed so that it does not get disturbed during compaction and the mortar does not
leak through. The concrete mix shall be of workable consistency and shall be tamped thoroughly to
make a dense mass. When the sides are removed, the surface should come out smooth without any
honey-combing. The damp proof course shall be laid continuous and the surface shall be double
chequered. Damp proof course shall be cured for at least seven days, after which it shall be allowed to
dry. Water proofing materials of approved quality shall be added to concrete mixture in accordance
with the manufacturers specifications starring the quantity for water proofing materials in litres or
kg. per 50 kg. of cement and will be paid for separately. Similarly, polymer based paint used under
damp proof course as per manufacturers specification shall also be paid separately.
The proportion of mortar of exterior or interior plaster shall be as specified in the items of work.
The plaster shall be of thickness as specified and the surface shall be similarly cured as for cement
concrete. The moulding shall be carried out as shown in the drawing and shall be separately measured
in overall length unless otherwise specified in the items. Interior corners and edges of openings if so
directed by the Engineer-in-Charge shall be rounded off or chamfered with the same mortar for which
no extra payment will be allowed. All cement concrete surface should be chipped off properly before
taking up the plastering work.
The artificial stone flooring shall be laid in panels of shape and size as directed. The casting ol the
panels will be so programmed as to prevent bonding of the freshly laid panel with adjacent panels.
Unless otherwise specified, the underlay shall be with graded stone chips 12 mm. down, the thickness of
topping shall be of 3mm. thick and colouring pigment as may be required shall only be added with the
topping. The topping and the underlay shall not be laid in one operation. After laying the Underlay the
surface shall be left out to dry. The topping shall be laid only alter the underlay has sufficiently dried
and initially set and after thoroughly brushing with hand wire brush and sweeping clean and after
application of slurry. The topping shall be finished with an English trowel and a piece of clean dry
linen. During all the stages. the required level shall be carefully observed and maintained. Suitable
grading, where required shall be provided in the flooring for water drainage as directed by the Engineer-
in-Charge.
The corner between floor and wall shall be rounded off if so directed by the Engineer-in-Charge for
which no separate payment shall be made. All cement concrete surface should be chipped off properly
before taking up the flooring work.
B-19
B-8 Rain Water Pipes :
The rain water pipes shall be of the materials and of the sizes as specified. All rainwater pipes shall have
suitable grating as directed at the inlet opening at roof and shall be fitted and fixed in proper position
with necessary offsets, clamps, shoe, Y-junctions and other accessories as required and as directed by
the Engineer-in- Charge. The pipes are to be fixed to walls in cement mortar (1: 4 with necessary
clamps and nails, suitable teak wood blocks being fixed on the walls to receive the nails. Y- junction
shall be used at the top of the pipe and the vertical leg thereof shall be provided with a cowl. All joints
are to be properly packed. In case the hole is made much larger than the size of the pipe, cement
concrete (1:2:4) shall be used to fill the annular space. The pipes with fittings etc. are to be painted with
2 coats of paints as approved by the Engineer-in-Charge.
Before white washing all the nails etc. have to be removed from the walls and all nail or other holes,
small depressions or damages in plaster of wall surface shall be filled or repaired to original condition
with lime paste.
Old surfaces spoiled by smoke and greasy soots shall be sprinkled with surki and water and rubbed
with brick bats or steel wire brushes or steel scrapers. The surface shall then the broomed to remove
all dust and shall be washed with clean water.
Preparation of white wash : The white washing is to be done with 5 parts of stone lime and one part
of shell lime with necessary gum (2 Kg. per Cu.M. of lime) using indigo as necessary and to be mixed
as per standard practice.
Preparation of colour wash : Colour washing shall have a primer of white wash and shall be of
shade as approved by the Engineer-in-Charge, sufficient quantity of colour wash enough for complete
job shall be prepared in one operation to avoid any difference in shade.
Application of white wash and colour wash : The operation for each coat shall consist of four
consecutive strokes of the brush, one horizontally from right to left and the next from left to right and
the third stroke bottom to upward and the fourth from top to down ward before the previous stroke
dries. Each coat shall be allowed to dry before the next coat applied. No portion of the surface shall be
left out initially to be patched up later on. The brush shall be dipped in white wash or colour wash,
pressed lightly against the wall of the container and then applied by lightly pressing against the
surface with full swing of hand.
B-20
Protective Measures : Surfaces of doors, windows, floors, articles of furniture, beams, burghas etc.
and such other parts of the building not to be white or colour washed shall be protected from being
splashed upon. Such surfaces shall be cleaned of white or colour wash splashes, if any
Dry distemper of approved brand and manufacture shall be used. The shade shall be got approved from
the Engineer-in-Charge before application of the distemper. The dry distemper shall be stirred slowly in
clean water using 6 deciliters of water per kg. of distemper or as specified by the manufacturer. Warm
water shall preferably be used. It shall be allowed to stand for at least 30 minutes (or if practicable over
night) before use. The mixture shall be well stirred before and during use to maintain an even consistency.
Distemper shall not be mixed in larger quantity than is actually required for one days work.
Before new work is distempered, the surface shall be thoroughly brushed free from mortar droppings
and other foreign matter and sand papered smooth. New plaster surface shall be allowed to dry for at
least two months, before applying distemper. In the case of old work, all loose pieces and scales shall
be removed by sand papering. The surface shall be cleaned of all grease, dirt etc. Pitting in plaster
shall be made good with plaster of paris mixed with dry distemper of the colour to be used. The
surface shall then be rubbed down again with a fine grade Sand paper and made smooth. A coat of the
distemper shall be applied over the patches. The surface shall be allowed to dry thoroughly before the
regular coat of distemper is applied. The priming coat of whiting shall be applied and no white
washing coat shall be used as a priming coat for distemper.
Whiting (ground white chalk) shall be dissolved in sufficient quantity of warm water and thoroughly
stirred to form a thin slurry which shall then be screened through a clean coarse cloth, Two kg. of gum
and 0.4 kg. of copper sulphate dissolved separately in hot water be added for every Cu.m. of the slurry
which shall then be diluted with water to the consistency of milk so as to make as wash ready for use.
The treated surface shall be allowed to dry before distemper coat is given. In the case of new work,
the treatment shall consist of a priming coat of whiting followed by the application of two or more
coats of distemper till the surface shows an even colour. For old work the surface is to be prepared as
described above and one or more coats of distemper shall be applied till the surface attains an even
colour. The application of each coat shall be as follows: The entire surface shall be coated with the
mixture uniformly, with proper distemper brushes (ordinary white wash brushes shall not be allowed)
in horizontal strokes followed immediately by vertical ones which together shall constitute one coat.
The subsequent coats shall be applied only after the previous coat has dried. The finished surface
shall be even and uniform and shall show no brush marks. Enough distemper shall be mixed to finish
one room at a time. The application of a coat in each room shall be finished in one operation and no
work shall be started in any room, which cannot be completed the same day. After each days work,
the brushes shall be washed in hot water and hung down to dry. Old brushes which are dirty or caked
with distemper shall not be used.
B-11 Painting:
All surfaces for painting shall be properly sand papered and cleaned and where necessary good quality
putty shall be used to hide all holes, cracks, open joints etc. The rate for painting includes such work.
B-21
Paint shall be applied with approved brushes and surfaces shall be sand papered after every coat. All work
when completed shall present a smooth, clean solid and uniform surface, to the satisfaction of the Engineer-
in-Charge.
(a) Primer : All surfaces for painting, if they are new, should have a coat of priming before application of the
paint. Old surfaces where existing paints have been completely worn out owing to long use should
also receive a coat of priming before application of fresh painting.
(i) Wood primer : Wood primer of approved brand and manufacture is to be applied on the wooden surface
which would be free from moisture and loose particles.
(ii) Steel Primer : For steel surface red oxide primer, zinc chromate primer of approved brand and
manufacture and as per direction of the Engineer-in-Charge is to be applied on the surface. The surface
should be made free of grease, rust, moisture and loose particles.
(iii) Acrylic Primer Coat (solvent based Primer) : Acrylic primer coat is to be used as base coat on wall
finish of cement, lime or lime cement plaster surface before application of any wall coating e.g.
distemper, oil based paints, synthetic enamel, acrylic emulsion etc. on them. Priming coat shall be
preferably applied by brushing and not by spraying. Hurried priming shall be avoided particularly on
absorbent surface. New plaster patches in old work before applying distemper paints etc. should also
be treated with acrylic primer. The surface shall then be allowed to dry for at least 48 hours. It shall then
be sand papered to give a smooth and even surface. Any unevenness shall be made good by applying
putty, made of plaster of paris mixed with water on the entire surface including filling up the
undulation and then Sand papering the same after it is dry. The cement primer shall be applied with a
brush on the clean dry and smooth surface. Horizontal strokes shall be given first, vertical strokes
shall be applied immediately afterwards. The entire operation will constitute one coat. The surface
shall be finished as uniformly as possible leaving no brush marks. It shall be allowed to dry for at least
48 hours before oil bound distemper or paint is applied.
(b) Synthetic Enamel Paint: Synthetic enamel paint of approved brand and manufacture and of the
required shade shall be used for the top coat and an undercoat of shade to match the coat as
recommended by the manufacturer shall be used. Undercoat of the specified paints of shade suited to
the shade of the top coat shall be applied and allowed to dry overnight. It shall be rubbed next day
with the fine grade of wet abrasive paper to ensure a smooth and even surface free from brush marks
and all loose particles dusted off. Top coats of specified paint of the desired shade shall be applied
after the undercoat is thoroughly dry. Additional finishing coats shall be applied if found necessary to
ensure properly uniform glossy surface.
(C) Aluminium Paint : Aluminium paint of approved brand and manufacture shall be used. The paint
comes in compact dual containers with the paste and the medium separately. The two shall be mixed
together to proper consistency before use. Each coat shall be allowed to dry for 24 hours and lightly
rubbed down with fine grade sand paper and dusted before the next coat is applied. The finished
surface shall present an even and uniform appearance. As aluminium paint is likely to settle in the
container, care shall be taken to frequently stir the paint during use. Also the paint shall be applied
and laid off quickly, as surface is otherwise not easily finished.
B-22
(d) Interior Acrylic Emulsion Paint : Acrylic emulsion paint are not suitable for application on
external surface and surface which are liable to heavy condensation and are be used generally
on internal surface. For plastered surfaces a cement priming coat is required before application
of acrylic emulsion. Acrylic emulsion paint of approved brand and manufacture and of the
required shade shall be used. The paint will be applied in the usual manner with brush or roller.
The paint dries by evaporation of the water content and as soon as the water has evaporated the
film gets hard and the next coat can be applied. The time for drying varies from one hour on
absorbent surfaces to 2 to 3 hours on non-absorbent surfaces. The thinning of emulsion is to be
done with water and not with turpentine. Thinning with water will be particularly required for
the undercoat which is applied on the absorbent surface. The quantity of thinner to be added
shall be as per manufacturers instructions. The surface on finishing shall present a flat, velvety,
smooth finish. If necessary more coats will be applied till the surface present a uniform
appearance.
Presautions : (i) Old brushes if they are to be used with emulsion paints should be completely dried of
turpentine or oil paints by washing in warm soap water. Brushes should be quickly
washed in water, immediately after use and kept immersed in water during break periods
to prevent the paint from hardening on the brush.
(ii) In the preparation of walls for Acrylic emulsion painting, an oil base putty shall be used
in filling cracks, holes etc.
(iii) Splashes in floor etc. shall be cleaned out without delay as they will be difficult remove
after hardening.
(iv) Washing of surfaces treated with emulsion paints shall not be done within 3 to 4 weeks
of application.
(e) Varnishing : Varnish for the undercoat shall be a flatting varnish of the same manufacture
as the top coats. New wood work to be varnished shall be finished smooth with a
carpenters plane. Knots shall be cut to a slight depth. Cracks and holes shall be cleaned
of dust. The knots, cracks etc. shall then be filled in with woodputty. The varnish shall
be applied liberally with a full brush and spread evenly with short light strokes to avoid
frothing. If the work is vertical the varnish shall be crossed and recrossed and then laid
off, the later being finished on the upstroke so that varnish, as it sets, flows down and
eliminates brush marks. The above process will constitute one coat. If the surface is
horizontal, varnish shall be worked in every direction with light quick strokes and finished
in one definite direction so that it will set without showing brush marks. Rubbing down
and fatting the surface shall be done after each coat except the final coat with fine sand
paper. The work shall be allowed to dry away from draughts and damp air. The finished
surface shall then present a uniform appearance and fine glossy surface free from streaks,
blisters etc. Any varnish left over in the small container shall not be poured back into the
stock tin, as it will render the latter unfit for use. Special fine haired varnishing brush
shall be used and not ordinary paint brushes. Brushes shall be well worn and perfectly
clean.
B-23
(f) Oiling with Raw Linseed Oil : Raw linseed oil shall be lightly viscous but clear and of a
yellowish colour with light brown tinge. Its specific gravity at a temperature of 300 C shall be
between 0.293 and 0.298. The oil shall be mellow and sweet to the taste with very little
smell. The oil shall be of sufficiently matured quality. Oil turbid or thick, with acid and bitter
taste and rancid odour and which remains sticky for a considerable time shall be rejected. The
oil shall be of approved brand and manufacture. The wood work shall be cleaned of all
smoke and water and completely dried. The oil shall be applied freely with brushes (not rags)
and spread evenly and smooth until no more oil is absorbed. Each subsequent coat shall be
applied after the previons coat is thoroughly dried and in any case not before 24 hours of
application of the first coat. Work after completion shall not be patchy and sticky to the touch
and shall present a uniform appearance.
(g) Wax polishing : Wax polishing shall be done with material of approved brand and
manufacture. Preparation of surface will be same as for varnishing. The polish shall be applied
evenly with a clean soft pad of cotton cloth is such a way that the surface is completely and
fully covered. The surface is then rubbed continuously for half an hour. When the surface is
quite dry, a second coat shall be applied in the same manner and rubbed continuously for one
hour or until the surface is dry. The final coat shall then be applied and rubbed for two hours
(more if necessary) until the surface has assumed a uniform gloss and is dry, showing no sign
of stickiness. The final polish depends largely on the amount of rubbing which should be
continuous and with uniform pressure with frequently changes in the direction.
(h) French Polishing : Pure shellac varying from pale orange to lemon yellow colour, free from
resin or dirt shall be dissolved in methylated spirit at the rate of 150 gm. of shellac to a litre of
spirit. Suitable pigment shall be added to get required shade. The surface shall be cleaned.
All unevenness shall be rubbed down smooth with sand paper and well dusted. Knots if
visible shall be covered with a preparation of red lead and glue size laid on while hot. Holes
and indentations on the surface shall be stopped with glaziers putty. The surface shall then be
given a coat of wood filler made by mixing whiting (ground chalk) in methylated spirit at the
rate of 1.4 kg. of whiting per litre of spirit. The surface shall again be rubbed down perfectly
smooth with glass paper and wiped clean. A pad of woolen cloth covered by a fine cloth shall
be used to apply the polish. The pad shall be moistened with the polish and rubbed hard on
the wood in a series of overlapping circles applying the mixture sparingly but uniformly over
the entire area of an even level surface. A trace of linseed oil on the face of the pad facilitates this
operation. The surface shall be allowed to dry and the remaining coats applied in the same
way. To finish off, the pad shall be covered with a fresh piece of clean fine cotton cloth,
slightly damped with methylated spirit and rubbed lightly and quickly with circular motions.
The finished surface shall have a uniform texture and high gloss.
B-24
B-12 Terrazzo Flooring : (Cast in situ) : I.S. 2114-1962
(a) (i) The aggregates used in terrazzo topping shall be marble aggregates of required colour.
Marble powder used in terrazzo shall pass through I.S. Sieve 30
(ii) Aggregates for terrazzo under layer as well as the base concrete shall conform to the
Requirements of ordinary cement concrete.
(b) Cement used for floor finish work shall be ordinary cement or white cement of approved quality.
(c) Pigments incorporated in terrazzo shall be of approved make & brand and of permanent colour
(d) The dividing strips may be copper, brass, aluminium, plastic, glass or similar materials. Metallic
dividing strips shall have a protective coating of bitumen. The thickness of strip shall not be less
than 1.5 mm. and width not less than 20 mm.
(e) (i) The base concrete shall be lean concrete of mix 1:5:10 of lime concrete and thickness shall
be not less than 100 mm.
(ii) The cushioning layer shall preferably be lime concrete and thickness shall be no less than
75 mm.
(iii) The under layer shall be of cement concrete of1: 2: 4, size of coarse aggregates not exceeding
12 mm. The thickness of terrazzo topping shall be not less than the following,depending
upon the grades and size of chips used.
(f) The mix for terrazzo topping shall consist of cement with or without pigments, marble powder,
marble aggregates and water. The proportion of cement and marble powder shall be 3 parts of
cement and one part of powder by WEIGHT. For every part of cement marble powder mix, the
proportion of aggregates by VOLUME shall be as follows depending upon the size and grade of
marble aggregates.
Size of aggregates Proportion of aggregates to binder mix
2 11/3 parts
B-25
(g) The Proportion of cement shall be inclusive of any pigments added to cement. The
proportions pigments die mixed with ordinary cement or white cement to obtain different colour
to the binder, shall be as specified in the following Table :
(h) (i) Terrazzo topping shall be laid while the under layer is still plastic, but is hardened sufficiently,
normally between 18 and 24 hrs. After the laying of the under layer, terrazzo topping may be laid.
A cement slurry, preferably of the same colour as the topping shall be brushed on the surface
immediately before laying is commenced. The terrazzo topping shall be compacted thoroughly
by tamping or rolling and trowelled smooth. Excessive trowelling or rolling in early stages shall
be avoided. The compaction shall ensure that air is cleared from the mix.
(ii) The surface shall be left dry for air curing for a duration of 12 to 18 hrs. and then be cured by
allowing water to stand in pools over it for a period of not less than 4 days.
(iii) Grinding and polishing may be done either by hand or by machine. The first and second
grinding shall be done with carborundum stone of Grit size 60 and 80 respectively. After each
grinding, the surface shall be washed clean and grouted with neat cement grout of the same colour
(without marble powder) of cream like consistency and then shall be allowed to dry for 24 hours
and wet cured for 4 days. The third grinding shall be done with carborundum stone of Grit
size 120 to 150 and the surface shall then be washed clean and allowed to dry for 11 hours and
wet cured for 4 days. The fourth grinding shall be done with carborundum stone of Grit size 320
to 400 and the surface shall then be washed clean and rubbed hard with felt and slightly moistened
oxalic acid powder (5 gms. of oxalic acid powder per sq.m. of floor area shall be adequate) and
finally the surface shall be washed clean with dilute oxalic acid solution and dried.
B-26
B-13 Door, Window Frames and Shutters:
All doors, window frames must have plaster rabbit 12 mm x 12 mm. and rabbit for receiving
shutter at least 15 mm deep. Wood work shall not be painted, oiled or otherwise treated before
it has been approved by the Engineer-in-Charge. All portion of timber abutting against or
embedded in masonry or concrete shall be painted with boiling coal-tar, before being placed in
position. In place of coal-tar, use of approved wood primer shall be permitted. In case of door
frames without sills, the vertical members shall be buried in floor 40 mm. deep. Where sills are
provided, these sills shall be sunk in the floor to 40 mm. depth and shall rest on damp-proof
course. Sills shall be provided, where so directed. The door frames without sills while being
placed in position, shall be provided with temporary wooden bracing or dry bricks well wedged
between the styles at the sill level. These shall be retained to keep the frames from warping
during construction. The frames shall also be protected from damages during construction. The
shutters shall be so fixed that while closing, the left hand leaf of the shutter is closed first and
the right hand leaf of shutter overlaps on the left hand leaf. The overlapping shall be minimum
20 mm. Solid wood panels shall be made out of one or more pieces of timber of not less than
125 mm. in width. In order to avoid warping, splitting and cracking, normally piece not exceeding
200 mm. in width should be used. When made from more than one piece, the pieces shall be
joined with continuous tongued and grooved joints glued together and reinforced with metal
dowels. The grains of the solid panel shall run along the longer dimension of the panel. The
corners and edges of panels shall be finished as shown in drawings and these shall be feather
tongued into styles and rails. Sash bars shall have mittered joints with styles. In measuring
the width and thickness of styles and rails, a tolerance can be allowed up to 1 mm. Styles and
rails shall be properly and accurately mortised and tennoned. Rails which are more than 180
mm. in width shall have two tennons. Styles and end rails of shutters shall be made out of one
piece only. Lock and intermediate rails exceeding 200 mm. in width may be made out of one or
more pieces of timber, but the width of each piece shall not be less than 75 mm. Where more
than one piece of timber are used, they shall be joined with a continuous tongued and grooved
joint glued together and reinforced with metal dowels at regular intervals not exceeding 200
mm. or pinned with not less than three 40 mm. rust proof pins of the lost heads type. Jointed
pieces of timber shall belong to the same pieces. The tennons shall pass clear through styles.
When assembling a leaf, styles shall be left projecting as a horn. The styles and rails shall have
12 mm. grooves in paneled portion for the panel to fit in. The joinery work shall be
assembled and passed the Engineer-in-Charge and then the joints shall be pressed and secured
by bamboo pins of about 6 mm. diameter. The horns of styles shall be sawn off.
Glass panes shall be fixed by wooden beading having mittred joints. A thin layer of putty shall
be applied between glass panes and sash bars and also between glass panes and the beading.
Fixing of glass panes with simple putty and beads shall not be permitted. Putty shall be prepared
by mixing one part white lead with three parts of finely powdered chalk and then adding boiled
linseed oil to the mixture to form a stiff paste.
B-27
(b) Aluminium Sections.
Specifications for different component will by as follows.
(INDAL/BECO/or any approved/ISl marked Aluminium extruded sections.)
HINDALCO BECO
Shutter :
Bottom &Top. Member 4148 151.161
Style Side 9777 151.152
Inter Lock 9778 151.153
Shutter :
Bottom & Top. Member 4148 151.161
Style Side 9777 151.152
Inter lock 9778 151.153
Shutter :
Bottom & Top. Member 4148 151.161
Style Side 9777 151.152
Inter lock 9778 151.153
Accessories: EPDM Gasket, Adhesive, Screw, Cleat Angle
Glass: clear bubble freefloat glass
B-28
(B) Casement Window :
(i) 40 series (40 mm depth).
Outer Frame.
Peripheral members 4133 151.1
Mullion 9149 151.79
Shutter :
Frame members 9148 151.81
Glazing Clip 4135 151.96
Cleat Angle. (Non-Anodized) 2081 151.167
(ii) 34 series (34 mm depth).
Outer Frame
Peripheral Member 2082 151.164
Mullion 9139 151.163
Shutter :
Peripheral Member 2082 151.164
Mullion 9139 151.163
Shutter :
Frame members 4124 151.165
Glazing Clip 4125 151.166
Cleat Angle. (Non-Anodized) 2081 151.167
Accessories: Stainless steel / Aluminium Functional, Hinge, EPDM
Gasket-T & U Type, Adhesive, Screw, Glass
Frame.
Top, Bottom & Side member 9835 303.01
Louver
Light 18 G 1702
Medium 16 G 1702 Local make
Heavy 14 G 1702
(D) Fixed glazzing on all tracks with member of fixed glazing flushed on one side only
Frame
Top, Bottom & Side 9210 151.53
Mullion 9207 151.52
Glazing Clip 4660 151.17
B-29
(E) Fixed Partition -for height of clear opening more than 1.0 metre.
Members:
Side, Top & Bottom 9210 151.53
Intermidiates 9207 151.52
Glazing Clip 4660 151.17
Members:
Side, Top & Bottom 9221 151.183
Intermidiates 9220 151.193
Glazing Clip 4660 151.17
B-30
F) Movable door shutters fully glazed, partly glazed
Partly prelaminated and rimless doors.
Shutter :
Top Rail 9201 151.261
Bottom Rail 9200 151.231
Lock Rail 9240 151.218
Door Vertical 9241 151.23
Glazing Clip 4660 151.17
Handle 5140 157.13
Accessories:
1. Heavy duty floor spring & top pin assembly
make: Garnish/Nita/Hardyn or any
approved make conforming to IS : 6315
2. EPDM Gasket
3. Wool Pile
4. Lock-Ramson.
5. Handle-Standard/Decorative/Acrylic.
6. Sundries: Adhesive, screw, Cleat Angle
(a) Unless otherwise specified the clamps shall be fixed to outer side of the frame with screws. For
the purpose of receiving clamps a recess of at least 12 mm. deep of suitable size shall be cut into
the frame. After fixing the frame true to plumb with the clamps, the exposed face of the clamps
shall he covered by a thin wooden covering fixed with screws.
(b) The side of the door, window frames which remains in contact with masonry shall invariably be
painted with a protective coat of paint.
(i) Fittings shall be of iron, aluminium or as specified. These shall be well made, reasonably smooth
and free from edges, corners, flaws and other defects. Screw holes shall be counter sunk to suit
the head of specified wood screws. All hinge pins shall be of steel and their riveted heads shall
be well formed.
B-31
bright (brass), oxidised or chromiumplated (electro-plated) and aluminium fittings shall be
finished bright or anodised or as specified. Fittings shall be got approved by the Engineer- in
charge before fixing.
(ii) Screws used for fittings shall be of the same metal and finish as the fittings; however anodised
brass screws or chromium brass screws shall be used for fixing aluminium fittings.
(iii) Fittings shall be fixed in proper position as shown in the drawings or as directed by the Engi-
neer-in-Charge. These shall be truly vertical or horizontal as the case may be. Screws shall be
driven home with screw driver and not hammered in. Recesses shall be cut to exact size and
depth for the counter -sinking of hinge.
B-16 Stone Masonry Block Walling :
(i) Considering ease in handling and other requirements, the nominal length and height of the block
is kept 300 mm. and 150 mm. respectively with the widths as 200, 150 and 100 mm. respec-
tively. The actual block dimensions are short by 10 mm. to accommodate mortar joint thickness.
These blocks weigh from 9 to 18 kg. each. The stone masonry blocks are made from large size
stone pieces bound together with lean cement concrete mix 1:5:8 (cement, sand, stone aggregate
10 mm. down). The stone piece sizes vary from 50 to 260 mm. To impart good workability and
bond, the sand should be well graded and should have tiny particles (15 to 20%) passing I.S.
sieve no. 300 micron and 5 to 15% passing I.S. sieve no 150 micron in area. Where fly ash is
available, this may be used as substitute for the fine particles of sand, provided good workability
and plasticity in such lean concrete is achieved to the desired extent and in such case of using of
fly ash, lesser cost of production of masonry stone block may be achieved at.
(ii) Stone masonry blocks are prepared in the following stages (a) Stone pieces are arranged in
mould (b) concrete (1:5:8) is filled around stone pieces in first layer (c) Second layer of stone
pieces is laid then (d) Concrete (1.5:8) is filled up to top.
Demoulding of such blocks follows soon after 3 to 7 minutes of its casting. The moulded blocks
are cured by frequent sprinkling of water over the stacks for 2 weeks and are cured for another 2
weeks before laying them in wall.
For quality control, testing of two blocks out of every 500 blocks for compressive strength
after providing proper capping as per test procedure laid down in I.S.-2185 of 1967, from
(1:5:8) lean concrete stone masonry block (290 mm x 190 mm.) and thickness 140 mm is
desired. Average ultimate crushing load for such block in tons is to be 38 and its average
compressive strength thus stands at 69 kg/sq. cm.
(iii) The blocks are used both for load bearing and non-load bearing walls. Permissible stresses in the
masonry are taken from the I.S. Code 1969 of 69 Structural safety of building - masonry
walls.
As cutting of the these blocks is not recommenced all length of walls, openings, spaces between
openings etc. shall be in multiple of 100 mm. and all height shall be multiple of course height
B-32
wall thickness is decided based on the strength of the blocks and the load coming over it. The
blocks should be dry at the time of laying in the masonry. If the climate is not dry, the blocks may
be wetted on the surface only in order to reduce the suctioning of water from the mortar. For
breaking of vertical joints in alternate course, smaller length blocks (depending upon the wall
length) are used. The external surface is finished with designable pointing; the internal face
may or may not be plastered.
Before beginning the actual demolition work, a careful study shall be made of the structure which is to
be pulled down and also of all its surroundings to ascertain how far the stage by stage demolition will
affect the safety of the adjoining structure. A definite plan of procedure for the demolition work, de-
pending upon the manner in which the loads off the various structural parts are supported, shall be
prepared and approved by the Engineer-in-Charge and this shall be followed as closely as possible, in
actual execution of the demolition work.
It should be ensured that the demolition operations do not, at any stage, endanger the safety of the
adjoining buildings. Moreover, the nuisance effect of the demolishing work on the use of the adjacent
buildings should be kept to the minimum.
No structure or part of the structure or any floor or temporary support or scaffold, side wall or any
device or equipment shall be loaded in excess of the safe carrying capacity, in its then existing condi-
tion.
1. On every demolition job, danger signs shall be posted all around the structure and all doors and
openings giving access to the structure shall be kept barricaded or manned except during the
actual passage of workmen or equipment. However, provisions shall be made for at least two
independent exists for escape of workmen during any emergency.
During nights, red lights shall be placed on or about all the barricades.
2 All the necessary safety appliances shall be issued to the workers and their use explained. It shall
be ensured that the workers are using all the safety appliances while at work
B-33
3. The power on all electrical service lines shall be shut off and all such lines cut or disconnected at or
outside the property line, before the demolition work is started. Prior to cutting of such lines, the
necessary approval shall be obtained from the electrical authorities concerned. The only exception
will be any power lines required for demolition work itself.
4. Water stream and other service lines shall be shut off and capped or otherwise controlled at or
outside the building line, before demolition work is started.
SPECIAL MEASURES FOR PUBLIC:
1. Safety distances to ensure safety of public shall be clearly marked and prominently sign posted.
Every sidewalk or road adjacent to the work shall be closed or protected. All main roads, which are
open to all, shall be kept open to the public clear and unobstructed at all times. Diversions for
pedestrians shall be constructed, where necessary for safety.
2. If the structure to be demolished is more than two storied or 7.5 m high, measured from the side
walk or street which cannot be closed or safely diverted, and the horizontal distance from the
inside of the sidewalk to the structure is 4.5 m or less, a substantial sidewalk shed shall be con-
structed over the entire length of the sidewalk adjacent to the structure, of sufficient width with a
view to accommodate the pedestrian traffic without causing congestion. The side walk shed shall
be lighted sufficiently to ensure safety at all times.
The roof of sidewalk sheds shall be capable of sustaining a load of 73 N/mm2. Only in exceptional
cases, say due to lack of other space, the storing of material on a sidewalk shed may be permitted
in which case the shed shall be designed for a load of 146 N/mm2. Roof of sidewalk shed shall be
designed taking into account the impact of the falling debris. By frequent removal of loads it shall
be ensured that the maximum load, at any time, on the roof of work shed is not more than 6000 N/
mm2. The height of sidewalk shed shall be such as to give a minimum clearance of 2.4 m.
Sidewalk shed opening. for loading purposes, shall be kept closed at all time except during actual
loading operations.
The deck flooring of the sidewalk shed shall consist of plank of not less than 50 mm in thickness
closely laid and deck made watertight. All members of the shed shall be adequately braced and
connected to resist displacement of members or distortion of framework.
When the horizontal distance from the inside of the sidewalk to the structure is more than 4.5 m
and less than 7.5 m, a sidewalk shed or fence with substantial railing shall be constructed on the
inside of the sidewalk or roadway along the entire length of the demolition side of the property with
movable bars as may be necessary for the proper execution of the work.
Prior to commencement of work, all material of fragile nature like glass shall be removed.
All openings shall be boarded up.
Dust shall be controlled by suitable means to prevent harm to workmen.
B-34
SEQUENCE OF DEMOLITION OPERATIONS:
(a) it causes the least damage and nuisance to the adjoining building and the members of the public, and
(b) it satisfies all safety requirements to avoid any accidents.
2. All existing fixtures required during demolition operation shall be well protected with substantial covering
to the entire satisfaction of the rules and regulations of the undertakings or they shall be temporarily
relocated.
3. Before demolition work is started, glazed sash, glazed doors and windows etc. shall be removed. All
fragile arid loose fixtures shall be removed. The lath and all loose plaster shall he stripped off throughout
the entire building. This is advantageous because it reduces glass breakage and also eliminates a large
amount of dust producing material before more substantial parts of the buildings are removed.
4 The demolition shall always proceed systematically storey by storey, in the descending order. All work in
the upper floor shall be completed and approved by the Engineer-in-Charge prior to disturbance to any
supporting member on the lower floor. Demolition of the structure in sections may be permitted in exceptional
cases if proper precautions are ensured to prevent injuries to persons and damage to property.
DEMOLITION OF WALLS:
1. While walls of sections of masonry are being demolished, it shall be ensured that they are not allowed to
fall as single mass upon the floors of the building that are being demolished so as to exceed the safe
carrying capacity of the floors. Overloading of floors shall be prevented by removing the accumulating
debris through chutes or by other means immediately. The floor shall be inspected by the Engineer-in-
Charge before undertaking demolition work and if the same is found to be incapable to carry the load of the
debris, necessary additional precautions shall be taken so as to prevent any possible unexpected collapse of
the floor.
2. Walls shall be removed part by part. Stages shall be provided for the men to work on if the walls are less
than one and a half brick thick and dangerous to work by standing over them.
DEMOLITION OF FLOOR:
1. Prior to removal of masonry or concrete floor adequate support centering shall be provided.
2. When floors are being removed, no workmen shall be allowed to work in the area, directly underneath and
such area shall be barricaded to prevent access to it.
B-35
DEMOLITION OF CERTAIN SPECIAL TYPES AND ELEMENTS OF STRUCTURES:
1. ROOF TRUSSES:
a) If a building has a pitched roof, the structure should be removed to wall plate level by hand
methods. Sufficient purlins and bracing should be retained to ensure stability of the remaining
roof trusses while each individual truss is removed progressively.
(b) On no account should the bottom tie of roof trusses be cut until the principal rafters are prevented
from making out ward movement.
Heavy baulks of timber and steel beams should be supported before cutting at the extremities and should
then be lowered gently to a safe working place.
3. BRICK ARCHES:
Expert advice should be obtained and, at all stages of the demolition, the closest supervision should be given
by persons fully experienced and conversant in this type of work to ensure that the structure is stable at all
times.
(a) On no account should the restraining influence of the abutments be removed before the dead load
of the spandrel fill and the arch rings are removed.
(b) A single span arch can be demolished by hand by cutting narrow segments progressively from each
springing parallel to the span of the earth, until the width of the arch has been reduced to a minimum
which can then be collapsed.
(c) Where deliberate collapse is feasible, the crown may be broken by the demolition ball method
working progressively from edges to the centre.
(d) In multi-span arches, before individual arches are removed, lateral restraint should be provided at
the springing level. Demolition may then proceed as for single span; where explosives are used it is
preferable to ensure the collapse of the whole structure in one operation to avoid the chance of
leaving unstable portion standing.
Canopies, cornices, staircases and balconies should be demolished or supported before tailing down load is
removed.
B-36
5. IN-SITU REINFORCED CONCRETE:
Before commencing demolition, the nature and condition of the concrete, the condition and position of
reinforcement and the possibility of lack of continuity of reinforcement should be ascertained.
Demolition should be commenced by removing partition and external non-load bearing cladding.
(a) REINFORCED CONCRETE BEAMS :
A supporting rope should be attached to the beam. Then the concrete should be removed from both ends
by pneumatic drill and the reinforcement exposed. The reinforcement should then be cut in such a way
as to allow the beam to be lowered under control to the floor.
The reinforcement should be exposed at the base after restraining wire guy ropes have been placed
round the member at the top. The reinforcement should then be out in such a way as to allow it to be
pulled down to the floor under control.
The slab should be cut into strips parallel to the main reinforcement and demolished strip by strip. Where
ribbed construction has been used, the principle of design and method of construction should be determined
before demolition is commenced. Care should be taken not to cut the ribs inadvertently.
Dismantled materials may be thrown to the ground only after taking adequate precautions. The material shall
preferably be dumped inside the building. Normally such materials shall be lowered to the ground or to the top
of the sidewalk shed, where provided, by means of ropes of suitable tackles.
B-37
(C) MODES OF MEASUREMENTS
GENERAL: Unless specifically mentioned otherwise, the following modes of measurement shall be
adopted.
C-1 Brick Walls:
The thickness of brick wall made of Modular Bricks with one brick laid flat (with long side
parallel to the length of the wall) shall be measured as 100 mm. One brick thick walls (with the
length of the brick parallel to the thickness of the wall) shall be measured as 200 mm., one and
half brick as 300 mm, two brick walls measured as 400 mm and so on.
(b) With Conventional Bricks (93/ 4 x 43/ 4 x 23/ 4) or (248 mm x 120 mm x 70 mm) :
The thickness of brick wall made with one brick laid on edge (with the long side parallel to the
length of the wall) shall be measured as 75 mm. Similarly, a wall made with one brick laid flat
(with the long side parallel to the length of wall) shall be measured as 125 mm. 1 brick thick walls
(with the length of brick parallel to the thickness of the wall) shall be measured as 250 mm., one
and half brick walls (i.e. one brick along the length and one brick along the width) shall be
measured as 375 mm., two brick thick walls measured as 500 mm. and so on.
(c) The width of lintels etc. covering the entire thickness of brick wall shall also be measured as
equal to corresponding wall thickness.
(d) Net measurement of all wall will be taken after deduction of all opening etc. This applies to 125/
100 mm. thick and 75 mm. thick walls also. Parapets (upto 1060 mm. height) will be measured
along with the brick work of the floor just below the roof and will be paid for at the same rate.
(e) No extra payment will be made for curved or chamfered work even though it may necessitate
cutting of bricks. For small curves or chamfers the Engineer-in-Charge may, at his discretion
allow measurement on the square (i.e. without deduction for the quantity removed for forming
the small curve or chamfer).
Finished net measurement will be taken after deduction of large holes, rebates etc. but without
deduction for the volume of reinforcement, if any, in the concrete.
B-38
C-3 Reinforcement:
The measurement will be on the basis of calculated weight of reinforcement only (i.e. without considering
the weight of tying wires) actually consumed in the finished work as per drawing and design or as per
direction of the Engineer-in-Charge. If the length of any rod be more than that shown in the drawing but
has been allowed to be used, the length will be taken as the length shown in the drawing. Hooks and laps
as per standard practice will be measured and paid for.
(i) Payment will be made on the basis of surface measurement without any deduction for door,
window or opening or similar dimension and without any separate measurement for jambs. sills
and soffits of such openings.
(ii) For cement paint and oil painting to walls or concrete jellies or similar other works, method of
measurements shall be the same as in plaster.
C-6 Painting:
(a) Measurement for painting work in doors and windows, grills, gratings, collapsible gates, corrugated
roofing etc. shall be on the following basis. In all such cases the Area shall be measured flat
(and not girthed). For door and windows, no separate payment shall be made for the frames
(chowkats), the Area in such cases represents the area of the wall opening covered by the
frames (including exposed surface of the frames). For grills, gratings etc. the area represents the
area of the opening covered by outer frames.
(a) The area measured as above shall be multiplied by the factor given below and the works of painting
shall be paid on the quantities thus arrived at:
B-39
Multiplying Multiplying
Name of surface painted
factor for factor for
painting one painting
side only both side only
B40
Note as per IS : 1200 (Part XV)-1976/P-8
Note 1 . The Height shall be taken from bottom of lowest rail, if palisades do not go below it or from
lower end of palisades, if they project below lowest rail, upto top of palisades, but not upto
top of standards, if they are higher than palisades.
Note 2 . Where doors, windows etc. are of composite types other than those included in this table,
different portions shall be measured separately with their appropriate coefficients, center line
of common rail being taken as the dividing line between the two portions.
Note 3 . Measurement of painting of doors, windows, collapsible gates, rolling shutters etc as given
in this table shall be deemed to include painting, if required of all iron fittings in the same
shade.
Note 4 When two faces of a door, window etc. are to be treated with different specified finishes,
measurable under separate items, edges of frames and shutters shall be treated with the one
or the other type of finish and measurement thereof shall be deemed to be included in the
measurement of the face treated with that finish.
Note 5 . In case shutters are fixed on both faces of a frame, measurement for the door frame and
shutter on one face shall be taken on the manner already described, while the additional
shutter on the other face shall be measured exclusive of the frame.
Note 6 . Where shutter is provided with clearance exceeding 15 cm. at top and/or at bottom, such
openings shall be deducted from the overall measurement and relevant coefficients applied.
C-7 Metal, Chips, Boulders, Bats, Sand, Lime, Coal, Carried Earth etc. :
(a) Unless specifically mentioned otherwise in the description of the item itself, measurements for
supply and / or carriage shall be taken in stacks and that as soon after the stacks are made as
possible. The height and the shape and size of the stacks shall be as per direction of the Engineer-
in-charge but in no case shall the height of the stacks be less than the minimum as indicated
hereinafter.
Allowance for shrinkage and / or shrinkage shall be made as indicated hereinafter. The net
quantity shall be arrived at after deducting these allowances from the measurement of fresh
stacks and payment for supply or carriage shall be made on the net quantity thus derived.
Quantity of any material shall always indicate such net quantity, unless specifically mentioned
otherwise.
(b) If for any special reasons, as per provisions in any particular contract, final measurements have to
be taken in wagons (before unloading at destination) no deduction for shrinkage and / or
shrinkage shall be made.
For carried earth supplied by the contractor, the earth is to be first stacked at site for measurement
and the earth utilised in the work after such stacks have been measured. The items of earthwork
with such carried earth include the cost of such operation. The net quantity, for the purpose of
payment, shall be derived after deducting allowances for shrinkage and/or shrinkage as specified
below. In special circumstances, the Engineer-in-Charge may, at his sole discretion, take borrow-
pit measurements for such carried earth, in which case no allowance for shrinkage and/or
shrinkage is to be deducted.
Where earth is to be carried from any excavation, the measurement for carriage for excavated
earth will be taken on the basis of earth excavated.
B-41
(c) For conversion of brick materials from one form to another 314 Nos. of bricks (conventional size)
will be taken to produce 1 cu.m. of bats and 1.1 cu.m. of bats to produce 1 cu.m. of khoa or metal.
Unless specifically mentioned otherwise in any particular contract, 1025 kg.. of steam coal shall be
taken as equivalent no 1 cu.m. (When measured in very old and settled stacks or in wagons at
destination or after deducting sinkage and/or shrinkage allowance when measured in fresh stacks).
Similarly 1107 Kg. of slack coal shall be taken as equivalent to 1 cu.m.
(d) For consolidation of stone or jhama metal and similar works involving utilisation of materials already
measured in stacks, the quantity of materials actually consumed in such works will be taken to be same
as the recorded quantities (after due allowance for sinkage and/or shrinkage, where applicable) of the
stack or stacks actually utilised in such works.
(e) Schedule showing minimum height of stacks and allowance to be deducted for sinkage and/or
shrinkage when measured in fresh stacks.
B-42
C-8 Carriage:
All items involving carriage, loading, unloading & stacking shall be in accordance with the provisions of
the Schedule of Rates of Public Works (Roads) Department applicable at the material time within the
jurisdiction of the circle.
C-9 Glazing:
All glazing shall be measured in square metres. Each pane of glass shall be measured to the nearest 0.5
cm. both width and height. Irregular or circular panes shall be measured as the smallest rectangular area
from which the irregular or circular pane can be cut. Irregular panes shall be measured separately, and
described as irregular shapes measured square.
(a) The value of materials supplied by the Department for use on the work shown in the schedule on page
II of the contract form (West Bengal Form No. 2911) in respect of items of work for which the contractors
rates are inclusive of the cost of such materials, will be debited to him in his accounts at the rates
specified in the schedule.
(b) Regarding materials in respect of items of work for which the contractors rates are not inclusive of the
cost of such materials, the contractor shall only act as custodian on behalf of the Govt. and the value of
such materials will not be charged to him except under sub-clause (f) and (g) hereof
(c) When the contract provides for use of certain specified materials to be supplied by the Deptt. the
contractor shall not obtain such materials from other sources unless authorised in writing by the Engineer-
in- Charge of the works.
(d) Materials supplied for a particular work or a part thereof shall not be used elsewhere except with
written permission of the said Engineer-in-Charge.
(e) Materials shall be supplied to the contractor in such installments as may be decided by the Engineer-in-
Charge.
(f) The contractor shall be held responsible for any misuse, loss or damage of the materials issued or
handed over to him by the Engineer-in-Charge. In default, the cost of such materials shall be recovered
from the contractor according to the terms of the provisions made in sub-clause (g) and (h) thereof.
(g) In the following cases, the materials issued or handed over to the contractor shall be deemed to have to
been misused by him.
(i) Materials lost or damaged due to negligence on the part of the contractor and/or defective storage
by him.
B-43
(ii) Materials used in excess of the requirements as shown in consumption chart attached herewith
(iii) Materials used without permission of the Engineer-in-Charge in temporary works (e.g. coffer
dams, embankments, shoring etc.) or in the construction of contractors godown, site office, labour
hutments etc.
The value of materials misused as above (in which case the decision of the Engineer-in-Charge shall be
final) shall be recovered at 50 per cent in excess of the highest of the following three rates;
(i) Issue rate as specified in the contract
(ii) Department stock rate at the time of recovery of value
(iii) Market rate at the time recovery of value.
(h) In cases of loss or damage of materials issued or handed over to the contractor other than under the
circumstances mentioned in sub-clause 9(g) the materials so lost or damaged shall be replaced by the
Engineer-in- Charge at the cost of the contractor and the certificate of the Engineer-in-Charge as to the
cost of replacement shall be final and binding on the contractor.
(i) Where so specified and in any case in respect of cement, steel and bituminous materials supplied by the
Deptt. a stock register shall be maintained by the contractor and the daily receipts, issues and balance of
such materials shall be shown therein. This register shall be produced by the contractor to the Engineer-
in-Charge or his representative whenever required for verification of stock.
(j) Whenever asked for by the Engineer-in-Charge during the progress of work and also with the final bill,
the contractor shall submit to the former a statement showing :
(i) The total quantity of materials received by the contractor from the Deptt.
(ii) Consumption thereof item by item in the work ; and
(iii) The balance in hand.
(k) Whenever by computing the consumption of materials of any description in any item or group of items
of work requiring use of such materials.
(i) It is found that the contractor has used less materials than are required by the specification and/or
as shown in consumption chart attached herewith, the value of the quantity of materials less used
shall be recovered from the contractor at 5(five) per cent in excess of the issue rate of such
materials. In such an event the contractor shall not be entitled to claim or receive the materials,
the cost of which has been thus recovered; or
(ii) If it is found that contractor has used any materials in excess of the requirement, the value of the
materials used in excess shall be recovered from the contractor as provided in sub- clause (g)
hereof.
(iii) Provided that recovery of materials used less or in excess as indicated in paragraphs (i) and (ii) of
the sub-clause shall be subjected to the decision of the Engineer-in-Charge who may allow
variation according to para I of consumption chart.
B-44
(D) MISCELLANEOUS
Extra rate for difficult I River line Areas / Difficult nature of work
D-1 The following extra rates will be allowed on the whole schedule of rates mentioned below.
D-2 Extra rate in respect all works on the whole schedule of rates for works
(i)Within the perimeter of Jail including perimeter wall work, where works
are permitted within restricted hours only @ 10%.
B-45
(ii) Rajbhavan, Kolkata @10%
(iii) If repair works required inside running wards / cabins of hospitals are restricted by hospital
authority in writing for duration less than usual working hours an extra rate of 10% will be
allowed.
(iv) If for unavoidable circumstances. works are to be done in emergency cases at night, extra rate
@10% will be applicable to items of night work only strictly under certificate of Engineer- in-
Charge.
(v) For works at Bhutni under Manikchawk P.S. in Malda District Extra 15% (Fifteen per cent) over
and above the rates provided in this schedule is allowed.
D-3 Rates for rehabilitation works in heritage structure / monuments (except buildings in use for Govt. or
similar offices) requiring careful expert quality conscious mistries under guidance of experts, may be
25% higher than the Schedule rate for corresponding items considering wastage of labour and lesser
output, with specific permission from Superintending Engineer of Concerned Circle.
D-4 5% (Five percent) extra in respect of works within Contai-I, Contai-Il, Contai- III, Khejuri-l, Nandigram-
1, Nandigram- II.Sutahata-I, Sutahata-II panchayat samity under East Midnapore District will be
allowed on the whole schedule excepting those under section-I (A) Earth works etc. (B) Dismantling
and cutting chase, holes etc. (N) Thatch, Mud and Bamboo works and whole of Section-II.
Extra in respect of works within following Police station will be allowed on (the whole schedule except-
ing those under section-I (A) Earth works etc. (B) Dismantling and cutting chase, holes etc (N) Thatch,
Mud and Bamboo works and whole of Section-II.
[Additional 5% (Five percent) for Durgachak, Haldia and Digha Police station area.
20% (twenty percent ) extra for Nayachar Island (developed on the midst of Hooghly river under the
Administrative control of D. M. East Midnapore on the whole schedule.
(i) 20% for works in the following places (a) Hill area of Garubathan Block (b) Kalimpong Municipal
Area (c) Dow hill area of Kurseong Sub-Division (d) Miric Block (e) Section from Mane Bhanjan to
Phalut of Simana Sandakphu Phalut Road (f) Section from Peshoke Khola to Lopchu Tea Garden of S.
H. No. 12 (g) within 10 km. from Mongpu under Takda Block (h) Ghoom Tiger Hill Road (i) Section
Pankhabari Bazar to the Starting of Kurseong Municipal Road of Garidhura- Kurseong Road (j) Kalimpong
Block 1/lI and Mongpo & Takda Block. k)Bijanbari Block l) Sukia Pokhri Block.
The rates under sections stated above for Jalpaiguri district are to be enhanced by 15% for works in
Boxa Hills .
B-46
The rates for all types of concrete works. masonry works and sand cement plastering in the District of
Uttar Dinajpur and Dakshin Dinajpur have been arrived at with the consideration that Bansloi sand
(Murarai Variety) shall be used in all such works. If any work is done with local sand with the approval
of the Executive Engineer, the rate of the item shall be reduced accordingly on the basis of difference of
cost of Bansloi sand and local sand. All cement concrete works in the District of Uttar Dinajpur and
Dakshin Dinajpur Shall be done with stone chips of Pakur variety when no specific mention is made in
the description of item.
D-6 The Schedule of Rates will be enhanced due to various circumstances as mentioned below:-
(a) By 10% (Ten percent) for works done within the Hills region of Ajodhya in the District of Purulia (a
region will be treated hills if the altitude is more than 200 Meters from the level of any adjoining
area within 10 km.)
(b) By 5 %( Five percent) for works done within the region of Khanakul-I & II Block under the
District of Hooghly.
B-47
CHART FOR CONSUMPTION OF MATERIALS
Consumption of different materials of construction in the corresponding contract items of work shall be
computed on the basis of the quantities shown in this table subject to a variation of plus/minus 5 (Five) per
cent. For steel reinforcement the variation may be permitted upto 10%
(i) That dry sand with necessary allowance for bulking is used and (ii) that the size of
bricks used shall be 248 120 70 mm or 93/ "43/ "23/ " for conventional bricks and
(190 90 90 mm) for modular bricks
Sl. Description of Items Unit Name of Materials Quantity of
No. required Materials
required
1. 10 mm. cement plaster 1:2 % sq.m. 1. Cement 0.54 Cu.m.
2. Sand 1.08 Cu.m
2. -Do- 1:3 % sq.m. 1. Cement 0.40 Cu.m.
2. Sand 1.20 Cu.m
3. -Do- 1:4 % sq.m. 1. Cement 0.30 Cu.m.
2. Sand 1.20 Cum.
4. -Do- 1:6 % sq.m. 1. Cement 0.20 Cu.m.
2. Sand 1.20 Cu.m
5. 15 mm cement plaster 1:2 % sq.m. 1. Cement 0.80 Cu.m.
2. Sand 1.60 Cu.m
6. -Do- 1:3 % sq.m. 1. Cement 0.60 Cu.m.
2. Sand 1.80 Cu.m
7. -Do- 1:4 % sq.m. 1. Cement 0.46 Cu.m.
2. Sand 1.84 Cu.m
8. -Do- 1:6 % sq.m. 1. Cement 0.30 Cu.m.
2. Sand 1.80 Cu.m
9. 20 mm. cement plaster 1:3 % sq.m. 1. Cement 0.80 Cu.m.
2. Sand 2.40 Cu.m
10. -Do- 1:4 % sq.m. 1. Cement 0.60 Cu.m.
2. Sand 2.40 Cu.m
11. -Do- 1:6 % sq.m. 1. Cement 0.40 Cu.m.
2. Sand 2.40 Cu.m
12. 25 mm. cement plaster 1:3 % sq.m. 1. Cement 0.884 Cu.m.
2. Sand 2.65 Cu.m
13. -Do- 1:4 % sq.m. 1. Cement 0.71 Cu.m.
2. Sand 2.84 Cu.m
B-48
Sl. Description of Items Unit Name of Materials Quantity of
No. required Materials
required
14. 25 mm. cement plaster 1:6 % sq.m. 1. Cement 0.472 cu.m.
2. Sand 2.84 cu.m
15. Cement flush / rule/ tuck 1:3 % sq.m. 1. Cement 0.119 cu.m.
pointing 2. Sand 0.357 cu.m
16. -Do- 1:4 % sq.m. 1. Cement 0.091 cu.m.
2. Sand 0.366 cu.m
B-49
Sl. Description of Items Unit Name of materials Quantity of
No. required materials required
B-50
Sl. Description of Items Unit Name of materials Quantity of
No. required materials required
33. Cement concrete with 1:3:6 cu.m. 1. Jhama chips 0.93 Cu.M.
jhama chips (6 to 19
mm.)
B-51
Sl. Description of Items Unit Name of materials Quantity of
No. required materials required
40 25 mm artificial stone 1:2:4 %sq.m 1.Jhama chips (5to 12 2.268 cu.m.
floor with jhama mm.)
chips(which includes 1.140 cu.m.
3mm thick neat cement 2.Sand
finish)(cement in the 0.872 cu.m.
consumption chart is 3.Cement
exclusive of cement
required for slurry
purpose)
41 20 mm artificial stone 1:2:4 %sq.m 1.Jhama chips (5to 12 1.716 cu.m.
floor with jhama mm.)
chips(which includes 0.858 cu.m.
3mm thick neat cement 2.Sand
finish)(cement in the 0.73 cu.m.
consumption chart is 3.Cement
exclusive of cement
required for slurry
purpose)
B-52
Sl. Description of Items Unit Name of materials Quantity of
No. required materials required
43 20 mm artificial stone 1:2:4 %sq.m 1.stone chips (5to 12 1.676 Cu.M.
floor with stone mm.)
chips(which includes 0.838 Cu.M.
3mm thick neat cement 2.Sand
finish)(cement in the 0.70 Cu.M.
consumption chart is 3.Cement
exclusive of cement
required for slurry
purpose)
46 7.5 cm lime terracing in roof with Sq.m 1.Brick Khoa 0.075 cu.m.
brick khoa,surki,lime(7:2:2) 2.Surki 0.021 cu.m.
Including finishing 3.Lime 0.021 cu.m.
B-53
Sl. Description of Items Unit Name of Quantity of
No. materials materials required
required
48 12.5 cm lime terracing in roof with Sq.m 1.Brick Khoa 0.125 cu.m.
brick khoa,surki,lime(7:2:2) 2.Surki 0.036 cu.m.
Including finishing 3.Lime 0.036 cu.m.
B-54
Sl. Description of Items Unit Name of Quantity of Sl. No. Descript
No. materials materials required ion of
required Items
B-55
Sl. No. Description of Items Unit Name of materials Quantity of
required materials required
B-56
67. 20 mm thick (finished) terrazzo work in
floor with precast tiles set on 20 mm av.
th. of lime / cement mortar 1:3 and sides
with admixtures of pigment as and when
necessary and white cement / grey
cement in ordinary grey colour (cement
in consumption chart is exclusive of
cement required for slurry @ 1.75
Kg./m2)
(a) When sand cement mortar is used in % sq.m 1.Grey cement 1.422 Cu.m
bed 2.Coarse sand 2.4 Cu.m
3.Pigment 31 kg
(b) When lime mortar is used in bed % sq.m 1.Unslaked Lime 5.65 Quintals
2.Surki 2.67 Cu.m
3.Grey Cement 0.616 Cu.m
4.Pigment 31 kg
68 -Do-
In black and red colour
(a)when sand cement morter is used in % sq.m 1.Grey cement 1.422 Cu.m
bed 2.Coarse sand 2.4 Cu.m
3.Pigment 31 kg
(b) when lime morter is used in bed % sq.m 1.Unslaked Lime 5.65 Quintals
2.Surki 2.67 Cu.m
3.Grey Cement 0.616 Cu.m
4.Pigment 31 kg
69 -DO-
In Silver colour
(a)when sand cement morter is used in % sq.m 1.Grey cement 1.268 Cu.m
bed 2.White cement 0.154 Cu.m
3.Coarse sand 2.4 Cu.m
b) when lime morter is used in bed % sq.m 1.Unslaked Lime 5.65 Quintals
2.Surki 2.67 Cu.m
3.Grey Cement 0.462 Cu.m
4. White cement 0.154 Cu.m
B-57
Sl. No. Description of Items Unit Name of Quantity of
materials materials required
required
70 20 mm thick (finished)
terrazzo work, in floor with
precast tiles set on 20mm
avg. thick of lime/cement
morter 1:3 and sides with
admixtures of pigment as and
when necessary and white
cement / grey cement in Pink,
Green, Yellow, Light Green
colour
(a)when sand cement morter % sq.m 1.Grey Cement 1.114 Cu.m
is used in bed 2.White Cement 0.308 Cu.m
3.Coarse sand 2.4 Cu.m
4.Pigment 31 kg
b) when lime morter is used % sq.m 1.Unslaked Lime 5.65 Quintals
in bed 2.Surki 2.67 Cu.m
3.Grey Cement 0.308 Cu.m
4. White cement 0.308 Cu.m
5 Pigment 31 kg
71(A) Plaster with composite
Morter of cement,lime and
sand with (1:2:9)
(a)35 mm thick % sq.m Cement 0.455 Cu.m
(b)25 mm thick % sq.m Cement 0.325 Cu.m
(c)20 mm thick % sq.m Cement 0.260 Cu.m
(d)15 mm thick % sq.m Cement 0.200 Cu.m
71(B) Plaster with composite
Morter of cement,lime and
sand with (1:1:6)
(a)20 mm thick % sq.m Cement 0.390 Cu.m
(b)15 mm thick % sq.m Cement 0.300 Cu.m
(c)10 mm thick % sq.m Cement 0.198 Cu.m
72 Rubble Masonry in cement
Morter
(a) 1:6 Cu.m 1.Stone 1.25 Cu.m
2.Cement 0.065 Cu.m
3.Sand 0.385 Cu.m
(b) Cu.m 1.Stone 1.25 Cu.m
2.Cement 0.09 Cu.m
3.Sand 0.36 Cu.m
73 250 mm th. Masonary work Cu.m 1.Cement 0.020 Cu.m
with Autoclave aerated 2.Sand 0.120 Cu.m
concrete blocks of size 625 3. Autoclave 1.05 Cu.m
mm x 250 mm x 125 mm aerated concrete
in Cement Mortar (1:6) blocks
74 125 mm thick Autoclave %Sq.m 1.Cement 0.25 Cu.m
aerated concrete blocks work 2.Sand 1.00 Cu.m
with its size 625 mm x 250 3. Autoclave 12.80 Cu.m
mm x 125 mm in Cement aerated concrete
Mortar (1:4). blocks
75 100 mm thick Autoclave %Sq.m 1.Cement 0.19 Cu.m
aerated concrete blocks work 2.Sand 0.78 Cu.m
with its size 625 mm x 250 3. Autoclave 9.86 Cu.m
mm x 125 mm in Cement aerated concrete
Mortar (1:4). blocks
76 Ordinary Cement concrete Cu.m 1. Stone chips 0.88 Cu.m
(mix 1:2:4) with graded stone 2.Cement 0.44 Cu.m
chips (6mm nominal size) 3.Sand 0.22 Cu.m
77 Masonry work with precast Cu.m 1.Cement Cu.m
Hollow Concrete Block of 2.Sand Cu.m
size 300mm X 200mm X 3. precast Hollow Cu.m
150mm with cement mortar Concrete Block
(6:1)
78 100mm thick Masonry work %Sq.m 1.Cement Cu.m
with precast Hollow Concrete 2.Sand Cu.m
Block of size 400mm X 3. precast Hollow Cu.m
100mm X 150mm Concrete Block
B-58
Quantity of Stone Aggregate to be considered for arriving consolidated rate of the
following Cement Concrete related Items:
B-59
Sl. Reference Description of Item Qnty. of Stone Aggregate to be Remarks
No. of Item considered per Cu.m. of Concrete
4) Chapter C; Batch Mixed concrete of M 20 Grade
It. No. with well Graded stone chips of 20
9(A)(a) to mm nominal size etc. etc.
9(A)(e) [with Batching Plant & transit mixer],
In Ground Floor and Foundation.
20 mm Nominal Size 0.54 Cu.m.
[Pakur Variety]. 10 mm Nominal Size 0.36 Cu.m.
(i) Without approved concrete
pump.
(ii) With approved concrete pump.
B-60
Sl. Reference Description of Item Qnty. of Stone Aggregate to be Remarks
No. of Item considered per Cu.m. of Concrete
5) Chapter C; Supplying ready mixed concrete of M20
It. No. Grade with well graded stone chips of
9(B)(a) to 20 mm nominal size etc. etc.
9(B)(e) In Ground Floor and Foundation.
[Pakur Variety].
20 mm Nominal Size 0.54 Cu.m.
(i) Without approved concrete 10 mm Nominal Size 0.36 Cu.m.
pump.
(ii) With approved concrete pump.
B-61
INDIAN STANDARDS FOR BUILDING WORKS
BUILDING CONSTRUCTION PRACTICE
Sl. No Specification for Indian Standard
No
1 Design of structural Timber (Fourth revision) 883 : 1994
4 Construction of floor roof with joists and filler blocks: Part-I with 6061 (Part 1) :1971
hollow concrete filler block
5 Construction of floor & roof with joists & filler block: Part 2 with 6061 (Part 2) :1981
hollow clay blocks joints and hollow clay filler block
6 Construction of floor and roof with joists & filler blocks: Part 3 6061 (Part 3): 1981
precast hollow clay block joints and hollow clay filler block
7 Construction of floor roof with joists & filler blocks: Part 4 with 6061 (Part 4): 1981
hollow clay block slab panels
8 Anti-termite measures in buildings part I constructional measures 6313 (Part 1): 1981
(First Revision)
12 Construction of reinforced brick and R.B.C floor and roofs 10440 :1983
25 Concrete structures for the storage of liquids: Part I general 3370 (Part 1) : 1965
requirements (Amendment No 1)
26 Concrete structures for the storage of liquids: Part 2 Reinforced 3370 (Part 2) : 1967
concrete structures (Amendment No-2)
27 Concrete structure for the storage of liquids: Part 3 Prestressed concrete 3370 (Part 3) : 1967
structures (Amendment No I)
28 Concrete structures for the storage of liquids Part 4: Design table 3370 (Part 4) : 1967
(Amendment No. 2)
29 Use of immersion vibrators for consolidating concrete (first revision) 3558 : 1983
30 Extreme Weather concreting : Recommended practice 7861 (Part 1) 1975
for hot weather concreting. (Amendment No. 1)
31 Extreme Weather concreting: Recommended practice for hot weather 7861 (Part 2): 1981
concreting. (Amendment No. 1)
B-63
CEMENT MATRIX PRODUCT
40 Concrete masonary units Part I Hollow and Solid concrete blocks 2185 :(Part 1) :
(Second Revision) (Amendment No 1) 1979
41 Concrete masonary units Part 2 Hollow and Solid lightweight 2185 : (Part 2) :
concrete blocks (first revision) 1983
42 Reinforced concrete fence posts (First Revision) 4996 : 1984
45 Precast reinforced concrete door & window frames (first revision) 6523 : 1983
48 Precast concrete blocks for lintels and sills (Amendment No-I) 9893 :1981
B-64
CONCRETE REINFORCEMENT
58 Mild steel and medium tensile steel bars and hard drawn steel wire for 432 (Part II) : 1982
concrete reinforcement Part 2 Hard Drawn Steel wire (Third Revision)
59 High strength deformed steel bars and wires for concrete reinforcement 1786 : 1985
(Third Revision) Amendment No.1
CONSTRUCTION MANAGEMENT
64 Wooden flush doors shutters (Solid core type) Part-1 Ply wood face 2202 (Part 1) : 1999
panels (Sixth Revision)
65 Wooden flush doors shutters (Solid core type) Part-2 particle board 2202 (Part 2) : 1983
face panels and hard board (Third Revision)
66 Steel doors frames (Second Revision) (Amendment No.2) 4351 : 2003
67 Wooden side sliding doors 4962 : 1968
68 Collapsible gate 10521 : 1983
B-65
EARTHQUAKE ENGINEERING
Sl. Specification for Indian Standard No.
No.
69 Earthquake resistant design & construction of buildings (Second 4326 : 1993
Revision) (Amendment No. 1)
70 Criteria for earthquake resistant design of structures (Fourth 1893 : 2002
Revision) (Amendment No. 1)
71(a) Improving earthquake resistant low strength masonry buildings 13828 : 1993
Guidelines (Amendment No. 1)
71(b) Ductile detailing of reinforced concrete structure subjected to 13920 : 1993
seismic forces
FIRE FIGHTING
73 Selection, installation and maintenance of portable first aid fire 2190 : 1992
extinguishers (Third Revision)
74 Installation and maintenance of internal fire hydrants and hose reels on 3844 : 1989
premises (First Revision)
75 Selection, Operation and maintenance of special fire fighting appliances: 5896 (Part 1) :
Part:1 combined foam and crash tender 1970
FIRE SAFETY
77 Fire Safety of buildings (General) : Details of construction (First Revision) 1642 : 1989
78 Fire safety of buildings (General) : Exposure hazard construction (First 1643 : 1988
Revision)
B-66
FLOORING, WALL FINISHING & ROOFING
Sl. No Specification for Indian Standard
No
79 Chequered Cement concrete tiles specification 13801 : 1993
83 Laying, fixing and maintenance of linoleum floor (First Revision) 1198 : 1982
84 Application of cement and cement lime plaster finishes (First Revision) 1661 : 1972
89 Use of silicate type chemical resistant mortars (First Revision) 4441 1980
91 Laying of bitumen mastic flooring for industries handling LPG and 13074 : 1991
other light hydrocarbon products
B-67
FUNCTIONAL RQUIREMENT IN BUILDINGS
100 Sound Insulation of building and of building elements: part 1 Airborne 11050(Part1):198
sound insulation in buildings and of building elements 4
101 Sound Insulation of building and of building elements: part 2 impact sound 11050(Part2):198
insulation in buildings and of building elements 4
102 Rating of Sound Insulation of building and of building elements: part 3 11050(Part3):198
Airborne sound insulation of facade elements and facades 4
103 Buildings and facilities for the physically handicapped(first revision) 4963:1987
105 Retaining wall for hill area : Part 1 Selection type of wall 14458 (Part 1) :
1998
106 Retaining wall for hill area : Part 2 Design of retaining / breast walls 14458 (Part 2) :
1997
107 Retaining wall for hill area : Part 3 construction of dry stone walls 14458 (Part 3) :
1998
108 Land slide controls 14680 : 1999
B-68
Housing
Sl.No Specification for Indian Standard No
109 Design and construction of floors and roofs with precast 13994:1994
reinforced planks and RC joists
110 Design and construction of floors and roofs with 14142:1994
prefabricated brick panel
111 Construction of floor and roof with RC channel units 14215:1994
112 precast reinforced concrete planks and joists for flooring 13990:1994
and roofing
113 prefabricated brick panel and partially precast concrete 14143:1994
joists for flooring and roofing
114 precast reinforced concrete channel unit for construction 14201:1994
of floors and roofs
115 Precast L-panel units for roofing 14241:1994
B-70
PUBLIC HEALTH ENGINEERING
Safety in construction
Sl No Specification for Indian Standard No
160 Steel tubular scaffolding:Part2 Safety regulations for 4014(part 2):1967
scaffolding
161 Preventive measures against hazards at work places: 13416(part 1):1992
Part 1 falling material hazards prevention
162 Preventive measures against hazards at work places: 13416(part 2):1992
Part 2 fall prevention
163 Preventive measures against hazards at work places: 13416(part 3):1994
Part3 disposal of debris
164 Preventive measures against hazards at work places: 13416(part 4):1994
Part4 timber structures
165 Preventive measures against hazards at work places: 13416(part 5):1994
Part5 timber structures
B-71
STONES
Sl No Specification for Indian Standard No
166 Marble(blocks,slabs and titles) 1130:1969
167 Sandstone(slabs and titles)(first revision) 3622:1977
STRUCTURAL SAFETY
Sl No Specification for Indian Standard No
168 Design loads(other than earthquake) for buildings and 875(part 1):1987
structures Part 1 Dead Load-unit weights of building
169 Design loads(other than earthquake) for buildings and 875(part 2):1987
structures Part 2 Imposed Load (second revision)
STRUCTURAL SECTIONS
Sl No Specification for Indian Standard No
170 Aluminium bulb angles Marine application(first 6449:1987
revision)
171 Aluminium channels(first revision) 3921:1985
172 Aluminium equal leg angles(first revision) 3908:1986
173 Aluminium I-beam(first revision) 5384:1985
174 Aluminium T-bars for Marine application(first revision) 6475:1987
175 Aluminium T sections(first revision) 6445:1985
176 Aluminium unequal leg angles(first revision) 3909:1986
177 Light Gauge structural steel sections(revised) 811:1987
TIMBER AND TIMBER STORES
For overall guidance and reference latest edition of National Building Code of India, may
be consulted.
B-72
PWD (WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
(A) EARTH WORK,ANTITERMITE TREATMENT
Rate (Rs.)
area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Bardhaman
Birbhum
Bankura
Sub Div
Item
Purulia
Malda
Nadia
Description of Items Unit
Dist.
No.
1) Cutting with chisel %Cum - 19223 19223 19223 - 19223 19223 19223 - - - 19223 - - -
2) by blasting operation
%Cum - 23240 23240 23240 - 23240 23240 23240 - - - 23240 - - -
3 Earth work in filling in foundation trenches or
plinth with good earth, in layers not exceeding
150 mm. including watering and ramming etc.
layer by layer complete. (Payment to be made on
the basis of measurement of finished quantity of
work)
(a) With earth obtained from excavation of
foundation. %Cum 7831 7831 7831 7831 7831 7831 7831 7831 7831 7831 7831 7831 7831 7831 7831
Page 1
PWD (WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
(A) EARTH WORK,ANTITERMITE TREATMENT
Rate (Rs.)
area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Bardhaman
Birbhum
Bankura
Sub Div
Item
Purulia
Malda
Nadia
Description of Items Unit
Dist.
No.
(B) Do - by fine sand %Cum 110422 56872 50928 50928 80670 74726 53306 50928 80670 74726 74726 152063 66393 66393 62827
5 Earth work in filling in compound, tank, low land,
ditches etc. with good earth, in layers not
exceeding 150 mm. including breaking clods and
consolidating the same by ramming and dressing
complete. (Payment will be made on profile
measurement before and after the work)
Page 2
PWD (WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
(A) EARTH WORK,ANTITERMITE TREATMENT
Rate (Rs.)
area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Bardhaman
Birbhum
Bankura
Sub Div
Item
Purulia
Malda
Nadia
Description of Items Unit
Dist.
No.
Page 3
PWD (WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
(A) EARTH WORK,ANTITERMITE TREATMENT
Rate (Rs.)
area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Bardhaman
Birbhum
Bankura
Sub Div
Item
Purulia
Malda
Nadia
Description of Items Unit
Dist.
No.
Page 4
PWD (WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
(A) EARTH WORK,ANTITERMITE TREATMENT
Rate (Rs.)
area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Bardhaman
Birbhum
Bankura
Sub Div
Item
Purulia
Malda
Nadia
Description of Items Unit
Dist.
No.
Page 5
PWD (WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
(A) EARTH WORK,ANTITERMITE TREATMENT
Rate (Rs.)
area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Bardhaman
Birbhum
Bankura
Sub Div
Item
Purulia
Malda
Nadia
Description of Items Unit
Dist.
No.
Page 6
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Bardhaman
Birbhum
Bankura
Sub Div
Item
Purulia
Malda
Nadia
Description of Items Unit
Dist.
No.
a) In ground floor including roof. Cu.M. 451 451 451 451 451 451 451 451 451 451 451 451 451 451 451
b) Extra rate for each addl. Floor over the
Cu.M. 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50
rate of ground floor
(c) Extra rate for careful dismantling and
recovering at least 150 no of useable bricks Cu.M. 58 58 58 58 58 58 58 58 58 58 58 58 58 58 58
per cum
2 Dismantling all types of plain cement
concrete works, stacking serviceable
materials at site and removing rubbish as
directed within a lead of 75 m
In ground floor including roof.
(a) upto 150 mm. thick Cu.M. 949 949 949 949 949 949 949 949 949 949 949 949 949 949 949
(b) above 150 mm. thick Cu.M. 1431 1431 1431 1431 1431 1431 1431 1431 1431 1431 1431 1431 1431 1431 1431
(c ) Extra rate for each addl floor over the
rate of ground floor. Cu.M. 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50
Page 7
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Bardhaman
Birbhum
Bankura
Sub Div
Item
Purulia
Malda
Nadia
Description of Items Unit
Dist.
No.
Page 8
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Bardhaman
Birbhum
Bankura
Sub Div
Item
Purulia
Malda
Nadia
Description of Items Unit
Dist.
No.
Page 9
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Bardhaman
Birbhum
Bankura
Sub Div
Item
Purulia
Malda
Nadia
Description of Items Unit
Dist.
No.
Page 10
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Bardhaman
Birbhum
Bankura
Sub Div
Item
Purulia
Malda
Nadia
Description of Items Unit
Dist.
No.
a) Pakur Variety Cu.M. 4603 4271 4213 4134 4427 4306 4352 4219 4393 4415 4324 4939 4431 4478 4583
(b ) River bazree Cu.M. 5930 4644 4712 5038
(c ) RajMahal Cu.M. 5033
(d) With local hard blackstone variety chips
Cu.M. 5131 5024 4881
(crusher broken)
Page 11
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Bardhaman
Birbhum
Bankura
Sub Div
Item
Purulia
Malda
Nadia
Description of Items Unit
Dist.
No.
Page 12
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Bardhaman
Birbhum
Bankura
Sub Div
Item
Purulia
Malda
Nadia
Description of Items Unit
Dist.
No.
Page 13
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Bardhaman
Birbhum
Bankura
Sub Div
Item
Purulia
Malda
Nadia
Description of Items Unit
Dist.
No.
(i) Pakur Variety Cu.M. 5389 5063 5007 4930 5216 5098 5142 5013 5183 5204 5140 5741 5244 5290 5392
(ii ) River Bazree Cu.M. 6792 5535 5600 5920
(iii) RajMahal Cu.M. 5887
(iv) With local hard blackstone variety chips
(crusher broken) Cu.M. 5937 5829 5693
Page 14
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Bardhaman
Birbhum
Bankura
Sub Div
Item
Purulia
Malda
Nadia
Description of Items Unit
Dist.
No.
Page 15
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Bardhaman
Birbhum
Bankura
Sub Div
Item
Purulia
Malda
Nadia
Description of Items Unit
Dist.
No.
Page 16
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Bardhaman
Birbhum
Bankura
Sub Div
Item
Purulia
Malda
Nadia
Description of Items Unit
Dist.
No.
Page 17
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Bardhaman
Birbhum
Bankura
Sub Div
Item
Purulia
Malda
Nadia
Description of Items Unit
Dist.
No.
Page 18
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Bardhaman
Birbhum
Bankura
Sub Div
Item
Purulia
Malda
Nadia
Description of Items Unit
Dist.
No.
Page 19
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Bardhaman
Birbhum
Bankura
Sub Div
Item
Purulia
Malda
Nadia
Description of Items Unit
Dist.
No.
Page 20
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Bardhaman
Birbhum
Bankura
Sub Div
Item
Purulia
Malda
Nadia
Description of Items Unit
Dist.
No.
Page 21
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Bardhaman
Birbhum
Bankura
Sub Div
Item
Purulia
Malda
Nadia
Description of Items Unit
Dist.
No.
Page 22
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Bardhaman
Birbhum
Bankura
Sub Div
Item
Purulia
Malda
Nadia
Description of Items Unit
Dist.
No.
Page 23
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Bardhaman
Birbhum
Bankura
Sub Div
Item
Purulia
Malda
Nadia
Description of Items Unit
Dist.
No.
Page 24
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Bardhaman
Birbhum
Bankura
Sub Div
Item
Purulia
Malda
Nadia
Description of Items Unit
Dist.
No.
Page 25
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Bardhaman
Birbhum
Bankura
Sub Div
Item
Purulia
Malda
Nadia
Description of Items Unit
Dist.
No.
Page 26
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Bardhaman
Birbhum
Bankura
Sub Div
Item
Purulia
Malda
Nadia
Description of Items Unit
Dist.
No.
Page 27
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Bardhaman
Birbhum
Bankura
Sub Div
Item
Purulia
Malda
Nadia
Description of Items Unit
Dist.
No.
a) 20 mm thick Sq.m 551 545 541 531 543 544 550 542 544 545 534 567 550 557 549
b) 25 mm thick Sq.m 586 578 573 561 575 577 584 574 577 579 564 605 584 593 583
c) 37.5mm thick Sq.m 668 656 648 630 652 655 665 650 654 657 635 697 665 678 664
19 Brick work with 1st class bricks in lime and
surki mortar (1:2) ( 1 lime putty/paste: 2
surki) lime to be slaked at site and the mortar
to be prepared with such lime putty and first
class surki made from kiln burnt bricks
having its fineness modulus between 2 and
2.5 and which passes through B.S. sieve No
8 with correspondes to I.S sieve No 200 with
considerable grinding and pugging it
complete.
a) In foundation and plinth Cu.M 6042 5509 4872 4872 6042 5896 5892 5222 5523 5506 5490 7153 5523 5506 5506
b) In Super structure, ground floor. Cu.M 6267 5734 5096 5096 6267 6120 6117 5447 5748 5730 5714 7378 5748 5730 5730
Page 28
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Bardhaman
Birbhum
Bankura
Sub Div
Item
Purulia
Malda
Nadia
Description of Items Unit
Dist.
No.
(a) In foundation and plinth Cu.M. 6011 5410 4812 4812 5913 5816 5757 5089 5528 5508 5507 7131 5487 5487 5546
(b) In superstructure, ground floor Cu.M. 6236 5635 5037 5037 6138 6041 5982 5314 5753 5733 5732 7356 5712 5712 5771
Page 29
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Bardhaman
Birbhum
Bankura
Sub Div
Item
Purulia
Malda
Nadia
Description of Items Unit
Dist.
No.
(a) In foundation and plinth Cu.M. 5882 5268 4670 4670 5784 5674 5615 4948 5386 5366 5358 7008 5339 5339 5398
(b) In superstructure, ground floor Cu.M. 6107 5493 4895 4895 6009 5899 5840 5172 5611 5591 5584 7233 5564 5564 5623
NOTE : 633 kg of unslaked lime @1 cu.m.
of lime putty/paste.
25 Extra Labour for brick for string course and
set square brick work, brackets and similar
Cu.M. 253 253 253 253 253 253 253 253 253 253 253 253 253 253 253
other projection brick works to be paid in
respective item.
26 Brick work with 1st class modular bricks
(a) With cement mortar (1:4)
(i) In foundation and plinth Cu.M. 5734 5638
(ii) In superstructure, ground floor Cu.M. 5880 5784
(b) With cement mortar (1:6)
(i) In foundation and plinth Cu.M. 5398 5302
(ii) In superstructure,ground floor Cu.M. 5521 5425
27 Add extra for basement and each additional
floor over the rate for ground floor on item
Nos. 19 to 26 except 25
(a) Upto 4th floor Cu.M. 112 112 112 112 112 112 112 112 112 112 112 112 112 112 112
(b) Above 4th floor Cu.M. 134 134 134 134 134 134 134 134 134 134 134 134 134 134 134
28 Extra over rate of corresponding items for
brick works in arches including hire and
labour charges for shuttering, centring etc.
complete.
(a) Clear span not exceeding 1,500 mm. Cu.M. 1044 1044 1044 1044 1044 1044 1044 1044 1044 1044 1044 1044 1044 1044 1044
(b) Clear span exceeding 1,500 mm. but not
Cu.M. 1107 1107 1107 1107 1107 1107 1107 1107 1107 1107 1107 1107 1107 1107 1107
exceeding 2,400 mm.
(c) Clear span exceeding 2,400 mm. but not
Cu.M. 1150 1150 1150 1150 1150 1150 1150 1150 1150 1150 1150 1150 1150 1150 1150
exceeding 3,600 mm.
(d) Clear span exceeding 3,600 mm. but not
Cu.M. 1168 1168 1168 1168 1168 1168 1168 1168 1168 1168 1168 1168 1168 1168 1168
exceeding 4,800 mm.
Page 30
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Bardhaman
Birbhum
Bankura
Sub Div
Item
Purulia
Malda
Nadia
Description of Items Unit
Dist.
No.
Page 31
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Bardhaman
Birbhum
Bankura
Sub Div
Item
Purulia
Malda
Nadia
Description of Items Unit
Dist.
No.
(a) 50 mm. thick panels Sq. M 405 405 405 405 405 405 405 405 405 405 405 418 405 405 405
(b) 37.5 mm thick panels Sq. M 351 351 351 351 351 351 351 351 351 351 351 364 351 351 351
(Cement and steel required for item no. 38
will not be issued by Deptt.)
Page 32
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Bardhaman
Birbhum
Bankura
Sub Div
Item
Purulia
Malda
Nadia
Description of Items Unit
Dist.
No.
Page 33
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Bardhaman
Birbhum
Bankura
Sub Div
Item
Purulia
Malda
Nadia
Description of Items Unit
Dist.
No.
Page 34
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Bardhaman
Birbhum
Bankura
Sub Div
Item
Purulia
Malda
Nadia
Description of Items Unit
Dist.
No.
Page 35
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Bardhaman
Birbhum
Bankura
Sub Div
Item
Purulia
Malda
Nadia
Description of Items Unit
Dist.
No.
Page 36
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Bardhaman
Birbhum
Bankura
Sub Div
Item
Purulia
Malda
Nadia
Description of Items Unit
Dist.
No.
Page 37
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Bardhaman
Birbhum
Bankura
Sub Div
Item
Purulia
Malda
Nadia
Description of Items Unit
Dist.
No.
Page 38
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Bardhaman
Birbhum
Bankura
Sub Div
Item
Purulia
Malda
Nadia
Description of Items Unit
Dist.
No.
Page 39
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
(D) Flooring
Rate (Rs.)
Jalpaiguri,Alipurduar,
/Area of Kalyani Sub
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Haldibari PS
Bardhaman
Birbhum
Bankura
Item
Purulia
Malda
Nadia
Divn.
Description of Items Unit
Dist.
Div
PS
S)
No.
In ground floor.
3 mm. thick topping (High polishing grinding
on this item is not permitted with ordinary
cement).
Using grey cement
(i) 20 mm. thick Sq. M 265 260 255 246 257 260 264 256 258 259 249 279 265 272 260
(ii) 25 mm. thick Sq. M 303 296 291 278 292 297 301 292 295 295 282 322 303 313 296
(iii) 35 mm. thick Sq. M 372 362 354 336 357 363 369 355 359 360 341 396 370 384 361
(Add extra @1.5% for each addl. floor upto
4th floor and @1.75% for each additional
floor above 4th floor for item No.1 and 3).
Page 40
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
(D) Flooring
Rate (Rs.)
Jalpaiguri,Alipurduar,
/Area of Kalyani Sub
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Haldibari PS
Bardhaman
Birbhum
Bankura
Item
Purulia
Malda
Nadia
Divn.
Description of Items Unit
Dist.
Div
PS
S)
No.
Page 41
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
(D) Flooring
Rate (Rs.)
Jalpaiguri,Alipurduar,
/Area of Kalyani Sub
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Haldibari PS
Bardhaman
Birbhum
Bankura
Item
Purulia
Malda
Nadia
Divn.
Description of Items Unit
Dist.
Div
PS
S)
No.
(i) In ordinary grey colour Sq. M 759 751 745 732 747 752 757 746 749 750 737 792 758 769 752
(ii) In black colour Sq. M 848 840 834 821 836 841 846 835 838 839 826 880 847 858 841
(iii) In red colour Sq. M 862 855 848 835 850 855 860 849 852 853 840 895 862 872 855
Page 42
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
(D) Flooring
Rate (Rs.)
Jalpaiguri,Alipurduar,
/Area of Kalyani Sub
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Haldibari PS
Bardhaman
Birbhum
Bankura
Item
Purulia
Malda
Nadia
Divn.
Description of Items Unit
Dist.
Div
PS
S)
No.
(i) In ordinary grey colour Sq. M 1056 1039 1037 1037 1049 1043 1041 1037 1047 1047 1049 1079 1047 1047 1053
(ii) In black colour Sq. M 1164 1147 1144 1144 1157 1150 1148 1144 1154 1154 1156 1186 1155 1155 1160
(iii) In red colour Sq. M 1172 1154 1152 1152 1164 1158 1156 1152 1162 1162 1164 1194 1163 1163 1168
Page 43
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
(D) Flooring
Rate (Rs.)
Jalpaiguri,Alipurduar,
/Area of Kalyani Sub
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Haldibari PS
Bardhaman
Birbhum
Bankura
Item
Purulia
Malda
Nadia
Divn.
Description of Items Unit
Dist.
Div
PS
S)
No.
Page 44
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
(D) Flooring
Rate (Rs.)
Jalpaiguri,Alipurduar,
/Area of Kalyani Sub
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Haldibari PS
Bardhaman
Birbhum
Bankura
Item
Purulia
Malda
Nadia
Divn.
Description of Items Unit
Dist.
Div
PS
S)
No.
Page 45
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
(D) Flooring
Rate (Rs.)
Jalpaiguri,Alipurduar,
/Area of Kalyani Sub
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Haldibari PS
Bardhaman
Birbhum
Bankura
Item
Purulia
Malda
Nadia
Divn.
Description of Items Unit
Dist.
Div
PS
S)
No.
In ground floor Sq. M 1166 1149 1147 1147 1159 1153 1151 1147 1156 1156 1157 1178 1156 1156 1162
(b) Supplying fitting and fixing in position 8
mm. to 12 mm. thick Dholpur slab in wall,
dado making suitable arrangement to hold
the stone properly with approved
polymerised adhesives (6 mm thick) as per
ISI specification including pointing with
cement mortar (1:2) (1 cement: 2 marble
dust) with admixture of pigment matching the
stone shades all complete as per direction of
Engineer-in-charge including cost of all
materials, labour, scaffolding, staging, curing
complete [using white cement for pointing @
2.4 kg/ Sq.m].
In ground floor Sq. M 1283 1283 1283 1283 1283 1283 1283 1283 1283 1283 1283 1320 1283 1283 1283
Page 46
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
(D) Flooring
Rate (Rs.)
Jalpaiguri,Alipurduar,
/Area of Kalyani Sub
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Haldibari PS
Bardhaman
Birbhum
Bankura
Item
Purulia
Malda
Nadia
Divn.
Description of Items Unit
Dist.
Div
PS
S)
No.
Page 47
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
(D) Flooring
Rate (Rs.)
Jalpaiguri,Alipurduar,
/Area of Kalyani Sub
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Haldibari PS
Bardhaman
Birbhum
Bankura
Item
Purulia
Malda
Nadia
Divn.
Description of Items Unit
Dist.
Div
PS
S)
No.
Page 48
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
(D) Flooring
Rate (Rs.)
Jalpaiguri,Alipurduar,
/Area of Kalyani Sub
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Haldibari PS
Bardhaman
Birbhum
Bankura
Item
Purulia
Malda
Nadia
Divn.
Description of Items Unit
Dist.
Div
PS
S)
No.
Page 49
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
(D) Flooring
Rate (Rs.)
Jalpaiguri,Alipurduar,
/Area of Kalyani Sub
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Haldibari PS
Bardhaman
Birbhum
Bankura
Item
Purulia
Malda
Nadia
Divn.
Description of Items Unit
Dist.
Div
PS
S)
No.
Page 50
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
(D) Flooring
Rate (Rs.)
Jalpaiguri,Alipurduar,
/Area of Kalyani Sub
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Haldibari PS
Bardhaman
Birbhum
Bankura
Item
Purulia
Malda
Nadia
Divn.
Description of Items Unit
Dist.
Div
PS
S)
No.
Page 51
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
(D) Flooring
Rate (Rs.)
Jalpaiguri,Alipurduar,
/Area of Kalyani Sub
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Haldibari PS
Bardhaman
Birbhum
Bankura
Item
Purulia
Malda
Nadia
Divn.
Description of Items Unit
Dist.
Div
PS
S)
No.
(A) Floor
With Sand Cement Mortar (1:4) 20 mm thick
& 2 mm thick cement slurry at back side of
tiles using cement @ 2.91 Kg/Sq.m & joint
filling using white cement slurry @
0.20kg/Sq.m.
(a) Area of each tile upto 0.09 Sq.m
(i) Coloured decorative Sq. M 844 827 824 824 837 830 828 824 834 834 834 867 833 833 838
(ii) Other than Coloured decorative including
white Sq. M 794 777 774 774 787 780 778 774 784 784 784 817 783 783 788
(B) Wall
Page 52
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
(D) Flooring
Rate (Rs.)
Jalpaiguri,Alipurduar,
/Area of Kalyani Sub
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Haldibari PS
Bardhaman
Birbhum
Bankura
Item
Purulia
Malda
Nadia
Divn.
Description of Items Unit
Dist.
Div
PS
S)
No.
(C ) Floor
With Polymerised
With PolymerisedAdhesive
Adhesiveand
& Epoxy
Epoxy grout
pointing including spacer- 2 mm ( When
Tiles are laid over existing hard ready
surface)
(a) Area of each tile upto 0.09 Sq.m [using
adhesive 3 mm thick]
(i) Coloured decorative Sq. M 895 895 895 895 895 895 895 895 895 895 895 916 895 895 895
(ii) Other than Coloured decorative including
Sq. M 845 845 845 845 845 845 845 845 845 845 845 866 845 845 845
white
(b) Area of each tile above 0.09 Sq.m [using
adhesive 4.5 mm thick]
(i) Coloured decorative Sq. M 1083 1083 1083 1083 1083 1083 1083 1083 1083 1083 1083 1105 1083 1083 1083
(ii) Other than Coloured decorative including
Sq. M 1020 1020 1020 1020 1020 1020 1020 1020 1020 1020 1020 1043 1020 1020 1020
white
(D ) Wall
With Polymerised
With PolymerisedAdhesive
Adhesiveand
& Epoxy
Epoxy grout
pointing including spacer- 2 mm ( When
Tiles are laid over existing hard ready
surface)
(a) Area of each tile upto 0.09 Sq.m [using
adhesive 3 mm thick]
(i) Coloured decorative Sq. M 920 920 920 920 920 920 920 920 920 920 920 942 920 920 920
(ii) Other than Coloured decorative including
white Sq. M 870 870 870 870 870 870 870 870 870 870 870 891 870 870 870
Page 53
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
(D) Flooring
Rate (Rs.)
Jalpaiguri,Alipurduar,
/Area of Kalyani Sub
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Haldibari PS
Bardhaman
Birbhum
Bankura
Item
Purulia
Malda
Nadia
Divn.
Description of Items Unit
Dist.
Div
PS
S)
No.
(i) Coloured decorative Sq. M 1333 1333 1333 1333 1333 1333 1333 1333 1333 1333 1333 1355 1333 1333 1333
(ii) other than Coloured decorative including
Sq. M 1258 1258 1258 1258 1258 1258 1258 1258 1258 1258 1258 1280 1258 1258 1258
white
Note:-1. If Cement grout is used in place of
epoxy grout then deduct Rs 115/ Sq.m for
item 30 (C) [a] & 30 (D) [a] and Rs 87/ Sq.m
for item 30 (C) [b] & 30 (D) [b]
2. Add extra for each addl, floor over the
rate for item 16 & 30.
(i) upto 4 th floor-Rs 5/ Sq.m
(i) above 4 th floor-Rs 6.25/ Sq.m
31 A Supplying, fitting & fixing granite tiles 10mm
to 12mm. thick in columns, wall, facia etc.
with 15 thick [avg] cement mortar (1:2)
including making suitable arrangements to
hold the stones properly by brass / copper
hooks including pointing in cement mortar
(1:2) (1 white cement : 2 marble dust) with
admixture of pigment matching the stone
shades all complete as per direction of the
Engineer-in-charge including cost of all
materials, labours, scaffolding, staging
,curing and roughening of concrete surface
complete.
[Using cement slurry at back side of tiles@
4.4 kg/sq.m & white cement slurry for joint
filling @ 1.8 kg/sq.m]
Area of each slab upto 0.2 Sq.m Sq. M 2015 2003 2002 2002 2010 2006 2004 2002 2008 2008 2010 2046 2009 2009 2013
Page 54
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
(D) Flooring
Rate (Rs.)
Jalpaiguri,Alipurduar,
/Area of Kalyani Sub
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Haldibari PS
Bardhaman
Birbhum
Bankura
Item
Purulia
Malda
Nadia
Divn.
Description of Items Unit
Dist.
Div
PS
S)
No.
Page 55
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
(D) Flooring
Rate (Rs.)
Jalpaiguri,Alipurduar,
/Area of Kalyani Sub
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Haldibari PS
Bardhaman
Birbhum
Bankura
Item
Purulia
Malda
Nadia
Divn.
Description of Items Unit
Dist.
Div
PS
S)
No.
Page 56
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
(D) Flooring
Rate (Rs.)
Jalpaiguri,Alipurduar,
/Area of Kalyani Sub
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Haldibari PS
Bardhaman
Birbhum
Bankura
Item
Purulia
Malda
Nadia
Divn.
Description of Items Unit
Dist.
Div
PS
S)
No.
Page 57
PWD(WB)Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
Jalpaiguri,Alipurduar,
/Area of Kalyani Sub
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Haldibari PS
Bardhaman
Birbhum
Bankura
Item
Purulia
Malda
Nadia
Divn.
Description of Items Unit
Dist.
Div
PS
S)
No.
(a) In single layer (Cement 1.7 Kg/ Sq.m) Sq.M 389 387 387 387 388 388 387 387 388 388 388 391 388 388 389
(b) In double layer (Cement 3.4 Kg/ Sq.m) Sq.M 721 716 716 716 719 718 716 716 719 719 719 725 718 718 720
Page 58
PWD(WB)Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
Jalpaiguri,Alipurduar,
/Area of Kalyani Sub
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Haldibari PS
Bardhaman
Birbhum
Bankura
Item
Purulia
Malda
Nadia
Divn.
Description of Items Unit
Dist.
Div
PS
S)
No.
5 Repair to roof cracks with Bitumen(VG-40) Sq.M 239 235 235 235 237 236 235 235 237 237 237 242 236 236 237
including cutting grooves and cleaning
cracks, heating bitumen as directed and
finished with sand blinding. (Bitumen 1.687
Kg/ Sq.m, Meadium Sand 0.6 Cu.m/100
Sq.m) (Bitumen to be supplied by contractor)
6 Repairs to cracks in terraced roof by cutting Metre 190 168 152 152 190 183 189 152 168 168 173 301 173 173 173
V-grooves 75 mm. to 100 mm. deep and 150
mm. to 200 mm. wide and filling the same
with beaten lime concrete (2:2:7) with lime
putty / paste and finishing complete (2 lime
putty / paste : 2 surki : 7 brick khoa )
10 Opening out and examining portion of Each 156 156 156 156 156 156 156 156 156 156 156 156 156 156 156
bearing of beam including mending good Bearing
damages as necessary.
Page 59
PWD(WB)Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
Jalpaiguri,Alipurduar,
/Area of Kalyani Sub
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Haldibari PS
Bardhaman
Birbhum
Bankura
Item
Purulia
Malda
Nadia
Divn.
Description of Items Unit
Dist.
Div
PS
S)
No.
(b) Clear span exceeding 3.7m but not Each 3214 3214 3214 3214 3214 3214 3214 3214 3214 3214 3214 3214 3214 3214 3214
exceeding 5m.
(c) Clear span exceeding 5m but not Each 3597 3597 3597 3597 3597 3597 3597 3597 3597 3597 3597 3597 3597 3597 3597
exceeding 6m.
(d) Clear span exceeding 6m but not Each 4076 4076 4076 4076 4076 4076 4076 4076 4076 4076 4076 4076 4076 4076 4076
exceeding 7.3m.
(ii) Height exceeding 5m but not
exceeding 7.3m.
(a) Clear span not exceeding 3.7m. Each 3286 3286 3286 3286 3286 3286 3286 3286 3286 3286 3286 3286 3286 3286 3286
(b) Clear span exceeding 3.7m but not Each 3959 3959 3959 3959 3959 3959 3959 3959 3959 3959 3959 3959 3959 3959 3959
exceeding 5m.
(c) Clear span exceeding 5m but not Each 4491 4491 4491 4491 4491 4491 4491 4491 4491 4491 4491 4491 4491 4491 4491
exceeding 6m.
(d) Clear span exceeding 6m but not Each 5164 5164 5164 5164 5164 5164 5164 5164 5164 5164 5164 5164 5164 5164 5164
exceeding 7.3m.
12 Labour for changing burgahs excluding Each 27 27 27 27 27 27 27 27 27 27 27 27 27 27 27
mending damages.
[Payment for the wooden burgahs (replacing
the old ones) will be made against Item 4 of
carpenter's work ]
Page 60
PWD(WB)Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
Jalpaiguri,Alipurduar,
/Area of Kalyani Sub
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Haldibari PS
Bardhaman
Birbhum
Bankura
Item
Purulia
Malda
Nadia
Divn.
Description of Items Unit
Dist.
Div
PS
S)
No.
13 Encasing R.S. joist / beam with 16 to 18 Sq.M 634 605 598 572 607 616 618 600 613 614 583 677 623 641 614
B.W.G. wire netting (13 to 19 mm. mesh)
and cement concrete (1:1..5:3) with stone
chips including finishing with 15 mm. thick
cement plaster (1:4) and 2 coats white
washing complete.( Cement 18.9 Kg/ Sq.m)
(a) Valamoid or similar bituminous paste as Sq.M 264 249 220 278 264 264 264 264 220 191 191 - - - -
approved
(b) Cement mortar (1:3) (Cement Sq.M 249 233 204 262 248 248 248 248 205 175 175 - - - -
0.5Kg/Sq.m)
16 Ridging of Ranigunge pattern tiled roof of 1st
class quality fitted and fixed including the
cost of setting and pointing with
(a) Valamoid or similar bituminous paste as Metre 148 148 148 148 148 148 148 148 148 148 148 - - - -
approved
(b) Cement mortar (1:3) (Cement 0.2Kg/Mtr) Metre 147 147 147 147 147 147 147 147 147 147 147 - - - -
Page 61
PWD(WB)Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
Jalpaiguri,Alipurduar,
/Area of Kalyani Sub
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Haldibari PS
Bardhaman
Birbhum
Bankura
Item
Purulia
Malda
Nadia
Divn.
Description of Items Unit
Dist.
Div
PS
S)
No.
(a) In Roof Sq.M 549 549 549 549 549 549 549 549 549 549 549 569 549 549 549
(b) In Wall Sq.M 539 539 539 539 539 539 539 539 539 539 539 559 539 539 539
Page 62
PWD(WB)Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
Jalpaiguri,Alipurduar,
/Area of Kalyani Sub
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Haldibari PS
Bardhaman
Birbhum
Bankura
Item
Purulia
Malda
Nadia
Divn.
Description of Items Unit
Dist.
Div
PS
S)
No.
(i) In Roof:-
a) With 0.60 mm thick sheet Sq.M 725 725 725 725 725 725 725 725 725 725 725 750 725 725 725
b) With 0.63 mm thick sheet Sq.M 755 755 755 755 755 755 755 755 755 755 755 779 755 755 755
c) With 0.80 mm thick sheet Sq.M 947 947 947 947 947 947 947 947 947 947 947 966 947 947 947
(ii) In wall:-
a) With 0.60 mm thick sheet Sq.M 711 711 711 711 711 711 711 711 711 711 711 735 711 711 711
b) With 0.63 mm thick sheet Sq.M 740 740 740 740 740 740 740 740 740 740 740 765 740 740 740
c) With 0.80 mm thick sheet Sq.M 932 932 932 932 932 932 932 932 932 932 932 951 932 932 932
25 Supplying, fitting and fixing glass reinforced
polyester translucent fiber glass sheet to
match with GCI Corrugation as per IS: 12866
- 1989 in roof fitted and fixed with 10 mm dia
"J" or "L" hook, bolts and nuts, limpet and
bitumen washers and putty with 150mm end
lap and one corrugation minimum side lap
complete.
ii) Fire retardant milky white Sq.M 937 937 937 937 937 937 937 937 937 937 937 1012 952 1005 937
iii) Coloured other than natural white or tinted Sq.M 907 907 907 907 907 907 907 907 907 907 907 1000 934 993 907
blue
iv) Special coloured textured tissue Sq.M 987 987 987 987 987 987 987 987 987 987 987 1083 1032 1077 987
Page 63
PWD(WB)Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
Jalpaiguri,Alipurduar,
/Area of Kalyani Sub
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Haldibari PS
Bardhaman
Birbhum
Bankura
Item
Purulia
Malda
Nadia
Divn.
Description of Items Unit
Dist.
Div
PS
S)
No.
i) Natural white or tinted blue colour Sq.M 1042 1042 1042 1042 1042 1042 1042 1042 1042 1042 1042 1056 1042 1042 1042
ii) Fire retardant milky white Sq.M 1133 1133 1133 1133 1133 1133 1133 1133 1133 1133 1133 1145 1133 1133 1133
iii) Coloured other than natural white or tinted Sq.M 1133 1133 1133 1133 1133 1133 1133 1133 1133 1133 1133 1145 1133 1133 1133
blue
iv) Special coloured textured tissue Sq.M 1234 1234 1234 1234 1234 1234 1234 1234 1234 1234 1234 1250 1234 1234 1234
ii) Fire retardant milkyl white Metre 721 721 721 721 721 721 721 721 721 721 721 731 721 721 721
iii) Coloured other than natural white or tinted Metre 721 721 721 721 721 721 721 721 721 721 721 731 721 721 721
blue
iv) Special coloured textured tissue Metre 840 840 840 840 840 840 840 840 840 840 840 850 840 840 840
ii) Fire retardant milky white Metre 1011 1011 1011 1011 1011 1011 1011 1011 1011 1011 1011 1095 1011 1011 1011
iii) Coloured other than natural white or tinted Metre 981 981 981 981 981 981 981 981 981 981 981 1083 981 981 981
blue
iv) Special coloured textured tissue Metre 1061 1061 1061 1061 1061 1061 1061 1061 1061 1061 1061 1166 1061 1061 1061
Page 64
PWD(WB)Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
Jalpaiguri,Alipurduar,
/Area of Kalyani Sub
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Haldibari PS
Bardhaman
Birbhum
Bankura
Item
Purulia
Malda
Nadia
Divn.
Description of Items Unit
Dist.
Div
PS
S)
No.
(a) In roof: with 0.63 mm. sheets. Sq.M 530 530 530 530 530 530 530 530 530 530 530 543 530 530 530
(b) In wall: with 0.63 mm. sheets. Sq.M 513 513 513 513 513 513 513 513 513 513 513 527 513 513 513
(b) Serrated adjustable type Metre 260 260 260 260 260 260 260 260 260 260 260 268 260 260 260
(a) 225 mm. wide gutter Metre 376 376 376 376 376 376 376 376 376 376 376 381 376 376 376
Page 65
PWD(WB)Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
Jalpaiguri,Alipurduar,
/Area of Kalyani Sub
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Haldibari PS
Bardhaman
Birbhum
Bankura
Item
Purulia
Malda
Nadia
Divn.
Description of Items Unit
Dist.
Div
PS
S)
No.
(b) 300 mm. wide gutter Metre 444 444 444 444 444 444 444 444 444 444 444 450 444 444 444
32 Galvanised iron sheets valley gutter with Metre 605 605 605 605 605 605 605 605 605 605 605 613 605 605 605
perimeter not less than 750 mm with 225
mm lap each way fitted and fixed with
necessary bolts, nuts, screws, etc.complete.
Valley gutter made of 0.63 mm. thick sheets.
(300mm End lapping)
Page 66
PWD(WB)Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
Jalpaiguri,Alipurduar,
/Area of Kalyani Sub
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Haldibari PS
Bardhaman
Birbhum
Bankura
Item
Purulia
Malda
Nadia
Divn.
Description of Items Unit
Dist.
Div
PS
S)
No.
(b) With all new fittings including the cost Metre 125 125 125 125 125 125 125 125 125 125 125 127 125 125 125
thereof.
35 Renewing galvanised J or L hook-bolt with
nut and with necessary limpet and bitumen
washers, putty etc. fitted and fixed complete.
(Total length of bolt upto 225 mm)
39 Walling or roofing fitted and fixed complete Sq.M 352 352 352 352 352 352 352 352 352 352 352 375 352 352 352
with cut drum sheets including the cost of
drums, cost of cutting drums and flattening
the sheets and cost of necessary nails and
screws.
Page 67
PWD(WB)Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
Jalpaiguri,Alipurduar,
/Area of Kalyani Sub
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Haldibari PS
Bardhaman
Birbhum
Bankura
Item
Purulia
Malda
Nadia
Divn.
Description of Items Unit
Dist.
Div
PS
S)
No.
(b) Made with 50 mm. X 6 mm. flats Metre 168 168 168 168 168 168 168 168 168 168 168 173 168 168 168
(c) Made with 50 mm. X 10 mm. flats Metre 266 266 266 266 266 266 266 266 266 266 266 275 266 266 266
(a) Above 1.5 m to 3 m span Each 440 440 440 440 440 440 440 440 440 440 440 440 440 440 440
(b) Above 3 m to 6 m span Each 728 728 728 728 728 728 728 728 728 728 728 728 728 728 728
(c) Above 6 m to 9 m span Each 1503 1503 1503 1503 1503 1503 1503 1503 1503 1503 1503 1503 1503 1503 1503
(d) Above 9 m to 12 m span Each 2048 2048 2048 2048 2048 2048 2048 2048 2048 2048 2048 2048 2048 2048 2048
(e) Above 12 m to 15 m span Each 2954 2954 2954 2954 2954 2954 2954 2954 2954 2954 2954 2954 2954 2954 2954
Page 68
PWD(WB)Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
Jalpaiguri,Alipurduar,
/Area of Kalyani Sub
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Haldibari PS
Bardhaman
Birbhum
Bankura
Item
Purulia
Malda
Nadia
Divn.
Description of Items Unit
Dist.
Div
PS
S)
No.
(a) For 20 mm. thick precast tiles (cement Sq.M 613 596 595 595 606 601 596 595 606 604 606 641 604 604 609
14.6 kg/ Sq.m for underlayer)
(b) For 25 mm. thick precast tiles (cement Sq.M 656 638 637 637 648 643 638 637 648 646 648 683 647 647 651
14.6 kg/ Sq.m for underlayer)
(Add extra @ 1.5% for each additional
floor upto 4th floor and @ 1.75% for each
additional floor above 4th floor)
Page 69
PWD(WB)Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
Jalpaiguri,Alipurduar,
/Area of Kalyani Sub
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Haldibari PS
Bardhaman
Birbhum
Bankura
Item
Purulia
Malda
Nadia
Divn.
Description of Items Unit
Dist.
Div
PS
S)
No.
(a) By Bricks (cement 25.66 kg/ Sq.m) Sq.M 915 838 791 791 891 877 863 811 866 861 863 1021 858 858 872
(b) By 1St Class Brick Bats (cement Sq.M 763 693 688 680 714 725 707 700 714 717 719 790 821 718 733
29.66kg/ Sq.m)
Page 70
PWD(WB)Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
Jalpaiguri,Alipurduar,
/Area of Kalyani Sub
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Haldibari PS
Bardhaman
Birbhum
Bankura
Item
Purulia
Malda
Nadia
Divn.
Description of Items Unit
Dist.
Div
PS
S)
No.
48 Labour for taking out and refixing of Narriah Sq.M - - 106 106 - - - 106 - - - - - - -
tiles(Khapra) in slope roof over GCI/Plane
Sheet roofing or bamboo frame work.
Page 71
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
(F) STRUCTURAL STEEL WORKS, GRILLS, GATES ETC.
Rate (Rs.)
Jalpaiguri,Alipurduar,
/Area of Kalyani Sub
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Haldibari PS
Bardhaman
Birbhum
Bankura
Item
Purulia
Malda
Nadia
Divn.
Description of Items Unit
Dist.
Div
PS
S)
No.
Page72
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
(F) STRUCTURAL STEEL WORKS, GRILLS, GATES ETC.
Rate (Rs.)
Jalpaiguri,Alipurduar,
/Area of Kalyani Sub
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Haldibari PS
Bardhaman
Birbhum
Bankura
Item
Purulia
Malda
Nadia
Divn.
Description of Items Unit
Dist.
Div
PS
S)
No.
Page73
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
(F) STRUCTURAL STEEL WORKS, GRILLS, GATES ETC.
Rate (Rs.)
Jalpaiguri,Alipurduar,
/Area of Kalyani Sub
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Haldibari PS
Bardhaman
Birbhum
Bankura
Item
Purulia
Malda
Nadia
Divn.
Description of Items Unit
Dist.
Div
PS
S)
No.
b) Span beyond 12 Mtr and up to 20.00 Mtr MT. 81868 81868 81868 81868 81868 81868 81868 81868 81868 81868 83206 84531 83206 83206 83206
c) Span beyond 20 Mtr and up to 30 Mtr MT. 84370 84370 84370 84370 84370 84370 84370 84370 84370 84370 85736 87086 85736 85736 85736
ii) For other Structural works like galleries
etc. MT. 81364 81364 81364 81364 81364 81364 81364 81364 81364 81364 82715 84053 82715 82715 82715
Page74
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
(F) STRUCTURAL STEEL WORKS, GRILLS, GATES ETC.
Rate (Rs.)
Jalpaiguri,Alipurduar,
/Area of Kalyani Sub
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Haldibari PS
Bardhaman
Birbhum
Bankura
Item
Purulia
Malda
Nadia
Divn.
Description of Items Unit
Dist.
Div
PS
S)
No.
(a) From 1st floor level Qntl. 199 199 199 199 199 199 199 199 199 199 199 199 199 199 199
(b) Add extra for each addl. Floor Qntl. 58 58 58 58 58 58 58 58 58 58 58 58 58 58 58
7 Ordinary grating bars made of round or
square M.S. rods fitted and fixed in holes of
window frames etc, complete.
In ground floor. Qntl. 7664 7664 7664 7664 7664 7664 7664 7664 7664 7664 7791 7918 7791 7791 7791
(Steel materials will not be issued by the
Deptt.)
(Add extra @1% for each additional floor
upto 4th floor. @1.25% for each additional
floor above 4th floor).
8 M.S. round or square bar grating of windows
etc. fitted and fixed in holes of window frame
and with intermediate flat bar stiffener( with
necessary holes for the grating bars and with
the ends turned and fixed to timber frame
with necessary screws) complete , as
directed.
In ground floor. Qntl. 7842 7842 7842 7842 7842 7842 7842 7842 7842 7842 7969 8096 7969 7969 7969
(Steel materials will not be issued by the
Deptt.)
Page75
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
(F) STRUCTURAL STEEL WORKS, GRILLS, GATES ETC.
Rate (Rs.)
Jalpaiguri,Alipurduar,
/Area of Kalyani Sub
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Haldibari PS
Bardhaman
Birbhum
Bankura
Item
Purulia
Malda
Nadia
Divn.
Description of Items Unit
Dist.
Div
PS
S)
No.
Page76
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
(F) STRUCTURAL STEEL WORKS, GRILLS, GATES ETC.
Rate (Rs.)
Jalpaiguri,Alipurduar,
/Area of Kalyani Sub
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Haldibari PS
Bardhaman
Birbhum
Bankura
Item
Purulia
Malda
Nadia
Divn.
Description of Items Unit
Dist.
Div
PS
S)
No.
Page77
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
(F) STRUCTURAL STEEL WORKS, GRILLS, GATES ETC.
Rate (Rs.)
Jalpaiguri,Alipurduar,
/Area of Kalyani Sub
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Haldibari PS
Bardhaman
Birbhum
Bankura
Item
Purulia
Malda
Nadia
Divn.
Description of Items Unit
Dist.
Div
PS
S)
No.
Page78
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
(F) STRUCTURAL STEEL WORKS, GRILLS, GATES ETC.
Rate (Rs.)
Jalpaiguri,Alipurduar,
/Area of Kalyani Sub
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Haldibari PS
Bardhaman
Birbhum
Bankura
Item
Purulia
Malda
Nadia
Divn.
Description of Items Unit
Dist.
Div
PS
S)
No.
(iii) 25 mm dia.
(a) 450 mm long. Each 260 260 260 260 260 260 260 260 260 260 260 262 260 260 260
(b) 500 mm long. Each 295 295 295 295 295 295 295 295 295 295 295 298 295 295 295
(c) 750 mm long Each 402 402 402 402 402 402 402 402 402 402 402 405 402 402 402
(iv) 32 mm dia:
(a) 450 mm long Each 378 378 378 378 378 378 378 378 378 378 378 381 378 378 378
(b) 500 mm long Each 402 402 402 402 402 402 402 402 402 402 402 405 402 402 402
(c) 750 mm long Each 498 498 498 498 498 498 498 498 498 498 498 504 498 498 498
Page79
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
(F) STRUCTURAL STEEL WORKS, GRILLS, GATES ETC.
Rate (Rs.)
Jalpaiguri,Alipurduar,
/Area of Kalyani Sub
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Haldibari PS
Bardhaman
Birbhum
Bankura
Item
Purulia
Malda
Nadia
Divn.
Description of Items Unit
Dist.
Div
PS
S)
No.
(c) Length above 150mm. Kg. 114 114 114 114 114 114 114 114 114 114 114 115 114 114 114
Page80
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
(F) STRUCTURAL STEEL WORKS, GRILLS, GATES ETC.
Rate (Rs.)
Jalpaiguri,Alipurduar,
/Area of Kalyani Sub
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Haldibari PS
Bardhaman
Birbhum
Bankura
Item
Purulia
Malda
Nadia
Divn.
Description of Items Unit
Dist.
Div
PS
S)
No.
Page81
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
(F) STRUCTURAL STEEL WORKS, GRILLS, GATES ETC.
Rate (Rs.)
Jalpaiguri,Alipurduar,
/Area of Kalyani Sub
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Haldibari PS
Bardhaman
Birbhum
Bankura
Item
Purulia
Malda
Nadia
Divn.
Description of Items Unit
Dist.
Div
PS
S)
No.
Page82
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
(F) STRUCTURAL STEEL WORKS, GRILLS, GATES ETC.
Rate (Rs.)
Jalpaiguri,Alipurduar,
/Area of Kalyani Sub
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Haldibari PS
Bardhaman
Birbhum
Bankura
Item
Purulia
Malda
Nadia
Divn.
Description of Items Unit
Dist.
Div
PS
S)
No.
(ii) 40 mm x 6 mm flat Mtr. 265 265 265 265 265 265 265 265 265 265 267 270 267 267 267
Page83
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
(F) STRUCTURAL STEEL WORKS, GRILLS, GATES ETC.
Rate (Rs.)
Jalpaiguri,Alipurduar,
/Area of Kalyani Sub
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Haldibari PS
Bardhaman
Birbhum
Bankura
Item
Purulia
Malda
Nadia
Divn.
Description of Items Unit
Dist.
Div
PS
S)
No.
(i) Above 50 mm. Each 126 126 126 126 126 126 126 126 126 126 126 126 126 126 126
(ii) below 50mm. Each 109 109 109 109 109 109 109 109 109 109 109 109 109 109 109
47 Labour for taking out steel door and window
frame for repairs and re-fixing the same ( or
replacement by new one) including mending
good damages (excluding the cost of repair
of damages) and applying a protective coat
of paint.
Upto one sq.m.area of frame. Each 129 129 129 129 129 129 129 129 129 129 129 129 129 129 129
48 Supplying, fitting and fixing cast iron heavy
type spiral staircase of approved design with
50 mm.dia. Stem and C.I. Steps 150 mm as
per design 900 mm. high C.I, railing including
necessary M.S. tie of suitable section
embedded to wall with cement concrete
(1:2:4) including cost of intermediate C.I.
platform secured with necessary tie to stem
and wall with cement concrete (1:2:4)
including fixing the stem in ground with
cement concrete (1:3:6) complete in all
respect with all labour and materials.
Page84
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly
of Haldibari PS
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Bardhaman
Birbhum
Bankura
Sub Div
Item
Purulia
Malda
Nadia
Description of Items Unit
No.
NOTE:
(1) Without the specific permission of the
Superintending Engineer no work
involving 1st class best Indian teak and
Siliguri: Sal wood should be carried out.
(2) In case of of using under specified
timber in frame, shutter etc. penal rate of
reduction to a maximum of 50% will be
made in such under specified timber
work.
Page 85
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly
of Haldibari PS
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Bardhaman
Birbhum
Bankura
Sub Div
Item
Purulia
Malda
Nadia
Description of Items Unit
No.
Mode of measurement :
Weight of frame shall be calculated for
the M.S. sections of frames. Payment of
butt hinges, clamps, hasp bolt, socket
bolts, screws etc. will be paid separately.
The weight of section should be
calculated at 7.85 gm/Cu.cm
2 Extra rate for Curved wood works in doors
and window frame fitted and fixed complete
over corresponding Items of Item No. 1. (In
measuring such average length and average Cu.M 10% 10% 10% 10% 10% 10% 10% 10% 10% 10% 10% 10% 10% 10% 10%
breadth to be taken into consideration, depth
remaining constant). (The quantum should
be corrected upto three decimals)
3 (A) Wood work in posts, post plates, rafters,
battens, truss members, purlins etc. fitted
and fixed complete (excluding the cost of
bolts, paints, but including the cost of nails,
screws etc.)
(The quantum should be corrected upto
three decimals)
(i) Sal : Siliguri. Cu.M 113732 100740 100740 100740 113732 100740 100740 100740 100740 98217 98217 94433 94433 94433 98217
(ii) Sal : Local. Cu.M 89345 83717 83717 83717 89345 83717 83717 83717 83717 83717 83717 83717 82468 82468 82468
(iii) Sal : Malayasian Cu.M 95964 86841 86841 86841 95964 86841 87465 87465 87465 87465 89340 - - - -
Page 86
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly
of Haldibari PS
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Bardhaman
Birbhum
Bankura
Sub Div
Item
Purulia
Malda
Nadia
Description of Items Unit
No.
(i) Sal : Siliguri. Cu.M 103101 90108 90108 90108 103101 90108 90108 90108 90108 87586 87586 83802 83802 83802 87586
(ii) Sal : Malayasian Cu.M 86069 76952 76952 76952 86069 76952 77577 77577 77577 77577 79450 - - - -
(iii) Local Sal. Cu.M 79454 73831 73831 73831 79454 73831 73831 73831 73831 73831 73831 73831 72583 72583 72583
Note: Extra for Lifting Charges:-
i) upto 4th floor Rs. 200/- per Cu.m
ii) Above 4th floor Rs. 250/- per Cu.m
5 Wood work in upper rails of railing, hand rail
of staircase, balcony etc. includig necessary
bend, moulding fitted and fixed complete (for
purpose of payment section will be
measured in the square).
(a) 1st class best Indian teak. Cu.M 191777 174641 168051 168051 191777 168051 166732 166732 166732 166732 166732 174641 166732 166732 166732
(b) Ordinary teak. Cu.M 148278 141687 128507 128507 148278 141687 128507 128507 135097 135097 135097 135097 135097 135097 135097
(c) Sishu, Gamar, Champ, Badam, Bhola,
Cu.M 101454 95579 95579 95579 101454 95579 95579 95579 95579 95579 98843 98843 95579 95579 95579
Morga, Hallak.
(d) Other Local Wood. Cu.M 44896 38352 38352 38352 44896 38352 38352 38352 38352 38352 38352 38352 39007 39007 39007
Note: Extra for Lifting Charges:-
i) upto 4th floor Rs. 200/- per Cu.m
ii) Above 4th floor Rs. 250/- per Cu.m
Page 87
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly
of Haldibari PS
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Bardhaman
Birbhum
Bankura
Sub Div
Item
Purulia
Malda
Nadia
Description of Items Unit
No.
(a) 1st class best Indian Teak. Metre 145 135 130 130 145 130 130 130 130 130 130 135 130 130 130
(b) Ordinary Teak Wood. Metre 118 114 106 106 118 114 106 106 110 110 110 110 110 110 110
(c) Sal : Siliguri. Metre 106 97 97 97 106 97 97 97 97 96 96 93 93 93 96
(d) Sal : Malayasian Metre 94 88 88 88 94 88 89 89 89 89 90 - - - -
(e) Local Sal. Metre 90 86 86 86 90 86 86 86 86 86 86 86 85 85 85
Page 88
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly
of Haldibari PS
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Bardhaman
Birbhum
Bankura
Sub Div
Item
Purulia
Malda
Nadia
Description of Items Unit
No.
(a) 1st class best Indian Teak. Each 425 389 375 375 425 375 373 373 373 373 373 390 373 373 373
(b) Ordinary Teak Wood. Each 330 316 289 289 330 316 289 289 303 303 303 303 303 303 303
(c) Sal : Siliguri. Each 289 261 261 261 289 261 261 261 261 255 255 247 247 247 255
(d) Sal : Malayasian Each 250 230 230 230 250 230 232 232 232 232 236 - - - -
(e) Local Sal. Each 236 223 223 223 236 223 223 223 223 223 223 224 221 221 221
11 M.S. sash bar upto 1200mm. Length with
coach screws and flat iron clamps 40mm X
6mm fitted and fixed complete.
(a) With 40mm. X 10mm flat. Each 296 250 250 250 250 250 250 250 250 250 250 253 250 250 250
(b) With 40mm. X 6mm flat. Each 212 182 182 182 182 182 182 182 182 182 182 184 182 182 182
12 Renewing M.S. sash bar upto 1200mm.
Length with coach screws (new) and flat iron
clamps (40mm X 6mm) fitted and fixed
complete.
(a) With 40mm. X 10mm flat. Each 313 267 267 267 267 267 267 267 267 267 267 270 267 267 267
(b) With 40mm. X 6mm flat. Each 229 199 199 199 199 199 199 199 199 199 199 201 199 199 199
13 Renewing M.S. clamps 40mm. X 6mm. Only
for sash bar fitted and fixed complete. Each 31 27 27 27 27 27 27 27 27 27 27 27 27 27 27
Page 89
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly
of Haldibari PS
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Bardhaman
Birbhum
Bankura
Sub Div
Item
Purulia
Malda
Nadia
Description of Items Unit
No.
Page 90
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly
of Haldibari PS
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Bardhaman
Birbhum
Bankura
Sub Div
Item
Purulia
Malda
Nadia
Description of Items Unit
No.
Page 91
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly
of Haldibari PS
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Bardhaman
Birbhum
Bankura
Sub Div
Item
Purulia
Malda
Nadia
Description of Items Unit
No.
Page 92
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly
of Haldibari PS
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Bardhaman
Birbhum
Bankura
Sub Div
Item
Purulia
Malda
Nadia
Description of Items Unit
No.
(a) 200mm long Each 155 155 155 155 155 155 155 155 155 155 155 160 155 155 155
(b) 250mm long. Each 184 184 184 184 184 184 184 184 184 184 184 189 184 184 184
(c) 300mm long. Each 193 193 193 193 193 193 193 193 193 193 193 201 193 193 193
ii) Brass hasp bolt of approved quality fitted
and fixed complete (oxidised) with 16mm dia
rod with centre bolt and round fitting.
(a) 200mm long Each 528 528 528 528 528 528 528 528 528 528 528 534 528 528 528
(b) 250mm long. Each 707 707 707 707 707 707 707 707 707 707 707 713 707 707 707
(c) 300mm long. Each 778 778 778 778 778 778 778 778 778 778 778 784 778 778 778
Page 93
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly
of Haldibari PS
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Bardhaman
Birbhum
Bankura
Sub Div
Item
Purulia
Malda
Nadia
Description of Items Unit
No.
(a) 100mm size Each 211 211 211 211 211 211 211 211 211 211 211 213 211 211 211
(b) 125mm size Each 270 270 270 270 270 270 270 270 270 270 270 276 270 270 270
(c) 150mm size Each 370 370 370 370 370 370 370 370 370 370 370 375 370 370 370
30 Iron Gravity Hinge (block patent best quality)
fitted and fixed complete. Each 132 132 132 132 132 132 132 132 132 132 132 135 132 132 132
Page 94
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly
of Haldibari PS
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Bardhaman
Birbhum
Bankura
Sub Div
Item
Purulia
Malda
Nadia
Description of Items Unit
No.
(d) With anodised aluminium decorative Each 1193 1193 1193 1193 1193 1193 1193 1193 1193 1193 1193 1199 1193 1193 1193
handle.
34 Renewing rebeated iron mortice lock (local
best approved quality) with handle,
connected rods and keys consisting a
complete set with I.S.I.
(a) With chromium mark.
plated handle. Each 1033 1033 1033 1033 1033 1033 1033 1033 1033 1033 1033 1051 1033 1033 1033
(b) With oxidised handle. Each 836 836 836 836 836 836 836 836 836 836 836 854 836 836 836
(c) With anodised aluminium white handle. Each 1146 1146 1146 1146 1146 1146 1146 1146 1146 1146 1146 1165 1146 1146 1146
(d) With anodised aluminium decorative Each 1223 1223 1223 1223 1223 1223 1223 1223 1223 1223 1223 1241 1223 1223 1223
handle.
35 Renewing mortice lock handle with
connected rod:
(a) With chromium plated. Pair 490 490 490 490 490 490 490 490 490 490 490 496 490 490 490
(b) Oxidised. Pair 431 431 431 431 431 431 431 431 431 431 431 443 431 431 431
(c) Anodised aluminium (white). Pair 550 550 550 550 550 550 550 550 550 550 550 562 550 550 550
(d) Anodised aluminium (decorative). Pair 758 758 758 758 758 758 758 758 758 758 758 776 758 758 758
36 (a) Supplying 'Godrej' mortice lock chromium Each 1223 1223 1223 1223 1223 1223 1223 1223 1223 1223 1223 1223 1223 1223 1223
plated with latch and keys 4 levers, including
fitting and fixing complete.
(b) Supplying 'Godrej' mortice lock Each 2264 2264 2264 2264 2264 2264 2264 2264 2264 2264 2264 2264 2264 2264 2264
chromium plated with keys 6levers including
fitting & fixing complete.
(c) Supplying 6levers 'Godrej' Crystal Satine Each 2199 2199 2199 2199 2199 2199 2199 2199 2199 2199 2199 2199 2199 2199 2199
Mortice Lock with keys including fitting &
fixing complete.
39 (i) Brass floor door stopper. Each 134 134 134 134 134 134 134 134 134 134 134 140 134 134 134
(ii) Anodised aluminium floor door stopper Each 78 78 78 78 78 78 78 78 78 78 78 84 78 78 78
(iii) Steel body foot-door holder. Each 75 75 75 75 75 75 75 75 75 75 75 80 75 75 75
40 Renewing iron catch hook of approved Each 26 26 26 26 26 26 26 26 26 26 26 27 26 26 26
quality for fan light or clerestory window
41 50mm size hinges
Renewing with 6mm
for rod.
fan light or clerestory Each 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18
window (iron).
Page 95
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly
of Haldibari PS
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Bardhaman
Birbhum
Bankura
Sub Div
Item
Purulia
Malda
Nadia
Description of Items Unit
No.
Page 96
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly
of Haldibari PS
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Bardhaman
Birbhum
Bankura
Sub Div
Item
Purulia
Malda
Nadia
Description of Items Unit
No.
Page 97
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly
of Haldibari PS
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Bardhaman
Birbhum
Bankura
Sub Div
Item
Purulia
Malda
Nadia
Description of Items Unit
No.
56 (a) Supplying fitting and fixing door made Sq.M 2850 2850 2850 2850 2850 2850 2850 2850 2850 2850 2850 2860 2850 2850 2850
with IRC febric mesh of 75mm x
50mmx4.5mmx2.7mm on 50mm x 50mm x
6mm angle iron frames all round and one
37.5mm x 6mm M.S. flat bar over the netting
all round welded to angle iron frame and
providing locking arrangements if necessary
and with two coats of synthetic enamel
paint(Other than Hi-gloss) fitted and fixed
with clamps or haskal doomney etc.
complete including flat stiffeners on every 1.0
(b) Renewing IRC febric mesh of 75mm x Sq.M 1707 1707 1707 1707 1707 1707 1707 1707 1707 1707 1707 1718 1707 1707 1707
50mmx4.5mmx2.7mm on 50mm x 50mm x
6mm old angle iron frames all round and
one 37.5mm x 6mm M.S. flat bar over the
netting all round welded to angle iron frame
and providing locking arrangements if
necessary and with two coats of synthetic
enamel paint(Other than Hi-gloss) fitted and
fixed with clamps or haskal doomney etc.
complete including flat stiffeners on every 1.0
57 m apart both
Renewing ways.
brass Cost
hasp andof staple
Concrete
for for
locking Each 56 56 56 56 56 56 56 56 56 56 56 57 56 56 56
arrangement 100mm long with brass screws
complete.
58 Repairs to automatic door closer including Each 367 367 367 367 367 367 367 367 367 367 367 379 367 367 367
replacement of damaged main spring, oiling
and adjusting as necessary including taking
out and refitting the same.
59 (A) Iron door ring of approved quality
fitted and fixed with nut and washer
complete.
(i) 50mm dia. Each 19 19 19 19 19 19 19 19 19 19 19 20 19 19 19
(ii) 75mm dia. Each 32 32 32 32 32 32 32 32 32 32 32 33 32 32 32
(B) Split shank iron door ring fitted and
fixed complete
(i) 50mm dia. Each 32 32 32 32 32 32 32 32 32 32 32 35 32 32 32
(ii) 75mm dia. Each 47 47 47 47 47 47 47 47 47 47 47 50 47 47 47
60 Supplying anodised aluminium catch hook
with eye fitted and fixed to shutter and
chowkat complete of best quality:
(i) 150mm long. Each 42 42 42 42 42 42 42 42 42 42 42 43 42 42 42
(ii) 225mm long. Each 49 49 49 49 49 49 49 49 49 49 49 50 49 49 49
Page 98
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly
of Haldibari PS
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Bardhaman
Birbhum
Bankura
Sub Div
Item
Purulia
Malda
Nadia
Description of Items Unit
No.
Page 99
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly
of Haldibari PS
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Bardhaman
Birbhum
Bankura
Sub Div
Item
Purulia
Malda
Nadia
Description of Items Unit
No.
Page 100
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly
of Haldibari PS
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Bardhaman
Birbhum
Bankura
Sub Div
Item
Purulia
Malda
Nadia
Description of Items Unit
No.
(v) 150 mm grip x 12 mm dia rod. Each 104 104 104 104 104 104 104 104 104 104 104 110 104 104 104
66 Anodised aluminium decorative handle
(hexagonal / fluted) of approed quality fitted
and fixed complete.
(i) 150mm plate x 10mm dia rod x 12mm Each 99 99 99 99 99 99 99 99 99 99 99 110 99 99 99
hexagonal/fluted.
(ii) 175mm plate x 12mm dia rod x 60mm Each 114 114 114 114 114 114 114 114 114 114 114 120 114 114 114
hexagonal / fluted.
67 (a) Metallic magic eye of approved quality Each 61 61 61 61 61 61 61 61 61 61 61 73 61 61 61
fitted and fixed complete.
(b) Plastic magic eye of approved quality Each 43 43 43 43 43 43 43 43 43 43 43 49 43 43 43
fitted and fixed complete.
68 Anodised aluminium grip handle with base
plate of approved quality fitted and fixed
complete.
(a) With base plate.
(i) 165mm grip x 12mm dia rod x 42mm plate Each 167 167 167 167 167 167 167 167 167 167 167 179 167 167 167
x 3.2mm thick.
(ii) 225mm grip x 16mm dia rod x 38mm Each 202 202 202 202 202 202 202 202 202 202 202 208 202 202 202
plate x 3.2mm thick.
(iii) 300mm grip x 20mm dia rod x 50mm Each 239 239 239 239 239 239 239 239 239 239 239 245 239 239 239
plate x 3.2mm thick.
69 Supplying fitting and fixing 4mm thick acrylic Sq.M 706 706 706 706 706 706 706 706 706 706 706 712 706 706 706
ornamental finger plate made of transparent
acrylic sheet including providing holes of
knobs and keys as per existing shutter and
chamfering the edges of the acrylic sheet.
70 Iron door handle of approved quality fitted
and fixed complete:
(i) 100mm x 5mm. Each 45 45 45 45 45 45 45 45 45 45 45 46 45 45 45
(ii) 150mm x 5.5mm. Each 57 57 57 57 57 57 57 57 57 57 57 58 57 57 57
71 Supplying , fitting and fixing Godrej ultra Each 1937 1937 1937 1937 1937 1937 1937 1937 1937 1937 1937 1967 1937 1937 1937
vertibold brass rim lock.
72 Labour for taking out door and window frame
including shutter for repair or replacement of
different parts of the frame & refixing the
same including mending good all damaes
complete. (Concrete and brick work for
mending
(a) damage
Upto area 2.5 will
Sq.mbe paid separately) Sq.M 121 121 121 121 121 121 121 121 121 121 121 121 121 121 121
(b) Above area 2.5 Sq.m Sq.M 148 148 148 148 148 148 148 148 148 148 148 148 148 148 148
Page 101
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly
of Haldibari PS
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Bardhaman
Birbhum
Bankura
Sub Div
Item
Purulia
Malda
Nadia
Description of Items Unit
No.
73 Taking out shutter of door and window, Sq.M 128 128 128 128 128 128 128 128 128 128 128 128 128 128 128
dismantling by parts (for repair or
replacement of damaged parts),
reassembling and refitting and rehanging
same with old fittings but with new screws as
necessary. (Where different parts of same
shutter are renewed under different item,
74 payment
Taking outunder
dooritemand73window
will be shutters
made onceand
rehanging the same with old fittings.
(a) With new iron screws. Sq.M 78 78 78 78 78 78 78 78 78 78 78 78 78 78 78
(b) With old screws. Sq.M 67 67 67 67 67 67 67 67 67 67 67 67 67 67 67
(a) 1st class best Indian Teak. Sq.M 2143 2024 1978 1978 2143 1978 1969 1969 1969 1969 1969 2024 1969 1969 1969
(b) Ordinary Teak Wood. Sq.M 1841 1795 1703 1703 1841 1795 1703 1703 1749 1749 1749 1749 1749 1749 1749
(c) Sishu, Gamar, Champ,Badam,Bhola, Sq.M 1515 1474 1474 1474 1515 1474 1474 1474 1474 1474 1474 1496 1474 1474 1474
Mogra, Hallak.
(c) Other Local Wood. Sq.M 1215 1169 1169 1169 1215 1169 1169 1169 1169 1169 1169 1169 1174 1174 1174
(This is a repair item. Item No. 73 or 74
will be admissible in addition).
77 Renewing plated hook of Venetian Valve Each 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16
with screws.
78 Renewing valve rod of size 37.5mmx
37.5mm for Venetian Shutters fitted and
fixed with old plated screw
(a) Sishu, Gamar, Champ,Badam,Bhola, Metre 328 313 313 313 328 313 313 313 313 313 313 321 313 313 313
Mogra, Hallak.
(b) Other Local Wood. Metre 213 195 195 195 213 195 195 195 195 195 195 195 197 197 197
79 Strengthening corners of shutters with M.S.
corner plate fitted with screws:
(a) With 4.5mm thick plate. Each 29 29 29 29 29 29 29 29 29 29 29 29 29 29 29
Page 102
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly
of Haldibari PS
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Bardhaman
Birbhum
Bankura
Sub Div
Item
Purulia
Malda
Nadia
Description of Items Unit
No.
Page 103
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly
of Haldibari PS
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Bardhaman
Birbhum
Bankura
Sub Div
Item
Purulia
Malda
Nadia
Description of Items Unit
No.
(b) Sishu, Gamar, Champ,Badam,Bhola, Sq.M 2802 2647 2647 2647 2802 2647 2647 2647 2647 2647 2647 2733 2647 2647 2647
Mogra, Hallak.
(c) Other Local Wood. Sq.M 1667 1496 1496 1496 1667 1496 1496 1496 1496 1496 1496 1496 1513 1513 1513
(v) 45mm. Thick shutter.
(a) Ordinary Teak Wood. Sq.M 4470 4272 3877 3877 4470 4272 3877 3877 4075 4075 4075 4075 4075 4075 4075
(b) Sishu, Gamar, Champ,Badam,Bhola, Sq.M 3066 2890 2890 2890 3066 2890 2890 2890 2890 2890 2890 2988 2890 2890 2890
Mogra, Hallak.
(c) Other Local Wood. Sq.M 1775 1579 1579 1579 1775 1579 1579 1579 1579 1579 1579 1579 1599 1599 1599
(vi) 50mm. Thick shutter.
(a) 1st class best Indian teak. Sq.M 6308 5746 5530 5530 6308 5530 5486 5486 5486 5486 5486 5746 5486 5486 5486
(b) Ordinary Teak Wood. Sq.M 4881 4665 4232 4232 4881 4665 4232 4232 4448 4448 4448 4448 4448 4448 4448
Page 104
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly
of Haldibari PS
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Bardhaman
Birbhum
Bankura
Sub Div
Item
Purulia
Malda
Nadia
Description of Items Unit
No.
(b) Ordinary Teak Wood. Sq.M 2099 2016 1851 1851 2099 2016 1851 1851 1933 1933 1933 1933 1933 1933 1933
(c) Sishu, Gamar, Champ,Badam,Bhola, Sq.M 1511 1437 1437 1437 1511 1437 1437 1437 1437 1437 1437 1478 1437 1437 1437
Mogra, Hallak.
(c) Other Local Wood. Sq.M 877 816 816 816 877 816 816 816 816 816 816 816 822 822 822
(This is a repair item, Item No. 73 will be
admissible in addition). Lifting Charges
for upper floors refer item 86.
84 Panel shutters of door and window, as per
design (each panel consisting of single plank
without joint), including fitting and fixing the
same in position but excluding the cost of
hinge and other fittings.
In ground floor.
(In case of non-supply of single plank,
penal rate of reduction of 20% will be
made)
(i) 50mm thick shutters with 25mm thick
panel of size 30to 45 Cm.
(a) 1st class best Indian teak. Sq.M 8442 7664 7365 7365 8442 7365 7305 7305 7305 7305 7305 7664 7305 7305 7305
(b) Ordinary teak wood. Sq.M 6468 6169 5571 5571 6468 6169 5571 5571 5870 5870 5870 5870 5870 5870 5870
(ii) 40mm thick shutters with 19mm thick
panel of size 30to 45 Cm.
(a) Ordinary Teak Wood. Sq.M 5237 5002 4532 4532 5237 5002 4532 4532 4767 4767 4767 4767 4767 4767 4767
(b) Sishu, Gamar, Champ,Badam,Bhola, Sq.M 3568 3358 3358 3358 3568 3358 3358 3358 3358 3358 3358 3474 3358 3358 3358
Mogra, Hallak.
(c) Other Local Wood. Sq.M 2032 1799 1799 1799 2032 1799 1799 1799 1799 1799 1799 1799 1822 1822 1822
(iii) 35mm thick shutters with 19mm thick
panel of size 30to 45 Cm.
(a) Ordinary Teak Wood. Sq.M 4852 4639 4211 4211 4852 4639 4211 4211 4425 4425 4425 4425 4425 4425 4425
(b) Sishu, Gamar, Champ,Badam,Bhola, Sq.M 3335 3144 3144 3144 3335 3144 3144 3144 3144 3144 3144 3250 3144 3144 3144
Mogra, Hallak.
(c) Other Local Wood. Sq.M 1939 1727 1727 1727 1939 1727 1727 1727 1727 1727 1727 1727 1748 1748 1748
(iv) 25mm thick shutters with 12mm thick
panel of size 30to 45 Cm.
(a) Ordinary Teak Wood. Sq.M 3570 3423 3129 3129 3570 3423 3129 3129 3276 3276 3276 3276 3276 3276 3276
(b) Sishu, Gamar, Champ,Badam,Bhola, Sq.M 2527 2396 2396 2396 2527 2396 2396 2396 2396 2396 2396 2469 2396 2396 2396
Mogra, Hallak.
(c) Other Local Wood. Sq.M 1567 1422 1422 1422 1567 1422 1422 1422 1422 1422 1422 1422 1436 1436 1436
Page 105
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly
of Haldibari PS
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Bardhaman
Birbhum
Bankura
Sub Div
Item
Purulia
Malda
Nadia
Description of Items Unit
No.
Page 106
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly
of Haldibari PS
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Bardhaman
Birbhum
Bankura
Sub Div
Item
Purulia
Malda
Nadia
Description of Items Unit
No.
(b) Sishu, Gamar, Champ,Badam,Bhola, Sq.M 4214 4028 4028 4028 4214 4028 4028 4028 4028 4028 4028 4132 4028 4028 4028
Mogra, Hallak.
(c) Other Local Wood. Sq.M 2851 2644 2644 2644 2851 2644 2644 2644 2644 2644 2644 2644 2665 2665 2665
(iii) 35mm thick shutters with 12mm thick
valve.
(a) Ordinary Teak Wood. Sq.M 5245 5062 4695 4695 5245 5062 4695 4695 4878 4878 4878 4878 4878 4878 4878
(b) Sishu, Gamar, Champ,Badam,Bhola, Sq.M 3941 3778 3778 3778 3941 3778 3778 3778 3778 3778 3778 3869 3778 3778 3778
Mogra, Hallak.
(c) Other Local Wood. Sq.M 2742 2560 2560 2560 2742 2560 2560 2560 2560 2560 2560 2560 2578 2578 2578
(iv) 25mm thick shutters with 12mm thick
valve.
(a) Ordinary Teak Wood. Sq.M 4250 4108 3825 3825 4250 4108 3825 3825 3966 3966 3966 3966 3966 3966 3966
(b) Sishu, Gamar, Champ,Badam,Bhola, Sq.M 3242 3116 3116 3116 3242 3116 3116 3116 3116 3116 3116 3186 3116 3116 3116
Mogra, Hallak.
(c) Other Local Wood. Sq.M 2315 2175 2175 2175 2315 2175 2175 2175 2175 2175 2175 2175 2189 2189 2189
Page 107
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly
of Haldibari PS
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Bardhaman
Birbhum
Bankura
Sub Div
Item
Purulia
Malda
Nadia
Description of Items Unit
No.
(a) Ordinary Teak Wood. Sq.M 3278 3175 2968 2968 3278 3175 2968 2968 3071 3071 3071 3071 3071 3071 3071
(b) Sishu, Gamar, Champ,Badam,Bhola, Sq.M 2544 2451 2451 2451 2544 2451 2451 2451 2451 2451 2451 2503 2451 2451 2451
Mogra, Hallak.
(c) Other Local Wood. Sq.M 1868 1765 1765 1765 1868 1765 1765 1765 1765 1765 1765 1765 1776 1776 1776
Note: i) Lifting Charges for upper floors
refer item 86.
Page 108
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly
of Haldibari PS
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Bardhaman
Birbhum
Bankura
Sub Div
Item
Purulia
Malda
Nadia
Description of Items Unit
No.
(b) Sishu, Gamar, Champ,Badam,Bhola, Sq.M 3470 3293 3293 3293 3470 3293 3293 3293 3293 3293 3293 3391 3293 3293 3293
Mogra, Hallak.
(c) Other Local Wood. Sq.M 2174 1978 1978 1978 2174 1978 1978 1978 1978 1978 1978 1978 1997 1997 1997
(iii) 35mm thick shutters with 19mm thick
panel.
(a) Ordinary Teak Wood. Sq.M 4446 4271 3923 3923 4446 4271 3923 3923 4097 4097 4097 4097 4097 4097 4097
(b) Sishu, Gamar, Champ,Badam,Bhola, Sq.M 3208 3053 3053 3053 3208 3053 3053 3053 3053 3053 3053 3139 3053 3053 3053
Mogra, Hallak.
(c) Other Local Wood. Sq.M 2069 1897 1897 1897 2069 1897 1897 1897 1897 1897 1897 1897 1914 1914 1914
(iv) 25mm thick shutters with 12mm thick
panel.
(a) Ordinary Teak Wood. Sq.M 3409 3283 3031 3031 3409 3283 3031 3031 3157 3157 3157 3157 3157 3157 3157
(b) Sishu, Gamar, Champ,Badam,Bhola, Sq.M 2513 2401 2401 2401 2513 2401 2401 2401 2401 2401 2401 2463 2401 2401 2401
Mogra, Hallak.
(c) Other Local Wood. Sq.M 1688 1564 1564 1564 1688 1564 1564 1564 1564 1564 1564 1564 1576 1576 1576
Note: i) Lifting Charges for upper floors refer
item 86.
91 Shutters of 2/3rd panel and 1/3rd glazed of
doors and windows as per design (each
panel consisting of a single plank without
joint and with ordinary glass of 7.4kg. Per
sq.m./3mm thick) fitted with putty bed and
teak wood beads and nails including fitting
and fixing shutters in position but excluding
the cost of glass , putty , teak bead, nails,
hinges etc. and other fittings, in ground floor.
Page 109
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly
of Haldibari PS
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Bardhaman
Birbhum
Bankura
Sub Div
Item
Purulia
Malda
Nadia
Description of Items Unit
No.
(a) Ordinary Teak Wood. Sq.M 4966 4768 4371 4371 4966 4768 4371 4371 4570 4570 4570 4570 4570 4570 4570
(b) Sishu, Gamar, Champ,Badam,Bhola, Sq.M 3558 3381 3381 3381 3558 3381 3381 3381 3381 3381 3381 3479 3381 3381 3381
Mogra, Hallak.
(c) Other Local Wood. Sq.M 2259 2063 2063 2063 2259 2063 2063 2063 2063 2063 2063 2063 2082 2082 2082
(iv) 25mm thick shutters with 12mm thick
panel.
(a) Ordinary Teak Wood. Sq.M 3797 3659 3382 3382 3797 3659 3382 3382 3520 3520 3520 3520 3520 3520 3520
(b) Sishu, Gamar, Champ,Badam,Bhola, Sq.M 2815 2692 2692 2692 2815 2692 2692 2692 2692 2692 2692 2761 2692 2692 2692
Mogra, Hallak.
(c) Other Local Wood. Sq.M 1909 1772 1772 1772 1909 1772 1772 1772 1772 1772 1772 1772 1786 1786 1786
Note: i) Lifting Charges for upper floors
refer item 86.
(ii) In case of panel with Rly. Type battens
the rate will be reduced by Rs. 12.00 per
Sq.m]
92 Shutter of 1/3rd fixed louvered, 2/3rd glazed
of doors as per design (with ordinary glass of
7.4kg per sq.m./3mm. Thick) fixed with putty
bed, teak wood beads and nails including
fitting and fixing shutters in position but
excluding the cost of glass , putty , teak
bead, nails, hinges etc. and other fittings, in
ground floor.
(i) 50mm thick shutters with 19mm thick
valve.
(a) 1st class best Indian teak. Sq.M 6820 6246 6026 6026 6820 6026 5982 5982 5982 5982 5982 6246 5982 5982 5982
(b) Ordinary teak. Sq.M 5364 5143 4701 4701 5364 5143 4701 4701 4922 4922 4922 4922 4922 4922 4922
(ii) 40mm thick shutters with 12mm thick
valve.
(a) Ordinary Teak Wood. Sq.M 4509 4335 3989 3989 4509 4335 3989 3989 4162 4162 4162 4162 4162 4162 4162
(b) Sishu, Gamar, Champ,Badam,Bhola, Sq.M 3278 3124 3124 3124 3278 3124 3124 3124 3124 3124 3124 3209 3124 3124 3124
Mogra, Hallak.
(c) Other Local Wood. Sq.M 2143 1971 1971 1971 2143 1971 1971 1971 1971 1971 1971 1971 1988 1988 1988
(iii) 35mm thick shutters with 12mm thick
valve.
(a) Ordinary Teak Wood. Sq.M 3966 3818 3522 3522 3966 3818 3522 3522 3670 3670 3670 3670 3670 3670 3670
(b) Sishu, Gamar, Champ,Badam,Bhola, Sq.M 2914 2782 2782 2782 2914 2782 2782 2782 2782 2782 2782 2855 2782 2782 2782
Mogra, Hallak.
(c) Other Local Wood. Sq.M 1943 1796 1796 1796 1943 1796 1796 1796 1796 1796 1796 1796 1811 1811 1811
Page 110
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly
of Haldibari PS
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Bardhaman
Birbhum
Bankura
Sub Div
Item
Purulia
Malda
Nadia
Description of Items Unit
No.
Page 111
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly
of Haldibari PS
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Bardhaman
Birbhum
Bankura
Sub Div
Item
Purulia
Malda
Nadia
Description of Items Unit
No.
(c) Other Local Wood. Sq.M 1846 1721 1721 1721 1846 1721 1721 1721 1721 1721 1721 1721 1734 1734 1734
Note: i) Lifting Charges for upper floors
refer item 86.
Page 112
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly
of Haldibari PS
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Bardhaman
Birbhum
Bankura
Sub Div
Item
Purulia
Malda
Nadia
Description of Items Unit
No.
Page 113
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly
of Haldibari PS
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Bardhaman
Birbhum
Bankura
Sub Div
Item
Purulia
Malda
Nadia
Description of Items Unit
No.
Page 114
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly
of Haldibari PS
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Bardhaman
Birbhum
Bankura
Sub Div
Item
Purulia
Malda
Nadia
Description of Items Unit
No.
Page 115
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly
of Haldibari PS
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Bardhaman
Birbhum
Bankura
Sub Div
Item
Purulia
Malda
Nadia
Description of Items Unit
No.
Page 116
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly
of Haldibari PS
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Bardhaman
Birbhum
Bankura
Sub Div
Item
Purulia
Malda
Nadia
Description of Items Unit
No.
Page 117
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly
of Haldibari PS
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Bardhaman
Birbhum
Bankura
Sub Div
Item
Purulia
Malda
Nadia
Description of Items Unit
No.
Page 118
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly
of Haldibari PS
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Bardhaman
Birbhum
Bankura
Sub Div
Item
Purulia
Malda
Nadia
Description of Items Unit
No.
(b) 32 mm thick shutters (single leaf) Sq.M. 2785 2785 2785 2785 2785 2785 2785 2785 2785 2785 2785 3047 2785 2785 2785
Page 119
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly
of Haldibari PS
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Bardhaman
Birbhum
Bankura
Sub Div
Item
Purulia
Malda
Nadia
Description of Items Unit
No.
(a) 35mm thick shutters (single leaf) Sq.M. 4689 4689 4689 4689 4689 4689 4689 4689 4689 4689 4689 5141 4689 4689 4689
(b) 25mm thick shutters (single leaf) Sq.M. 4483 4483 4483 4483 4483 4483 4483 4483 4483 4483 4483 4914 4483 4483 4483
Page 120
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly
of Haldibari PS
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Bardhaman
Birbhum
Bankura
Sub Div
Item
Purulia
Malda
Nadia
Description of Items Unit
No.
(b) Sq.M. 1143 1076 1076 1076 1143 1076 1076 1076 1076 1076 1076 1114 1076 1076 1076
Sishu/Champ/Badam/Gamar/Bhola/Mogra/H
allak
(For upper floors refer to item 128 )
106 Wall panelling / partition with Melamine
faced 3 layered flat pressed wood particle
board of approved make and brand as per
direction of Engineer - in - Charge of
requisite grade bonded with phenol
formaldehyde synthetic resin conforming to
IS: 848 - 1974 (excluding the cost of
supporting frame work and teak wood
battens / lipping)
In Ground Floor
(A) Plain : Conforming to IS: 3087 - 1985
a) 9 mm thick Sq.M. 746 746 746 746 746 746 746 746 746 746 746 773 746 746 746
b) 12 mm thick. Sq.M. 914 914 914 914 914 914 914 914 914 914 914 950 914 914 914
c) 18 mm thick. Sq.M. 1212 1212 1212 1212 1212 1212 1212 1212 1212 1212 1212 1263 1212 1212 1212
a) Exterior grade
9mm thick Sq.M. 1189 1189 1189 1189 1189 1189 1189 1189 1189 1189 1189 1244 1189 1189 1189
12mm thick Sq.M. 1242 1242 1242 1242 1242 1242 1242 1242 1242 1242 1242 1257 1242 1242 1242
9mm thick Sq.M. 983 983 983 983 983 983 983 983 983 983 983 1007 983 983 983
12mm thick Sq.M. 1203 1203 1203 1203 1203 1203 1203 1203 1203 1203 1203 1257 1203 1203 1203
Page 121
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly
of Haldibari PS
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Bardhaman
Birbhum
Bankura
Sub Div
Item
Purulia
Malda
Nadia
Description of Items Unit
No.
9mm thick Sq.M. 1292 1292 1292 1292 1292 1292 1292 1292 1292 1292 1292 1319 1292 1292 1292
12mm thick Sq.M. 1507 1507 1507 1507 1507 1507 1507 1507 1507 1507 1507 1569 1507 1507 1507
9mm thick Sq.M. 1007 1007 1007 1007 1007 1007 1007 1007 1007 1007 1007 1069 1007 1007 1007
12mm thick Sq.M. 1257 1257 1257 1257 1257 1257 1257 1257 1257 1257 1257 1319 1257 1257 1257
Page 122
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly
of Haldibari PS
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Bardhaman
Birbhum
Bankura
Sub Div
Item
Purulia
Malda
Nadia
Description of Items Unit
No.
(ii) 19mm Sq.M. 2113 2113 2113 2113 2113 2113 2113 2113 2113 2113 2113 2200 2113 2113 2113
(iii) 25mm Sq.M. 2863 2863 2863 2863 2863 2863 2863 2863 2863 2863 2863 2988 2863 2863 2863
(b) Local Sal Sq.M. 218 211 211 211 218 211 211 211 211 211 211 217 209 209 209
(c) Sq.M. 215 209 209 209 215 209 209 209 209 209 209 219 209 209 209
Sishu/Champ/Badam/Gamar/Bhola/Mogra/H
allak
111 Hessian partition as per design fitted and
fixed complete (excluding supporting
framework but including necessary wood
battens of size 25 mmx25 mm).
(a) malayasian Sal Sq.M. 193 182 182 182 193 182 184 184 184 184 185
(b) Local Sal Sq.M. 185 179 179 179 185 179 179 179 179 179 179 185 177 177 177
(c) Sq.M. 183 176 176 176 183 176 176 176 176 176 176 187 176 176 176
Sishu/Champ/Badam/Gamar/Bhola/Mogra/H
allak
Page 123
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly
of Haldibari PS
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Bardhaman
Birbhum
Bankura
Sub Div
Item
Purulia
Malda
Nadia
Description of Items Unit
No.
(c) Sq.M. 252 245 245 245 252 245 245 245 245 245 245 254 245 245 245
Sishu/Gamar/Champ/Badam/Bhola/Mogra/H
allak
115 Renewing canvas only of ceiling including Sq.M. 124 124 124 124 124 124 124 124 124 124 124 129 124 124 124
taking out old battens etc. and refixing the
same with new screws.
Page 124
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly
of Haldibari PS
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Bardhaman
Birbhum
Bankura
Sub Div
Item
Purulia
Malda
Nadia
Description of Items Unit
No.
In Ground Floor
(a) Ordinary Teak Sq.M. 630 618 593 593 630 618 593 593 605 605 605 618 605 605 605
(b) Sal Local Sq.M. 546 535 535 535 546 535 535 535 535 535 535 547 532 532 532
Page 125
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly
of Haldibari PS
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Bardhaman
Birbhum
Bankura
Sub Div
Item
Purulia
Malda
Nadia
Description of Items Unit
No.
Page 126
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly
of Haldibari PS
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Bardhaman
Birbhum
Bankura
Sub Div
Item
Purulia
Malda
Nadia
Description of Items Unit
No.
In Ground Floor
(i) 4mm thick Sq.M. 718 706 681 681 718 706 681 681 693 693 693 781 693 693 693
(ii) 6mm thick Sq.M. 906 893 868 868 906 893 868 868 881 881 881 987 881 881 881
(iii) 12mm thick Sq.M. 1218 1206 1181 1181 1218 1206 1181 1181 1193 1193 1193 1256 1193 1193 1193
(a) Ordinary teak Mtr. 116 112 104 104 116 112 104 104 108 108 108 108 108 108 108
(b) Mtr. 87 83 83 83 87 83 83 83 83 83 83 85 83 83 83
Sishu/Champ/Badam/Gamar/Bhola/Mogra/H
allak
Page 127
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly
of Haldibari PS
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Bardhaman
Birbhum
Bankura
Sub Div
Item
Purulia
Malda
Nadia
Description of Items Unit
No.
Page 128
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly
of Haldibari PS
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Bardhaman
Birbhum
Bankura
Sub Div
Item
Purulia
Malda
Nadia
Description of Items Unit
No.
(c) other Local wood Sq.M. 1136 917 917 917 917 917 917 917 917 917 917 917 939 939 939
Page 129
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly
of Haldibari PS
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Bardhaman
Birbhum
Bankura
Sub Div
Item
Purulia
Malda
Nadia
Description of Items Unit
No.
(a) 19mm mesh. Sq.M. 471 455 455 455 471 455 455 455 455 455 455 462 452 452 452
(b) 25mm mesh Sq.M. 442 426 426 426 442 426 426 426 426 426 426 431 422 422 422
(c) 37.5mm mesh Sq.M. 421 405 405 405 421 405 405 405 405 405 405 409 401 401 401
(a) 19mm mesh. Sq.M. 240 240 240 240 240 240 240 240 240 240 240 247 240 240 240
(b) 25mm mesh Sq.M. 210 210 210 210 210 210 210 210 210 210 210 216 210 210 210
(c) 37.5mm mesh Sq.M. 189 189 189 189 189 189 189 189 189 189 189 193 189 189 189
Page 130
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly
of Haldibari PS
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Bardhaman
Birbhum
Bankura
Sub Div
Item
Purulia
Malda
Nadia
Description of Items Unit
No.
(a) 50mm x 25mm x 2.7mm x 2.7mm. Sq.M. 263 263 263 263 263 263 263 263 263 263 263 271 263 263 263
(b) 75mm x 25mm x 2.7mm x 2.7mm. Sq.M. 257 257 257 257 257 257 257 257 257 257 257 264 257 257 257
(c) 75mm x 25mm x 4.5mm x 2.7mm. Sq.M. 303 303 303 303 303 303 303 303 303 303 303 313 303 303 303
(d) 75mm x 50mm x 4.5mm x 3.0mm. Sq.M. 259 259 259 259 259 259 259 259 259 259 259 267 259 259 259
(e) 75mm x 50mm x 2.7mm x 2.7mm. Sq.M. 256 256 256 256 256 256 256 256 256 256 256 263 256 256 256
(f) 75mm x75mm x 4.5mm x 4.5mm. Sq.M. 308 308 308 308 308 308 308 308 308 308 308 318 308 308 308
(g) 75mm x 75mm x 2.7mm x 2.7mm. Sq.M. 227 227 227 227 227 227 227 227 227 227 227 232 227 227 227
(h) 100mm x 100mm x 2.7mm x 2.7mm. Sq.M. 206 206 206 206 206 206 206 206 206 206 206 211 206 206 206
(i) 25mm x 25mm x 2.7mm x 2.7mm. Sq.M. 350 350 350 350 350 350 350 350 350 350 350 361 350 350 350
(j) 25mm x 25mm x 2.2mm x 2.2mm. Sq.M. 223 223 223 223 223 223 223 223 223 223 223 228 223 223 223
140 Renewing G.I. sheet door with old sheet but Sq.M. 1941 1842 1842 1842 1941 1842 1842 1842 1842 1842 1842 1842 1820 1820 1820
with new local sal wood frame (styles, rails
and diagonal braces 100mm x 35mm)
including fitting, fixing with proper screws and
rehanging shutter with haskal and doomney
(excluding the cost of haskal and doomney).
141 Renewing G.I. sheet door with new sheet Sq.M. 820 820 820 820 820 820 820 820 820 820 820 820 820 820 820
0.63mm th. but with old local sal wood frame
(styles, rails and diagonal braces 100mm x
35mm) including fitting, fixing with proper
screws and rehanging shutter with haskal
and doomney (excluding the cost of haskal
and doomney).
Page 131
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly
of Haldibari PS
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Bardhaman
Birbhum
Bankura
Sub Div
Item
Purulia
Malda
Nadia
Description of Items Unit
No.
142 (a) Supplying, fitting fixing I.S.I. approved Set 2427 2427 2427 2427 2427 2427 2427 2427 2427 2427 2427 2534 2427 2427 2427
quality and brand hydraulic (oil check) floor
door spring, heavy duty double action with
brass shoe, brass top centre aluminium top
cover etc. complete set as per direction of
Engineer-in-charge.
(b) Supplying, fitting fixing Godrej type Set 4212 4212 4212 4212 4212 4212 4212 4212 4212 4212 4212 4408 4212 4212 4212
hydraulic (oil check) floor door spring, heavy
duty double action with brass shoe, brass top
centre aluminium top cover etc. complete set
as per direction of Engineer-in-charge.
(ii) 66mm x 70mm Mtr. 525 525 525 525 525 525 525 525 525 525 525 549 525 525 525
Page 132
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly
of Haldibari PS
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Bardhaman
Birbhum
Bankura
Sub Div
Item
Purulia
Malda
Nadia
Description of Items Unit
No.
145 Supplying, Fitting & Fixing 30 mm thick Sq.m 2277 2277 2277 2277 2277 2277 2277 2277 2277 2277 2277 2380 2277 2277 2277
Factory made solid Panel PVC Door Shutter
consisting of outer frame made out of M.S.
tubes of 19 gauge thickness and size 19
mmx19 mm for styles, top and bottom rails,
M.S. frame shall have cost of steel primers of
approved make and manufacture, M.S.
frame covered with 5 mm th. heat moulded
PVC C channel of size 30 mm th, 70 mm
width out of which 50 mm shall be flat and 20
mm shall be tapered in 45 degree angle on
either sides forming styles; and 5 mm th. 95
mm wide PVC sheet out of which 75 mm
shall be flat and 20 mm tapered in 45 degree
on the inner side to form top & bottom rail
and 115 mm wide PVC sheet out of which
75mm shall be flat and 20 mm shall be
tapered on both sides to form lock rail. Top,
bottom and lock rails shall be provided either
side of the panel with 10 mm (5 mmx2) th.,20
mm wide cross PVC sheet as gap insert for
top rail and bottom rail. Paneling of 5 mm th.
both side PVC sheet to be fitted in the M.S.
frame welded/sealed to the styles &rails with
7 mm (5 mm+2 mm) th.x15 mm wide PVC
sheet beading on inner side and joined
together with solvent cement adhesive. An
additional 5 mm th. PVC strip of 20 mm
Page 133
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly
of Haldibari PS
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Bardhaman
Birbhum
Bankura
Sub Div
Item
Purulia
Malda
Nadia
Description of Items Unit
No.
146 Supplying, Fitting & Fixing 30 mm thick both Sq.m 2868 2868 2868 2868 2868 2868 2868 2868 2868 2868 2868 3000 2868 2868 2868
side prelaminated Factory made solid Panel
PVC Door Shutter consisting of outer frame
made out of M.S. tubes of 19 gauge
thickness and size 19 mmx19 mm for styles,
top and bottom rails, M.S. frame shall have
cost of steel primers of approved make and
manufacture, M.S. frame covered with 5 mm
th. heat moulded PVC C channel of size 30
mm th, 70 mm width out of which 50 mm
shall be flat and 20 mm shall be tapered in
45 degree angle on either sides forming
styles; and 5 mm th. 95 mm wide PVC sheet
out of which 75 mm shall be flat and 20 mm
tapered in 45 degree on the inner side to
form top & bottom rail and 115 mm wide
PVC sheet out of which 75mm shall be flat
and 20 mm shall be tapered on both sides to
form lock rail. Top, bottom and lock rails
shall be provided either side of the panel with
10 mm (5 mmx2) th.,20 mm wide cross PVC
sheet as gap insert for top rail and bottom
rail sheet to be fitted in the M.S. frame
welded/sealed to the styles &rails with 7 mm
(5 mm+2 mm) th.x15 mm wide PVC sheet
beading on inner side and joined together
with solvent cement adhesive. An additional
5 mm th. PVC strip of 20 mm which is to be
Page 134
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly
of Haldibari PS
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Bardhaman
Birbhum
Bankura
Sub Div
Item
Purulia
Malda
Nadia
Description of Items Unit
No.
147 Supplying, Fitting & Fixing 30 mm thick Sq.m 2677 2677 2677 2677 2677 2677 2677 2677 2677 2677 2677 2800 2677 2677 2677
Double Leaf Factory made solid Panel PVC
Door Shutter consisting of outer frame made
out of M.S. tubes of 19 gauge thickness and
size 19 mmx19 mm for styles, top and
bottom rails, M.S. frame shall have cost of
steel primers of approved make and
manufacture, M.S. frame covered with 5 mm
th. heat moulded PVC C channel of size 30
mm th, 70 mm width out of which 50 mm
shall be flat and 20 mm shall be tapered in
45 degree angle on either sides forming
styles; and 5 mm th. 95 mm wide PVC sheet
out of which 75 mm shall be flat and 20 mm
tapered in 45 degree on the inner side to
form top & bottom rail and 115 mm wide
PVC sheet out of which 75mm shall be flat
and 20 mm shall be tapered on both sides to
form lock rail. Top, bottom and lock rails
shall be provided either side of the panel with
10 mm (5 mmx2) th.,20 mm wide cross PVC
sheet as gap insert for top rail and bottom
rail. Paneling of 5 mm th. both side PVC
sheet to be fitted in the M.S. frame
welded/sealed to the styles &rails with 7 mm
(5 mm+2 mm) th.x15 mm wide PVC sheet
beading on inner side and joined together
with solvent cement adhesive. An additional
5 mm th. PVC strip of 20 mm which is to be
Page 135
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly
of Haldibari PS
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Bardhaman
Birbhum
Bankura
Sub Div
Item
Purulia
Malda
Nadia
Description of Items Unit
No.
148 Supplying, Fitting & Fixing 30 mm thick thick Sq.m 3197 3197 3197 3197 3197 3197 3197 3197 3197 3197 3197 3346 3197 3197 3197
both side prelaminated Double Leaf Factory
made solid Panel PVC Door Shutter
consisting of outer frame made out of M.S.
tubes of 19 gauge thickness and size 19
mmx19 mm for styles, top and bottom rails,
M.S. frame shall have cost of steel primers of
approved make and manufacture, M.S.
frame covered with 5 mm th. heat moulded
PVC C channel of size 30 mm th, 70 mm
width out of which 50 mm shall be flat and 20
mm shall be tapered in 45 degree angle on
either sides forming styles; and 5 mm th. 95
mm wide PVC sheet out of which 75 mm
shall be flat and 20 mm tapered in 45 degree
on the inner side to form top & bottom rail
and 115 mm wide PVC sheet out of which
75mm shall be flat and 20 mm shall be
tapered on both sides to form lock rail. Top,
bottom and lock rails shall be provided either
side of the panel with 10 mm (5 mmx2) th.,20
mm wide cross PVC sheet as gap insert for
top rail and bottom rail. Paneling of 5 mm th.
both side PVC sheet to be fitted in the M.S.
frame welded/sealed to the styles &rails with
7 mm (5 mm+2 mm) th.x15 mm wide PVC
sheet beading on inner side and joined
together with solvent cement adhesive. An
149 Supplying, Fitting & Fixing Factory made Mtr. 352 352 352 352 352 352 352 352 352 352 352 366 352 352 352
P.V.C. door frame of size 50 mmx47 mm
with a wall thickness of 5 mm, made out of
extruded 5 mm, PVC sheet miter cut at two
corners and joined with two nos of 1.5 mm
long brackets of 15 mm x15 mm M.S. square
tube. The two vertical door profiles are to be
reinforced with 19 mmx 19 mm M.S. Square
tube of 19 gauge, weather seal to be
provided through out the frame. The door
frame shall be fixed with the wall using
65/100 mm long M.S. Screws through the
frame by using P.V.C fasteners. A minimum
of 4 Nos of screws to be provided for each
vertical member and minimum 2 Nos for
Page 136
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly
of Haldibari PS
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Bardhaman
Birbhum
Bankura
Sub Div
Item
Purulia
Malda
Nadia
Description of Items Unit
No.
150 Supplying, Fitting & Fixing Factory made Mtr. 447 447 447 447 447 447 447 447 447 447 447 466 447 447 447
prelaminated P.V.C. door frame of size 50
mmx47 mm with a wall thickness of 5 mm,
made out of extruded 5 mm Prelaminated
PVC sheet miter cut at two corners and
joined with two nos of 1.5 mm long brackets
of 15 mm x15 mm M.S. square tube. The two
vertical door profiles are to be reinforced with
19 mmx 19 mm M.S. Square tube of 19
gauge, weather seal to be provided through
out the frame. The door frame shall be fixed
with the wall using 65/100 mm M.S. Screws
through the frame by using P.V.C fasteners.
A minimum of 4 Nos of screws to be
provided for each vertical member and
minimum 2 Nos for horizontal member etc.
area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly
of Haldibari PS
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Bardhaman
Birbhum
Bankura
Sub Div
Item
Purulia
Malda
Nadia
Description of Items Unit
No.
(b) Moulded door using 2 mm Prelam Sq.M. 3560 3560 3560 3560 3560 3560 3560 3560 3560 3560 3560 3727 3560 3560 3560
moulded PVC sheet on both side.
(b) Moulded door using 2 mm Prelam Sq..M 4296 4296 4296 4296 4296 4296 4296 4296 4296 4296 4296 4500 4296 4296 4296
moulded PVC sheet on both side.
153 Taking out door shutter and rehanging the Sq..M 609 609 609 609 609 609 609 609 609 609 609 629 609 609 609
same by fixing aluminium sheet [0.457 mm]
with proper nail etc.
Page 138
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly
of Haldibari PS
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Bardhaman
Birbhum
Bankura
Sub Div
Item
Purulia
Malda
Nadia
Description of Items Unit
No.
154 Supplying fitting and fixing in position Mtr. 282 282 282 282 282 282 282 282 282 282 282 288 282 282 282
approved P.V.C. door frame (Matt finish)
made of extruded P.V.C. multichamber
hollow section having dimensions 60mm x
50mm x 2mm (+/-0.2mm), horizontal section
will be joined with vertical section by
galvanised steel screws after inserting two
number steel brackets as reinforcement
making suitable space for placing hinges,
one steel tube 40mm x 20mm x 1.20 mm will
be inserted on one full vertical side of the
frame (hinge side) as reinforcement, the
frame will then be fixed in the opening with
the help of P.V.C. expandable
fastner/wooden gutties and galvanised steel
screws including cost of all materials and
labour, hire charges of tools and appliances,
carriage of all materials, taxes and all other
incidental charges complete.
155 PVC Door Shutter-37 mm thick:
(A)
Page 139
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly
of Haldibari PS
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Bardhaman
Birbhum
Bankura
Sub Div
Item
Purulia
Malda
Nadia
Description of Items Unit
No.
Supplying fitting and fixing P.V.C. door Sq.M. 2310 2310 2310 2310 2310 2310 2310 2310 2310 2310 2310 2413 2310 2310 2310
shutter of approved quality & shade in
position, the style & rail of the P.V.C. door
shutter will be made of rigid P.V.C.
multicavity hollow chamber of suitable size
and section with 2.0 mm (+/-0.2 mm) wall
thickness, the section will have 2nos. built in
beads, horizontal & vertical section shall be
fixed to each other by self tapping screws
and 2 nos. of solid plastic or M.S. tubular
galvanised brackets of length 200mm x
80mm and other 100mm x 100mm both 1.20
mm in each corner of the shutter frame for
placing hinges. Polymer based multicavity
hollow section of 105 mm x37mm with 2.0
mm (+/- 0.2 mm) wall thickness will be fitted
in the middle as lock rail reinforced by solid
polymer bar of 200 mm long at both ends
abd screws from both sides. The section
frame will then be fitted in by PVC panels of
size 100 mmx20 mm with wall thickness of
1.2 mm (+/- 0.2 mm) and 2 nos. of 6 mm dia
and screws from both sides 6mm dia bright
rod will be inserted horizontally with both side
check and nut system and stretches where
fixing of hinges / hasp bolt / tower bolt / door
ring are required to be strong enough to with
stand wear and tear. The rate is inclusive of
Page 140
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly
of Haldibari PS
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Bardhaman
Birbhum
Bankura
Sub Div
Item
Purulia
Malda
Nadia
Description of Items Unit
No.
Supplying fitting and fixing P.V.C. door Sq.M. 2149 2149 2149 2149 2149 2149 2149 2149 2149 2149 2149 2244 2149 2149 2149
shutter of approved quality & shade in
position, the style & rail of the P.V.C. door
shutter will be made of rigid P.V.C.
multicavity hollow chamber of 59 mm x30
mm section with 2.0 mm (+/-0.2 mm) wall
thickness.Horizontal & vertical section shall
be fixed to each other by self tapping screws
and 1 solid polymeric or M.S. galvanised
tubular 'L' shaped bracket 100mm x 200mm
in each corner of the shutter frame for
placing hinges. Polymer based multicavity
hollow section of 120 mm x30mm with 2.0
mm (+/- 0.2 mm) wall thickness will be fitted
in the middle, reinforced by solid polymer bar
of 200 mm long at both ends and screws
from both sides as lock rail. The section
frame will then be fitted in by PVC panels of
size 100 mmx25 mm with wall thickness of
1.2 mm (+/- 0.2 mm) and 2 nos. of 6 mm dia
bright rod will be inserted horizontally with
both side check and nut system and
stretches where fixing of hinges / hasp bolt /
tower bolt / door ring are required to be
strong enough to with stand wear and tear.
The rate is inclusive of cost of all materials,
labour, and hire of tools and plants and
156 Wall paneling with Gypsum Plaster Board of Sq.M. 1007 1006 1006 1006 1007 1006 1006 1006 1006 1006 1006 1020 1005 1005 1005
12.5 mm thick fitted to G.I. channel of 55
mmx50 mm placed at 300 mm c/c in
horizontal direction and metal stand 55
mmx48 mm placed @900 mm c/c in vertical
direction connected with G.I. connecting
clips. 12.5 mm thick Gypsum plaster based
are to be fixed with G.I. channel by machine
screws. The boards are to be joined with
jointing compound and fibre tape and
finished with top coat etc the rate includes
the cost of all materials, labour charges
including scaffolding etc. complete as per
direction of the Engineer-in-charge.
In ground floor
Page 141
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly
of Haldibari PS
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Bardhaman
Birbhum
Bankura
Sub Div
Item
Purulia
Malda
Nadia
Description of Items Unit
No.
157 M.F. suspended ceiling made with 12.5 mm Sq.M. 1257 1257 1257 1257 1257 1257 1257 1257 1257 1257 1257 1273 1257 1257 1257
thick Gypsum plaster board including G.I.
perimeter channel of 0.55 mm flush (having
two flanges 20 mm and 30 mm respectively
and web 27 mm ) along with perimeter of
ceiling with G.I. intermediate channel of 0.9
mm thick size 45 mmx15mm placed at 750
mm c/c with G.I. ceiling angle of size 25
mmx10mmx0.55 mm thick fixed to the ceiling
with G.I. Cleat and steel expansion fastener
ceiling section 0.55 mm thick of size 51.50
mmx26mm fixed to the intermediate
channels with the help of connecting clip and
in the direction of perpendicular to the
intermediate channel of 300 mm c/c 12.5
mm thick Gypsum plastered board are to be
fixed under ceiling section as above by
machine screws. The boards are to be joined
and finished with jointing compound, paper
tape and application of top coat etc. as per
the direction of Engineer-in-charge. (The rate
includes of cost of all materials including
Page 142
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly
of Haldibari PS
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Bardhaman
Birbhum
Bankura
Sub Div
Item
Purulia
Malda
Nadia
Description of Items Unit
No.
158 P.V.C Partition: Sq.M 2221 2221 2221 2221 2221 2221 2221 2221 2221 2221 2221 2333 2221 2221 2221
Supplying,fitting and fixing the partition,frame
will be made with rectangular steel tube of
size 50mmx25mm with wall thickness not
less than 1.00mm. The vertical members
duly welded to the horizontal members shall
be placed between 1000mm to 1200mm
apart the entire partition frame will be
securedly fixed to the wall, ceiling and floor
using rawlplug or wooden gutties and screws
etc.the frame will be painted with synthetic
paint, the section of the partition frame will
then fitted with PRINTED LAMINATED
P.V.C extruded hollow section of size
100mmx25mm. panel with approved quality
fixed in the place by means of P.V.C
extruded beading on both sides or P.V.C
extruded angles (20mmx18mm) on one side
and P.V.C extruded beading (9mmx9mm) on
other side ,angle/beading will be fixed to the
steel frame by 19mm (nos.6) self tapping
steel screw placed at an interval of 450mm
and complete in all respect as per direction
of Engineer-in-Charge with all labour and
materials
Page 143
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly
of Haldibari PS
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Bardhaman
Birbhum
Bankura
Sub Div
Item
Purulia
Malda
Nadia
Description of Items Unit
No.
159 P.V.C- False Ceiling : Sq.M 1542 1542 1542 1542 1542 1542 1542 1542 1542 1542 1542 1615 1542 1542 1542
Providing False Ceiling made with
framework of steel tube of 40mm x 20mm of
not less than 18 gauge,the long and cross
section will be welded with each other
1000mm to 1200mm apart the entire
framework will be fixed in wall using rawlplug
or gutties or screws etc. and suspended from
ceiling with M.S flat 19mmx3mm as
necessary,the entire frame will be painted
with red oxide. PRINTED LAMINATED
P.V.C Section 150mm x 12mmx 1.00mm (+/-
0.01mm) of approved quality and colour will
be fixed on the frame so that the entire
framework will not be visible from below
P.V.C Section will be fixed with the frame
with the help of self tapping steel screws
including all materials and labour charges
including fitting,fixing the same and hoisting
including mending the damages in all
respect and cost of paint as required as per
direction of Engineer-in-Charge .
In ground floor.
Page 144
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
(H)BAND MOULDING, CORNICE ETC.
Rate (Rs.)
Jalpaiguri,Alipurduar,
/Area of Kalyani Sub
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Haldibari PS
Bardhaman
Birbhum
Bankura
Item
Purulia
Malda
Nadia
Divn.
Description of Items Unit
Dist.
Div
PS
S)
No.
(ii) Projection 40 mm
(a) Depth or width (75 mm to 100 mm)
(Cement 3.5Kg/Mtr.) Metre 76 70 69 69 73 72 70 69 73 73 73 81 72 72 74
Page 145
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
(H)BAND MOULDING, CORNICE ETC.
Rate (Rs.)
Jalpaiguri,Alipurduar,
/Area of Kalyani Sub
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Haldibari PS
Bardhaman
Birbhum
Bankura
Item
Purulia
Malda
Nadia
Divn.
Description of Items Unit
Dist.
Div
PS
S)
No.
Page 146
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
(H)BAND MOULDING, CORNICE ETC.
Rate (Rs.)
Jalpaiguri,Alipurduar,
/Area of Kalyani Sub
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Haldibari PS
Bardhaman
Birbhum
Bankura
Item
Purulia
Malda
Nadia
Divn.
Description of Items Unit
Dist.
Div
PS
S)
No.
Page 147
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
(H)BAND MOULDING, CORNICE ETC.
Rate (Rs.)
Jalpaiguri,Alipurduar,
/Area of Kalyani Sub
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Haldibari PS
Bardhaman
Birbhum
Bankura
Item
Purulia
Malda
Nadia
Divn.
Description of Items Unit
Dist.
Div
PS
S)
No.
Page 148
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
(H)BAND MOULDING, CORNICE ETC.
Rate (Rs.)
Jalpaiguri,Alipurduar,
/Area of Kalyani Sub
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Haldibari PS
Bardhaman
Birbhum
Bankura
Item
Purulia
Malda
Nadia
Divn.
Description of Items Unit
Dist.
Div
PS
S)
No.
Page 149
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
(H)BAND MOULDING, CORNICE ETC.
Rate (Rs.)
Jalpaiguri,Alipurduar,
/Area of Kalyani Sub
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Haldibari PS
Bardhaman
Birbhum
Bankura
Item
Purulia
Malda
Nadia
Divn.
Description of Items Unit
Dist.
Div
PS
S)
No.
Page 150
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
Jalpaiguri,Alipurduar,
/Area of Kalyani Sub
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Haldibari PS
Bardhaman
Bankura
Birbhum
Item
Purulia
Malda
Nadia
Description of Items Unit
Dist.
Div
S)
No.
Page 151
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
Jalpaiguri,Alipurduar,
/Area of Kalyani Sub
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Haldibari PS
Bardhaman
Bankura
Birbhum
Item
Purulia
Malda
Nadia
Description of Items Unit
Dist.
Div
S)
No.
(c) 10 mm. thick plaster Sq.M 131 122 121 121 127 124 122 121 126 125 125 138 124 124 126
4 Plaster with lime and surki mortar including
rounding off or chamfering corners as
directed and raking out joints (Ground floor).
Page 152
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
Jalpaiguri,Alipurduar,
/Area of Kalyani Sub
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Haldibari PS
Bardhaman
Bankura
Birbhum
Item
Purulia
Malda
Nadia
Description of Items Unit
Dist.
Div
S)
No.
Page 153
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
Jalpaiguri,Alipurduar,
/Area of Kalyani Sub
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Haldibari PS
Bardhaman
Bankura
Birbhum
Item
Purulia
Malda
Nadia
Description of Items Unit
Dist.
Div
S)
No.
(b) 12 mm thick plaster Sq.M 114 101 100 100 110 103 101 100 105 105 104 124 103 103 105
(ii) (1:3) with Lime & Sand mortar
(a) 25 mm thick plaster Sq.M 160 134 133 133 151 139 134 133 145 143 141 178 139 139 145
(b) 19 mm thick plaster Sq.M 133 113 112 112 126 117 113 112 121 120 119 147 117 117 121
(c) 12.5 mm thick plaster Sq.M 109 96 95 95 105 99 96 95 101 100 100 118 99 99 101
(iii) (1:4) with Lime & Sand mortar
(a) 25 mm thick plaster Sq.M 145 122 121 121 137 127 122 121 132 130 129 161 127 127 132
(b) 19 mm thick plaster Sq.M 119 101 100 100 113 105 101 100 109 108 106 131 105 105 109
(c) 12.5 mm thick plaster Sq.M 97 86 85 85 93 88 86 85 91 90 89 105 88 88 91
23 Surki beaten plaster (1:2) including rounding
off or chamfering corners, as directed and
raking out joints or roughening surface
(a) 19 mm thick plaster Sq.M 172 160 156 156 172 162 162 161 161 159 158 185 161 159 159
(b) 12.5 mm thick plaster Sq.M 128 119 117 117 128 121 121 120 120 119 118 136 120 119 119
24 Flush pointing to stone masonry wall in
cement morter (1:3) including racking out Sq.M 45 43 43 43 44 43 43 43 44 44 44 47 44 44 44
joints (Cement 0.119 Cu.m/100 Sq.m)
Page 154
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
Jalpaiguri,Alipurduar,
/Area of Kalyani Sub
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Haldibari PS
Bardhaman
Birbhum
Bankura
Item
Purulia
Malda
Nadia
Divn.
Description of Items Unit
Dist.
Div
PS
S)
No.
(c) Three coats (on new works only). %Sq.M 2081 2081 2081 2081 2081 2081 2081 2081 2081 2081 2081 2120 2081 2081 2081
4 Colour washing with "ELLA" with a coat of
white wash priming including cleaning and
smoothening surface thoroughly :
(i) Internal (all floors)
(a) One coat %Sq.M 1496 1496 1496 1496 1496 1496 1496 1496 1496 1496 1496 1522 1496 1496 1496
(b) Two coats %Sq.M 2240 2240 2240 2240 2240 2240 2240 2240 2240 2240 2240 2281 2240 2240 2240
(ii) External surface (ground floor)
(a) One coat %Sq.M 1514 1514 1514 1514 1514 1514 1514 1514 1514 1514 1514 1540 1514 1514 1514
(b) Two coats %Sq.M 2264 2264 2264 2264 2264 2264 2264 2264 2264 2264 2264 2305 2264 2264 2264
N.B. : Extra for each additional floor in
external walls refer item 20
5 Colour washing with any shade with
Stainers, as required including cleaning and
smoothening surface thoroughly :
(i) Internal surface (All floors)
(a) One coat of colour wash
(i) Other than yellow, pink. %Sq.M 1525 1525 1525 1525 1525 1525 1525 1525 1525 1525 1525 1551 1525 1525 1525
(ii) Yellow, pink. %Sq.M 1537 1537 1537 1537 1537 1537 1537 1537 1537 1537 1537 1563 1537 1537 1537
(b) Two coats (on new works only).
(i) Other than yellow, pink. %Sq.M 2139 2139 2139 2139 2139 2139 2139 2139 2139 2139 2139 2179 2139 2139 2139
(ii) Yellow, pink. %Sq.M 2157 2157 2157 2157 2157 2157 2157 2157 2157 2157 2157 2197 2157 2157 2157
(ii) External surface (Ground floor)
Page 155
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
Jalpaiguri,Alipurduar,
/Area of Kalyani Sub
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Haldibari PS
Bardhaman
Birbhum
Bankura
Item
Purulia
Malda
Nadia
Divn.
Description of Items Unit
Dist.
Div
PS
S)
No.
Page 156
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
Jalpaiguri,Alipurduar,
/Area of Kalyani Sub
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Haldibari PS
Bardhaman
Birbhum
Bankura
Item
Purulia
Malda
Nadia
Divn.
Description of Items Unit
Dist.
Div
PS
S)
No.
Page 157
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
Jalpaiguri,Alipurduar,
/Area of Kalyani Sub
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Haldibari PS
Bardhaman
Birbhum
Bankura
Item
Purulia
Malda
Nadia
Divn.
Description of Items Unit
Dist.
Div
PS
S)
No.
i) Water based interior grade Acrylic Primer %Sq.M 4798 4798 4798 4798 4798 4798 4798 4798 4798 4798 4798 4899 4798 4798 4798
ii) Solvent based interior grade Acrylic
Primer %Sq.M 5303 5303 5303 5303 5303 5303 5303 5303 5303 5303 5303 5434 5303 5303 5303
In Ground Floor:
(a) One Coat %Sq.M 3404 3404 3404 3404 3404 3404 3404 3404 3404 3404 3404 3474 3404 3404 3404
(b) Two Coats %Sq.M 4899 4899 4899 4899 4899 4899 4899 4899 4899 4899 4899 5010 4899 4899 4899
[This item to be done under specific
instruction of the Superintending Engineer]
Page 158
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
Jalpaiguri,Alipurduar,
/Area of Kalyani Sub
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Haldibari PS
Bardhaman
Birbhum
Bankura
Item
Purulia
Malda
Nadia
Divn.
Description of Items Unit
Dist.
Div
PS
S)
No.
Page 159
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
Jalpaiguri,Alipurduar,
/Area of Kalyani Sub
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Haldibari PS
Bardhaman
Birbhum
Bankura
Item
Purulia
Malda
Nadia
Divn.
Description of Items Unit
Dist.
Div
PS
S)
No.
Page 160
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Bardhaman
Birbhum
Bankura
Sub Div
Item
Purulia
Malda
Nadia
Description of Items Unit
Dist.
No.
N.B.:
(Payment against item 1, 2, 3, 4 will be
made only when done at specific
direction of the Engineer- in-charge. Cost
of taking out shutter etc.for this item and
rehanging the same or changing glass
panes cracked or broken in the operation
will be deemed to be covered by the rate
of this item and no seperate payment
therefor shall be made.)
Page161
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Bardhaman
Birbhum
Bankura
Sub Div
Item
Purulia
Malda
Nadia
Description of Items Unit
Dist.
No.
Page162
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Bardhaman
Birbhum
Bankura
Sub Div
Item
Purulia
Malda
Nadia
Description of Items Unit
Dist.
No.
Page163
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Bardhaman
Birbhum
Bankura
Sub Div
Item
Purulia
Malda
Nadia
Description of Items Unit
Dist.
No.
15 Coal tarring :
(a) One coat Sq.M 175 175 175 175 175 175 175 175 175 175 175 175 175 175 175
(b) Two coats Sq.M 257 257 257 257 257 257 257 257 257 257 257 258 257 257 257
18 French polishing to wood work including
preparing surface (ordinary gloss)
(a) On new wood work Sq.M 492 492 492 492 492 492 492 492 492 492 492 500 492 492 492
(b) On old French polished surface including
complete removal of the old polish. Sq.M 563 563 563 563 563 563 563 563 563 563 563 571 563 563 563
Page164
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Bardhaman
Birbhum
Bankura
Sub Div
Item
Purulia
Malda
Nadia
Description of Items Unit
Dist.
No.
Page165
PWD(WB) Schedule of Rates;
SECTION 1. ------------BUILDING WORKS
(L)GLARZIER'S WORK
Rate (Rs.)
area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly
of Haldibari PS
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Bardhaman
Bankura
Birbhum
Item
Purulia
Malda
Nadia
Description of Items Unit
Div
No.
(i) 3 mm thick(White) Sq.M 479 479 479 479 479 479 479 479 479 479 479 488 479 479 479
(ii) 3 mm thick(Coloured) Sq.M 550 550 550 550 550 550 550 550 550 550 550 558 550 550 550
6 Supplying best Indian laminated safety glass
5 mm. thick including cutting to required
sizes, setting on putty bases and fitted and
fixed with teak glazing beads (19 mm x 12 Sq.M 2405 2405 2405 2405 2405 2405 2405 2405 2405 2405 2405 2436 2405 2405 2405
mm) including putty and nails as necessary
complete.(In all floors for internal wall & upto
6 m height for external wall)
Page 166
PWD(WB) Schedule of Rates;
SECTION 1. ------------BUILDING WORKS
(L)GLARZIER'S WORK
Rate (Rs.)
area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly
of Haldibari PS
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Bardhaman
Bankura
Birbhum
Item
Purulia
Malda
Nadia
Description of Items Unit
Div
No.
Page 167
PWD(WB)Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
Jalpaiguri,Alipurduar, plains of
excluding area of Kalyani Sub
area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Haldibari PS
Bardhaman
Birbhum
Bankura
Item
Purulia
Malda
Nadia
Description of Items Unit
Div
No.
Page 168
PWD(WB)Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
Jalpaiguri,Alipurduar, plains of
excluding area of Kalyani Sub
area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Haldibari PS
Bardhaman
Birbhum
Bankura
Item
Purulia
Malda
Nadia
Description of Items Unit
Div
No.
Page 169
PWD(WB)Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
Jalpaiguri,Alipurduar, plains of
excluding area of Kalyani Sub
area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Haldibari PS
Bardhaman
Birbhum
Bankura
Item
Purulia
Malda
Nadia
Description of Items Unit
Div
No.
(i) 75 mm. Dia projection 75 mm. Each 465 465 465 465 465 465 465 465 465 465 465 477 465 465 465
(ii) 75 mm. Dia projection 150 mm. Each 562 562 562 562 562 562 562 562 562 562 562 574 562 562 562
(iii) 100 mm. Dia projection 75 mm. Each 610 610 610 610 610 610 610 610 610 610 610 628 610 610 610
(iv) 100 mm. Dia projection 150 mm. Each 682 682 682 682 682 682 682 682 682 682 682 694 682 682 682
(v) 150 mm. Dia projection 75 mm. Each 891 891 891 891 891 891 891 891 891 891 891 903 891 891 891
(vi) 150 mm. Dia projection 150 mm. Each 1140 1140 1140 1140 1140 1140 1140 1140 1140 1140 1140 1153 1140 1140 1140
(D)(1) C. I Bend of down pipe (Without
door)
(i) 75 mm. Dia. Each 430 430 430 430 430 430 430 430 430 430 430 441 430 430 430
(ii) 100 mm. Dia. Each 533 533 533 533 533 533 533 533 533 533 533 543 533 533 533
(iii) 150 mm. Dia. Each 942 942 942 942 942 942 942 942 942 942 942 955 942 942 942
(D)(2) C. I Bend of down pipe. (With door)
(i) 75 mm. Dia. Each 506 506 506 506 506 506 506 506 506 506 506 518 506 506 506
(ii) 100 mm. Dia. Each 609 609 609 609 609 609 609 609 609 609 609 621 609 609 609
(iii) 150 mm. Dia. Each 1050 1050 1050 1050 1050 1050 1050 1050 1050 1050 1050 1062 1050 1050 1050
(E) C. I shoe of down pipe.
(i) 75 mm. Dia. Each 411 411 411 411 411 411 411 411 411 411 411 423 411 411 411
(ii) 100 mm. Dia. Each 454 454 454 454 454 454 454 454 454 454 454 466 454 454 454
(iii) 150 mm. Dia. Each 592 592 592 592 592 592 592 592 592 592 592 604 592 592 592
10 Supplying, fitting, fixing C.I Grating (Heavy
type).
(a) Up to 100 mm Square or 100 mm Dia. Each 80 80 80 80 80 80 80 80 80 80 80 86 80 80 80
(b) Above 100 mm and upto 150 mm
Square or round. Each 128 128 128 128 128 128 128 128 128 128 128 134 128 128 128
Page 170
PWD(WB)Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
Jalpaiguri,Alipurduar, plains of
excluding area of Kalyani Sub
area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Haldibari PS
Bardhaman
Birbhum
Bankura
Item
Purulia
Malda
Nadia
Description of Items Unit
Div
No.
Page 171
PWD(WB)Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
Jalpaiguri,Alipurduar, plains of
excluding area of Kalyani Sub
area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Haldibari PS
Bardhaman
Birbhum
Bankura
Item
Purulia
Malda
Nadia
Description of Items Unit
Div
No.
Page 172
PWD(WB)Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
Jalpaiguri,Alipurduar, plains of
excluding area of Kalyani Sub
area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Haldibari PS
Bardhaman
Birbhum
Bankura
Item
Purulia
Malda
Nadia
Description of Items Unit
Div
No.
A) UPVC Pipes:
(i) 75 mm. Dia. Metre 216 216 216 216 216 216 216 216 216 216 216 228 216 216 216
(ii) 110 mm. Dia. Metre 291 291 291 291 291 291 291 291 291 291 291 303 291 291 291
(iii) 160 mm. Dia. Metre 570 570 570 570 570 570 570 570 570 570 570 584 570 570 570
B) UPVC Fittings:
a) Plain Tee
(i) 75 mm. Dia. Nos 117 117 117 117 117 117 117 117 117 117 117 120 117 117 117
(ii) 110 mm. Dia. Nos 200 200 200 200 200 200 200 200 200 200 200 206 200 200 200
(iii) 160 mm. Dia. Nos 600 600 600 600 600 600 600 600 600 600 600 611 600 600 600
b) Plain Y
(i) 75 mm. Dia. Nos 144 144 144 144 144 144 144 144 144 144 144 153 144 144 144
(ii) 110 mm. Dia. Nos 261 261 261 261 261 261 261 261 261 261 261 271 261 261 261
(iii) 160 mm. Dia. Nos 686 686 686 686 686 686 686 686 686 686 686 700 686 686 686
Page 173
PWD(WB)Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
Jalpaiguri,Alipurduar, plains of
excluding area of Kalyani Sub
area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Haldibari PS
Bardhaman
Birbhum
Bankura
Item
Purulia
Malda
Nadia
Description of Items Unit
Div
No.
Page 174
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly
of Haldibari PS
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Bardhaman
Birbhum
Bankura
Sub Div
Item
Purulia
Malda
Nadia
Description of Items Unit
No.
Page 175
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly
of Haldibari PS
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Bardhaman
Birbhum
Bankura
Sub Div
Item
Purulia
Malda
Nadia
Description of Items Unit
No.
Page 176
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly
of Haldibari PS
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Bardhaman
Birbhum
Bankura
Sub Div
Item
Purulia
Malda
Nadia
Description of Items Unit
No.
Page 177
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly
of Haldibari PS
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Bardhaman
Birbhum
Bankura
Sub Div
Item
Purulia
Malda
Nadia
Description of Items Unit
No.
Page 178
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly
of Haldibari PS
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Bardhaman
Birbhum
Bankura
Sub Div
Item
Purulia
Malda
Nadia
Description of Items Unit
No.
Page 179
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
(O) FENCING
Rate (Rs.)
area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly
of Haldibari PS
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Bardhaman
Birbhum
Bankura
Sub Div
Item
Purulia
Malda
Nadia
Description of Items Unit
No.
Page 180
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
(O) FENCING
Rate (Rs.)
area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly
of Haldibari PS
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Bardhaman
Birbhum
Bankura
Sub Div
Item
Purulia
Malda
Nadia
Description of Items Unit
No.
(a) Galvanised wire of 9 to 12 B.W.G. %Mtr. 337 337 337 337 337 337 337 337 337 337 337 337 337 337 337
(b) Strand wire (3 to 7 ply) upto 6 mm. dia. %Mtr. 501 501 501 501 501 501 501 501 501 501 501 501 501 501 501
(c) Standard wire (3 to 7 ply) above 6 mm.
%Mtr. 589 589 589 589 589 589 589 589 589 589 589 589 589 589 589
dia
(d) Barbed wire %Mtr. 662 662 662 662 662 662 662 662 662 662 662 662 662 662 662
6 (a) Supplying, fitting galvanised 3 ply 12
gauge / 4 points line of barbed wire in
fencing (holes already made in the body of
the post) or fixed by staples tightening and
fixing the wires in taut condition with straining %Mtr. 2795 2795 2795 2795 2795 2795 2795 2795 2795 2795 2795 2920 2795 2795 2795
bolts including the cost of cutting and of
lapping joints in the wire as necessary but
excluding the cost of galvanised
staples,straining bolt and binding wire where
necessary.
(Payment to be made on the length of
individual lines of wire.)
Page 181
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
(O) FENCING
Rate (Rs.)
area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly
of Haldibari PS
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Bardhaman
Birbhum
Bankura
Sub Div
Item
Purulia
Malda
Nadia
Description of Items Unit
No.
(d) Barbed wire %Mtr. 147 147 147 147 147 147 147 147 147 147 147 147 147 147 147
Page 182
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
(O) FENCING
Rate (Rs.)
area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly
of Haldibari PS
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Bardhaman
Birbhum
Bankura
Sub Div
Item
Purulia
Malda
Nadia
Description of Items Unit
No.
(a) Net upto 1350 mm. height %Mtr. 1424 1424 1424 1424 1424 1424 1424 1424 1424 1424 1424 1424 1424 1424 1424
(b) Net above 1350 mm. height %Mtr. 1770 1770 1770 1770 1770 1770 1770 1770 1770 1770 1770 1770 1770 1770 1770
10 Labour for taking out (from fencing) line of
wire (galvanised, strand or barbed) by
drawing the same out through holes in the %Mtr. 97 97 97 97 97 97 97 97 97 97 97 97 97 97 97
body of the post or through holes formed by
fixed staples.
(Payment to be made on the length of the
wire taken out.)
11 Labour for taking out (from fencing) line of
wire (galvanised, strand or barbed) including
%Mtr. 129 129 129 129 129 129 129 129 129 129 129 129 129 129 129
the cost of taking out staples (by cutting or
otherwise, as necessary).
(Payment to be made on the length of the
wire taken out.)
12 Labour for taking out wove wire or similar net
(from fencing) including the cost of taking out
staples (by cutting or otherwise,as
necessary).
(a) Net upto 1350 mm. height %Mtr. 468 468 468 468 468 468 468 468 468 468 468 468 468 468 468
(b) Net above 1350 mm. height %Mtr. 541 541 541 541 541 541 541 541 541 541 541 541 541 541 541
13 Supplying galvanised straining bolts (with
eye at one end with double nuts and
washers) fitted and fixed complete.
(i) 10 mm. dia.
(a) 150 mm. Each 50 50 50 50 50 50 50 50 50 50 50 52 50 50 50
(b) 200 mm. Each 58 58 58 58 58 58 58 58 58 58 58 61 58 58 58
Page 183
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
(O) FENCING
Rate (Rs.)
area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly
of Haldibari PS
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Bardhaman
Birbhum
Bankura
Sub Div
Item
Purulia
Malda
Nadia
Description of Items Unit
No.
Page 184
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
(O) FENCING
Rate (Rs.)
area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly
of Haldibari PS
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Bardhaman
Birbhum
Bankura
Sub Div
Item
Purulia
Malda
Nadia
Description of Items Unit
No.
Page 185
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
(O) FENCING
Rate (Rs.)
area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly
of Haldibari PS
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Bardhaman
Birbhum
Bankura
Sub Div
Item
Purulia
Malda
Nadia
Description of Items Unit
No.
(a) 25 mm. x 25 mm. x 8 g. Sq. M 833 833 833 833 833 833 833 833 833 833 833 846 833 833 833
(b) 25 mm. x 50 mm. x 8 g. Sq. M 646 646 646 646 646 646 646 646 646 646 646 658 646 646 646
(c) 50 mm. x 50 mm. x 8 g. Sq. M 533 533 533 533 533 533 533 533 533 533 533 546 533 533 533
(d) 75 mm. x 75 mm. x 8 g. Sq. M 465 465 465 465 465 465 465 465 465 465 465 477 465 465 465
(e) 75 mm. x 25 mm. x 8 g. Sq. M 615 615 615 615 615 615 615 615 615 615 615 627 615 615 615
23 Supplying fitting and fixing 600 mm (+/- 30
mm) diametre R.B.T (Reinforced Barbed
Tape) Concertina fencing on wall top using
concertina coils stretched to approx.6 meters
length at site clipped with two nos. of
Mtr. 481 481 481 481 481 481 481 481 481 481 481 494 481 481 481
horizontal R.B.T strands which will be
tensioned and fixed with the vertical M.S
angle iron posts by means of security
fasteners (such as 'C' clips, R.B.T clips etc.)
Page 186
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
(O) FENCING
Rate (Rs.)
area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly
of Haldibari PS
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Bardhaman
Birbhum
Bankura
Sub Div
Item
Purulia
Malda
Nadia
Description of Items Unit
No.
Page 187
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly
of Haldibari PS
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Bardhaman
Birbhum
Bankura
Sub Div
Item
Purulia
Malda
Nadia
Description of Items Unit
No.
Page 188
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly
of Haldibari PS
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Bardhaman
Birbhum
Bankura
Sub Div
Item
Purulia
Malda
Nadia
Description of Items Unit
No.
(a) Brick-on-edge edging (125 mm) depth. %Metre 760 760 760 760 760 760 760 760 760 760 760 760 760 760 760
(b) Brick-on-end edging (250 mm) depth. %Metre 1197 1197 1197 1197 1197 1197 1197 1197 1197 1197 1197 1197 1197 1197 1197
Page 189
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly
of Haldibari PS
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Bardhaman
Birbhum
Bankura
Sub Div
Item
Purulia
Malda
Nadia
Description of Items Unit
No.
(a) Single flat soling %Sq.M 991 991 991 991 991 991 991 991 991 991 991 991 991 991 991
(b) Double flat soling %Sq.M 1457 1457 1457 1457 1457 1457 1457 1457 1457 1457 1457 1457 1457 1457 1457
7 Labour for taking out brick-on-end edging
including removing debris to flank or berm
sorting out serviceable materials and %Metre 671 671 671 671 671 671 671 671 671 671 671 671 671 671 671
stacking.
8 Labour for taking out brick-on-edge of
herring bone bond including removing debris
to flank or berm sorting out serviceable %Sq.M 1749 1749 1749 1749 1749 1749 1749 1749 1749 1749 1749 1749 1749 1749 1749
materials and stacking.
9 Labour for taking out brick-on-edge of
herring bone bond set in cement mortar
including removing debris to flank or berm %Sq.M 3499 3499 3499 3499 3499 3499 3499 3499 3499 3499 3499 3499 3499 3499 3499
sorting out serviceable materials and
stacking.
10 Supplying cinder including throwing
spreading rough leavlling and dressing. Cum 302 285 285 285 285 285 285 285 285 285 285 289 285 285 285
Page 190
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly
of Haldibari PS
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Bardhaman
Birbhum
Bankura
Sub Div
Item
Purulia
Malda
Nadia
Description of Items Unit
No.
Page 191
PWD(WB)Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly
of Haldibari PS
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Bardhaman
Birbhum
Bankura
Sub Div
Item
Purulia
Malda
Nadia
Description of Items Unit
No.
Page 192
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
( R) ALUMINIUN WORKS
Rate (Rs.)
area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly
of Haldibari PS
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Bardhaman
Birbhum
Bankura
Sub Div
Item
Purulia
Malda
Nadia
Description of Items Unit
No.
i) Bottom & Top member. Metre 138 138 138 138 138 138 138 138 138 138 138 143 138 138 138
ii) Style side member. Metre 140 140 140 140 140 140 140 140 140 140 140 146 140 140 140
iii) Interlock member. Metre 176 176 176 176 176 176 176 176 176 176 176 183 176 176 176
e) Casement window ( 40 mm Depth
series)
i) Outer frame. Metre 185 185 185 185 185 185 185 185 185 185 185 192 185 185 185
ii) Mullion. Metre 264 264 264 264 264 264 264 264 264 264 264 274 264 264 264
iii) Shutter. Metre 182 182 182 182 182 182 182 182 182 182 182 190 182 182 182
iv) Glazing clip. Metre 49 49 49 49 49 49 49 49 49 49 49 52 49 49 49
v) Cleat angle. (Non-annodized) Metre 314 314 314 314 314 314 314 314 314 314 314 327 314 314 314
f) Casement window ( 34 mm Depth
series)
i) Outer frame. Metre 157 157 157 157 157 157 157 157 157 157 157 163 157 157 157
Page 193
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
( R) ALUMINIUN WORKS
Rate (Rs.)
area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly
of Haldibari PS
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Bardhaman
Birbhum
Bankura
Sub Div
Item
Purulia
Malda
Nadia
Description of Items Unit
No.
ii) Mullion. Metre 228 228 228 228 228 228 228 228 228 228 228 237 228 228 228
iii) Shutter. Metre 134 134 134 134 134 134 134 134 134 134 134 140 134 134 134
iv) Glazing clip. Metre 52 52 52 52 52 52 52 52 52 52 52 54 52 52 52
v) Cleat angle. (Non-annodized) Metr. 314 314 314 314 314 314 314 314 314 314 314 327 314 314 314
g) Fixed glazing.
i) Top and bottom & side member. Metre 382 382 382 382 382 382 382 382 382 382 382 397 382 382 382
ii) Mullion. Metre 403 403 403 403 403 403 403 403 403 403 403 419 403 403 403
iii) Glazing clip. Metre 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50
h) Louvered window.
i) Top, bottom and side member. Metre 218 218 218 218 218 218 218 218 218 218 218 226 218 218 218
ii) Louvered Section. Metre 780 780 780 780 780 780 780 780 780 780 780 811 780 780 780
iii) Cleat angle ( Non-annodized). Metre 314 314 314 314 314 314 314 314 314 314 314 327 314 314 314
i) Fixed partitions.
(Unsupported length of vertical member upto
1.5 mtr. Height of both ends of vertical
member restrained but panels within 0.9
sq.m.)
i) Top , bottom & side member. Metre 382 382 382 382 382 382 382 382 382 382 382 397 382 382 382
ii) Intermediate member. Metre 403 403 403 403 403 403 403 403 403 403 403 419 403 403 403
iii) Glazing clip. Metre 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50
j) Fixed partitions.
(Unsupported length of vertical member upto
1.5 mtr. Height of both ends of vertical
member restrained but panels within 0.9
sq.m.)
i) Top , bottom & side member. Metre 548 548 548 548 548 548 548 548 548 548 548 571 548 548 548
ii) Intermediate member. Metre 571 571 571 571 571 571 571 571 571 571 571 594 571 571 571
iii) Glazing clip. Metre 46 46 46 46 46 46 46 46 46 46 46 47 46 46 46
k) Movable door shutter.
i) Door frame. (Top & sides). Metre 376 376 376 376 376 376 376 376 376 376 376 391 376 376 376
ii) Shutter :
Top rail. Metre 361 361 361 361 361 361 361 361 361 361 361 376 361 361 361
Bottom rail. Metre 534 534 534 534 534 534 534 534 534 534 534 557 534 534 534
Lock rail Metre 446 446 446 446 446 446 446 446 446 446 446 465 446 446 446
Door vertical. Metre 395 395 395 395 395 395 395 395 395 395 395 410 395 395 395
Glazing cleap. Metre 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50
Page 194
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
( R) ALUMINIUN WORKS
Rate (Rs.)
area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly
of Haldibari PS
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Bardhaman
Birbhum
Bankura
Sub Div
Item
Purulia
Malda
Nadia
Description of Items Unit
No.
l) Rimless door.
i) Top & bottom rail. Metre 964 964 964 964 964 964 964 964 964 964 964 1003 964 964 964
II) Coloured
a) 2- track sliding window
i) Bottom frame Metre 283 283 283 283 283 283 283 283 283 283 283 292 283 283 283
ii) Top and side frame. Metre 253 253 253 253 253 253 253 253 253 253 253 262 253 253 253
b) 3- track sliding window
i) Bottom frame Metre 406 406 406 406 406 406 406 406 406 406 406 420 406 406 406
ii) Top and side frame. Metre 354 354 354 354 354 354 354 354 354 354 354 366 354 354 354
c) 4- track sliding window
i) Bottom frame Metre 478 478 478 478 478 478 478 478 478 478 478 495 478 478 478
ii) Top and side frame. Metre 421 421 421 421 421 421 421 421 421 421 421 436 421 421 421
d) Shutter for all track sliding window.
i) Bottom & Top member. Metre 153 153 153 153 153 153 153 153 153 153 153 158 153 153 153
ii) Style side member. Metre 149 149 149 149 149 149 149 149 149 149 149 156 149 149 149
iii) Interlock member. Metre 188 188 188 188 188 188 188 188 188 188 188 195 188 188 188
e) Casement window ( 40 mm Depth
series)
i) Outer frame. Metre 201 201 201 201 201 201 201 201 201 201 201 208 201 201 201
ii) Mullion. Metre 278 278 278 278 278 278 278 278 278 278 278 289 278 278 278
iii) Shutter. Metre 196 196 196 196 196 196 196 196 196 196 196 203 196 196 196
iv) Glazing clip. Metre 56 56 56 56 56 56 56 56 56 56 56 58 56 56 56
v) Cleat angle. (Non-annodized) Metre 314 314 314 314 314 314 314 314 314 314 314 327 314 314 314
f) Casement window ( 34 mm Depth
series)
i) Outer frame. Metre 172 172 172 172 172 172 172 172 172 172 172 178 172 172 172
ii) Mullion. Metre 245 245 245 245 245 245 245 245 245 245 245 255 245 245 245
iii) Shutter. Metre 169 169 169 169 169 169 169 169 169 169 169 175 169 169 169
iv) Glazing clip. Metre 59 59 59 59 59 59 59 59 59 59 59 61 59 59 59
v) Cleat angle. (Non-annodized) Metre 314 314 314 314 314 314 314 314 314 314 314 327 314 314 314
g) Fixed Glazing.
i) Top, bottom and side member. Metre 395 395 395 395 395 395 395 395 395 395 395 410 395 395 395
ii) Mullion. Metre 419 419 419 419 419 419 419 419 419 419 419 436 419 419 419
Page 195
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
( R) ALUMINIUN WORKS
Rate (Rs.)
area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly
of Haldibari PS
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Bardhaman
Birbhum
Bankura
Sub Div
Item
Purulia
Malda
Nadia
Description of Items Unit
No.
Page 196
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
( R) ALUMINIUN WORKS
Rate (Rs.)
area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly
of Haldibari PS
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Bardhaman
Birbhum
Bankura
Sub Div
Item
Purulia
Malda
Nadia
Description of Items Unit
No.
i) Bottom frame Metre 422 422 422 422 422 422 422 422 422 422 422 436 422 422 422
ii) Top and side frame. Metre 368 368 368 368 368 368 368 368 368 368 368 380 368 368 368
c) 4- track sliding window
i) Bottom frame Metre 507 507 507 507 507 507 507 507 507 507 507 524 507 507 507
ii) Top and side frame. Metre 437 437 437 437 437 437 437 437 437 437 437 452 437 437 437
i) Bottom & Top member. Metre 158 158 158 158 158 158 158 158 158 158 158 163 158 158 158
ii) Style side member. Metre 154 154 154 154 154 154 154 154 154 154 154 159 154 154 154
iii) Interlock member. Metre 193 193 193 193 193 193 193 193 193 193 193 200 193 193 193
e) Casement window ( 40 mm Depth
series)
i) Outer frame. Metre 207 207 207 207 207 207 207 207 207 207 207 214 207 207 207
ii) Mullion. Metre 284 284 284 284 284 284 284 284 284 284 284 295 284 284 284
iii) Shutter. Metre 201 201 201 201 201 201 201 201 201 201 201 208 201 201 201
iv) Glazing clip. Metre 58 58 58 58 58 58 58 58 58 58 58 60 58 58 58
v) Cleat angle. (Non-annodized) Metre 314 314 314 314 314 314 314 314 314 314 314 327 314 314 314
f) Casement window ( 34 mm Depth
series)
i) Outer frame. Metre 179 179 179 179 179 179 179 179 179 179 179 185 179 179 179
ii) Mullion. Metre 253 253 253 253 253 253 253 253 253 253 253 262 253 253 253
iii) Shutter. Metre 175 175 175 175 175 175 175 175 175 175 175 181 175 175 175
iv) Glazing clip. Metre 62 62 62 62 62 62 62 62 62 62 62 64 62 62 62
v) Cleat angle. (Non-annodized) Metre 314 314 314 314 314 314 314 314 314 314 314 327 314 314 314
g) Fixed glazing.
i) Top, bottom and side member. Metre 400 400 400 400 400 400 400 400 400 400 400 415 400 400 400
ii) Mullion. Metre 426 426 426 426 426 426 426 426 426 426 426 442 426 426 426
iii) Glazing clip. Metre 58 58 58 58 58 58 58 58 58 58 58 60 58 58 58
h) Louvered window.
i) Top, bottom and side member. Metre 230 230 230 230 230 230 230 230 230 230 230 239 230 230 230
ii) Louvered Section. Metre 803 803 803 803 803 803 803 803 803 803 803 835 803 803 803
iii) Cleat angle ( Non-annodized). Metre 314 314 314 314 314 314 314 314 314 314 314 327 314 314 314
Page 197
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
( R) ALUMINIUN WORKS
Rate (Rs.)
area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly
of Haldibari PS
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Bardhaman
Birbhum
Bankura
Sub Div
Item
Purulia
Malda
Nadia
Description of Items Unit
No.
i) Fixed partitions.
(Unsupported length of vertical member upto
1.5 mtr. Height of both ends of vertical
member restrained but panels within 0.9
sq.m.)
i) Top , bottom & side member. Metre 400 400 400 400 400 400 400 400 400 400 400 415 400 400 400
ii) Intermediate member. Metre 426 426 426 426 426 426 426 426 426 426 426 442 426 426 426
iii) Glazing clip. Metre 58 58 58 58 58 58 58 58 58 58 58 60 58 58 58
j) Fixed partitions.
(Unsupported length of vertical member
more than 1.5 mtr.or both ends of vertical
member restrained but panels more than 0.9
sq.m.)
i) Top , bottom & side member. Metre 576 576 576 576 576 576 576 576 576 576 576 598 576 576 576
ii) Intermediate member. Metre 599 599 599 599 599 599 599 599 599 599 599 622 599 599 599
iii) Glazing clip. Metre 58 58 58 58 58 58 58 58 58 58 58 60 58 58 58
k) Movable door shutter.
i) Door frame. (Top & sides). Metre 376 376 376 376 376 376 376 376 376 376 376 391 376 376 376
ii) Shutter :
Top rail. Metre 381 381 381 381 381 381 381 381 381 381 381 395 381 381 381
Bottom rail. Metre 581 581 581 581 581 581 581 581 581 581 581 603 581 581 581
Lock rail Metre 478 478 478 478 478 478 478 478 478 478 478 495 478 478 478
Door vertical. Metre 419 419 419 419 419 419 419 419 419 419 419 434 419 419 419
Glazing clip. Metre 58 58 58 58 58 58 58 58 58 58 58 60 58 58 58
l) Rimless door.
i) Top & bottom rail. Metre 995 995 995 995 995 995 995 995 995 995 995 1035 995 995 995
2 Labour charge for fabrication and installation
of composite door, window , partitions made
from annodized extruded alloy aluminium
sections for the following units:-
Page 198
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
( R) ALUMINIUN WORKS
Rate (Rs.)
area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly
of Haldibari PS
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Bardhaman
Birbhum
Bankura
Sub Div
Item
Purulia
Malda
Nadia
Description of Items Unit
No.
i) 2 track sliding window. Sq.M 703 703 703 703 703 703 703 703 703 703 703 703 703 703 703
ii ) 3 /4 track sliding window. Sq.M 950 950 950 950 950 950 950 950 950 950 950 950 950 950 950
iii ) Openable / Casement window. Sq.M 1128 1128 1128 1128 1128 1128 1128 1128 1128 1128 1128 1128 1128 1128 1128
iv ) Fixed glazzing. Sq.M 776 776 776 776 776 776 776 776 776 776 776 776 776 776 776
v ) Louvered window. Sq.M 737 737 737 737 737 737 737 737 737 737 737 737 737 737 737
vi) Add for special architectural feature,
where members / sections are required to be R.M. 261 261 261 261 261 261 261 261 261 261 261 261 261 261 261
bent as per requirement.
Page 199
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
( R) ALUMINIUN WORKS
Rate (Rs.)
area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly
of Haldibari PS
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Bardhaman
Birbhum
Bankura
Sub Div
Item
Purulia
Malda
Nadia
Description of Items Unit
No.
Page 200
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
( R) ALUMINIUN WORKS
Rate (Rs.)
area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly
of Haldibari PS
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Bardhaman
Birbhum
Bankura
Sub Div
Item
Purulia
Malda
Nadia
Description of Items Unit
No.
Page 201
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
( R) ALUMINIUN WORKS
Rate (Rs.)
area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly
of Haldibari PS
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Bardhaman
Birbhum
Bankura
Sub Div
Item
Purulia
Malda
Nadia
Description of Items Unit
No.
Page 202
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
( R) ALUMINIUN WORKS
Rate (Rs.)
area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly
of Haldibari PS
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Bardhaman
Birbhum
Bankura
Sub Div
Item
Purulia
Malda
Nadia
Description of Items Unit
No.
i) 4mm thick clear glass. Sq.M 475 475 475 475 475 475 475 475 475 475 475 482 475 475 475
ii) 4mm thick coloured / tinted / smoke
Sq.M 558 558 558 558 558 558 558 558 558 558 558 572 558 558 558
glass.
iii) 5mm thick clear glass. Sq.M 628 628 628 628 628 628 628 628 628 628 628 628 628 628 628
iv) 5mm thick coloured / tinted / smoke
Sq.M 698 698 698 698 698 698 698 698 698 698 698 698 698 698 698
glass.
v) 6mm thick clear glass. Sq.M 726 726 726 726 726 726 726 726 726 726 726 726 726 726 726
vi) 6mm thick coloured / tinted / smoke
Sq.M 789 789 789 789 789 789 789 789 789 789 789 803 789 789 789
glass.
vii) 8mm thick clear glass. Sq.M 1012 1012 1012 1012 1012 1012 1012 1012 1012 1012 1012 1026 1012 1012 1012
viii) 8mm thick coloured / tinted / smoke
Sq.M 1082 1082 1082 1082 1082 1082 1082 1082 1082 1082 1082 1096 1082 1082 1082
glass.
ix) 10mm thick clear glass. Sq.M 1291 1291 1291 1291 1291 1291 1291 1291 1291 1291 1291 1291 1291 1291 1291
x) 10 mm thick coloured / tinted / smoke
Sq.M 1361 1361 1361 1361 1361 1361 1361 1361 1361 1361 1361 1382 1361 1361 1361
glass.
xi) 12mm thick clear glass. Sq.M 1500 1500 1500 1500 1500 1500 1500 1500 1500 1500 1500 1500 1500 1500 1500
xii) 12mm thick coloured / tinted / smoke
Sq.M 2212 2212 2212 2212 2212 2212 2212 2212 2212 2212 2212 2212 2212 2212 2212
glass.
xiii) 12mm thick cleared toughened glass
Sq.M 3859 3859 3859 3859 3859 3859 3859 3859 3859 3859 3859 3859 3859 3859 3859
coforming to IS: 2553-1992 (Part-II)
xiv) 12mm thick coloured / tinted /
toughened glass coforming to IS: 2553-1992 Sq.M 4913 4913 4913 4913 4913 4913 4913 4913 4913 4913 4913 4913 4913 4913 4913
(Part-II)
10 Supplying stainless steel functional hinge for
casement window as per approved brand as
directed by Engineer- in -charge. (Natural
White)
(a) 250 mm long Each 361 361 361 361 361 361 361 361 361 361 361 229 361 361 361
(b) 300 mm long Each 397 397 397 397 397 397 397 397 397 397 397 265 397 397 397
11 Supplying annodized aluminium extruded
section box hinge for casement windows as
per approved brand and make directed by Each 44 44 44 44 44 44 44 44 44 44 44 46 44 44 44
Engineer- in -Charge.(Natural White)
12 Supplying 4 lever mortice lock or any
approved make and brand as per direction of
the Engineer- in -Charge.
i) 150 mm. Each 451 451 451 451 451 451 451 451 451 451 451 457 451 451 451
ii) 100 mm. Each 252 252 252 252 252 252 252 252 252 252 252 235 252 252 252
Page 203
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
( R) ALUMINIUN WORKS
Rate (Rs.)
area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly
of Haldibari PS
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Bardhaman
Birbhum
Bankura
Sub Div
Item
Purulia
Malda
Nadia
Description of Items Unit
No.
iii) 75 mm. Each 157 157 157 157 157 157 157 157 157 157 157 163 157 157 157
13 (A) Supplying Aluminium casted body
hydraulic door closer as per I.S.I. Each 757 757 757 757 757 757 757 757 757 757 757 763 757 757 757
Page 204
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly
of Haldibari PS
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Bardhaman
Birbhum
Bankura
Sub Div
Item
Purulia
Malda
Nadia
Description of Items Unit
No.
a) Upto 3 metre below G.L. Mtr. 712 553 535 535 623 605 542 535 623 605 605 581 581 570
b) Beyond 3 metre upto 6 metre below G.L. Mtr. 761 601 583 583 672 654 590 583 672 654 654 629 629 619
c) Beyond 6 metre upto 9 metre below G.L. Mtr. 829 670 652 652 740 723 659 652 740 723 723 698 698 687
d) Beyond 9 metre upto 12 metre below G.L. Mtr. 946 787 769 769 857 840 776 769 857 840 840 815 815 804
f) Beyond 15 metre upto 18 metre below G.L. Mtr. 1151 992 974 974 1062 1045 981 974 1062 1045 1045 1020 1020 1010
a) Upto 3 metre below G.L. Mtr. 905 703 680 680 793 770 689 680 793 770 770 739 739 725
b) Beyond 3 metre upto 6 metre below G.L. Mtr. 954 751 729 729 841 819 738 729 841 819 819 787 787 774
c) Beyond 6 metre upto 9 metre below G.L. Mtr. 1022 820 797 797 910 887 806 797 910 887 887 856 856 842
d) Beyond 9 metre upto 12 metre below G.L. Mtr. 1091 888 866 866 978 956 875 866 978 956 956 924 924 911
f) Beyond 15 metre upto 18 metre below G.L. Mtr. 1325 1122 1100 1100 1212 1190 1109 1100 1212 1190 1190 1158 1158 1145
Page 205
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly
of Haldibari PS
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Bardhaman
Birbhum
Bankura
Sub Div
Item
Purulia
Malda
Nadia
Description of Items Unit
No.
a) Upto 3 metre below G.L. Mtr. 1420 1202 1178 1178 1299 1275 1188 1178 1299 1275 1275 1241 1241 1227
b) Beyond 3 metre upto 6 metre below G.L. Mtr. 1469 1251 1227 1227 1348 1324 1237 1227 1348 1324 1324 1290 1290 1275
c) Beyond 6 metre upto 9 metre below G.L. Mtr. 1537 1319 1295 1295 1416 1392 1305 1295 1416 1392 1392 1358 1358 1344
d) Beyond 9 metre upto 12 metre below G.L. Mtr. 1654 1437 1412 1412 1533 1509 1422 1412 1533 1509 1509 1475 1475 1461
f) Beyond 15 metre upto 18 metre below G.L. Mtr. 1811 1593 1569 1569 1690 1666 1579 1569 1690 1666 1666 1632 1632 1617
a) Upto 3 metre below G.L. Mtr. 1145 890 861 861 1004 975 873 861 1004 975 975 935 935 918
b) Beyond 3 metre upto 6 metre below G.L. Mtr. 1194 938 910 910 1052 1024 921 910 1052 1024 1024 984 984 967
c) Beyond 6 metre upto 9 metre below G.L. Mtr. 1331 1075 1047 1047 1189 1161 1058 1047 1189 1161 1161 1121 1121 1104
d) Beyond 9 metre upto 12 metre below G.L. Mtr. 1448 1192 1164 1164 1306 1278 1175 1164 1306 1278 1278 1238 1238 1221
f) Beyond 15 metre upto 18 metre below G.L. Mtr. 1702 1446 1418 1418 1560 1531 1429 1418 1560 1531 1531 1492 1492 1475
a) Upto 3 metre below G.L. Mtr. 1310 1017 984 984 1147 1114 997 984 1147 1114 1114 1069 1069 1049
b) Beyond 3 metre upto 6 metre below G.L. Mtr. 1427 1134 1101 1101 1264 1231 1114 1101 1264 1231 1231 1186 1186 1166
c) Beyond 6 metre upto 9 metre below G.L. Mtr. 1564 1270 1238 1238 1401 1368 1251 1238 1401 1368 1368 1322 1322 1303
d) Beyond 9 metre upto 12 metre below G.L. Mtr. 1701 1407 1375 1375 1538 1505 1388 1375 1538 1505 1505 1459 1459 1440
Page 206
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly
of Haldibari PS
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Bardhaman
Birbhum
Bankura
Sub Div
Item
Purulia
Malda
Nadia
Description of Items Unit
No.
f) Beyond 15 metre upto 18 metre below G.L. Mtr. 1935 1641 1609 1609 1772 1739 1622 1609 1772 1739 1739 1694 1694 1674
a) Upto 3 metre below G.L. Mtr. 1426 1095 1058 1058 1242 1205 1072 1058 1242 1205 1205 1154 1154 1131
b) Beyond 3 metre upto 6 metre below G.L. Mtr. 1474 1143 1106 1106 1290 1254 1121 1106 1290 1254 1254 1202 1202 1180
c) Beyond 6 metre upto 9 metre below G.L. Mtr. 1591 1260 1223 1223 1407 1371 1238 1223 1407 1371 1371 1319 1319 1297
d) Beyond 9 metre upto 12 metre below G.L. Mtr. 1708 1377 1340 1340 1524 1488 1355 1340 1524 1488 1488 1436 1436 1414
f) Beyond 15 metre upto 18 metre below G.L. Mtr. 1962 1631 1594 1594 1778 1741 1609 1594 1778 1741 1741 1690 1690 1668
a) Upto 3 metre below G.L. Mtr. 1590 1221 1180 1180 1385 1344 1197 1180 1385 1344 1344 1287 1287 1262
b) Beyond 3 metre upto 6 metre below G.L. Mtr. 1639 1270 1229 1229 1434 1393 1245 1229 1434 1393 1393 1335 1335 1311
c) Beyond 6 metre upto 9 metre below G.L. Mtr. 1756 1387 1346 1346 1551 1510 1362 1346 1551 1510 1510 1452 1452 1428
d) Beyond 9 metre upto 12 metre below G.L. Mtr. 1873 1504 1463 1463 1668 1627 1479 1463 1668 1627 1627 1569 1569 1545
f) Beyond 15 metre upto 18 metre below G.L. Mtr. 2127 1758 1716 1716 1922 1881 1733 1716 1922 1881 1881 1823 1823 1799
a) Upto 3 metre below G.L. Mtr. 2030 1441 1375 1375 1702 1637 1401 1375 1702 1637 1637 1545 1545 1506
b) Beyond 3 metre upto 6 metre below G.L. Mtr. 2078 1489 1424 1424 1751 1686 1450 1424 1751 1686 1686 1594 1594 1555
c) Beyond 6 metre upto 9 metre below G.L. Mtr. 2195 1607 1541 1541 1868 1803 1567 1541 1868 1803 1803 1711 1711 1672
Page 207
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly
of Haldibari PS
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Bardhaman
Birbhum
Bankura
Sub Div
Item
Purulia
Malda
Nadia
Description of Items Unit
No.
d) Beyond 9 metre upto 12 metre below G.L. Mtr. 2312 1724 1658 1658 1985 1920 1684 1658 1985 1920 1920 1828 1828 1789
f) Beyond 15 metre upto 18 metre below G.L. Mtr. 2566 1977 1912 1912 2239 2173 1938 1912 2239 2173 2173 2082 2082 2043
a) Upto 3 metre below G.L. Mtr. 2278 1588 1511 1511 1894 1818 1542 1511 1894 1818 1818 1710 1710 1664
b) Beyond 3 metre upto 6 metre below G.L. Mtr. 2375 1685 1608 1608 1992 1915 1639 1608 1992 1915 1915 1808 1808 1762
c) Beyond 6 metre upto 9 metre below G.L. Mtr. 2512 1822 1745 1745 2128 2052 1776 1745 2128 2052 2052 1944 1944 1898
d) Beyond 9 metre upto 12 metre below G.L. Mtr. 2629 1939 1862 1862 2245 2169 1893 1862 2245 2169 2169 2061 2061 2015
f) Beyond 15 metre upto 18 metre below G.L. Mtr. 2883 2192 2116 2116 2499 2423 2146 2116 2499 2423 2423 2315 2315 2269
a) Upto 3 metre below G.L. Mtr. 2506 1715 1627 1627 2066 1978 1662 1627 2066 1978 1978 1855 1855 1803
b) Beyond 3 metre upto 6 metre below G.L. Mtr. 2603 1812 1724 1724 2163 2076 1759 1724 2163 2076 2076 1953 1953 1900
c) Beyond 6 metre upto 9 metre below G.L. Mtr. 2740 1949 1861 1861 2301 2212 1896 1861 2301 2212 2212 2089 2089 2037
d) Beyond 9 metre upto 12 metre below G.L. Mtr. 2857 2066 1978 1978 2418 2329 2013 1978 2418 2329 2329 2206 2206 2154
f) Beyond 15 metre upto 18 metre below G.L. Mtr. 3091 2300 2212 2212 2651 2563 2247 2212 2651 2563 2563 2440 2440 2388
N.B.
a) Extra 10% per meter for work beyond
the initial depth of 18 metre will be paid.
Page 208
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly
of Haldibari PS
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Bardhaman
Birbhum
Bankura
Sub Div
Item
Purulia
Malda
Nadia
Description of Items Unit
No.
Page 209
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly
of Haldibari PS
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Bardhaman
Birbhum
Bankura
Sub Div
Item
Purulia
Malda
Nadia
Description of Items Unit
No.
c) above 9 metre to 12 metre depth. Cum 6557 5961 5287 5287 6464 6409 6353 5602 6072 6053 6061 6043 6043 6098
d) above 12 metre to 15 metre depth. Cum 6585 5988 5315 5315 6492 6436 6381 5629 6099 6081 6089 6070 6070 6126
e) above 15 metre to 18 metre depth. Cum 6645 6049 5375 5375 6553 6497 6442 5690 6160 6141 6150 6131 6131 6187
f) above 18 metre up to any depth. Cum 6673 6076 5403 5403 6580 6525 6469 5717 6187 6169 6177 6159 6159 6214
5 Taking out and removing silt from the bottom
of well after bailing out water, removing moss
and weed from the well surface (by wire
brush) and disinfecting the well complete.
Page 210
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly
of Haldibari PS
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Bardhaman
Birbhum
Bankura
Sub Div
Item
Purulia
Malda
Nadia
Description of Items Unit
No.
Page 211
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
(T)MISCELLANEOUS WORKS
Rate (Rs.)
area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly
of Haldibari PS
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Bardhaman
Birbhum
Bankura
Sub Div
Item
Purulia
Malda
Nadia
Description of Items Unit
No.
Page 212
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
(T)MISCELLANEOUS WORKS
Rate (Rs.)
area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly
of Haldibari PS
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Bardhaman
Birbhum
Bankura
Sub Div
Item
Purulia
Malda
Nadia
Description of Items Unit
No.
(Cement-2.5 Kg/No.)
(B) Stitching crack in brick wall by carefully
cutting out face brick 250 mm. long, 75 mm.
thick and 125 mm deep into the wall,cleaning
the gap and filling up the same with sound
new brick, carefully set in cement mortar Brick 45 42 40 40 44 43 43 41 43 43 43 50 43 43 43
(1:3) including mending good damages and
finishing the surface to match with adjacent
areas complete as per direction.
(Cement-1 Kg/No.)
(C) Renewing weathered face brick including
taking out the old brick completely and
setting the head brick carefully in cement
mortar (1:3) complete,including making good
all damages.
Page 213
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
(T)MISCELLANEOUS WORKS
Rate (Rs.)
area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly
of Haldibari PS
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Bardhaman
Birbhum
Bankura
Sub Div
Item
Purulia
Malda
Nadia
Description of Items Unit
No.
Page 214
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
(T)MISCELLANEOUS WORKS
Rate (Rs.)
area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly
of Haldibari PS
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Bardhaman
Birbhum
Bankura
Sub Div
Item
Purulia
Malda
Nadia
Description of Items Unit
No.
Page 215
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
(T)MISCELLANEOUS WORKS
Rate (Rs.)
area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly
of Haldibari PS
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Bardhaman
Birbhum
Bankura
Sub Div
Item
Purulia
Malda
Nadia
Description of Items Unit
No.
Page 216
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
(T)MISCELLANEOUS WORKS
Rate (Rs.)
area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly
of Haldibari PS
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Bardhaman
Birbhum
Bankura
Sub Div
Item
Purulia
Malda
Nadia
Description of Items Unit
No.
24 Pumping out water from ponds or tanks %Cum 1054 1054 1054 1054 1054 1054 1054 1054 1054 1054 1054 1073 1054 1054 1054
(Payment if permitted will be made on the
quantity of water calculated on the basis of
initial water level and final level on
consideration being made for any water that
may have been made for any water that may
have been added through percolation or
otherwise)
Page 217
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
(T)MISCELLANEOUS WORKS
Rate (Rs.)
area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly
of Haldibari PS
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Bardhaman
Birbhum
Bankura
Sub Div
Item
Purulia
Malda
Nadia
Description of Items Unit
No.
(Cement- 25 Kg/No)
(ii) When more than half the gabion has to
be restored. Each 1268 1140 1093 1093 1220 1191 1162 1111 1198 1188 1190 1405 1181 1181 1209
(Cement- 50 Kg/No)
Page 218
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
(T)MISCELLANEOUS WORKS
Rate (Rs.)
area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly
of Haldibari PS
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Bardhaman
Birbhum
Bankura
Sub Div
Item
Purulia
Malda
Nadia
Description of Items Unit
No.
Page 219
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
(T)MISCELLANEOUS WORKS
Rate (Rs.)
area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly
of Haldibari PS
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Bardhaman
Birbhum
Bankura
Sub Div
Item
Purulia
Malda
Nadia
Description of Items Unit
No.
Page 220
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
(T)MISCELLANEOUS WORKS
Rate (Rs.)
area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly
of Haldibari PS
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Bardhaman
Birbhum
Bankura
Sub Div
Item
Purulia
Malda
Nadia
Description of Items Unit
No.
Page 221
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
(T)MISCELLANEOUS WORKS
Rate (Rs.)
area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly
of Haldibari PS
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Bardhaman
Birbhum
Bankura
Sub Div
Item
Purulia
Malda
Nadia
Description of Items Unit
No.
Page 222
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
(T)MISCELLANEOUS WORKS
Rate (Rs.)
area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly
of Haldibari PS
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Bardhaman
Birbhum
Bankura
Sub Div
Item
Purulia
Malda
Nadia
Description of Items Unit
No.
(i) 600 mm. x 450 mm. size of board. Each 535 535 535 535 535 535 535 535 535 535 535 560 535 535 535
(ii) 900 mm. x 600 mm. size of board. Each 986 927 981 925 977 953 948 905 938 937 958 1046 957 957 962
48 Projection of individual brick 12.5 cm x 7.5
cm x 6.5 cm to 12.5 cm projection from wall
surface. (The rate covers the projection only,
Each 13 13 11 11 14 13 13 12 13 13 13 16 13 13 13
the embedded portion being including in the
measurement of the wall against appropriate
item)
Page 223
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
(T)MISCELLANEOUS WORKS
Rate (Rs.)
area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly
of Haldibari PS
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Bardhaman
Birbhum
Bankura
Sub Div
Item
Purulia
Malda
Nadia
Description of Items Unit
No.
a) 3.90 metre height Each 386 386 386 386 386 386 386 386 386 386 386 386 386 386 386
Page 224
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
(T)MISCELLANEOUS WORKS
Rate (Rs.)
area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly
of Haldibari PS
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Bardhaman
Birbhum
Bankura
Sub Div
Item
Purulia
Malda
Nadia
Description of Items Unit
No.
Page 225
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
(T)MISCELLANEOUS WORKS
Rate (Rs.)
area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly
of Haldibari PS
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Bardhaman
Birbhum
Bankura
Sub Div
Item
Purulia
Malda
Nadia
Description of Items Unit
No.
Page 226
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
(T)MISCELLANEOUS WORKS
Rate (Rs.)
area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly
of Haldibari PS
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Bardhaman
Birbhum
Bankura
Sub Div
Item
Purulia
Malda
Nadia
Description of Items Unit
No.
Page 227
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
(T)MISCELLANEOUS WORKS
Rate (Rs.)
area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly
of Haldibari PS
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Bardhaman
Birbhum
Bankura
Sub Div
Item
Purulia
Malda
Nadia
Description of Items Unit
No.
Page 228
PWD(WB) Schedule of Rates 2014
SECTION 1. ------------BUILDING WORKS
(T)MISCELLANEOUS WORKS
Rate (Rs.)
area of Haldibari PS
Siliguri Sub Divn.
Howrah/ Hoogly
of Haldibari PS
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Bardhaman
Birbhum
Bankura
Sub Div
Item
Purulia
Malda
Nadia
Description of Items Unit
No.
Page 229
Section 1.........BUILDING WORKS
PWD (WB) Schedule of Rates 2014
(U) - Additional Items
Rate (Rs.)
of Haldibari PS
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Haldibari PS
Bardhaman
Birbhum
Bankura
Item
Purulia
Malda
Nadia
Description of Items Unit
Div
No.
In Super Structure, Ground Floor. Sq.M. 694 573 573 573 577 575 573 573 577 576 577 585 576 576 578
3) 100 mm thick Autoclave aerated concrete
blocks work with its size 625 mm x 250 mm
x 100 mm made of fly ash, lime & cement
conforming to IS: 2185 ( Part-3)-1984 in
Cement Mortar (1:4) complete in all respect.
In Super Structure, Ground Floor. Sq.M. 563 558 557 557 560 559 558 557 560 560 560 567 560 560 561
4) Ordinary Cement concrete (mix 1:2:4) with
graded stone chips (6mm nominal size)
excluding shuttering and reinforcement,if
any, in gound floor as per relevant IS codes.
Pakur variety Cu.M. 6313 5822 5789 5281 5872 6106 6235 5872 5944 6068 5381 6937 6205 6501 6016
Page 230
Section 1.........BUILDING WORKS
PWD (WB) Schedule of Rates 2014
(U) - Additional Items
Rate (Rs.)
of Haldibari PS
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Haldibari PS
Bardhaman
Birbhum
Bankura
Item
Purulia
Malda
Nadia
Description of Items Unit
Div
No.
Page 231
Section 1.........BUILDING WORKS
PWD (WB) Schedule of Rates 2014
(U) - Additional Items
Rate (Rs.)
of Haldibari PS
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Haldibari PS
Bardhaman
Birbhum
Bankura
Item
Purulia
Malda
Nadia
Description of Items Unit
Div
No.
(i) In Roof:-
a) With 0.90 mm thick sheet Sq.M. 905 905 905 905 905 905 905 905 905 905 905 915 905 905 905
9) Supplying, fitting & fixing circular corrugated
Aluminium sheet (excluding the supporting
frame work) of approved make & brand in
alloy 3105 conforming to IS: 1254-1991 fitted
and fixed with 55 mm & 25 mm Self tapping
screw , EPDM Washer 16 mm dia & 3 mm th
washer etc complete with 150 mm. end lap
and one corrugation minimum side lap.
(Payment to be made on area of finished
work) (Aluminium sheet to be supplied by
contractor).
(i) In Roof:-
a) With 0.65 mm thick sheet Sq.M. 781 781 781 781 781 781 781 781 781 781 781 791 781 781 781
b) With 0.71 mm thick sheet Sq.M. 831 831 831 831 831 831 831 831 831 831 831 841 831 831 831
c) With 0.91 mm thick sheet Sq.M. 903 903 903 903 903 903 903 903 903 903 903 915 903 903 903
Page 232
Section 1.........BUILDING WORKS
PWD (WB) Schedule of Rates 2014
(U) - Additional Items
Rate (Rs.)
of Haldibari PS
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Haldibari PS
Bardhaman
Birbhum
Bankura
Item
Purulia
Malda
Nadia
Description of Items Unit
Div
No.
In Roof Sq.M. 2357 2357 2357 2357 2357 2357 2357 2357 2357 2357 2357 2366 2357 2357 2357
Page 233
Section 1.........BUILDING WORKS
PWD (WB) Schedule of Rates 2014
(U) - Additional Items
Rate (Rs.)
of Haldibari PS
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Haldibari PS
Bardhaman
Birbhum
Bankura
Item
Purulia
Malda
Nadia
Description of Items Unit
Div
No.
In Roof Sq.M. 2766 2766 2766 2766 2766 2766 2766 2766 2766 2766 2766 2776 2766 2766 2766
14) supplying wooden moulding slanting beat of
size 37mm X 18mm (finished) of approved
design to finish the joint between wooden
frame of door/window with masonary in true
line and level fitted & fixed with adhesive and
head less pins complete as per direction of
Engineer -in-charge.
a) Teak wood beat Mtr. 127 127 127 127 127 127 127 127 127 127 127 138 127 127 127
b) Kappoor wood beat Mtr. 87 87 87 87 87 87 87 87 87 87 87 93 87 87 87
15) Polishing with melamine finish to wooden
surface after preparing the surface as per
decision and direction of Engineer-in-
Charge.
Sq.M. 78 78 78 78 78 78 78 78 78 78 78 83 78 78 78
16) Supplying, fitting and fixing Godrej Multi Lock
or equivallent .
Each 150 150 150 150 150 150 150 150 150 150 150 159 150 150 150
Page 234
Section 1.........BUILDING WORKS
PWD (WB) Schedule of Rates 2014
(U) - Additional Items
Rate (Rs.)
of Haldibari PS
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Haldibari PS
Bardhaman
Birbhum
Bankura
Item
Purulia
Malda
Nadia
Description of Items Unit
Div
No.
Sq.M. 388 388 388 388 388 388 388 388 388 388 388 348 388 388 388
Page 235
Section 1.........BUILDING WORKS
PWD (WB) Schedule of Rates 2014
(U) - Additional Items
Rate (Rs.)
of Haldibari PS
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Haldibari PS
Bardhaman
Birbhum
Bankura
Item
Purulia
Malda
Nadia
Description of Items Unit
Div
No.
Sq.M. 573 573 573 573 573 573 573 573 573 573 573 584 573 573 573
Page 236
Section 1.........BUILDING WORKS
PWD (WB) Schedule of Rates 2014
(U) - Additional Items
Rate (Rs.)
of Haldibari PS
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Haldibari PS
Bardhaman
Birbhum
Bankura
Item
Purulia
Malda
Nadia
Description of Items Unit
Div
No.
Sq.M. 400 400 400 400 400 400 400 400 400 400 400 409 400 400 400
Page 237
Section 1.........BUILDING WORKS
PWD (WB) Schedule of Rates 2014
(U) - Additional Items
Rate (Rs.)
of Haldibari PS
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Haldibari PS
Bardhaman
Birbhum
Bankura
Item
Purulia
Malda
Nadia
Description of Items Unit
Div
No.
Sq.M. 2689 2689 2689 2689 2689 2689 2689 2689 2689 2689 2689 2936 2689 2689 2689
21) A. Exposed False-ceiling Work --
(a) Supplying, fitting & fixing High Pressure
steam Cured Non Asbestos fibre cement
standard ceiling board (Density > 1300Kg
per Cu.M. ) of size595mm X595mm
conforming IS 14862 and type B, catagory III
of ISO 8336, tested as per AS-1530 Part 3
and BS-476 Part 4,5,6,7 & 8, should be
placed in the Grid module to form a false
ceiling. All complete as per drawing &
direction of Engineer - in- Charge.
Page 238
Section 1.........BUILDING WORKS
PWD (WB) Schedule of Rates 2014
(U) - Additional Items
Rate (Rs.)
of Haldibari PS
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Haldibari PS
Bardhaman
Birbhum
Bankura
Item
Purulia
Malda
Nadia
Description of Items Unit
Div
No.
Page 239
Section 1.........BUILDING WORKS
PWD (WB) Schedule of Rates 2014
(U) - Additional Items
Rate (Rs.)
of Haldibari PS
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Haldibari PS
Bardhaman
Birbhum
Bankura
Item
Purulia
Malda
Nadia
Description of Items Unit
Div
No.
Page 240
Section 1.........BUILDING WORKS
PWD (WB) Schedule of Rates 2014
(U) - Additional Items
Rate (Rs.)
of Haldibari PS
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Haldibari PS
Bardhaman
Birbhum
Bankura
Item
Purulia
Malda
Nadia
Description of Items Unit
Div
No.
Page 241
Section 1.........BUILDING WORKS
PWD (WB) Schedule of Rates 2014
(U) - Additional Items
Rate (Rs.)
of Haldibari PS
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Haldibari PS
Bardhaman
Birbhum
Bankura
Item
Purulia
Malda
Nadia
Description of Items Unit
Div
No.
Page 242
Section 1.........BUILDING WORKS
PWD (WB) Schedule of Rates 2014
(U) - Additional Items
Rate (Rs.)
of Haldibari PS
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Haldibari PS
Bardhaman
Birbhum
Bankura
Item
Purulia
Malda
Nadia
Description of Items Unit
Div
No.
(i) 15mm thick OW Acoustic Board/Tiles. Sq.M. 945 945 945 945 945 945 945 945 945 945 945 957 945 945 945
(e) Supplying ,fitting & fixing Eco-friendly,
Water Resistance and Incombustable
Calcium Silicate board/tiles (Density >900 Kg
per Cu.M.) of approved design and brand
finished with calcium silicate jointing
compound to form a joint less false ceiling.
All complete as per drawing & direction of
Engineer - in- Charge.
False ceiling with
(i) 6mm thick square edged Calcium Silicate Sq.M. 439 439 439 439 439 439 439 439 439 439 439 455 439 439 439
Board
(ii) 8mm thick square edged Calcium Silicate Sq.M. 533 533 533 533 533 533 533 533 533 533 533 554 533 533 533
Board
(f) Supplying ,fitting & fixing Eco-
friendly,Moisture Resistance and
Incombustable Gypsum plaster board (
Density > 700Kg per Cu.M.) confirming to IS
2095- Part 1, 2011 of approved design and
brand finished with gypsum jointing
compound to form a joint less false ceiling.
All complete as per drawing & direction of
Engineer - in- Charge.
False ceiling with
(i) 9.5mm thick tapered edged Gypsum Sq.M. 460 460 460 460 460 460 460 460 460 460 460 486 460 460 460
Plaster Board
(ii) 12.5mm thick tapered edged Gypsum Sq.M. 475 475 475 475 475 475 475 475 475 475 475 502 475 475 475
Plaster Board
(g) Supplying ,fitting & fixing Eco-friendly,
Heat Resistance and Incombustable
Gypsum plaster board ( Density > 700Kg per
Cu.M.) confirming to IS 2095- Part 1, 2011
of approved design and brand finished with
gypsum jointing compound to form a joint
less false ceiling. All complete as per
drawing & direction of Engineer - in- Charge.
Page 243
Section 1.........BUILDING WORKS
PWD (WB) Schedule of Rates 2014
(U) - Additional Items
Rate (Rs.)
of Haldibari PS
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Haldibari PS
Bardhaman
Birbhum
Bankura
Item
Purulia
Malda
Nadia
Description of Items Unit
Div
No.
Page 244
Section 1.........BUILDING WORKS
PWD (WB) Schedule of Rates 2014
(U) - Additional Items
Rate (Rs.)
of Haldibari PS
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Haldibari PS
Bardhaman
Birbhum
Bankura
Item
Purulia
Malda
Nadia
Description of Items Unit
Div
No.
Page 245
Section 1.........BUILDING WORKS
PWD (WB) Schedule of Rates 2014
(U) - Additional Items
Rate (Rs.)
of Haldibari PS
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Haldibari PS
Bardhaman
Birbhum
Bankura
Item
Purulia
Malda
Nadia
Description of Items Unit
Div
No.
Page 246
Section 1.........BUILDING WORKS
PWD (WB) Schedule of Rates 2014
(U) - Additional Items
Rate (Rs.)
of Haldibari PS
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Haldibari PS
Bardhaman
Birbhum
Bankura
Item
Purulia
Malda
Nadia
Description of Items Unit
Div
No.
b) For unsupported length of vertical member Kg. 432 432 432 432 432 432 432 432 432 432 432 444 432 432 432
above 1.50m. height of both ends of vertical
member restrained but panel above 0.90
sqm
(unit wt of Top, bottom & side member @
1.978; intermediate member @ 2.055;
glazing clip @ 0.167 kg/m respectively)
[Note : for estimate purpose construction
wing may consider weight of Al-Sections
for Partition wall @ 5.0 Kg per Sq.M]
[Mode of Measurement:
for SL No. 24 to 26
Payment will be made on the basis of
actual weight of Aluminium Composit
section based on relevant specification]
Page 247
Section 1.........BUILDING WORKS
PWD (WB) Schedule of Rates 2014
(U) - Additional Items
Rate (Rs.)
of Haldibari PS
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Haldibari PS
Bardhaman
Birbhum
Bankura
Item
Purulia
Malda
Nadia
Description of Items Unit
Div
No.
Grill made with 10 mm wide and 5.2 mm Sq.M. 1859 1859 1859 1859 1859 1859 1859 1859 1859 1859 1859 1948 1859 1859 1859
thick aluminium sheet having expansion
width of 66.00 mm and weight not less than
3.26 Kg/Sq.m.
28) Supplying profiles of required section made
of Aluminium Alloy Extrusion conforming to
IS: 732-1983 and IS: 1285-1975; Annodised
with required film thickness and specified
colour/natural matt finished conforming to IS:
1868-1983 for fabrication of Structural
Glazing, Curtain Wall formed of basic
sections of any ISI embossed/certified make
and brand as per direction of Engineer-in-
charge. ( Payment will be made on finished
length of the work).
15 micron colour annodizing
Structural glazing /Cartain Wall
i) Mulion & Transom (Weight @1.819 Kg per Sq.M. 552 552 552 552 552 552 552 552 552 552 552 573 552 552 552
Meter)
ii) Sub frame for fixing Glass (Weight @0.31 Sq.M. 97 97 97 97 97 97 97 97 97 97 97 100 97 97 97
Kg per Meter)
29) Supplying Glazing Silicon of approved make
and brand for fixing of Glass on Sub-frame
as per direction of Engineer-in-charge for
Page 248
Section 1.........BUILDING WORKS
PWD (WB) Schedule of Rates 2014
(U) - Additional Items
Rate (Rs.)
of Haldibari PS
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Haldibari PS
Bardhaman
Birbhum
Bankura
Item
Purulia
Malda
Nadia
Description of Items Unit
Div
No.
(i) Fixing Plate (Wt. @ 0.515 Kg per Mtr.) Mtr. 139 139 139 139 139 139 139 139 139 139 139 144 139 139 139
(ii) Fixing cap (Wt. @ 0.342 Kg per Mtr.) Mtr. 92 92 92 92 92 92 92 92 92 92 92 96 92 92 92
32) Labour charge for fabrication and installation
of structural Glazing/Curtain Wall made from
annodized extruded allooy aluminium
sections for the following units:-
Sq.M. 881 881 881 881 881 881 881 881 881 881 881 881 881 881 881
Page 249
Section 1.........BUILDING WORKS
PWD (WB) Schedule of Rates 2014
(U) - Additional Items
Rate (Rs.)
of Haldibari PS
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Haldibari PS
Bardhaman
Birbhum
Bankura
Item
Purulia
Malda
Nadia
Description of Items Unit
Div
No.
Mtr. 270 270 270 270 270 270 270 270 270 270 270 270 270 270 270
35) Taking out old damaged tarfelt from the roof,
parapet etc. preparing the roof surfaces by
removing all spoils, blisters, moss etc. from
the working site and disposal of the same
beyond the compound and cleaning the site
in all respect as per direction of Engineer-in-
Charge.
Page 250
Section 1.........BUILDING WORKS
PWD (WB) Schedule of Rates 2014
(U) - Additional Items
Rate (Rs.)
of Haldibari PS
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Haldibari PS
Bardhaman
Birbhum
Bankura
Item
Purulia
Malda
Nadia
Description of Items Unit
Div
No.
Page 251
Section 1.........BUILDING WORKS
PWD (WB) Schedule of Rates 2014
(U) - Additional Items
Rate (Rs.)
of Haldibari PS
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Haldibari PS
Bardhaman
Birbhum
Bankura
Item
Purulia
Malda
Nadia
Description of Items Unit
Div
No.
A. Over Flat Roof. Sq.M. 367 367 367 367 367 367 367 367 367 367 367 367 367 367 367
B. Over Sloped Roof. Sq.M. 364 353 352 352 355 354 353 352 354 354 354 359 353 353 355
Page 252
Section 1.........BUILDING WORKS
PWD (WB) Schedule of Rates 2014
(U) - Additional Items
Rate (Rs.)
of Haldibari PS
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Haldibari PS
Bardhaman
Birbhum
Bankura
Item
Purulia
Malda
Nadia
Description of Items Unit
Div
No.
A. Over Flat Roof. Sq.M. 574 574 574 574 574 574 574 574 574 574 574 574 574 574 574
B. Over Sloped Roof. Sq.M. 571 567 566 566 569 568 567 566 569 569 568 573 568 568 569
40) Supplying and stacking of good earth
(adequate for horticulture work) at site
including royalty (earth measured in stack
will be reduced by 20% for payment)
Cu.M. 309 309 309 309 309 309 309 309 309 309 309 309 309 309 309
Page 253
Section 1.........BUILDING WORKS
PWD (WB) Schedule of Rates 2014
(U) - Additional Items
Rate (Rs.)
of Haldibari PS
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Haldibari PS
Bardhaman
Birbhum
Bankura
Item
Purulia
Malda
Nadia
Description of Items Unit
Div
No.
Cu.M. 462 462 462 462 462 462 462 462 462 462 462 462 462 462 462
42) Spreading of sludge, dump manure,/farm
yard manure/animel dung manure and good
earth in required thickness. This includes
supply of labour, tools & plants excluding
materials.
% Sq.M. 177 177 177 177 177 177 177 177 177 177 177 177 177 177 177
43) Supplying and fixing grasses tiles of grass
Maxican Carpet/Selection No. 1 Healthy &
fresh grasses (size 1'x1' or bigger) including
watering and maintenance of the lawn for 30
days or more till the grass forms a thick lawn
free from wees and fit for mowing including
supplying good earth as required by
Engineer-in-charge. (Rate includes supply of
labour, tools & plants including materials)
% Sq.M. 20343 20343 20343 20343 20343 20343 20343 20343 20343 20343 20343 20343 20343 20343 20343
Planting hedge plants in two rows at 30cm % Sq.M. 3565 3565 3565 3565 3565 3565 3565 3565 3565 3565 3565 3565 3565 3565 3565
apart
Page 254
Section 1.........BUILDING WORKS
PWD (WB) Schedule of Rates 2014
(U) - Additional Items
Rate (Rs.)
of Haldibari PS
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Haldibari PS
Bardhaman
Birbhum
Bankura
Item
Purulia
Malda
Nadia
Description of Items Unit
Div
No.
% Sq.M. 11888 11888 11888 11888 11888 11888 11888 11888 11888 11888 11888 11888 11888 11888 11888
46) Planting of trees ( Avenue plants) in 0.60m
dia holea, 1m deep dug in the ground, mixing
the soil with decayed farm yard/sludge
manure. This includes supply of labour, tools
& plants including materials but excluding
cost of tree.
Each 118 118 118 118 118 118 118 118 118 118 118 118 118 118 118
47) Maintanance of trees for one year (Avenue
Plants) including watering, trimming,
manuring, spraying insecticide and guarding
as required. This includes supply of labour,
tools & plants including materials.
Each Per 482 482 482 482 482 482 482 482 482 482 482 482 482 482 482
Year
48) Supplying and Planting of different plant /
trees ( Supplying well grown plants bushy
and healthy, minimum height as specified i.e.
exposed height including all leads & lift,
carriage, handling, manuring, applying
presticide and fertilizer etc.
i) Furcaria veriegated 10-12 leaves in height Each 162 162 162 162 162 162 162 162 162 162 162 162 162 162 162
20-30cm in earthen pots of size 25cm.
Page 255
Section 1.........BUILDING WORKS
PWD (WB) Schedule of Rates 2014
(U) - Additional Items
Rate (Rs.)
of Haldibari PS
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Haldibari PS
Bardhaman
Birbhum
Bankura
Item
Purulia
Malda
Nadia
Description of Items Unit
Div
No.
viii) China palm of leaves 4-5 in earthen pots Each 1893 1893 1893 1893 1893 1893 1893 1893 1893 1893 1893 1893 1893 1893 1893
size 25cm
ix) Ficus bengalensis (variegated) of height Each 185 185 185 185 185 185 185 185 185 185 185 185 185 185 185
60-75cm in earthen pots size 30cm
x) Ficus blakii ( F. Vivicon ) well branched ( Each 187 187 187 187 187 187 187 187 187 187 187 187 187 187 187
Bushy ) of height 120cm - 135 cm in earthen
pot of size 30cm.
xi) Ficus elastica Decora ( Rubber plant ) of Each 69 69 69 69 69 69 69 69 69 69 69 69 69 69 69
height 90cm-60cm in each earthen pot of
size 25cm.
xii) Ficus infectoria (Pilikhan) of height Each 61 61 61 61 61 61 61 61 61 61 61 61 61 61 61
135cm-150cm in big polybag of size 25cm-
30cm
xiii) Ficus regnold well branched (bushy) of Each 142 142 142 142 142 142 142 142 142 142 142 142 142 142 142
height 120cm-135cm in cement pots of size
35cm.
xvi) Adenium obesum of height 90cm-60cm Each 207 207 207 207 207 207 207 207 207 207 207 207 207 207 207
in earthen pots of size 25cm.
xix) Bougainvillea (name variety, bushy Each 103 103 103 103 103 103 103 103 103 103 103 103 103 103 103
plants, full bloom) of height 90cm-60cm in
cement pots of size 30cm.
xx) Croton (broad leaves) 3-5 branches of Each 148 148 148 148 148 148 148 148 148 148 148 148 148 148 148
height 90cm-120cm in cement pots of size
30cm.
xxi) Croton different varieties of height 30 cm Each 110 110 110 110 110 110 110 110 110 110 110 110 110 110 110
to 90 cm in earthen pots of size 25cm.
Page 256
Section 1.........BUILDING WORKS
PWD (WB) Schedule of Rates 2014
(U) - Additional Items
Rate (Rs.)
of Haldibari PS
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Haldibari PS
Bardhaman
Birbhum
Bankura
Item
Purulia
Malda
Nadia
Description of Items Unit
Div
No.
xxvi) Areca Palm 4 - 5 suckers of height 90 Each 127 127 127 127 127 127 127 127 127 127 127 127 127 127 127
cm to 105 cm in earthen pots of size 25 cm.
xxvii) Areca Palm 4 - 5 suckers of height Each 163 163 163 163 163 163 163 163 163 163 163 163 163 163 163
120 cm to 135 cm in earthen pots of size 25
cm.
xxviii) Dracaena (Mahatma) of height 30 cm Each 51 51 51 51 51 51 51 51 51 51 51 51 51 51 51
to 90 cm in earthen pots of size 20 cm.
Page 257
Section 1.........BUILDING WORKS
PWD (WB) Schedule of Rates 2014
(U) - Additional Items
Rate (Rs.)
of Haldibari PS
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Haldibari PS
Bardhaman
Birbhum
Bankura
Item
Purulia
Malda
Nadia
Description of Items Unit
Div
No.
Page 258
Section 1.........BUILDING WORKS
PWD (WB) Schedule of Rates 2014
(U) - Additional Items
Rate (Rs.)
of Haldibari PS
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Haldibari PS
Bardhaman
Birbhum
Bankura
Item
Purulia
Malda
Nadia
Description of Items Unit
Div
No.
(a) Plain Colour. Mtr. 606 606 606 606 606 606 606 606 606 606 606 606 606 606 606
(b) Pre-laminated Colour. Mtr. 661 661 661 661 661 661 661 661 661 661 661 661 661 661 661
Page 259
Section 1.........BUILDING WORKS
PWD (WB) Schedule of Rates 2014
(U) - Additional Items
Rate (Rs.)
of Haldibari PS
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Haldibari PS
Bardhaman
Birbhum
Bankura
Item
Purulia
Malda
Nadia
Description of Items Unit
Div
No.
Page 260
Section 1.........BUILDING WORKS
PWD (WB) Schedule of Rates 2014
(U) - Additional Items
Rate (Rs.)
of Haldibari PS
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Haldibari PS
Bardhaman
Birbhum
Bankura
Item
Purulia
Malda
Nadia
Description of Items Unit
Div
No.
Page 261
Section 1.........BUILDING WORKS
PWD (WB) Schedule of Rates 2014
(U) - Additional Items
Rate (Rs.)
of Haldibari PS
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Haldibari PS
Bardhaman
Birbhum
Bankura
Item
Purulia
Malda
Nadia
Description of Items Unit
Div
No.
v) Pile diameter - 500 mm. Mtr. 2040 2040 2040 2040 2040 2040 2040 2040 2040 2040 2040 2137 2040 2040 2040
vi) Pile diameter - 550 mm. Mtr. 2144 2144 2144 2144 2144 2144 2144 2144 2144 2144 2144 2245 2144 2144 2144
vii) Pile diameter - 600 mm. Mtr. 2259 2259 2259 2259 2259 2259 2259 2259 2259 2259 2259 2365 2259 2259 2259
viii) Pile diameter - 650 mm. Mtr. 2386 2386 2386 2386 2386 2386 2386 2386 2386 2386 2386 2499 2386 2386 2386
ix) Pile diameter - 700 mm. Mtr. 2529 2529 2529 2529 2529 2529 2529 2529 2529 2529 2529 2648 2529 2529 2529
Note:
1. The rate provided is exclusive of cost of
concrete. Construction wing is to add cost of
concrete of desired grade for volume
corresponding to 1.0m length of pile length,
to arrive at the complete rate. Also the
desired crushing strength is to be mentioned
in the space provided in the description of
item. The Rate of providing the temporary
steel casing upto 3m depth is included.
2.To obtain the complete rate the
construction wing have to add cost of
concrete volume for 1m length of pile,
multiplied by a factor:[1+ { dummy length of
pile( max=1.5m) / Individual pile length}]
3. The cost of dismantling the length of the
pile above cut off level is to be paid
separately.
Page 262
Section 1.........BUILDING WORKS
PWD (WB) Schedule of Rates 2014
(U) - Additional Items
Rate (Rs.)
of Haldibari PS
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Haldibari PS
Bardhaman
Birbhum
Bankura
Item
Purulia
Malda
Nadia
Description of Items Unit
Div
No.
Note:
1. The rate provided is exclusive of cost of
concrete. Construction wing is to add cost of
concrete of desired grade for volume
corresponding to 1.0m length of pile length,
to arrive at the complete rate. Also the
desired crushing strength is to be mentioned
in the space provided in the description of
item. The Rate of providing the temporary
steel casing upto 3m depth is included.
Page 263
Section 1.........BUILDING WORKS
PWD (WB) Schedule of Rates 2014
(U) - Additional Items
Rate (Rs.)
of Haldibari PS
REMARKS
Medinipur (W)
Medinipur (E)
Murshidabad
Haldibari PS
Bardhaman
Birbhum
Bankura
Item
Purulia
Malda
Nadia
Description of Items Unit
Div
No.
Note:
1. Add extra over the rate of ground floor for
basement and each additional floor above
ground floor for item 4
(i) upto 4 th floor. = Rs.96/Cum
(ii) above 4 th floor =Rs. 117/cum
Page 264
SECTION II ---- MATERIALS AND LABOUR
1. Building ---- (A) Materials delivered and stacked at site
RATE(Rs.)
area of Haldibari PS
REMARKS
Siliguri Sub Divn.
Howrah/ Hoogly
Medinipur (W)
Medinipur (E)
Murshidabad
Bardhaman
Birbhum
Bankura
Sub Div
Description of
Purulia
Malda
Nadia
Dist.
Sl. No.
Items Unit
area of Haldibari PS
REMARKS
Siliguri Sub Divn.
Howrah/ Hoogly
Medinipur (W)
Medinipur (E)
Murshidabad
Bardhaman
Birbhum
Bankura
Sub Div
Description of
Purulia
Malda
Nadia
Dist.
Sl. No.
Items Unit
except plains
Jalpaiguri,Ali
Haldibari PS
Coochbehar
Kalyani Sub
Kalyani Sub
Kolkata / 24
Pgs (N & S)
Siliguri Sub
Bardhaman
REMARKS
the area of
Darjeeling
Medinipur
Medinipur
Sub Divn.
excluding
excluding
of Siliguri
purduar,
plains of
Howrah/
Bankura
Dinajpur
Birbhum
Dakshin
/Area of
Hoogly
area of
Purulia
Malda
Nadia
Uttar/
Dist.
(W)
Div
Div
(E)
ZONE (A) (A) (B) (B) (A) (A) (A) (B) (B) (B) (B) (A) (A) (B) (B)
1) Mason (Head) Each 326 326 326 326 326 326 326 326 326 326 326 326 326 326 326
2) Mason (Ordinary) Each 296 296 296 296 296 296 296 296 296 296 296 296 296 296 296
3) Mazdoor (Male) Each 245 245 245 245 245 245 245 245 245 245 245 245 245 245 245
4) Mazdoor (Female) Each 245 245 245 245 245 245 245 245 245 245 245 245 245 245 245
5) Carpenter (Head) Each 326 326 326 326 326 326 326 326 326 326 326 326 326 326 326
6) Carpenter (Ordinary) Each 296 296 296 296 296 296 296 296 296 296 296 296 296 296 296
7) Carpenter (Helper) Each 270 270 270 270 270 270 270 270 270 270 270 270 270 270 270
8) Beater Women Each 270 270 270 270 270 270 270 270 270 270 270 270 270 270 270
9) Gharamee (Head) Each 326 326 326 326 326 326 326 326 326 326 326 326 326 326 326
10) Gharamee (Ordinary) Each 296 296 296 296 296 296 296 296 296 296 296 296 296 296 296
11) Bhistee Each 270 270 270 270 270 270 270 270 270 270 270 270 270 270 270
12) Stone Cutter Each 326 326 326 326 326 326 326 326 326 326 326 326 326 326 326
13) Santras Each 326 326 326 326 326 326 326 326 326 326 326 326 326 326 326
14) Blacksmith (Head) Each 326 326 326 326 326 326 326 326 326 326 326 326 326 326 326
15) Blacksmith (Ordinary) Each 296 296 296 296 296 296 296 296 296 296 296 296 296 296 296
16) Blacksmith (Helper) Each 270 270 270 270 270 270 270 270 270 270 270 270 270 270 270
17) Fitter Mechanic Each 326 326 326 326 326 326 326 326 326 326 326 326 326 326 326
18) Fitter Mechanic (Helper) Each 270 270 270 270 270 270 270 270 270 270 270 270 270 270 270
19) Hammer Man Each 270 270 270 270 270 270 270 270 270 270 270 270 270 270 270
20) Khalasi Each 245 245 245 245 245 245 245 245 245 245 245 245 245 245 245
21) Tarman Each 296 296 296 296 296 296 296 296 296 296 296 296 296 296 296
22) Painter Each 326 326 326 326 326 326 326 326 326 326 326 326 326 326 326
23) Spray Painter Each 326 326 326 326 326 326 326 326 326 326 326 326 326 326 326
24) Welder Each 326 326 326 326 326 326 326 326 326 326 326 326 326 326 326
25) Welder (Helper) Each 296 296 296 296 296 296 296 296 296 296 296 296 296 296 296
26) Rod Binder (Head) Each 326 326 326 326 326 326 326 326 326 326 326 326 326 326 326
27) Rod Binder (Ordinary) Each 296 296 296 296 296 296 296 296 296 296 296 296 296 296 296
28) Rod Binder (Helper) Each 270 245 245 245 245 245 245 245 245 245 245 245 245 245 245
29) Mosaic Mistry Each 326 326 326 326 326 326 326 326 326 326 326 326 326 326 326
Note :- (I)The above rates of labour are exclusive of 10% profit which would be admissible to the Contractors, but contractual percentage will not be applicable on the above rates.
(II) The workers employed on High Rise Building or any structure over 30 ft in height and also workers engaged in Tunnel workers shall be paid 20% as extra wages.
ANNEXURE-I
Table-1-1- ISSUE RATE OF CEMENT & STEEL MATERIALS
Cement:
PPC/PSC/ MT 8100 8320 7360 7560
OPC(33 Grade)
Cement:
8100 8320 7360 7560
OPC(43 Grade)
FORMAT - A
(Format for analysis of rate of items involving use of Cement supplied by Contractor)
Step - 2 Deduct cost of cement = (Quantity of cement) X (Issue rate of cement Rs. B
vide Item No. 1, Column - 4, Table - 1 - 1 of Annexure - I)
Step - 3 Add cost of cement supplied by Contractor including 10% Profit = Rs. C
1.1 X (Quantity of cement) X (Basic price of cement vide Item No. 1,
Column - 5, Table - 1 - 1 of Annexure-I)
Note: The quantity of cement shall be same as Step - 2.
FORMAT - B
Step - 2 Deduct Issue Rate (Per MT) of respective Quality Steel X 1.05 Rs. B
Step - 3 Add Basic Price at outlet of Steel of respective quality X 1.05 Rs. C
Step - 4 Add Contractor's Profit @ 10% on cost of Steel only (Sl. No. 3) Rs. D
Step - 5 Add cost of Carriage from outlet to site with necessary loading, Rs. E
unloading and stacking charges for 1.05 MT Steel
Step - 2 Add cost of stone aggregate of different grading as per consumption required for one cum of concrete.
( As per table:T-1)
Step - 3 Add cost of carriage of stone aggregate as per consumption required for one cum of concrete.
( As per table:T-2)
Step - 4 Add cost for loading and unloading of stone aggregate Rs. D
( As per table:T-3)
Note:
1. Cost of stone aggregate of different grading to be obtained from Table T-1 by considering rate of the nearest railway stack
yard.
2. Cost of carriage of stone aggregate to be obtained from Table: T-2 by considering the actual distance from the nearest
railway stack yard to the working site.
3. Cost for loading and unloading of stone aggregate to be obtained from Table:T-3
4. ANNEXURE II is applicable for It. No. 5(a), 6(a)(i) to 6(e)(i), 7(a), 9(A)(a) to 9(A)(e) & 9(B)(a) to 9(B)(e) of Chapter
C only.
P.W.D(WB) Schedule of Rates 2014 Vol-I
(TABLE :T-1)
RATES OF PAKUR VARIETY STONE AGGREGATES AT DIFFERENT RAILWAY YARDS
Aggregat
Boulder
Stone
Hand broken
es
Machine made Stone Chips Stone Screening Graded Aggregates
Aggregates
aggregates
aggregates
Stone dust
Grade - II
Stone grit
Grade - I
37.5 mm
40 mm
20 mm
10 mm
Name of
30 / 45 kg
Railway Unit
26.5 mm
22.4 mm
13.2 mm
11.2 mm
Type - A
Type - B
5.6 mm
Yards
(53 - 22.4
Nominal
Nominal
Nominal
45mm)
mm)
(63 -
size
size
size
Adrajn. Cum 1193 1401 1424 1419 1482 1497 1521 1376 1110 1013 989 1196 992 1473 1463 1296
Andal Cum 966 1174 1197 1192 1255 1270 1294 1149 883 786 762 969 765 1246 1236 1069
Asansol Cum 1024 1232 1255 1250 1313 1328 1352 1207 941 844 820 1027 823 1304 1294 1127
Ballyganj Cum 1250 1458 1481 1476 1539 1554 1578 1433 1167 1070 1046 1253 1049 1530 1520 1353
Bankura Jn. Cum 1304 1512 1535 1530 1593 1608 1632 1487 1221 1124 1100 1307 1103 1584 1574 1407
Bandel Jn. Cum 1135 1343 1366 1361 1424 1439 1463 1318 1052 955 931 1138 934 1415 1405 1238
Barasat Cum 1250 1458 1481 1476 1539 1554 1578 1433 1167 1070 1046 1253 1049 1530 1520 1353
Barrackpur Cum 1193 1401 1424 1419 1482 1497 1521 1376 1110 1013 989 1196 992 1473 1463 1296
Baripurjn. Cum 1304 1512 1535 1530 1593 1608 1632 1487 1221 1124 1100 1307 1103 1584 1574 1407
Berhampur
Cum 1473 1681 1704 1699 1762 1777 1801 1656 1390 1293 1269 1476 1272 1753 1743 1576
Court
Bishnupur Cum 1360 1568 1591 1586 1649 1664 1688 1543 1277 1180 1156 1363 1159 1640 1630 1463
Bongaon Cum 1304 1512 1535 1530 1593 1608 1632 1487 1221 1124 1100 1307 1103 1584 1574 1407
Burdwan In. Cum 966 1174 1197 1192 1255 1270 1294 1149 883 786 762 969 765 1246 1236 1069
Page 1
P.W.D(WB) Schedule of Rates 2014 Vol-I
Aggregat
Boulder
Stone
Hand broken
es
Machine made Stone Chips Stone Screening Graded Aggregates
Aggregates
aggregates
aggregates
Stone dust
Grade - II
Stone grit
Grade - I
37.5 mm
40 mm
20 mm
10 mm
Name of
30 / 45 kg
Railway Unit
26.5 mm
22.4 mm
13.2 mm
11.2 mm
Type - A
Type - B
5.6 mm
Yards
(53 - 22.4
Nominal
Nominal
Nominal
45mm)
mm)
(63 -
size
size
size
Chandrakona
Cum 1587 1795 1818 1813 1876 1891 1915 1770 1504 1407 1383 1590 1386 1867 1857 1690
Road
Contai roads Cum 1587 1795 1818 1813 1876 1891 1915 1770 1504 1407 1383 1590 1386 1867 1857 1690
Dalkhola Cum 1024 1232 1255 1250 1313 1328 1352 1207 941 844 820 1027 823 1304 1294 1127
Dankuni Cum 1135 1343 1366 1361 1424 1439 1463 1318 1052 955 931 1138 934 1415 1405 1238
Dhupguri Cum 1416 1624 1647 1642 1705 1720 1744 1599 1333 1236 1212 1419 1215 1696 1686 1519
Durgapur Cum 966 1174 1197 1192 1255 1270 1294 1149 883 786 762 969 765 1246 1236 1069
Falakata Cum 1473 1681 1704 1699 1762 1777 1801 1656 1390 1293 1269 1476 1272 1753 1743 1576
Haldia Cum 1530 1738 1761 1756 1819 1834 1858 1713 1447 1350 1326 1533 1329 1810 1800 1633
Jhargram Cum 1587 1795 1818 1813 1876 1891 1915 1770 1504 1407 1383 1590 1386 1867 1857 1690
Kalyani Cum 1193 1401 1424 1419 1482 1497 1521 1376 1110 1013 989 1196 992 1473 1463 1296
Kharagpur Jn. Cum 1473 1681 1704 1699 1762 1777 1801 1656 1390 1293 1269 1476 1272 1753 1743 1576
Krishnanagar
Cum 1304 1512 1535 1530 1593 1608 1632 1487 1221 1124 1100 1307 1103 1584 1574 1407
City
Maldah Town Cum 795 1003 1026 1021 1084 1099 1123 978 712 615 591 798 594 1075 1065 898
Midnapore Cum 1530 1738 1761 1756 1819 1834 1858 1713 1447 1350 1326 1533 1329 1810 1800 1633
New Farakka Cum 795 1003 1026 1021 1084 1099 1123 978 712 615 591 798 594 1075 1065 898
Page 2
P.W.D(WB) Schedule of Rates 2014 Vol-I
Aggregat
Boulder
Stone
Hand broken
es
Machine made Stone Chips Stone Screening Graded Aggregates
Aggregates
aggregates
aggregates
Stone dust
Grade - II
Stone grit
Grade - I
37.5 mm
40 mm
20 mm
10 mm
Name of
30 / 45 kg
Railway Unit
26.5 mm
22.4 mm
13.2 mm
11.2 mm
Type - A
Type - B
5.6 mm
Yards
(53 - 22.4
Nominal
Nominal
Nominal
45mm)
mm)
(63 -
size
size
size
New Alipore Cum 1250 1458 1481 1476 1539 1554 1578 1433 1167 1070 1046 1253 1049 1530 1520 1353
New
Cum 1587 1795 1818 1813 1876 1891 1915 1770 1504 1407 1383 1590 1386 1867 1857 1690
Alipurduar
New
Cum 1587 1795 1818 1813 1876 1891 1915 1770 1504 1407 1383 1590 1386 1867 1857 1690
Coochbehar
New Jalpaiguri Cum 1304 1512 1535 1530 1593 1608 1632 1487 1221 1124 1100 1307 1103 1584 1574 1407
Panskura Cum 1360 1568 1591 1586 1649 1664 1688 1543 1277 1180 1156 1363 1159 1640 1630 1463
Purulia Cum 1078 1286 1309 1304 1367 1382 1406 1261 995 898 874 1081 877 1358 1348 1181
Raniganj Cum 966 1174 1197 1192 1255 1270 1294 1149 883 786 762 969 765 1246 1236 1069
Sainthia Cum 795 1003 1026 1021 1084 1099 1123 978 712 615 591 798 594 1075 1065 898
Salimar Cum 1250 1458 1481 1476 1539 1554 1578 1433 1167 1070 1046 1253 1049 1530 1520 1353
Sealdah Cum 1250 1458 1481 1476 1539 1554 1578 1433 1167 1070 1046 1253 1049 1530 1520 1353
Serampore Cum 1193 1401 1424 1419 1482 1497 1521 1376 1110 1013 989 1196 992 1473 1463 1296
Suri Cum 795 1003 1026 1021 1084 1099 1123 978 712 615 591 798 594 1075 1065 898
Tarakeswar Cum 1416 1624 1647 1642 1705 1720 1744 1599 1333 1236 1212 1419 1215 1696 1686 1519
Tamluk Cum 1135 1343 1366 1361 1424 1439 1463 1318 1052 955 931 1138 934 1415 1405 1238
Page 3
(TABLE :T-3)
Rate for loading & unloading of Stone Aggregate
All districts of
West Bengal and
Item Darjeeling
Description of Items Unit Unit Darjeeling Plain of Remarks
No. Hill Area
Siliguri Sub-
Division
Zone
Item No. Unit up to up to up to up to
Items
10 km 20 km 50 km 100 km
(per km) (per km) (per km) (per km) (per km)
1.
All district except hill
124.00 10.90 10.10 9.50 8.40 7.90
area of Darjeeling
Carriage of Stone
Cum
Aggregate
Hill area of
185.00 16.40 15.20 14.30 12.60 11.90
Darjeeling