Work Order Summary for 1919 Market St
Work Order Summary for 1919 Market St
Priority 3 - Medium
Supervisor
Cityworks Project Name
Initiated By DAVIS SR., RODERICK L
Initiated Date 11/8/2012 2:39:18 PM
Actual Start Date 11/8/2012 1:00:03 PM
Actual Finish Date 11/8/2012 2:00:03 PM
Labor
Labor Cost Labor Name Hours Start Date Finish Date
$85.99 DAVIS SR., RODERICK L 1.00 11/8/2012 1:00:27 PM 11/8/2012 2:00:27 PM
Equipment
Equipment Description Equip ID Hours Start Date Finish Date Equip Equipment
Cost Unit Cost Rate Type
$13.70 4127 - VAN CARGO 4127 1.00 11/8/2012 1:00:29 11/8/2012 2:00:29 $13.70 Hourly
CNG PM PM
Material
Material Cost Description Material UID Mat Unit Units
Cost Required
$3.00 MARKING PAINT Paint $3.00 1.00
Entities
Entity UID Entity Type
2482 OAKLANDSTREETS
Custom Fields
Custom Field Names Custom Field Value
1 of 37 3/24/2017 12:17 PM
Print Preview - Cityworks http://cityworks/cwportal/WorkManagement/Printing/PrintPreview.asp...
2 of 37 3/24/2017 12:17 PM
Print Preview - Cityworks http://cityworks/cwportal/WorkManagement/Printing/PrintPreview.asp...
Description: Trailer piled with trash and couch outside of rv that someone lives in have been
blocking the sidewalk for several weeks. At least please come haul the trash and trailer that is
blocking the sidewalk. --------------------------------------------------
SeeClickFix user commented on 05/31/2016
Why do folks think they have the right to do this???
By UDO-OKON, DONNISHA: 6/1/2016 8:16:39 AM
CITIZEN IS REQUESTING REMOVAL OF 2 LOVE SEATS, A WOODEN TABLE, AND A
LARGE TRAILER WITH FURNITURE PIECES AND OTHER MISC. DEBRIS IN THE RIGHT
OF WAY OF SIDEWALK, LOCATED AT1919 MARKET STREET, BEHIND THE BUILDING
ON MYRTLE STREET.
Caller:
Q: Are the dumped materials located on public or private property?
A: Public
Q: Are the dumped materials in the middle of the roadway BLOCKING through traffic in a
traffic lane?
A: NO
Q: What are the contents of the illegally dumped materials?
A: Furniture
Priority 3 - Medium
Supervisor MOORE SR., LELAND S
Cityworks Project Name
Initiated By JACKSON, IRENE D
Initiated Date 6/1/2016 9:19:14 AM
Actual Start Date 6/20/2016 3:46:37 PM
Actual Finish Date 6/20/2016 3:46:40 PM
Labor
Labor Cost Labor Name Hours Start Date Finish Date
$35.80 BROWN, LORENZO 0.75 6/20/2016 12:00:00 6/20/2016 12:00:00
AM AM
$41.50 MACIAS, GABRIEL 0.75 6/20/2016 12:00:00 6/20/2016 12:00:00
AM AM
Equipment
Equipment Description Equip ID Hours Start Date Finish Date Equip Equipment
Cost Unit Cost Rate Type
3 of 37 3/24/2017 12:17 PM
Print Preview - Cityworks http://cityworks/cwportal/WorkManagement/Printing/PrintPreview.asp...
$3.75 4693 - REFUSE 4693 0.75 6/20/2016 12:00:00 6/20/2016 12:00:00 $3.75 Hourly
PACKER 25YD AM AM
Material
Material Cost Description Material UID Mat Unit Units
Cost Required
Entities
Entity UID Entity Type
2482 OAKLANDSTREETS
Custom Fields
Custom Field Names Custom Field Value
(LEO) EVIDENCE COLLECTED?
(CREW) # OF APPLIANCES
(CREW) # OF TIRES
(CREW) # OF E-WASTE
(CREW) # OF MATTRESSES/BOXSPR
(CREW) CY CONSTRUCTION DEBRIS
(CREW) CY OF OTHER DEBRIS
CAUSE OF DAMAGE Normal Wear and Tear
(CREW) CY FURNITURE
(LEO) CASE #
(CREW) CY HOUSEHOLD WASTE
(LEO) SIGNATURE / DATE
4 of 37 3/24/2017 12:17 PM
Print Preview - Cityworks http://cityworks/cwportal/WorkManagement/Printing/PrintPreview.asp...
Description: Couch
By HUEY, BETTY: 9/16/2015 7:28:54 AM
CITIZEN IS REQUESTING THE REMOVAL OF A BROWN COUCH IN FRONT OF 1919
MARKET ST.
Caller:
Q: Are the dumped materials located on public or private property?
A: Public
Q: Are the dumped materials in the middle of the roadway BLOCKING through traffic in a
traffic lane?
A: NO
Q: What are the contents of the illegally dumped materials?
A: Furniture
Priority 3 - Medium
Supervisor MOORE SR., LELAND S
Cityworks Project Name
Initiated By DUNLAP, PETER O
Initiated Date 9/16/2015 9:43:50 AM
Actual Start Date 9/19/2015 5:44:08 PM
Actual Finish Date 9/19/2015 5:44:10 PM
Labor
Labor Cost Labor Name Hours Start Date Finish Date
$35.80 BROWN, LORENZO 0.75 9/19/2015 12:00:00 9/19/2015 12:00:00
AM AM
$35.80 GARCIA GUTIERREZ, HUGO R 0.75 9/19/2015 12:00:00 9/19/2015 12:00:00
AM AM
Equipment
Equipment Description Equip ID Hours Start Date Finish Date Equip Equipment
Cost Unit Cost Rate Type
5 of 37 3/24/2017 12:17 PM
Print Preview - Cityworks http://cityworks/cwportal/WorkManagement/Printing/PrintPreview.asp...
$35.25 4345 - REFUSE 4345 0.75 9/19/2015 12:00:00 9/19/2015 12:00:00 $35.25 Hourly
PACKER 25YD - AM AM
REARLOAD
Material
Material Cost Description Material UID Mat Unit Units
Cost Required
Entities
Entity UID Entity Type
2482 OAKLANDSTREETS
Custom Fields
Custom Field Names Custom Field Value
(LEO) EVIDENCE COLLECTED?
(CREW) # OF APPLIANCES
(CREW) # OF TIRES
(CREW) # OF E-WASTE
(CREW) # OF MATTRESSES/BOXSPR
(CREW) CY CONSTRUCTION DEBRIS
(CREW) CY OF OTHER DEBRIS
CAUSE OF DAMAGE Normal Wear and Tear
(CREW) CY FURNITURE
(LEO) CASE #
(CREW) CY HOUSEHOLD WASTE
(LEO) SIGNATURE / DATE
6 of 37 3/24/2017 12:17 PM
Print Preview - Cityworks http://cityworks/cwportal/WorkManagement/Printing/PrintPreview.asp...
Priority 3 - Medium
Supervisor VAN ECK, JEFFREY A
Cityworks Project Name
Initiated By VAN ECK, JEFFREY A
Initiated Date 2/1/2016 4:37:45 PM
Actual Start Date 2/2/2016 2:46:39 PM
Actual Finish Date 2/2/2016 2:46:42 PM
Labor
Labor Cost Labor Name Hours Start Date Finish Date
$0.00 COURT ASSIGNEES, 0.75 2/2/2016 12:00:00 AM 2/2/2016 12:00:00 AM
$41.50 CONTI, DAVID 0.75 2/2/2016 12:00:00 AM 2/2/2016 12:00:00 AM
$35.80 LEAL, ANDRES 0.75 2/2/2016 12:00:00 AM 2/2/2016 12:00:00 AM
Equipment
Equipment Description Equip ID Hours Start Date Finish Date Equip Equipment
Cost Unit Cost Rate Type
$39.75 4828 - PICKUP DUMP 4828 0.75 2/2/2016 12:00:00 2/2/2016 12:00:00 $39.75 Hourly
4X2 3/4T AM AM
$3.75 4693 - REFUSE 4693 0.75 2/2/2016 12:00:00 2/2/2016 12:00:00 $3.75 Hourly
PACKER 25YD AM AM
Material
Material Cost Description Material UID Mat Unit Units
Cost Required
Entities
Entity UID Entity Type
2482 OAKLANDSTREETS
Custom Fields
Custom Field Names Custom Field Value
(LEO) EVIDENCE COLLECTED?
7 of 37 3/24/2017 12:17 PM
Print Preview - Cityworks http://cityworks/cwportal/WorkManagement/Printing/PrintPreview.asp...
(CREW) # OF APPLIANCES
(CREW) # OF TIRES
(CREW) # OF E-WASTE
(CREW) # OF MATTRESSES/BOXSPR
(CREW) CY CONSTRUCTION DEBRIS
(CREW) CY OF OTHER DEBRIS
CAUSE OF DAMAGE Normal Wear and Tear
(CREW) CY FURNITURE
(LEO) CASE #
(CREW) CY HOUSEHOLD WASTE
(LEO) SIGNATURE / DATE
8 of 37 3/24/2017 12:17 PM
Print Preview - Cityworks http://cityworks/cwportal/WorkManagement/Printing/PrintPreview.asp...
Caller:
Q: Are the dumped materials located on public or private property?
A: Public
Q: Are the dumped materials in the middle of the roadway BLOCKING through traffic in a
traffic lane?
A: NO
Priority 3 - Medium
Supervisor MOORE SR., LELAND S
Cityworks Project Name
Initiated By ENGLISH, DEXTER
Initiated Date 5/23/2016 4:41:22 PM
Actual Start Date 5/31/2016 2:30:59 PM
Actual Finish Date 5/31/2016 2:31:05 PM
Labor
Labor Cost Labor Name Hours Start Date Finish Date
$54.02 BURCIAGA, POLICARPIO B 0.75 5/31/2016 12:00:00 5/31/2016 12:00:00
AM AM
$41.50 MACIAS, GABRIEL 0.75 5/31/2016 12:00:00 5/31/2016 12:00:00
AM AM
Equipment
Equipment Description Equip ID Hours Start Date Finish Date Equip Equipment
Cost Unit Cost Rate Type
$23.25 4317 - FLATBED DUMP 4317 0.75 5/31/2016 12:00:00 5/31/2016 12:00:00 $23.25 Hourly
W/LIFTGATE AM AM
Material
Material Cost Description Material UID Mat Unit Units
Cost Required
9 of 37 3/24/2017 12:17 PM
Print Preview - Cityworks http://cityworks/cwportal/WorkManagement/Printing/PrintPreview.asp...
Entities
Entity UID Entity Type
2482 OAKLANDSTREETS
Custom Fields
Custom Field Names Custom Field Value
(LEO) EVIDENCE COLLECTED?
(CREW) # OF APPLIANCES
(CREW) # OF TIRES
(CREW) # OF E-WASTE
(CREW) # OF MATTRESSES/BOXSPR
(CREW) CY CONSTRUCTION DEBRIS
(CREW) CY OF OTHER DEBRIS
CAUSE OF DAMAGE Normal Wear and Tear
(CREW) CY FURNITURE
(LEO) CASE #
(CREW) CY HOUSEHOLD WASTE
(LEO) SIGNATURE / DATE
10 of 37 3/24/2017 12:17 PM
Print Preview - Cityworks http://cityworks/cwportal/WorkManagement/Printing/PrintPreview.asp...
Priority 3 - Medium
Supervisor
Cityworks Project Name
Initiated By JONES JR., ROBERT L
Initiated Date 3/12/2013 11:51:20 AM
Actual Start Date 3/13/2013 3:52:16 PM
Actual Finish Date 3/13/2013 3:52:16 PM
Labor
Labor Cost Labor Name Hours Start Date Finish Date
$0.00 COURT ASSIGNEES, 0.75 3/13/2013 3:51:34 PM 3/13/2013 3:51:34 PM
$54.01 DUNLAP, PETER O 0.75 3/13/2013 3:51:34 PM 3/13/2013 3:51:34 PM
$54.01 JACKSON, JOHNNY R 0.75 3/13/2013 3:51:34 PM 3/13/2013 3:51:34 PM
$41.50 JONES, MICHAEL D 0.75 3/13/2013 3:51:34 PM 3/13/2013 3:51:34 PM
Equipment
Equipment Description Equip ID Hours Start Date Finish Date Equip Equipment
Cost Unit Cost Rate Type
$3.75 4693 - REFUSE 4693 0.75 3/13/2013 3:51:58 3/13/2013 3:51:58 $3.75 Hourly
PACKER 25YD PM PM
$3.75 4983 - REFUSE 4983 0.75 3/13/2013 3:51:58 3/13/2013 3:51:58 $3.75 Hourly
PACKER 25YD PM PM
Material
Material Cost Description Material UID Mat Unit Units
Cost Required
Entities
Entity UID Entity Type
2482 OAKLANDSTREETS
11 of 37 3/24/2017 12:17 PM
Print Preview - Cityworks http://cityworks/cwportal/WorkManagement/Printing/PrintPreview.asp...
Custom Fields
Custom Field Names Custom Field Value
(LEO) EVIDENCE COLLECTED?
(CREW) # OF APPLIANCES
(CREW) # OF TIRES
(CREW) # OF E-WASTE
(CREW) # OF MATTRESSES/BOXSPR
(CREW) CY CONSTRUCTION DEBRIS
(CREW) CY OF OTHER DEBRIS 2
CAUSE OF DAMAGE NormWT
(CREW) CY FURNITURE
(LEO) CASE #
(CREW) CY HOUSEHOLD WASTE
(LEO) SIGNATURE / DATE
12 of 37 3/24/2017 12:17 PM
Print Preview - Cityworks http://cityworks/cwportal/WorkManagement/Printing/PrintPreview.asp...
Caller:
Q: Are the dumped materials located on public or private property?
A: Public
Q: Are the dumped materials in the middle of the roadway BLOCKING through traffic in a
traffic lane?
A: NO
Priority 3 - Medium
Supervisor MOORE SR., LELAND S
Cityworks Project Name
Initiated By ENGLISH, DEXTER
Initiated Date 5/23/2016 4:41:30 PM
Actual Start Date 5/24/2016 3:51:50 PM
Actual Finish Date 5/24/2016 3:51:52 PM
Labor
Labor Cost Labor Name Hours Start Date Finish Date
$41.50 SMITH SR., OSCAR E 0.75 5/24/2016 12:00:00 5/24/2016 12:00:00
AM AM
Equipment
Equipment Description Equip ID Hours Start Date Finish Date Equip Equipment
Cost Unit Cost Rate Type
Material
Material Cost Description Material UID Mat Unit Units
Cost Required
Entities
13 of 37 3/24/2017 12:17 PM
Print Preview - Cityworks http://cityworks/cwportal/WorkManagement/Printing/PrintPreview.asp...
Custom Fields
Custom Field Names Custom Field Value
(LEO) EVIDENCE COLLECTED?
(CREW) # OF APPLIANCES
(CREW) # OF TIRES
(CREW) # OF E-WASTE
(CREW) # OF MATTRESSES/BOXSPR
(CREW) CY CONSTRUCTION DEBRIS
(CREW) CY OF OTHER DEBRIS
CAUSE OF DAMAGE Normal Wear and Tear
(CREW) CY FURNITURE
(LEO) CASE #
(CREW) CY HOUSEHOLD WASTE
(LEO) SIGNATURE / DATE
14 of 37 3/24/2017 12:17 PM
Print Preview - Cityworks http://cityworks/cwportal/WorkManagement/Printing/PrintPreview.asp...
Priority 3 - Medium
Supervisor VAN ECK, JEFFREY A
Cityworks Project Name
Initiated By VAN ECK, JEFFREY A
Initiated Date 2/1/2016 4:37:44 PM
Actual Start Date 2/2/2016 2:46:39 PM
Actual Finish Date 2/2/2016 2:46:42 PM
Labor
Labor Cost Labor Name Hours Start Date Finish Date
$0.00 COURT ASSIGNEES, 0.75 2/2/2016 12:00:00 AM 2/2/2016 12:00:00 AM
$41.50 CONTI, DAVID 0.75 2/2/2016 12:00:00 AM 2/2/2016 12:00:00 AM
$35.80 LEAL, ANDRES 0.75 2/2/2016 12:00:00 AM 2/2/2016 12:00:00 AM
Equipment
Equipment Description Equip ID Hours Start Date Finish Date Equip Equipment
Cost Unit Cost Rate Type
$39.75 4828 - PICKUP DUMP 4828 0.75 2/2/2016 12:00:00 2/2/2016 12:00:00 $39.75 Hourly
4X2 3/4T AM AM
$3.75 4693 - REFUSE 4693 0.75 2/2/2016 12:00:00 2/2/2016 12:00:00 $3.75 Hourly
PACKER 25YD AM AM
Material
Material Cost Description Material UID Mat Unit Units
Cost Required
Entities
Entity UID Entity Type
2482 OAKLANDSTREETS
Custom Fields
Custom Field Names Custom Field Value
(LEO) EVIDENCE COLLECTED?
15 of 37 3/24/2017 12:17 PM
Print Preview - Cityworks http://cityworks/cwportal/WorkManagement/Printing/PrintPreview.asp...
(CREW) # OF APPLIANCES
(CREW) # OF TIRES
(CREW) # OF E-WASTE
(CREW) # OF MATTRESSES/BOXSPR
(CREW) CY CONSTRUCTION DEBRIS
(CREW) CY OF OTHER DEBRIS
CAUSE OF DAMAGE Normal Wear and Tear
(CREW) CY FURNITURE
(LEO) CASE #
(CREW) CY HOUSEHOLD WASTE
(LEO) SIGNATURE / DATE
16 of 37 3/24/2017 12:17 PM
Print Preview - Cityworks http://cityworks/cwportal/WorkManagement/Printing/PrintPreview.asp...
Priority 3 - Medium
Supervisor
Cityworks Project Name
Initiated By FOSTER, FRANK D
Initiated Date 10/19/2011 3:46:15 PM
Actual Start Date 10/20/2011 11:52:00 AM
Actual Finish Date 10/20/2011 11:52:00 AM
Labor
Labor Cost Labor Name Hours Start Date Finish Date
$54.01 BURCIAGA, POLICARPIO B 0.75
$41.50 GELLA, GERMAN R 0.75
Equipment
Equipment Description Equip ID Hours Start Date Finish Date Equip Equipment
Cost Unit Cost Rate Type
$3.75 4693 - REFUSE 4693 0.75 $3.75 Hourly
PACKER 25YD
Material
Material Cost Description Material UID Mat Unit Units
Cost Required
Entities
Entity UID Entity Type
2482 OAKLANDSTREETS
Custom Fields
Custom Field Names Custom Field Value
(LEO) EVIDENCE COLLECTED?
17 of 37 3/24/2017 12:17 PM
Print Preview - Cityworks http://cityworks/cwportal/WorkManagement/Printing/PrintPreview.asp...
(CREW) # OF APPLIANCES
(CREW) # OF TIRES
(CREW) # OF E-WASTE
(CREW) # OF MATTRESSES/BOXSPR
(CREW) CY CONSTRUCTION DEBRIS
(CREW) CY OF OTHER DEBRIS 1
CAUSE OF DAMAGE NormWT
(CREW) CY FURNITURE
(LEO) CASE #
(CREW) CY HOUSEHOLD WASTE
(LEO) SIGNATURE / DATE
18 of 37 3/24/2017 12:17 PM
Print Preview - Cityworks http://cityworks/cwportal/WorkManagement/Printing/PrintPreview.asp...
Priority 3 - Medium
Supervisor MOORE SR., LELAND S
Cityworks Project Name
Initiated By OTTEN, RUSSELL D
Initiated Date 3/10/2015 9:10:20 AM
Actual Start Date 3/10/2015 1:07:22 PM
Actual Finish Date 3/10/2015 1:07:26 PM
Labor
Labor Cost Labor Name Hours Start Date Finish Date
$54.02 BURCIAGA, POLICARPIO B 0.75 3/10/2015 4:00:00 PM 3/10/2015 4:00:00 PM
$41.50 OTTEN, RUSSELL D 0.75 3/10/2015 4:00:00 PM 3/10/2015 4:00:00 PM
Equipment
Equipment Description Equip ID Hours Start Date Finish Date Equip Equipment
Cost Unit Cost Rate Type
$23.25 4317 - FLATBED DUMP 4317 0.75 3/10/2015 4:00:00 3/10/2015 4:00:00 $23.25 Hourly
W/LIFTGATE PM PM
19 of 37 3/24/2017 12:17 PM
Print Preview - Cityworks http://cityworks/cwportal/WorkManagement/Printing/PrintPreview.asp...
Material
Material Cost Description Material UID Mat Unit Units
Cost Required
Entities
Entity UID Entity Type
2482 OAKLANDSTREETS
Custom Fields
Custom Field Names Custom Field Value
(LEO) EVIDENCE COLLECTED?
(CREW) # OF APPLIANCES
(CREW) # OF TIRES
(CREW) # OF E-WASTE
(CREW) # OF MATTRESSES/BOXSPR
(CREW) CY CONSTRUCTION DEBRIS
(CREW) CY OF OTHER DEBRIS
CAUSE OF DAMAGE Normal Wear and Tear
(CREW) CY FURNITURE
(LEO) CASE #
(CREW) CY HOUSEHOLD WASTE
(LEO) SIGNATURE / DATE
20 of 37 3/24/2017 12:17 PM
Print Preview - Cityworks http://cityworks/cwportal/WorkManagement/Printing/PrintPreview.asp...
Priority 3 - Medium
Supervisor
Cityworks Project Name
Initiated By VAN ECK, JEFFREY A
Initiated Date 12/20/2011 12:30:34 PM
Actual Start Date 12/21/2011 12:29:25 PM
Actual Finish Date 12/21/2011 12:29:25 PM
Labor
Labor Cost Labor Name Hours Start Date Finish Date
$54.01 BURCIAGA, POLICARPIO B 0.75
$41.50 GELLA, GERMAN R 0.75
Equipment
Equipment Description Equip ID Hours Start Date Finish Date Equip Equipment
Cost Unit Cost Rate Type
$3.75 4693 - REFUSE 4693 0.75 $3.75 Hourly
PACKER 25YD
Material
Material Cost Description Material UID Mat Unit Units
Cost Required
Entities
Entity UID Entity Type
2482 OAKLANDSTREETS
21 of 37 3/24/2017 12:17 PM
Print Preview - Cityworks http://cityworks/cwportal/WorkManagement/Printing/PrintPreview.asp...
Custom Fields
Custom Field Names Custom Field Value
(LEO) EVIDENCE COLLECTED?
(CREW) # OF APPLIANCES
(CREW) # OF TIRES
(CREW) # OF E-WASTE
(CREW) # OF MATTRESSES/BOXSPR
(CREW) CY CONSTRUCTION DEBRIS
(CREW) CY OF OTHER DEBRIS 1
CAUSE OF DAMAGE NormWT
(CREW) CY FURNITURE
(LEO) CASE #
(CREW) CY HOUSEHOLD WASTE
(LEO) SIGNATURE / DATE
22 of 37 3/24/2017 12:17 PM
Print Preview - Cityworks http://cityworks/cwportal/WorkManagement/Printing/PrintPreview.asp...
Description:
By CRIDDLE, DEON: 5/14/2016 10:52:58 AM
CITIZEN IS REPORTING FRAMED FURNITURE, ON THE SIDEWALK, LOCATED AT 1919
MARKET STREET.
Caller:
Q: Are the dumped materials located on public or private property?
A: Public
Q: Are the dumped materials in the middle of the roadway BLOCKING through traffic in a
traffic lane?
A: NO
Q: What are the contents of the illegally dumped materials?
A: Misc Debris
Priority 3 - Medium
Supervisor MOORE SR., LELAND S
Cityworks Project Name
Initiated By MOORE SR., LELAND S
Initiated Date 5/14/2016 2:03:28 PM
Actual Start Date 5/15/2016 2:48:56 PM
Actual Finish Date 5/15/2016 2:48:58 PM
Labor
Labor Cost Labor Name Hours Start Date Finish Date
$41.50 GRIFFIN, DANIEL A 0.75 5/15/2016 12:00:00 5/15/2016 12:00:00
AM AM
Equipment
Equipment Description Equip ID Hours Start Date Finish Date Equip Equipment
Cost Unit Cost Rate Type
$3.75 4582 - ISUZU NPR 4582 0.75 5/15/2016 12:00:00 5/15/2016 12:00:00 $3.75 Hourly
W/6YD DIAMONDBACK AM AM
MINI PACKER
Material
Material Cost Description Material UID Mat Unit Units
23 of 37 3/24/2017 12:17 PM
Print Preview - Cityworks http://cityworks/cwportal/WorkManagement/Printing/PrintPreview.asp...
Cost Required
Entities
Entity UID Entity Type
13167 OAKLANDSTREETS
Custom Fields
Custom Field Names Custom Field Value
(LEO) EVIDENCE COLLECTED?
(CREW) # OF APPLIANCES
(CREW) # OF TIRES
(CREW) # OF E-WASTE
(CREW) # OF MATTRESSES/BOXSPR
(CREW) CY CONSTRUCTION DEBRIS
(CREW) CY OF OTHER DEBRIS
CAUSE OF DAMAGE Normal Wear and Tear
(CREW) CY FURNITURE
(LEO) CASE #
(CREW) CY HOUSEHOLD WASTE
(LEO) SIGNATURE / DATE
24 of 37 3/24/2017 12:17 PM
Print Preview - Cityworks http://cityworks/cwportal/WorkManagement/Printing/PrintPreview.asp...
Priority 3 - Medium
Supervisor
Cityworks Project Name
Initiated By VAN ECK, JEFFREY A
Initiated Date 9/27/2011 1:20:16 PM
Actual Start Date 9/28/2011 3:19:49 PM
Actual Finish Date 9/28/2011 3:19:49 PM
Labor
Labor Cost Labor Name Hours Start Date Finish Date
$54.01 BURCIAGA, POLICARPIO B 0.75
$41.50 GELLA, GERMAN R 0.75
Equipment
Equipment Description Equip ID Hours Start Date Finish Date Equip Equipment
Cost Unit Cost Rate Type
$3.75 4693 - REFUSE 4693 0.75 $3.75 Hourly
PACKER 25YD
Material
Material Cost Description Material UID Mat Unit Units
Cost Required
Entities
Entity UID Entity Type
2482 OAKLANDSTREETS
25 of 37 3/24/2017 12:17 PM
Print Preview - Cityworks http://cityworks/cwportal/WorkManagement/Printing/PrintPreview.asp...
Custom Fields
Custom Field Names Custom Field Value
(LEO) EVIDENCE COLLECTED?
(CREW) # OF APPLIANCES
(CREW) # OF TIRES
(CREW) # OF E-WASTE
(CREW) # OF MATTRESSES/BOXSPR
(CREW) CY CONSTRUCTION DEBRIS
(CREW) CY OF OTHER DEBRIS 1
CAUSE OF DAMAGE NormWT
(CREW) CY FURNITURE
(LEO) CASE #
(CREW) CY HOUSEHOLD WASTE
(LEO) SIGNATURE / DATE
26 of 37 3/24/2017 12:17 PM
Print Preview - Cityworks http://cityworks/cwportal/WorkManagement/Printing/PrintPreview.asp...
Description: Couch
By HUEY, BETTY: 11/18/2015 9:12:30 AM
CITIZEN REQUESTING REMOVAL OF A COUCH ON THE SIDEWALK AT 1919 MARKET
ST
Priority 3 - Medium
Supervisor MOORE SR., LELAND S
Cityworks Project Name
Initiated By GELLA, GERMAN R
Initiated Date 11/18/2015 10:48:26 AM
Actual Start Date 11/19/2015 2:08:47 PM
Actual Finish Date 11/19/2015 2:08:49 PM
Labor
Labor Cost Labor Name Hours Start Date Finish Date
$41.50 ALMGALEH, BASSAM 0.75 11/19/2015 12:00:00 11/19/2015 12:00:00
AM AM
$54.02 BURCIAGA, POLICARPIO B 0.75 11/19/2015 12:00:00 11/19/2015 12:00:00
AM AM
$35.80 GARCIA GUTIERREZ, HUGO R 0.75 11/19/2015 12:00:00 11/19/2015 12:00:00
AM AM
Equipment
Equipment Description Equip ID Hours Start Date Finish Date Equip Equipment
Cost Unit Cost Rate Type
$3.75 4693 - REFUSE 4693 0.75 11/19/2015 12:00:00 11/19/2015 12:00:00 $3.75 Hourly
PACKER 25YD AM AM
$39.75 4803 - PICKUP DUMP 4803 0.75 11/19/2015 12:00:00 11/19/2015 12:00:00 $39.75 Hourly
4X2 3/4T AM AM
Material
Material Cost Description Material UID Mat Unit Units
Cost Required
27 of 37 3/24/2017 12:17 PM
Print Preview - Cityworks http://cityworks/cwportal/WorkManagement/Printing/PrintPreview.asp...
Entities
Entity UID Entity Type
5998 OAKLANDSTREETS
Custom Fields
Custom Field Names Custom Field Value
(LEO) EVIDENCE COLLECTED?
(CREW) # OF APPLIANCES
(CREW) # OF TIRES
(CREW) # OF E-WASTE
(CREW) # OF MATTRESSES/BOXSPR
(CREW) CY CONSTRUCTION DEBRIS
(CREW) CY OF OTHER DEBRIS
CAUSE OF DAMAGE Normal Wear and Tear
(CREW) CY FURNITURE
(LEO) CASE #
(CREW) CY HOUSEHOLD WASTE
(LEO) SIGNATURE / DATE
28 of 37 3/24/2017 12:17 PM
Print Preview - Cityworks http://cityworks/cwportal/WorkManagement/Printing/PrintPreview.asp...
Priority 3 - Medium
Supervisor MOORE SR., LELAND S
Cityworks Project Name
Initiated By KWANTE, DAMON D
Initiated Date 3/24/2016 2:09:51 PM
Actual Start Date 3/26/2016 3:37:14 PM
Actual Finish Date 3/26/2016 3:37:16 PM
Labor
Labor Cost Labor Name Hours Start Date Finish Date
$41.50 CONTI, DAVID 0.75 3/26/2016 12:00:00 3/26/2016 12:00:00
AM AM
Equipment
Equipment Description Equip ID Hours Start Date Finish Date Equip Equipment
Cost Unit Cost Rate Type
$3.75 4583 - ISUZU NPR 4583 0.75 3/26/2016 12:00:00 3/26/2016 12:00:00 $3.75 Hourly
W/6YD DIAMONDBACK AM AM
MINI PACKER
Material
Material Cost Description Material UID Mat Unit Units
Cost Required
Entities
Entity UID Entity Type
9010 OAKLANDSTREETS
Custom Fields
Custom Field Names Custom Field Value
(LEO) EVIDENCE COLLECTED?
29 of 37 3/24/2017 12:17 PM
Print Preview - Cityworks http://cityworks/cwportal/WorkManagement/Printing/PrintPreview.asp...
(CREW) # OF APPLIANCES
(CREW) # OF TIRES
(CREW) # OF E-WASTE
(CREW) # OF MATTRESSES/BOXSPR
(CREW) CY CONSTRUCTION DEBRIS
(CREW) CY OF OTHER DEBRIS
CAUSE OF DAMAGE Normal Wear and Tear
(CREW) CY FURNITURE
(LEO) CASE #
(CREW) CY HOUSEHOLD WASTE
(LEO) SIGNATURE / DATE
30 of 37 3/24/2017 12:17 PM
Print Preview - Cityworks http://cityworks/cwportal/WorkManagement/Printing/PrintPreview.asp...
Description: Couch
By HUEY, BETTY: 9/16/2015 7:28:54 AM
CITIZEN IS REQUESTING THE REMOVAL OF A BROWN COUCH IN FRONT OF 1919
MARKET ST.
Caller: ,
Q: Are the dumped materials located on public or private property?
A: Public
Q: Are the dumped materials in the middle of the roadway BLOCKING through traffic in a
traffic lane?
A: NO
Q: What are the contents of the illegally dumped materials?
A: Furniture
Priority 3 - Medium
Supervisor MOORE SR., LELAND S
Cityworks Project Name
Initiated By DUNLAP, PETER O
Initiated Date 9/16/2015 9:43:50 AM
Actual Start Date
Actual Finish Date
Labor
Labor Cost Labor Name Hours Start Date Finish Date
Equipment
Equipment Description Equip ID Hours Start Date Finish Date Equip Equipment
Cost Unit Cost Rate Type
Material
Material Cost Description Material UID Mat Unit Units
Cost Required
Entities
Entity UID Entity Type
31 of 37 3/24/2017 12:17 PM
Print Preview - Cityworks http://cityworks/cwportal/WorkManagement/Printing/PrintPreview.asp...
0 MAJOR ROADS
Custom Fields
Custom Field Names Custom Field Value
(LEO) EVIDENCE COLLECTED?
(CREW) # OF APPLIANCES
(CREW) # OF TIRES
(CREW) # OF E-WASTE
(CREW) # OF MATTRESSES/BOXSPR
(CREW) CY CONSTRUCTION DEBRIS
(CREW) CY OF OTHER DEBRIS
CAUSE OF DAMAGE Normal Wear and Tear
(CREW) CY FURNITURE
(LEO) CASE #
(CREW) CY HOUSEHOLD WASTE
(LEO) SIGNATURE / DATE
32 of 37 3/24/2017 12:17 PM
Print Preview - Cityworks http://cityworks/cwportal/WorkManagement/Printing/PrintPreview.asp...
Priority 3 - Medium
Supervisor MOORE SR., LELAND S
Cityworks Project Name
Initiated By OTTEN, RUSSELL D
Initiated Date 3/10/2015 9:09:41 AM
Actual Start Date 3/11/2015 9:48:00 AM
Actual Finish Date 3/11/2015 9:48:03 AM
Labor
Labor Cost Labor Name Hours Start Date Finish Date
$41.50 SATTERFIELD, IVAN 0.75 3/11/2015 12:00:00 3/11/2015 12:00:00
AM AM
$35.80 JONES, MICHAEL D 0.75 3/11/2015 12:00:00 3/11/2015 12:00:00
AM AM
$54.02 WALKER, ALONZO 0.75 3/11/2015 12:00:00 3/11/2015 12:00:00
AM AM
33 of 37 3/24/2017 12:17 PM
Print Preview - Cityworks http://cityworks/cwportal/WorkManagement/Printing/PrintPreview.asp...
Equipment
Equipment Description Equip ID Hours Start Date Finish Date Equip Equipment
Cost Unit Cost Rate Type
$3.75 4983 - REFUSE 4983 0.75 3/11/2015 12:00:00 3/11/2015 12:00:00 $3.75 Hourly
PACKER 25YD AM AM
$39.75 4817 - DUMP TRUCK 4817 0.75 3/11/2015 12:00:00 3/11/2015 12:00:00 $39.75 Hourly
W/CAB AM AM
Material
Material Cost Description Material UID Mat Unit Units
Cost Required
Entities
Entity UID Entity Type
2482 OAKLANDSTREETS
Custom Fields
Custom Field Names Custom Field Value
(LEO) EVIDENCE COLLECTED?
(CREW) # OF APPLIANCES
(CREW) # OF TIRES
(CREW) # OF E-WASTE
(CREW) # OF MATTRESSES/BOXSPR
(CREW) CY CONSTRUCTION DEBRIS
(CREW) CY OF OTHER DEBRIS
CAUSE OF DAMAGE Normal Wear and Tear
(CREW) CY FURNITURE
(LEO) CASE #
(CREW) CY HOUSEHOLD WASTE
(LEO) SIGNATURE / DATE
34 of 37 3/24/2017 12:17 PM
Print Preview - Cityworks http://cityworks/cwportal/WorkManagement/Printing/PrintPreview.asp...
Priority 3 - Medium
Supervisor HAYES, GIL
Cityworks Project Name
Initiated By SINGH, RATNESH
Initiated Date 6/12/2015 1:08:49 PM
Actual Start Date 5/12/2015 2:40:00 PM
Actual Finish Date 5/12/2015 2:50:00 PM
Labor
Labor Cost Labor Name Hours Start Date Finish Date
$11.60 SINGH, RATNESH 0.17 5/12/2015 2:40:00 PM 5/12/2015 2:50:00 PM
$1.60 INTERN, SURVEY 0.08 6/12/2015 1:08:00 PM 6/12/2015 1:13:00 PM
Equipment
Equipment Description Equip ID Hours Start Date Finish Date Equip Equipment
Cost Unit Cost Rate Type
Material
Material Cost Description Material UID Mat Unit Units
Cost Required
Entities
Entity UID Entity Type
2482 OAKLANDSTREETS
Custom Fields
Custom Field Names Custom Field Value
CIP PROJECT NUMBER
PERFORMED BY CONTRACTOR
35 of 37 3/24/2017 12:17 PM
Print Preview - Cityworks http://cityworks/cwportal/WorkManagement/Printing/PrintPreview.asp...
Priority 2 - High
Supervisor
Cityworks Project Name
Initiated By NOWACKI, ANDREW
Initiated Date 10/24/2014 10:50:27 AM
Actual Start Date 10/20/2014 10:00:00 AM
Actual Finish Date 10/20/2014 11:00:00 AM
Labor
Labor Cost Labor Name Hours Start Date Finish Date
$137.83 NOWACKI, ANDREW 1.00 10/20/2014 10:00:00 10/20/2014 11:00:00
AM AM
Equipment
Equipment Description Equip ID Hours Start Date Finish Date Equip Equipment
Cost Unit Cost Rate Type
36 of 37 3/24/2017 12:17 PM
Print Preview - Cityworks http://cityworks/cwportal/WorkManagement/Printing/PrintPreview.asp...
$9.75 3698 - SEDAN 4DR 3698 1.00 10/20/2014 10:00:00 10/20/2014 11:00:06 $9.75 Hourly
WAGON AM AM
Material
Material Cost Description Material UID Mat Unit Units
Cost Required
Entities
Entity UID Entity Type
0 STRUCTURES
Custom Fields
Custom Field Names Custom Field Value
37 of 37 3/24/2017 12:17 PM