Design of Pier Final

This document provides design details for a pier and abutment for a bridge. For the pier: it is 4.05 meters high and tapers from a bottom width of 3.15 meters to a top width of 1.8 meters. Reinforcement calculations are provided showing the pier design meets minimum reinforcement requirements. Stress calculations accounting for loads from self-weight, current, wind, and live loads on the bridge show compressive stresses remain below design limits. Similarly, the abutment design meets minimum reinforcement standards with compressive stresses below limits.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
468 views5 pages

Design of Pier Final

This document provides design details for a pier and abutment for a bridge. For the pier: it is 4.05 meters high and tapers from a bottom width of 3.15 meters to a top width of 1.8 meters. Reinforcement calculations are provided showing the pier design meets minimum reinforcement requirements. Stress calculations accounting for loads from self-weight, current, wind, and live loads on the bridge show compressive stresses remain below design limits. Similarly, the abutment design meets minimum reinforcement standards with compressive stresses below limits.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 5

DESIGN OF PIER

Sl.No Description

1 MWL 794 m
2 Freeboard 1.5 m
3 Ground Level @pier location(for ht calculation) 791.45 m
4 Length of Pier 5 m
5 Length of Pier @ base 7.5 m
6 Width of Pier @ top 1.8 m
7 Width of Pier @ bottom 3.15 m
8 Density of Concrete 24 kn/m3
9 Load from Bridge 1003 kn
10 Reaction due to LL load on one span 464 kn
11 Height of the pier 4.05 m
12 Width of pier @ HFL 2.65
13 Breaking force/ Tractive effort for class AA load 140 kn
14 Basic wind speed Vb 44 m/s
15 Risk co-eff k1 0.94
16 roughness co-eff k2 0.91
17 Topography factor k3 1
18 Design wind speed 37.6376 m/s
19 Design Wind pressure 849.95 N/sqm
20 85.00 Kn/sqm
21 Dia of bar 16 mm
22 Grade of concrete M 20
23 Grade of Steel Fe 415
24 st 200 N/mm2
25 Front batter 1 6
26 Back batter 1 6
27 Unit weight of water 10 kn/m3
28 Dist to C/L of bearing for Elastomeric bearings 0.28 m
29 SBC of Rock 2000 kn/m2
30 Dia of Ddistribution reinforcement 12 mm
31 Max mean velocity of current 5 m/s

Design Computations
1 Stress due to dead load & self-weight of pier
Self Weight of pier 1202.85 kn
Dead load from SS(bridge) 1003.21 kn

Total load 2206.06 kn

Compressive stress @ base of pier 140.07 kn/m2

2 Effect of buoyancy
Width of pier @ HFL 2.65 m
Height of pier @ HFL 2.55 m
Submerged volume of pier 36.975 m3
Reduction in weight of pier due to buoyancy 369.75 kn
Tensile stress @ base due to buoyancy -23.48 kn/m2

Page 1 of 5 02/28/2017
3 Stresses due to eccentricity of live load
Reaction due to LL load on one span 464
eccentricity e 0.28
Moment about base M 129.92 knm
Section modulus 8.27 m3
Stresses developed @ base of pier due to the eccentricity of live load
Max stress 45.17 kn/m2
Min stress 13.75 kn/m2

4 Stresses due to Longitudinal breaking forces


Breaking force @ bearing level 140 kn
Moment about base of the pier 567 knm
Stress @ base 68.57 kn/m2
-68.57 kn/m2

5 Stresses due toresistance in bearings to movement due to temp.

Total resistance by left side bearings 366.80 kn


Total resistance by right side bearings 225.72 kn
Ubaalnced force @ bearing 141.08 kn
Moment @ base 571.38 knm
Stress @ base 69.10 kn/m2
-69.10 kn/m2
6 Stresses due to wind pressure
Area of structure seen in elevation due to deck slab & hand rail 18.18 m2
a Total wind pressure on pier=area of str in ele*wind intensity 15.45 kn
b Wind force against moving load, considering Class A Train 0.03 kn
c Total wind force as in (a) & (b) 15.48 kn
d Min limiting force on deck @ 4kn/m 0.06 kn
e Min limiting force on deck @ 2.4kn/m2 on exposed surface 0.04 kn
f Max of above 15.48 kn
Moment @ base 62.70 knm
Modulus of section of pier @ base about the long axis 13.13 m3

Stress developed @base due to wind loads 4.78 kn/m2


-4.78 kn/m2

7 Stresses due to water current


Intensity of pressure 52KV2 0.04 kg/m2
k 0.66
858.00 kg/m2
85.80 kn/m2
Force due to water current 1.23 T
12.33 kn
Moment @ base 20.96 knm
Stress @ base 1.60 kn/m2
-1.60 kn/m2
If current direction varies by 20 deg

Page 2 of 5 02/28/2017
Minimum & Maximum stresses @ base of pier
Sl.no Type of load Stress(kn/m2)
Dry During floods
1 DL & Self weight 140.07 140.07
2 Buoyancy - -23.48
3 Eccentric LL 45.17 45.17
4 13.75 13.75
5 Longitudinal Forces
a Breaking forces(+/-) 68.57 68.57
b Tractive effort(+/-) 69.10 69.10
6 Wind pressure (+/ -) 4.78 4.78

Maximum Stress 341.44 317.96 SAFE


Minimum stress 56.54 33.06 SAFE

STRESSES ARE COMPRESSIVE


Reinforcements
1 Min Ast 0.075%bd 750 mm2
2 Bar Dia 16 mm
3 Area of bar 201.06 mm2
4 Spacing required 268.08 mm
5 Spacing provided 250 mm
6 Provide 16mm dia bars @ 250c/c

7 Min Ast 0.06%bd 600 mm2


8 Bar Dia 12 mm
9 Area of bar 113.10 mm2
10 Spacing required 188.50 mm
11 Spacing provided 175 mm
12 Provide 12mm dia bars @ 175c/c

Page 3 of 5 02/28/2017
DESIGN OF ABUTMENT

Sl.no Description

1 MWL 794 m
2 Freeboard 1.5 m
3 Ground Level @Abutment location(for ht calculation) 793 m
4 Length of Abutment 5 m
5 Length of Abutment @ base 7.5 m
6 Width of Abutment @ top 1.2 m
7 Width of Abutment @ bottom 2.03 m
8 Density of Concrete 24 kn/m3
9 Load from Bridge 501.61 kn
10 Reaction due to LL load on one span 464 kn
11 Height of the Abutment 2.5 m
12 Width of Abutment @ HFL 1.53
13 Breaking force/ Tractive effort for class AA load 140 kn
14 Basic wind speed Vb 44 m/s
15 Risk co-eff k1 1
16 roughness co-eff k2 1
17 Topography factor k3 1
18 Design wind speed 44 m/s
19 Design Wind pressure 1161.6 N/sqm
20 116.16 Kn/sqm
21 Carriage way 4.5 m
22 Density of soil 14.3 kn/m3
23 Angle of repose 30 deg
24 SBC of Rock 2000 kn/m2
25 72 deg
26 Cos 0.309
27 Sin 0.95
28 Back batter 3
29 Front batter 3
30 Top of abutment 796.5 m
31 Height of the earth fill 3.5 m
32 Length of abutment 5 m
33 Length of earth fill 1.4 m
34 Bar dia 16
35 Grade of concrete M 20
Permissible stress in concrete in
36 bending compression cbc 7 N/mm^2
37 Grade of steel Fe 415
Permissible stress in steel in
38 tension st 190 N/mm^2
39 Modular ratio m 14

Page 4 of 5 02/28/2017
40 k m*scbc/(m*scbc+sst 0.34
41 j 0.89
42 q 1.06
43 Dia of Ddistribution reinforcement 12 mm

Design Computations

Total Vertical forces W


43 w1=Weight of rectangular portion 72 kn
44 w2=Weight of triangular portion 25 kn
45 w3=Live & Dead load/m width 193.12 kn
46 Soil pressure p=0.5*wh2(1-sin phi/1+sin phi) 29.20 kn/m
47 Ver component p*Sin theta 27.74 kn
48 Total Vertical forces 317.86 kn

49 Hor component p*Cos theta 9.02 kn


50
51 Moment about A 258.57 knm

52 Position of resultant R from A Z 0.81 m

53 Eccentricity e=(b/2-Z) 0.20

54 b/6 0.34

55 SAFE
56 STRESSES ARE COMPRESSIVE @ BOTH TOE & HEEL
57
58 Maximum stress in Kn/m2 P/b(1+6e/b) 250.05 SAFE
59 Minimum stress in Kn/m2 P/b(1-6e/b) 62.59 SAFE

60 Min Ast 0.15%bd 750 mm2


61 Bar Dia 16 mm
62 Area of bar 201.06 mm2
63 Spacing required 268.08 mm
64 Spacing provided 250 mm
65 Provide 16mm dia bars @ 250c/c

66 Min Ast 0.12%bd 600 mm2


67 Bar Dia 12 mm
68 Area of bar 113.10 mm2
69 Spacing required 188.50 mm
70 Spacing provided 175 mm
71 Provide 12mm dia bars @ 175c/c