BDC 42
BDC 42
:
NOTE: A Transmittal is required for each Specification Section. Project Description: (Project Title, Facility Name and Address)
DO NOT bind together separate submittals from different
Specification Sections.
This form is to be used only if there are no deviations from
the Contract Documents. If there are ANY deviations from
the Contract Documents, you must submit the Contract
Document Deviation Request Form (BDC 49).
Date:
TO: FROM:
SUBMITTAL TYPE:
Re-Submittal Information (Waiver)
Comply with all submittal requirements in
Product Data Shop Drawings Quality Control/Assurance the Project Manual as per Section 013300
Test Reports Certificate Contract Closeout and the particular Specification Section for
which you are transmitting material.
Design Data Samples Other
Contractors Certification:
We have verified that all material or equipment contained in this submittal meets all the requirements specified or shown (no exceptions).
We acknowledge that in accordance with Article 4.7 of the General Conditions a re-evaluation fee can be assessed against our contract if this
submittal requires a re-submission and review, if the submittal requirements have not been met.
Contractor/Contractors Representative (Print Name) Signature
BDC 42 Rev02