Measure R Project Presentation

The document provides an update on progress and next steps for several transit projects funded by Measure R and Measure M. Several projects are now in service or under construction, including expansions of the Expo, Orange, and Gold lines. Projects now in environmental review or initial planning include expansions and new lines serving the airport, East San Fernando Valley, West Santa Ana Branch, Eastside, and South Bay areas. The Sepulveda Pass corridor is moving to initiate a feasibility study in mid-2017. Overall the document outlines the status and timelines for over 10 major transit expansion projects in Los Angeles County.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
1K views11 pages

Measure R Project Presentation

The document provides an update on progress and next steps for several transit projects funded by Measure R and Measure M. Several projects are now in service or under construction, including expansions of the Expo, Orange, and Gold lines. Projects now in environmental review or initial planning include expansions and new lines serving the airport, East San Fernando Valley, West Santa Ana Branch, Eastside, and South Bay areas. The Sepulveda Pass corridor is moving to initiate a feasibility study in mid-2017. Overall the document outlines the status and timelines for over 10 major transit expansion projects in Los Angeles County.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 11

Planning Update

Measure R Oversight Committee


David Mieger, Senior Executive Officer"
Countywide Planning

March 6, 2017
Measure R Transit Program (Existing and Future)

"
Existing + Measure R:
178-202 stations!
210+ miles 2
Progress with Measure R

Now in service
Expo Line Phase I & II
Orange Line Canoga Extension
Gold Line Foothill Extension (Pasadena to Azusa)
"
Now under construction !
Crenshaw/LAX Transit Corridor
Regional Connector
Purple Line Extension Section 1
"

3
Progress with Measure R

Now in Environmental Review !


Airport Metro Connector 96th Street Transit Station
East San Fernando Valley Transit Corridor
West Santa Ana Branch Corridor
South Bay Green Line Extension
Eastside Transit Corridor Phase 2
"
Now in Initial Planning
Sepulveda Pass Transit Corridor

4
Airport Metro Connector 96th Street Transit Station

Status "
Environmental Review Process "
January 2017 Metro Board certified
Environmental Impact Report (EIR)"
March 2017 - Complete Categorical
Exclusion (CE) for NEPA documentation "
Architectural and Engineering Design Services "
Continuing Schematic Design "
"
Next Steps "
Spring 2017 Complete Schematic Design"
Continue coordination with:"
LAWA " Locally Preferred Alternative for Environmental
Crenshaw/LAX project team " Clearance

Southwestern Maintenance Yard "


FY 2018 Expected start of construction" Measure R
$200 Million (2008 $)
Measure M
$347 Million (2015 $)

5
East San Fernando Valley
Transit Corridor
Status "
Draft Environmental Impact Statement/
Environmental Impact Report (EIS/EIR) in
"
preparation for public release:
Build alternatives under review"
Two Bus Rapid Transit (BRT) alternatives"
Two Rail alternatives"

"
Next Steps "
Spring 2017 Public Release of Draft EIS/EIR "
FY 2021 Expected start of construction "
"
Measure R:
"
68.5 Million (2008 $)
Measure M
810.5 Million (2015 $)
6
West Santa Ana Branch Corridor

Status "
September 2016 Metro Board awarded
contracts to conduct environmental clearance
study "
Project Awareness phase conducting corridor-
wide briefings with: "
Eco-Rapid Board of Directors"
Elected offices"
Project Study Area Cities"
Major Project Stakeholders"
Office of Extraordinary Innovation (OEI)
advanced two unsolicited proposals to Phase II
analysis"
"
Next Steps "
Spring 2017 Initiate Scoping Period
Measure R " "
Prepare Draft environmental document
"Measure M "
$240 Million (2008 $)

FY 2022 Expected start of construction "


$1.435 Billion (2015 $) 20-mile corridor from LA Union Station to the City of Artesia 7
Eastside Transit Corridor Phase 2

Status

"
Continued:"
Technical Study to address comments from
Cooperating and Participating agencies: "
Caltrans "
Southern California Edison (SCE) "
US Army Corps of Engineers (USACE) "
US Environmental Protection Agency
(USEPA) "
California Department of Fish and Wildlife
(CDFW)"
Advancing conceptual design for five new North/
South configuration concepts for Washington
Alternative "
Studying the feasibility of operating both SR 60
Alternatives and Washington Blvd."
Briefings with: "
SR-60 Coalition (monthly)"
Washington Blvd. Coalition (monthly) "
East LA Stakeholder meeting"
February 2017 held five Community meetings " Measure R
"
$1.271 Billion (2008 $)
"
Next Steps!
Measure M
"
$3.976 Billion (2015 $)

April 2017 Complete Technical Study "


FY 2029 Expected start of construction
8
South Bay Metro Green Line Extension

Status"
Preparing technical analysis update for
environmental purpose previously
prepared in 2012"
"
Next Steps"
Coordinate with cities of Redondo Beach,
Lawndale and Torrance"
FY 2026 Expected start of construction"

Measure R
"
$272 Million (2008 $)
Measure M
$619 Million (2015 $)

9
Sepulveda Pass
Transit Corridor
Status"
Completed:"
Corridor Systems Planning Study (2012) "
Six options explored from shoulder running buses
to tunnel options: "
1. Van Nuys/Sepulveda BRT "
2. BRT in At-Grade Freeway Managed Lanes "
3. BRT with Aerial/Viaduct Managed Lanes "
4. BRT with Tolled Highway Tunnel "
5. Fixed-Guideway LRT or HRT Tunnel "
6. Toll Tunnel and Rail Tunnel "
Stated Preference Study and Financial Strategy
(2015) "
OEI advanced two unsolicited proposals to Phase II
analysis"
"
Next Steps"
Initiate Transit Feasibility Study and Technical
Compendium mid 2017 " Measure R
FY 2024 Expected start of construction$1 Billion (2008 $) "
Measure M
$2.8 Billion (2015 $) 10
Thank you.

You might also like